Air ProductsAir ProductsReactor Catalyst ChangeoutReactor Catalyst Changeout
Daniel Brisach, Nick Dobies, Laura Elliott, Daniel Brisach, Nick Dobies, Laura Elliott, Chris Reed, Janessa SmithChris Reed, Janessa Smith
Presentation AgendaPresentation Agenda
Project Objectives and ScopeProject Objectives and Scope BackgroundBackground Concept SolutionConcept Solution Cost AnalysisCost Analysis SummarySummary Questions and DiscussionQuestions and Discussion
Project Objective Project Objective
The objective of this project is to The objective of this project is to develop a more effective way for develop a more effective way for operators to load the catalyst used for operators to load the catalyst used for the production of TEDA into the main the production of TEDA into the main reactor.reactor.
Project ScopeProject Scope
Design a system to load 18 drums of Design a system to load 18 drums of catalyst into the TEDA reactor catalyst into the TEDA reactor
Revise the Safe Work Practice of the Revise the Safe Work Practice of the reactor catalyst changeout processreactor catalyst changeout process
Current ProcessCurrent Process
Manual dumping with a mopping bucketManual dumping with a mopping bucket
Customer WantsCustomer Wants
1.1. ErgonomicErgonomic
2.2. Fast ChangeoverFast Changeover
3.3. One Man OperationOne Man Operation
4.4. Low ComplexityLow Complexity
5.5. Ease of RepairEase of Repair
Metrics & Target ValuesMetrics & Target ValuesMetricsMetrics Target ValuesTarget ValuesSpeed of ProcessSpeed of Process 12 man hours12 man hours
Cost of ImplementationCost of Implementation Less than $15,000Less than $15,000
Footprint sizeFootprint size Less than 8’ x 8’Less than 8’ x 8’
Ease of OperationEase of Operation Physically & Mentally SimplePhysically & Mentally Simple
Resistance to Ambient Resistance to Ambient ConditionsConditions
YesYes
Resistance to CatalystResistance to Catalyst YesYes
Electrical RatingElectrical Rating Class 1, Div 2 approvedClass 1, Div 2 approved
Number of Required OperatorsNumber of Required Operators 11
Special ToolsSpecial Tools NoNo
Special Training to OperateSpecial Training to Operate NoNo
Special Training to RepairSpecial Training to Repair NoNo
Number of Pinch PointsNumber of Pinch Points 00
The DesignThe Design
Drum is loadedand secured tocart.
Cart is winchedup the track.
Cart stops oncein pouring position.
Barrel emptiesvia linkageengagement using pistons.
ComponentsComponents
Track (rail)Track (rail) C3x6 Steel C-ChannelC3x6 Steel C-Channel Can be cycled Can be cycled
indefinitely under indefinitely under normal operating normal operating conditionsconditions
Custom fabricatedCustom fabricated
ComponentsComponents
Track SupportTrack Support 2” x 2” square tube2” x 2” square tube Can be cycled Can be cycled
indefinitely under indefinitely under normal operating normal operating conditionsconditions
Custom fabricatedCustom fabricated Accommodates pulley Accommodates pulley
systemsystem
ComponentsComponents
Pulley SystemPulley System Guides and powers Guides and powers
the cart throughout the cart throughout its path of motionits path of motion
Custom pulley and Custom pulley and winch, some stock winch, some stock componentscomponents
ComponentsComponents
CartCart Can cycle indefinitely Can cycle indefinitely
under normal operating under normal operating conditionsconditions
Custom fabricatedCustom fabricated Facilitates dumping Facilitates dumping
motionmotion
ValidationValidation
Fabricated components were designed Fabricated components were designed for infinite fatigue life.for infinite fatigue life.
All stock parts have a high factor of All stock parts have a high factor of safety.safety.
Favored safety when assumptions were Favored safety when assumptions were required.required.
PrototypePrototype
Tested pouring trajectory with respect to Tested pouring trajectory with respect to the manholethe manhole
ResultsResults
Successfully emptied catalyst into model manhole Successfully emptied catalyst into model manhole with zero wastewith zero waste
Determined optimum positioning between rail and Determined optimum positioning between rail and manholemanhole
Determined that 90Determined that 90°° of tilt of tilt would be necessary to empty would be necessary to empty entire drumentire drum
Drum cone did not require a Drum cone did not require a valvevalve
Benefit to the SponsorBenefit to the Sponsor
A safer and more ergonomic processA safer and more ergonomic process Reduction of reactor downtime by Reduction of reactor downtime by
approximately 24 hoursapproximately 24 hours Reduction of man-hours from 36 to 9Reduction of man-hours from 36 to 9
Labor savings of about 100 hours/yearLabor savings of about 100 hours/year
Cost AnalysisCost Analysis
Total: $14,483Total: $14,483 Rail and support: $1787Rail and support: $1787 Cart: $2401Cart: $2401 Winch, pulleys, pneumatic supply: $6395Winch, pulleys, pneumatic supply: $6395 Drum cone and collar: $1400Drum cone and collar: $1400 Safety fence: $500Safety fence: $500 Labor: $2000Labor: $2000
Total without cone: $13,083Total without cone: $13,083
Current StatusCurrent Status
Successfully designed and validated our Successfully designed and validated our best concept.best concept.
Analyzed budget and installation costs Analyzed budget and installation costs and sources.and sources.
Closed the loop through sponsor Closed the loop through sponsor feedback.feedback.
Ready to Celebrate.Ready to Celebrate.
Going ForwardGoing Forward
Deliver design to Air Products so the Deliver design to Air Products so the implementation path may chosen.implementation path may chosen.
AcknowledgementsAcknowledgements