Air Carrier
and
General Aviation
Airport FUNDED
Program 2019-2020
Item Airport Project Description
Federal
Funds State Match Local Other Total Funds
Airport Construction and Development Priority Program 2019-2020
Air Carrier Capital Outlay
1 BATON ROUGE METROPOLITAN AIRPORT
Runway 13-31 RSA/RPZ Improvements - Phase II (Final Design and Land Acquisition)
$7,300,000 $3,311,111 $20,000 $10,631,111
2 LAFAYETTE REGIONAL AIRPORT Construct Terminal - Phase III $12,000,000 $4,233,333 $20,616,067 $36,849,400
3 NEW ORLEANS LOUIS ARMSTRONG INTERNATIONAL AIRPORT
Terminal Construction Project - Phase VI $4,984,867 $3,664,649 $996,973 $9,646,489
4 LAKE CHARLES REGIONAL AIRPORT Bury Utility Lines - Phase III (Construction) $0 $700,000 $20,000 $720,000
5 SHREVEPORT REGIONAL AIRPORT Improve Runway 32 RPZ $0 $120,000 $0 $120,000
6 ALEXANDRIA INTERNATIONAL AIRPORT
Airfield Electrical Rehabilitation - Phase V (Final) $0 $480,141 $0 $480,141
7 MONROE REGIONAL AIRPORT Runway 14/32 Extension - Phase III (Runway Construction)
$5,400,000 $1,600,000 $0 $7,000,000
8 ALEXANDRIA INTERNATIONAL AIRPORT
Rehabilitation of Runway and Taxiway Safety Area - Phase II (Construction)
$1,445,235 $2,440,582 $0 $3,885,817
9 SHREVEPORT REGIONAL AIRPORT Noise Mitigation - (Land Reuse Plan) $343,127 $38,125 $0 $381,252
10 ALEXANDRIA INTERNATIONAL AIRPORT
Master Drainage Rehabilitation - Phase III (Design) $247,500 $27,500 $0 $275,000
11 SHREVEPORT REGIONAL AIRPORT Rehabilitate Twy B & GA Taxilanes - Phase I (Design) $450,000 $50,000 $0 $500,000
12 LAKE CHARLES REGIONAL AIRPORT Runway 5/23 Rehabilitation - Phase I (Design) $0 $325,000 $0 $325,000
13 NEW ORLEANS LOUIS ARMSTRONG INTERNATIONAL AIRPORT
Taxiway G West Extension - Phase I (Design and Construct)
$3,000,000 $400,000 $600,000 $4,000,000
14 SHREVEPORT REGIONAL AIRPORT Security Improvements - Phase II $1,800,000 $200,000 $0 $2,000,000
15 LAKE CHARLES REGIONAL AIRPORT Terminal Loading Bridge $1,000,000 $111,111 $0 $1,111,111
$17,701,552 $22,253,040 $77,925,321Air Carrier Capital Outlay Totals $37,970,729
Tuesday, February 19, 2019 Page 1 of 5Air Carrier Capital Outlay
Item Airport Project Description
Federal
Funds State Match Local Other Total Funds
Airport Construction and Development Priority Program 2019-2020
General Aviation Capital Outlay
1 NEW ORLEANS LAKEFRONT AIRPORT Rehabilitate Runway 18R/36L - Phase III (Construction) $9,000,000 $1,000,000 $0 $10,000,000
2 NEW ORLEANS LAKEFRONT AIRPORT Rehabilitation of Drainage - Phase III (Design) $0 $290,000 $0 $290,000
3 MOREHOUSE MEMORIAL AIRPORT Obstruction Removal - Design (16/34 Approaches) $58,500 $6,500 $0 $65,000
4 SHREVEPORT DOWNTOWN AIRPORT Rehabilitate Runway 14/32 - Phase I (Design) $346,500 $38,500 $0 $385,000
5 JENA AIRPORT Obstruction Removal Ph I (Approach Runway 18) $103,500 $11,500 $0 $115,000
6 HAMMOND NORTHSHORE REGIONAL AIRPORT
Taxiway Lighting Rehabilitation - Phase I (Design) $0 $150,000 $0 $150,000
7 NEW ORLEANS LAKEFRONT AIRPORT RehabiliteTaxiway F Drainage (Construction) $0 $150,000 $0 $150,000
8 LOUISIANA REGIONAL AIRPORT Runway & Taxiway Overlay - Phase II (Construction) $1,488,600 $165,400 $0 $1,654,000
9 PORT OF SOUTH LOUISIANA EXECUTIVE REGIONAL AIRPORT
Runway 17-35 Rehabilitation - Phase II (Construction) $1,320,300 $146,700 $0 $1,467,000
10 LOUISIANA REGIONAL AIRPORT South Apron Expansion - Phase II (Design & Construction)
$0 $750,000 $0 $750,000
11 SOUTH LAFOURCHE LEONARD MILLER, JR. AIRPORT
Airfield Drainage Improvements - Phase II (Construction) $189,000 $21,000 $0 $210,000
12 EUNICE AIRPORT Apron Rehabilitation - Phase II (Construction) $450,000 $50,000 $0 $500,000
13 VIVIAN AIRPORT Obstruction Removal - (Phase I Runway 9 and 27 Approaches)
$150,000 $16,667 $0 $166,667
14 NATCHITOCHES REGIONAL AIRPORT Rehabilitate Drainage - Phase II (Design) $0 $50,000 $0 $50,000
15 JENNINGS AIRPORT Taxiway & Apron Rehabilitation (Design & Construction) $0 $490,000 $20,000 $510,000
16 BEAUREGARD REGIONAL AIRPORT Apron Rehabilitation - Phase I (Construction) $594,000 $66,000 $0 $660,000
17 HARRY P. WILLIAMS MEMORIAL AIRPORT
Rehabilitate Pump Station - Phase II (Design & Construction)
$0 $165,000 $0 $165,000
Tuesday, February 19, 2019 Page 2 of 5General Aviation Capital Outlay
Item Airport Project Description
Federal
Funds State Match Local Other Total Funds
Airport Construction and Development Priority Program 2019-2020
General Aviation Capital Outlay
18 ST LANDRY PARISH-AHART FIELD Perimeter Fencing - Phase II (Construction) $345,150 $38,350 $0 $383,500
19 SLIDELL AIRPORT Aviation Fuel System Rehabilitation $0 $335,000 $50,000 $385,000
20 C.E. RUSTY WILLIAMS AIRPORT Runway Rehabilitation - Phase I (Design) $0 $10,000 $90,000 $100,000
21 LEESVILLE AIRPORT Runway Safety Area Improvements - Phase IIB $51,863 $5,763 $0 $57,626
22 LEESVILLE AIRPORT Construct Runway Turnabouts - Phase II (Construction) $548,000 $60,889 $0 $608,889
23 DE QUINCY INDUSTRIAL AIRPARK Perimeter Fencing - Phase III (Construction) $141,300 $15,700 $0 $157,000
24 HARRY P. WILLIAMS MEMORIAL AIRPORT
Rehabilitate Perimeter Fence $570,180 $63,353 $0 $633,533
25 ESLER REGIONAL AIRPORT Rehabilitate Runway 9/27 - Phase IIB (Construction) $1,533,510 $170,390 $0 $1,703,900
26 HARRY P. WILLIAMS MEMORIAL AIRPORT
Upgrade Localizer $0 $250,000 $0 $250,000
27 MINDEN AIRPORT Rehabilitate Runway 1/19 - Phase I (Design) $108,000 $12,000 $0 $120,000
28 FALSE RIVER REGIONAL AIRPORT Runway 36 RPZ Drainage Improvements $0 $620,000 $0 $620,000
29 SOUTHLAND FIELD Rehabilitate Taxiway B & T-hangar Apron $117,000 $13,000 $0 $130,000
30 PORT OF SOUTH LOUISIANA EXECUTIVE REGIONAL AIRPORT
South Hangar Access $0 $102,000 $10,000 $112,000
31 BEAUREGARD REGIONAL AIRPORT Rehabilitate Taxiways $0 $289,489 $0 $289,489
32 MARKSVILLE MUNICIPAL AIRPORT T-Hangar Apron Access Improvements $0 $131,750 $0 $131,750
33 CONCORDIA PARISH AIRPORT Obstruction Mitigation - Phase I T-Hangar Taxilane (Design and Construction)
$315,000 $35,000 $0 $350,000
34 PINEVILLE MUNICIPAL AIRPORT Runway Rehabilitation - Construction - Rural Airport Program
$0 $870,000 $0 $870,000
Tuesday, February 19, 2019 Page 3 of 5General Aviation Capital Outlay
Item Airport Project Description
Federal
Funds State Match Local Other Total Funds
Airport Construction and Development Priority Program 2019-2020
General Aviation Capital Outlay
35 ABBEVILLE CHRIS CRUSTA MEMORIAL AIRPORT
Rehabilitate T-hangar Taxilanes & Apron - Phase I (Design)
$0 $70,000 $0 $70,000
36 ABBEVILLE CHRIS CRUSTA MEMORIAL AIRPORT
Approach Lighting - Phase I (Preliminary) $0 $140,000 $0 $140,000
37 CHENNAULT INTERNATIONAL AIRPORT Taxiway Delta Realignment - Phase I (PER) $67,500 $7,500 $0 $75,000
38 NATCHITOCHES REGIONAL AIRPORT Install New Perimeter Fence and Repair Existing Fence - Phase I
$0 $300,000 $0 $300,000
39 WINNSBORO MUNICIPAL AIRPORT Taxiway and Apron Rehab (Design and Construction) $378,000 $42,000 $0 $420,000
40 VICKSBURG TALLULAH REGIONAL AIRPORT
Hangar Development Area- Phase I (Design) $94,500 $10,500 $0 $105,000
41 NATCHITOCHES REGIONAL AIRPORT Acquire Land for Runway 35 Runway Protection Zone $94,500 $10,500 $0 $105,000
42 FALSE RIVER REGIONAL AIRPORT Hangar Development - Phase I (Preliminary) $0 $80,000 $0 $80,000
43 MARKSVILLE MUNICIPAL AIRPORT Small Scale Master Plan Update $170,100 $18,900 $0 $189,000
44 ALLEN PARISH AIRPORT Small Scale Masterplan $202,500 $22,500 $0 $225,000
45 WOODWORTH AIRPORT Rehabilitate Runway 1/19 - Construction - Rural Airport Program
$0 $560,000 $0 $560,000
46 LIVINGSTON REGIONAL AIRPORT Master Plan Update and Preliminary Runway Development
$0 $552,000 $0 $552,000
$8,403,851 $170,000 $27,011,354General Aviation Capital Outlay Totals $18,437,503
Tuesday, February 19, 2019 Page 4 of 5General Aviation Capital Outlay
Item Airport Project Description
Federal
Funds State Match Local Other Total Funds
Airport Construction and Development Priority Program 2019-2020
General Aviation Capital Outlay
NAVAIDS Program
GA Maintenance Reimbursement Program
2019-2020 AVIATION PRIORITY PROGRAM TOTAL
Obstruction Removal Program
$975,000
$300,000
$119,597
$28,200,000
AC Maintenance Reimbursement Program $700,000
Tuesday, February 19, 2019 Page 5 of 5General Aviation Capital Outlay
Louisiana Airport
System Unfunded
Program 2020-2021
Item Airport Project Description
Federal
Funds State Match Local Other Total Funds
Airport Construction and Development Priority Program 2020-2021
Air Carrier Capital Outlay
1 BATON ROUGE METROPOLITAN AIRPORT
Runway 13-31 RSA/RPZ Improvements - Phase III $5,800,000 $3,394,444 $20,000 $9,214,444
2 LAFAYETTE REGIONAL AIRPORT Construct Terminal - Phase IV $12,000,000 $4,083,333 $3,882,322 $19,965,655
3 MONROE REGIONAL AIRPORT Airfield Lighting Rehabilitation - Phase II (Construction) $0 $750,000 $20,000 $770,000
4 SHREVEPORT REGIONAL AIRPORT Airfield Lighting Rehabilitation - Phase V - (Construction) $0 $800,000 $0 $800,000
5 SHREVEPORT REGIONAL AIRPORT Rehabilitate Taxiway B & GA Taxilanes - Phase II (Construction)
$1,800,000 $200,000 $0 $2,000,000
6 LAKE CHARLES REGIONAL AIRPORT Runway 5/23 Rehabilitation - Phase II (Construction) $0 $2,175,000 $0 $2,175,000
7 NEW ORLEANS LOUIS ARMSTRONG INTERNATIONAL AIRPORT
Terminal Construction Project - Phase VII $15,609,765 $2,081,302 $3,121,953 $20,813,020
8 ALEXANDRIA INTERNATIONAL AIRPORT
Rehabilitation of Runway and Taxiway Safety Area - Phase III (Construction)
$0 $2,750,000 $0 $2,750,000
9 ALEXANDRIA INTERNATIONAL AIRPORT
Master Drainage Rehabilitation - Phase IV (Construction) $3,000,000 $333,333 $0 $3,333,333
10 NEW ORLEANS LOUIS ARMSTRONG INTERNATIONAL AIRPORT
Taxiway G West Extension - Phase II $7,000,000 $933,333 $1,400,000 $9,333,333
11 SHREVEPORT REGIONAL AIRPORT ATC Relocation/Terminal Modernization - Phase I (EA/Design)
$720,000 $80,000 $0 $800,000
12 LAKE CHARLES REGIONAL AIRPORT Construct Entrance Road Canopy - Phase I (Departures) $1,000,000 $111,111 $0 $1,111,111
13 NEW ORLEANS LOUIS ARMSTRONG INTERNATIONAL AIRPORT
Airport Master Plan Update $1,500,000 $200,000 $300,000 $2,000,000
$17,891,856 $8,744,275 $75,065,896Air Carrier Capital Outlay Totals $48,429,765
Tuesday, February 19, 2019 Page 1 of 5Air Carrier Capital Outlay
Item Airport Project Description
Federal
Funds State Match Local Other Total Funds
Airport Construction and Development Priority Program 2020-2021
General Aviation Capital Outlay
1 SLIDELL AIRPORT Runway 18 Obstruction Mitigation - Phase III (Wetland Mitigation)
$900,000 $100,000 $0 $1,000,000
2 SOUTH LAFOURCHE LEONARD MILLER, JR. AIRPORT
Obstruction Removal - Runway 18 Approach Phase II (Construction)
$135,000 $15,000 $0 $150,000
3 MINDEN AIRPORT Obstruction Removal - Phase III (Construction) $0 $160,000 $0 $160,000
4 ST TAMMANY REGIONAL AIRPORT Mitigate Transitional Obstructions Phase V - Relocate Airport Access Road (Construction)
$0 $880,472 $0 $880,472
5 MOREHOUSE MEMORIAL AIRPORT Obstruction Removal - Phase II (Construction Both Ends) $346,500 $38,500 $0 $385,000
6 JENA AIRPORT Obstruction Removal - Phase II (Construction Approach Both Runway Ends)
$36,000 $4,000 $0 $40,000
7 NEW ORLEANS LAKEFRONT AIRPORT Rehabilitation of Drainage - Phase IV (Final Design) $0 $385,000 $0 $385,000
8 HAMMOND NORTHSHORE REGIONAL AIRPORT
Terminal Apron Rehabilitation $342,000 $38,000 $20,000 $400,000
9 HOUMA TERREBONNE AIRPORT Runway and Taxiway Marking $0 $700,000 $20,000 $720,000
10 LOUISIANA REGIONAL AIRPORT Terminal Apron Reconstruction - Phase II (Design) $0 $95,000 $0 $95,000
11 NEW ORLEANS LAKEFRONT AIRPORT Rehabilitate Taxiway B - Phase I (Design) $0 $100,000 $0 $100,000
12 SHREVEPORT DOWNTOWN AIRPORT Terminal Ramp Rehabilitation - Phase I (Design) $0 $80,000 $0 $80,000
13 HOUMA TERREBONNE AIRPORT West Apron Expansion - Phase I (Design) $0 $200,000 $20,000 $220,000
14 HAMMOND NORTHSHORE REGIONAL AIRPORT
Taxiway Lighting Rehabilitation - Phase II (Construction) $0 $850,000 $0 $850,000
15 SLIDELL AIRPORT Aviation Fuel System Rehabilitation - Phase II $0 $100,000 $0 $100,000
16 C.E. RUSTY WILLIAMS AIRPORT Apron Overlay - Phase I Design $49,500 $5,500 $0 $55,000
17 LOUISIANA REGIONAL AIRPORT Aviation Fuel System Rehabilitation $0 $180,000 $20,000 $200,000
Tuesday, February 19, 2019 Page 2 of 5General Aviation Capital Outlay
Item Airport Project Description
Federal
Funds State Match Local Other Total Funds
Airport Construction and Development Priority Program 2020-2021
General Aviation Capital Outlay
18 LOUISIANA REGIONAL AIRPORT Hangar Development - Phase II $0 $600,000 $20,000 $620,000
19 MINDEN AIRPORT Rehabilitate Runway 1/19 - Phase II (Construction) $1,125,000 $125,000 $0 $1,250,000
20 LE GROS MEMORIAL AIRPORT Rehabilitate Airfield Drainage Phase II - Construction $503,100 $55,900 $0 $559,000
21 RUSTON REGIONAL AIRPORT Construct Runway Extension - Phase III (Construction) $3,780,000 $420,000 $0 $4,200,000
22 CHENNAULT INTERNATIONAL AIRPORT Airfield Lighting Rehabilitation - Phase III (Taxiway Design)
$0 $80,000 $0 $80,000
23 UNION PARISH AIRPORT Obstruction Removal - Phase I (Design Both Runway Ends)
$45,000 $5,000 $0 $50,000
24 FELICIANA AIRPARK Runway Rehabilitation - Phase I (Design) - Rural Airport Program
$0 $40,000 $0 $40,000
25 ST LANDRY PARISH-AHART FIELD Perimeter Fencing - Phase III (Construction) $345,150 $38,350 $0 $383,500
26 COLUMBIA AIRPORT Runway Rehabilitation - Rural Airport Program $0 $165,000 $0 $165,000
27 C.E. RUSTY WILLIAMS AIRPORT Runway Rehabilitation - Phase II (Construction) $0 $350,000 $750,000 $1,100,000
28 ABBEVILLE CHRIS CRUSTA MEMORIAL AIRPORT
Approach Lighting - Phase II (Design) $0 $35,000 $0 $35,000
29 CHENNAULT INTERNATIONAL AIRPORT Install SSALR Approach Lighting System - Phase II (Construction)
$0 $920,000 $0 $920,000
30 CHENNAULT INTERNATIONAL AIRPORT Taxiway Delta Realignment - Phase II (Design) $202,500 $22,500 $0 $225,000
31 HAMMOND NORTHSHORE REGIONAL AIRPORT
Runway 31 Threshold Recovery - Phase I (Environmental)
$58,500 $6,500 $0 $65,000
32 JENNINGS AIRPORT Rehabilitate Runway 8/26 $326,700 $36,300 $0 $363,000
33 VICKSBURG TALLULAH REGIONAL AIRPORT
North Hangar Development - Phase II (Construction) $0 $500,000 $20,000 $520,000
34 KELLY DUMAS Construct Stub Taxiway - Phase II (Construction) $453,591 $50,399 $0 $503,990
Tuesday, February 19, 2019 Page 3 of 5General Aviation Capital Outlay
Item Airport Project Description
Federal
Funds State Match Local Other Total Funds
Airport Construction and Development Priority Program 2020-2021
General Aviation Capital Outlay
35 VICKSBURG TALLULAH REGIONAL AIRPORT
Construct Taxilane- Phase II (Construction North End) $405,000 $45,000 $0 $450,000
36 ABBEVILLE CHRIS CRUSTA MEMORIAL AIRPORT
Construct Hangar Development Area - Phase I (Design) $36,000 $4,000 $0 $40,000
37 GEORGE R. CARR MEMORIAL AIRPORT Runway Rehabilitation - Phase I (Design) $186,667 $20,741 $0 $207,408
38 ST TAMMANY REGIONAL AIRPORT Runway Rehabilitation - Phase I (Design) $157,950 $17,550 $0 $175,500
39 HOUMA TERREBONNE AIRPORT Taxiway F - Phase I (Design) $315,000 $35,000 $0 $350,000
40 NATCHITOCHES REGIONAL AIRPORT Rehabilitate Runway 7/25 Phase I - Design $90,000 $10,000 $0 $100,000
41 VIVIAN AIRPORT Obstruction Mitigation - Phase II Relocate Existing Hangar
$0 $625,000 $0 $625,000
42 SOUTHLAND FIELD Apron Expansion - Phase I (Design) $100,800 $11,200 $0 $112,000
43 KELLY DUMAS Widen Runway 18/36 - Phase I (EA and Design) $0 $220,000 $0 $220,000
44 JENA AIRPORT Taxiway Relocation - Phase I (Preliminary Engineering Report and Environmental)
$18,000 $2,000 $0 $20,000
45 JOHN H. HOOKS JR. MEMORIAL Taxiway Rehabilitation $180,000 $20,000 $0 $200,000
46 WINNSBORO MUNICIPAL AIRPORT Runway Rehabilitation $162,000 $18,000 $0 $180,000
47 NATCHITOCHES REGIONAL AIRPORT Install New Perimeter Fence and Repair Existing Fence - Phase II
$0 $100,000 $0 $100,000
48 SPRINGHILL AIRPORT Taxilanes for T-Hangar Development Area - Phase I (Design)
$67,500 $7,500 $0 $75,000
49 ESLER REGIONAL AIRPORT Small Scale Airport Master Plan $114,750 $12,750 $0 $127,500
50 JONESVILLE MUNICIPAL AIRPORT Small Scale Masterplan $90,000 $10,000 $0 $100,000
51 LIVINGSTON REGIONAL AIRPORT Runway Development - Phase I $3,465,000 $385,000 $0 $3,850,000
Tuesday, February 19, 2019 Page 4 of 5General Aviation Capital Outlay
Item Airport Project Description
Federal
Funds State Match Local Other Total Funds
Airport Construction and Development Priority Program 2020-2021
General Aviation Capital Outlay
$8,925,162 $870,000 $23,832,370General Aviation Capital Outlay Totals $14,037,208
NAVAIDS Program
GA Maintenance Reimbursement Program
2020-2021 AVIATION PRIORITY PROGRAM TOTAL
Obstruction Removal Program
$975,000
$300,000
$282,982
$28,900,000
AC Maintenance Reimbursement Program $525,000
Tuesday, February 19, 2019 Page 5 of 5General Aviation Capital Outlay
Louisiana Airport
System Unfunded
Program 2021-2022
Item Airport Project Description
Federal
Funds State Match Local Other Total Funds
Airport Construction and Development Priority Program 2021-2022
Air Carrier Capital Outlay
1 BATON ROUGE METROPOLITAN AIRPORT
Runway 13-31 RSA/RPZ Improvements - Phase IV $8,300,000 $3,922,222 $20,000 $12,242,222
2 MONROE REGIONAL AIRPORT Airfield Lighting Rehabilitation - Phase III (Construction) $0 $750,000 $0 $750,000
3 SHREVEPORT REGIONAL AIRPORT Rehabilitate Runway 14/32 - Phase I (Design) $0 $400,000 $0 $400,000
4 LAFAYETTE REGIONAL AIRPORT Construct Terminal - Phase V $5,000,000 $3,555,556 $3,704,561 $12,260,117
5 SHREVEPORT REGIONAL AIRPORT Airfield Drainage Rehabilitation - Phase IV (Design & Construction)
$0 $1,600,000 $0 $1,600,000
6 ALEXANDRIA INTERNATIONAL AIRPORT
Rehabilitation of Runway and Taxiway Safety Area - Phase IV (Construction)
$0 $2,069,180 $0 $2,069,180
7 LAKE CHARLES REGIONAL AIRPORT Safety Area Drainage Rehabilitation $0 $300,000 $0 $300,000
8 LAKE CHARLES REGIONAL AIRPORT Obstruction Removal - Transitional - Phase I (EA) $0 $150,000 $0 $150,000
9 NEW ORLEANS LOUIS ARMSTRONG INTERNATIONAL AIRPORT
Rehabilitate Taxiways E, S, & F - Phase I $4,046,250 $539,500 $809,250 $5,395,000
10 LAKE CHARLES REGIONAL AIRPORT Construct Middle Ramp $0 $805,000 $0 $805,000
11 LAKE CHARLES REGIONAL AIRPORT Apron Area Lighting (Commercial & GA) $0 $250,000 $0 $250,000
12 LAKE CHARLES REGIONAL AIRPORT ATCT Study $0 $250,000 $0 $250,000
13 ALEXANDRIA INTERNATIONAL AIRPORT
North Ramp Rehabilitation $0 $388,889 $0 $388,889
14 LAFAYETTE REGIONAL AIRPORT Taxiway B Reconfiguration $2,484,000 $276,000 $0 $2,760,000
15 LAKE CHARLES REGIONAL AIRPORT Construct Entrance Road Canopy - Phase II (Arrivals) $1,000,000 $111,111 $0 $1,111,111
16 NEW ORLEANS LOUIS ARMSTRONG INTERNATIONAL AIRPORT
Southside Redevelopment - Phase I $0 $2,750,000 $0 $2,750,000
$18,117,458 $4,533,811 $43,481,519Air Carrier Capital Outlay Totals $20,830,250
Tuesday, February 19, 2019 Page 1 of 5Air Carrier Capital Outlay
Item Airport Project Description
Federal
Funds State Match Local Other Total Funds
Airport Construction and Development Priority Program 2021-2022
General Aviation Capital Outlay
1 HAMMOND NORTHSHORE REGIONAL AIRPORT
Runway 31 Threshold Recovery - Phase II (Design/Clearing)
$483,300 $53,700 $0 $537,000
2 ST LANDRY PARISH-AHART FIELD Obstruction Removal (Runway 18-36) - Phase II (Construction)
$0 $333,000 $0 $333,000
3 HOUMA TERREBONNE AIRPORT West Apron Expansion - Phase II (Construction) $0 $1,000,000 $20,000 $1,020,000
4 SHREVEPORT DOWNTOWN AIRPORT Rehabilitate Runway 14/32 - Phase II (Construction) $4,500,000 $500,000 $0 $5,000,000
5 NEW ORLEANS LAKEFRONT AIRPORT Rehabilitation of Drainage - Phase IV (Construction) $0 $300,000 $0 $300,000
6 NEW ORLEANS LAKEFRONT AIRPORT Rehabilitate Taxiway B - Phase II (Construction) $0 $700,000 $0 $700,000
7 SHREVEPORT DOWNTOWN AIRPORT Terminal Ramp Rehabilitation - Phase II (Construction) $0 $450,000 $0 $450,000
8 LOUISIANA REGIONAL AIRPORT Terminal Apron Reconstruction - Phase III (Construction) $630,000 $70,000 $0 $700,000
9 SOUTH LAFOURCHE LEONARD MILLER, JR. AIRPORT
Airfield Pavement Rehabilitation - Phase I (Design) $0 $40,000 $20,000 $60,000
10 SHREVEPORT DOWNTOWN AIRPORT Rehabilitate Northwest Apron - Phase I (Design) $0 $220,000 $0 $220,000
11 CONCORDIA PARISH AIRPORT Obstruction Mitigation - Phase II Hangars (Design) $0 $35,000 $25,000 $60,000
12 SLIDELL AIRPORT North Apron Overlay $693,000 $77,000 $0 $770,000
13 HOUMA TERREBONNE AIRPORT Taxiway F - Phase II (Construction) $2,925,000 $325,000 $0 $3,250,000
14 FALSE RIVER REGIONAL AIRPORT Overlay Runway and Taxiway - Phase III (Construction) $1,440,000 $160,000 $0 $1,600,000
15 GEORGE R. CARR MEMORIAL AIRPORT Runway Rehabilitation - Phase II (Construction) $990,000 $110,000 $0 $1,100,000
16 ABBEVILLE CHRIS CRUSTA MEMORIAL AIRPORT
Approach Lighting - Phase III (Construction) $0 $215,000 $0 $215,000
17 ST TAMMANY REGIONAL AIRPORT Runway Rehabilitation - Phase II (Construction) $1,408,345 $156,483 $0 $1,564,828
Tuesday, February 19, 2019 Page 2 of 5General Aviation Capital Outlay
Item Airport Project Description
Federal
Funds State Match Local Other Total Funds
Airport Construction and Development Priority Program 2021-2022
General Aviation Capital Outlay
18 HART AIRPORT Runway Rehabilitation South - Phase I (Design) $81,000 $9,000 $0 $90,000
19 ABBEVILLE CHRIS CRUSTA MEMORIAL AIRPORT
Rehabilitate Runway & Partial Taxiway - Phase II (Construction)
$1,215,230 $135,026 $0 $1,350,256
20 CHENNAULT INTERNATIONAL AIRPORT Airfield Lighting Rehabilitation - Phase IV (Taxiway Construction)
$0 $600,000 $0 $600,000
21 FELICIANA AIRPARK Rehabilitate Runway - Phase II (Construction) - Rural Airport Program
$0 $400,000 $0 $400,000
22 SOUTHLAND FIELD Apron Expansion - Phase II (Construction) $828,000 $92,000 $0 $920,000
23 FALSE RIVER REGIONAL AIRPORT Obstruction Removal - Phase II (Land Acquisition & Construction)
$283,500 $31,500 $0 $315,000
24 ABBEVILLE CHRIS CRUSTA MEMORIAL AIRPORT
Rehabilitate T-hangar Taxilanes & Apron - Phase II (Construction)
$0 $500,000 $0 $500,000
25 GEORGE R. CARR MEMORIAL AIRPORT Partial Parallel Taxiway Widening $0 $280,000 $0 $280,000
26 JENA AIRPORT Taxiway Relocation - Phase II (Design) $90,000 $10,000 $0 $100,000
27 CHENNAULT INTERNATIONAL AIRPORT Taxiway Delta Realignment - Phase III (Construction) $2,970,000 $330,000 $0 $3,300,000
28 PORT OF SOUTH LOUISIANA EXECUTIVE REGIONAL AIRPORT
Apron Rehabilitation (Design & Construction) $558,000 $62,000 $0 $620,000
29 ABBEVILLE CHRIS CRUSTA MEMORIAL AIRPORT
Construct Hangar Development Area - Phase II (Construction)
$585,000 $65,000 $0 $650,000
30 C.E. RUSTY WILLIAMS AIRPORT Apron Overlay - Phase II (Construction) $382,500 $42,500 $0 $425,000
31 NATCHITOCHES REGIONAL AIRPORT Rehabilitate Airfield Drainage - Phase III (Construction) $0 $225,000 $0 $225,000
32 SOUTH LAFOURCHE LEONARD MILLER, JR. AIRPORT
Obstruction Removal - Runway 18 Approach - Phase I (Design)
$36,000 $4,000 $0 $40,000
33 LEESVILLE AIRPORT Rehabilitate Runway $372,600 $41,400 $0 $414,000
Tuesday, February 19, 2019 Page 3 of 5General Aviation Capital Outlay
Item Airport Project Description
Federal
Funds State Match Local Other Total Funds
Airport Construction and Development Priority Program 2021-2022
General Aviation Capital Outlay
34 NATCHITOCHES REGIONAL AIRPORT Rehabilitate Runway 7/25 - Phase II (Construction) $1,350,000 $150,000 $0 $1,500,000
35 MOREHOUSE MEMORIAL AIRPORT Rehabilitate Runway/Taxiway - Phase I (Design) $130,500 $14,500 $0 $145,000
36 WELSH AIRPORT Runway Rehabilitation - Phase I (Design) - Rural Airport Program
$0 $35,000 $0 $35,000
37 EUNICE AIRPORT New Aircraft Hangars - Phase I (Design) $135,000 $15,000 $0 $150,000
38 DE QUINCY INDUSTRIAL AIRPARK T-hangar Construction - Phase I (Design) $149,400 $16,600 $0 $166,000
39 HART AIRPORT Small Scale Master Plan Update $112,500 $12,500 $0 $125,000
40 JOHN H. HOOKS JR. MEMORIAL North Apron Access - Phase I (Design) $90,000 $10,000 $0 $100,000
41 LIVINGSTON REGIONAL AIRPORT Runway Development - Phase II $3,465,000 $385,000 $0 $3,850,000
42 UNION PARISH AIRPORT New Taxilanes - (Design) $67,500 $7,500 $0 $75,000
43 WINNSBORO MUNICIPAL AIRPORT Master Plan $54,000 $6,000 $0 $60,000
44 JONESVILLE MUNICIPAL AIRPORT Runway Rehabilitation - (Design) $45,000 $5,000 $0 $50,000
$8,229,709 $65,000 $34,365,084General Aviation Capital Outlay Totals $26,070,375
Tuesday, February 19, 2019 Page 4 of 5General Aviation Capital Outlay
Item Airport Project Description
Federal
Funds State Match Local Other Total Funds
Airport Construction and Development Priority Program 2021-2022
General Aviation Capital Outlay
NAVAIDS Program
GA Maintenance Reimbursement Program
2021-2022 AVIATION PRIORITY PROGRAM TOTAL
Obstruction Removal Program
$975,000
$300,000
$227,833
$28,200,000
AC Maintenance Reimbursement Program $350,000
Tuesday, February 19, 2019 Page 5 of 5General Aviation Capital Outlay
Louisiana Airport
System Unfunded
Program 2022-2023
Item Airport Project Description
Federal
Funds State Match Local Other Total Funds
Airport Construction and Development Priority Program 2022-2023
Air Carrier Capital Outlay
1 BATON ROUGE METROPOLITAN AIRPORT
Runway 13-31 RSA/RPZ Improvements - Phase Va $2,875,000 $319,444 $0 $3,194,444
2 LAFAYETTE REGIONAL AIRPORT ARFF Truck Replacement $0 $850,000 $0 $850,000
3 LAFAYETTE REGIONAL AIRPORT Taxiway Hotel Reconfiguration & Kilo Removal $1,755,000 $195,000 $0 $1,950,000
4 LAFAYETTE REGIONAL AIRPORT Taxiway Delta Removal $382,500 $42,500 $0 $425,000
5 MONROE REGIONAL AIRPORT Taxiway D - Phase II (Construction) $0 $2,500,000 $20,000 $2,520,000
6 BATON ROUGE METROPOLITAN AIRPORT
Runway 31 Threshold Recovery $2,800,000 $311,111 $0 $3,111,111
7 LAFAYETTE REGIONAL AIRPORT Rehabilitate North General Aviation Apron - IV of V $2,700,000 $300,000 $0 $3,000,000
8 LAKE CHARLES REGIONAL AIRPORT North Apron Expansion for Development - (Design & Construction)
$0 $1,000,000 $20,000 $1,020,000
9 LAKE CHARLES REGIONAL AIRPORT Obstruction Removal - Transitional - Phase II $0 $250,000 $0 $250,000
10 NEW ORLEANS LOUIS ARMSTRONG INTERNATIONAL AIRPORT
Rehabilitate Taxiways E, S, & F - Phase II $4,046,250 $539,500 $809,250 $5,395,000
11 SHREVEPORT REGIONAL AIRPORT ATC Relocation/ Terminal Modernization - Phase II (Construction)
$13,000,000 $4,444,444 $2,555,556 $20,000,000
12 LAFAYETTE REGIONAL AIRPORT Construct Terminal - Phase VI $0 $1,050,000 $0 $1,050,000
13 MONROE REGIONAL AIRPORT Airfield Lighting Rehabilitation - Phase IV (Construction) $0 $300,000 $0 $300,000
14 BATON ROUGE METROPOLITAN AIRPORT
East General Aviation Development $0 $2,500,000 $20,000 $2,520,000
15 NEW ORLEANS LOUIS ARMSTRONG INTERNATIONAL AIRPORT
Rehabilitate Runway 2/20 $7,500,000 $1,000,000 $1,500,000 $10,000,000
16 NEW ORLEANS LOUIS ARMSTRONG INTERNATIONAL AIRPORT
Southside Redevelopment - Phase II $0 $2,500,000 $0 $2,500,000
Tuesday, February 19, 2019 Page 1 of 6Air Carrier Capital Outlay
Item Airport Project Description
Federal
Funds State Match Local Other Total Funds
Airport Construction and Development Priority Program 2022-2023
Air Carrier Capital Outlay
17 MONROE REGIONAL AIRPORT Taxiway C Realignment - Phase I (Planning & Design) $1,300,000 $144,444 $0 $1,444,444
18 LAKE CHARLES REGIONAL AIRPORT Terminal Loading Bridge - Phase II $1,000,000 $111,111 $0 $1,111,111
$18,357,554 $4,924,806 $60,641,110Air Carrier Capital Outlay Totals $37,358,750
Tuesday, February 19, 2019 Page 2 of 6Air Carrier Capital Outlay
Item Airport Project Description
Federal
Funds State Match Local Other Total Funds
Airport Construction and Development Priority Program 2022-2023
General Aviation Capital Outlay
1 GEORGE R. CARR MEMORIAL AIRPORT Obstruction Removal North End - Phase III (Construction)
$0 $300,000 $0 $300,000
2 NEW ORLEANS LAKEFRONT AIRPORT Rehabilitation of Drainage - Phase V (Construction) $5,400,000 $600,000 $0 $6,000,000
3 SHREVEPORT DOWNTOWN AIRPORT Rehabilitate Northwest Apron - Phase II (Construction) $0 $470,000 $0 $470,000
4 C.E. RUSTY WILLIAMS AIRPORT Obstruction Removal - Phase III (Construction) $0 $250,000 $0 $250,000
5 SLIDELL AIRPORT Runway 18 Threshold Recovery $153,900 $17,100 $0 $171,000
6 HAMMOND NORTHSHORE REGIONAL AIRPORT
Taxiway A Realignment - Phase I (Design) $181,800 $20,200 $20,000 $222,000
7 HOUMA TERREBONNE AIRPORT Taxiway E Rehabilitation - Phase I (Design) $0 $505,000 $20,000 $525,000
8 UNION PARISH AIRPORT Obstruction Removal - Phase II (Construction) $0 $150,000 $0 $150,000
9 SOUTH LAFOURCHE LEONARD MILLER, JR. AIRPORT
Airfield Pavement Rehabiliation - Phase II (Construction) $500,000 $55,556 $0 $555,556
10 HAMMOND NORTHSHORE REGIONAL AIRPORT
Runway 31 Threshold Recovery - Phase III (Construction)
$0 $350,500 $0 $350,500
11 SLIDELL AIRPORT Taxilane Pavement Reconstruction $0 $261,000 $0 $261,000
12 SHREVEPORT DOWNTOWN AIRPORT Perimeter Fence Rehabilitation (Design & Construction) $0 $120,000 $0 $120,000
13 NEW ORLEANS LAKEFRONT AIRPORT Airfield Signage Upgrades - Phase I (Design) $0 $75,000 $0 $75,000
14 NEW ORLEANS LAKEFRONT AIRPORT Upgrade Lighting Vault Equipment $0 $230,000 $0 $230,000
15 MOREHOUSE MEMORIAL AIRPORT Rehabilitate Runway & Taxiway - Phase II (Construction) $1,309,500 $145,500 $0 $1,455,000
16 PORT OF SOUTH LOUISIANA EXECUTIVE REGIONAL AIRPORT
Obstruction Mitigation Runway 17 - Phase II (Design) $0 $100,000 $0 $100,000
17 LE GROS MEMORIAL AIRPORT Rehabilitate Airfield Draingage Phase 3 - (Design) $49,500 $5,500 $0 $55,000
Tuesday, February 19, 2019 Page 3 of 6General Aviation Capital Outlay
Item Airport Project Description
Federal
Funds State Match Local Other Total Funds
Airport Construction and Development Priority Program 2022-2023
General Aviation Capital Outlay
18 SLIDELL AIRPORT Taxilane Widening and Overlay $0 $262,000 $0 $262,000
19 HOUMA TERREBONNE AIRPORT West GA Apron Rehabilitation - Phase I (Design) $450,000 $50,000 $0 $500,000
20 HAMMOND NORTHSHORE REGIONAL AIRPORT
Airfield Lighting Improvements - Phase III (Design) $0 $180,000 $0 $180,000
21 LOUISIANA REGIONAL AIRPORT Drainage Improvements - Phase I (Design) $0 $39,000 $0 $39,000
22 SHREVEPORT DOWNTOWN AIRPORT Construct North Side Access Road - Phase I (Design) $0 $50,000 $0 $50,000
23 ACADIANA REGIONAL AIRPORT ARFF Station Relocation - Phase III (Construction) $950,000 $1,105,556 $0 $2,055,556
24 FALSE RIVER REGIONAL AIRPORT NAVAID Improvements - Phase III $0 $300,000 $0 $300,000
25 PORT OF SOUTH LOUISIANA EXECUTIVE REGIONAL AIRPORT
Parallel Taxiway Rehabilitation (Design & Construction) $522,000 $58,000 $0 $580,000
26 ST LANDRY PARISH-AHART FIELD Runway 18-36 Lighting Rehabilitation $360,000 $40,000 $0 $400,000
27 CONCORDIA PARISH AIRPORT Obstruction Mitigation - Phase III Hangars (Construction) $0 $540,000 $0 $540,000
28 CHENNAULT INTERNATIONAL AIRPORT Apron Rehabilitation - Phase I (Design) $180,000 $20,000 $0 $200,000
29 HARRY P. WILLIAMS MEMORIAL AIRPORT
Rehabilitate Runway - Phase I (Design) $90,000 $10,000 $0 $100,000
30 FALSE RIVER REGIONAL AIRPORT Hangar Development - Phase II (Land Acquisition) $0 $700,000 $0 $700,000
31 ACADIANA REGIONAL AIRPORT GA Taxiway Rehabilitation - Phase I (Design) $0 $100,000 $0 $100,000
32 DE QUINCY INDUSTRIAL AIRPARK Rehabilitate Runway - Phase I (Design) $33,000 $3,667 $0 $36,667
33 NATCHITOCHES REGIONAL AIRPORT Rehabilitate Taxiway B1 $225,000 $25,000 $0 $250,000
34 ALLEN PARISH AIRPORT Widen Runway 18/36 - Phase I (Design) $337,500 $37,500 $0 $375,000
Tuesday, February 19, 2019 Page 4 of 6General Aviation Capital Outlay
Item Airport Project Description
Federal
Funds State Match Local Other Total Funds
Airport Construction and Development Priority Program 2022-2023
General Aviation Capital Outlay
35 KELLY DUMAS Widen Runway - Phase II (Construction) $1,350,000 $150,000 $0 $1,500,000
36 FALSE RIVER REGIONAL AIRPORT Perimeter Fencing of Runway 18 RPZ and Grading with Access Dr.
$450,000 $50,000 $0 $500,000
37 WELSH AIRPORT Runway Rehabilitation - Phase II (Construction) - Rural Airport Program
$0 $160,000 $0 $160,000
38 SPRINGHILL AIRPORT T-Hangar Development Area - Phase II (Construct Taxilanes)
$675,000 $75,000 $0 $750,000
39 GEORGE R. CARR MEMORIAL AIRPORT Perimeter Road and Fencing - Phase I (Design) $150,000 $16,667 $0 $166,667
40 SPRINGHILL AIRPORT Overlay Runway - Phase I (Design) $112,500 $12,500 $0 $125,000
41 LE MAIRE MEMORIAL AIRPORT Runway Overlay - Phase I (Design) - Rural Airport Program
$0 $70,000 $0 $70,000
42 JONESVILLE MUNICIPAL AIRPORT Runway Rehab - Phase II (Construction) $315,000 $35,000 $0 $350,000
43 JOHN H. HOOKS JR. MEMORIAL Shade Hangars - Phase I (Design) $90,000 $10,000 $0 $100,000
44 LIVINGSTON REGIONAL AIRPORT Airfield Lighting and NAVAIDS $2,250,000 $250,000 $0 $2,500,000
45 UNION PARISH AIRPORT New Taxilanes - (Construction) $382,500 $42,500 $0 $425,000
46 LIVINGSTON REGIONAL AIRPORT Taxiway Development - Phase I $585,000 $65,000 $0 $650,000
47 WINNSBORO MUNICIPAL AIRPORT Fuel Farm Rehab $126,000 $14,000 $0 $140,000
$8,126,746 $40,000 $25,394,946General Aviation Capital Outlay Totals $17,228,200
Tuesday, February 19, 2019 Page 5 of 6General Aviation Capital Outlay
Item Airport Project Description
Federal
Funds State Match Local Other Total Funds
Airport Construction and Development Priority Program 2022-2023
General Aviation Capital Outlay
NAVAIDS Program
GA Maintenance Reimbursement Program
2022-2023 AVIATION PRIORITY PROGRAM TOTAL
Obstruction Removal Program
$975,000
$300,000
$265,700
$28,200,000
AC Maintenance Reimbursement Program $175,000
Tuesday, February 19, 2019 Page 6 of 6General Aviation Capital Outlay
Louisiana Airport
System Long-Range
Unfunded Program
Item Airport Project Description
Federal/
Other Funds State Funds Total Funds
Air Carrier Capital Outlay Long Range Unfunded Program
1 Baton Rouge Metropolitan Airport North General Aviation Development - Apron (phase II) $20,000 $3,000,000 $3,020,000
2 Baton Rouge Metropolitan Airport Construct EMAS Replacement $5,000,000 $555,556 $5,555,556
3 Shreveport Regional Airport ARFF Vehicle $900,000 $100,000 $1,000,000
4 New Orleans Louis Armstrong International Airport Terminal Construction Project - Phase VIII (Additional) $0 $3,000,000 $3,000,000
5 Lake Charles Regional Airport South Apron Expansion - Phase II of III (Construction) $20,000 $1,200,000 $1,220,000
6 Lake Charles Regional Airport South Apron Expansion - Phase III of III $20,000 $2,720,000 $2,740,000
7 Lake Charles Regional Airport ARFF Bunker Gear/SCBA $0 $75,000 $75,000
8 Baton Rouge Metropolitan Airport Runway 4L/22R Rehabilitation $500,004 $55,556 $555,560
9 Lafayette Regional Airport Taxiway Hotel Re-configuration $1,260,000 $140,000 $1,400,000
10 Lake Charles Regional Airport Construct ATCT Phase I - (Tower & Cab) $20,000 $1,800,000 $1,820,000
11 Monroe Regional Airport Taxiway D - Phase IV (Construction) $0 $2,020,000 $2,020,000
12 Monroe Regional Airport Taxiway D - Phase III (Construction) $20,000 $2,700,000 $2,720,000
13 Monroe Regional Airport Airfield Lighting Rehabilitation - Phase V (Construction) $20,000 $1,000,000 $1,020,000
14 Lafayette Regional Airport Taxiway F Improvements - Phase IV (Northend) $1,800,000 $200,000 $2,000,000
15 New Orleans Louis Armstrong International Airport ARFF Vehicle Replacement $900,000 $100,000 $1,000,000
16 Alexandria International Airport Install Emergency Generators for Navigational Aids $0 $300,000 $300,000
17 Shreveport Regional Airport Rehabilitate Runway 14/32 - Phase II (Construction) $0 $3,000,000 $3,000,000
18 Baton Rouge Metropolitan Airport North General Aviation Development - Apron (Phase I) $20,000 $1,000,000 $1,020,000
19 Monroe Regional Airport Runway 4/22 Blast Pads (construction) $20,000 $500,000 $520,000
20 Monroe Regional Airport Rehabilitate Runway 14/32 $0 $1,020,000 $1,020,000
21 Shreveport Regional Airport Airfield Drainage Rehabilitation Phase V $0 $2,000,000 $2,000,000
22 Alexandria International Airport Wildlife Mitigation Approach to Runway 18 $0 $225,000 $225,000
23 Baton Rouge Metropolitan Airport Perimeter Road Relocation - SE $2,800,000 $311,111 $3,111,111
24 Baton Rouge Metropolitan Airport Construct New Taxiway E/L $9,315,000 $1,035,000 $10,350,000
Tuesday, February 19, 2019 Page 1 of 32Air Carrier Capital Outlay
Item Airport Project Description
Federal/
Other Funds State Funds Total Funds
Air Carrier Capital Outlay Long Range Unfunded Program
25 Lafayette Regional Airport Rehabilitate North General Aviation Apron - Phase V of V $2,700,000 $300,000 $3,000,000
26 Baton Rouge Metropolitan Airport Northwest GA Taxilane Lighting $20,000 $750,000 $770,000
27 Monroe Regional Airport Perimeter Road - Phase II $0 $2,620,000 $2,620,000
28 Baton Rouge Metropolitan Airport Common Use Terminal System Equipment $199,998 $22,222 $222,220
29 Lake Charles Regional Airport Apron Area Lighting (Commercial & GA) - Phase II (Construction) $0 $200,000 $200,000
30 Monroe Regional Airport Drainage Project - Phase II $0 $400,000 $400,000
31 Lake Charles Regional Airport Construct ATCT Phase III - (Tower & Cab) $20,000 $1,800,000 $1,820,000
32 Lake Charles Regional Airport Construct ATCT Phase II - (Tower & Cab) $20,000 $1,800,000 $1,820,000
33 Baton Rouge Metropolitan Airport Runway 13/31 and 4/22 Intersection Rehabilitation $999,999 $111,111 $1,111,110
34 Monroe Regional Airport Taxiway C Realignment - Phase II (Construction) $6,000,000 $666,667 $6,666,667
35 Monroe Regional Airport Taxiway C Realignment - Phase III (Construction) $5,000,000 $555,556 $5,555,556
36 Shreveport Regional Airport Airfield Lighting Rehabilitation - Phase V - (Design) $0 $120,000 $120,000
37 Shreveport Regional Airport Terminal Apron Rehabilitation - (Design & Construction) $2,160,000 $240,000 $2,400,000
38 Monroe Regional Airport ARFF Truck $20,000 $500,000 $520,000
39 Shreveport Regional Airport Airfield Lighting Rehabilitation - Phase VI $0 $1,000,000 $1,000,000
40 Baton Rouge Metropolitan Airport Construct New Taxiway E/L $9,315,000 $1,035,000 $10,350,000
41 Lake Charles Regional Airport Airport Service Road Improvements - Phase II $1,000,000 $111,111 $1,111,111
42 Baton Rouge Metropolitan Airport Taxiway Intersection Re-Alignment $20,000 $1,250,000 $1,270,000
43 Lafayette Regional Airport 4L - 22R Runway Rehabilitation $720,000 $80,000 $800,000
44 Monroe Regional Airport Perimeter Road Phase I $0 $2,020,000 $2,020,000
45 New Orleans Louis Armstrong International Airport Rehabilitate Runway 11/29 $9,000,000 $1,000,000 $10,000,000
46 Monroe Regional Airport Infield Drainage Phase I $1,300,000 $144,444 $1,444,444
47 Lafayette Regional Airport T-Hangar Apron Overlay $450,000 $50,000 $500,000
48 Shreveport Regional Airport Airfield Lighting - Phase VII $0 $1,000,000 $1,000,000
Tuesday, February 19, 2019 Page 2 of 32Air Carrier Capital Outlay
Item Airport Project Description
Federal/
Other Funds State Funds Total Funds
Air Carrier Capital Outlay Long Range Unfunded Program
49 Baton Rouge Metropolitan Airport Perimeter Road Relocation - SE $1,800,000 $200,000 $2,000,000
50 Monroe Regional Airport ARFF Perimeter Rd PH II $130,000 $14,444 $144,444
51 New Orleans Louis Armstrong International Airport Southside Redevelopment - Phase IIII $0 $3,000,000 $3,000,000
52 Lake Charles Regional Airport South Apron Expansion - Phase I (Design) $0 $175,000 $175,000
53 Lafayette Regional Airport Rehabilitate Perimeter Fence $3,375,000 $375,000 $3,750,000
54 Alexandria International Airport Install LED Runway Lighting $0 $750,000 $750,000
55 Lafayette Regional Airport Erosion Slope Rehab Study $900,000 $100,000 $1,000,000
56 Lake Charles Regional Airport Construct Access Road Extension (North Development) - Phase I of II $0 $1,200,000 $1,200,000
57 Lake Charles Regional Airport Construct Access Road Extension (North Development) - Phase II of II $1,993,500 $221,500 $2,215,000
58 Alexandria International Airport Large Southeast Apron Hangar & Delushe (100K S.F.) $0 $22,000,000 $22,000,000
59 Lake Charles Regional Airport Secure Employee Parking (Terminal) $0 $205,000 $205,000
60 Monroe Regional Airport ARFF Rapid Response Vehicle $0 $400,000 $400,000
61 Alexandria International Airport Construct Holding Bay at Runway 36 End $1,900,000 $211,111 $2,111,111
62 Alexandria International Airport Install LED Taxiway Sign Fixtures $0 $375,000 $375,000
63 Baton Rouge Metropolitan Airport Air Cargo Apron Expansion $4,750,000 $527,778 $5,277,778
64 Baton Rouge Metropolitan Airport Hangar No. 1 - Phase I $0 $1,500,000 $1,500,000
65 Baton Rouge Metropolitan Airport Hangar No.1 - Phase II $0 $1,500,000 $1,500,000
66 Baton Rouge Metropolitan Airport Hangar No.1 - Phase III $0 $1,500,000 $1,500,000
67 Baton Rouge Metropolitan Airport Hangar No.1 - Phase IV $0 $1,500,000 $1,500,000
68 Baton Rouge Metropolitan Airport North Airpark Development - Phase III $0 $1,500,000 $1,500,000
69 Alexandria International Airport Property Acquisition for Industrial Park Development $0 $204,000 $204,000
70 Baton Rouge Metropolitan Airport North Airpark Development - Phase IV $0 $1,500,000 $1,500,000
71 Baton Rouge Metropolitan Airport North Airpark Development - Phase V $0 $1,500,000 $1,500,000
72 Baton Rouge Metropolitan Airport North Airpark Development - Phase VI $0 $1,500,000 $1,500,000
Tuesday, February 19, 2019 Page 3 of 32Air Carrier Capital Outlay
Item Airport Project Description
Federal/
Other Funds State Funds Total Funds
Air Carrier Capital Outlay Long Range Unfunded Program
73 Baton Rouge Metropolitan Airport North Airpark Development - Phase VIII $0 $1,500,000 $1,500,000
74 Baton Rouge Metropolitan Airport North Airpark Development - Phase IX $0 $1,500,000 $1,500,000
75 Baton Rouge Metropolitan Airport North Airpark Development - Phase X $0 $1,500,000 $1,500,000
76 Baton Rouge Metropolitan Airport North General Aviation Development - Phase II $20,000 $2,980,000 $3,000,000
77 Baton Rouge Metropolitan Airport Airport Police Vehicle $0 $20,000 $20,000
78 Alexandria International Airport Runway Blast Pads $0 $5,400,000 $5,400,000
79 Alexandria International Airport Runway Rubber Removal and Striping $630,000 $70,000 $700,000
80 Alexandria International Airport Rehabilitate Taxiway "F" $1,092,500 $121,389 $1,213,889
81 Alexandria International Airport Rehabilitate Overrun Area Runway 18/36 $190,000 $21,111 $211,111
82 Alexandria International Airport Extend Runway 14/32 - Phase II $14,535,000 $765,000 $15,300,000
83 Alexandria International Airport Rehabilitate FBO Apron - Phase II (Construction) $3,172,501 $170,884 $3,343,385
84 Lake Charles Regional Airport Construct Perimeter Road $0 $1,000,000 $1,000,000
85 Alexandria International Airport North Ramp Rehabilitation- Phase II $2,700,000 $300,000 $3,000,000
86 Alexandria International Airport ILS Upgrade $1,900,000 $211,111 $2,111,111
87 Alexandria International Airport Relocate Fuel Farm - Phase IV (Demolition of Old Fuel Farm) $665,000 $73,889 $738,889
88 Baton Rouge Metropolitan Airport North GA Terminal Facility $20,000 $2,980,000 $3,000,000
89 Alexandria International Airport Master Drainage Rehabilitation - Phase I $699,275 $77,697 $776,972
90 Alexandria International Airport Runway 18 Extension: Environmental Assessment $0 $500,000 $500,000
91 Alexandria International Airport Install CAT 1 Approach - Runway 18/36 (Equipment Lighting) $0 $2,500,000 $2,500,000
92 Alexandria International Airport Southeast Apron Expansion $0 $8,000,000 $8,000,000
93 Alexandria International Airport Large Southeast Apron Hangar - One $0 $19,200,000 $19,200,000
94 Alexandria International Airport Westside Infrastructure Improvements (Electrical, Water, Sewer, Drainage and Access $0 $83,000,000 $83,000,000
95 Alexandria International Airport Large Southeast Apron Hangar - Three $0 $19,200,000 $19,200,000
96 Alexandria International Airport Large Southeast Apron Hangar - Two $0 $19,200,000 $19,200,000
Tuesday, February 19, 2019 Page 4 of 32Air Carrier Capital Outlay
Item Airport Project Description
Federal/
Other Funds State Funds Total Funds
Air Carrier Capital Outlay Long Range Unfunded Program
97 Alexandria International Airport Midfield Apron (S) New Construction North Ramp $0 $34,000,000 $34,000,000
98 Alexandria International Airport Midfield Apron (N) New Construction North Ramp $0 $22,600,000 $22,600,000
99 Alexandria International Airport FAA Radar Facility Relocation $2,700,000 $300,000 $3,000,000
100 Alexandria International Airport Extend Taxiway A $5,850,000 $5,850,000 $11,700,000
101 Alexandria International Airport Rehabilitate North Ramp, Runway 18 and Hot Pad $1,500,000 $0 $1,500,000
102 Alexandria International Airport Southeast Apron N Two Large Hangars (100K S.F.) $0 $18,000,000 $18,000,000
103 Alexandria International Airport Runway 18 Extension - Construction Phase II $6,306,188 $3,700,688 $10,006,876
104 Alexandria International Airport Runway 18 Extension - Construction Phase I $6,765,275 $2,446,142 $9,211,417
105 Baton Rouge Metropolitan Airport Property South of Blount Road - Phase I $0 $1,500,000 $1,500,000
106 Alexandria International Airport 10 Unit T-hangar $0 $700,000 $700,000
107 Baton Rouge Metropolitan Airport Reconstruct Runway 4R/22L & Taxiway E - Phase II (Design & Construction) $20,000 $2,980,000 $3,000,000
108 Alexandria International Airport Runway 14 Parallel Taxiway Westside $0 $43,000,000 $43,000,000
109 Monroe Regional Airport Rehabilitate Runway 14/32 Markings $0 $308,730 $308,730
110 Baton Rouge Metropolitan Airport Property East Side of Plank Road - Phase IV $0 $1,500,000 $1,500,000
111 Monroe Regional Airport Storm Water Management Plan $0 $55,000 $55,000
112 Monroe Regional Airport Replace Airfield Sign Panels $0 $40,000 $40,000
113 Monroe Regional Airport Improve Perimeter Road - Phase II $450,000 $50,000 $500,000
114 Alexandria International Airport Thermoplast Hold Lines and Markings - Phase II $0 $400,000 $400,000
115 Alexandria International Airport GA Apron Rehabilitation $990,000 $110,000 $1,100,000
116 Alexandria International Airport South Ramp Rehabilitation $0 $1,000,000 $1,000,000
117 Alexandria International Airport Replace Air Traffic Control Equipment $0 $250,000 $250,000
118 Alexandria International Airport Rehabilitation of Taxiway E & Terminal Ramp - Phase I $495,000 $55,000 $550,000
119 Monroe Regional Airport Rehabilitate Runway 04/22 Markings $0 $308,730 $308,730
120 Monroe Regional Airport Relocate Taxiway D Holding Position $0 $31,980 $31,980
Tuesday, February 19, 2019 Page 5 of 32Air Carrier Capital Outlay
Item Airport Project Description
Federal/
Other Funds State Funds Total Funds
Air Carrier Capital Outlay Long Range Unfunded Program
121 Alexandria International Airport Taxiway B Rehabilitation - Construction for Phase II $360,000 $40,000 $400,000
122 Monroe Regional Airport Geographic Information System $270,000 $30,000 $300,000
123 Monroe Regional Airport Acquire Mass Casualty Vehicle $0 $550,000 $550,000
124 Monroe Regional Airport Acquire Runway Sweeper $0 $225,000 $225,000
125 Baton Rouge Metropolitan Airport North General Aviation Development - Phase III $20,000 $3,000,000 $3,020,000
126 Baton Rouge Metropolitan Airport GA Runway to Taxiway Conversion - Phase I $4,680,000 $520,000 $5,200,000
127 Baton Rouge Metropolitan Airport GA Runway to Taxiway Conversion - Phase II $2,700,000 $300,000 $3,000,000
128 Alexandria International Airport Property Acq. for Obstruction Removal to Approaches for Runway 14 & 18 - Phase II $0 $70,729 $70,729
129 Monroe Regional Airport Rehabilitate Runway 4/22 $0 $813,000 $813,000
130 Lake Charles Regional Airport Construct Perimeter Road - Phase III (Construction) $0 $1,000,000 $1,000,000
131 Lake Charles Regional Airport Airport Entrance Improvements $0 $1,319,000 $1,319,000
132 Lafayette Regional Airport RTR Cable Relocation $2,369,055 $263,228 $2,632,283
133 New Orleans Louis Armstrong International Airport Airfield Electrical, Lighting, & Signage Phase III $2,511,161 $279,018 $2,790,179
134 Lake Charles Regional Airport Airport Service Road Improvements - Phase I $2,500,000 $277,778 $2,777,778
135 Baton Rouge Metropolitan Airport Parking Garage Improvements $5,450,004 $605,556 $6,055,560
136 Baton Rouge Metropolitan Airport Terminal Building Improvements $669,420 $74,380 $743,800
137 Alexandria International Airport Noise Mitigation - Phase II Completion $2,076,237 $230,693 $2,306,930
138 Alexandria International Airport Rehabilitate Runway 14/32 & 18/36 Safety Areas - Phase II $270,000 $30,000 $300,000
139 Baton Rouge Metropolitan Airport Property East Side of Plank Road - Phase II $0 $1,500,000 $1,500,000
140 Baton Rouge Metropolitan Airport Relocate South Portion of Plank Road - Phase IX $0 $1,500,000 $1,500,000
141 Baton Rouge Metropolitan Airport Relocate South Portion of Plank Road - Phase X $0 $1,500,000 $1,500,000
142 Baton Rouge Metropolitan Airport Relocate South Portion of Plank Road - Phase XI $0 $1,500,000 $1,500,000
143 Baton Rouge Metropolitan Airport Relocate South Portion of Plank Road - Phase XII $0 $1,500,000 $1,500,000
144 Baton Rouge Metropolitan Airport Relocate South Portion of Plank Road - Phase XIII $0 $1,500,000 $1,500,000
Tuesday, February 19, 2019 Page 6 of 32Air Carrier Capital Outlay
Item Airport Project Description
Federal/
Other Funds State Funds Total Funds
Air Carrier Capital Outlay Long Range Unfunded Program
145 Baton Rouge Metropolitan Airport Relocate South Portion of Plank Road - Phase XIV $0 $1,500,000 $1,500,000
146 Baton Rouge Metropolitan Airport Relocate South Portion of Plank Road - Phase XV $0 $1,100,000 $1,100,000
147 Baton Rouge Metropolitan Airport Reconstruct Runway 4R/22L & Taxiway E - Phase III $20,000 $2,980,000 $3,000,000
148 Baton Rouge Metropolitan Airport Reconstruct Runway 4R/22L & Taxiway E - Phase IV $20,000 $1,480,000 $1,500,000
149 Baton Rouge Metropolitan Airport RW 4R/22L Reconstruction - Phase V $0 $1,500,000 $1,500,000
150 Baton Rouge Metropolitan Airport Green Building Initiative (Lighting, Mechanical Energy Management System) - Phase I $0 $1,500,000 $1,500,000
151 Baton Rouge Metropolitan Airport Green Building Initiative (Lighting, Mechanical Energy Management System) - Phase II $0 $1,500,000 $1,500,000
152 Monroe Regional Airport Replace Airfield Regulators $0 $60,000 $60,000
153 Baton Rouge Metropolitan Airport Property East Side of Plank Road - Phase I $0 $1,500,000 $1,500,000
154 Baton Rouge Metropolitan Airport Relocate South Portion of Plank Road - Phase VIII $0 $1,500,000 $1,500,000
155 Baton Rouge Metropolitan Airport Property East Side of Plank Road - Phase III $0 $1,500,000 $1,500,000
156 Baton Rouge Metropolitan Airport Property East Side of Plank Road - Phase V $0 $500,000 $500,000
157 Baton Rouge Metropolitan Airport Property South of Blount Road - Phase II $0 $1,500,000 $1,500,000
158 Baton Rouge Metropolitan Airport Property South of Blount Road - Phase III $0 $1,099,450 $1,099,450
159 Alexandria International Airport GIS Development - Phase II $0 $500,000 $500,000
160 Monroe Regional Airport Design Precision Approach for Runway 14/32 Extension $270,000 $30,000 $300,000
161 Alexandria International Airport North Apron Rehabilitation - Joint Seal and Spall Repair $382,500 $42,500 $425,000
162 Lake Charles Regional Airport Airport Entrance Improvements $0 $1,319,000 $1,319,000
163 Monroe Regional Airport Rehabilitate Taxiway A $81,000 $19,000 $100,000
164 Monroe Regional Airport Thermoplastic Markings $498,150 $55,350 $553,500
165 Monroe Regional Airport Upgrade Windcone to LED $0 $38,000 $38,000
166 Monroe Regional Airport Upgrade Airfield Lighting Controls $180,000 $20,000 $200,000
167 Monroe Regional Airport Upgrade Taxiway Lighting, Signs, and REILS to LED $2,340,000 $260,000 $2,600,000
168 Baton Rouge Metropolitan Airport Green Building Initiative (Lighting, Mechanical Energy Management System) - Phase II $0 $1,000,000 $1,000,000
Tuesday, February 19, 2019 Page 7 of 32Air Carrier Capital Outlay
Item Airport Project Description
Federal/
Other Funds State Funds Total Funds
Air Carrier Capital Outlay Long Range Unfunded Program
Air Carrier Capital Outlay Totals
Local/Other: $45,818,410
Federal: $108,978,357
State: $438,401,200
Total: $593,197,967
Tuesday, February 19, 2019 Page 8 of 32Air Carrier Capital Outlay
Item Airport Project Description
Federal/
Other Funds State Funds Total Funds
General Aviation Capital Outlay Long Range Unfunded Program
1 Houma Terrebonne Airport Taxiway E Rehabilitation - Phase III (Construction) $20,000 $1,000,000 $1,020,000
2 Houma Terrebonne Airport Taxiway E Rehabilitation - Phase II (Construction) $20,000 $1,000,000 $1,020,000
3 Hammond Northshore Regional Airport Taxiway A Realignment - Phase II (Construction) $1,626,950 $178,550 $1,805,500
4 New Orleans Lakefront Airport Rehabilitate Runway 18R/36L - Phase II (Construction) $2,826,000 $314,000 $3,140,000
5 Shreveport Downtown Airport Runway 14/32 Lighting Upgrade - Phase II (Construction) $0 $500,000 $500,000
6 Slidell Airport Mitigate Obstructions - Phase II $0 $250,000 $250,000
7 Jennings Airport Land Acquisition OFZ North of Runway 8-26 $328,500 $36,500 $365,000
8 Slidell Airport Extend Runway 36 and Parallel Taxiway - Phase II (Construction) $1,810,800 $201,200 $2,012,000
9 Jennings Airport Land Acquisition for Runway 13 Approach Protection $0 $425,000 $425,000
10 New Orleans Lakefront Airport ARFF Relocation - Phase I (Design) $25,000 $250,000 $275,000
11 Shreveport Downtown Airport Runway 5/23 Lighting - Phase II (Construction) $0 $700,000 $700,000
12 Houma Terrebonne Airport West GA Apron Rehabilitation - Phase II (Construction) $3,150,000 $350,000 $3,500,000
13 Concordia Parish Airport Obstruction Relocation $0 $500,000 $500,000
14 Shreveport Downtown Airport Construct Taxiway S - Phase II (Construction) $0 $800,000 $800,000
15 Beauregard Regional Airport Runway 18/36 Obstruction Removal $0 $100,000 $100,000
16 Le Maire Memorial Airport Obstruction Removal - Phase II (Construction) $0 $150,000 $150,000
17 Esler Regional Airport Obstruction Removal - Phase I $0 $21,000 $21,000
18 Le Maire Memorial Airport Obstruction Removal - Phase III $0 $100,000 $100,000
19 Natchitoches Regional Airport Bury Powerlines Runway 7 $0 $575,000 $575,000
20 Shreveport Downtown Airport Construct North Side Access Road - Phase II (Construction) $0 $675,000 $675,000
21 New Orleans Lakefront Airport Rehabilitate Runway 18L/36R (Design & Construction) $2,150,000 $238,889 $2,388,889
22 Louisiana Regional Airport South Apron Expansion - Phase III (Design & Construction) $0 $1,000,000 $1,000,000
23 New Orleans Lakefront Airport Rehabilitate Taxiway C $0 $635,000 $635,000
24 Louisiana Regional Airport Hangar Development - Phase III $20,000 $1,000,000 $1,020,000
Tuesday, February 19, 2019 Page 9 of 32General Aviation Capital Outlay
Item Airport Project Description
Federal/
Other Funds State Funds Total Funds
General Aviation Capital Outlay Long Range Unfunded Program
25 Louisiana Regional Airport Drainage Improvements - Phase II (Construction) $0 $611,000 $611,000
26 Hammond Northshore Regional Airport Box Hangar Development $620,000 $66,667 $686,667
27 Slidell Airport Runway and Taxiway Surface Treatment $249,300 $27,700 $277,000
28 New Orleans Lakefront Airport Airfield Signage Upgrades - Phase II (Construction) $0 $250,000 $250,000
29 Hammond Northshore Regional Airport Parallel Taxiway D Extension - Phase II (Construction) $1,665,900 $185,100 $1,851,000
30 Houma Terrebonne Airport Construct Partial Parallel Taxiway - Phase III (Construction) $1,800,000 $200,000 $2,000,000
31 Chennault International Airport New Access Road - Phase II (Construction) $750,000 $1,000,000 $1,750,000
32 Harry P. Williams Memorial Airport Runway Rehabilitation - Phase II (Construction) $2,700,000 $300,000 $3,000,000
33 Chennault International Airport Apron Rehabilitation - Phase II (Construction) $1,800,000 $200,000 $2,000,000
34 Slidell Airport Extend Runway 36 and Parallel Taxiway - Phase I (Design and EA) $350,100 $38,900 $389,000
35 New Orleans Lakefront Airport Airport Lighting Control Monitoring System Upgrade $0 $150,000 $150,000
36 Southland Field Clear Airspace - Phase II (Land Acquisition/Easements) $346,500 $38,500 $385,000
37 Hart Airport Runway Rehabilitation South - Phase III (Construction) $675,000 $75,000 $750,000
38 Byerley Airport Obstruction Removal Phase III $0 $250,000 $250,000
39 Port Of South Louisiana Executive Regional Airport Obstruction Mitigation Runway 17 - Phase II (Construction) $0 $982,000 $982,000
40 Louisiana Regional Airport Runway & Taxiway Rehabilitation $0 $261,000 $261,000
41 New Orleans Lakefront Airport Relocation of Runway 9/27 - Phase I (Design) $0 $150,000 $150,000
42 Port Of South Louisiana Executive Regional Airport Runway 17 Threshold Recovery $171,000 $19,000 $190,000
43 Shreveport Downtown Airport Sea Lane and Sea Taxiway - Phase I (Environmental Study) $150,000 $16,667 $166,667
44 Shreveport Downtown Airport Runway 14/32 & 5/23 Lighting Upgrade - Phase I (Design) $0 $200,000 $200,000
45 Port Of South Louisiana Executive Regional Airport Runway 17-35 Widening - Phase II (Construction) $1,701,900 $189,100 $1,891,000
46 South Lafourche Leonard Miller, Jr. Airport Terminal Construction $1,000,000 $1,000,000 $2,000,000
47 Slidell Airport Apron Expansion - Phase II $719,100 $79,900 $799,000
48 Acadiana Regional Airport GA Taxiway Rehabilitation - Phase II (Construction) $0 $1,000,000 $1,000,000
Tuesday, February 19, 2019 Page 10 of 32General Aviation Capital Outlay
Item Airport Project Description
Federal/
Other Funds State Funds Total Funds
General Aviation Capital Outlay Long Range Unfunded Program
49 Hammond Northshore Regional Airport Airfield Pavement Rehabilitation $0 $891,000 $891,000
50 Shreveport Downtown Airport Construct Taxiway S - Phase I (Environmental & Design) $0 $150,000 $150,000
51 Ruston Regional Airport Construct Taxilanes $270,000 $30,000 $300,000
52 Beauregard Regional Airport Rehabilitate Apron - Phase II (Design) $135,000 $15,000 $150,000
53 Ruston Regional Airport Apron Expansion - Construction $630,000 $70,000 $700,000
54 Eunice Airport Obstruction Removal - Transitional $0 $400,000 $400,000
55 Marksville Municipal Airport Terminal Apron Rehabilitation - Phase II (Construction) $499,500 $55,500 $555,000
56 Beauregard Regional Airport Apron Rehab Phase II Construction $450,000 $50,000 $500,000
57 Southland Field Clear Airspace - Phase III (Obstruction Removal) $234,000 $26,000 $260,000
58 Bunkie Municipal Airport Runway Rehabilitation - Phase II $0 $829,780 $829,780
59 Tensas Parish Airport Rehabilitate Runway PH II $0 $400,000 $400,000
60 De Quincy Industrial Airpark Rehabilitate Runway - Phase II (Construction) $264,060 $29,340 $293,400
61 Jennings Airport 8-Unit T-Hangars $581,400 $64,600 $646,000
62 Shreveport Downtown Airport Construct 10-Unit T-Hangar $0 $600,000 $600,000
63 Jennings Airport Construct Entrance Taxiway - Runway 13 $20,000 $338,000 $358,000
64 Concordia Parish Airport Taxiway Extension - Phase III - (Construction) $1,260,000 $140,000 $1,400,000
65 Hammond Northshore Regional Airport Taxiway Joint Reseal $654,300 $72,700 $727,000
66 Louisiana Regional Airport Terminal Apron Reconstruction - Phase I (Study) $0 $50,000 $50,000
67 Vicksburg Tallulah Regional Airport Runway Extension - Phase III (Design) $225,000 $25,000 $250,000
68 Vicksburg Tallulah Regional Airport Runway Extension Phase IV (Construction) $5,400,000 $600,000 $6,000,000
69 Concordia Parish Airport Obstruction Mitigation - Phase IV Hangars (Design and Construction) $540,000 $60,000 $600,000
70 Vicksburg Tallulah Regional Airport Runway Extension - Phase II (Land Acquisition) $697,500 $77,500 $775,000
71 Bunkie Municipal Airport Apron & Taxiway Rehab - Ph II Construction $0 $408,490 $408,490
72 Ruston Regional Airport Construct Apron Expansion - Phase III $540,000 $60,000 $600,000
Tuesday, February 19, 2019 Page 11 of 32General Aviation Capital Outlay
Item Airport Project Description
Federal/
Other Funds State Funds Total Funds
General Aviation Capital Outlay Long Range Unfunded Program
73 Le Gros Memorial Airport Rehabilitate Airfield Draingage (Phase 3) - Construction $586,800 $65,200 $652,000
74 Jennings Airport North Apron Development - Phase II (Construction) $758,700 $84,300 $843,000
75 Hammond Northshore Regional Airport Drainage Improvements - Phase IV $0 $750,000 $750,000
76 Hammond Northshore Regional Airport Drainage Improvements - Phase V $0 $750,000 $750,000
77 Concordia Parish Airport Taxiway Extension - Phase II (Design) $99,000 $11,000 $110,000
78 Minden Airport Apron Expansion Phase II - Construction $1,642,500 $182,500 $1,825,000
79 Marksville Municipal Airport Runway 4/22 Extension - Phase II (Land Acquisition) $0 $100,000 $100,000
80 Allen Parish Airport Widen Runway 18/36 - Phase II (Construction) $2,790,000 $310,000 $3,100,000
81 Marksville Municipal Airport Runway 4/22 Extension - Phase I (Design) $180,000 $20,000 $200,000
82 Marksville Municipal Airport Runway 4/22 Extension - Phase II (Construction) $2,700,000 $300,000 $3,000,000
83 St Tammany Regional Airport Extend Runway 18/36 - Phase II (Design & Mitigation) $522,000 $58,000 $580,000
84 Leesville Airport Extend Runway 18/36 - Phase II (Construction) $1,172,700 $130,300 $1,303,000
85 St Tammany Regional Airport Runway 18/36 Extension - Phase IV (Widening and Overlay) $1,140,000 $126,667 $1,266,667
86 Leesville Airport Construct Parallel Taxiway - Phase II $2,095,200 $232,800 $2,328,000
87 Slidell Airport Hangar Development - Phase II (16-Unit Hangar) $0 $900,000 $900,000
88 Slidell Airport Hangar Development - Phase I (Taxilane) $0 $775,000 $775,000
89 Jena Airport Taxiway Relocation - Phase III (Construction) $846,000 $94,000 $940,000
90 St Tammany Regional Airport Parallel Taxiway $3,316,590 $368,510 $3,685,100
91 Ruston Regional Airport Construct T Hangars - Construction $0 $400,000 $400,000
92 George R. Carr Memorial Airport Perimeter Fencing $630,000 $70,000 $700,000
93 Minden Airport Airfield Lighting Rehabilitation - Phase II (Construction) $0 $1,000,000 $1,000,000
94 St Tammany Regional Airport Apron Extension - Phase II (Construction) $0 $1,000,000 $1,000,000
95 Tensas Parish Airport Obstruction Removal (Phase III) $0 $150,000 $150,000
96 Tensas Parish Airport Runway Extension - Phase II $0 $150,000 $150,000
Tuesday, February 19, 2019 Page 12 of 32General Aviation Capital Outlay
Item Airport Project Description
Federal/
Other Funds State Funds Total Funds
General Aviation Capital Outlay Long Range Unfunded Program
97 Jonesboro Airport Parallel Taxiway - Phase II (Construction) $0 $662,400 $662,400
98 Allen Parish Airport Install Perimeter Fence - Phase II (Construction) $0 $731,000 $731,000
99 Acadiana Regional Airport Perimeter/Emergency Access Road - Phase III (Construction) $2,250,000 $250,000 $2,500,000
100 Jennings Airport Runway 8-26 Rehabilitation $1,191,600 $132,400 $1,324,000
101 Le Gros Memorial Airport Perimeter Fencing - Phase II (Design & Construction) $0 $156,000 $156,000
102 Tensas Parish Airport Apron and Taxilane Ph II $0 $600,000 $600,000
103 Eunice Airport New Aircraft Hangars - Phase II (Construction) $900,000 $100,000 $1,000,000
104 St Tammany Regional Airport Obstruction Mitigation (NAVAIDS) - Phase II (Northwest) $0 $395,000 $395,000
105 St Tammany Regional Airport NAVAIDS Phase IV - PAPI $101,754 $11,306 $113,060
106 Esler Regional Airport Drainage Rehabilitation of Safety Areas and Midfield - Phase II Construction $2,104,870 $233,874 $2,338,744
107 St Tammany Regional Airport Obstruction Mitigation (NAVAIDS) - Phase III (Southwest) $0 $495,000 $495,000
108 Franklinton Airport Perimeter Fencing - Phase I $0 $100,000 $100,000
109 Esler Regional Airport Taxiway Rehabilitation - Phase II (Construction) $3,043,800 $338,200 $3,382,000
110 C.e. Rusty Williams Airport Airfield Lighting System Improvements and New Electrical Vault - Design $0 $100,000 $100,000
111 Franklinton Airport Perimeter Fencing Phase II $0 $300,000 $300,000
112 Esler Regional Airport Perimeter Drainage Rehabilitation (Construction) $0 $1,000,000 $1,000,000
113 Thibodaux Municipal Airport Perimeter Fencing - Phase II (Construction) $210,000 $23,333 $233,333
114 C.e. Rusty Williams Airport Runway Extension $4,050,000 $450,000 $4,500,000
115 Thibodaux Municipal Airport Perimeter Fencing - Phase III (Construction) $150,000 $16,667 $166,667
116 Hammond Northshore Regional Airport Parallel Taxiway D Extension - Phase I (Design/EA) $247,500 $27,500 $275,000
117 Thibodaux Municipal Airport Perimeter Fencing - Construction Phase IV (Construction) $150,000 $16,667 $166,667
118 Esler Regional Airport Rehabilitate Taxiways - Phase I (Construction) $2,925,180 $325,020 $3,250,200
119 Thibodaux Municipal Airport Perimeter Fencing - Phase V (Construction) $150,000 $16,667 $166,667
120 Tensas Parish Airport Lighting Rehabilitation (Phase II - Construction) $0 $525,000 $525,000
Tuesday, February 19, 2019 Page 13 of 32General Aviation Capital Outlay
Item Airport Project Description
Federal/
Other Funds State Funds Total Funds
General Aviation Capital Outlay Long Range Unfunded Program
121 Southland Field Rehabilitate Runway 15/33 $225,000 $25,000 $250,000
122 Jennings Airport Taxiway G Rehabilitation (Design & Construction) $0 $150,000 $150,000
123 Esler Regional Airport Rehabilitate Runway 14/32 (Construction) $2,926,080 $325,120 $3,251,200
124 Natchitoches Regional Airport Sealcoat Runway 17/35 $450,000 $50,000 $500,000
125 Esler Regional Airport Runway 14/32 Rehabilitation (Design) $0 $199,300 $199,300
126 Acadiana Regional Airport Peimeter/Emergency Access Road - Phase II (Design) $225,000 $25,000 $250,000
127 Marksville Municipal Airport Agriculture Apron Improvements - Phase II (Construction) $0 $525,000 $525,000
128 Concordia Parish Airport Rehabilitate Main Apron $540,000 $60,000 $600,000
129 Morehouse Memorial Airport Hangars Ph II $270,000 $30,000 $300,000
130 Franklinton Airport Hangar Taxilane - Phase II (Construction) $0 $300,000 $300,000
131 De Quincy Industrial Airpark Construct 14 T-Hangars with Taxilane $1,428,600 $158,733 $1,587,333
132 Thibodaux Municipal Airport Airport Terminal - Phase II (Construction) $0 $500,000 $500,000
133 Concordia Parish Airport Relocate Signage/Markings $0 $50,000 $50,000
134 Acadiana Regional Airport Seaway Lighting Rehabilitation $0 $500,000 $500,000
135 George R. Carr Memorial Airport Runway Safety Area Restoration $270,000 $30,000 $300,000
136 Port Of South Louisiana Executive Regional Airport Runway 17-35 Widening - Phase I (Design) $126,000 $14,000 $140,000
137 Hart Airport Construct T-Hangar $36,000 $300,000 $336,000
138 Beauregard Regional Airport Rehabilitate Runway 18/36 $0 $605,000 $605,000
139 Marksville Municipal Airport Runway Rehab $0 $200,000 $200,000
140 Southland Field Clear Airspace - Phase 1 (Environmental) $99,000 $11,000 $110,000
141 Jonesboro Airport Construct Agriculture Apron - Phase II (Construction) $0 $400,000 $400,000
142 Le Maire Memorial Airport Runway Overlay - Phase II (Construction) - Rural Airport Program $0 $583,000 $583,000
143 False River Regional Airport Pavement Rehabilitation - Sealcoat $0 $1,000,000 $1,000,000
144 Port Of South Louisiana Executive Regional Airport East Side Levee Relocation $3,150,000 $350,000 $3,500,000
Tuesday, February 19, 2019 Page 14 of 32General Aviation Capital Outlay
Item Airport Project Description
Federal/
Other Funds State Funds Total Funds
General Aviation Capital Outlay Long Range Unfunded Program
145 Beauregard Regional Airport Rehabilitate Taxiway Signage $0 $187,500 $187,500
146 Louisiana Regional Airport Terminal Apron Reconstruction - Phase IV (Construction) $630,000 $70,000 $700,000
147 Le Gros Memorial Airport Ag Apron Rehabilitation - (Design & Construction) $0 $84,000 $84,000
148 George R. Carr Memorial Airport Perimeter Road $702,000 $78,000 $780,000
149 Eunice Airport Rehabilitate Runway Edge Lighting to LED $0 $135,000 $135,000
150 Homer Municipal Airport Runway and Taxiway Apron Rehab $200,000 $0 $200,000
151 Port Of South Louisiana Executive Regional Airport New Terminal Apron - Phase I (Design) $0 $150,000 $150,000
152 Hart Airport Apron Overlay $0 $225,000 $225,000
153 Bunkie Municipal Airport Airfield Lighting and Navaid Rehabilitation $0 $307,760 $307,760
154 Acadiana Regional Airport Construct Blast Pad $0 $500,000 $500,000
155 Homer Municipal Airport Runway Safety Area Improvements - Design $0 $105,000 $105,000
156 Tensas Parish Airport Runwy Rehabilitation - Phase I (Design) $0 $50,000 $50,000
157 Concordia Parish Airport Obstruction Removal $0 $125,000 $125,000
158 Bunkie Municipal Airport Runway Rehab - Design PH I $0 $64,200 $64,200
159 Marksville Municipal Airport Terminal Apron Rehabilitation - Phase I (Design) $0 $55,000 $55,000
160 George R. Carr Memorial Airport Ramp Overlay $0 $460,000 $460,000
161 Harry P. Williams Memorial Airport Rehabilitate North Apron - Phase I (Design) $0 $35,000 $35,000
162 Homer Municipal Airport Runway Safety Area Improvements - Construction $0 $1,000,000 $1,000,000
163 John H. Hooks Jr. Memorial Taxiway Stub Apron Expansion PH II $405,000 $45,000 $450,000
164 Springhill Airport Overlay Runway - Phase II (Construction) $900,000 $100,000 $1,000,000
165 Chennault International Airport Obstruction Removal - South End $0 $500,000 $500,000
166 Jennings Airport Install Taxiway Lighting $0 $648,000 $648,000
167 Port Of South Louisiana Executive Regional Airport Airport Security/Wildlife Fence $0 $325,000 $325,000
168 Beauregard Regional Airport Rehabilitate Runway 14/32 $0 $317,000 $317,000
Tuesday, February 19, 2019 Page 15 of 32General Aviation Capital Outlay
Item Airport Project Description
Federal/
Other Funds State Funds Total Funds
General Aviation Capital Outlay Long Range Unfunded Program
169 Columbia Airport Construct New Runway - Phase II (Land Acquisition) $0 $400,000 $400,000
170 Delhi Municipal Airport Drainage Improvements - Phase II $0 $50,000 $50,000
171 C.e. Rusty Williams Airport Design and Construct Taxilanes & 10-Unit T-Hangar $0 $800,000 $800,000
172 Minden Airport Apron Expansion Phase II - Design $157,500 $17,500 $175,000
173 Le Gros Memorial Airport Rehabilitate Airfield Markings $0 $103,000 $103,000
174 Ruston Regional Airport Construct SSALR $0 $900,000 $900,000
175 Jennings Airport North Apron Development - Phase I (Design) $0 $88,000 $88,000
176 Vicksburg Tallulah Regional Airport Runway Extension - Phase I (Feasibility Study/EA) $238,500 $26,500 $265,000
177 Bunkie Municipal Airport Apron & Taxiway Rehab - Ph I Design $0 $43,300 $43,300
178 Ruston Regional Airport SSALSR - Phase I (Design) $0 $115,000 $115,000
179 Abbeville Chris Crusta Memorial Airport Construct Agriculture Apron (Design & Construction) $122,490 $13,610 $136,100
180 False River Regional Airport Taxiway Centerline Shift $3,420,000 $380,000 $3,800,000
181 Minden Airport Parallel Taxiway - Phase II (Construction) $1,800,000 $200,000 $2,000,000
182 Chennault International Airport Taxiway G Rehabilitation - Phase I (Design) $225,000 $25,000 $250,000
183 Morehouse Memorial Airport Runway Extension - Phase I Design $270,000 $30,000 $300,000
184 Union Parish Airport Runway Extension - Ph II $1,575,000 $175,000 $1,750,000
185 Kelly Dumas Instrument Approach Survey $90,000 $10,000 $100,000
186 Red River Parish Airport Construct East Airfield Perimeter Fence Replacement $0 $350,000 $350,000
187 Natchitoches Regional Airport Apron Expansion $0 $200,000 $200,000
188 Jennings Airport Relocate Wind Cone and Construct Segmented Circle $0 $112,000 $112,000
189 Marksville Municipal Airport Runway Lighting Rehab $0 $100,000 $100,000
190 Hart Airport Runway Extension - Phase II (Design) $0 $160,000 $160,000
191 South Lafourche Leonard Miller, Jr. Airport Upgrade PAPI-4 Systems to LED $0 $80,000 $80,000
192 Pineville Municipal Airport Apron Rehabilitation - Phase II (Construction) $0 $806,500 $806,500
Tuesday, February 19, 2019 Page 16 of 32General Aviation Capital Outlay
Item Airport Project Description
Federal/
Other Funds State Funds Total Funds
General Aviation Capital Outlay Long Range Unfunded Program
193 Morehouse Memorial Airport Runway Extension - Ph II $12,780,002 $1,420,000 $14,200,002
194 Leesville Airport Airfield Lighting Improvements $0 $250,000 $250,000
195 St Tammany Regional Airport Extend Runway 18/36 - Phase I (Environmental) $180,000 $20,000 $200,000
196 Leesville Airport Extend Runway 18/36 - Phase I (Design) $103,500 $11,500 $115,000
197 Marksville Municipal Airport Runway 4/22 Extension - Phase I (Environmental) $234,000 $26,000 $260,000
198 Allen Parish Airport Runway Extension $4,320,000 $480,000 $4,800,000
199 Hart Airport Runway Extension - Phase II (Road Relocation) $720,000 $80,000 $800,000
200 Kelly Dumas Full Length Parallel Twy $1,125,000 $125,000 $1,250,000
201 Hart Airport Construct Parallel Taxiway $1,620,000 $180,000 $1,800,000
202 Acadiana Regional Airport Update Airport Master Plan $225,000 $25,000 $250,000
203 Thibodaux Municipal Airport Midfield Connector Taxiway $0 $300,000 $300,000
204 Minden Airport Perimeter Fencing - Design/Construct $225,000 $25,000 $250,000
205 Concordia Parish Airport Electronic Slide Gate (North Airfield) $0 $25,000 $25,000
206 Leesville Airport Construct Parallel Taxiway - Phase I $0 $176,000 $176,000
207 Le Gros Memorial Airport Parallel Taxiway for Runway 4-22 $2,047,500 $227,500 $2,275,000
208 Union Parish Airport Parallel Taxiway Extension - Construction $1,125,000 $125,000 $1,250,000
209 Concordia Parish Airport Taxiway Extension - Phase I (EA) $72,000 $8,000 $80,000
210 Hart Airport Runway Extension - Phase III (Extend Runway) $720,000 $80,000 $800,000
211 Minden Airport Airfield Lighting Improvements - Phase I (Design) $0 $80,000 $80,000
212 Le Maire Memorial Airport Apron Expansion - Phase II (Construction) $0 $400,000 $400,000
213 Ruston Regional Airport Taxilanes and T Hangars - Phase I (Design) $0 $75,000 $75,000
214 St Tammany Regional Airport Apron Extension - Phase I (Environmental & Design) $0 $150,000 $150,000
215 Columbia Airport Construct New Runway - Phase I (EA) $0 $175,000 $175,000
216 Allen Parish Airport Rehabilitate North Apron Drainage $0 $535,000 $535,000
Tuesday, February 19, 2019 Page 17 of 32General Aviation Capital Outlay
Item Airport Project Description
Federal/
Other Funds State Funds Total Funds
General Aviation Capital Outlay Long Range Unfunded Program
217 Port Of South Louisiana Executive Regional Airport Fuel Farm Improvement $0 $90,000 $90,000
218 Marksville Municipal Airport Airfield Drainage Improvements $0 $150,000 $150,000
219 Natchitoches Regional Airport Replace AWOS III P/T $0 $200,000 $200,000
220 False River Regional Airport PAPI Upgrades $0 $150,000 $150,000
221 Tensas Parish Airport Runway Extension - Phase I $0 $200,000 $200,000
222 False River Regional Airport ODALS/REILS Upgrades $0 $150,000 $150,000
223 Le Gros Memorial Airport Perimeter Fencing - Phase I (Design & Construction) $0 $168,000 $168,000
224 Leesville Airport Install Perimeter Fence $1,003,050 $111,450 $1,114,500
225 John H. Hooks Jr. Memorial Shade Hangars PH II $360,000 $40,000 $400,000
226 Hart Airport Design Parallel Taxiway $0 $225,000 $225,000
227 Hart Airport Design & Construct Perimeter Fencing $0 $350,000 $350,000
228 Feliciana Airpark Construct Taxiway $0 $300,000 $300,000
229 Jonesboro Airport Parallel Taxiway - Phase I (Design) $0 $73,600 $73,600
230 Homer Municipal Airport Design Parallel Taxiway $0 $125,000 $125,000
231 Port Of South Louisiana Executive Regional Airport Wildlife Assessment $0 $60,000 $60,000
232 Thibodaux Municipal Airport Perimeter Fencing - Phase I (Environmental/Design) $90,000 $10,000 $100,000
233 Homer Municipal Airport Parallel Taxiway - Construction $0 $1,500,000 $1,500,000
234 Red River Parish Airport Construct New Apron, Connecting Taxiway, and Taxilanes - Phase II $0 $1,000,000 $1,000,000
235 Port Of South Louisiana Executive Regional Airport Airport Master Plan $247,500 $27,500 $275,000
236 George R. Carr Memorial Airport Wildlife Fencing - Phase I (Wildlife Assessment and Preliminary Engineering) $81,000 $9,000 $90,000
237 Allen Parish Airport Install Perimeter Fence - Phase I (Design) $0 $60,000 $60,000
238 Columbia Airport Construct Access Taxilane $0 $450,000 $450,000
239 Jonesboro Airport Construct Hangars $0 $500,000 $500,000
240 Harry P. Williams Memorial Airport Upgrade of ILS/DME $0 $365,000 $365,000
Tuesday, February 19, 2019 Page 18 of 32General Aviation Capital Outlay
Item Airport Project Description
Federal/
Other Funds State Funds Total Funds
General Aviation Capital Outlay Long Range Unfunded Program
241 Natchitoches Regional Airport Taxiway to End of Runway 25 $405,000 $45,000 $450,000
242 Tensas Parish Airport Apron and Taxilane Ph I Design $0 $75,000 $75,000
243 Marksville Municipal Airport AWOS $0 $200,000 $200,000
244 St Landry Parish-ahart Field T-Hangars $0 $553,200 $553,200
245 Natchitoches Regional Airport Runway 7/25 Lighting Improvements $0 $300,000 $300,000
246 Kelly Dumas Install AWOS III P/T $180,000 $20,000 $200,000
247 South Lafourche Leonard Miller, Jr. Airport Fuel System Rehabilitation $225,000 $25,000 $250,000
248 Chennault International Airport CATII Approach Study/Survey $0 $75,000 $75,000
249 Esler Regional Airport Drainage Rehabilitation of Safety Areas and Midfield - Phase I Design $0 $165,800 $165,800
250 Natchitoches Regional Airport Construct Taxilanes for T-Hangars $405,000 $45,000 $450,000
251 Le Gros Memorial Airport Upgrade Runway 4-22 REIL $0 $31,000 $31,000
252 Acadiana Regional Airport SSALR Upgrade $0 $490,000 $490,000
253 Allen Parish Airport Approach Lighting $0 $750,000 $750,000
254 Franklinton Airport Perimeter Fencing - Phase I (Design) $0 $35,000 $35,000
255 Eunice Airport Airport Layout Plan $135,000 $15,000 $150,000
256 Columbia Airport Access Gate and Terminal Area Fencing $0 $50,000 $50,000
257 Bunkie Municipal Airport Security Fencing Rehabilitation $0 $86,800 $86,800
258 Bunkie Municipal Airport Perimeter Fencing $0 $405,390 $405,390
259 Esler Regional Airport Rehabilitate Taxiways - Phase I (Design) $0 $199,200 $199,200
260 Esler Regional Airport Perimeter Drainage Rehabilitation (Design) $0 $119,000 $119,000
261 South Lafourche Leonard Miller, Jr. Airport Master Plan Update $198,000 $22,000 $220,000
262 Natchitoches Regional Airport Agricultural Apron $0 $325,000 $325,000
263 Le Gros Memorial Airport Installation of Runway 13-31 Lighting $0 $432,000 $432,000
264 Thibodaux Municipal Airport Airport Terminal - Phase I (Design) $0 $100,000 $100,000
Tuesday, February 19, 2019 Page 19 of 32General Aviation Capital Outlay
Item Airport Project Description
Federal/
Other Funds State Funds Total Funds
General Aviation Capital Outlay Long Range Unfunded Program
265 Esler Regional Airport Taxiway Rehabilitation - Phase II (Design) $0 $207,000 $207,000
266 Tensas Parish Airport Acquire and Install AWOS $0 $200,000 $200,000
267 Natchitoches Regional Airport Construct 10-Unit T-Hangar & Box Hangar $0 $650,000 $650,000
268 Beauregard Regional Airport Construct T-Hangar Taxilanes $1,352,502 $150,278 $1,502,780
269 Leesville Airport GA Development Area - Taxilanes and Drainage $0 $433,000 $433,000
270 Welsh Airport Rehabilitate Airfield Lighting $0 $555,000 $555,000
271 Homer Municipal Airport Sealcoat Runway and Apron $0 $150,000 $150,000
272 Marksville Municipal Airport Agriculture Apron Improvements - Phase I (Design) $0 $41,500 $41,500
273 Harry P. Williams Memorial Airport Small Scale Masterplan $0 $50,000 $50,000
274 False River Regional Airport Construct Hangars - (Design & Construction) $990,000 $110,000 $1,100,000
275 Kelly Dumas Site Prep for Hangars $0 $170,000 $170,000
276 Natchitoches Regional Airport Land Acquisition - ODALS $0 $260,000 $260,000
277 Le Gros Memorial Airport New Terminal Building $0 $448,000 $448,000
278 St Tammany Regional Airport Box Hangar $0 $865,000 $865,000
279 Morehouse Memorial Airport Construct Hangars - Phase I $45,000 $5,000 $50,000
280 Vivian Airport Rehabilitate East Apron $0 $225,000 $225,000
281 George R. Carr Memorial Airport Hangar $0 $700,000 $700,000
282 Kelly Dumas Ugrade Fuel System $180,000 $20,000 $200,000
283 Delhi Municipal Airport Small Apron Reconstruction $0 $190,000 $190,000
284 Le Gros Memorial Airport Construct 5 Unit Hangars $0 $570,000 $570,000
285 Leesville Airport Construct 6 T-Hangars $0 $646,000 $646,000
286 Kelly Dumas Construct Hangars $0 $600,000 $600,000
287 Franklinton Airport Hangar Taxilane - Phase I (Design) $0 $50,000 $50,000
288 Le Gros Memorial Airport Construct Aviation Fuel System $0 $150,000 $150,000
Tuesday, February 19, 2019 Page 20 of 32General Aviation Capital Outlay
Item Airport Project Description
Federal/
Other Funds State Funds Total Funds
General Aviation Capital Outlay Long Range Unfunded Program
289 Vicksburg Tallulah Regional Airport North Taxilane $855,000 $95,000 $950,000
290 Winnsboro Municipal Airport Apron Reconstruction $360,000 $40,000 $400,000
291 Bunkie Municipal Airport Agricultural Operations Apron $0 $500,000 $500,000
292 Columbia Airport Construct Agriculture Apron and Taxiway Stub $0 $250,000 $250,000
293 St Tammany Regional Airport 10 Unit T-Hangar Complex $0 $780,000 $780,000
294 Acadiana Regional Airport Acquisition of ARFF Vehicle $0 $1,000,000 $1,000,000
295 Jonesboro Airport Construct Agriculture Apron - Phase I (Design) $0 $100,000 $100,000
296 Tensas Parish Airport Terminal Building $0 $150,000 $150,000
297 Homer Municipal Airport Construct Hangars $0 $350,000 $350,000
298 Columbia Airport Construct T-Hangars $0 $550,000 $550,000
299 Bunkie Municipal Airport Airport Terminal Building $0 $100,000 $100,000
300 Bunkie Municipal Airport Hangars & Apron $0 $750,000 $750,000
301 Columbia Airport Fuel Farm $0 $250,000 $250,000
302 Feliciana Airpark Hangar Development $0 $300,000 $300,000
303 Tensas Parish Airport New T-Hangars $0 $500,000 $500,000
304 Bunkie Municipal Airport Small Scale Masterplan Update $0 $125,000 $125,000
305 Thibodaux Municipal Airport Relocate Airport Access Road $0 $600,000 $600,000
306 Leesville Airport Access Road Rehabilitation $0 $75,000 $75,000
307 False River Regional Airport Bury Powerlines - Runway 36 Approach $0 $250,000 $250,000
308 Acadiana Regional Airport Perimeter/Emergency Access Road - Phase I (PER) $150,000 $16,667 $166,667
309 Chennault International Airport New Access Road - Phase I (Design) $0 $175,000 $175,000
310 Franklinton Airport Update Airport Layout Plan $0 $100,000 $100,000
311 Concordia Parish Airport Security Lighting for Main and T-Hangar Ramps $142,500 $15,833 $158,333
312 Kelly Dumas Access Road & Parking $315,000 $35,000 $350,000
Tuesday, February 19, 2019 Page 21 of 32General Aviation Capital Outlay
Item Airport Project Description
Federal/
Other Funds State Funds Total Funds
General Aviation Capital Outlay Long Range Unfunded Program
313 Homer Municipal Airport Airport Master Plan $0 $200,000 $200,000
314 Franklinton Airport Land Acquisition $0 $100,000 $100,000
315 Vivian Airport Upgrade Airfield Lighting $0 $200,000 $200,000
316 Esler Regional Airport GA Apron Strengthening and Expansion $0 $350,000 $350,000
317 Bunkie Municipal Airport Land Acquistion $0 $200,000 $200,000
318 Springhill Airport Airfield Lighting Rehabilitation $0 $1,000,000 $1,000,000
319 Union Parish Airport Design Runway Extension $202,500 $22,500 $225,000
320 Red River Parish Airport Design Parallel Taxiway $0 $200,000 $200,000
321 Columbia Airport Relocate Airport Access Road - Phase I $0 $40,000 $40,000
322 Esler Regional Airport Rehabilitate Security Fencing & Gates $0 $108,900 $108,900
323 Pineville Municipal Airport Small Scope Master Plan - Phase II $0 $66,000 $66,000
324 C.e. Rusty Williams Airport Airfield Lighting System Improvements and New Electrical Vault - Construction $450,000 $450,000 $900,000
325 Tensas Parish Airport Construct Access Road $0 $700,000 $700,000
326 Red River Parish Airport Design/Construct Apron Taxilane Extension $0 $300,000 $300,000
327 Union Parish Airport Parallel Taxiway Extension - Design $157,500 $17,500 $175,000
328 St Tammany Regional Airport Runway 18/36 Extension - Phase III (Construction) $2,713,842 $301,538 $3,015,380
329 Vivian Airport Complete Airfield Perimeter Security Fencing $0 $300,000 $300,000
330 Pineville Municipal Airport Apron Rehabilitation - Design $0 $72,000 $72,000
331 Byerley Airport Rehabilitate Airfield Lighting $405,000 $45,000 $450,000
332 Scott Airport Taxiway Improvements $0 $75,000 $75,000
333 Winnsboro Municipal Airport Security Fencing $486,000 $54,000 $540,000
334 Le Maire Memorial Airport Apron Expansion - Phase I (Design) $0 $50,000 $50,000
335 John H. Hooks Jr. Memorial Terminal Building - Phase I $180,000 $20,000 $200,000
336 Jonesville Municipal Airport Hangar Replacement - Ph. I Design $90,000 $10,000 $100,000
Tuesday, February 19, 2019 Page 22 of 32General Aviation Capital Outlay
Item Airport Project Description
Federal/
Other Funds State Funds Total Funds
General Aviation Capital Outlay Long Range Unfunded Program
337 Le Maire Memorial Airport Perimeter Fence $0 $330,000 $330,000
338 David G. Joyce Airport Construct Parallel Taxiway - Phase I $0 $471,000 $471,000
339 Red River Parish Airport Construct New Apron, Connecting Taxiway, and Taxilanes - Phase I $0 $1,000,000 $1,000,000
340 Byerley Airport Apron Rehabilitation $463,500 $51,500 $515,000
341 Esler Regional Airport Construct T-Hangars $0 $373,258 $373,258
342 Chennault International Airport CAT II/ILS Upgrade $0 $400,000 $400,000
343 Red River Parish Airport Design & Construct Fuel System $0 $250,000 $250,000
344 Springhill Airport Construct 6-Unit T-Hangar $0 $350,000 $350,000
345 Red River Parish Airport Design & Construct Hangars for New Apron $0 $350,000 $350,000
346 Vivian Airport Construct Box Hangars $0 $625,000 $625,000
347 Livingston Regional Airport Parallel Taxiway -Phase II (Construction) $2,700,000 $300,000 $3,000,000
348 Red River Parish Airport Action Plan/ALP Update $0 $125,000 $125,000
349 Livingston Regional Airport Construct Apron - Phase II (Construction) $0 $500,000 $500,000
350 Winnsboro Municipal Airport Hangars $540,000 $60,000 $600,000
351 Pineville Municipal Airport Seaplane Improvements $0 $410,000 $410,000
352 David G. Joyce Airport Rehabilitate Airfield Lighting $0 $325,000 $325,000
353 Union Parish Airport 10 Unit T-Hangar - Construction $0 $375,000 $375,000
354 Pineville Municipal Airport Construct South Apron Extension $0 $285,000 $285,000
355 Vivian Airport Rehab Runway 9/27 $0 $200,000 $200,000
356 Delhi Municipal Airport Masterplan and Drainage Study $0 $30,000 $30,000
357 Esler Regional Airport Access Road and Security Checkpoints $1,080,000 $120,000 $1,200,000
358 Livingston Regional Airport Perimeter Fence - Phase II (Construction) $900,000 $100,000 $1,000,000
359 St Landry Parish-ahart Field Apron Rehabilitation $0 $186,010 $186,010
360 Pineville Municipal Airport East Access Road and Site Improvements $0 $1,000,000 $1,000,000
Tuesday, February 19, 2019 Page 23 of 32General Aviation Capital Outlay
Item Airport Project Description
Federal/
Other Funds State Funds Total Funds
General Aviation Capital Outlay Long Range Unfunded Program
361 St Landry Parish-ahart Field Runway 6-24 Rehabilitation $0 $415,368 $415,368
362 Le Maire Memorial Airport T-Hangar Complex $0 $385,000 $385,000
363 David G. Joyce Airport Rehabilitate Agricultural Apron $0 $267,000 $267,000
364 David G. Joyce Airport Apron Rehabilitation - Phase I (Construction of South End) $0 $460,000 $460,000
365 Scott Airport Master Drainage Study $0 $55,000 $55,000
366 Natchitoches Regional Airport Replace Airfield Signage and 17/35 Lights $0 $135,000 $135,000
367 Welsh Airport Airfield Perimeter Fencing $0 $250,000 $250,000
368 Delhi Municipal Airport Perimeter Fencing $0 $420,000 $420,000
369 Livingston Regional Airport Entrance Road $900,000 $100,000 $1,000,000
370 Pineville Municipal Airport Obstruction Mitigation $0 $825,000 $825,000
371 Pineville Municipal Airport Terminal Building Improvements $0 $713,000 $713,000
372 Acadiana Regional Airport Taxiway B Improvements (East) $4,950,000 $550,000 $5,500,000
373 David G. Joyce Airport Design Parallel Taxiway $0 $150,000 $150,000
374 Scott Airport Rehabilitate Runway Lighting - Phase I $0 $40,000 $40,000
375 Jonesville Municipal Airport Hangars - Ph II $450,000 $50,000 $500,000
376 Arcadia Bienville Airport Perimeter Fencing $0 $70,000 $70,000
377 Delhi Municipal Airport Fuel Farm $0 $150,000 $150,000
378 Pineville Municipal Airport Automobile Parking Lot Expansion $0 $143,000 $143,000
379 Welsh Airport Airport Layout Plan (ALP) $0 $100,000 $100,000
380 Natchitoches Regional Airport Upgrade Localizer $0 $450,000 $450,000
381 David G. Joyce Airport Apron Rehabilitation - Design $0 $80,000 $80,000
382 Jonesboro Airport Runway Lighting Improvements $0 $415,000 $415,000
383 David G. Joyce Airport Rehabilitate Apron - North Section $0 $250,000 $250,000
384 Arcadia Bienville Airport Design Agriculture Apron, Taxilane, and Entrance Road $0 $85,000 $85,000
Tuesday, February 19, 2019 Page 24 of 32General Aviation Capital Outlay
Item Airport Project Description
Federal/
Other Funds State Funds Total Funds
General Aviation Capital Outlay Long Range Unfunded Program
385 Leesville Airport AWOS/ASOS $270,000 $30,000 $300,000
386 Livingston Regional Airport Environmental Mitigation $0 $300,000 $300,000
387 Olla Airport Perimeter Fencing $0 $400,000 $400,000
388 Arcadia Bienville Airport Design Hangar $0 $120,000 $120,000
389 Livingston Regional Airport Construct Apron - Phase I (Design) $0 $300,000 $300,000
390 Arcadia Bienville Airport Action Plan/ALP $0 $95,000 $95,000
391 Livingston Regional Airport Perimeter Fence - Phase I (Design) $0 $50,000 $50,000
392 Livingston Regional Airport AWOS III/PT $0 $200,000 $200,000
393 Livingston Regional Airport Airfield Lighting and NAVAIDS - Phase I (Design) $0 $400,000 $400,000
394 David G. Joyce Airport Construct Parallel Taxiway - Phase II $0 $508,000 $508,000
395 Livingston Regional Airport Hangar Development $0 $1,000,000 $1,000,000
396 Livingston Regional Airport Fuel Farm $0 $200,000 $200,000
397 Arcadia Bienville Airport Design Parallel Taxiway $0 $100,000 $100,000
398 Arcadia Bienville Airport Construct Parallel Taxiway $0 $1,200,000 $1,200,000
399 Arcadia Bienville Airport Construct Agriculture Apron, Taxilane, and Entrance Road $0 $600,000 $600,000
400 Arcadia Bienville Airport Design Terminal and Fuel Farm $0 $90,000 $90,000
401 Arcadia Bienville Airport Construct Terminal $0 $300,000 $300,000
402 Arcadia Bienville Airport Construct Fuel Farm $0 $250,000 $250,000
403 Allen Parish Airport Construct T-Hangars $0 $300,000 $300,000
404 John H.hooks Jr. Memorial New Fuel Farm $0 $50,000 $50,000
405 John H.hooks Jr. Memorial Terminal Building - Phase II $475,000 $52,778 $527,778
406 Arcadia Bienville Airport Construct Hangars $0 $500,000 $500,000
407 Allen Parish Airport Construct Taxilane/Apron for T-Hangar Access $0 $690,000 $690,000
408 Bunkie Municipal Airport Airport Access Drive $0 $135,500 $135,500
Tuesday, February 19, 2019 Page 25 of 32General Aviation Capital Outlay
Item Airport Project Description
Federal/
Other Funds State Funds Total Funds
General Aviation Capital Outlay Long Range Unfunded Program
409 Concordia Parish Airport Rehabilitate Southwest Apron - Phase I $71,250 $7,917 $79,167
410 False River Regional Airport Construction of Corporate Hangar $144,000 $12,667 $156,667
411 Le Maire Memorial Airport Land Acquisition $0 $150,000 $150,000
412 John H.hooks Jr. Memorial New East Apron - Phase II $475,000 $52,778 $527,778
413 Red River Parish Airport Construct Terminal Building $400,000 $44,444 $444,444
414 Jennings Airport Approach Lights for Runway 8/26 (ODALS) $242,105 $26,901 $269,006
415 Winnsboro Municipal Airport Site Selection & EA for new Airport $270,000 $30,000 $300,000
416 Olla Airport Rehabilitation of Beacon and Windsock $0 $55,000 $55,000
417 Winnsboro Municipal Airport Construct Entrance Drive, Gating & Erosion Control Measures for New Airport Site $360,000 $40,000 $400,000
418 Winnsboro Municipal Airport Master Planning for New Airport $270,000 $30,000 $300,000
419 Tensas Parish Airport Perimeter Fencing Phase I $0 $250,000 $250,000
420 Kelly Dumas Construct T-Hangar Taxilanes $360,000 $40,000 $400,000
421 Ruston Regional Airport Construct Hangar Taxiways - Phase II $1,170,000 $130,000 $1,300,000
422 Louisiana Regional Airport Land Acquisition for RPZ Expansion $0 $900,000 $900,000
423 Tensas Parish Airport Apron Expansion - Phase III (Construction) $0 $450,000 $450,000
424 Tensas Parish Airport Apron Expansion - Phase I (EA & Design) $0 $55,000 $55,000
425 Tensas Parish Airport Apron Expansion - Phase II (Land Acquisition) $0 $250,000 $250,000
426 Tensas Parish Airport Fuel Farm $0 $120,000 $120,000
427 Morehouse Memorial Airport Apron Rehabilitation $292,500 $32,500 $325,000
428 Byerley Airport Construct New Shade Ports $450,000 $50,000 $500,000
429 Delhi Municipal Airport Land Acquisition $0 $95,000 $95,000
430 Beauregard Regional Airport Runway 18/36 Approach Lighting Improvements $855,117 $95,013 $950,130
431 John H.hooks Jr. Memorial New East Apron - Phase I $95,000 $10,556 $105,556
432 John H.hooks Jr. Memorial Construct Hangar AccessTaxiway Phase I $58,500 $6,500 $65,000
Tuesday, February 19, 2019 Page 26 of 32General Aviation Capital Outlay
Item Airport Project Description
Federal/
Other Funds State Funds Total Funds
General Aviation Capital Outlay Long Range Unfunded Program
433 Eunice Airport Taxiway Extension (South) with Associated Lighting and Signage $540,000 $60,000 $600,000
434 Harry P. Williams Memorial Airport Rehab Public Heliport $0 $40,000 $40,000
435 Harry P. Williams Memorial Airport Runway Safety Area Improvements $150,000 $16,667 $166,667
436 Ruston Regional Airport Taxiway Lighting $617,500 $68,611 $686,111
437 John H. Hooks Jr. Memorial Design & Environmental for Runway & Taxiway Extension $152,000 $16,889 $168,889
438 Allen Parish Airport Construct Hangars $0 $750,000 $750,000
439 Slidell Airport Land Acquisition West Side $0 $375,000 $375,000
440 Vicksburg Tallulah Regional Airport Taxiway Lighting - Phase I $0 $35,000 $35,000
441 Jonesboro Airport Fuel Farm $20,000 $110,000 $130,000
442 Delhi Municipal Airport Perimeter Fence - Phase III $0 $330,000 $330,000
443 Jonesboro Airport Construct Hangars $8,000 $292,000 $300,000
444 Feliciana Airpark Extend Runway 15/33 $0 $136,000 $136,000
445 Feliciana Airpark Temporary Runway Lighting $0 $51,600 $51,600
446 Houma Terrebonne Airport Taxiway A Extension - Phase II (Construction) $1,800,000 $200,000 $2,000,000
447 Houma Terrebonne Airport Taxiway A Extension - Phase I (Design) $450,000 $50,000 $500,000
448 Houma Terrebonne Airport Construct Partial Parallel Taxiway - Phase IV (Construction) $20,000 $1,000,000 $1,020,000
449 Thibodaux Municipal Airport Resurface Terminal Building Parking Lot $150,000 $16,667 $166,667
450 False River Regional Airport Obstruction Mitigation Runway 18 Approach $283,500 $31,500 $315,000
451 Acadiana Regional Airport Runway 17/35 Extension - Phase I (Design) $0 $500,000 $500,000
452 Acadiana Regional Airport Construct Hangar $0 $350,000 $350,000
453 Acadiana Regional Airport Heavy Jet Apron Expansion - Phase III of V (Construction) $4,500,000 $500,000 $5,000,000
454 South Lafourche Leonard Miller, Jr. Airport Terminal Design $50,000 $150,000 $200,000
455 Louisiana Regional Airport North T-Hangar Development - Phase III (Hangars) $20,000 $860,000 $880,000
456 Jena Airport Taxiway A Extension - Phase I $150,000 $30,000 $180,000
Tuesday, February 19, 2019 Page 27 of 32General Aviation Capital Outlay
Item Airport Project Description
Federal/
Other Funds State Funds Total Funds
General Aviation Capital Outlay Long Range Unfunded Program
457 Louisiana Regional Airport North T-Hangar Development - Phase I (Environmental) $0 $100,000 $100,000
458 Jena Airport Taxiway Lighting - Phase II $0 $250,000 $250,000
459 South Lafourche Leonard Miller, Jr. Airport Taxiway Pavement Strengthening - Phase II (Construction) $3,600,000 $400,000 $4,000,000
460 South Lafourche Leonard Miller, Jr. Airport Taxiway Pavement Strengthening - Phase I (Design) $270,000 $30,000 $300,000
461 South Lafourche Leonard Miller, Jr. Airport Runway Pavement Strengthening - Phase I (Design) $0 $350,000 $350,000
462 De Quincy Industrial Airpark Hangar Rehabilitation $0 $300,000 $300,000
463 Concordia Parish Airport Runway Extension - Phase II $787,500 $87,500 $875,000
464 Columbia Airport Construct New Runway - Phase III (Site Preparation) $0 $750,000 $750,000
465 Kelly Dumas Widen Runway 18/36 - Design $108,000 $12,000 $120,000
466 Natchitoches Regional Airport Rehabilitate Lighting on Runway 17/35 $0 $100,000 $100,000
467 New Orleans Lakefront Airport Main Apron Rehabilitation $3,600,000 $400,000 $4,000,000
468 Hart Airport Construct Apron Overlay $0 $165,000 $165,000
469 Jena Airport Taxiway Lighting $0 $25,000 $25,000
470 Jena Airport Taxiway A Extension - South - Phase II (Construction) $0 $1,275,000 $1,275,000
471 Welsh Airport T-Hangar $0 $400,000 $400,000
472 Louisiana Regional Airport North T-Hangar Development - Phase II (Apron) $0 $877,000 $877,000
473 South Lafourche Leonard Miller, Jr. Airport Airfield Marking Rehabilitation $135,000 $15,000 $150,000
474 Houma Terrebonne Airport South Apron $1,800,000 $300,000 $2,100,000
475 Houma Terrebonne Airport Runway 18-36 Drainage Improvements (Construction - Phase II) $0 $1,000,000 $1,000,000
476 Vicksburg Tallulah Regional Airport Runway Extension - Phase V (Construction) $3,600,000 $400,000 $4,000,000
477 Louisiana Regional Airport Hangar Development - Phase IV $20,000 $800,000 $820,000
478 Louisiana Regional Airport Taxiway Guidance Signs $0 $230,000 $230,000
479 Concordia Parish Airport Relocate West Apron Taxiway Connector $180,000 $20,000 $200,000
480 Beauregard Regional Airport Rehabilitate Taxiway Signage - Phase II (Construction) $0 $150,000 $150,000
Tuesday, February 19, 2019 Page 28 of 32General Aviation Capital Outlay
Item Airport Project Description
Federal/
Other Funds State Funds Total Funds
General Aviation Capital Outlay Long Range Unfunded Program
481 Beauregard Regional Airport Rehabilitate Runway 14/32 - Phase II (Construction) $0 $227,000 $227,000
482 Beauregard Regional Airport Rehabilitate Runway 18/36 - Phase II (Construction) $0 $455,000 $455,000
483 Abbeville Chris Crusta Memorial Airport Taxiway C Reconfiguration $128,970 $14,330 $143,300
484 Columbia Airport Construct New Runway - Phase IV (Pavement & Lighting) $0 $2,750,000 $2,750,000
485 Acadiana Regional Airport ATCT Relocation - Phase II (Construction) $27,000,000 $3,000,000 $30,000,000
486 Acadiana Regional Airport ATCT Relocation - Phase I (Design) $0 $5,400,000 $5,400,000
487 Feliciana Airpark Install Runway Lighting $0 $186,000 $186,000
488 Acadiana Regional Airport AGIS Survey $0 $200,000 $200,000
489 Jena Airport Construct 4 T-hangars $0 $225,000 $225,000
490 Tensas Parish Airport Runway Extension - Phase III (Design) $0 $150,000 $150,000
491 Winnsboro Municipal Airport AGIS Survey $21,900 $63,100 $85,000
492 Kelly-dumas Tree Removal $0 $50,000 $50,000
493 Houma-terrebonne Airport Runway 18-36 Drainage Improvements - Phase I (Design) $0 $300,000 $300,000
494 Acadiana Regional Airport Heavy Jet Apron Expansion - Phase IV of V (Construction) $4,500,000 $500,000 $5,000,000
495 Acadiana Regional Airport Runway Sweeper $0 $300,000 $300,000
496 Acadiana Regional Airport Heavy Jet Apron Expansion - Phase V of V (Construction) $4,515,000 $501,667 $5,016,667
497 Acadiana Regional Airport Taxiway B Improvements - West $666,000 $74,000 $740,000
498 New Orleans Lakefront Airport Pavement and Lighting Rehab - Hot Spot 1 $340,344 $37,816 $378,160
499 New Orleans Lakefront Airport Pavement and Lighting Rehab - Hot Spot 2 $183,573 $20,397 $203,970
500 Shreveport Downtown Airport Taxiway L and T-Hangar Ramps - Phase I (Environmental & Design) $0 $800,000 $800,000
501 Shreveport Downtown Airport Taxiway L and T-Hangar Lease - Construction & CA $0 $450,000 $450,000
502 Vivian Airport Construct Teacup Taxiways $990,000 $110,000 $1,100,000
503 Chennault International Airport Perimeter Fence Rehabilitation $0 $400,000 $400,000
504 Concordia Parish Airport Runway Extension - Preliminary $60,750 $6,750 $67,500
Tuesday, February 19, 2019 Page 29 of 32General Aviation Capital Outlay
Item Airport Project Description
Federal/
Other Funds State Funds Total Funds
General Aviation Capital Outlay Long Range Unfunded Program
505 Columbia Airport Relocate Airport Access Road and Auto Parking - Phase II $0 $200,000 $200,000
506 Delhi Municipal Airport Perimeter Fencing - Phase II $0 $50,000 $50,000
507 Scott Airport Rehabilitate Runway Lighting - Phase II $0 $300,000 $300,000
508 St Landry Parish-ahart Field Install Localizer Runway 18 $225,000 $25,000 $250,000
509 Beauregard Regional Airport Airport Layout Plan Update $0 $60,000 $60,000
510 Beauregard Regional Airport Drainage Study $0 $120,000 $120,000
511 Byerley Airport Fuel Farm $0 $50,000 $50,000
512 Vicksburg-tallulah Regional Airport Rehabilitate Apron $120,000 $13,333 $133,333
513 Vicksburg-tallulah Regional Airport Taxiway Lighting - Phase II $0 $275,000 $275,000
514 Le Maire Memorial Airport Runway Extension $0 $250,000 $250,000
515 Ruston Regional Airport RehabilitateTaxiway - Phase II $135,000 $15,000 $150,000
516 Natchitoches Regional Airport Relocate Fairgrounds Road Project - Phase I $0 $125,000 $125,000
517 Jena Airport Land Acquisition $0 $200,000 $200,000
518 Concordia Parish Airport Runway Extension - Phase I $123,750 $13,750 $137,500
519 George R. Carr Memorial Airport Construct Parallel Taxiway - Phase III $585,000 $65,000 $650,000
520 Concordia Parish Airport Acquistion of Land $0 $100,000 $100,000
521 Homer Municipal Airport Apron Rehabilitation Phase II $0 $175,000 $175,000
522 Tensas Parish Airport Parking Lot $0 $65,000 $65,000
523 Arcadia Bienville Airport Construct Perimeter Fencing $0 $500,000 $500,000
524 Columbia Airport Install AWOS $0 $230,100 $230,100
525 Columbia Airport Mitigate Wastewater Treatment Facility $0 $187,200 $187,200
526 Columbia Airport Terminal Building $0 $50,000 $50,000
527 Natchitoches Regional Airport Rehabilitate Access Road - Phase II $0 $400,000 $400,000
528 Natchitoches Regional Airport Rehabilitate Access Road - Phase I $0 $50,000 $50,000
Tuesday, February 19, 2019 Page 30 of 32General Aviation Capital Outlay
Item Airport Project Description
Federal/
Other Funds State Funds Total Funds
General Aviation Capital Outlay Long Range Unfunded Program
529 Natchitoches Regional Airport Wildlife Hazard Study $0 $75,000 $75,000
530 Natchitoches Regional Airport Repair Hangar Taxilanes $0 $125,000 $125,000
531 Red River Parish Airport Construct Parallel Taxiway $1,100,000 $122,222 $1,222,222
532 Ruston Regional Airport Rehabilitate Runway - Phase I $153,000 $17,000 $170,000
533 Natchitoches Regional Airport Rehabilitate Taxiway A $2,115,000 $235,000 $2,350,000
534 Ruston Regional Airport Construct Runway Extension - Phase II (Construction) $2,430,000 $270,000 $2,700,000
535 Jena Airport T-hangar Apron $0 $75,000 $75,000
536 Jena Airport Fuel Farm Installation $20,000 $65,000 $85,000
537 Jena Airport Apron Rehabilitation - Phase III $0 $280,000 $280,000
538 St John The Baptist Parish Airport Taxiway Relocation and Widening - Phase II $855,000 $95,000 $950,000
539 St John The Baptist Parish Airport Taxiway Relocation and Widening - Phase I $1,350,000 $150,000 $1,500,000
540 Harry P. Williams Memorial Airport Dredge and Stabilize Seaway - Phase II (Construction) $742,500 $82,500 $825,000
541 Harry P. Williams Memorial Airport Dredge and Stabilize Seaway - Phase I (Design) $0 $100,000 $100,000
542 Marksville Municipal Airport LPV Obstruction Survey $0 $60,000 $60,000
543 False River Regional Airport 7 Row T-Hangars $499,500 $55,500 $555,000
544 Vivian Airport Construct New Runway 9/27 $1,822,500 $427,500 $2,250,000
545 Vivian Airport Site Preparation for New Runway 9/27 $2,227,500 $522,500 $2,750,000
546 Vivian Airport Land Acquisition for New Runway 9/27 $0 $350,000 $350,000
547 Vivian Airport Environmental Assessment to Construct New Runway 9/27 $0 $150,000 $150,000
548 Columbia Airport Perimeter Fencing $0 $356,200 $356,200
549 Acadiana Regional Airport Heavy Jet Apron Expansion - Phase I of V (Design) $810,000 $90,000 $900,000
550 Concordia Parish Airport Rehabilitate Southwest Apron - Phase II $475,000 $52,778 $527,778
551 Ruston Regional Airport Taxiways Rehabilitation $0 $125,000 $125,000
552 Concordia Parish Airport Construct Segmented Circle $0 $30,000 $30,000
Tuesday, February 19, 2019 Page 31 of 32General Aviation Capital Outlay
Item Airport Project Description
Federal/
Other Funds State Funds Total Funds
General Aviation Capital Outlay Long Range Unfunded Program
553 Hart Airport Construct T-Hangars $20,000 $280,000 $300,000
554 South Lafourche Leonard Miller, Jr. Airport Runway Pavement Strengthening - Phase II (Construction) $0 $4,450,000 $4,450,000
555 Red River Parish Airport Design New Apron $54,000 $6,000 $60,000
556 Natchitoches Regional Airport Construct Partial Parallel Taxiway $405,000 $45,000 $450,000
557 John H.hooks Jr. Memorial Construct Hangar Access Taxiway Phase II $540,000 $60,000 $600,000
558 Acadiana Regional Airport Heavy Jet Apron Expansion - Phase II of V (Construction) $4,500,000 $500,000 $5,000,000
559 Natchitoches Regional Airport Construct Agricultural Ramp & Wash Rack $0 $325,000 $325,000
560 Columbia Airport Survey Approaches $0 $80,000 $80,000
561 C.e. (rusty) Williams Airport Seal Coat Runway and Taxiways $0 $150,000 $150,000
562 Concordia Parish Airport Construct Taxilane $0 $375,000 $375,000
563 George R. Carr Memorial Airport Design Parallel Taxiway - Phase III $0 $120,000 $120,000
564 Louisiana Regional Airport Land Acquisition North (T-Hangar Development) $20,000 $200,000 $220,000
General Aviation Capital Outlay Totals
Local/Other: $7,090,400
Federal: $227,310,929
State: $161,454,340
Total: $395,855,669
Tuesday, February 19, 2019 Page 32 of 32General Aviation Capital Outlay
Cancelled Projects
and Addendum
PAGE 1 OF 1
FISCAL YEAR 2017-2018 GENERAL AVIATION PROGRAMLine Item Airport Project State Amount
10GA SHREVEPORT DOWNTOWN AIRPORT NORTHWEST RAMP REHABILITATION (DESIGN & CONSTRUCTION) $ 400,000
15GA MOREHOUSE MEMORIAL AIRPORT OBSTRUCTION REMOVAL (RUNWAY 16 AND 34 APPROACH) $ 45,000 25GA C.E. RUSTY WILLIAMS AIRPORT DESIGN RUNWAY REHABILITATION $ 10,000
TOTAL GA FY 17-18 $ 455,000
FISCAL YEAR 2017-2018 AIR CARRIER PROGRAM6AC ALEXANDRIA INTERNATIONAL AIRPORT REHABILITATE RUNWAY 14/32 - PHHSE II $ 80,600
10AC MONROE REGIONAL AIRPORT REHABILITATE RUNWAY 4/22 BLAST PADS $ 50,000 15AC SHREVEPORT REGIONAL AIRPORT SECURITY IMPROVEMENTS - PHASE II $ 85,000
17AC SHREVEPORT REGIONAL AIRPORTATC RELOCATION & CONCOURSE MODERNIZATION - ENVIRONMENTAL/FEASIBILITY
$ 40,000
TOTAL AC FY 17-18 $ 255,600
FISCAL YEAR 2016-2017 GENERAL AVIATION PROGRAM10GA JENA AIRPORT OBSTRUCTION REMOVAL PHASE - II $ 175,000
14GASOUTH LAFOURCHE LEONARD MILLER JR AIRPORT
OBSTRUCTION REMOVAL - RWY 18 APPROACH PHASE I (ACQUISITION)
$ 60,000
40GA VICKSBURG-TALLULAH REGIONAL AIRPORT DESIGN TO CONSTRUCT ACCESS ROAD REHAB $ 5,000 TOTAL GA FY 16-17 $ 240,000
FISCAL YEAR 2007-2008 GENERAL AVIATION PROGRAM11GA ESLER REGIONAL AIRPORT UPGRADE AIRFIELD LIGHTING FOR RUNWAY 14-32 $ 47,222
TOTAL GA FY 07-08 $ 47,222
FISCAL YEAR 2007-2008 AIR CARRIER PROGRAM19AC SHREVEPORT REGIONAL AIRPORT SECURITY UPGRADES - PHASE III $ 25,000
TOTAL AC FY 07-08 25,000$
FISCAL YEAR 2006-2007 GENERAL AVIATION PROGRAM001GA SHREVEPORT DOWNTOWN AIRPORT INSTALL GUIDANCE SIGNS $ 29,224
025GA RUSTON REGIONAL AIRPORTELECTRONIC GATES AND ENVIRONMENTAL ASSESSMENT FOR RUNWAY EXTENSION
$ 4,000
028GA THIBODAUX MUNICIPAL AIRPORT AVIGATION EASEMENTS $ 6,316 TOTAL GA FY 06-07 $ 39,540
Listed below are projects in the Airport Construction and Development Priority Program for the Fiscal Years indicated. These projects are either idle or outdated, and their scopes of work are no longer valid. Therefore, we recommend approval of the sponsor’s request to withdraw the following projects from the Airport Construction and Development Priority Program.
PROJECTS RECOMMENDED FOR CANCELLATION
Program Addendum for
FY 2019-2020 Airport Construction & Development Priority Program
The actual project cost, on a project by project basis, may be below or above the estimate. The total amount approved for the Airport Construction and Development Priority Program (hereinafter referred to as the Program), for fiscal year 2019-2020 approved by the Louisiana Legislature, will not be exceeded.
In accordance with Act 451, 1989 regular Session, Louisiana Revised Statutes 2 §803 (B) states, “…if governing authority of an airport authority, district, parish or of any local unit of government obtains ninety percent or more funding for an airport, or for an airport project, from federal sources or from sources other than state funds, the legislature shall give priority to funding the remaining amount necessary for the airport or for the airport project, even if the project is not on the priority list of projects.”
With the passage of the Federal Omnibus bill and the recent passage of the FAA Appropriation Bill, additional federal discretionary funding may be available for governing authorities of airports that are in the National Plan of Integrated Airport Systems (NPIAS). State funding may be required to ensure the match to additional federal funding through this program. The availability of funds will be determined by the Department and distributed in accordance with the following as approved by the Louisiana Legislature: 1) Any other project or eligible enhancements to previously approved or new projects which receives 90% funding from any federal source through special appropriations packages. 2) Any other project or eligible enhancements to previously approved projects which receives 90% funding from any source, other than another State source, but which has not been processed and prioritized and is not in either the FY 2019-2020 funded or the FY 2020-2024 supplemental unfunded and long-range portion of the Program. 3) The General Aviation and Reliever Airports Maintenance Grant Program shall be funded in accordance with the conditions specified in L.R.S. 2 Chapter 8. 4) In the event that additional funds become available through underruns, project cancellations, or unplanned appropriations, state only projects required for safety or infrastructure preservation at airports may be moved from the Unfunded FY 2019-2024 Unfunded portion of the Program to the funded list. 5) Aviation Appropriations in the Transportation Trust Fund (TTF) will not be used as a match for projects funded with Passenger Facility Charges (PFC) as PFCs can be applied for and approved by the FAA at 100% of the project cost.