AIR MONITORINGREPORT
2nd & 3rd Floor HallwaysMurray Junior High School2200 Buford Ave.St. Paul, MN 55108
August 8 – 14, 2006
Nova Client No.: STPAU006/Project No: H06-0946
AIR MONITORING REPORT
2nd & 3rd Floor HallwaysMurray Junior High School
2200 Buford Ave.St. Paul, MN 55108
Nova Client No.: STPAU006Project No.: H06-0946
August 8 – 14, 2006
Prepared For:
Saint Paul School District360 Colborne Street
Saint Paul, MN 55102
Prepared By:
Brian Meyer, Project ManagerJason Karpe, Air Monitoring Specialist
Nova Consulting Group, Inc.1107 Hazeltine Boulevard, Suite #400
Chaska, MN 55318
Murray Junior High School, St. Paul, MN H06-0946R.001-BJMPage i August 8 – 14, 2006
TABLE OF CONTENTS
Section Page
1.0 INTRODUCTION ....................................................................................................................1
2.0 ENCLOSURE SUMMARY .....................................................................................................2
3.0 AIR MONITORING AND SAMPLE ANALYSIS..................................................................3
4.0 WASTE TRACKING ...............................................................................................................4
APPENDICES
A: Air Sample Results SummaryB: Air Sample Results DetailC: Sample Location MapsD: Daily Log ReportsE: Personnel Certification FormF: Waste TrackingG: Daily Microscope ChecklistH: Personnel Certifications
Murray Junior High School, St. Paul, MN H06-0946R.001-BJMPage 1 August 8 – 14, 2006
1.0 INTRODUCTION
Nova Consulting Group, Inc. (Nova) provided on-site air monitoring during the removal ofasbestos-containing materials located in the 2nd & 3rd Floor Hallways at the Murray Junior HighSchool building, 2200 Buford Ave., St. Paul, MN 55108.
Removal was conducted using floor tile enclosure and full enclosure asbestos abatementtechniques. All asbestos-related work was performed in accordance with Federal, State, andLocal asbestos regulations.
Asbestos-related work began on August 8, 2006 and was completed on August 14, 2006. TwellEnviornmental, License #592, conducted the asbestos abatement.
Sample collection and analysis was completed by Jason Karpe of Nova Consulting Group, Inc.,1107 Hazeltine Boulevard, Suite #400, Chaska, MN 55318.
Murray Junior High School, St. Paul, MN H06-0946R.001-BJMPage 2 August 8 – 14, 2006
2.0 ENCLOSURE SUMMARY
The following enclosure summary describes each enclosure including location of the enclosure andmaterials removed. Also identified is the clearance date and whether destructive means were usedto access ACM located in interstitial spaces or other inaccessible areas.
Specific details relating to enclosure construction and removal details can be found in the daily logslocated in the appendices.
Enclosure Number: 1Enclosure Type: Floor Tile EnclosureArea: 1200 SFLocation: Third FloorRoom Number: HallwayClearance Date: 8/10/2006Destructive Means Used: NoMaterial Identification Subcategory Description Quantity Unit9x9 Floor Tile & Mastic Tan With Brown Streaks 1200 SF
Enclosure Number: 2Enclosure Type: Full EnclosureArea: 1200 SFLocation: Second FloorRoom Number: HallwayClearance Date: 8/11/2006Destructive Means Used: NoMaterial Identification Subcategory Description Quantity Unit9x9 Floor Tile & Mastic Tan With Brown Streaks 1200 SF
Murray Junior High School, St. Paul, MN H06-0946R.001-BJMPage 3 August 8 – 14, 2006
3.0 AIR MONITORING AND SAMPLE ANALYSIS
On-site air monitoring was provided by Jason Karpe. PCM sample collection and analysis wascompleted in accordance with NIOSH Method 7400. Quality control procedures were followedas required by this method. Air sample analysis results can be found on the air sample summarytable located in the appendices.
Murray Junior High School, St. Paul, MN H06-0946R.001-BJMPage 4 August 8 – 14, 2006
4.0 WASTE TRACKING
All asbestos waste containers were labeled with the required EPA, DOT, and OSHA labels. Thefollowing waste containers were removed from the project site:
Date Qty Waste Container Type ofTransport
ImmediateDestination
8/10/2006 14.0 Fiber Drums Truck Dumpster8/10/2006 10.0 6-Mil Poly Bag Truck Dumpster8/11/2006 16.0 Fiber Drums Truck Dumpster8/11/2006 14.0 6-Mil Poly Bag Truck Dumpster
Waste was transported to the SKB Rosemont Industrial Waste Facility located at 13425Courthouse Blvd., Rosemount, MN 55068.
A waste tracking table is located in the appendices.
APPENDIX A
AIR SAMPLE RESULTS SUMMARY
Nova Consulting Group, Inc.1107 Hazeltine Boulevard, Suite #400Chaska, MN 55318
Air Sample Results by Enclosure
Building NumberBuilding Name Murray Junior High School
Project Number H06-0946
Client Number STPAU006
Project Description Floor Tile AbatementClient Name Saint Paul School District Building Address: 2200 Buford Ave.
St. Paul MN. 55108
AreaLocationRoom Number
Enclosure NumberEnclosure Type
DateCollected
Sample NumberSample Location
Type ofSample
Sub-Typeof Sample
Result
1200 SFThird FloorHallway
8/9/2006003-0001 Negative Pressure Enclosure
AdjacentFloor Tile Enclosure
Enclosure # 1 <0.01Outside Of Decontamination
1200 SFThird FloorHallway
8/9/2006003-0002 Negative Pressure Enclosure
AdjacentFloor Tile Enclosure
Enclosure # 1 <0.01Outside Of Decontamination
1200 SFThird FloorHallway
8/10/2006003-0003 Negative Pressure Enclosure
AdjacentFloor Tile Enclosure
Enclosure # 1 <0.01Outside Of Decontamination
1200 SFThird FloorHallway
8/10/2006003-0004 Negative Pressure Enclosure
AdjacentFloor Tile Enclosure
Enclosure # 1 <0.01Outside Of Decontamination
1200 SFThird FloorHallway
8/10/2006003-0005 Negative Pressure Enclosure
Final ClearanceFloor Tile Enclosure
Enclosure # 1 <0.01Outside of Room 2215
1200 SFThird FloorHallway
8/10/2006003-0006 Negative Pressure Enclosure
Final ClearanceFloor Tile Enclosure
Enclosure # 1 <0.01Outside of Room 2215
1200 SFThird FloorHallway
8/10/2006003-0007 Negative Pressure Enclosure
Final ClearanceFloor Tile Enclosure
Enclosure # 1 <0.01Outside of Room 2213.
1200 SFThird FloorHallway
8/10/2006003-0008 Negative Pressure Enclosure
Final ClearanceFloor Tile Enclosure
Enclosure # 1 <0.01Outside of Room 2213.
1200 SFThird FloorHallway
8/10/2006003-0009 Negative Pressure Enclosure
Final ClearanceFloor Tile Enclosure
Enclosure # 1 <0.01Outside of Room 2210.
1200 SFSecond FloorHallway
8/11/2006002-0001 Negative Pressure Enclosure
AdjacentFull EnclosureEnclosure # 2 <0.01
Outside Of Decontamination
1200 SFSecond FloorHallway
8/11/2006002-0002 Negative Pressure Enclosure
AdjacentFull EnclosureEnclosure # 2 <0.01
Outside Of Decontamination
1200 SFSecond FloorHallway
8/11/2006002-0003 Negative Pressure Enclosure
AdjacentFull EnclosureEnclosure # 2 <0.01
Outside Of Decontamination
Tuesday, December 19, 2006 Page 1 of 2
© Nova Consulting Group, Inc.
Nova Consulting Group, Inc.1107 Hazeltine Boulevard, Suite #400Chaska, MN 55318
Air Sample Results by Enclosure
Building NumberBuilding Name Murray Junior High School
Project Number H06-0946
Client Number STPAU006
Project Description Floor Tile AbatementClient Name Saint Paul School District Building Address: 2200 Buford Ave.
St. Paul MN. 55108
AreaLocationRoom Number
Enclosure NumberEnclosure Type
DateCollected
Sample NumberSample Location
Type ofSample
Sub-Typeof Sample
Result
1200 SFSecond FloorHallway
8/11/2006002-0004 Negative Pressure Enclosure
AdjacentFull EnclosureEnclosure # 2 <0.01
Outside Of Decontamination
1200 SFSecond FloorHallway
8/11/2006002-0005 Negative Pressure Enclosure
Final ClearanceFull EnclosureEnclosure # 2 <0.01
In Front Of Room 1216.
1200 SFSecond FloorHallway
8/11/2006002-0006 Negative Pressure Enclosure
Final ClearanceFull EnclosureEnclosure # 2 <0.01
In Front Of Room 1216.
1200 SFSecond FloorHallway
8/11/2006002-0007 Negative Pressure Enclosure
Final ClearanceFull EnclosureEnclosure # 2 <0.01
In Front Of Room 1216.
1200 SFSecond FloorHallway
8/11/2006002-0008 Negative Pressure Enclosure
Final ClearanceFull EnclosureEnclosure # 2 <0.01
In Front Of Room 1210.
1200 SFSecond FloorHallway
8/11/2006002-0009 Negative Pressure Enclosure
Final ClearanceFull EnclosureEnclosure # 2 <0.01
North End Hallway.
Tuesday, December 19, 2006 Page 2 of 2
© Nova Consulting Group, Inc.
APPENDIX B
AIR SAMPLE RESULTS DETAIL
Collected ByDate
CollectedSampleNumber
Sub-Typeof Sample
Numberof Fields
DateAnalyzed Analyzed By
TotalFibers
GraticuleArea
Nova Consulting Group, Inc.1107 Hazeltine Boulevard, Suite #400Chaska, MN 55318
Air Sample Results Detail
Building NumberBuilding Name Murray Junior High School
Project Number H06-0946
Client Number STPAU006
Project Description Floor Tile AbatementClient Name Saint Paul School District Building Address 2200 Buford Ave.
St. Paul MN. 55108
Collection Information Analysis InformationType ofSample
BlankValue
FiberDensity
Concen-trationVolume
CalibratedFlow Rate
Jason Karpe8/9/2006 003-0001
Adjacent
Adjacent Sample Passed.
1008/9/2006 Jason Karpe 210.00785
Note:
Negative Pressure Enclosure
02778.4 26.75 <0.0115.1
Jason Karpe8/9/2006 003-0002
Adjacent
Adjacent Samples Passed.
1008/9/2006 Jason Karpe 130.00785
Note:
Negative Pressure Enclosure
02745.4 16.56 <0.0114.84
Jason Karpe8/9/2006 B-0001 Adjacent 1008/9/2006 Jason Karpe 00.00785Blank 00 0 0 fibers0
Jason Karpe8/10/2006 003-0003
Adjacent
Adjacent Samples.
1008/10/2006 Jason Karpe 140.00785
Note:
Negative Pressure Enclosure
02168.6 17.83 <0.0115.06
Jason Karpe8/10/2006 003-0004
Adjacent
Adjacent Samples.
1008/10/2006 Jason Karpe 90.00785
Note:
Negative Pressure Enclosure
02173.6 11.46 <0.0115.2
Jason Karpe8/10/2006 003-0005
Final Clearance
Final Clearance Passed.
1008/10/2006 Jason Karpe 90.00785
Note:
Negative Pressure Enclosure
02298 11.46 <0.0115.32
Tuesday, December 19, 2006 Page 1 of 4
© Nova Consulting Group, Inc.
Collected ByDate
CollectedSampleNumber
Sub-Typeof Sample
Numberof Fields
DateAnalyzed Analyzed By
TotalFibers
GraticuleArea
Nova Consulting Group, Inc.1107 Hazeltine Boulevard, Suite #400Chaska, MN 55318
Air Sample Results Detail
Building NumberBuilding Name Murray Junior High School
Project Number H06-0946
Client Number STPAU006
Project Description Floor Tile AbatementClient Name Saint Paul School District Building Address 2200 Buford Ave.
St. Paul MN. 55108
Collection Information Analysis InformationType ofSample
BlankValue
FiberDensity
Concen-trationVolume
CalibratedFlow Rate
Jason Karpe8/10/2006 003-0006
Final Clearance
Final Clearance Passed.
1008/10/2006 Jason Karpe 80.00785
Note:
Negative Pressure Enclosure
02260.5 10.19 <0.0115.07
Jason Karpe8/10/2006 003-0007
Final Clearance
Final Clearance Passed.
1008/10/2006 Jason Karpe 140.00785
Note:
Negative Pressure Enclosure
02260.2 17.83 <0.0114.87
Jason Karpe8/10/2006 003-0008
Final Clearance
Final Clearance Passed.
1008/10/2006 Jason Karpe 120.00785
Note:
Negative Pressure Enclosure
02378.8 15.29 <0.0115.65
Jason Karpe8/10/2006 003-0009
Final Clearance
Final Clearance Passed.
1008/10/2006 Jason Karpe 120.00785
Note:
Negative Pressure Enclosure
02330.2 15.29 <0.0115.33
Jason Karpe8/11/2006 002-0001
Adjacent
Adjacent Sample.
1008/11/2006 Jason Karpe 80.00785
Note:
Negative Pressure Enclosure
02296.7 10.19 <0.0115.11
Tuesday, December 19, 2006 Page 2 of 4
© Nova Consulting Group, Inc.
Collected ByDate
CollectedSampleNumber
Sub-Typeof Sample
Numberof Fields
DateAnalyzed Analyzed By
TotalFibers
GraticuleArea
Nova Consulting Group, Inc.1107 Hazeltine Boulevard, Suite #400Chaska, MN 55318
Air Sample Results Detail
Building NumberBuilding Name Murray Junior High School
Project Number H06-0946
Client Number STPAU006
Project Description Floor Tile AbatementClient Name Saint Paul School District Building Address 2200 Buford Ave.
St. Paul MN. 55108
Collection Information Analysis InformationType ofSample
BlankValue
FiberDensity
Concen-trationVolume
CalibratedFlow Rate
Jason Karpe8/11/2006 002-0002
Adjacent
Adjacent Sample.
1008/11/2006 Jason Karpe 110.00785
Note:
Negative Pressure Enclosure
02291.9 14.01 <0.0114.98
Jason Karpe8/11/2006 002-0003
Adjacent
Morning Adjacent Samples.
1008/11/2006 Jason Karpe 70.00785
Note:
Negative Pressure Enclosure
02543.5 8.92 <0.0115.14
Jason Karpe8/11/2006 002-0004
Adjacent
Morning Adjacent Samples.
1008/11/2006 Jason Karpe 110.00785
Note:
Negative Pressure Enclosure
02479.7 14.01 <0.0114.76
Jason Karpe8/11/2006 002-0005
Final Clearance
Finals
1008/11/2006 Jason Karpe 90.00785
Note:
Negative Pressure Enclosure
02085.8 11.46 <0.0115.45
Jason Karpe8/11/2006 002-0006
Final Clearance
Finals
1008/11/2006 Jason Karpe 120.00785
Note:
Negative Pressure Enclosure
02099.3 15.29 <0.0115.55
Tuesday, December 19, 2006 Page 3 of 4
© Nova Consulting Group, Inc.
Collected ByDate
CollectedSampleNumber
Sub-Typeof Sample
Numberof Fields
DateAnalyzed Analyzed By
TotalFibers
GraticuleArea
Nova Consulting Group, Inc.1107 Hazeltine Boulevard, Suite #400Chaska, MN 55318
Air Sample Results Detail
Building NumberBuilding Name Murray Junior High School
Project Number H06-0946
Client Number STPAU006
Project Description Floor Tile AbatementClient Name Saint Paul School District Building Address 2200 Buford Ave.
St. Paul MN. 55108
Collection Information Analysis InformationType ofSample
BlankValue
FiberDensity
Concen-trationVolume
CalibratedFlow Rate
Jason Karpe8/11/2006 002-0007
Final Clearance
Finals
1008/11/2006 Jason Karpe 120.00785
Note:
Negative Pressure Enclosure
02069.6 15.29 <0.0115.33
Jason Karpe8/11/2006 002-0008
Final Clearance
Finals
1008/11/2006 Jason Karpe 100.00785
Note:
Negative Pressure Enclosure
02082.2 12.74 <0.0114.98
Jason Karpe8/11/2006 002-0009
Final Clearance
Finals
1008/11/2006 Jason Karpe 90.00785
Note:
Negative Pressure Enclosure
02121.1 11.46 <0.0115.26
Jason Karpe8/11/2006 B-0002 Adjacent 1008/11/2006 00.00785Blank 00 0 0 fibers0
Tuesday, December 19, 2006 Page 4 of 4
© Nova Consulting Group, Inc.
APPENDIX C
SAMPLE LOCATION MAPS
Second Floor Murray Junior High School 2200 Buford Ave,. St. Paul MN. 55108
JOB NUMBER 8/10/06
Floor 2Consulting Group, Inc.
EnvironmentalArchitectureEngineering
Key
M
Decon Unit
HEPA MachineManometer
Sample Location
Enclosure Boundary
H
001-0001
D E C O NStairs
Elevator
Stairs To Main Entrance
Room 1203
Room 1205
Room 1207
Room 1209
Room 1211
Closet
D C NE
O
Hallway
Boys
Girls
Room 1212
Room 1214
Room 1216
Room 1218
Restroom
Room 1222
To Auditorium
Room 1206
Room 1204
H H
M
Room 1202
H06- 0946
Bagout
Samples 002-0005002-0006002-0007
x x x
Sample 002-0008
x
Sample
002-0009x
Samples 002-0001 and 0003
x x
amples 002- 0002, 002-0004
xx
Floor 03
Murray Junior High School 2200 Buford Ave.St. Paul MN. 55108
JOB NUMBER
Aug 9, 2006
Floor 03Consulting Group, Inc.
EnvironmentalArchitectureEngineering
Key
M
Decon Unit
HEPA MachineManometer
Sample LocationEnclosure Boundary
H
001-0001
D E C O N
Abat
emen
t Are
a
Room 2215
Room 2213
Room 2209
Room 2211
Room 2207
Stairs
Elevator
Room 2216
Room 2214
Room 2212
Room 2210
Room 2208
Girls Restroom
Room 2202
Room 2203Room 2201Lockers
H
D C O NEStairs
Samples 003-0001,0002,0003,0004
x x M
1200
SF
H06-0946
/Hallway
Samples 003-0009003-0008003-0007
x x x
Samples003-0006003-0005
X X
APPENDIX D
DAILY LOG REPORTS
Nova Consulting Group, Inc.1107 Hazeltine Boulevard, Suite #400Chaska, MN 55318
Daily Log
Building NumberBuilding Name Murray Junior High School
Contractor Name Twell EnviornmentalContractor License Number 592
Consultant License NumberConsultant Name Nova Consulting GroupProject Number H06-0946
Client Number STPAU006
Project Description Floor Tile AbatementClient Name Saint Paul School District
Daily Log Date 8/8/2006Environmental Specialist Jason Karpe
License Number
Contractor 9.0Consultant 1.5
Total Worker Hours
Log EntriesTime Description
Start Time End Time BreaksCrewSize
ShiftHours
Consultant Time Sheet
2:30 PM 4:00 PM 0.0 1 1.5Start Time End Time Breaks
CrewSize
ShiftHours
Contractor Time Sheet
2:00 PM 3:30 PM 0.0 6 1.5
2:00 PM Twell arrives onsite and begins to mobilze equipment to the Third Floor.2:30 PM Twell begins to critical of vents and other areas of importance. Nova arrives onsite and begins to set up work area
and pumps for the abatement process.3:00 PM Twell works on criticals and Nova gathers information to generate Jazz report.3:30 PM Twell is close to completing the prep work and will be starting abatement sometime in the morning on
Wednesday. The building closes at 15:30 so work will resume in the morning.4:00 PM Nova is allowed to work a little while longer to unload equipment and finalize data enteries.
Tuesday, December 19, 2006 Page 1 of 4
© Nova Consulting Group, Inc.
Nova Consulting Group, Inc.1107 Hazeltine Boulevard, Suite #400Chaska, MN 55318
Daily Log
Building NumberBuilding Name Murray Junior High School
Contractor Name Twell EnviornmentalContractor License Number 592
Consultant License NumberConsultant Name Nova Consulting GroupProject Number H06-0946
Client Number STPAU006
Project Description Floor Tile AbatementClient Name Saint Paul School District
Daily Log Date 8/9/2006Environmental Specialist Jason Karpe
License Number
Contractor 48.0Consultant 8.5
Total Worker Hours
Log EntriesTime Description
Start Time End Time BreaksCrewSize
ShiftHours
Consultant Time Sheet
7:00 AM 3:30 PM 0.0 1 8.5Start Time End Time Breaks
CrewSize
ShiftHours
Contractor Time Sheet
7:00 AM 3:30 PM 0.5 6 8.0
7:00 AM Twell and Nova arrive onsite. Twell works on critical barriers and putting up the Decontamination Unit. Nova oversees the work that is being perfomrd
7:30 AM Twell works on the critical barriers as Nova prepares pumps for PCM Samples8:00 AM Twell has completed critical barriers and ask Nova to do a visual inspection of the area. Nova walks through
makes suggestions on splash guards for the lockers. Twell agrees with the idea and the area passes inspection.8:15 AM Twell is ready to enter the containment and Nova prepares to start Adjacent Samples 003-0001 and 003-0002.8:30 AM The Abatement has begun and Nova monitors the manometer. The reading is -0.023.9:00 AM Abatement work continues and Nova is informed that under the tile appears a tar paper type material. Twell will
treat the material as ACM and dispose of the waste in the Fiber Barrels.9:30 AM Twell works on the abatement of the tile and Nova enters data into the Jazz program.10:00 AM Twell Supervisor leaves site to pick up neccesary paper work for Murray Junior High School. Nova monitors work
in the continment.10:30 AM Twell works in the Enclosure on the third floor and Nova works on updating Jazz file.11:00 AM Twell begins to put ACM in fiber barrels and start to remove mastic from the floor. Nova pulls morning PCM
samples and gets prepared to analyze the slides.11:30 AM Twell cleans up containment area and finishes putting ACM in barrels. Twell breaks for lunch.12:00 PM Twell returns and workers suit up for entry into the Enclosure.12:30 PM Nova checks Negative Air and finds that the level has increased to -0.18. Nova mentions to Twell Supervisor the
finding. Nova starts afternoon adjacents 003-0003 and 003-0004.1:00 PM Twell is finding that the mastic is coming up slower than anticipated.1:30 PM Nova finishes with analysis on samples 003-0001 and 003-0002.2:00 PM Twell works on mastic removal and Nova generates map for the Enclosure.2:30 PM Mastic is coming up slowly but workers are making progress.3:00 PM Nova sets up pumps for Finals that will be ran on Thursday. Twell continues with removal of mastic.3:30 PM Nova has finished reading samples 003-0003 and 003-0004 the results show the samples have passed. Work will
continue in the AM.
Tuesday, December 19, 2006 Page 2 of 4
© Nova Consulting Group, Inc.
Nova Consulting Group, Inc.1107 Hazeltine Boulevard, Suite #400Chaska, MN 55318
Daily Log
Building NumberBuilding Name Murray Junior High School
Contractor Name Twell EnviornmentalContractor License Number 592
Consultant License NumberConsultant Name Nova Consulting GroupProject Number H06-0946
Client Number STPAU006
Project Description Floor Tile AbatementClient Name Saint Paul School District
Daily Log Date 8/10/2006Environmental Specialist Jason Karpe
License Number
Contractor 48.0Consultant 0.0
Total Worker Hours
Log EntriesTime Description
Start Time End Time BreaksCrewSize
ShiftHours
Consultant Time Sheet
7:00 AM 3:30 PM 0.0 0 8.5Start Time End Time Breaks
CrewSize
ShiftHours
Contractor Time Sheet
7:00 AM 3:30 PM 0.5 6 8.0
7:00 AM Twell arrives onsite and begins to remove barrels containing ACM from the third floor. Nova assists workers with the safe removal of the barrels.
7:30 AM Twell workers continue to remove mastic from floor. Nova prepares pumps for finals later in the morning.8:00 AM Twell works on clean up in the containment. Nova helps prep floor two.8:30 AM Twell has completed clean up in containment and are ready for a visual inspection.9:00 AM Nova does visual inspection and passes the containment. Finals will be ran shortly following the visual clearance.9:30 AM Nova has started Final Clearance Samples 003-0005 through 0009. The Samples will be analyzed at
approximently at 12:0010:00 AM Twell workers continue with critical barriers on second floor. Nova visually inspects prep work performed by Twell.10:30 AM Twell works on critical barriers and Nova draws map of second floor Enclosure.11:00 AM Twell continues to work on criticals Nova draws maps.11:30 AM Twell waits for finals to be completed to so that they can use the HEPA Unit and the Decontamination Unit for the
Enclosure 02. Twell takes lunch break Nova waits for samples.12:00 PM Twell returns from break and waits for Nova to finish reading samples.12:30 PM Nova finishes analyzing Final Samples and all samples pass.1:00 PM Twell puts Decontamination Unit and HEPA filters into position in Enclosure 02. Nova enters data into Jazz.1:30 PM Twell suit up and prepare to enter containment. Nova starts afternoon Adjacent Samples.2:00 PM Twell continues with removal of Floor Tile as Nova enters data into Jazz program.2:30 PM Twell has started with mastic removal and sealing barrels that contain ACM.3:30 PM Twell will continue with the removal of mastic in the morning. Nova pulls afternoon adjacents and will read results
in the morning.
Tuesday, December 19, 2006 Page 3 of 4
© Nova Consulting Group, Inc.
Nova Consulting Group, Inc.1107 Hazeltine Boulevard, Suite #400Chaska, MN 55318
Daily Log
Building NumberBuilding Name Murray Junior High School
Contractor Name Twell EnviornmentalContractor License Number 592
Consultant License NumberConsultant Name Nova Consulting GroupProject Number H06-0946
Client Number STPAU006
Project Description Floor Tile AbatementClient Name Saint Paul School District
Daily Log Date 8/11/2006Environmental Specialist Jason Karpe
License Number
Contractor 48.0Consultant 8.5
Total Worker Hours
Log EntriesTime Description
Start Time End Time BreaksCrewSize
ShiftHours
Consultant Time Sheet
7:00 AM 3:30 PM 0.0 1 8.5Start Time End Time Breaks
CrewSize
ShiftHours
Contractor Time Sheet
7:00 AM 3:30 PM 0.5 6 8.0
7:00 AM Twell has mobilized into the building and is getting suited up to enter the Enclosure.7:30 AM Nova starts Adjacent Samples and Twell begins with mastic removal.8:00 AM Nova monitors Negative Air and monitors critical barriers inside the containment.8:30 AM Mastic removal is moving along and the Adjacent pumps are running properly. Nova reads afternoon Adjacent
Samples from 8/10/06.9:00 AM Twell continues with mastic removal. Nova updates jazz program and generates map of second floor.9:30 AM Twell workers remove mastic and load ACM containing material into fiber barrels.10:00 AM Nova makes visual inspection of containment and finds that all critical barriers are secured.10:30 AM Twell workers begin to bagout fiber barrels through the back hallway. Nova makes visual inspection of
containment and finds that areas of the floor need work. Twell enters the containment and continue to work on floor. Nova still feels that floor needs improvement so workers continue.
11:00 AM Twell has started removing carpet in basement hallways near the elevator. Nova makes point that floor filler should be removed from Second Floor but Twell Supervisor insists that it should stay. Twell breaks for lunch.
11:15 AM Nova starts finals on the Second Floor Enclosure.11:30 AM Twell returns from lunch and continue to remove carpet. Twell is removing approximently 1100 SF of carpet.12:00 PM Nova watches removal of carpet and analyzes samples from the morning.12:30 PM Morning Adjacents pass requiement.1:00 PM Twell removes rolls of old carpet to the trailer. Nova waits for samples to cycle through1:30 PM Twell removes carpet and loads into trailer. Nova prepares to pull samples from the containment area.2:00 PM Twell Supervisor leaves site to drop off trailer containing ACM Barrrels at the dumpster located at Mississippi
Elementary.2:15 PM Nova analyzes final samples and clear the containment safe to enter.2:45 PM Twell sweeps carpet area and finishes bagging critical barriers from second floor.3:15 PM Twell loads up equipment into trailer as Nova works on drawing maps.3:30 PM Nova and Twell leave site for the weekend.
Tuesday, December 19, 2006 Page 4 of 4
© Nova Consulting Group, Inc.
APPENDIX E
PERSONNEL CERTIFICATION FORM
Nova Consulting Group, Inc.
Personnel Certification Report
Client Number: STPAU006Project Number: H06-0946 Client Name: Saint Paul School DistrictProject Location: 2nd & 3rd Floor Hallways
I hereby certify that this project was completed by me or under my supervision.
Air Monitoring/Sampling Professional Certification Number Expiration DateEPA / State
Jason Karpe TDAI-H06-1306-02
Asbestos Consultant Certification Number Expiration DateEPA / State
Jason Karpe
Asbestos Contractor/Supervisor Certification Number Expiration DateEPA / State
Allen L. Nitti AS8441 10/21/2006 10/21/2006
Asbestos Worker Certification Number Expiration DateEPA / State
Javier Morales AW9390 7/15/2007 10/21/2006
Jesus Montes Morales AW8587 7/15/2007 10/21/2006
Pedro Martinez AW9148 3/4/2007 10/21/2006
Roberto Martinez AW8960 5/14/2007 10/21/2006
Santiago Gonzales AW9632 6/10/2007 10/21/2006
NIOSH 582E Certification Number Expiration DateEPA / State
Jason Karpe NIOSH-H06-1306-02
Tuesday, December 19, 2006
© Nova Consulting Group, Inc.
APPENDIX F
WASTE TRACKING
Nova Consulting Group, Inc.1107 Hazeltine Boulevard, Suite #400Chaska, MN 55318
Waste Tracking Report
Building NumberBuilding Name Murray Junior High School
Project Number H06-0946
Client Number STPAU006
Project Description Floor Tile AbatementClient Name Saint Paul School District Building Address: 2200 Buford Ave.
St. Paul MN. 55108
Removal Date Immediate Destination Final Destination Type of Transport Note8/10/2006 Twell Trailer SKB Landfill Truck
Container Fiber Barrels Quantity 14 NoteContainer Poly Bags Quantity 10 Note
8/11/2006 Twell Trailer SKB Landfill TruckContainer Fiber Barrels Quantity 16 Note Barrels contain ACM Floor Tiles and Mastic.Container Poly Bags Quantity 14 Note
Tuesday, December 19, 2006 Page 1 of 1
© Nova Consulting Group, Inc.
APPENDIX G
DAILY MICROSCOPE CHECKLIST
Nova Consulting Group, Inc.1107 Hazeltine Boulevard, Suite #400Chaska, MN 55318
Daily Microscope Report
Building NumberBuilding Name Murray Junior High School
Project Number H06-0946
Client Number STPAU006
Project Description Floor Tile AbatementClient Name Saint Paul School District Building Address 2200 Buford Ave.
St. Paul MN. 55108
FocusCondenser
CenterPhaseRings
Adjust InterocularDistance
FocusIndividualOculars
Date MicroscopeIdentifier
EnvironmentalSpecialist
NIOSH Cert.Number
CalibrationDate
8/9/2006 11/21/2005PCM-953 Jason Karpe NIOSH-H06-1306-02Check Check Check Check8/10/2006 11/21/2005PCM-953 Jason Karpe NIOSH-H06-1306-02Check Check Check Check8/11/2006 11/21/2005PCM-953 Jason Karpe NIOSH-H06-1306-02Check Check Check Check
Tuesday, December 19, 2006 Page 1 of 1
© Nova Consulting Group, Inc.
APPENDIX H
PERSONNEL CERTIFICATIONS
Issue Date: May 19, 2006Expiration Date: May 19, 2007 Diploma No.: CSI-H06-1306-02
Nova Consulting Group, Inc.
Certifies that
Jason Karpe
Has attended and successfully completed theContractor/Supervisor Initial Training Course
"Practices and Procedures for Asbestos Abatement Projects"presented in Chaska, Minnesota on
May 15, 2006
Course has been permitted by the State of Minnesotaunder Minnesota Rules, parts 4620.3702 to 4620.3722
and the U.S. EPA under Title II of TSCA, 40 CFR Part 763 (AHERA)
Charles E. EasleyCourse Director
Nova Consulting Group, Inc. - 1107 Hazeltine Boulevard, Suite #400 - Chaska, MN 55318Telephone: (612) 448-9393 FAX: (612) 448-9572
Issue Date: May 25, 2006 Diploma No.: NIOSH-H06-1306-02
Nova Consulting Group, Inc.
Certifies that
Jason Karpe
Has attended the“Asbestos In Buildings: Air Sampling and Analysis”
-- A NIOSH 582 EQUIVALENT -- Coursepresented in Chaska, Minnesota on
May 22, 2006 - May 25, 2006
and has satisfactorily passed an examination that meetsall criteria required for the course given on
May 25, 2006
Charles E. EasleyCourse Director
Nova Consulting Group, Inc. - 1107 Hazeltine Boulevard, Suite #400 - Chaska, MN 55318Telephone: (952) 448-9393 FAX: (952) 448-957
Issue Date: May 26, 2006 Diploma No.: TDA-H06-1306-02
Nova Consulting Group, Inc.Certifies that
Jason Karpe
Has attended and successfully completed theMinnesota Two Day
Asbestos Air Sampling Coursepresented in Chaska, Minnesota on
May 25, 2006 - May 26, 2006
Course has been permitted by the State of Minnesotaunder Minnesota Rules, parts 4620.3702 to 4620.3722
Charles E. EasleyCourse Director
Nova Consulting Group, Inc. - 1107 Hazeltine Boulevard, Suite #400 - Chaska, MN 55318Telephone: (952) 448-9393 FAX: (952) 448-9572