air / ground communications in europe

23
Air / Ground Communications in Europe Organisation for the Safety of Air Navigation [email protected] Future Communications Sub-Domain Manager 27 – 31 March 2006, Malmö

Upload: heidi

Post on 21-Jan-2016

28 views

Category:

Documents


0 download

DESCRIPTION

Air / Ground Communications in Europe. [email protected] Future Communications Sub-Domain Manager 27 – 31 March 2006, Malmö. European Organisation for the Safety of Air Navigation. Strategic Context. Voice VDL2+?. ADS-B Receiver. ADS-B. 8.33 kHz CPDLC Mode S EHS. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Air / Ground Communications in Europe

Air / Ground Communications in Europe

European Organisation for the Safety of Air Navigation

[email protected] Communications Sub-Domain Manager

27 – 31 March 2006, Malmö

Page 2: Air / Ground Communications in Europe

Strategic Context

ACARS

2000> 2005 > 2010 >

P+S RADAR

Voice

Departure Clearance

Digital-ATIS

Oceanic Clearance

Classical Radar

Mode S

Voice

VDL2

Voice

Transfer of ControlClearances

Microphone Check

Downlink of Heading, Speed, Selected flight

level

Mode S

Voice

VDL2

ADS-B Receiver

Voice

Initial ADS-B services

More CPDLC services

More D-FIS services

Airborne Separation

Trajectory negotiation

Voice

Autonomous Separation

8.33 kHz8.33 kHzCPDLCCPDLC

Mode S EHSMode S EHS

ADS-BADS-B

NewNewApplicationsApplications

FCIFCI

Voice

VDL2+?

ADS-B Receiver

Page 3: Air / Ground Communications in Europe

CPDLCLINK 2000+

European Organisation for the Safety of Air Navigation

Page 4: Air / Ground Communications in Europe

Operational CPDLC in the Cockpit

Page 5: Air / Ground Communications in Europe

Overview LINK

LINK implementation is well underway The extra Capacity is required, essential to implement in time LINK provides the infrastructure for future datalink enhancements

E.g. CASCADE programme LINK is seen as a necessary step towards SESAR Continued co-ordination with FAA is ongoing

Was in place with FAA CPDLC Programme Continues in PARC/ Datalink Roadmap initiative

Using ATN and VDL2

http://www.eurocontrol.int/link2000

Page 6: Air / Ground Communications in Europe

Implementing Rule for Data Link Services

European Organisation for the Safety of Air Navigation

Page 7: Air / Ground Communications in Europe

Milestones of Data Link Services Mandate

The European Commission, gave a Mandate to EUROCONTROL for the development of an Implementing Rule (IR) for Datalink Services on 30th May 2005

Delivery of Initial Plan 15 July 2005

Delivery of Regulatory Approach January 2006

Draft final report including proposed draft Implementing Rule

May 2006

Delivery of the final report including the draft Implementing Rule and the justification material

September 2006

Page 8: Air / Ground Communications in Europe

CPDLC – ADS-BCASCADE

European Organisation for the Safety of Air Navigation

Page 9: Air / Ground Communications in Europe

CASCADE Scope & Schedule

Stream 1 ADS-B-out, Auto-CPDLC, D-TAXI and

D-OTIS First implementation in 2008

Stream 2 ADS-B-in & out (ATSAW applications)

and more advanced CPDLC First implementation in 2011

Page 10: Air / Ground Communications in Europe

CASCADE Validation

CRISTAL Ireland & Portugal & Austria focusing on: ADS-B-NRA

CRISTAL Sweden focusing on: ADS-B-NRA, ADS-B-RAD, ADS-B-APT and ATSA-AIRB

CRISTAL UK focusing on: ADS-B-RAD CRISTAL MED focusing on: ADS-B-NRA,

ADS-B RAD and ADS-B APT CRISTAL Toulouse focusing on ADS-B

certification CRISTAL Paris focusing on: ASPA S&M CRISTAL Germany: focusing on TIS-B Maastricht UAC focusing on Auto-CPDLC D-OTIS & D-TAXI at Brussels Airport

FI

GE

AMAZ

EE

UA

MD

TR

CY

FR

LV

LT

NL

GB

IE BY

RO

ALMK

BG

GR

CH

IT

ATHU

YU

ESPT

DK

NO SE

PL

CZ

MT

BA

MA DZ TN

SY IQ

IR

KZ

LU SK

SIHR

BE

FI

GE

AMAZ

EE

UA

MD

TR

FR

LV

LT

DEGB

IE BY

RO

ALMK

GR

IT

ATHU

ESPT

DK

NO SE

PL

MA DZ TN

SY IQ

IR

KZ

RU

LU SK

SICRCH

BE

NL

Page 11: Air / Ground Communications in Europe

Priorities 2006

Finalise standardisation work for Stream 1. Continue trials for Stream 1. Establish a 2008 implementation baseline with an operational

approval roadmap.

www.eurocontrol.int/cascade

Page 12: Air / Ground Communications in Europe

Priorities 2006

Finalise standardisation work for Stream 1. Continue trials for Stream 1. Establish a 2008 implementation baseline with an operational

approval roadmap.

www.eurocontrol.int/cascade

Page 13: Air / Ground Communications in Europe

Future Communication System for A/G communications

European Organisation for the Safety of Air Navigation

Page 14: Air / Ground Communications in Europe

RADAR

ATSAOCAPC

VHF 25/8.33ATN-VDL-2ACARS

Regional Networks

Future Aeronautical A/G CommunicationsMost likely base on IP protocol

1090 ES

IP Ground Infrastructure (PEN)F/R F/R F/R

F/RF/R

F/RF/RF/RF/R

F/RF/R

Always Best Connected

New Link(s)

/ New Link

Page 15: Air / Ground Communications in Europe

FAA/Eurocontrol Joint Study

FAA/Eurocontrol 3 year joint study* Objectives:

Identification of requirements and operating concepts Investigation into new mobile communication technologies Investigation of a flexible avionics architecture

Development of a Future Communications Roadmap

Creation of industry buy-in

Improvements to maximise utilisation of current spectrum

* Federal Aviation Administration/EUROCONTROL , Cooperative Research and Development Action Plan 17: Future Communications Study (AP 17-04)

CCOMFAA/EUROCONTROL

Co-ordination Committee

CoordinatedWith IATA

Page 16: Air / Ground Communications in Europe

Aircraft Traffic Communications

A Day in 2025

• More than double of today’s traffic

• Advanced ATC concept

• Data Primary

• …

• T -Throughput

• C - Continuity

• I - Integrity

• A - Availability

Page 17: Air / Ground Communications in Europe

0

5

10

15

20

PIA

C

High Density Low Density

PIAC: Oceanic

2015

0

2

4

6

8

10

PIAC: Polar

2015

0

2

4

6

8

10

PIAC: Polar

2015 2030

0

5

10

15

20

PIA

C

High Density Low Density

PIAC: Oceanic

2015 2030

0

5

10

15

20

25

30

35

PIA

C

High Density Low Density

PIAC: En Route

2015

0

5

10

15

20

25

30

35

PIA

C

High Density Low Density

PIAC: En Route

2015 2030

ATC/AOC Services by DomainEn Route/Oceanic/Polar

Red = Service AvailableAfter 2015

Green = AOC Services

Blue = ATS Services

Also Available: D-ALERT AMC URCO

0%

20%

40%

60%

80%

100%

Equip Voice Data

Oceanic/Polar2015

0%

20%

40%

60%

80%

100%

Equip Voice Data

Oceanic/Polar2030ACL

SAP

ACM

ADS-B / ITP

ARMAND

PPD

FLIPCY

DSC

D-SIGMET

GRECO

FLIPINT

D-ORIS

ADS-B / S&M

ADS-B

0%

20%

40%

60%

80%

100%

Equip Voice Data

En Route2015

0%

20%

40%

60%

80%

100%

Equip Voice Data

En Route2030

COTRAC

ADS-B / C&P

DYNAV

Flight Status

Engine Performance Rpt

Fuel Status

Position Report

NOTAMS

Free Text

Weather Request

Flight Plan Request

Maintenance Troubleshooting

Graphical Weather

Real Time Maintenance

Real Time Weather

Online Technical Troubleshooting

A I R T R A F F I C O R G A N I Z A T I O NA I R T R A F F I C O R G A N I Z A T I O N

Page 18: Air / Ground Communications in Europe

Process to Identify Communications Parameters

Concepts – Services

High Level Safety and Security Analysis C, I, A

Operational Performance Latency Allocation to the Communications Pipe

Communications Loading Analysis Typical Service Volumes STATFOR – SAAM Transactions per A/C per Service Volume

Queueing Model Thoughput

Page 19: Air / Ground Communications in Europe

COCR Document

Results

•2020 and 2030

•A/G voice; A/G data; A/A data

•ATC and/or AOC

Usage

•Industry Consultation - ongoing

•Europe : Provided to SESAR

•Technology Selection

•Spectrum Calculation

•US : Used by JPDO for future system

•Coordinated with ICAO

Cooperation : EUROCONTROL and FAA

Page 20: Air / Ground Communications in Europe

Role of IP in the FCS

European Organisation for the Safety of Air Navigation

Page 21: Air / Ground Communications in Europe

Role of Communications in an ATM System

Router Network

ATC Centre

ARINC, SITA, …

A/GRouter

Data Link

Aircraft

Airborne Router

Pilot HMI

Flight Crew

ProceduresFlight Deck

EndSystem

FDP

Controller HMI

ProceduresEnd-toEnd + Networking

Router

End System

ATC Ser

vices

,

Proce

dure

s

G/G NetworkATN ATN ATNATN

ATNATN

IP? IP? IP?IP?

IP?IP?

Page 22: Air / Ground Communications in Europe

A/G Communications : IP for A/G ATC ?

Study : Use of IP for A/G safety critical comms

Internet Engineering Task Force (IETF) emerging IP standards

Live Cycle

Commercial Of The Shelf (COTS) Dilemma

Transition

Page 23: Air / Ground Communications in Europe

Thank You …