aircom world telecom ctio summit 2012 - keynote

26
1 © 2012 AIRCOM International Ltd World Telecom CTIO Summit – Singapore 7 September 2012 ‘Not all LTE is Created Equal’ - strategies for success Stephen Bowker – CTO [email protected]

Upload: steve-bowker

Post on 18-Aug-2015

40 views

Category:

Technology


15 download

TRANSCRIPT

Page 1: AIRCOM World Telecom CTIO Summit 2012 - Keynote

1 © 2012 AIRCOM International Ltd

World Telecom CTIO Summit – Singapore 7 September 2012

‘Not all LTE is Created Equal’ - strategies for success

Stephen Bowker – [email protected]

Page 2: AIRCOM World Telecom CTIO Summit 2012 - Keynote

2 © 2012 AIRCOM International Ltd

Introduction to AIRCOM InternationalAIRCOM is a leading independent provider of end-to-end software products

and consulting services designed to plan, manage and optimise mobile networks Global market leader in mobile Radio Network Planning, Optimisation

and Performance Management (PM) solutions Recognized and Trusted Industry Expert across all major radio and core

technologies including GSM, CDMA, UMTS, WiMAX and LTE 350+ mobile operator customers in 135+ countries including product

and service deployments with all of the top 20 largest global mobile operators

Recently (April 2012) acquired advanced optimisation company - Symena

Software Consulting Services

Core Capabilities

Strategy and Technology Planning

Network Design and Planning

Spectrum Re-farming Solutions

Vendor Management

Roll-out Management

Optimisation and Audit Services

Network operations outsourcing

Core Capabilities

#1* Radio Planning Tool – AIRCOM ASSET

Advanced proven scalable OSS software PM (AIRCOM OPTIMA) and CM (LIVE-PLAN)

Worlds fastest** and most accurate optimisation tool (Symena CAPESSOTM)

Integrated RAN/Backhaul Planning and Optimisation/Dimensioning capabilities

Multi-Technology / Multi-Vendor tools, already Interfacing to all leading equipment

* Based on Analysys Mason “Network planning and optimisation outlook 2012“** Capesso rated #1 technically in every trial since 2006 (Vendor & Operator)

Page 3: AIRCOM World Telecom CTIO Summit 2012 - Keynote

3 © 2012 AIRCOM International Ltd

AIRCOM’s Product Portfolio

Expected Network Performance ð ï Actual Network Performance

ï Tune Models / Parameters Configure and Optimise Network ð

Radio network design for all sizes of network including centralised system with over 300k cells

Microwave and transmission planning

Backhaul routing and

dimensioning and mobile network node capacity dimensioning

Optimisation through all stages of the network lifecycle

Performance management including the worlds largest centralised PM system

Configuration management, parameter auditing and base-lining of the planning tool data

Consulting solution to optimise networks based on measurement and trace data

Centralised SON optimisation across multiple technologies and vendors

Page 4: AIRCOM World Telecom CTIO Summit 2012 - Keynote

4 © 2012 AIRCOM International Ltd

Plan and Design Design Objectives

Design Basis

Model Calibration

Radio + Backhaul Design

Measurement test processes

Business Planning (HSPA+ vs. LTE)

Migration strategies

Spectrum Planning

Infrastructure Sharing

LTE trials evaluation

LTE Strategy

LTE – Important Strategic Decisions to take

Page 5: AIRCOM World Telecom CTIO Summit 2012 - Keynote

5 © 2012 AIRCOM International Ltd

Radio Access Technology Planning Inter-Technology Radio Planning

requires tools to support multiple technologies simultaneously in same project Support for Shared Antenna Systems

Interim Voice Services such as CSFB are dependent on have 2G/3G coverage co-incidental with LTE

Inter-RAT multi-technology features such as: simulated/live traffic capture, neighbour planning, PCI planning

Joint planning of Tracking Areas in LTE and Location Areas in 2G and 3G

Automation, including Live update of configuration parameters from network keeps planning tools in sync

Voice Calls (CSFB) likely to fail in this area due to coverage/quality

Page 6: AIRCOM World Telecom CTIO Summit 2012 - Keynote

6 © 2012 AIRCOM International Ltd

Important to dimension and plan on an end-to-end basis from Radio Planning tool (e.g. AIRCOM ASSET®) across backhaul (e.g. CONNECT®) and the network (e.g. I-VIEW DIMENSION)

Technology evolution => LTE higher network elements are supported (SAEGW, MME) Ability to create the LTE logical interfaces (S1-SAE, S1-MME, X2) Realization of the LTE mesh topology (an eNodeB can belong to more than one SAEGW or

MME) Inter-technology operation Actual and simulated traffic

from different sources (GSM, UMTS, LTE sites) is created and carried over

Transmission Backhaul

Core NetworkAir Interface

Carried Traffic Analysis for LTE (CTA)

Page 7: AIRCOM World Telecom CTIO Summit 2012 - Keynote

7 © 2012 AIRCOM International Ltd

Predictions

Drive Test

OSS & trace

Ope

rate

Dep

loy

Plan

Initial Optimized

Optimized Plan

Optimized Deployment

Optimized Operation

Better, Faster, Simpler

Page 8: AIRCOM World Telecom CTIO Summit 2012 - Keynote

8 © 2012 AIRCOM International Ltd

0

20

40

60

80

100

120

0 5 10 15 20 25 30Average received Es/N0 per receiver branch (dB)

Thr

ough

put (

Mbp

s)

QRM-MLD using ASESSMMSE

QPSK R = 1/2QPSK R = 2/3QPSK R = 3/416QAM R = 1/216QAM R = 2/316QAM R = 3/416QAM R = 4/564QAM R = 2/364QAM R = 3/464QAM R = 4/5

Multiple carrier Frequency options

Flexible bandwidth1.4 – 20MHz

Adaptive modulationand coding

Multiuser & frequencyscheduling gain

Shared broadbandantennas (2G/3G/LTE)

MIMO(2x2, 4x2, 4x4,…)

Wide range of new technologies and options

Automatic trafficsharing for voice/data

HetNetMulti-layer interaction

LTE Planning and Optimization Complexities

Page 9: AIRCOM World Telecom CTIO Summit 2012 - Keynote

9 © 2012 AIRCOM International Ltd

High number of LTE cases need to be analyzed

· f-Band A· Channel bandwidth

(1,4MHz …20MHz)· Expected traffic

growth· Adaptive Modulation

and Coding Schemes· Channel overhead· MIMO (2x2, 4x4, …)· Used antenna technology

(individual antennas)· Vendor specific settings & thresholds· Multi RAT deployments· Etc.

· Different radio networks sharing same antenna

· Individual antenna tilts· 2G + 3G + LTE· High complexity· Traffic Sharing· Multi RAT Handover· Sharing equipment· Service level optimization· HetNet· Different traffic maps· Different traffic growth· Etc.

Better results, faster and simpler!

Option 1

Option 2

Option N

LTE deployment options Multi RAT

Page 10: AIRCOM World Telecom CTIO Summit 2012 - Keynote

10 © 2012 AIRCOM International Ltd

Customer Example USA Tier 1 – HetNet

CDMA 800MHz

EVDO 1900MHzLTE FDD 1900MHz

LTE FDD 800MHz

LTE FDD 1600MHz

TD-LTE 2500MHz

HetNet, Multi-RAT, frequency bands on single antenna

Page 11: AIRCOM World Telecom CTIO Summit 2012 - Keynote

11 © 2012 AIRCOM International Ltd

Traffic Growth Planning

Mobile data traffic is expected to grow aggressively

How to plan accordingly?

What are the resources available? Spectrum Technology Timeline

Page 12: AIRCOM World Telecom CTIO Summit 2012 - Keynote

12 © 2012 AIRCOM International Ltd

Optimise for Traffic Growth (i)

time2012 2013 2014

CDMA 800Tech

no

log

y&

sp

ectr

um

Exp

ecte

d t

ota

l tr

affi

c d

eman

d

EVDO 1900LTE 1900

CDMA 800EVDO 1900

LTE 1900LTE 800

LTE 1600

CDMA 800EVDO 1900

LTE 1900LTE 800

LTE 1600LTE 2500

Page 13: AIRCOM World Telecom CTIO Summit 2012 - Keynote

13 © 2012 AIRCOM International Ltd

Optimise for Traffic Growth (ii)

Traffic handled by EVDO

Traffic handled by LTE – band 1

Total data traffic demand

CDMA 800 traffic

Remaining traffic offload

LTE band 2, WiFi?

Page 14: AIRCOM World Telecom CTIO Summit 2012 - Keynote

14 © 2012 AIRCOM International Ltd

Multiple RAT – Planning and Optimisation

Page 15: AIRCOM World Telecom CTIO Summit 2012 - Keynote

15 © 2012 AIRCOM International Ltd

Optimisation incorporating Drive Test and OSS trace and Geolocation data

Deploy

Operate

Drive Testbased data

OSS and trace data

Page 16: AIRCOM World Telecom CTIO Summit 2012 - Keynote

16 © 2012 AIRCOM International Ltd

Planning data from Planning Tool, e.g.

ASSET, Atoll, Planet etc…

0 3 6 9

12

15

18

21

24

27

30

33

36

39

42

45

48

010

20

30

40

50

60

70

80

90

100

Number of Sites

Better plansVery fast processingCost efficiency analysisImplementation plansProject plansBest budget useComplementary

Case N

Case 2

Optimised Plans validated in Planning

Tool and Implemented

Case 1

Effective “What if” analysis

Better results, faster and simpler!

Supplemented with Drive Test data

Efficiently analyze and compute many cases

Page 17: AIRCOM World Telecom CTIO Summit 2012 - Keynote

17 © 2012 AIRCOM International Ltd

Cost Efficient Targeted Optimisation

Note: massive improvements with just two modifications

Page 18: AIRCOM World Telecom CTIO Summit 2012 - Keynote

18 © 2012 AIRCOM International Ltd

Planning | Deployment | Operation

PlanPredictions

DeployDrive Test data

OperateOSS Trace data

Software to optimize planning, deployment and operation

Page 19: AIRCOM World Telecom CTIO Summit 2012 - Keynote

19 © 2012 AIRCOM International Ltd

Case Study: Optimisationwith Geolocation trace data

Large improvements by remote changes

before after

Page 20: AIRCOM World Telecom CTIO Summit 2012 - Keynote

20 © 2012 AIRCOM International Ltd

Case Study: Optimisationwith Geolocation trace data

Clear enhancements proven by measurements

before after

Page 21: AIRCOM World Telecom CTIO Summit 2012 - Keynote

21 © 2012 AIRCOM International Ltd

Performance: Visibility, Analytics and Automation

PM - Live Status/Root-Cause Analysis/Management Reports Live-network status and monitor Proactive and Interactive Trouble Resolution End-to-end with customer centric and service metrics Multi-layer analytics (Mobile, Transport, IP, Core) Multi-Technology <- Important for LTE Vendor Independent and multi-vendor

Page 22: AIRCOM World Telecom CTIO Summit 2012 - Keynote

22 © 2012 AIRCOM International Ltd

ENTERPRISE WEB SERVICES (EWS)LIVE PLAN SERVER

LIVE NETWORK CONFIGURATION DATA FROM VENDOR OMC’S

........

VENDOR-1/OMC-1 VENDOR-2/OMC-2 VENDOR-3/OMC-3 VENDOR-N/OMC-N

CLIENTS

INVENTORY SITE DATABASE

ENGINEERING DATA

READ/COMPARE

UPDATE

CREATE

DELETE

FULLY AUTOMATED

Closing the loop – LIVE-PLANNNG

Page 23: AIRCOM World Telecom CTIO Summit 2012 - Keynote

23 © 2012 AIRCOM International Ltd

PM data harmonizationKPI from different PM counters/vendors

Monitor, Control,

TriggerData analysis, Use Cases and Policy Control

Multi-RAT optimization processing

Multi vendormediationPM and CM data

CM data transcriptMML, XML or other

3rd party

solutions

and input

data(e.g. geo located trace

data, RF planning data, etc.)

CM writeETL engine

Vendor A Vendor CVendor B

Self-Organizing Network (SON) Solution

ptimize

Page 24: AIRCOM World Telecom CTIO Summit 2012 - Keynote

24 © 2012 AIRCOM International Ltd

SON in Action – Bringing it together (i)

SON Trial in ASIA driven by Geolocated Trace Data powered

by SONnovoTM Engine

Page 25: AIRCOM World Telecom CTIO Summit 2012 - Keynote

25 © 2012 AIRCOM International Ltd

SON in Action – Bringing it together (ii)

Massive improvements for

data calls

Significant enhancements in top 10 problem

cells

Page 26: AIRCOM World Telecom CTIO Summit 2012 - Keynote

26 © 2012 AIRCOM International Ltd

Thank You