Implementation Methodologyfor Dual-Mode GPS Receiver
David Tester, Founder & CTO, Air Semiconductor
Jon Young, Chris Atkinson & Tom Ryan, Synopsys
8/8/2019 Air SNUG foils
http://slidepdf.com/reader/full/air-snug-foils 2/40
2
Overview of Presentation
- GPS 101Quick overview of GPS
- AirGlimpse into life inside a start-up
- Low Power Methodology ChallengesAspects of low power IC implementationthat we care about that may interest you
8/8/2019 Air SNUG foils
http://slidepdf.com/reader/full/air-snug-foils 3/40
3
GPS 101Receive Power is -130dBm to -160dBm … 20dB to 50dB below the Thermal Noise Floor!
Regional geo-stationary augmentation satellites
WAAS Wide Area Augmentation System – USA
EGNOS European Geostationary Navigation OverlaySystem – Europe
Earth radius
6378 km
1 9 1 0
0 k m
2 0 2 0 0 k m
23222 km
Galileo
GPS Orbit 11 hours 58 minutes
13900 km/h
GLONASS
Moon Approx. 400000 km
3 5 7 8 6 k
m
Geo-stationary
GPS 6 orbital planes; 55°to equator
Galileo 3 orbital planes; 56°to equator
GLONASS 3 orbital planes; 65°to equator
8/8/2019 Air SNUG foils
http://slidepdf.com/reader/full/air-snug-foils 4/40
4
GPS 101Triangulation allows Receiver Position to be Calculated
r 4r 1
r 3
r 2
8/8/2019 Air SNUG foils
http://slidepdf.com/reader/full/air-snug-foils 5/40
5
300m
3x108 ms-11µs
1 _.@ DEF32ABC
4GHI MNO65JKL
7PQRS WXYZ98TUV
#0+*
MOBILE
GPS 101Satellite transmits essential information required for Receiver Positioning
8/8/2019 Air SNUG foils
http://slidepdf.com/reader/full/air-snug-foils 6/40
6
Air Invents Continuous Adaptive GPS… offers both Low-Power & Position Accuracy
Competitor
Air
Low-Power
A c
c u r a c y
8/8/2019 Air SNUG foils
http://slidepdf.com/reader/full/air-snug-foils 7/407
air wave architecture enables useful geofences
A-GPS geofence
Air geofence
8/8/2019 Air SNUG foils
http://slidepdf.com/reader/full/air-snug-foils 8/408
View from the office window of a start-up…
8/8/2019 Air SNUG foils
http://slidepdf.com/reader/full/air-snug-foils 9/409
David TesterCo-Founder & CTO
Stephen GrahamCo-Founder & VP Marketing
Staff
Employee #1 (20 years experience)
Employee #2 (20 years experience)
Contract
Contract #1 (15 years experience)
Contract #2 (15 years experience)
Staff
Employee #3 (20 years experience)
Employee #1 (20 years experience)
Staff
Employee #4 (10 years experience)
Employee #5 (15 years experience)
Employee #6 (15 years experience)
Contract
Contract #3 (20 years experience)
Contract #4 (20 years experience)
Contract #5 (20 years experience)
2x Synopsys IC layout contractors
Staff
Employee #7 (20 years experience)
Employee #8 (15 years experience)
Contract
Contract #8 (20 years experience)
Contract #9 (15 years experience)
RFIC Design System Design ASIC Design Software Design
ex-CEO Andromedia (acquired Macromedia ‘99)
ex-CEO Frictionless Commerce (acquired SAP ‘06)
Andy HeatonVP Operations & Development
ex-CEO PortalPlayer (NASDAQ: PLAY)
ex-CEO S3 (NASDAQ: SIII)
Kent Godfrey
Michael Gera
David Tester
Board of Directors
Gary Johnson
Pond Ventures
Independent
Pond Ventures
ex-CEO TapRootHugh Thomas
Hugh ThomasCEO
Support Staff
1x General Admin
1x Finance ManagerCTO
CEO
The A Development Team
8/8/2019 Air SNUG foils
http://slidepdf.com/reader/full/air-snug-foils 10/4010
Concept to Engineering Sample Silicon
Red Herring 100 Europe 2008April „08
Series-A TermsheetApril „06
Prof Izzet Kale joins Technical Advisory BoardOctober „08
Demonstrate GPS technologyJuly „08
Recruit external CEOMay „08
Exit stealth modeAnnounce 1st product
January „08
Gary Johnson joins Board of Directors2x NASDAQ CEO (PortalPlayer & S3)
May „07
A1225 RFIC (v1)April „07
A1250 single die GPS receiverJanuary „09
A1225 RFIC (v2)February „08
J F M A M J J A S O N D
J F M A M J J A S O N D
J F M A M J J A S O N D
J F M A M J J A S O N D
2006 2007
J F M A M J J A S O N D
J F M A M J J A S O N D
J F M A M J J A S O N D
J F M A M J J A S O N D
2008 2009
Air Inc + Ltd incorporatedMay „06
Development starts!June „06
Engage with TSMC for siliconSept „06
IET Start-Up of the Year 2008
November '08
Electra Start-Up of the Year 2008
November „08
RFIC + FGPA platformMay „08
Air tracks GPS satellites with RFICMarch „08
Air tracks GPS satellites with RFIC + FPGAJune „08
Air first PVT, confirms lab in Swindon
June „08
8/8/2019 Air SNUG foils
http://slidepdf.com/reader/full/air-snug-foils 11/4011
Concept to Engineering Sample Silicon
Red Herring 100 Europe 2008April „08
Series-A TermsheetApril „06
Prof Izzet Kale joins Technical Advisory BoardOctober „08
Demonstrate GPS technologyJuly „08
Recruit external CEOMay „08
Exit stealth modeAnnounce 1st product
January „08
Gary Johnson joins Board of Directors2x NASDAQ CEO (PortalPlayer & S3)
May „07
A1225 RFIC (v1)April „07
A1250 single die GPS receiverJanuary „09
A1225 RFIC (v2)February „08
J F M A M J J A S O N D
J F M A M J J A S O N D
J F M A M J J A S O N D
J F M A M J J A S O N D
2006 2007
J F M A M J J A S O N D
J F M A M J J A S O N D
J F M A M J J A S O N D
J F M A M J J A S O N D
2008 2009
Air Inc + Ltd incorporatedMay „06
Development starts!June „06
Engage with TSMC for siliconSept „06
IET Start-Up of the Year 2008
November '08
Electra Start-Up of the Year 2008
November „08
RFIC + FGPA platformMay „08
Air tracks GPS satellites with RFICMarch „08
Air tracks GPS satellites with RFIC + FPGAJune „08
Tracking DSPArchitecture
Acquisition DSPArchitecture
Air first PVT, confirms lab in Swindon
June „08
Acquisition DSP
Implementation
Tracking DSPArchitecture
Tracking DSPImplementation
J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D
Radio IC
Implementation
PVT &Kalman Filter
Tracking DSP
Implementation
Radio IC
ImplementationA1250
IC design
Dual-Mode GPS
system design
Dual-Mode GPSsoftware design
A1250 silicon evaluation
8/8/2019 Air SNUG foils
http://slidepdf.com/reader/full/air-snug-foils 12/4012
BACK
air wave1 system development platformand engineering sample silicon module
8/8/2019 Air SNUG foils
http://slidepdf.com/reader/full/air-snug-foils 13/4013
air wave1 engineering siliconQFN bonding photo
8/8/2019 Air SNUG foils
http://slidepdf.com/reader/full/air-snug-foils 14/4014
GPS with air wave1 silicon
8/8/2019 Air SNUG foils
http://slidepdf.com/reader/full/air-snug-foils 15/4015
Air Technical Demonstration Platform … in Japan
8/8/2019 Air SNUG foils
http://slidepdf.com/reader/full/air-snug-foils 16/4016
Low-Power Implementation ChallengesWhat is necessary for low-power silicon implementation of a system?
- Low-Power is no exception and requires …
- Example: air wave1 and low-power GPS optimization
- Today we will not discuss GPS system implementation!
- Instead let‟s look at silicon methodology and challenges
Let‟s consider an alternative question:
“How did you create the silicon implementation of alow power architecture? What are the challenges?”
Q1. Lazy is OK. How do you know when you‟re done?
Q2. Did you survive (or avoid) the pain a PMK can offer?
Q3. Can clock tree power consumption be predicted?
Q4. Multi-DVDD chips – Where EDA meets reality …
Q5. Is timing-optimized and power-optimized the same?
Here are five … not in any order and not an exhaustive list …
Disruptive products demand system-level optimizations
-
8/8/2019 Air SNUG foils
http://slidepdf.com/reader/full/air-snug-foils 17/40
17
Optimize Power Everywhere, Earlier is BetterEfficient algorithms provide more power saving than optimized circuits
8/8/2019 Air SNUG foils
http://slidepdf.com/reader/full/air-snug-foils 18/40
18
System
Design &Verification
Simplified Air System + Silicon Design Flow(Does not include any analog or custom IC aspects!)
System-LevelSimulation
FPGAPrototype
SiliconPlatform
Logical
Design &Verification
Physical
Design &Verification
System-LevelArchitecture
Trial P&Rfor blocks
Trial CTSfor blocks
Trial STA(Post-P&R)
Final P&Rfor blocks
Final CTSfor blocks
Final STA(Post-P&R)
Trial P&R(top level)
Trial CTS(top-level)
Trial STA(top level)
Final P&R
(top level)
Final CTS
(top-level)
Final STA
(top level)
DRC(top level)
LVS(top-level)
Trial LogicSynthesis
Pre-P&RCircuit Sim
Final LogicSynthesis
Pre-P&RCircuit Sim
Logic LevelArchitecture
Logic LevelRTL Design
Logic LevelSimulation
Logic LevelVerification
Power Level
Verification
Top-LevelFloorplan
Pad RingDesign
FirmwareDesign
FirmwareDesign
MoreFirmware
GDSII
PowerDomains
8/8/2019 Air SNUG foils
http://slidepdf.com/reader/full/air-snug-foils 19/40
19
air wave1 engineering siliconQFN bonding diagram
i
8/8/2019 Air SNUG foils
http://slidepdf.com/reader/full/air-snug-foils 20/40
20
air wave1 engineering siliconDevice Floorplan (No Global Routing)
i i i ili
8/8/2019 Air SNUG foils
http://slidepdf.com/reader/full/air-snug-foils 21/40
21
air wave1 engineering siliconDevice Floorplan (with Global Routing)
i 1 i i ili
8/8/2019 Air SNUG foils
http://slidepdf.com/reader/full/air-snug-foils 22/40
22
air wave1 engineering silicon44 independent digital power domains
2 3 45
76 89
1110 1213
1514 1617
44
34 35 36 37 38
39 40 41
2524
3332
2322
3130
2120
2928
1918
2726
1
4243
i 1 i i ili
8/8/2019 Air SNUG foils
http://slidepdf.com/reader/full/air-snug-foils 23/40
23
air wave1 engineering siliconRadio Macro + Analog Support Macro
8/8/2019 Air SNUG foils
http://slidepdf.com/reader/full/air-snug-foils 24/40
24
Quick Review on Where Power is ConsumedDynamic (switching) and static (leakage) power from DVDD to DVSS
Example circuit taken from:Source: http://www.dti.unimi.it/~liberali/papers/c63.pdf
8/8/2019 Air SNUG foils
http://slidepdf.com/reader/full/air-snug-foils 25/40
25
Routing Capacitance is the EnemyParasitic capacitance significantly alters logic switching power
How can you verify post-layout parasitic routing capacitance is acceptable?
St h “L P ” i l h?
8/8/2019 Air SNUG foils
http://slidepdf.com/reader/full/air-snug-foils 26/40
26
Stop when “Low-Power” is low enough?Products need to get to market …
Stop when you‟ve verified it‟s good enough
“I‟d like the lowest possible power consumption, please”“I‟d also like to get that product to market on time, please”
Do you have a power budget? When should verification STOP ?
Track and predict power performance at all levels of abstraction:
- Architecture / Algorithm / System Partitioning- Pre-Synthesis RTL and Post-Synthesis Gates
- Pre-Layout and Post-Layout
“… but verification is never really complete…”
True… what is the milestone for sufficient
confidence that power meets budget?
Can you spot the conflict between the following two statements?
8/8/2019 Air SNUG foils
http://slidepdf.com/reader/full/air-snug-foils 27/40
27
Less Complexity, Less Transitions = Low PowerReduce depth of logic and switching activity to minimise power
How to verify switching
activity level on budget?
How to verify the original
complexity assumptions?
8/8/2019 Air SNUG foils
http://slidepdf.com/reader/full/air-snug-foils 28/40
28
“Custom” Cells rather than “Standard” Cells?„Optimized for Power‟ and „Optimized for Timing‟ might not be the same
Example
- Custom flip-flop used in air wave1 datapath- Relaxed timing enabled >40% power improvement!- Also provided die area and P&R enhancements
- Knowledge of “use” offer options for power optimized gates
- Power optimized and timing optimized are not always the same
Wh ‟ Y M h d l B ild Cl k T ?
8/8/2019 Air SNUG foils
http://slidepdf.com/reader/full/air-snug-foils 29/40
29
What‟s Your Methodology to Build Clock Trees?Not all clock tree‟s are low power … can you trust the tools?
- Power depends on conflicting constraints: skew, rise time, load, etc
- CTS tools build functional but over-designed, high-power clock trees- Can‟t verify power until P&R started ... but is that too late for market?
- Clock tree can pass functional verification but fail power verification!
Example:
air wave1 contains
400+ clock domains
More a clock forest
than a clock tree ...
P M t Kit H dl C f ll !
8/8/2019 Air SNUG foils
http://slidepdf.com/reader/full/air-snug-foils 30/40
30
Power Management Kit - Handle Carefully!… rather like a chainsaw with all the safety features removed …
- Standard cell library assumes single DVDD supply voltage
- Power management library enables multiple voltage domains
- Voltage domain control cells – DVDD and DVSS switch
- P&R “optimisation” can pull cells from PMK library by mistake!
- Can simulation identify these problems?…
- Signal isolation cells (for crossing voltage domains)
- Must verify P&R didn‟t “optimise” these!
- PMK also adds more back-end DRC and LVS
verification issues simulation can‟t solve…
M l i DVDD Sili Wh EDA R li !
8/8/2019 Air SNUG foils
http://slidepdf.com/reader/full/air-snug-foils 31/40
31
Multi-DVDD Silicon: Where EDA meets Reality!Circuit level functionality that needs to be verified at RTL level
- How, and when, are cells instanced in the design?
- Manually by logic designer or layout team?
- Automatically by EDA tool? Do you trust it?
- Yet another task to verify before tape-out !!!
- Control signal active sense depends on cell used:
- Active low for PMOS but active high for NMOS
- Are control signal wired correctly?
- How many cells for each domain?
- “Power Aware” design flows try to plug the hole!
… but don‟t address all the issues !!!Example:
air wave1: 44x digital, 8x analog voltage domains
- DVDD functionality in “HEAD” and “FOOT” cells
… but DVDD not represented in non-UPF flow logic simulation!
DVDD d DVSS ti
8/8/2019 Air SNUG foils
http://slidepdf.com/reader/full/air-snug-foils 32/40
32
DVDD and DVSS power routingmetal5 and “thick” metal6 reserved for power routing
airwave1 engineering silicon
8/8/2019 Air SNUG foils
http://slidepdf.com/reader/full/air-snug-foils 33/40
33
air wave1 engineering silicon44 independent digital power domains
2 3 45
76 89
1110 1213
1514 1617
44
34 35 36 37 38
39 40 41
2524
3332
2322
3130
2120
2928
1918
2726
1
4243
Power Domains Some Issues to Watch
8/8/2019 Air SNUG foils
http://slidepdf.com/reader/full/air-snug-foils 34/40
34
Power Domains - Some Issues to WatchDon‟t forget substrate, N-well and control signal polarity
Power Domains Some Issues to Watch
8/8/2019 Air SNUG foils
http://slidepdf.com/reader/full/air-snug-foils 35/40
35
Power Domains - Some Issues to WatchDon‟t forget substrate, N-well and control signal polarity
Automatic vs Manual Cell Placement
8/8/2019 Air SNUG foils
http://slidepdf.com/reader/full/air-snug-foils 36/40
36
Automatic vs Manual Cell PlacementP&R placement algorithm is not always optimum
Manual Placement
Automatic Placement
Impact of UTM metal on P&R efficiency
8/8/2019 Air SNUG foils
http://slidepdf.com/reader/full/air-snug-foils 37/40
37
Impact of UTM metal on P&R efficiencyMetal pitch + spacing rules directly impact P&R result
“thin”
metal5
“thick”metal6
Post P&R Optimization? Roll the Dice Again!
8/8/2019 Air SNUG foils
http://slidepdf.com/reader/full/air-snug-foils 38/40
38
Post-P&R Optimization? Roll the Dice Again!Development on-schedule and on-budget?
“Here‟s the final netlist,
it meets the power spec‟sand just needs to go through P&R”
- Pre-Layout gate level power estimates are estimates
- Routing capacitance impacts both timing and power
- P&R optimization resizes gates to close timing
… almost certainly ignoring circuit power
… so power estimates on pre-P&R netlist
are exactly that, estimates
Verification Issue:How to verify post-layout power still hits
the target specification …
… and hit your schedule
P&R “optimization” can solve that…
“Blind Faith and Ignorance”
8/8/2019 Air SNUG foils
http://slidepdf.com/reader/full/air-snug-foils 39/40
39
Blind Faith and Ignorance
Low-Power can be broken anywhere:
- Architecture
- Hardware (RTL) or Software
- Logic Synthesis
- P&R and CTS- Cell library and macros choices
- Process technology
Each step needs differing levels of implementation and verification
activity, but verification of power needs more than just logicsimulation and must include power budgets and circuit simulation
CPU power alone can‟t solve the problems, brain power is needed!
or “Informed Decision”?
Don‟t forget to be paranoid about power, if you care about power