airline management system

16
UNIVERSITY OF Hertfordshire MASTER OF BUSINESS ADMINISTRATION COURSE CODE: XXXXXX TITLE OF ASSIGNMENT Management Accounting: A case of Hertfordshire Airways PLC Author's initials and surname  J. Law Students Registration Number XXXXXXXX Month and year of submission  JANUARY 2009 Page 1

Upload: nnigeltaylor

Post on 14-Apr-2018

231 views

Category:

Documents


1 download

TRANSCRIPT

7/29/2019 AIRLINE MANAGEMENT SYSTEM

http://slidepdf.com/reader/full/airline-management-system 1/16

UNIVERSITY OF Hertfordshire

MASTER OF BUSINESS ADMINISTRATION

COURSE CODE: XXXXXX

TITLE OF ASSIGNMENT

Management Accounting: A case of Hertfordshire Airways PLC

Author's initials and surname

 J. Law

Students Registration Number

XXXXXXXX

Month and year of submission JANUARY 2009

Page1

7/29/2019 AIRLINE MANAGEMENT SYSTEM

http://slidepdf.com/reader/full/airline-management-system 2/16

Table of Contents

1. Executive Summary.............................................................................32. Strategic Decision Independent of Forecasting Team..........................4

2.1 Strategic Decision 1: New Fuel Efficient Aircraft (Type A)...............42.1.1 Cost Considerations for Aircraft Type A....................................42.1.2 Revenue Considerations...........................................................52.1.3 Profit Consideration..................................................................52.1.4 Analysis.....................................................................................6

2.2 Strategic Decision 2: Improved Design of Current Model................62.2.1 Cost Considerations for Aircraft Model Improvement...............72.2.2 Revenue Considerations: Optimistic Scenario..........................72.2.3 Profit Consideration: Optimistic Scenario..................................82.2.4 Analysis.....................................................................................8

2.3 Strategic Decision 3: Previous Aircraft Model.................................9

2.3.1 Cost Considerations for Aircraft Model Improvement...............92.3.2 Revenue Considerations: Optimistic Scenario........................102.3.3 Profit Consideration: Optimistic Scenario................................102.3.4 Analysis...................................................................................11

3. Strategic Decision based on Predictions of Forecasting Team...........12...............................................................................................................12

3.1 Analysis.........................................................................................123.2 Final Recommendations................................................................13

4. Assumptions & Methodology: Traditional Cost System......................134.1 Critique: Traditional Based Cost System.......................................134.2 Alternative: Activity Based Costing Approaches...........................134.3 ABC: Overcoming Limitations & Improving Decision Making........14

4.3.1 Price Allocation.......................................................................144.3.2 Revenue Generation vs Resource Consumption.....................144.3.3 Different Views........................................................................14

5. Strategy Option: Short Haul Flights....................................................156. Bibliography & Reference...................................................................15

 

Page2

7/29/2019 AIRLINE MANAGEMENT SYSTEM

http://slidepdf.com/reader/full/airline-management-system 3/16

Assignment Overview

1. Executive Summary

Hertfordshire Airways is currently in the process of repositioning itself asmarket leader after long years of market domination, but with an ageingfleet and dip in profits, Hertfordshire Airways seeks recommendations onthe best strategy to implement amongst three options as it responds witha commitment to long haul routes which requires renewal of its fleet of aircrafts. In this report, utilizing the traditional cost methodology whichinvolves identifying and calculating the key cost drivers such as variablecost, fixed cost and projected profitability, I have outlined for topmanagement the viability of three different strategies and a finalrecommendation on the best option based on sample evidence as thecompany pursues its drive to renew its fleet for long haul flights.

For the first strategy which is the purchase of 35 new fuel-efficientaircrafts of type (A), which is a radically new aircraft model, with aprojection of no delivery delays and a realistic scenario, the companywould incur a total cost of £837,600,000, a total revenue of £1,940,400,000 and a projected profitability of £1,102,800,000.

For the second strategy which is embarking on the purchase of 15 newaircrafts of type (A) and 25 new aircrafts of type (B) which are bothimproved designs of the current model, the company would incur a total

cost of £362,400,000, a total revenue of £831,600,000 and a projectedprofitability of £469,200,000 for the 15 new aircrafts of type (A). Inaddition, the company would incur a total cost of £298,000,000, a totalrevenue of £588,000,000 and a projected profitability of £290,000,000 if itpurchases 25 new aircrafts of type (B).

With regards the final strategy, if the company embarks on purchasing 25aircrafts of type (B) and 25 new aircrafts of type (C), which are previousdesigns of the current model, it would incur a total cost of £298,000,000,a total revenue of £588,000,000 and a projected profitability of £290,000,000 for aircrafts type (B) and incur a total cost of £156,625,000,

a total revenue of £306,250,000 and a projected profitability of £149,625,000 for aircrafts type (C).

Based on the sample evidence, I would therefore recommend the thirdstrategy because based on delivery delays of 3 years for aircraft type (A)and 18 months for aircraft type (B), the company would run at a loss of -£18,000,000 fixed cost for the first 3 years if it decides to go ahead withthe first strategy and would only break even in year 3, while the companywould run at a loss of -£8,000,000 fixed cost for the first two years if itdecides to go ahead with the second strategy and would only break evenat the end of year 2. But with the third strategy, there are no deliverydelays and the company would be better positioned to overcome thedisruptions, risks, teething issues which are synonymous with the

Page3

7/29/2019 AIRLINE MANAGEMENT SYSTEM

http://slidepdf.com/reader/full/airline-management-system 4/16

introduction of major new models of aircraft. In addition, based on the factthat a ten year profitability projection is desired starting from 2007,profitability of £290,000,000 for aircraft type (B) and £149,625,000 foraircrafts type (C) is most viable considering the other options.

2. Strategic Decision Independent of Forecasting Team

2.1 Strategic Decision 1: New Fuel Efficient Aircraft (Type A)

Number of aircrafts = 35

Aircraft capacity for Type A = 550

 Total Capacity = 550 * 35 = 19250

Average number of flights per routes for Type A = 90

 Total Number of flights / routes for Type A = 90 * 4 = 360

Average ticket price of Type A = £280

Cost per flight for Type (A) - £280 * 19250 = 5,390,000

AFC of Type A = 6,000,000

AVC per passenger for Type A = £120 * 19250 = 2,310,000

2.1.1 Cost Considerations for Aircraft Type A

Routes: Cost of Tickets / Flights

 Total Variable Cost = Variable cost multiplied by the quantity (VCq)

 

Aircraf 

t Type

TotalAircraft

Capacity

AVCper

Flight

Total Noof Flights /

Routes

Variable Cost for

Routes 

A 192502,310,000 360

2,310,000 * 360 =831,600,000

  B 0 0 0 0

 Total Variable Cost for Aircraft Type A = £831,600,000

Fixed Cost

 

AircraftType

TotalAircraftCapacity

FixedCost

 

Page4

7/29/2019 AIRLINE MANAGEMENT SYSTEM

http://slidepdf.com/reader/full/airline-management-system 5/16

  A 19250 6,000,000

 

Fixed Cost for Aircraft Type A = £6,000,000

 Total Cost for Aircraft Type A = (Fixed Cost) + (Total Variable Cost)

 TC=FC + VCq

 Total Cost = £6,000,000 + £831,600,000

 Total Cost = £837,600,000

 

 Total cost

£6,000,000 +

£831,600,000 =

£837,600,0

00 

2.1.2 Revenue Considerations

 Total Revenue = (Selling Price / Unit) Multiplied by (Quantity Sold)

 TR=pq

 Total Revenue = 5,390,000 * 360

 Total Revenue = £1,940,400,000

 

AircraftType

TotalAircraftCapacity

AveragePrice /Passenger 

TotalTicketCost /Flight

Total Noof Flights /Routes

Total Cost of Tickets /Routes

 

A 19250 £280 5,390,000 360

5,390,000 * 360 =

1,940,400,000

 

2.1.3 Profit Consideration

Profit = Total Revenue – Total Cost

Profit = £1,940,400,000 - £837,600,000

 

 Total cost£6,000,000 +£831,600,000 =

£837,600,000

 

 Total 5,390,000 * 360 = £1,940,400,0

Page5

7/29/2019 AIRLINE MANAGEMENT SYSTEM

http://slidepdf.com/reader/full/airline-management-system 6/16

revenue 00

 

Pre-taxprofit  

£1,102,800,000

2.1.4 Analysis

From the calculated analysis, with a projection of no delivery delays and arealistic scenario, it can be observed that if the company decided to buy35 new fuel-efficient aircraft of type (A), which is a radically new aircraftmodel, it would incur a total cost of £837,600,000, a total revenue of £1,940,400,000 and a projected profitability of £1,102,800,000.

2.2 Strategic Decision 2: Improved Design of Current Model

15 of aircraft A = 15A

25 of aircraft B = 25B

 Type C = 0

Aircraft Type A

Aircraft capacity for Type A = 550

Average number of flights per routes for Type A = 90

 Total Capacity = 550 * 15 = 8250

 Total Number of flights / routes for Type A = 90 * 4 = 360

Average ticket price of Type A = £280

Cost per flight for Type (A) - £280 * 8250 = 2,310,000

AFC of Type A = 6,000,000

AVC per passenger for Type A = £120 * 8250 = 990,000

Aircraft Type B

Aircraft capacity for Type B = 420

Average number of flights per routes for Type B = 140

 Total Capacity = 420 * 25 = 10500

 Total Number of flights / routes for Type B = 140 * 2 = 280

Page6

7/29/2019 AIRLINE MANAGEMENT SYSTEM

http://slidepdf.com/reader/full/airline-management-system 7/16

Average ticket price of Type B = £200

Cost per flight for Type (B) - £200 * 10500 = 2,100,000

AFC of Type B = 4,000,000

AVC per passenger for Type B = £100 * 10500 = 1,050,000

2.2.1 Cost Considerations for Aircraft Model Improvement

Routes: Cost of Tickets / Flights

 Total Variable Cost = Variable cost multiplied by the quantity (VCq)

 AircraftType

Total

AircraftCapacity

AVC per Flight

Total No

of Flights /Routes Variable Cost for Routes

 

A 550 990,000 360

990,000 * 560 =

356,400,000

  B 420 1,050,000 280

1,050,000 * 280 =

294,000,000

 Total Variable Cost for Aircraft Type A = £356,400,000

 Total Variable Cost for Aircraft Type B = £294,000,000

Fixed Cost

 

AircraftType

TotalAircraftCapacity

FixedCost

 

A 8250 6,000,000

  B 10500 4,000,000

 Total Cost = (Fixed Cost) + (Total Variable Cost)

 TC=FC + VCq

 

 Total Cost Type A£6,000,000 +£356,400,000

£362,400,000

  Total Cost Type B£4,000,000 +£294,000,000

£298,000,000

2.2.2 Revenue Considerations: Optimistic Scenario

 Total Revenue = (Selling Price / Unit) Multiplied by (Quantity Sold)

Page7

7/29/2019 AIRLINE MANAGEMENT SYSTEM

http://slidepdf.com/reader/full/airline-management-system 8/16

 TR=pq

 

AircraftType

TotalAircraftCapacity

AveragePrice /Passenger 

TotalTicketCost /Flight

Total Noof Flights /Routes

Total Cost of Tickets /Routes

 

A 550 £280 2,310,000 360

2,310,000 * 360 =

831,600,000

  B 420 £200 2,100,000 280

2,100,000 * 280 =

588,000,000

2.2.3 Profit Consideration: Optimistic Scenario

Profit = Total Revenue – Total Cost

Profit = £47,040,000 - £27,520,000

 

 Total Cost TypeA £6,000,000 + £356,400,000 =

£362,400,000

  Total Cost TypeB £4,000,000 + £294,000,000 =

£298,000,000

 

 Total Revenue

 Type A 2,310,000 * 360 =

£831,600,00

0 Total Revenue Type B 2,100,000 * 280 =

£588,000,000

 

Pre-tax profit(Type A)  £831,600,000 - £362,400,000 =

£469,200,000

 

Pre-tax profit(Type B)  £588,000,000 - £298,000,000 =

£290,000,000

2.2.4 Analysis

From the calculated analysis, if the company embarks on purchasing 15new aircraft of type (A) which is an improved design of the current model,it would incur a total cost of £362,400,000, a total revenue of £831,600,000 and a projected profitability of £469,200,000. In addition, if the company embarks on purchasing 25 new aircraft of type (B) which isan improved design of the current model, it would incur a total cost of £298,000,000, a total revenue of £588,000,000 and a projectedprofitability of £290,000,000.

Page8

7/29/2019 AIRLINE MANAGEMENT SYSTEM

http://slidepdf.com/reader/full/airline-management-system 9/16

2.3 Strategic Decision 3: Previous Aircraft Model

25 of aircraft B = 25B

25 of aircraft C = 25C

Aircraft Type B

Aircraft capacity for Type B = 420

Average number of flights per routes for Type B = 140

 Total Capacity - 420 * 25 = 10500

 Total Number of flights / routes for Type B = 140 * 2 = 280

Average ticket price of Type B = £200

Cost per flight for Type (B) - £200 * 10500 = 2,100,000

AFC of Type A = 4,000,000

AVC per passenger for Type B = £100 * 10500 = 1,050,000

Aircraft Type C

Aircraft capacity for Type C = 350

Average number of flights per routes for Type C = 250

 Total Capacity - 350 * 25 = 8750

 Total Number of flights / routes for Type C = 250 * 1 = 250

Average ticket price of Type C = £140

Cost per flight for Type (A) - £140 * 8750 = 1,225,000

AFC of Type A = 3,500,000

AVC per passenger for Type A = £70 * 8750 = 612,500

2.3.1 Cost Considerations for Aircraft Model Improvement

Routes: Cost of Tickets / Flights

 Total Variable Cost = Variable cost multiplied by the quantity (VCq)

  Aircraft Total AVC per Total No Variable Cost for Routes

Page9

7/29/2019 AIRLINE MANAGEMENT SYSTEM

http://slidepdf.com/reader/full/airline-management-system 10/16

TypeAircraftCapacity Flight

of Flights /Routes

 

B 420 1,050,000 280

1,050,000 * 280 =

294,000,000

  C 350 612,500 250

612,500 * 250 =

153,125,000

 Total Variable Cost for Aircraft Type B = £294,000,000

 Total Variable Cost for Aircraft Type C = £153,125,000

Fixed Cost

 

AircraftType

TotalAircraftCapacity

FixedCost

 B 10500 4,000,000

  C 8750 3,500,000

 Total Cost = (Fixed Cost) + (Total Variable Cost)

 TC=FC + VCq

 

 Total Cost Type B

£4,000,000 +

£294,000,000

£298,000,0

00

  Total Cost Type C£3,500,000 +£153,125,000

£156,625,000

2.3.2 Revenue Considerations: Optimistic Scenario

 Total Revenue = (Selling Price / Unit) Multiplied by (Quantity Sold)

 TR=pq

 

AircraftType

TotalAircraftCapacity

AveragePrice /Passenger 

TotalTicketCost /Flight

Total Noof Flights /Routes

Total Cost of Tickets /Routes

 

B 420 £200 2,100,000 280

2,100,000 * 280 =

588,000,000

  C 350 £140 1,225,000 1000

1,225,000 * 250 =

306,250,000

2.3.3 Profit Consideration: Optimistic Scenario

Profit = Total Revenue – Total Cost

Page10

7/29/2019 AIRLINE MANAGEMENT SYSTEM

http://slidepdf.com/reader/full/airline-management-system 11/16

 

 Total Cost Type B £4,000,000 + £294,000,000 = £298,000,000  Total Cost

 Type C £3,500,000 + £153,125,000 = £156,625,000

 

 Total Revenue Type B 2,100,000 * 280 = £588,000,000 Total Revenue Type C 1,225,000 * 250 = £306,250,000

 

Pre-tax profit(Type B)  £588,000,000 - £298,000,000 = £290,000,000

 

Pre-tax profit(Type C)  £306,250,000 - £156,625,000 = £149,625,000

2.3.4 Analysis

From the calculated analysis, if the company embarks on purchasing 25aircrafts of type (B) which is a previous design of the current model, itwould incur a total cost of £298,000,000, a total revenue of £588,000,000and a projected profitability of £290,000,000. In addition, if the companyembarks on purchasing 25 new aircraft of type (C) which is a previousdesign of the current model, it would incur a total cost of £156,625,000, a

total revenue of £306,250,000 and a projected profitability of £149,625,000.

Page11

7/29/2019 AIRLINE MANAGEMENT SYSTEM

http://slidepdf.com/reader/full/airline-management-system 12/16

3. Strategic Decision based on Predictions of ForecastingTeam

Figure 1 Profitability projections of type (A) aircraft based on 3 year delay

Figure 2 Profitability projections of type (B) aircraft based on 18 monthdelay

3.1 Analysis

Page12

7/29/2019 AIRLINE MANAGEMENT SYSTEM

http://slidepdf.com/reader/full/airline-management-system 13/16

Based on delivery delays of 3 years for aircraft type (A) and 18 months foraircraft type (B) as shown in figure 1 and 2 above, the company would runat a loss of -£18,000,000 fixed cost for the first 3 years if it decides to go ahead withthe first strategy and would only break even in year 3, while the company

would run at a loss of -£8,000,000 fixed cost for the first two years if itdecides to go ahead with the second strategy and would only break evenat the end of year 2.

3.2 Final Recommendations

Based on the sample evidence, I would therefore recommend the thirdstrategy, as with the third strategy, there are no delivery delays and thecompany would be better positioned overcome the disruptions, risks,teething issues which are synonymous with the introduction major new

models of aircraft. In addition, based on the fact that a ten yearprofitability projection is desired starting from 2007, profitability of £290,000,000 for aircraft type (B) and £149,625,000 for aircrafts type (C)is most suitable.

4. Assumptions & Methodology: Traditional Cost System

4.1 Critique: Traditional Based Cost System

 The traditional cost systems assign costs directly to the products orservices, so there is no information about the activities. The traditionalcosting system utilizes different cost structures, (e.g. fixed cost) todistribute the indirect costs to all products and services. This method of allocating indirect costs commonly results in erroneous cost data. Oftenproducts which have high volume (and high labour cost) are over costed,and likewise, the cost of lower volume products are often understated,and many of the indirect costs of these products are overlooked.Consequently, traditional cost systems can actually hide problems and failto identify improvement opportunities.

4.2 Alternative: Activity Based Costing Approaches

In contrast, ABC provides more accurate cost information by assigningcosts to the activities that generate the costs, and then assigning thecosts from the activities to the products or services, this is unlike thetraditional-based costing where all overhead costs including unused, oridle capacity costs are applied to the products. By moving away fromtraditional cost allocation methods and using improved ABC methods of 

tracing and assignment, ABC provides managers with a clearer picture of cost of processes and the profitability of customers and products. Unlike

Page13

7/29/2019 AIRLINE MANAGEMENT SYSTEM

http://slidepdf.com/reader/full/airline-management-system 14/16

traditional cost systems, ABC assumes that activities cause cost, notproducts or services (i.e., products and services merely create demand foractivities). By knowing what activities cost, organizations can identifyactivities that have the greatest potential for cost reduction. This moreaccurate cost information allows organizations to make improvements

such as eliminating waste from overhead activities that are inefficient ornonessential.

4.3 ABC: Overcoming Limitations & Improving Decision Making

4.3.1 Price Allocation

Activity Based Costing is a management tool to assist decisions. It can beused as a basis to allocate fixed costs or indirect costs across products or

services with a view to justifying prices. This stems from the existence of costs in an organisation which are not directly related to Products. Thesemay be service departments (finance, personnel etc.) or fixed overheads(factory rent, office heating etc.). If unchecked, these costs can build upsizeable portions of the total revenue and unless management takes careto control them they can outweigh the Contribution from products sold,thereby causing a loss.

4.3.2 Revenue Generation vs Resource Consumption

ABC can be a guide to management action that can translate directly intohigher profits reveals the links between performing particular activitiesand the demands those activities make on the organization’s resources, itcan give managers a clear picture of how products, brands, customers,facilities, regions, or distribution channels both generate revenues andconsume resources. The profitability picture that emerges from the ABCanalysis helps managers focus their attention and energy on improvingactivities that will have the biggest impact on the bottom line.

4.3.3 Different Views

ABC analysis enables managers to have varied views into the businessmany different ways, either by product or group of similar products, byindividual customer or client group, or by distribution channel, thus givingthem a close-up view of whatever aspect of the business they areconsidering. ABC analysis also illuminates exactly what activities areassociated with that part of the business and how those activities arelinked to the generation of revenues and the consumption of resources.By highlighting those relationships, ABC helps managers understandprecisely where to take actions that will drive profits.

Page14

7/29/2019 AIRLINE MANAGEMENT SYSTEM

http://slidepdf.com/reader/full/airline-management-system 15/16

5. Strategy Option: Short Haul Flights

6. Bibliography & Reference

Anderson, S. 1995. A framework for assessing cost management systemchanges: The case of activity based costing implementation at GeneralMotors, 1986-1993. Journal of Management Accounting Research (7): 1-51.

Anthony, R. N. 2003. Management accounting: A personal history. Journalof Management Accounting Research (15): 249-253.

Balakishnan, R. and K. Sivaramakrishnan. 2002. A critical overview of theuse of full-cost data for planning and pricing. Journal of Management  Accounting Research (14): 3-31.

Banker, R. D. and G. Potter. 1993. Economic implications of single costdriver systems. Journal of Management Accounting Research (5): 15-32.

Banker, R. D. and S. C. Hansen. 2002. The adequacy of full-cost-basedpricing heuristics. Journal of Management Accounting Research (14): 33-58.

Birnberg, J. G. 2003. Introductory note to "Management accounting: Apersonal history". Journal of Management Accounting Research (15): 247.

Covaleski, M. A, J. H. Evans III, J. L. Luft and M. D. Shields. 2003. Budgetingresearch: Three theoretical perspectives and criteria for selectiveintegration. Journal of Management Accounting Research (15): 3-49.

Dearman, D. T. and M. D. Shields. 2001. Cost knowledge and cost-based judgment performance. Journal of Management Accounting Research (13):1-18.

Dhavale, D. G. 2007. Product costing for decision making in certainvariable-proportion technologies. Journal of Management Accounting

Research (19): 51-70.

Foster, G. and D. W. Swenson. 1997 Measuring the success of activity-based cost management and its determinants. Journal of Management  Accounting Research (9): 109-141.

Hilton, Ronal W. (1994) Managerial Accounting, Second Edition, McGraw-Hill, Inc., New York.

Horngren, C. T. 2004. Management accounting: Some comments. Journalof Management Accounting Research (16): 207-211.

Page15

7/29/2019 AIRLINE MANAGEMENT SYSTEM

http://slidepdf.com/reader/full/airline-management-system 16/16

Leitch, R. A., P. R. Philipoom and T. D. Fry. 2005. Opportunity costingdecision heuristics for product acceptance decisions. Journal of Management Accounting Research (17): 95-117.

Page