Page 1: Air Carrier and General Aviation - Louisiana · General Aviation Capital Outlay 18 ST LANDRY PARISH-AHART FIELD Perimeter Fencing - Phase II (Construction) $345,150 $38,350 $0 $383,500
Page 2: Air Carrier and General Aviation - Louisiana · General Aviation Capital Outlay 18 ST LANDRY PARISH-AHART FIELD Perimeter Fencing - Phase II (Construction) $345,150 $38,350 $0 $383,500

Air Carrier

and

General Aviation

Airport FUNDED

Program 2019-2020

Page 3: Air Carrier and General Aviation - Louisiana · General Aviation Capital Outlay 18 ST LANDRY PARISH-AHART FIELD Perimeter Fencing - Phase II (Construction) $345,150 $38,350 $0 $383,500

Item Airport Project Description

Federal

Funds State Match Local Other Total Funds

Airport Construction and Development Priority Program 2019-2020

Air Carrier Capital Outlay

1 BATON ROUGE METROPOLITAN AIRPORT

Runway 13-31 RSA/RPZ Improvements - Phase II (Final Design and Land Acquisition)

$7,300,000 $3,311,111 $20,000 $10,631,111

2 LAFAYETTE REGIONAL AIRPORT Construct Terminal - Phase III $12,000,000 $4,233,333 $20,616,067 $36,849,400

3 NEW ORLEANS LOUIS ARMSTRONG INTERNATIONAL AIRPORT

Terminal Construction Project - Phase VI $4,984,867 $3,664,649 $996,973 $9,646,489

4 LAKE CHARLES REGIONAL AIRPORT Bury Utility Lines - Phase III (Construction) $0 $700,000 $20,000 $720,000

5 SHREVEPORT REGIONAL AIRPORT Improve Runway 32 RPZ $0 $120,000 $0 $120,000

6 ALEXANDRIA INTERNATIONAL AIRPORT

Airfield Electrical Rehabilitation - Phase V (Final) $0 $480,141 $0 $480,141

7 MONROE REGIONAL AIRPORT Runway 14/32 Extension - Phase III (Runway Construction)

$5,400,000 $1,600,000 $0 $7,000,000

8 ALEXANDRIA INTERNATIONAL AIRPORT

Rehabilitation of Runway and Taxiway Safety Area - Phase II (Construction)

$1,445,235 $2,440,582 $0 $3,885,817

9 SHREVEPORT REGIONAL AIRPORT Noise Mitigation - (Land Reuse Plan) $343,127 $38,125 $0 $381,252

10 ALEXANDRIA INTERNATIONAL AIRPORT

Master Drainage Rehabilitation - Phase III (Design) $247,500 $27,500 $0 $275,000

11 SHREVEPORT REGIONAL AIRPORT Rehabilitate Twy B & GA Taxilanes - Phase I (Design) $450,000 $50,000 $0 $500,000

12 LAKE CHARLES REGIONAL AIRPORT Runway 5/23 Rehabilitation - Phase I (Design) $0 $325,000 $0 $325,000

13 NEW ORLEANS LOUIS ARMSTRONG INTERNATIONAL AIRPORT

Taxiway G West Extension - Phase I (Design and Construct)

$3,000,000 $400,000 $600,000 $4,000,000

14 SHREVEPORT REGIONAL AIRPORT Security Improvements - Phase II $1,800,000 $200,000 $0 $2,000,000

15 LAKE CHARLES REGIONAL AIRPORT Terminal Loading Bridge $1,000,000 $111,111 $0 $1,111,111

$17,701,552 $22,253,040 $77,925,321Air Carrier Capital Outlay Totals $37,970,729

Tuesday, February 19, 2019 Page 1 of 5Air Carrier Capital Outlay

Page 4: Air Carrier and General Aviation - Louisiana · General Aviation Capital Outlay 18 ST LANDRY PARISH-AHART FIELD Perimeter Fencing - Phase II (Construction) $345,150 $38,350 $0 $383,500

Item Airport Project Description

Federal

Funds State Match Local Other Total Funds

Airport Construction and Development Priority Program 2019-2020

General Aviation Capital Outlay

1 NEW ORLEANS LAKEFRONT AIRPORT Rehabilitate Runway 18R/36L - Phase III (Construction) $9,000,000 $1,000,000 $0 $10,000,000

2 NEW ORLEANS LAKEFRONT AIRPORT Rehabilitation of Drainage - Phase III (Design) $0 $290,000 $0 $290,000

3 MOREHOUSE MEMORIAL AIRPORT Obstruction Removal - Design (16/34 Approaches) $58,500 $6,500 $0 $65,000

4 SHREVEPORT DOWNTOWN AIRPORT Rehabilitate Runway 14/32 - Phase I (Design) $346,500 $38,500 $0 $385,000

5 JENA AIRPORT Obstruction Removal Ph I (Approach Runway 18) $103,500 $11,500 $0 $115,000

6 HAMMOND NORTHSHORE REGIONAL AIRPORT

Taxiway Lighting Rehabilitation - Phase I (Design) $0 $150,000 $0 $150,000

7 NEW ORLEANS LAKEFRONT AIRPORT RehabiliteTaxiway F Drainage (Construction) $0 $150,000 $0 $150,000

8 LOUISIANA REGIONAL AIRPORT Runway & Taxiway Overlay - Phase II (Construction) $1,488,600 $165,400 $0 $1,654,000

9 PORT OF SOUTH LOUISIANA EXECUTIVE REGIONAL AIRPORT

Runway 17-35 Rehabilitation - Phase II (Construction) $1,320,300 $146,700 $0 $1,467,000

10 LOUISIANA REGIONAL AIRPORT South Apron Expansion - Phase II (Design & Construction)

$0 $750,000 $0 $750,000

11 SOUTH LAFOURCHE LEONARD MILLER, JR. AIRPORT

Airfield Drainage Improvements - Phase II (Construction) $189,000 $21,000 $0 $210,000

12 EUNICE AIRPORT Apron Rehabilitation - Phase II (Construction) $450,000 $50,000 $0 $500,000

13 VIVIAN AIRPORT Obstruction Removal - (Phase I Runway 9 and 27 Approaches)

$150,000 $16,667 $0 $166,667

14 NATCHITOCHES REGIONAL AIRPORT Rehabilitate Drainage - Phase II (Design) $0 $50,000 $0 $50,000

15 JENNINGS AIRPORT Taxiway & Apron Rehabilitation (Design & Construction) $0 $490,000 $20,000 $510,000

16 BEAUREGARD REGIONAL AIRPORT Apron Rehabilitation - Phase I (Construction) $594,000 $66,000 $0 $660,000

17 HARRY P. WILLIAMS MEMORIAL AIRPORT

Rehabilitate Pump Station - Phase II (Design & Construction)

$0 $165,000 $0 $165,000

Tuesday, February 19, 2019 Page 2 of 5General Aviation Capital Outlay

Page 5: Air Carrier and General Aviation - Louisiana · General Aviation Capital Outlay 18 ST LANDRY PARISH-AHART FIELD Perimeter Fencing - Phase II (Construction) $345,150 $38,350 $0 $383,500

Item Airport Project Description

Federal

Funds State Match Local Other Total Funds

Airport Construction and Development Priority Program 2019-2020

General Aviation Capital Outlay

18 ST LANDRY PARISH-AHART FIELD Perimeter Fencing - Phase II (Construction) $345,150 $38,350 $0 $383,500

19 SLIDELL AIRPORT Aviation Fuel System Rehabilitation $0 $335,000 $50,000 $385,000

20 C.E. RUSTY WILLIAMS AIRPORT Runway Rehabilitation - Phase I (Design) $0 $10,000 $90,000 $100,000

21 LEESVILLE AIRPORT Runway Safety Area Improvements - Phase IIB $51,863 $5,763 $0 $57,626

22 LEESVILLE AIRPORT Construct Runway Turnabouts - Phase II (Construction) $548,000 $60,889 $0 $608,889

23 DE QUINCY INDUSTRIAL AIRPARK Perimeter Fencing - Phase III (Construction) $141,300 $15,700 $0 $157,000

24 HARRY P. WILLIAMS MEMORIAL AIRPORT

Rehabilitate Perimeter Fence $570,180 $63,353 $0 $633,533

25 ESLER REGIONAL AIRPORT Rehabilitate Runway 9/27 - Phase IIB (Construction) $1,533,510 $170,390 $0 $1,703,900

26 HARRY P. WILLIAMS MEMORIAL AIRPORT

Upgrade Localizer $0 $250,000 $0 $250,000

27 MINDEN AIRPORT Rehabilitate Runway 1/19 - Phase I (Design) $108,000 $12,000 $0 $120,000

28 FALSE RIVER REGIONAL AIRPORT Runway 36 RPZ Drainage Improvements $0 $620,000 $0 $620,000

29 SOUTHLAND FIELD Rehabilitate Taxiway B & T-hangar Apron $117,000 $13,000 $0 $130,000

30 PORT OF SOUTH LOUISIANA EXECUTIVE REGIONAL AIRPORT

South Hangar Access $0 $102,000 $10,000 $112,000

31 BEAUREGARD REGIONAL AIRPORT Rehabilitate Taxiways $0 $289,489 $0 $289,489

32 MARKSVILLE MUNICIPAL AIRPORT T-Hangar Apron Access Improvements $0 $131,750 $0 $131,750

33 CONCORDIA PARISH AIRPORT Obstruction Mitigation - Phase I T-Hangar Taxilane (Design and Construction)

$315,000 $35,000 $0 $350,000

34 PINEVILLE MUNICIPAL AIRPORT Runway Rehabilitation - Construction - Rural Airport Program

$0 $870,000 $0 $870,000

Tuesday, February 19, 2019 Page 3 of 5General Aviation Capital Outlay

Page 6: Air Carrier and General Aviation - Louisiana · General Aviation Capital Outlay 18 ST LANDRY PARISH-AHART FIELD Perimeter Fencing - Phase II (Construction) $345,150 $38,350 $0 $383,500

Item Airport Project Description

Federal

Funds State Match Local Other Total Funds

Airport Construction and Development Priority Program 2019-2020

General Aviation Capital Outlay

35 ABBEVILLE CHRIS CRUSTA MEMORIAL AIRPORT

Rehabilitate T-hangar Taxilanes & Apron - Phase I (Design)

$0 $70,000 $0 $70,000

36 ABBEVILLE CHRIS CRUSTA MEMORIAL AIRPORT

Approach Lighting - Phase I (Preliminary) $0 $140,000 $0 $140,000

37 CHENNAULT INTERNATIONAL AIRPORT Taxiway Delta Realignment - Phase I (PER) $67,500 $7,500 $0 $75,000

38 NATCHITOCHES REGIONAL AIRPORT Install New Perimeter Fence and Repair Existing Fence - Phase I

$0 $300,000 $0 $300,000

39 WINNSBORO MUNICIPAL AIRPORT Taxiway and Apron Rehab (Design and Construction) $378,000 $42,000 $0 $420,000

40 VICKSBURG TALLULAH REGIONAL AIRPORT

Hangar Development Area- Phase I (Design) $94,500 $10,500 $0 $105,000

41 NATCHITOCHES REGIONAL AIRPORT Acquire Land for Runway 35 Runway Protection Zone $94,500 $10,500 $0 $105,000

42 FALSE RIVER REGIONAL AIRPORT Hangar Development - Phase I (Preliminary) $0 $80,000 $0 $80,000

43 MARKSVILLE MUNICIPAL AIRPORT Small Scale Master Plan Update $170,100 $18,900 $0 $189,000

44 ALLEN PARISH AIRPORT Small Scale Masterplan $202,500 $22,500 $0 $225,000

45 WOODWORTH AIRPORT Rehabilitate Runway 1/19 - Construction - Rural Airport Program

$0 $560,000 $0 $560,000

46 LIVINGSTON REGIONAL AIRPORT Master Plan Update and Preliminary Runway Development

$0 $552,000 $0 $552,000

$8,403,851 $170,000 $27,011,354General Aviation Capital Outlay Totals $18,437,503

Tuesday, February 19, 2019 Page 4 of 5General Aviation Capital Outlay

Page 7: Air Carrier and General Aviation - Louisiana · General Aviation Capital Outlay 18 ST LANDRY PARISH-AHART FIELD Perimeter Fencing - Phase II (Construction) $345,150 $38,350 $0 $383,500

Item Airport Project Description

Federal

Funds State Match Local Other Total Funds

Airport Construction and Development Priority Program 2019-2020

General Aviation Capital Outlay

NAVAIDS Program

GA Maintenance Reimbursement Program

2019-2020 AVIATION PRIORITY PROGRAM TOTAL

Obstruction Removal Program

$975,000

$300,000

$119,597

$28,200,000

AC Maintenance Reimbursement Program $700,000

Tuesday, February 19, 2019 Page 5 of 5General Aviation Capital Outlay

Page 8: Air Carrier and General Aviation - Louisiana · General Aviation Capital Outlay 18 ST LANDRY PARISH-AHART FIELD Perimeter Fencing - Phase II (Construction) $345,150 $38,350 $0 $383,500

Louisiana Airport

System Unfunded

Program 2020-2021

Page 9: Air Carrier and General Aviation - Louisiana · General Aviation Capital Outlay 18 ST LANDRY PARISH-AHART FIELD Perimeter Fencing - Phase II (Construction) $345,150 $38,350 $0 $383,500

Item Airport Project Description

Federal

Funds State Match Local Other Total Funds

Airport Construction and Development Priority Program 2020-2021

Air Carrier Capital Outlay

1 BATON ROUGE METROPOLITAN AIRPORT

Runway 13-31 RSA/RPZ Improvements - Phase III $5,800,000 $3,394,444 $20,000 $9,214,444

2 LAFAYETTE REGIONAL AIRPORT Construct Terminal - Phase IV $12,000,000 $4,083,333 $3,882,322 $19,965,655

3 MONROE REGIONAL AIRPORT Airfield Lighting Rehabilitation - Phase II (Construction) $0 $750,000 $20,000 $770,000

4 SHREVEPORT REGIONAL AIRPORT Airfield Lighting Rehabilitation - Phase V - (Construction) $0 $800,000 $0 $800,000

5 SHREVEPORT REGIONAL AIRPORT Rehabilitate Taxiway B & GA Taxilanes - Phase II (Construction)

$1,800,000 $200,000 $0 $2,000,000

6 LAKE CHARLES REGIONAL AIRPORT Runway 5/23 Rehabilitation - Phase II (Construction) $0 $2,175,000 $0 $2,175,000

7 NEW ORLEANS LOUIS ARMSTRONG INTERNATIONAL AIRPORT

Terminal Construction Project - Phase VII $15,609,765 $2,081,302 $3,121,953 $20,813,020

8 ALEXANDRIA INTERNATIONAL AIRPORT

Rehabilitation of Runway and Taxiway Safety Area - Phase III (Construction)

$0 $2,750,000 $0 $2,750,000

9 ALEXANDRIA INTERNATIONAL AIRPORT

Master Drainage Rehabilitation - Phase IV (Construction) $3,000,000 $333,333 $0 $3,333,333

10 NEW ORLEANS LOUIS ARMSTRONG INTERNATIONAL AIRPORT

Taxiway G West Extension - Phase II $7,000,000 $933,333 $1,400,000 $9,333,333

11 SHREVEPORT REGIONAL AIRPORT ATC Relocation/Terminal Modernization - Phase I (EA/Design)

$720,000 $80,000 $0 $800,000

12 LAKE CHARLES REGIONAL AIRPORT Construct Entrance Road Canopy - Phase I (Departures) $1,000,000 $111,111 $0 $1,111,111

13 NEW ORLEANS LOUIS ARMSTRONG INTERNATIONAL AIRPORT

Airport Master Plan Update $1,500,000 $200,000 $300,000 $2,000,000

$17,891,856 $8,744,275 $75,065,896Air Carrier Capital Outlay Totals $48,429,765

Tuesday, February 19, 2019 Page 1 of 5Air Carrier Capital Outlay

Page 10: Air Carrier and General Aviation - Louisiana · General Aviation Capital Outlay 18 ST LANDRY PARISH-AHART FIELD Perimeter Fencing - Phase II (Construction) $345,150 $38,350 $0 $383,500

Item Airport Project Description

Federal

Funds State Match Local Other Total Funds

Airport Construction and Development Priority Program 2020-2021

General Aviation Capital Outlay

1 SLIDELL AIRPORT Runway 18 Obstruction Mitigation - Phase III (Wetland Mitigation)

$900,000 $100,000 $0 $1,000,000

2 SOUTH LAFOURCHE LEONARD MILLER, JR. AIRPORT

Obstruction Removal - Runway 18 Approach Phase II (Construction)

$135,000 $15,000 $0 $150,000

3 MINDEN AIRPORT Obstruction Removal - Phase III (Construction) $0 $160,000 $0 $160,000

4 ST TAMMANY REGIONAL AIRPORT Mitigate Transitional Obstructions Phase V - Relocate Airport Access Road (Construction)

$0 $880,472 $0 $880,472

5 MOREHOUSE MEMORIAL AIRPORT Obstruction Removal - Phase II (Construction Both Ends) $346,500 $38,500 $0 $385,000

6 JENA AIRPORT Obstruction Removal - Phase II (Construction Approach Both Runway Ends)

$36,000 $4,000 $0 $40,000

7 NEW ORLEANS LAKEFRONT AIRPORT Rehabilitation of Drainage - Phase IV (Final Design) $0 $385,000 $0 $385,000

8 HAMMOND NORTHSHORE REGIONAL AIRPORT

Terminal Apron Rehabilitation $342,000 $38,000 $20,000 $400,000

9 HOUMA TERREBONNE AIRPORT Runway and Taxiway Marking $0 $700,000 $20,000 $720,000

10 LOUISIANA REGIONAL AIRPORT Terminal Apron Reconstruction - Phase II (Design) $0 $95,000 $0 $95,000

11 NEW ORLEANS LAKEFRONT AIRPORT Rehabilitate Taxiway B - Phase I (Design) $0 $100,000 $0 $100,000

12 SHREVEPORT DOWNTOWN AIRPORT Terminal Ramp Rehabilitation - Phase I (Design) $0 $80,000 $0 $80,000

13 HOUMA TERREBONNE AIRPORT West Apron Expansion - Phase I (Design) $0 $200,000 $20,000 $220,000

14 HAMMOND NORTHSHORE REGIONAL AIRPORT

Taxiway Lighting Rehabilitation - Phase II (Construction) $0 $850,000 $0 $850,000

15 SLIDELL AIRPORT Aviation Fuel System Rehabilitation - Phase II $0 $100,000 $0 $100,000

16 C.E. RUSTY WILLIAMS AIRPORT Apron Overlay - Phase I Design $49,500 $5,500 $0 $55,000

17 LOUISIANA REGIONAL AIRPORT Aviation Fuel System Rehabilitation $0 $180,000 $20,000 $200,000

Tuesday, February 19, 2019 Page 2 of 5General Aviation Capital Outlay

Page 11: Air Carrier and General Aviation - Louisiana · General Aviation Capital Outlay 18 ST LANDRY PARISH-AHART FIELD Perimeter Fencing - Phase II (Construction) $345,150 $38,350 $0 $383,500

Item Airport Project Description

Federal

Funds State Match Local Other Total Funds

Airport Construction and Development Priority Program 2020-2021

General Aviation Capital Outlay

18 LOUISIANA REGIONAL AIRPORT Hangar Development - Phase II $0 $600,000 $20,000 $620,000

19 MINDEN AIRPORT Rehabilitate Runway 1/19 - Phase II (Construction) $1,125,000 $125,000 $0 $1,250,000

20 LE GROS MEMORIAL AIRPORT Rehabilitate Airfield Drainage Phase II - Construction $503,100 $55,900 $0 $559,000

21 RUSTON REGIONAL AIRPORT Construct Runway Extension - Phase III (Construction) $3,780,000 $420,000 $0 $4,200,000

22 CHENNAULT INTERNATIONAL AIRPORT Airfield Lighting Rehabilitation - Phase III (Taxiway Design)

$0 $80,000 $0 $80,000

23 UNION PARISH AIRPORT Obstruction Removal - Phase I (Design Both Runway Ends)

$45,000 $5,000 $0 $50,000

24 FELICIANA AIRPARK Runway Rehabilitation - Phase I (Design) - Rural Airport Program

$0 $40,000 $0 $40,000

25 ST LANDRY PARISH-AHART FIELD Perimeter Fencing - Phase III (Construction) $345,150 $38,350 $0 $383,500

26 COLUMBIA AIRPORT Runway Rehabilitation - Rural Airport Program $0 $165,000 $0 $165,000

27 C.E. RUSTY WILLIAMS AIRPORT Runway Rehabilitation - Phase II (Construction) $0 $350,000 $750,000 $1,100,000

28 ABBEVILLE CHRIS CRUSTA MEMORIAL AIRPORT

Approach Lighting - Phase II (Design) $0 $35,000 $0 $35,000

29 CHENNAULT INTERNATIONAL AIRPORT Install SSALR Approach Lighting System - Phase II (Construction)

$0 $920,000 $0 $920,000

30 CHENNAULT INTERNATIONAL AIRPORT Taxiway Delta Realignment - Phase II (Design) $202,500 $22,500 $0 $225,000

31 HAMMOND NORTHSHORE REGIONAL AIRPORT

Runway 31 Threshold Recovery - Phase I (Environmental)

$58,500 $6,500 $0 $65,000

32 JENNINGS AIRPORT Rehabilitate Runway 8/26 $326,700 $36,300 $0 $363,000

33 VICKSBURG TALLULAH REGIONAL AIRPORT

North Hangar Development - Phase II (Construction) $0 $500,000 $20,000 $520,000

34 KELLY DUMAS Construct Stub Taxiway - Phase II (Construction) $453,591 $50,399 $0 $503,990

Tuesday, February 19, 2019 Page 3 of 5General Aviation Capital Outlay

Page 12: Air Carrier and General Aviation - Louisiana · General Aviation Capital Outlay 18 ST LANDRY PARISH-AHART FIELD Perimeter Fencing - Phase II (Construction) $345,150 $38,350 $0 $383,500

Item Airport Project Description

Federal

Funds State Match Local Other Total Funds

Airport Construction and Development Priority Program 2020-2021

General Aviation Capital Outlay

35 VICKSBURG TALLULAH REGIONAL AIRPORT

Construct Taxilane- Phase II (Construction North End) $405,000 $45,000 $0 $450,000

36 ABBEVILLE CHRIS CRUSTA MEMORIAL AIRPORT

Construct Hangar Development Area - Phase I (Design) $36,000 $4,000 $0 $40,000

37 GEORGE R. CARR MEMORIAL AIRPORT Runway Rehabilitation - Phase I (Design) $186,667 $20,741 $0 $207,408

38 ST TAMMANY REGIONAL AIRPORT Runway Rehabilitation - Phase I (Design) $157,950 $17,550 $0 $175,500

39 HOUMA TERREBONNE AIRPORT Taxiway F - Phase I (Design) $315,000 $35,000 $0 $350,000

40 NATCHITOCHES REGIONAL AIRPORT Rehabilitate Runway 7/25 Phase I - Design $90,000 $10,000 $0 $100,000

41 VIVIAN AIRPORT Obstruction Mitigation - Phase II Relocate Existing Hangar

$0 $625,000 $0 $625,000

42 SOUTHLAND FIELD Apron Expansion - Phase I (Design) $100,800 $11,200 $0 $112,000

43 KELLY DUMAS Widen Runway 18/36 - Phase I (EA and Design) $0 $220,000 $0 $220,000

44 JENA AIRPORT Taxiway Relocation - Phase I (Preliminary Engineering Report and Environmental)

$18,000 $2,000 $0 $20,000

45 JOHN H. HOOKS JR. MEMORIAL Taxiway Rehabilitation $180,000 $20,000 $0 $200,000

46 WINNSBORO MUNICIPAL AIRPORT Runway Rehabilitation $162,000 $18,000 $0 $180,000

47 NATCHITOCHES REGIONAL AIRPORT Install New Perimeter Fence and Repair Existing Fence - Phase II

$0 $100,000 $0 $100,000

48 SPRINGHILL AIRPORT Taxilanes for T-Hangar Development Area - Phase I (Design)

$67,500 $7,500 $0 $75,000

49 ESLER REGIONAL AIRPORT Small Scale Airport Master Plan $114,750 $12,750 $0 $127,500

50 JONESVILLE MUNICIPAL AIRPORT Small Scale Masterplan $90,000 $10,000 $0 $100,000

51 LIVINGSTON REGIONAL AIRPORT Runway Development - Phase I $3,465,000 $385,000 $0 $3,850,000

Tuesday, February 19, 2019 Page 4 of 5General Aviation Capital Outlay

Page 13: Air Carrier and General Aviation - Louisiana · General Aviation Capital Outlay 18 ST LANDRY PARISH-AHART FIELD Perimeter Fencing - Phase II (Construction) $345,150 $38,350 $0 $383,500

Item Airport Project Description

Federal

Funds State Match Local Other Total Funds

Airport Construction and Development Priority Program 2020-2021

General Aviation Capital Outlay

$8,925,162 $870,000 $23,832,370General Aviation Capital Outlay Totals $14,037,208

NAVAIDS Program

GA Maintenance Reimbursement Program

2020-2021 AVIATION PRIORITY PROGRAM TOTAL

Obstruction Removal Program

$975,000

$300,000

$282,982

$28,900,000

AC Maintenance Reimbursement Program $525,000

Tuesday, February 19, 2019 Page 5 of 5General Aviation Capital Outlay

Page 14: Air Carrier and General Aviation - Louisiana · General Aviation Capital Outlay 18 ST LANDRY PARISH-AHART FIELD Perimeter Fencing - Phase II (Construction) $345,150 $38,350 $0 $383,500

Louisiana Airport

System Unfunded

Program 2021-2022

Page 15: Air Carrier and General Aviation - Louisiana · General Aviation Capital Outlay 18 ST LANDRY PARISH-AHART FIELD Perimeter Fencing - Phase II (Construction) $345,150 $38,350 $0 $383,500

Item Airport Project Description

Federal

Funds State Match Local Other Total Funds

Airport Construction and Development Priority Program 2021-2022

Air Carrier Capital Outlay

1 BATON ROUGE METROPOLITAN AIRPORT

Runway 13-31 RSA/RPZ Improvements - Phase IV $8,300,000 $3,922,222 $20,000 $12,242,222

2 MONROE REGIONAL AIRPORT Airfield Lighting Rehabilitation - Phase III (Construction) $0 $750,000 $0 $750,000

3 SHREVEPORT REGIONAL AIRPORT Rehabilitate Runway 14/32 - Phase I (Design) $0 $400,000 $0 $400,000

4 LAFAYETTE REGIONAL AIRPORT Construct Terminal - Phase V $5,000,000 $3,555,556 $3,704,561 $12,260,117

5 SHREVEPORT REGIONAL AIRPORT Airfield Drainage Rehabilitation - Phase IV (Design & Construction)

$0 $1,600,000 $0 $1,600,000

6 ALEXANDRIA INTERNATIONAL AIRPORT

Rehabilitation of Runway and Taxiway Safety Area - Phase IV (Construction)

$0 $2,069,180 $0 $2,069,180

7 LAKE CHARLES REGIONAL AIRPORT Safety Area Drainage Rehabilitation $0 $300,000 $0 $300,000

8 LAKE CHARLES REGIONAL AIRPORT Obstruction Removal - Transitional - Phase I (EA) $0 $150,000 $0 $150,000

9 NEW ORLEANS LOUIS ARMSTRONG INTERNATIONAL AIRPORT

Rehabilitate Taxiways E, S, & F - Phase I $4,046,250 $539,500 $809,250 $5,395,000

10 LAKE CHARLES REGIONAL AIRPORT Construct Middle Ramp $0 $805,000 $0 $805,000

11 LAKE CHARLES REGIONAL AIRPORT Apron Area Lighting (Commercial & GA) $0 $250,000 $0 $250,000

12 LAKE CHARLES REGIONAL AIRPORT ATCT Study $0 $250,000 $0 $250,000

13 ALEXANDRIA INTERNATIONAL AIRPORT

North Ramp Rehabilitation $0 $388,889 $0 $388,889

14 LAFAYETTE REGIONAL AIRPORT Taxiway B Reconfiguration $2,484,000 $276,000 $0 $2,760,000

15 LAKE CHARLES REGIONAL AIRPORT Construct Entrance Road Canopy - Phase II (Arrivals) $1,000,000 $111,111 $0 $1,111,111

16 NEW ORLEANS LOUIS ARMSTRONG INTERNATIONAL AIRPORT

Southside Redevelopment - Phase I $0 $2,750,000 $0 $2,750,000

$18,117,458 $4,533,811 $43,481,519Air Carrier Capital Outlay Totals $20,830,250

Tuesday, February 19, 2019 Page 1 of 5Air Carrier Capital Outlay

Page 16: Air Carrier and General Aviation - Louisiana · General Aviation Capital Outlay 18 ST LANDRY PARISH-AHART FIELD Perimeter Fencing - Phase II (Construction) $345,150 $38,350 $0 $383,500

Item Airport Project Description

Federal

Funds State Match Local Other Total Funds

Airport Construction and Development Priority Program 2021-2022

General Aviation Capital Outlay

1 HAMMOND NORTHSHORE REGIONAL AIRPORT

Runway 31 Threshold Recovery - Phase II (Design/Clearing)

$483,300 $53,700 $0 $537,000

2 ST LANDRY PARISH-AHART FIELD Obstruction Removal (Runway 18-36) - Phase II (Construction)

$0 $333,000 $0 $333,000

3 HOUMA TERREBONNE AIRPORT West Apron Expansion - Phase II (Construction) $0 $1,000,000 $20,000 $1,020,000

4 SHREVEPORT DOWNTOWN AIRPORT Rehabilitate Runway 14/32 - Phase II (Construction) $4,500,000 $500,000 $0 $5,000,000

5 NEW ORLEANS LAKEFRONT AIRPORT Rehabilitation of Drainage - Phase IV (Construction) $0 $300,000 $0 $300,000

6 NEW ORLEANS LAKEFRONT AIRPORT Rehabilitate Taxiway B - Phase II (Construction) $0 $700,000 $0 $700,000

7 SHREVEPORT DOWNTOWN AIRPORT Terminal Ramp Rehabilitation - Phase II (Construction) $0 $450,000 $0 $450,000

8 LOUISIANA REGIONAL AIRPORT Terminal Apron Reconstruction - Phase III (Construction) $630,000 $70,000 $0 $700,000

9 SOUTH LAFOURCHE LEONARD MILLER, JR. AIRPORT

Airfield Pavement Rehabilitation - Phase I (Design) $0 $40,000 $20,000 $60,000

10 SHREVEPORT DOWNTOWN AIRPORT Rehabilitate Northwest Apron - Phase I (Design) $0 $220,000 $0 $220,000

11 CONCORDIA PARISH AIRPORT Obstruction Mitigation - Phase II Hangars (Design) $0 $35,000 $25,000 $60,000

12 SLIDELL AIRPORT North Apron Overlay $693,000 $77,000 $0 $770,000

13 HOUMA TERREBONNE AIRPORT Taxiway F - Phase II (Construction) $2,925,000 $325,000 $0 $3,250,000

14 FALSE RIVER REGIONAL AIRPORT Overlay Runway and Taxiway - Phase III (Construction) $1,440,000 $160,000 $0 $1,600,000

15 GEORGE R. CARR MEMORIAL AIRPORT Runway Rehabilitation - Phase II (Construction) $990,000 $110,000 $0 $1,100,000

16 ABBEVILLE CHRIS CRUSTA MEMORIAL AIRPORT

Approach Lighting - Phase III (Construction) $0 $215,000 $0 $215,000

17 ST TAMMANY REGIONAL AIRPORT Runway Rehabilitation - Phase II (Construction) $1,408,345 $156,483 $0 $1,564,828

Tuesday, February 19, 2019 Page 2 of 5General Aviation Capital Outlay

Page 17: Air Carrier and General Aviation - Louisiana · General Aviation Capital Outlay 18 ST LANDRY PARISH-AHART FIELD Perimeter Fencing - Phase II (Construction) $345,150 $38,350 $0 $383,500

Item Airport Project Description

Federal

Funds State Match Local Other Total Funds

Airport Construction and Development Priority Program 2021-2022

General Aviation Capital Outlay

18 HART AIRPORT Runway Rehabilitation South - Phase I (Design) $81,000 $9,000 $0 $90,000

19 ABBEVILLE CHRIS CRUSTA MEMORIAL AIRPORT

Rehabilitate Runway & Partial Taxiway - Phase II (Construction)

$1,215,230 $135,026 $0 $1,350,256

20 CHENNAULT INTERNATIONAL AIRPORT Airfield Lighting Rehabilitation - Phase IV (Taxiway Construction)

$0 $600,000 $0 $600,000

21 FELICIANA AIRPARK Rehabilitate Runway - Phase II (Construction) - Rural Airport Program

$0 $400,000 $0 $400,000

22 SOUTHLAND FIELD Apron Expansion - Phase II (Construction) $828,000 $92,000 $0 $920,000

23 FALSE RIVER REGIONAL AIRPORT Obstruction Removal - Phase II (Land Acquisition & Construction)

$283,500 $31,500 $0 $315,000

24 ABBEVILLE CHRIS CRUSTA MEMORIAL AIRPORT

Rehabilitate T-hangar Taxilanes & Apron - Phase II (Construction)

$0 $500,000 $0 $500,000

25 GEORGE R. CARR MEMORIAL AIRPORT Partial Parallel Taxiway Widening $0 $280,000 $0 $280,000

26 JENA AIRPORT Taxiway Relocation - Phase II (Design) $90,000 $10,000 $0 $100,000

27 CHENNAULT INTERNATIONAL AIRPORT Taxiway Delta Realignment - Phase III (Construction) $2,970,000 $330,000 $0 $3,300,000

28 PORT OF SOUTH LOUISIANA EXECUTIVE REGIONAL AIRPORT

Apron Rehabilitation (Design & Construction) $558,000 $62,000 $0 $620,000

29 ABBEVILLE CHRIS CRUSTA MEMORIAL AIRPORT

Construct Hangar Development Area - Phase II (Construction)

$585,000 $65,000 $0 $650,000

30 C.E. RUSTY WILLIAMS AIRPORT Apron Overlay - Phase II (Construction) $382,500 $42,500 $0 $425,000

31 NATCHITOCHES REGIONAL AIRPORT Rehabilitate Airfield Drainage - Phase III (Construction) $0 $225,000 $0 $225,000

32 SOUTH LAFOURCHE LEONARD MILLER, JR. AIRPORT

Obstruction Removal - Runway 18 Approach - Phase I (Design)

$36,000 $4,000 $0 $40,000

33 LEESVILLE AIRPORT Rehabilitate Runway $372,600 $41,400 $0 $414,000

Tuesday, February 19, 2019 Page 3 of 5General Aviation Capital Outlay

Page 18: Air Carrier and General Aviation - Louisiana · General Aviation Capital Outlay 18 ST LANDRY PARISH-AHART FIELD Perimeter Fencing - Phase II (Construction) $345,150 $38,350 $0 $383,500

Item Airport Project Description

Federal

Funds State Match Local Other Total Funds

Airport Construction and Development Priority Program 2021-2022

General Aviation Capital Outlay

34 NATCHITOCHES REGIONAL AIRPORT Rehabilitate Runway 7/25 - Phase II (Construction) $1,350,000 $150,000 $0 $1,500,000

35 MOREHOUSE MEMORIAL AIRPORT Rehabilitate Runway/Taxiway - Phase I (Design) $130,500 $14,500 $0 $145,000

36 WELSH AIRPORT Runway Rehabilitation - Phase I (Design) - Rural Airport Program

$0 $35,000 $0 $35,000

37 EUNICE AIRPORT New Aircraft Hangars - Phase I (Design) $135,000 $15,000 $0 $150,000

38 DE QUINCY INDUSTRIAL AIRPARK T-hangar Construction - Phase I (Design) $149,400 $16,600 $0 $166,000

39 HART AIRPORT Small Scale Master Plan Update $112,500 $12,500 $0 $125,000

40 JOHN H. HOOKS JR. MEMORIAL North Apron Access - Phase I (Design) $90,000 $10,000 $0 $100,000

41 LIVINGSTON REGIONAL AIRPORT Runway Development - Phase II $3,465,000 $385,000 $0 $3,850,000

42 UNION PARISH AIRPORT New Taxilanes - (Design) $67,500 $7,500 $0 $75,000

43 WINNSBORO MUNICIPAL AIRPORT Master Plan $54,000 $6,000 $0 $60,000

44 JONESVILLE MUNICIPAL AIRPORT Runway Rehabilitation - (Design) $45,000 $5,000 $0 $50,000

$8,229,709 $65,000 $34,365,084General Aviation Capital Outlay Totals $26,070,375

Tuesday, February 19, 2019 Page 4 of 5General Aviation Capital Outlay

Page 19: Air Carrier and General Aviation - Louisiana · General Aviation Capital Outlay 18 ST LANDRY PARISH-AHART FIELD Perimeter Fencing - Phase II (Construction) $345,150 $38,350 $0 $383,500

Item Airport Project Description

Federal

Funds State Match Local Other Total Funds

Airport Construction and Development Priority Program 2021-2022

General Aviation Capital Outlay

NAVAIDS Program

GA Maintenance Reimbursement Program

2021-2022 AVIATION PRIORITY PROGRAM TOTAL

Obstruction Removal Program

$975,000

$300,000

$227,833

$28,200,000

AC Maintenance Reimbursement Program $350,000

Tuesday, February 19, 2019 Page 5 of 5General Aviation Capital Outlay

Page 20: Air Carrier and General Aviation - Louisiana · General Aviation Capital Outlay 18 ST LANDRY PARISH-AHART FIELD Perimeter Fencing - Phase II (Construction) $345,150 $38,350 $0 $383,500

Louisiana Airport

System Unfunded

Program 2022-2023

Page 21: Air Carrier and General Aviation - Louisiana · General Aviation Capital Outlay 18 ST LANDRY PARISH-AHART FIELD Perimeter Fencing - Phase II (Construction) $345,150 $38,350 $0 $383,500

Item Airport Project Description

Federal

Funds State Match Local Other Total Funds

Airport Construction and Development Priority Program 2022-2023

Air Carrier Capital Outlay

1 BATON ROUGE METROPOLITAN AIRPORT

Runway 13-31 RSA/RPZ Improvements - Phase Va $2,875,000 $319,444 $0 $3,194,444

2 LAFAYETTE REGIONAL AIRPORT ARFF Truck Replacement $0 $850,000 $0 $850,000

3 LAFAYETTE REGIONAL AIRPORT Taxiway Hotel Reconfiguration & Kilo Removal $1,755,000 $195,000 $0 $1,950,000

4 LAFAYETTE REGIONAL AIRPORT Taxiway Delta Removal $382,500 $42,500 $0 $425,000

5 MONROE REGIONAL AIRPORT Taxiway D - Phase II (Construction) $0 $2,500,000 $20,000 $2,520,000

6 BATON ROUGE METROPOLITAN AIRPORT

Runway 31 Threshold Recovery $2,800,000 $311,111 $0 $3,111,111

7 LAFAYETTE REGIONAL AIRPORT Rehabilitate North General Aviation Apron - IV of V $2,700,000 $300,000 $0 $3,000,000

8 LAKE CHARLES REGIONAL AIRPORT North Apron Expansion for Development - (Design & Construction)

$0 $1,000,000 $20,000 $1,020,000

9 LAKE CHARLES REGIONAL AIRPORT Obstruction Removal - Transitional - Phase II $0 $250,000 $0 $250,000

10 NEW ORLEANS LOUIS ARMSTRONG INTERNATIONAL AIRPORT

Rehabilitate Taxiways E, S, & F - Phase II $4,046,250 $539,500 $809,250 $5,395,000

11 SHREVEPORT REGIONAL AIRPORT ATC Relocation/ Terminal Modernization - Phase II (Construction)

$13,000,000 $4,444,444 $2,555,556 $20,000,000

12 LAFAYETTE REGIONAL AIRPORT Construct Terminal - Phase VI $0 $1,050,000 $0 $1,050,000

13 MONROE REGIONAL AIRPORT Airfield Lighting Rehabilitation - Phase IV (Construction) $0 $300,000 $0 $300,000

14 BATON ROUGE METROPOLITAN AIRPORT

East General Aviation Development $0 $2,500,000 $20,000 $2,520,000

15 NEW ORLEANS LOUIS ARMSTRONG INTERNATIONAL AIRPORT

Rehabilitate Runway 2/20 $7,500,000 $1,000,000 $1,500,000 $10,000,000

16 NEW ORLEANS LOUIS ARMSTRONG INTERNATIONAL AIRPORT

Southside Redevelopment - Phase II $0 $2,500,000 $0 $2,500,000

Tuesday, February 19, 2019 Page 1 of 6Air Carrier Capital Outlay

Page 22: Air Carrier and General Aviation - Louisiana · General Aviation Capital Outlay 18 ST LANDRY PARISH-AHART FIELD Perimeter Fencing - Phase II (Construction) $345,150 $38,350 $0 $383,500

Item Airport Project Description

Federal

Funds State Match Local Other Total Funds

Airport Construction and Development Priority Program 2022-2023

Air Carrier Capital Outlay

17 MONROE REGIONAL AIRPORT Taxiway C Realignment - Phase I (Planning & Design) $1,300,000 $144,444 $0 $1,444,444

18 LAKE CHARLES REGIONAL AIRPORT Terminal Loading Bridge - Phase II $1,000,000 $111,111 $0 $1,111,111

$18,357,554 $4,924,806 $60,641,110Air Carrier Capital Outlay Totals $37,358,750

Tuesday, February 19, 2019 Page 2 of 6Air Carrier Capital Outlay

Page 23: Air Carrier and General Aviation - Louisiana · General Aviation Capital Outlay 18 ST LANDRY PARISH-AHART FIELD Perimeter Fencing - Phase II (Construction) $345,150 $38,350 $0 $383,500

Item Airport Project Description

Federal

Funds State Match Local Other Total Funds

Airport Construction and Development Priority Program 2022-2023

General Aviation Capital Outlay

1 GEORGE R. CARR MEMORIAL AIRPORT Obstruction Removal North End - Phase III (Construction)

$0 $300,000 $0 $300,000

2 NEW ORLEANS LAKEFRONT AIRPORT Rehabilitation of Drainage - Phase V (Construction) $5,400,000 $600,000 $0 $6,000,000

3 SHREVEPORT DOWNTOWN AIRPORT Rehabilitate Northwest Apron - Phase II (Construction) $0 $470,000 $0 $470,000

4 C.E. RUSTY WILLIAMS AIRPORT Obstruction Removal - Phase III (Construction) $0 $250,000 $0 $250,000

5 SLIDELL AIRPORT Runway 18 Threshold Recovery $153,900 $17,100 $0 $171,000

6 HAMMOND NORTHSHORE REGIONAL AIRPORT

Taxiway A Realignment - Phase I (Design) $181,800 $20,200 $20,000 $222,000

7 HOUMA TERREBONNE AIRPORT Taxiway E Rehabilitation - Phase I (Design) $0 $505,000 $20,000 $525,000

8 UNION PARISH AIRPORT Obstruction Removal - Phase II (Construction) $0 $150,000 $0 $150,000

9 SOUTH LAFOURCHE LEONARD MILLER, JR. AIRPORT

Airfield Pavement Rehabiliation - Phase II (Construction) $500,000 $55,556 $0 $555,556

10 HAMMOND NORTHSHORE REGIONAL AIRPORT

Runway 31 Threshold Recovery - Phase III (Construction)

$0 $350,500 $0 $350,500

11 SLIDELL AIRPORT Taxilane Pavement Reconstruction $0 $261,000 $0 $261,000

12 SHREVEPORT DOWNTOWN AIRPORT Perimeter Fence Rehabilitation (Design & Construction) $0 $120,000 $0 $120,000

13 NEW ORLEANS LAKEFRONT AIRPORT Airfield Signage Upgrades - Phase I (Design) $0 $75,000 $0 $75,000

14 NEW ORLEANS LAKEFRONT AIRPORT Upgrade Lighting Vault Equipment $0 $230,000 $0 $230,000

15 MOREHOUSE MEMORIAL AIRPORT Rehabilitate Runway & Taxiway - Phase II (Construction) $1,309,500 $145,500 $0 $1,455,000

16 PORT OF SOUTH LOUISIANA EXECUTIVE REGIONAL AIRPORT

Obstruction Mitigation Runway 17 - Phase II (Design) $0 $100,000 $0 $100,000

17 LE GROS MEMORIAL AIRPORT Rehabilitate Airfield Draingage Phase 3 - (Design) $49,500 $5,500 $0 $55,000

Tuesday, February 19, 2019 Page 3 of 6General Aviation Capital Outlay

Page 24: Air Carrier and General Aviation - Louisiana · General Aviation Capital Outlay 18 ST LANDRY PARISH-AHART FIELD Perimeter Fencing - Phase II (Construction) $345,150 $38,350 $0 $383,500

Item Airport Project Description

Federal

Funds State Match Local Other Total Funds

Airport Construction and Development Priority Program 2022-2023

General Aviation Capital Outlay

18 SLIDELL AIRPORT Taxilane Widening and Overlay $0 $262,000 $0 $262,000

19 HOUMA TERREBONNE AIRPORT West GA Apron Rehabilitation - Phase I (Design) $450,000 $50,000 $0 $500,000

20 HAMMOND NORTHSHORE REGIONAL AIRPORT

Airfield Lighting Improvements - Phase III (Design) $0 $180,000 $0 $180,000

21 LOUISIANA REGIONAL AIRPORT Drainage Improvements - Phase I (Design) $0 $39,000 $0 $39,000

22 SHREVEPORT DOWNTOWN AIRPORT Construct North Side Access Road - Phase I (Design) $0 $50,000 $0 $50,000

23 ACADIANA REGIONAL AIRPORT ARFF Station Relocation - Phase III (Construction) $950,000 $1,105,556 $0 $2,055,556

24 FALSE RIVER REGIONAL AIRPORT NAVAID Improvements - Phase III $0 $300,000 $0 $300,000

25 PORT OF SOUTH LOUISIANA EXECUTIVE REGIONAL AIRPORT

Parallel Taxiway Rehabilitation (Design & Construction) $522,000 $58,000 $0 $580,000

26 ST LANDRY PARISH-AHART FIELD Runway 18-36 Lighting Rehabilitation $360,000 $40,000 $0 $400,000

27 CONCORDIA PARISH AIRPORT Obstruction Mitigation - Phase III Hangars (Construction) $0 $540,000 $0 $540,000

28 CHENNAULT INTERNATIONAL AIRPORT Apron Rehabilitation - Phase I (Design) $180,000 $20,000 $0 $200,000

29 HARRY P. WILLIAMS MEMORIAL AIRPORT

Rehabilitate Runway - Phase I (Design) $90,000 $10,000 $0 $100,000

30 FALSE RIVER REGIONAL AIRPORT Hangar Development - Phase II (Land Acquisition) $0 $700,000 $0 $700,000

31 ACADIANA REGIONAL AIRPORT GA Taxiway Rehabilitation - Phase I (Design) $0 $100,000 $0 $100,000

32 DE QUINCY INDUSTRIAL AIRPARK Rehabilitate Runway - Phase I (Design) $33,000 $3,667 $0 $36,667

33 NATCHITOCHES REGIONAL AIRPORT Rehabilitate Taxiway B1 $225,000 $25,000 $0 $250,000

34 ALLEN PARISH AIRPORT Widen Runway 18/36 - Phase I (Design) $337,500 $37,500 $0 $375,000

Tuesday, February 19, 2019 Page 4 of 6General Aviation Capital Outlay

Page 25: Air Carrier and General Aviation - Louisiana · General Aviation Capital Outlay 18 ST LANDRY PARISH-AHART FIELD Perimeter Fencing - Phase II (Construction) $345,150 $38,350 $0 $383,500

Item Airport Project Description

Federal

Funds State Match Local Other Total Funds

Airport Construction and Development Priority Program 2022-2023

General Aviation Capital Outlay

35 KELLY DUMAS Widen Runway - Phase II (Construction) $1,350,000 $150,000 $0 $1,500,000

36 FALSE RIVER REGIONAL AIRPORT Perimeter Fencing of Runway 18 RPZ and Grading with Access Dr.

$450,000 $50,000 $0 $500,000

37 WELSH AIRPORT Runway Rehabilitation - Phase II (Construction) - Rural Airport Program

$0 $160,000 $0 $160,000

38 SPRINGHILL AIRPORT T-Hangar Development Area - Phase II (Construct Taxilanes)

$675,000 $75,000 $0 $750,000

39 GEORGE R. CARR MEMORIAL AIRPORT Perimeter Road and Fencing - Phase I (Design) $150,000 $16,667 $0 $166,667

40 SPRINGHILL AIRPORT Overlay Runway - Phase I (Design) $112,500 $12,500 $0 $125,000

41 LE MAIRE MEMORIAL AIRPORT Runway Overlay - Phase I (Design) - Rural Airport Program

$0 $70,000 $0 $70,000

42 JONESVILLE MUNICIPAL AIRPORT Runway Rehab - Phase II (Construction) $315,000 $35,000 $0 $350,000

43 JOHN H. HOOKS JR. MEMORIAL Shade Hangars - Phase I (Design) $90,000 $10,000 $0 $100,000

44 LIVINGSTON REGIONAL AIRPORT Airfield Lighting and NAVAIDS $2,250,000 $250,000 $0 $2,500,000

45 UNION PARISH AIRPORT New Taxilanes - (Construction) $382,500 $42,500 $0 $425,000

46 LIVINGSTON REGIONAL AIRPORT Taxiway Development - Phase I $585,000 $65,000 $0 $650,000

47 WINNSBORO MUNICIPAL AIRPORT Fuel Farm Rehab $126,000 $14,000 $0 $140,000

$8,126,746 $40,000 $25,394,946General Aviation Capital Outlay Totals $17,228,200

Tuesday, February 19, 2019 Page 5 of 6General Aviation Capital Outlay

Page 26: Air Carrier and General Aviation - Louisiana · General Aviation Capital Outlay 18 ST LANDRY PARISH-AHART FIELD Perimeter Fencing - Phase II (Construction) $345,150 $38,350 $0 $383,500

Item Airport Project Description

Federal

Funds State Match Local Other Total Funds

Airport Construction and Development Priority Program 2022-2023

General Aviation Capital Outlay

NAVAIDS Program

GA Maintenance Reimbursement Program

2022-2023 AVIATION PRIORITY PROGRAM TOTAL

Obstruction Removal Program

$975,000

$300,000

$265,700

$28,200,000

AC Maintenance Reimbursement Program $175,000

Tuesday, February 19, 2019 Page 6 of 6General Aviation Capital Outlay

Page 27: Air Carrier and General Aviation - Louisiana · General Aviation Capital Outlay 18 ST LANDRY PARISH-AHART FIELD Perimeter Fencing - Phase II (Construction) $345,150 $38,350 $0 $383,500

Louisiana Airport

System Long-Range

Unfunded Program

Page 28: Air Carrier and General Aviation - Louisiana · General Aviation Capital Outlay 18 ST LANDRY PARISH-AHART FIELD Perimeter Fencing - Phase II (Construction) $345,150 $38,350 $0 $383,500

Item Airport Project Description

Federal/

Other Funds State Funds Total Funds

Air Carrier Capital Outlay Long Range Unfunded Program

1 Baton Rouge Metropolitan Airport North General Aviation Development - Apron (phase II) $20,000 $3,000,000 $3,020,000

2 Baton Rouge Metropolitan Airport Construct EMAS Replacement $5,000,000 $555,556 $5,555,556

3 Shreveport Regional Airport ARFF Vehicle $900,000 $100,000 $1,000,000

4 New Orleans Louis Armstrong International Airport Terminal Construction Project - Phase VIII (Additional) $0 $3,000,000 $3,000,000

5 Lake Charles Regional Airport South Apron Expansion - Phase II of III (Construction) $20,000 $1,200,000 $1,220,000

6 Lake Charles Regional Airport South Apron Expansion - Phase III of III $20,000 $2,720,000 $2,740,000

7 Lake Charles Regional Airport ARFF Bunker Gear/SCBA $0 $75,000 $75,000

8 Baton Rouge Metropolitan Airport Runway 4L/22R Rehabilitation $500,004 $55,556 $555,560

9 Lafayette Regional Airport Taxiway Hotel Re-configuration $1,260,000 $140,000 $1,400,000

10 Lake Charles Regional Airport Construct ATCT Phase I - (Tower & Cab) $20,000 $1,800,000 $1,820,000

11 Monroe Regional Airport Taxiway D - Phase IV (Construction) $0 $2,020,000 $2,020,000

12 Monroe Regional Airport Taxiway D - Phase III (Construction) $20,000 $2,700,000 $2,720,000

13 Monroe Regional Airport Airfield Lighting Rehabilitation - Phase V (Construction) $20,000 $1,000,000 $1,020,000

14 Lafayette Regional Airport Taxiway F Improvements - Phase IV (Northend) $1,800,000 $200,000 $2,000,000

15 New Orleans Louis Armstrong International Airport ARFF Vehicle Replacement $900,000 $100,000 $1,000,000

16 Alexandria International Airport Install Emergency Generators for Navigational Aids $0 $300,000 $300,000

17 Shreveport Regional Airport Rehabilitate Runway 14/32 - Phase II (Construction) $0 $3,000,000 $3,000,000

18 Baton Rouge Metropolitan Airport North General Aviation Development - Apron (Phase I) $20,000 $1,000,000 $1,020,000

19 Monroe Regional Airport Runway 4/22 Blast Pads (construction) $20,000 $500,000 $520,000

20 Monroe Regional Airport Rehabilitate Runway 14/32 $0 $1,020,000 $1,020,000

21 Shreveport Regional Airport Airfield Drainage Rehabilitation Phase V $0 $2,000,000 $2,000,000

22 Alexandria International Airport Wildlife Mitigation Approach to Runway 18 $0 $225,000 $225,000

23 Baton Rouge Metropolitan Airport Perimeter Road Relocation - SE $2,800,000 $311,111 $3,111,111

24 Baton Rouge Metropolitan Airport Construct New Taxiway E/L $9,315,000 $1,035,000 $10,350,000

Tuesday, February 19, 2019 Page 1 of 32Air Carrier Capital Outlay

Page 29: Air Carrier and General Aviation - Louisiana · General Aviation Capital Outlay 18 ST LANDRY PARISH-AHART FIELD Perimeter Fencing - Phase II (Construction) $345,150 $38,350 $0 $383,500

Item Airport Project Description

Federal/

Other Funds State Funds Total Funds

Air Carrier Capital Outlay Long Range Unfunded Program

25 Lafayette Regional Airport Rehabilitate North General Aviation Apron - Phase V of V $2,700,000 $300,000 $3,000,000

26 Baton Rouge Metropolitan Airport Northwest GA Taxilane Lighting $20,000 $750,000 $770,000

27 Monroe Regional Airport Perimeter Road - Phase II $0 $2,620,000 $2,620,000

28 Baton Rouge Metropolitan Airport Common Use Terminal System Equipment $199,998 $22,222 $222,220

29 Lake Charles Regional Airport Apron Area Lighting (Commercial & GA) - Phase II (Construction) $0 $200,000 $200,000

30 Monroe Regional Airport Drainage Project - Phase II $0 $400,000 $400,000

31 Lake Charles Regional Airport Construct ATCT Phase III - (Tower & Cab) $20,000 $1,800,000 $1,820,000

32 Lake Charles Regional Airport Construct ATCT Phase II - (Tower & Cab) $20,000 $1,800,000 $1,820,000

33 Baton Rouge Metropolitan Airport Runway 13/31 and 4/22 Intersection Rehabilitation $999,999 $111,111 $1,111,110

34 Monroe Regional Airport Taxiway C Realignment - Phase II (Construction) $6,000,000 $666,667 $6,666,667

35 Monroe Regional Airport Taxiway C Realignment - Phase III (Construction) $5,000,000 $555,556 $5,555,556

36 Shreveport Regional Airport Airfield Lighting Rehabilitation - Phase V - (Design) $0 $120,000 $120,000

37 Shreveport Regional Airport Terminal Apron Rehabilitation - (Design & Construction) $2,160,000 $240,000 $2,400,000

38 Monroe Regional Airport ARFF Truck $20,000 $500,000 $520,000

39 Shreveport Regional Airport Airfield Lighting Rehabilitation - Phase VI $0 $1,000,000 $1,000,000

40 Baton Rouge Metropolitan Airport Construct New Taxiway E/L $9,315,000 $1,035,000 $10,350,000

41 Lake Charles Regional Airport Airport Service Road Improvements - Phase II $1,000,000 $111,111 $1,111,111

42 Baton Rouge Metropolitan Airport Taxiway Intersection Re-Alignment $20,000 $1,250,000 $1,270,000

43 Lafayette Regional Airport 4L - 22R Runway Rehabilitation $720,000 $80,000 $800,000

44 Monroe Regional Airport Perimeter Road Phase I $0 $2,020,000 $2,020,000

45 New Orleans Louis Armstrong International Airport Rehabilitate Runway 11/29 $9,000,000 $1,000,000 $10,000,000

46 Monroe Regional Airport Infield Drainage Phase I $1,300,000 $144,444 $1,444,444

47 Lafayette Regional Airport T-Hangar Apron Overlay $450,000 $50,000 $500,000

48 Shreveport Regional Airport Airfield Lighting - Phase VII $0 $1,000,000 $1,000,000

Tuesday, February 19, 2019 Page 2 of 32Air Carrier Capital Outlay

Page 30: Air Carrier and General Aviation - Louisiana · General Aviation Capital Outlay 18 ST LANDRY PARISH-AHART FIELD Perimeter Fencing - Phase II (Construction) $345,150 $38,350 $0 $383,500

Item Airport Project Description

Federal/

Other Funds State Funds Total Funds

Air Carrier Capital Outlay Long Range Unfunded Program

49 Baton Rouge Metropolitan Airport Perimeter Road Relocation - SE $1,800,000 $200,000 $2,000,000

50 Monroe Regional Airport ARFF Perimeter Rd PH II $130,000 $14,444 $144,444

51 New Orleans Louis Armstrong International Airport Southside Redevelopment - Phase IIII $0 $3,000,000 $3,000,000

52 Lake Charles Regional Airport South Apron Expansion - Phase I (Design) $0 $175,000 $175,000

53 Lafayette Regional Airport Rehabilitate Perimeter Fence $3,375,000 $375,000 $3,750,000

54 Alexandria International Airport Install LED Runway Lighting $0 $750,000 $750,000

55 Lafayette Regional Airport Erosion Slope Rehab Study $900,000 $100,000 $1,000,000

56 Lake Charles Regional Airport Construct Access Road Extension (North Development) - Phase I of II $0 $1,200,000 $1,200,000

57 Lake Charles Regional Airport Construct Access Road Extension (North Development) - Phase II of II $1,993,500 $221,500 $2,215,000

58 Alexandria International Airport Large Southeast Apron Hangar & Delushe (100K S.F.) $0 $22,000,000 $22,000,000

59 Lake Charles Regional Airport Secure Employee Parking (Terminal) $0 $205,000 $205,000

60 Monroe Regional Airport ARFF Rapid Response Vehicle $0 $400,000 $400,000

61 Alexandria International Airport Construct Holding Bay at Runway 36 End $1,900,000 $211,111 $2,111,111

62 Alexandria International Airport Install LED Taxiway Sign Fixtures $0 $375,000 $375,000

63 Baton Rouge Metropolitan Airport Air Cargo Apron Expansion $4,750,000 $527,778 $5,277,778

64 Baton Rouge Metropolitan Airport Hangar No. 1 - Phase I $0 $1,500,000 $1,500,000

65 Baton Rouge Metropolitan Airport Hangar No.1 - Phase II $0 $1,500,000 $1,500,000

66 Baton Rouge Metropolitan Airport Hangar No.1 - Phase III $0 $1,500,000 $1,500,000

67 Baton Rouge Metropolitan Airport Hangar No.1 - Phase IV $0 $1,500,000 $1,500,000

68 Baton Rouge Metropolitan Airport North Airpark Development - Phase III $0 $1,500,000 $1,500,000

69 Alexandria International Airport Property Acquisition for Industrial Park Development $0 $204,000 $204,000

70 Baton Rouge Metropolitan Airport North Airpark Development - Phase IV $0 $1,500,000 $1,500,000

71 Baton Rouge Metropolitan Airport North Airpark Development - Phase V $0 $1,500,000 $1,500,000

72 Baton Rouge Metropolitan Airport North Airpark Development - Phase VI $0 $1,500,000 $1,500,000

Tuesday, February 19, 2019 Page 3 of 32Air Carrier Capital Outlay

Page 31: Air Carrier and General Aviation - Louisiana · General Aviation Capital Outlay 18 ST LANDRY PARISH-AHART FIELD Perimeter Fencing - Phase II (Construction) $345,150 $38,350 $0 $383,500

Item Airport Project Description

Federal/

Other Funds State Funds Total Funds

Air Carrier Capital Outlay Long Range Unfunded Program

73 Baton Rouge Metropolitan Airport North Airpark Development - Phase VIII $0 $1,500,000 $1,500,000

74 Baton Rouge Metropolitan Airport North Airpark Development - Phase IX $0 $1,500,000 $1,500,000

75 Baton Rouge Metropolitan Airport North Airpark Development - Phase X $0 $1,500,000 $1,500,000

76 Baton Rouge Metropolitan Airport North General Aviation Development - Phase II $20,000 $2,980,000 $3,000,000

77 Baton Rouge Metropolitan Airport Airport Police Vehicle $0 $20,000 $20,000

78 Alexandria International Airport Runway Blast Pads $0 $5,400,000 $5,400,000

79 Alexandria International Airport Runway Rubber Removal and Striping $630,000 $70,000 $700,000

80 Alexandria International Airport Rehabilitate Taxiway "F" $1,092,500 $121,389 $1,213,889

81 Alexandria International Airport Rehabilitate Overrun Area Runway 18/36 $190,000 $21,111 $211,111

82 Alexandria International Airport Extend Runway 14/32 - Phase II $14,535,000 $765,000 $15,300,000

83 Alexandria International Airport Rehabilitate FBO Apron - Phase II (Construction) $3,172,501 $170,884 $3,343,385

84 Lake Charles Regional Airport Construct Perimeter Road $0 $1,000,000 $1,000,000

85 Alexandria International Airport North Ramp Rehabilitation- Phase II $2,700,000 $300,000 $3,000,000

86 Alexandria International Airport ILS Upgrade $1,900,000 $211,111 $2,111,111

87 Alexandria International Airport Relocate Fuel Farm - Phase IV (Demolition of Old Fuel Farm) $665,000 $73,889 $738,889

88 Baton Rouge Metropolitan Airport North GA Terminal Facility $20,000 $2,980,000 $3,000,000

89 Alexandria International Airport Master Drainage Rehabilitation - Phase I $699,275 $77,697 $776,972

90 Alexandria International Airport Runway 18 Extension: Environmental Assessment $0 $500,000 $500,000

91 Alexandria International Airport Install CAT 1 Approach - Runway 18/36 (Equipment Lighting) $0 $2,500,000 $2,500,000

92 Alexandria International Airport Southeast Apron Expansion $0 $8,000,000 $8,000,000

93 Alexandria International Airport Large Southeast Apron Hangar - One $0 $19,200,000 $19,200,000

94 Alexandria International Airport Westside Infrastructure Improvements (Electrical, Water, Sewer, Drainage and Access $0 $83,000,000 $83,000,000

95 Alexandria International Airport Large Southeast Apron Hangar - Three $0 $19,200,000 $19,200,000

96 Alexandria International Airport Large Southeast Apron Hangar - Two $0 $19,200,000 $19,200,000

Tuesday, February 19, 2019 Page 4 of 32Air Carrier Capital Outlay

Page 32: Air Carrier and General Aviation - Louisiana · General Aviation Capital Outlay 18 ST LANDRY PARISH-AHART FIELD Perimeter Fencing - Phase II (Construction) $345,150 $38,350 $0 $383,500

Item Airport Project Description

Federal/

Other Funds State Funds Total Funds

Air Carrier Capital Outlay Long Range Unfunded Program

97 Alexandria International Airport Midfield Apron (S) New Construction North Ramp $0 $34,000,000 $34,000,000

98 Alexandria International Airport Midfield Apron (N) New Construction North Ramp $0 $22,600,000 $22,600,000

99 Alexandria International Airport FAA Radar Facility Relocation $2,700,000 $300,000 $3,000,000

100 Alexandria International Airport Extend Taxiway A $5,850,000 $5,850,000 $11,700,000

101 Alexandria International Airport Rehabilitate North Ramp, Runway 18 and Hot Pad $1,500,000 $0 $1,500,000

102 Alexandria International Airport Southeast Apron N Two Large Hangars (100K S.F.) $0 $18,000,000 $18,000,000

103 Alexandria International Airport Runway 18 Extension - Construction Phase II $6,306,188 $3,700,688 $10,006,876

104 Alexandria International Airport Runway 18 Extension - Construction Phase I $6,765,275 $2,446,142 $9,211,417

105 Baton Rouge Metropolitan Airport Property South of Blount Road - Phase I $0 $1,500,000 $1,500,000

106 Alexandria International Airport 10 Unit T-hangar $0 $700,000 $700,000

107 Baton Rouge Metropolitan Airport Reconstruct Runway 4R/22L & Taxiway E - Phase II (Design & Construction) $20,000 $2,980,000 $3,000,000

108 Alexandria International Airport Runway 14 Parallel Taxiway Westside $0 $43,000,000 $43,000,000

109 Monroe Regional Airport Rehabilitate Runway 14/32 Markings $0 $308,730 $308,730

110 Baton Rouge Metropolitan Airport Property East Side of Plank Road - Phase IV $0 $1,500,000 $1,500,000

111 Monroe Regional Airport Storm Water Management Plan $0 $55,000 $55,000

112 Monroe Regional Airport Replace Airfield Sign Panels $0 $40,000 $40,000

113 Monroe Regional Airport Improve Perimeter Road - Phase II $450,000 $50,000 $500,000

114 Alexandria International Airport Thermoplast Hold Lines and Markings - Phase II $0 $400,000 $400,000

115 Alexandria International Airport GA Apron Rehabilitation $990,000 $110,000 $1,100,000

116 Alexandria International Airport South Ramp Rehabilitation $0 $1,000,000 $1,000,000

117 Alexandria International Airport Replace Air Traffic Control Equipment $0 $250,000 $250,000

118 Alexandria International Airport Rehabilitation of Taxiway E & Terminal Ramp - Phase I $495,000 $55,000 $550,000

119 Monroe Regional Airport Rehabilitate Runway 04/22 Markings $0 $308,730 $308,730

120 Monroe Regional Airport Relocate Taxiway D Holding Position $0 $31,980 $31,980

Tuesday, February 19, 2019 Page 5 of 32Air Carrier Capital Outlay

Page 33: Air Carrier and General Aviation - Louisiana · General Aviation Capital Outlay 18 ST LANDRY PARISH-AHART FIELD Perimeter Fencing - Phase II (Construction) $345,150 $38,350 $0 $383,500

Item Airport Project Description

Federal/

Other Funds State Funds Total Funds

Air Carrier Capital Outlay Long Range Unfunded Program

121 Alexandria International Airport Taxiway B Rehabilitation - Construction for Phase II $360,000 $40,000 $400,000

122 Monroe Regional Airport Geographic Information System $270,000 $30,000 $300,000

123 Monroe Regional Airport Acquire Mass Casualty Vehicle $0 $550,000 $550,000

124 Monroe Regional Airport Acquire Runway Sweeper $0 $225,000 $225,000

125 Baton Rouge Metropolitan Airport North General Aviation Development - Phase III $20,000 $3,000,000 $3,020,000

126 Baton Rouge Metropolitan Airport GA Runway to Taxiway Conversion - Phase I $4,680,000 $520,000 $5,200,000

127 Baton Rouge Metropolitan Airport GA Runway to Taxiway Conversion - Phase II $2,700,000 $300,000 $3,000,000

128 Alexandria International Airport Property Acq. for Obstruction Removal to Approaches for Runway 14 & 18 - Phase II $0 $70,729 $70,729

129 Monroe Regional Airport Rehabilitate Runway 4/22 $0 $813,000 $813,000

130 Lake Charles Regional Airport Construct Perimeter Road - Phase III (Construction) $0 $1,000,000 $1,000,000

131 Lake Charles Regional Airport Airport Entrance Improvements $0 $1,319,000 $1,319,000

132 Lafayette Regional Airport RTR Cable Relocation $2,369,055 $263,228 $2,632,283

133 New Orleans Louis Armstrong International Airport Airfield Electrical, Lighting, & Signage Phase III $2,511,161 $279,018 $2,790,179

134 Lake Charles Regional Airport Airport Service Road Improvements - Phase I $2,500,000 $277,778 $2,777,778

135 Baton Rouge Metropolitan Airport Parking Garage Improvements $5,450,004 $605,556 $6,055,560

136 Baton Rouge Metropolitan Airport Terminal Building Improvements $669,420 $74,380 $743,800

137 Alexandria International Airport Noise Mitigation - Phase II Completion $2,076,237 $230,693 $2,306,930

138 Alexandria International Airport Rehabilitate Runway 14/32 & 18/36 Safety Areas - Phase II $270,000 $30,000 $300,000

139 Baton Rouge Metropolitan Airport Property East Side of Plank Road - Phase II $0 $1,500,000 $1,500,000

140 Baton Rouge Metropolitan Airport Relocate South Portion of Plank Road - Phase IX $0 $1,500,000 $1,500,000

141 Baton Rouge Metropolitan Airport Relocate South Portion of Plank Road - Phase X $0 $1,500,000 $1,500,000

142 Baton Rouge Metropolitan Airport Relocate South Portion of Plank Road - Phase XI $0 $1,500,000 $1,500,000

143 Baton Rouge Metropolitan Airport Relocate South Portion of Plank Road - Phase XII $0 $1,500,000 $1,500,000

144 Baton Rouge Metropolitan Airport Relocate South Portion of Plank Road - Phase XIII $0 $1,500,000 $1,500,000

Tuesday, February 19, 2019 Page 6 of 32Air Carrier Capital Outlay

Page 34: Air Carrier and General Aviation - Louisiana · General Aviation Capital Outlay 18 ST LANDRY PARISH-AHART FIELD Perimeter Fencing - Phase II (Construction) $345,150 $38,350 $0 $383,500

Item Airport Project Description

Federal/

Other Funds State Funds Total Funds

Air Carrier Capital Outlay Long Range Unfunded Program

145 Baton Rouge Metropolitan Airport Relocate South Portion of Plank Road - Phase XIV $0 $1,500,000 $1,500,000

146 Baton Rouge Metropolitan Airport Relocate South Portion of Plank Road - Phase XV $0 $1,100,000 $1,100,000

147 Baton Rouge Metropolitan Airport Reconstruct Runway 4R/22L & Taxiway E - Phase III $20,000 $2,980,000 $3,000,000

148 Baton Rouge Metropolitan Airport Reconstruct Runway 4R/22L & Taxiway E - Phase IV $20,000 $1,480,000 $1,500,000

149 Baton Rouge Metropolitan Airport RW 4R/22L Reconstruction - Phase V $0 $1,500,000 $1,500,000

150 Baton Rouge Metropolitan Airport Green Building Initiative (Lighting, Mechanical Energy Management System) - Phase I $0 $1,500,000 $1,500,000

151 Baton Rouge Metropolitan Airport Green Building Initiative (Lighting, Mechanical Energy Management System) - Phase II $0 $1,500,000 $1,500,000

152 Monroe Regional Airport Replace Airfield Regulators $0 $60,000 $60,000

153 Baton Rouge Metropolitan Airport Property East Side of Plank Road - Phase I $0 $1,500,000 $1,500,000

154 Baton Rouge Metropolitan Airport Relocate South Portion of Plank Road - Phase VIII $0 $1,500,000 $1,500,000

155 Baton Rouge Metropolitan Airport Property East Side of Plank Road - Phase III $0 $1,500,000 $1,500,000

156 Baton Rouge Metropolitan Airport Property East Side of Plank Road - Phase V $0 $500,000 $500,000

157 Baton Rouge Metropolitan Airport Property South of Blount Road - Phase II $0 $1,500,000 $1,500,000

158 Baton Rouge Metropolitan Airport Property South of Blount Road - Phase III $0 $1,099,450 $1,099,450

159 Alexandria International Airport GIS Development - Phase II $0 $500,000 $500,000

160 Monroe Regional Airport Design Precision Approach for Runway 14/32 Extension $270,000 $30,000 $300,000

161 Alexandria International Airport North Apron Rehabilitation - Joint Seal and Spall Repair $382,500 $42,500 $425,000

162 Lake Charles Regional Airport Airport Entrance Improvements $0 $1,319,000 $1,319,000

163 Monroe Regional Airport Rehabilitate Taxiway A $81,000 $19,000 $100,000

164 Monroe Regional Airport Thermoplastic Markings $498,150 $55,350 $553,500

165 Monroe Regional Airport Upgrade Windcone to LED $0 $38,000 $38,000

166 Monroe Regional Airport Upgrade Airfield Lighting Controls $180,000 $20,000 $200,000

167 Monroe Regional Airport Upgrade Taxiway Lighting, Signs, and REILS to LED $2,340,000 $260,000 $2,600,000

168 Baton Rouge Metropolitan Airport Green Building Initiative (Lighting, Mechanical Energy Management System) - Phase II $0 $1,000,000 $1,000,000

Tuesday, February 19, 2019 Page 7 of 32Air Carrier Capital Outlay

Page 35: Air Carrier and General Aviation - Louisiana · General Aviation Capital Outlay 18 ST LANDRY PARISH-AHART FIELD Perimeter Fencing - Phase II (Construction) $345,150 $38,350 $0 $383,500

Item Airport Project Description

Federal/

Other Funds State Funds Total Funds

Air Carrier Capital Outlay Long Range Unfunded Program

Air Carrier Capital Outlay Totals

Local/Other: $45,818,410

Federal: $108,978,357

State: $438,401,200

Total: $593,197,967

Tuesday, February 19, 2019 Page 8 of 32Air Carrier Capital Outlay

Page 36: Air Carrier and General Aviation - Louisiana · General Aviation Capital Outlay 18 ST LANDRY PARISH-AHART FIELD Perimeter Fencing - Phase II (Construction) $345,150 $38,350 $0 $383,500

Item Airport Project Description

Federal/

Other Funds State Funds Total Funds

General Aviation Capital Outlay Long Range Unfunded Program

1 Houma Terrebonne Airport Taxiway E Rehabilitation - Phase III (Construction) $20,000 $1,000,000 $1,020,000

2 Houma Terrebonne Airport Taxiway E Rehabilitation - Phase II (Construction) $20,000 $1,000,000 $1,020,000

3 Hammond Northshore Regional Airport Taxiway A Realignment - Phase II (Construction) $1,626,950 $178,550 $1,805,500

4 New Orleans Lakefront Airport Rehabilitate Runway 18R/36L - Phase II (Construction) $2,826,000 $314,000 $3,140,000

5 Shreveport Downtown Airport Runway 14/32 Lighting Upgrade - Phase II (Construction) $0 $500,000 $500,000

6 Slidell Airport Mitigate Obstructions - Phase II $0 $250,000 $250,000

7 Jennings Airport Land Acquisition OFZ North of Runway 8-26 $328,500 $36,500 $365,000

8 Slidell Airport Extend Runway 36 and Parallel Taxiway - Phase II (Construction) $1,810,800 $201,200 $2,012,000

9 Jennings Airport Land Acquisition for Runway 13 Approach Protection $0 $425,000 $425,000

10 New Orleans Lakefront Airport ARFF Relocation - Phase I (Design) $25,000 $250,000 $275,000

11 Shreveport Downtown Airport Runway 5/23 Lighting - Phase II (Construction) $0 $700,000 $700,000

12 Houma Terrebonne Airport West GA Apron Rehabilitation - Phase II (Construction) $3,150,000 $350,000 $3,500,000

13 Concordia Parish Airport Obstruction Relocation $0 $500,000 $500,000

14 Shreveport Downtown Airport Construct Taxiway S - Phase II (Construction) $0 $800,000 $800,000

15 Beauregard Regional Airport Runway 18/36 Obstruction Removal $0 $100,000 $100,000

16 Le Maire Memorial Airport Obstruction Removal - Phase II (Construction) $0 $150,000 $150,000

17 Esler Regional Airport Obstruction Removal - Phase I $0 $21,000 $21,000

18 Le Maire Memorial Airport Obstruction Removal - Phase III $0 $100,000 $100,000

19 Natchitoches Regional Airport Bury Powerlines Runway 7 $0 $575,000 $575,000

20 Shreveport Downtown Airport Construct North Side Access Road - Phase II (Construction) $0 $675,000 $675,000

21 New Orleans Lakefront Airport Rehabilitate Runway 18L/36R (Design & Construction) $2,150,000 $238,889 $2,388,889

22 Louisiana Regional Airport South Apron Expansion - Phase III (Design & Construction) $0 $1,000,000 $1,000,000

23 New Orleans Lakefront Airport Rehabilitate Taxiway C $0 $635,000 $635,000

24 Louisiana Regional Airport Hangar Development - Phase III $20,000 $1,000,000 $1,020,000

Tuesday, February 19, 2019 Page 9 of 32General Aviation Capital Outlay

Page 37: Air Carrier and General Aviation - Louisiana · General Aviation Capital Outlay 18 ST LANDRY PARISH-AHART FIELD Perimeter Fencing - Phase II (Construction) $345,150 $38,350 $0 $383,500

Item Airport Project Description

Federal/

Other Funds State Funds Total Funds

General Aviation Capital Outlay Long Range Unfunded Program

25 Louisiana Regional Airport Drainage Improvements - Phase II (Construction) $0 $611,000 $611,000

26 Hammond Northshore Regional Airport Box Hangar Development $620,000 $66,667 $686,667

27 Slidell Airport Runway and Taxiway Surface Treatment $249,300 $27,700 $277,000

28 New Orleans Lakefront Airport Airfield Signage Upgrades - Phase II (Construction) $0 $250,000 $250,000

29 Hammond Northshore Regional Airport Parallel Taxiway D Extension - Phase II (Construction) $1,665,900 $185,100 $1,851,000

30 Houma Terrebonne Airport Construct Partial Parallel Taxiway - Phase III (Construction) $1,800,000 $200,000 $2,000,000

31 Chennault International Airport New Access Road - Phase II (Construction) $750,000 $1,000,000 $1,750,000

32 Harry P. Williams Memorial Airport Runway Rehabilitation - Phase II (Construction) $2,700,000 $300,000 $3,000,000

33 Chennault International Airport Apron Rehabilitation - Phase II (Construction) $1,800,000 $200,000 $2,000,000

34 Slidell Airport Extend Runway 36 and Parallel Taxiway - Phase I (Design and EA) $350,100 $38,900 $389,000

35 New Orleans Lakefront Airport Airport Lighting Control Monitoring System Upgrade $0 $150,000 $150,000

36 Southland Field Clear Airspace - Phase II (Land Acquisition/Easements) $346,500 $38,500 $385,000

37 Hart Airport Runway Rehabilitation South - Phase III (Construction) $675,000 $75,000 $750,000

38 Byerley Airport Obstruction Removal Phase III $0 $250,000 $250,000

39 Port Of South Louisiana Executive Regional Airport Obstruction Mitigation Runway 17 - Phase II (Construction) $0 $982,000 $982,000

40 Louisiana Regional Airport Runway & Taxiway Rehabilitation $0 $261,000 $261,000

41 New Orleans Lakefront Airport Relocation of Runway 9/27 - Phase I (Design) $0 $150,000 $150,000

42 Port Of South Louisiana Executive Regional Airport Runway 17 Threshold Recovery $171,000 $19,000 $190,000

43 Shreveport Downtown Airport Sea Lane and Sea Taxiway - Phase I (Environmental Study) $150,000 $16,667 $166,667

44 Shreveport Downtown Airport Runway 14/32 & 5/23 Lighting Upgrade - Phase I (Design) $0 $200,000 $200,000

45 Port Of South Louisiana Executive Regional Airport Runway 17-35 Widening - Phase II (Construction) $1,701,900 $189,100 $1,891,000

46 South Lafourche Leonard Miller, Jr. Airport Terminal Construction $1,000,000 $1,000,000 $2,000,000

47 Slidell Airport Apron Expansion - Phase II $719,100 $79,900 $799,000

48 Acadiana Regional Airport GA Taxiway Rehabilitation - Phase II (Construction) $0 $1,000,000 $1,000,000

Tuesday, February 19, 2019 Page 10 of 32General Aviation Capital Outlay

Page 38: Air Carrier and General Aviation - Louisiana · General Aviation Capital Outlay 18 ST LANDRY PARISH-AHART FIELD Perimeter Fencing - Phase II (Construction) $345,150 $38,350 $0 $383,500

Item Airport Project Description

Federal/

Other Funds State Funds Total Funds

General Aviation Capital Outlay Long Range Unfunded Program

49 Hammond Northshore Regional Airport Airfield Pavement Rehabilitation $0 $891,000 $891,000

50 Shreveport Downtown Airport Construct Taxiway S - Phase I (Environmental & Design) $0 $150,000 $150,000

51 Ruston Regional Airport Construct Taxilanes $270,000 $30,000 $300,000

52 Beauregard Regional Airport Rehabilitate Apron - Phase II (Design) $135,000 $15,000 $150,000

53 Ruston Regional Airport Apron Expansion - Construction $630,000 $70,000 $700,000

54 Eunice Airport Obstruction Removal - Transitional $0 $400,000 $400,000

55 Marksville Municipal Airport Terminal Apron Rehabilitation - Phase II (Construction) $499,500 $55,500 $555,000

56 Beauregard Regional Airport Apron Rehab Phase II Construction $450,000 $50,000 $500,000

57 Southland Field Clear Airspace - Phase III (Obstruction Removal) $234,000 $26,000 $260,000

58 Bunkie Municipal Airport Runway Rehabilitation - Phase II $0 $829,780 $829,780

59 Tensas Parish Airport Rehabilitate Runway PH II $0 $400,000 $400,000

60 De Quincy Industrial Airpark Rehabilitate Runway - Phase II (Construction) $264,060 $29,340 $293,400

61 Jennings Airport 8-Unit T-Hangars $581,400 $64,600 $646,000

62 Shreveport Downtown Airport Construct 10-Unit T-Hangar $0 $600,000 $600,000

63 Jennings Airport Construct Entrance Taxiway - Runway 13 $20,000 $338,000 $358,000

64 Concordia Parish Airport Taxiway Extension - Phase III - (Construction) $1,260,000 $140,000 $1,400,000

65 Hammond Northshore Regional Airport Taxiway Joint Reseal $654,300 $72,700 $727,000

66 Louisiana Regional Airport Terminal Apron Reconstruction - Phase I (Study) $0 $50,000 $50,000

67 Vicksburg Tallulah Regional Airport Runway Extension - Phase III (Design) $225,000 $25,000 $250,000

68 Vicksburg Tallulah Regional Airport Runway Extension Phase IV (Construction) $5,400,000 $600,000 $6,000,000

69 Concordia Parish Airport Obstruction Mitigation - Phase IV Hangars (Design and Construction) $540,000 $60,000 $600,000

70 Vicksburg Tallulah Regional Airport Runway Extension - Phase II (Land Acquisition) $697,500 $77,500 $775,000

71 Bunkie Municipal Airport Apron & Taxiway Rehab - Ph II Construction $0 $408,490 $408,490

72 Ruston Regional Airport Construct Apron Expansion - Phase III $540,000 $60,000 $600,000

Tuesday, February 19, 2019 Page 11 of 32General Aviation Capital Outlay

Page 39: Air Carrier and General Aviation - Louisiana · General Aviation Capital Outlay 18 ST LANDRY PARISH-AHART FIELD Perimeter Fencing - Phase II (Construction) $345,150 $38,350 $0 $383,500

Item Airport Project Description

Federal/

Other Funds State Funds Total Funds

General Aviation Capital Outlay Long Range Unfunded Program

73 Le Gros Memorial Airport Rehabilitate Airfield Draingage (Phase 3) - Construction $586,800 $65,200 $652,000

74 Jennings Airport North Apron Development - Phase II (Construction) $758,700 $84,300 $843,000

75 Hammond Northshore Regional Airport Drainage Improvements - Phase IV $0 $750,000 $750,000

76 Hammond Northshore Regional Airport Drainage Improvements - Phase V $0 $750,000 $750,000

77 Concordia Parish Airport Taxiway Extension - Phase II (Design) $99,000 $11,000 $110,000

78 Minden Airport Apron Expansion Phase II - Construction $1,642,500 $182,500 $1,825,000

79 Marksville Municipal Airport Runway 4/22 Extension - Phase II (Land Acquisition) $0 $100,000 $100,000

80 Allen Parish Airport Widen Runway 18/36 - Phase II (Construction) $2,790,000 $310,000 $3,100,000

81 Marksville Municipal Airport Runway 4/22 Extension - Phase I (Design) $180,000 $20,000 $200,000

82 Marksville Municipal Airport Runway 4/22 Extension - Phase II (Construction) $2,700,000 $300,000 $3,000,000

83 St Tammany Regional Airport Extend Runway 18/36 - Phase II (Design & Mitigation) $522,000 $58,000 $580,000

84 Leesville Airport Extend Runway 18/36 - Phase II (Construction) $1,172,700 $130,300 $1,303,000

85 St Tammany Regional Airport Runway 18/36 Extension - Phase IV (Widening and Overlay) $1,140,000 $126,667 $1,266,667

86 Leesville Airport Construct Parallel Taxiway - Phase II $2,095,200 $232,800 $2,328,000

87 Slidell Airport Hangar Development - Phase II (16-Unit Hangar) $0 $900,000 $900,000

88 Slidell Airport Hangar Development - Phase I (Taxilane) $0 $775,000 $775,000

89 Jena Airport Taxiway Relocation - Phase III (Construction) $846,000 $94,000 $940,000

90 St Tammany Regional Airport Parallel Taxiway $3,316,590 $368,510 $3,685,100

91 Ruston Regional Airport Construct T Hangars - Construction $0 $400,000 $400,000

92 George R. Carr Memorial Airport Perimeter Fencing $630,000 $70,000 $700,000

93 Minden Airport Airfield Lighting Rehabilitation - Phase II (Construction) $0 $1,000,000 $1,000,000

94 St Tammany Regional Airport Apron Extension - Phase II (Construction) $0 $1,000,000 $1,000,000

95 Tensas Parish Airport Obstruction Removal (Phase III) $0 $150,000 $150,000

96 Tensas Parish Airport Runway Extension - Phase II $0 $150,000 $150,000

Tuesday, February 19, 2019 Page 12 of 32General Aviation Capital Outlay

Page 40: Air Carrier and General Aviation - Louisiana · General Aviation Capital Outlay 18 ST LANDRY PARISH-AHART FIELD Perimeter Fencing - Phase II (Construction) $345,150 $38,350 $0 $383,500

Item Airport Project Description

Federal/

Other Funds State Funds Total Funds

General Aviation Capital Outlay Long Range Unfunded Program

97 Jonesboro Airport Parallel Taxiway - Phase II (Construction) $0 $662,400 $662,400

98 Allen Parish Airport Install Perimeter Fence - Phase II (Construction) $0 $731,000 $731,000

99 Acadiana Regional Airport Perimeter/Emergency Access Road - Phase III (Construction) $2,250,000 $250,000 $2,500,000

100 Jennings Airport Runway 8-26 Rehabilitation $1,191,600 $132,400 $1,324,000

101 Le Gros Memorial Airport Perimeter Fencing - Phase II (Design & Construction) $0 $156,000 $156,000

102 Tensas Parish Airport Apron and Taxilane Ph II $0 $600,000 $600,000

103 Eunice Airport New Aircraft Hangars - Phase II (Construction) $900,000 $100,000 $1,000,000

104 St Tammany Regional Airport Obstruction Mitigation (NAVAIDS) - Phase II (Northwest) $0 $395,000 $395,000

105 St Tammany Regional Airport NAVAIDS Phase IV - PAPI $101,754 $11,306 $113,060

106 Esler Regional Airport Drainage Rehabilitation of Safety Areas and Midfield - Phase II Construction $2,104,870 $233,874 $2,338,744

107 St Tammany Regional Airport Obstruction Mitigation (NAVAIDS) - Phase III (Southwest) $0 $495,000 $495,000

108 Franklinton Airport Perimeter Fencing - Phase I $0 $100,000 $100,000

109 Esler Regional Airport Taxiway Rehabilitation - Phase II (Construction) $3,043,800 $338,200 $3,382,000

110 C.e. Rusty Williams Airport Airfield Lighting System Improvements and New Electrical Vault - Design $0 $100,000 $100,000

111 Franklinton Airport Perimeter Fencing Phase II $0 $300,000 $300,000

112 Esler Regional Airport Perimeter Drainage Rehabilitation (Construction) $0 $1,000,000 $1,000,000

113 Thibodaux Municipal Airport Perimeter Fencing - Phase II (Construction) $210,000 $23,333 $233,333

114 C.e. Rusty Williams Airport Runway Extension $4,050,000 $450,000 $4,500,000

115 Thibodaux Municipal Airport Perimeter Fencing - Phase III (Construction) $150,000 $16,667 $166,667

116 Hammond Northshore Regional Airport Parallel Taxiway D Extension - Phase I (Design/EA) $247,500 $27,500 $275,000

117 Thibodaux Municipal Airport Perimeter Fencing - Construction Phase IV (Construction) $150,000 $16,667 $166,667

118 Esler Regional Airport Rehabilitate Taxiways - Phase I (Construction) $2,925,180 $325,020 $3,250,200

119 Thibodaux Municipal Airport Perimeter Fencing - Phase V (Construction) $150,000 $16,667 $166,667

120 Tensas Parish Airport Lighting Rehabilitation (Phase II - Construction) $0 $525,000 $525,000

Tuesday, February 19, 2019 Page 13 of 32General Aviation Capital Outlay

Page 41: Air Carrier and General Aviation - Louisiana · General Aviation Capital Outlay 18 ST LANDRY PARISH-AHART FIELD Perimeter Fencing - Phase II (Construction) $345,150 $38,350 $0 $383,500

Item Airport Project Description

Federal/

Other Funds State Funds Total Funds

General Aviation Capital Outlay Long Range Unfunded Program

121 Southland Field Rehabilitate Runway 15/33 $225,000 $25,000 $250,000

122 Jennings Airport Taxiway G Rehabilitation (Design & Construction) $0 $150,000 $150,000

123 Esler Regional Airport Rehabilitate Runway 14/32 (Construction) $2,926,080 $325,120 $3,251,200

124 Natchitoches Regional Airport Sealcoat Runway 17/35 $450,000 $50,000 $500,000

125 Esler Regional Airport Runway 14/32 Rehabilitation (Design) $0 $199,300 $199,300

126 Acadiana Regional Airport Peimeter/Emergency Access Road - Phase II (Design) $225,000 $25,000 $250,000

127 Marksville Municipal Airport Agriculture Apron Improvements - Phase II (Construction) $0 $525,000 $525,000

128 Concordia Parish Airport Rehabilitate Main Apron $540,000 $60,000 $600,000

129 Morehouse Memorial Airport Hangars Ph II $270,000 $30,000 $300,000

130 Franklinton Airport Hangar Taxilane - Phase II (Construction) $0 $300,000 $300,000

131 De Quincy Industrial Airpark Construct 14 T-Hangars with Taxilane $1,428,600 $158,733 $1,587,333

132 Thibodaux Municipal Airport Airport Terminal - Phase II (Construction) $0 $500,000 $500,000

133 Concordia Parish Airport Relocate Signage/Markings $0 $50,000 $50,000

134 Acadiana Regional Airport Seaway Lighting Rehabilitation $0 $500,000 $500,000

135 George R. Carr Memorial Airport Runway Safety Area Restoration $270,000 $30,000 $300,000

136 Port Of South Louisiana Executive Regional Airport Runway 17-35 Widening - Phase I (Design) $126,000 $14,000 $140,000

137 Hart Airport Construct T-Hangar $36,000 $300,000 $336,000

138 Beauregard Regional Airport Rehabilitate Runway 18/36 $0 $605,000 $605,000

139 Marksville Municipal Airport Runway Rehab $0 $200,000 $200,000

140 Southland Field Clear Airspace - Phase 1 (Environmental) $99,000 $11,000 $110,000

141 Jonesboro Airport Construct Agriculture Apron - Phase II (Construction) $0 $400,000 $400,000

142 Le Maire Memorial Airport Runway Overlay - Phase II (Construction) - Rural Airport Program $0 $583,000 $583,000

143 False River Regional Airport Pavement Rehabilitation - Sealcoat $0 $1,000,000 $1,000,000

144 Port Of South Louisiana Executive Regional Airport East Side Levee Relocation $3,150,000 $350,000 $3,500,000

Tuesday, February 19, 2019 Page 14 of 32General Aviation Capital Outlay

Page 42: Air Carrier and General Aviation - Louisiana · General Aviation Capital Outlay 18 ST LANDRY PARISH-AHART FIELD Perimeter Fencing - Phase II (Construction) $345,150 $38,350 $0 $383,500

Item Airport Project Description

Federal/

Other Funds State Funds Total Funds

General Aviation Capital Outlay Long Range Unfunded Program

145 Beauregard Regional Airport Rehabilitate Taxiway Signage $0 $187,500 $187,500

146 Louisiana Regional Airport Terminal Apron Reconstruction - Phase IV (Construction) $630,000 $70,000 $700,000

147 Le Gros Memorial Airport Ag Apron Rehabilitation - (Design & Construction) $0 $84,000 $84,000

148 George R. Carr Memorial Airport Perimeter Road $702,000 $78,000 $780,000

149 Eunice Airport Rehabilitate Runway Edge Lighting to LED $0 $135,000 $135,000

150 Homer Municipal Airport Runway and Taxiway Apron Rehab $200,000 $0 $200,000

151 Port Of South Louisiana Executive Regional Airport New Terminal Apron - Phase I (Design) $0 $150,000 $150,000

152 Hart Airport Apron Overlay $0 $225,000 $225,000

153 Bunkie Municipal Airport Airfield Lighting and Navaid Rehabilitation $0 $307,760 $307,760

154 Acadiana Regional Airport Construct Blast Pad $0 $500,000 $500,000

155 Homer Municipal Airport Runway Safety Area Improvements - Design $0 $105,000 $105,000

156 Tensas Parish Airport Runwy Rehabilitation - Phase I (Design) $0 $50,000 $50,000

157 Concordia Parish Airport Obstruction Removal $0 $125,000 $125,000

158 Bunkie Municipal Airport Runway Rehab - Design PH I $0 $64,200 $64,200

159 Marksville Municipal Airport Terminal Apron Rehabilitation - Phase I (Design) $0 $55,000 $55,000

160 George R. Carr Memorial Airport Ramp Overlay $0 $460,000 $460,000

161 Harry P. Williams Memorial Airport Rehabilitate North Apron - Phase I (Design) $0 $35,000 $35,000

162 Homer Municipal Airport Runway Safety Area Improvements - Construction $0 $1,000,000 $1,000,000

163 John H. Hooks Jr. Memorial Taxiway Stub Apron Expansion PH II $405,000 $45,000 $450,000

164 Springhill Airport Overlay Runway - Phase II (Construction) $900,000 $100,000 $1,000,000

165 Chennault International Airport Obstruction Removal - South End $0 $500,000 $500,000

166 Jennings Airport Install Taxiway Lighting $0 $648,000 $648,000

167 Port Of South Louisiana Executive Regional Airport Airport Security/Wildlife Fence $0 $325,000 $325,000

168 Beauregard Regional Airport Rehabilitate Runway 14/32 $0 $317,000 $317,000

Tuesday, February 19, 2019 Page 15 of 32General Aviation Capital Outlay

Page 43: Air Carrier and General Aviation - Louisiana · General Aviation Capital Outlay 18 ST LANDRY PARISH-AHART FIELD Perimeter Fencing - Phase II (Construction) $345,150 $38,350 $0 $383,500

Item Airport Project Description

Federal/

Other Funds State Funds Total Funds

General Aviation Capital Outlay Long Range Unfunded Program

169 Columbia Airport Construct New Runway - Phase II (Land Acquisition) $0 $400,000 $400,000

170 Delhi Municipal Airport Drainage Improvements - Phase II $0 $50,000 $50,000

171 C.e. Rusty Williams Airport Design and Construct Taxilanes & 10-Unit T-Hangar $0 $800,000 $800,000

172 Minden Airport Apron Expansion Phase II - Design $157,500 $17,500 $175,000

173 Le Gros Memorial Airport Rehabilitate Airfield Markings $0 $103,000 $103,000

174 Ruston Regional Airport Construct SSALR $0 $900,000 $900,000

175 Jennings Airport North Apron Development - Phase I (Design) $0 $88,000 $88,000

176 Vicksburg Tallulah Regional Airport Runway Extension - Phase I (Feasibility Study/EA) $238,500 $26,500 $265,000

177 Bunkie Municipal Airport Apron & Taxiway Rehab - Ph I Design $0 $43,300 $43,300

178 Ruston Regional Airport SSALSR - Phase I (Design) $0 $115,000 $115,000

179 Abbeville Chris Crusta Memorial Airport Construct Agriculture Apron (Design & Construction) $122,490 $13,610 $136,100

180 False River Regional Airport Taxiway Centerline Shift $3,420,000 $380,000 $3,800,000

181 Minden Airport Parallel Taxiway - Phase II (Construction) $1,800,000 $200,000 $2,000,000

182 Chennault International Airport Taxiway G Rehabilitation - Phase I (Design) $225,000 $25,000 $250,000

183 Morehouse Memorial Airport Runway Extension - Phase I Design $270,000 $30,000 $300,000

184 Union Parish Airport Runway Extension - Ph II $1,575,000 $175,000 $1,750,000

185 Kelly Dumas Instrument Approach Survey $90,000 $10,000 $100,000

186 Red River Parish Airport Construct East Airfield Perimeter Fence Replacement $0 $350,000 $350,000

187 Natchitoches Regional Airport Apron Expansion $0 $200,000 $200,000

188 Jennings Airport Relocate Wind Cone and Construct Segmented Circle $0 $112,000 $112,000

189 Marksville Municipal Airport Runway Lighting Rehab $0 $100,000 $100,000

190 Hart Airport Runway Extension - Phase II (Design) $0 $160,000 $160,000

191 South Lafourche Leonard Miller, Jr. Airport Upgrade PAPI-4 Systems to LED $0 $80,000 $80,000

192 Pineville Municipal Airport Apron Rehabilitation - Phase II (Construction) $0 $806,500 $806,500

Tuesday, February 19, 2019 Page 16 of 32General Aviation Capital Outlay

Page 44: Air Carrier and General Aviation - Louisiana · General Aviation Capital Outlay 18 ST LANDRY PARISH-AHART FIELD Perimeter Fencing - Phase II (Construction) $345,150 $38,350 $0 $383,500

Item Airport Project Description

Federal/

Other Funds State Funds Total Funds

General Aviation Capital Outlay Long Range Unfunded Program

193 Morehouse Memorial Airport Runway Extension - Ph II $12,780,002 $1,420,000 $14,200,002

194 Leesville Airport Airfield Lighting Improvements $0 $250,000 $250,000

195 St Tammany Regional Airport Extend Runway 18/36 - Phase I (Environmental) $180,000 $20,000 $200,000

196 Leesville Airport Extend Runway 18/36 - Phase I (Design) $103,500 $11,500 $115,000

197 Marksville Municipal Airport Runway 4/22 Extension - Phase I (Environmental) $234,000 $26,000 $260,000

198 Allen Parish Airport Runway Extension $4,320,000 $480,000 $4,800,000

199 Hart Airport Runway Extension - Phase II (Road Relocation) $720,000 $80,000 $800,000

200 Kelly Dumas Full Length Parallel Twy $1,125,000 $125,000 $1,250,000

201 Hart Airport Construct Parallel Taxiway $1,620,000 $180,000 $1,800,000

202 Acadiana Regional Airport Update Airport Master Plan $225,000 $25,000 $250,000

203 Thibodaux Municipal Airport Midfield Connector Taxiway $0 $300,000 $300,000

204 Minden Airport Perimeter Fencing - Design/Construct $225,000 $25,000 $250,000

205 Concordia Parish Airport Electronic Slide Gate (North Airfield) $0 $25,000 $25,000

206 Leesville Airport Construct Parallel Taxiway - Phase I $0 $176,000 $176,000

207 Le Gros Memorial Airport Parallel Taxiway for Runway 4-22 $2,047,500 $227,500 $2,275,000

208 Union Parish Airport Parallel Taxiway Extension - Construction $1,125,000 $125,000 $1,250,000

209 Concordia Parish Airport Taxiway Extension - Phase I (EA) $72,000 $8,000 $80,000

210 Hart Airport Runway Extension - Phase III (Extend Runway) $720,000 $80,000 $800,000

211 Minden Airport Airfield Lighting Improvements - Phase I (Design) $0 $80,000 $80,000

212 Le Maire Memorial Airport Apron Expansion - Phase II (Construction) $0 $400,000 $400,000

213 Ruston Regional Airport Taxilanes and T Hangars - Phase I (Design) $0 $75,000 $75,000

214 St Tammany Regional Airport Apron Extension - Phase I (Environmental & Design) $0 $150,000 $150,000

215 Columbia Airport Construct New Runway - Phase I (EA) $0 $175,000 $175,000

216 Allen Parish Airport Rehabilitate North Apron Drainage $0 $535,000 $535,000

Tuesday, February 19, 2019 Page 17 of 32General Aviation Capital Outlay

Page 45: Air Carrier and General Aviation - Louisiana · General Aviation Capital Outlay 18 ST LANDRY PARISH-AHART FIELD Perimeter Fencing - Phase II (Construction) $345,150 $38,350 $0 $383,500

Item Airport Project Description

Federal/

Other Funds State Funds Total Funds

General Aviation Capital Outlay Long Range Unfunded Program

217 Port Of South Louisiana Executive Regional Airport Fuel Farm Improvement $0 $90,000 $90,000

218 Marksville Municipal Airport Airfield Drainage Improvements $0 $150,000 $150,000

219 Natchitoches Regional Airport Replace AWOS III P/T $0 $200,000 $200,000

220 False River Regional Airport PAPI Upgrades $0 $150,000 $150,000

221 Tensas Parish Airport Runway Extension - Phase I $0 $200,000 $200,000

222 False River Regional Airport ODALS/REILS Upgrades $0 $150,000 $150,000

223 Le Gros Memorial Airport Perimeter Fencing - Phase I (Design & Construction) $0 $168,000 $168,000

224 Leesville Airport Install Perimeter Fence $1,003,050 $111,450 $1,114,500

225 John H. Hooks Jr. Memorial Shade Hangars PH II $360,000 $40,000 $400,000

226 Hart Airport Design Parallel Taxiway $0 $225,000 $225,000

227 Hart Airport Design & Construct Perimeter Fencing $0 $350,000 $350,000

228 Feliciana Airpark Construct Taxiway $0 $300,000 $300,000

229 Jonesboro Airport Parallel Taxiway - Phase I (Design) $0 $73,600 $73,600

230 Homer Municipal Airport Design Parallel Taxiway $0 $125,000 $125,000

231 Port Of South Louisiana Executive Regional Airport Wildlife Assessment $0 $60,000 $60,000

232 Thibodaux Municipal Airport Perimeter Fencing - Phase I (Environmental/Design) $90,000 $10,000 $100,000

233 Homer Municipal Airport Parallel Taxiway - Construction $0 $1,500,000 $1,500,000

234 Red River Parish Airport Construct New Apron, Connecting Taxiway, and Taxilanes - Phase II $0 $1,000,000 $1,000,000

235 Port Of South Louisiana Executive Regional Airport Airport Master Plan $247,500 $27,500 $275,000

236 George R. Carr Memorial Airport Wildlife Fencing - Phase I (Wildlife Assessment and Preliminary Engineering) $81,000 $9,000 $90,000

237 Allen Parish Airport Install Perimeter Fence - Phase I (Design) $0 $60,000 $60,000

238 Columbia Airport Construct Access Taxilane $0 $450,000 $450,000

239 Jonesboro Airport Construct Hangars $0 $500,000 $500,000

240 Harry P. Williams Memorial Airport Upgrade of ILS/DME $0 $365,000 $365,000

Tuesday, February 19, 2019 Page 18 of 32General Aviation Capital Outlay

Page 46: Air Carrier and General Aviation - Louisiana · General Aviation Capital Outlay 18 ST LANDRY PARISH-AHART FIELD Perimeter Fencing - Phase II (Construction) $345,150 $38,350 $0 $383,500

Item Airport Project Description

Federal/

Other Funds State Funds Total Funds

General Aviation Capital Outlay Long Range Unfunded Program

241 Natchitoches Regional Airport Taxiway to End of Runway 25 $405,000 $45,000 $450,000

242 Tensas Parish Airport Apron and Taxilane Ph I Design $0 $75,000 $75,000

243 Marksville Municipal Airport AWOS $0 $200,000 $200,000

244 St Landry Parish-ahart Field T-Hangars $0 $553,200 $553,200

245 Natchitoches Regional Airport Runway 7/25 Lighting Improvements $0 $300,000 $300,000

246 Kelly Dumas Install AWOS III P/T $180,000 $20,000 $200,000

247 South Lafourche Leonard Miller, Jr. Airport Fuel System Rehabilitation $225,000 $25,000 $250,000

248 Chennault International Airport CATII Approach Study/Survey $0 $75,000 $75,000

249 Esler Regional Airport Drainage Rehabilitation of Safety Areas and Midfield - Phase I Design $0 $165,800 $165,800

250 Natchitoches Regional Airport Construct Taxilanes for T-Hangars $405,000 $45,000 $450,000

251 Le Gros Memorial Airport Upgrade Runway 4-22 REIL $0 $31,000 $31,000

252 Acadiana Regional Airport SSALR Upgrade $0 $490,000 $490,000

253 Allen Parish Airport Approach Lighting $0 $750,000 $750,000

254 Franklinton Airport Perimeter Fencing - Phase I (Design) $0 $35,000 $35,000

255 Eunice Airport Airport Layout Plan $135,000 $15,000 $150,000

256 Columbia Airport Access Gate and Terminal Area Fencing $0 $50,000 $50,000

257 Bunkie Municipal Airport Security Fencing Rehabilitation $0 $86,800 $86,800

258 Bunkie Municipal Airport Perimeter Fencing $0 $405,390 $405,390

259 Esler Regional Airport Rehabilitate Taxiways - Phase I (Design) $0 $199,200 $199,200

260 Esler Regional Airport Perimeter Drainage Rehabilitation (Design) $0 $119,000 $119,000

261 South Lafourche Leonard Miller, Jr. Airport Master Plan Update $198,000 $22,000 $220,000

262 Natchitoches Regional Airport Agricultural Apron $0 $325,000 $325,000

263 Le Gros Memorial Airport Installation of Runway 13-31 Lighting $0 $432,000 $432,000

264 Thibodaux Municipal Airport Airport Terminal - Phase I (Design) $0 $100,000 $100,000

Tuesday, February 19, 2019 Page 19 of 32General Aviation Capital Outlay

Page 47: Air Carrier and General Aviation - Louisiana · General Aviation Capital Outlay 18 ST LANDRY PARISH-AHART FIELD Perimeter Fencing - Phase II (Construction) $345,150 $38,350 $0 $383,500

Item Airport Project Description

Federal/

Other Funds State Funds Total Funds

General Aviation Capital Outlay Long Range Unfunded Program

265 Esler Regional Airport Taxiway Rehabilitation - Phase II (Design) $0 $207,000 $207,000

266 Tensas Parish Airport Acquire and Install AWOS $0 $200,000 $200,000

267 Natchitoches Regional Airport Construct 10-Unit T-Hangar & Box Hangar $0 $650,000 $650,000

268 Beauregard Regional Airport Construct T-Hangar Taxilanes $1,352,502 $150,278 $1,502,780

269 Leesville Airport GA Development Area - Taxilanes and Drainage $0 $433,000 $433,000

270 Welsh Airport Rehabilitate Airfield Lighting $0 $555,000 $555,000

271 Homer Municipal Airport Sealcoat Runway and Apron $0 $150,000 $150,000

272 Marksville Municipal Airport Agriculture Apron Improvements - Phase I (Design) $0 $41,500 $41,500

273 Harry P. Williams Memorial Airport Small Scale Masterplan $0 $50,000 $50,000

274 False River Regional Airport Construct Hangars - (Design & Construction) $990,000 $110,000 $1,100,000

275 Kelly Dumas Site Prep for Hangars $0 $170,000 $170,000

276 Natchitoches Regional Airport Land Acquisition - ODALS $0 $260,000 $260,000

277 Le Gros Memorial Airport New Terminal Building $0 $448,000 $448,000

278 St Tammany Regional Airport Box Hangar $0 $865,000 $865,000

279 Morehouse Memorial Airport Construct Hangars - Phase I $45,000 $5,000 $50,000

280 Vivian Airport Rehabilitate East Apron $0 $225,000 $225,000

281 George R. Carr Memorial Airport Hangar $0 $700,000 $700,000

282 Kelly Dumas Ugrade Fuel System $180,000 $20,000 $200,000

283 Delhi Municipal Airport Small Apron Reconstruction $0 $190,000 $190,000

284 Le Gros Memorial Airport Construct 5 Unit Hangars $0 $570,000 $570,000

285 Leesville Airport Construct 6 T-Hangars $0 $646,000 $646,000

286 Kelly Dumas Construct Hangars $0 $600,000 $600,000

287 Franklinton Airport Hangar Taxilane - Phase I (Design) $0 $50,000 $50,000

288 Le Gros Memorial Airport Construct Aviation Fuel System $0 $150,000 $150,000

Tuesday, February 19, 2019 Page 20 of 32General Aviation Capital Outlay

Page 48: Air Carrier and General Aviation - Louisiana · General Aviation Capital Outlay 18 ST LANDRY PARISH-AHART FIELD Perimeter Fencing - Phase II (Construction) $345,150 $38,350 $0 $383,500

Item Airport Project Description

Federal/

Other Funds State Funds Total Funds

General Aviation Capital Outlay Long Range Unfunded Program

289 Vicksburg Tallulah Regional Airport North Taxilane $855,000 $95,000 $950,000

290 Winnsboro Municipal Airport Apron Reconstruction $360,000 $40,000 $400,000

291 Bunkie Municipal Airport Agricultural Operations Apron $0 $500,000 $500,000

292 Columbia Airport Construct Agriculture Apron and Taxiway Stub $0 $250,000 $250,000

293 St Tammany Regional Airport 10 Unit T-Hangar Complex $0 $780,000 $780,000

294 Acadiana Regional Airport Acquisition of ARFF Vehicle $0 $1,000,000 $1,000,000

295 Jonesboro Airport Construct Agriculture Apron - Phase I (Design) $0 $100,000 $100,000

296 Tensas Parish Airport Terminal Building $0 $150,000 $150,000

297 Homer Municipal Airport Construct Hangars $0 $350,000 $350,000

298 Columbia Airport Construct T-Hangars $0 $550,000 $550,000

299 Bunkie Municipal Airport Airport Terminal Building $0 $100,000 $100,000

300 Bunkie Municipal Airport Hangars & Apron $0 $750,000 $750,000

301 Columbia Airport Fuel Farm $0 $250,000 $250,000

302 Feliciana Airpark Hangar Development $0 $300,000 $300,000

303 Tensas Parish Airport New T-Hangars $0 $500,000 $500,000

304 Bunkie Municipal Airport Small Scale Masterplan Update $0 $125,000 $125,000

305 Thibodaux Municipal Airport Relocate Airport Access Road $0 $600,000 $600,000

306 Leesville Airport Access Road Rehabilitation $0 $75,000 $75,000

307 False River Regional Airport Bury Powerlines - Runway 36 Approach $0 $250,000 $250,000

308 Acadiana Regional Airport Perimeter/Emergency Access Road - Phase I (PER) $150,000 $16,667 $166,667

309 Chennault International Airport New Access Road - Phase I (Design) $0 $175,000 $175,000

310 Franklinton Airport Update Airport Layout Plan $0 $100,000 $100,000

311 Concordia Parish Airport Security Lighting for Main and T-Hangar Ramps $142,500 $15,833 $158,333

312 Kelly Dumas Access Road & Parking $315,000 $35,000 $350,000

Tuesday, February 19, 2019 Page 21 of 32General Aviation Capital Outlay

Page 49: Air Carrier and General Aviation - Louisiana · General Aviation Capital Outlay 18 ST LANDRY PARISH-AHART FIELD Perimeter Fencing - Phase II (Construction) $345,150 $38,350 $0 $383,500

Item Airport Project Description

Federal/

Other Funds State Funds Total Funds

General Aviation Capital Outlay Long Range Unfunded Program

313 Homer Municipal Airport Airport Master Plan $0 $200,000 $200,000

314 Franklinton Airport Land Acquisition $0 $100,000 $100,000

315 Vivian Airport Upgrade Airfield Lighting $0 $200,000 $200,000

316 Esler Regional Airport GA Apron Strengthening and Expansion $0 $350,000 $350,000

317 Bunkie Municipal Airport Land Acquistion $0 $200,000 $200,000

318 Springhill Airport Airfield Lighting Rehabilitation $0 $1,000,000 $1,000,000

319 Union Parish Airport Design Runway Extension $202,500 $22,500 $225,000

320 Red River Parish Airport Design Parallel Taxiway $0 $200,000 $200,000

321 Columbia Airport Relocate Airport Access Road - Phase I $0 $40,000 $40,000

322 Esler Regional Airport Rehabilitate Security Fencing & Gates $0 $108,900 $108,900

323 Pineville Municipal Airport Small Scope Master Plan - Phase II $0 $66,000 $66,000

324 C.e. Rusty Williams Airport Airfield Lighting System Improvements and New Electrical Vault - Construction $450,000 $450,000 $900,000

325 Tensas Parish Airport Construct Access Road $0 $700,000 $700,000

326 Red River Parish Airport Design/Construct Apron Taxilane Extension $0 $300,000 $300,000

327 Union Parish Airport Parallel Taxiway Extension - Design $157,500 $17,500 $175,000

328 St Tammany Regional Airport Runway 18/36 Extension - Phase III (Construction) $2,713,842 $301,538 $3,015,380

329 Vivian Airport Complete Airfield Perimeter Security Fencing $0 $300,000 $300,000

330 Pineville Municipal Airport Apron Rehabilitation - Design $0 $72,000 $72,000

331 Byerley Airport Rehabilitate Airfield Lighting $405,000 $45,000 $450,000

332 Scott Airport Taxiway Improvements $0 $75,000 $75,000

333 Winnsboro Municipal Airport Security Fencing $486,000 $54,000 $540,000

334 Le Maire Memorial Airport Apron Expansion - Phase I (Design) $0 $50,000 $50,000

335 John H. Hooks Jr. Memorial Terminal Building - Phase I $180,000 $20,000 $200,000

336 Jonesville Municipal Airport Hangar Replacement - Ph. I Design $90,000 $10,000 $100,000

Tuesday, February 19, 2019 Page 22 of 32General Aviation Capital Outlay

Page 50: Air Carrier and General Aviation - Louisiana · General Aviation Capital Outlay 18 ST LANDRY PARISH-AHART FIELD Perimeter Fencing - Phase II (Construction) $345,150 $38,350 $0 $383,500

Item Airport Project Description

Federal/

Other Funds State Funds Total Funds

General Aviation Capital Outlay Long Range Unfunded Program

337 Le Maire Memorial Airport Perimeter Fence $0 $330,000 $330,000

338 David G. Joyce Airport Construct Parallel Taxiway - Phase I $0 $471,000 $471,000

339 Red River Parish Airport Construct New Apron, Connecting Taxiway, and Taxilanes - Phase I $0 $1,000,000 $1,000,000

340 Byerley Airport Apron Rehabilitation $463,500 $51,500 $515,000

341 Esler Regional Airport Construct T-Hangars $0 $373,258 $373,258

342 Chennault International Airport CAT II/ILS Upgrade $0 $400,000 $400,000

343 Red River Parish Airport Design & Construct Fuel System $0 $250,000 $250,000

344 Springhill Airport Construct 6-Unit T-Hangar $0 $350,000 $350,000

345 Red River Parish Airport Design & Construct Hangars for New Apron $0 $350,000 $350,000

346 Vivian Airport Construct Box Hangars $0 $625,000 $625,000

347 Livingston Regional Airport Parallel Taxiway -Phase II (Construction) $2,700,000 $300,000 $3,000,000

348 Red River Parish Airport Action Plan/ALP Update $0 $125,000 $125,000

349 Livingston Regional Airport Construct Apron - Phase II (Construction) $0 $500,000 $500,000

350 Winnsboro Municipal Airport Hangars $540,000 $60,000 $600,000

351 Pineville Municipal Airport Seaplane Improvements $0 $410,000 $410,000

352 David G. Joyce Airport Rehabilitate Airfield Lighting $0 $325,000 $325,000

353 Union Parish Airport 10 Unit T-Hangar - Construction $0 $375,000 $375,000

354 Pineville Municipal Airport Construct South Apron Extension $0 $285,000 $285,000

355 Vivian Airport Rehab Runway 9/27 $0 $200,000 $200,000

356 Delhi Municipal Airport Masterplan and Drainage Study $0 $30,000 $30,000

357 Esler Regional Airport Access Road and Security Checkpoints $1,080,000 $120,000 $1,200,000

358 Livingston Regional Airport Perimeter Fence - Phase II (Construction) $900,000 $100,000 $1,000,000

359 St Landry Parish-ahart Field Apron Rehabilitation $0 $186,010 $186,010

360 Pineville Municipal Airport East Access Road and Site Improvements $0 $1,000,000 $1,000,000

Tuesday, February 19, 2019 Page 23 of 32General Aviation Capital Outlay

Page 51: Air Carrier and General Aviation - Louisiana · General Aviation Capital Outlay 18 ST LANDRY PARISH-AHART FIELD Perimeter Fencing - Phase II (Construction) $345,150 $38,350 $0 $383,500

Item Airport Project Description

Federal/

Other Funds State Funds Total Funds

General Aviation Capital Outlay Long Range Unfunded Program

361 St Landry Parish-ahart Field Runway 6-24 Rehabilitation $0 $415,368 $415,368

362 Le Maire Memorial Airport T-Hangar Complex $0 $385,000 $385,000

363 David G. Joyce Airport Rehabilitate Agricultural Apron $0 $267,000 $267,000

364 David G. Joyce Airport Apron Rehabilitation - Phase I (Construction of South End) $0 $460,000 $460,000

365 Scott Airport Master Drainage Study $0 $55,000 $55,000

366 Natchitoches Regional Airport Replace Airfield Signage and 17/35 Lights $0 $135,000 $135,000

367 Welsh Airport Airfield Perimeter Fencing $0 $250,000 $250,000

368 Delhi Municipal Airport Perimeter Fencing $0 $420,000 $420,000

369 Livingston Regional Airport Entrance Road $900,000 $100,000 $1,000,000

370 Pineville Municipal Airport Obstruction Mitigation $0 $825,000 $825,000

371 Pineville Municipal Airport Terminal Building Improvements $0 $713,000 $713,000

372 Acadiana Regional Airport Taxiway B Improvements (East) $4,950,000 $550,000 $5,500,000

373 David G. Joyce Airport Design Parallel Taxiway $0 $150,000 $150,000

374 Scott Airport Rehabilitate Runway Lighting - Phase I $0 $40,000 $40,000

375 Jonesville Municipal Airport Hangars - Ph II $450,000 $50,000 $500,000

376 Arcadia Bienville Airport Perimeter Fencing $0 $70,000 $70,000

377 Delhi Municipal Airport Fuel Farm $0 $150,000 $150,000

378 Pineville Municipal Airport Automobile Parking Lot Expansion $0 $143,000 $143,000

379 Welsh Airport Airport Layout Plan (ALP) $0 $100,000 $100,000

380 Natchitoches Regional Airport Upgrade Localizer $0 $450,000 $450,000

381 David G. Joyce Airport Apron Rehabilitation - Design $0 $80,000 $80,000

382 Jonesboro Airport Runway Lighting Improvements $0 $415,000 $415,000

383 David G. Joyce Airport Rehabilitate Apron - North Section $0 $250,000 $250,000

384 Arcadia Bienville Airport Design Agriculture Apron, Taxilane, and Entrance Road $0 $85,000 $85,000

Tuesday, February 19, 2019 Page 24 of 32General Aviation Capital Outlay

Page 52: Air Carrier and General Aviation - Louisiana · General Aviation Capital Outlay 18 ST LANDRY PARISH-AHART FIELD Perimeter Fencing - Phase II (Construction) $345,150 $38,350 $0 $383,500

Item Airport Project Description

Federal/

Other Funds State Funds Total Funds

General Aviation Capital Outlay Long Range Unfunded Program

385 Leesville Airport AWOS/ASOS $270,000 $30,000 $300,000

386 Livingston Regional Airport Environmental Mitigation $0 $300,000 $300,000

387 Olla Airport Perimeter Fencing $0 $400,000 $400,000

388 Arcadia Bienville Airport Design Hangar $0 $120,000 $120,000

389 Livingston Regional Airport Construct Apron - Phase I (Design) $0 $300,000 $300,000

390 Arcadia Bienville Airport Action Plan/ALP $0 $95,000 $95,000

391 Livingston Regional Airport Perimeter Fence - Phase I (Design) $0 $50,000 $50,000

392 Livingston Regional Airport AWOS III/PT $0 $200,000 $200,000

393 Livingston Regional Airport Airfield Lighting and NAVAIDS - Phase I (Design) $0 $400,000 $400,000

394 David G. Joyce Airport Construct Parallel Taxiway - Phase II $0 $508,000 $508,000

395 Livingston Regional Airport Hangar Development $0 $1,000,000 $1,000,000

396 Livingston Regional Airport Fuel Farm $0 $200,000 $200,000

397 Arcadia Bienville Airport Design Parallel Taxiway $0 $100,000 $100,000

398 Arcadia Bienville Airport Construct Parallel Taxiway $0 $1,200,000 $1,200,000

399 Arcadia Bienville Airport Construct Agriculture Apron, Taxilane, and Entrance Road $0 $600,000 $600,000

400 Arcadia Bienville Airport Design Terminal and Fuel Farm $0 $90,000 $90,000

401 Arcadia Bienville Airport Construct Terminal $0 $300,000 $300,000

402 Arcadia Bienville Airport Construct Fuel Farm $0 $250,000 $250,000

403 Allen Parish Airport Construct T-Hangars $0 $300,000 $300,000

404 John H.hooks Jr. Memorial New Fuel Farm $0 $50,000 $50,000

405 John H.hooks Jr. Memorial Terminal Building - Phase II $475,000 $52,778 $527,778

406 Arcadia Bienville Airport Construct Hangars $0 $500,000 $500,000

407 Allen Parish Airport Construct Taxilane/Apron for T-Hangar Access $0 $690,000 $690,000

408 Bunkie Municipal Airport Airport Access Drive $0 $135,500 $135,500

Tuesday, February 19, 2019 Page 25 of 32General Aviation Capital Outlay

Page 53: Air Carrier and General Aviation - Louisiana · General Aviation Capital Outlay 18 ST LANDRY PARISH-AHART FIELD Perimeter Fencing - Phase II (Construction) $345,150 $38,350 $0 $383,500

Item Airport Project Description

Federal/

Other Funds State Funds Total Funds

General Aviation Capital Outlay Long Range Unfunded Program

409 Concordia Parish Airport Rehabilitate Southwest Apron - Phase I $71,250 $7,917 $79,167

410 False River Regional Airport Construction of Corporate Hangar $144,000 $12,667 $156,667

411 Le Maire Memorial Airport Land Acquisition $0 $150,000 $150,000

412 John H.hooks Jr. Memorial New East Apron - Phase II $475,000 $52,778 $527,778

413 Red River Parish Airport Construct Terminal Building $400,000 $44,444 $444,444

414 Jennings Airport Approach Lights for Runway 8/26 (ODALS) $242,105 $26,901 $269,006

415 Winnsboro Municipal Airport Site Selection & EA for new Airport $270,000 $30,000 $300,000

416 Olla Airport Rehabilitation of Beacon and Windsock $0 $55,000 $55,000

417 Winnsboro Municipal Airport Construct Entrance Drive, Gating & Erosion Control Measures for New Airport Site $360,000 $40,000 $400,000

418 Winnsboro Municipal Airport Master Planning for New Airport $270,000 $30,000 $300,000

419 Tensas Parish Airport Perimeter Fencing Phase I $0 $250,000 $250,000

420 Kelly Dumas Construct T-Hangar Taxilanes $360,000 $40,000 $400,000

421 Ruston Regional Airport Construct Hangar Taxiways - Phase II $1,170,000 $130,000 $1,300,000

422 Louisiana Regional Airport Land Acquisition for RPZ Expansion $0 $900,000 $900,000

423 Tensas Parish Airport Apron Expansion - Phase III (Construction) $0 $450,000 $450,000

424 Tensas Parish Airport Apron Expansion - Phase I (EA & Design) $0 $55,000 $55,000

425 Tensas Parish Airport Apron Expansion - Phase II (Land Acquisition) $0 $250,000 $250,000

426 Tensas Parish Airport Fuel Farm $0 $120,000 $120,000

427 Morehouse Memorial Airport Apron Rehabilitation $292,500 $32,500 $325,000

428 Byerley Airport Construct New Shade Ports $450,000 $50,000 $500,000

429 Delhi Municipal Airport Land Acquisition $0 $95,000 $95,000

430 Beauregard Regional Airport Runway 18/36 Approach Lighting Improvements $855,117 $95,013 $950,130

431 John H.hooks Jr. Memorial New East Apron - Phase I $95,000 $10,556 $105,556

432 John H.hooks Jr. Memorial Construct Hangar AccessTaxiway Phase I $58,500 $6,500 $65,000

Tuesday, February 19, 2019 Page 26 of 32General Aviation Capital Outlay

Page 54: Air Carrier and General Aviation - Louisiana · General Aviation Capital Outlay 18 ST LANDRY PARISH-AHART FIELD Perimeter Fencing - Phase II (Construction) $345,150 $38,350 $0 $383,500

Item Airport Project Description

Federal/

Other Funds State Funds Total Funds

General Aviation Capital Outlay Long Range Unfunded Program

433 Eunice Airport Taxiway Extension (South) with Associated Lighting and Signage $540,000 $60,000 $600,000

434 Harry P. Williams Memorial Airport Rehab Public Heliport $0 $40,000 $40,000

435 Harry P. Williams Memorial Airport Runway Safety Area Improvements $150,000 $16,667 $166,667

436 Ruston Regional Airport Taxiway Lighting $617,500 $68,611 $686,111

437 John H. Hooks Jr. Memorial Design & Environmental for Runway & Taxiway Extension $152,000 $16,889 $168,889

438 Allen Parish Airport Construct Hangars $0 $750,000 $750,000

439 Slidell Airport Land Acquisition West Side $0 $375,000 $375,000

440 Vicksburg Tallulah Regional Airport Taxiway Lighting - Phase I $0 $35,000 $35,000

441 Jonesboro Airport Fuel Farm $20,000 $110,000 $130,000

442 Delhi Municipal Airport Perimeter Fence - Phase III $0 $330,000 $330,000

443 Jonesboro Airport Construct Hangars $8,000 $292,000 $300,000

444 Feliciana Airpark Extend Runway 15/33 $0 $136,000 $136,000

445 Feliciana Airpark Temporary Runway Lighting $0 $51,600 $51,600

446 Houma Terrebonne Airport Taxiway A Extension - Phase II (Construction) $1,800,000 $200,000 $2,000,000

447 Houma Terrebonne Airport Taxiway A Extension - Phase I (Design) $450,000 $50,000 $500,000

448 Houma Terrebonne Airport Construct Partial Parallel Taxiway - Phase IV (Construction) $20,000 $1,000,000 $1,020,000

449 Thibodaux Municipal Airport Resurface Terminal Building Parking Lot $150,000 $16,667 $166,667

450 False River Regional Airport Obstruction Mitigation Runway 18 Approach $283,500 $31,500 $315,000

451 Acadiana Regional Airport Runway 17/35 Extension - Phase I (Design) $0 $500,000 $500,000

452 Acadiana Regional Airport Construct Hangar $0 $350,000 $350,000

453 Acadiana Regional Airport Heavy Jet Apron Expansion - Phase III of V (Construction) $4,500,000 $500,000 $5,000,000

454 South Lafourche Leonard Miller, Jr. Airport Terminal Design $50,000 $150,000 $200,000

455 Louisiana Regional Airport North T-Hangar Development - Phase III (Hangars) $20,000 $860,000 $880,000

456 Jena Airport Taxiway A Extension - Phase I $150,000 $30,000 $180,000

Tuesday, February 19, 2019 Page 27 of 32General Aviation Capital Outlay

Page 55: Air Carrier and General Aviation - Louisiana · General Aviation Capital Outlay 18 ST LANDRY PARISH-AHART FIELD Perimeter Fencing - Phase II (Construction) $345,150 $38,350 $0 $383,500

Item Airport Project Description

Federal/

Other Funds State Funds Total Funds

General Aviation Capital Outlay Long Range Unfunded Program

457 Louisiana Regional Airport North T-Hangar Development - Phase I (Environmental) $0 $100,000 $100,000

458 Jena Airport Taxiway Lighting - Phase II $0 $250,000 $250,000

459 South Lafourche Leonard Miller, Jr. Airport Taxiway Pavement Strengthening - Phase II (Construction) $3,600,000 $400,000 $4,000,000

460 South Lafourche Leonard Miller, Jr. Airport Taxiway Pavement Strengthening - Phase I (Design) $270,000 $30,000 $300,000

461 South Lafourche Leonard Miller, Jr. Airport Runway Pavement Strengthening - Phase I (Design) $0 $350,000 $350,000

462 De Quincy Industrial Airpark Hangar Rehabilitation $0 $300,000 $300,000

463 Concordia Parish Airport Runway Extension - Phase II $787,500 $87,500 $875,000

464 Columbia Airport Construct New Runway - Phase III (Site Preparation) $0 $750,000 $750,000

465 Kelly Dumas Widen Runway 18/36 - Design $108,000 $12,000 $120,000

466 Natchitoches Regional Airport Rehabilitate Lighting on Runway 17/35 $0 $100,000 $100,000

467 New Orleans Lakefront Airport Main Apron Rehabilitation $3,600,000 $400,000 $4,000,000

468 Hart Airport Construct Apron Overlay $0 $165,000 $165,000

469 Jena Airport Taxiway Lighting $0 $25,000 $25,000

470 Jena Airport Taxiway A Extension - South - Phase II (Construction) $0 $1,275,000 $1,275,000

471 Welsh Airport T-Hangar $0 $400,000 $400,000

472 Louisiana Regional Airport North T-Hangar Development - Phase II (Apron) $0 $877,000 $877,000

473 South Lafourche Leonard Miller, Jr. Airport Airfield Marking Rehabilitation $135,000 $15,000 $150,000

474 Houma Terrebonne Airport South Apron $1,800,000 $300,000 $2,100,000

475 Houma Terrebonne Airport Runway 18-36 Drainage Improvements (Construction - Phase II) $0 $1,000,000 $1,000,000

476 Vicksburg Tallulah Regional Airport Runway Extension - Phase V (Construction) $3,600,000 $400,000 $4,000,000

477 Louisiana Regional Airport Hangar Development - Phase IV $20,000 $800,000 $820,000

478 Louisiana Regional Airport Taxiway Guidance Signs $0 $230,000 $230,000

479 Concordia Parish Airport Relocate West Apron Taxiway Connector $180,000 $20,000 $200,000

480 Beauregard Regional Airport Rehabilitate Taxiway Signage - Phase II (Construction) $0 $150,000 $150,000

Tuesday, February 19, 2019 Page 28 of 32General Aviation Capital Outlay

Page 56: Air Carrier and General Aviation - Louisiana · General Aviation Capital Outlay 18 ST LANDRY PARISH-AHART FIELD Perimeter Fencing - Phase II (Construction) $345,150 $38,350 $0 $383,500

Item Airport Project Description

Federal/

Other Funds State Funds Total Funds

General Aviation Capital Outlay Long Range Unfunded Program

481 Beauregard Regional Airport Rehabilitate Runway 14/32 - Phase II (Construction) $0 $227,000 $227,000

482 Beauregard Regional Airport Rehabilitate Runway 18/36 - Phase II (Construction) $0 $455,000 $455,000

483 Abbeville Chris Crusta Memorial Airport Taxiway C Reconfiguration $128,970 $14,330 $143,300

484 Columbia Airport Construct New Runway - Phase IV (Pavement & Lighting) $0 $2,750,000 $2,750,000

485 Acadiana Regional Airport ATCT Relocation - Phase II (Construction) $27,000,000 $3,000,000 $30,000,000

486 Acadiana Regional Airport ATCT Relocation - Phase I (Design) $0 $5,400,000 $5,400,000

487 Feliciana Airpark Install Runway Lighting $0 $186,000 $186,000

488 Acadiana Regional Airport AGIS Survey $0 $200,000 $200,000

489 Jena Airport Construct 4 T-hangars $0 $225,000 $225,000

490 Tensas Parish Airport Runway Extension - Phase III (Design) $0 $150,000 $150,000

491 Winnsboro Municipal Airport AGIS Survey $21,900 $63,100 $85,000

492 Kelly-dumas Tree Removal $0 $50,000 $50,000

493 Houma-terrebonne Airport Runway 18-36 Drainage Improvements - Phase I (Design) $0 $300,000 $300,000

494 Acadiana Regional Airport Heavy Jet Apron Expansion - Phase IV of V (Construction) $4,500,000 $500,000 $5,000,000

495 Acadiana Regional Airport Runway Sweeper $0 $300,000 $300,000

496 Acadiana Regional Airport Heavy Jet Apron Expansion - Phase V of V (Construction) $4,515,000 $501,667 $5,016,667

497 Acadiana Regional Airport Taxiway B Improvements - West $666,000 $74,000 $740,000

498 New Orleans Lakefront Airport Pavement and Lighting Rehab - Hot Spot 1 $340,344 $37,816 $378,160

499 New Orleans Lakefront Airport Pavement and Lighting Rehab - Hot Spot 2 $183,573 $20,397 $203,970

500 Shreveport Downtown Airport Taxiway L and T-Hangar Ramps - Phase I (Environmental & Design) $0 $800,000 $800,000

501 Shreveport Downtown Airport Taxiway L and T-Hangar Lease - Construction & CA $0 $450,000 $450,000

502 Vivian Airport Construct Teacup Taxiways $990,000 $110,000 $1,100,000

503 Chennault International Airport Perimeter Fence Rehabilitation $0 $400,000 $400,000

504 Concordia Parish Airport Runway Extension - Preliminary $60,750 $6,750 $67,500

Tuesday, February 19, 2019 Page 29 of 32General Aviation Capital Outlay

Page 57: Air Carrier and General Aviation - Louisiana · General Aviation Capital Outlay 18 ST LANDRY PARISH-AHART FIELD Perimeter Fencing - Phase II (Construction) $345,150 $38,350 $0 $383,500

Item Airport Project Description

Federal/

Other Funds State Funds Total Funds

General Aviation Capital Outlay Long Range Unfunded Program

505 Columbia Airport Relocate Airport Access Road and Auto Parking - Phase II $0 $200,000 $200,000

506 Delhi Municipal Airport Perimeter Fencing - Phase II $0 $50,000 $50,000

507 Scott Airport Rehabilitate Runway Lighting - Phase II $0 $300,000 $300,000

508 St Landry Parish-ahart Field Install Localizer Runway 18 $225,000 $25,000 $250,000

509 Beauregard Regional Airport Airport Layout Plan Update $0 $60,000 $60,000

510 Beauregard Regional Airport Drainage Study $0 $120,000 $120,000

511 Byerley Airport Fuel Farm $0 $50,000 $50,000

512 Vicksburg-tallulah Regional Airport Rehabilitate Apron $120,000 $13,333 $133,333

513 Vicksburg-tallulah Regional Airport Taxiway Lighting - Phase II $0 $275,000 $275,000

514 Le Maire Memorial Airport Runway Extension $0 $250,000 $250,000

515 Ruston Regional Airport RehabilitateTaxiway - Phase II $135,000 $15,000 $150,000

516 Natchitoches Regional Airport Relocate Fairgrounds Road Project - Phase I $0 $125,000 $125,000

517 Jena Airport Land Acquisition $0 $200,000 $200,000

518 Concordia Parish Airport Runway Extension - Phase I $123,750 $13,750 $137,500

519 George R. Carr Memorial Airport Construct Parallel Taxiway - Phase III $585,000 $65,000 $650,000

520 Concordia Parish Airport Acquistion of Land $0 $100,000 $100,000

521 Homer Municipal Airport Apron Rehabilitation Phase II $0 $175,000 $175,000

522 Tensas Parish Airport Parking Lot $0 $65,000 $65,000

523 Arcadia Bienville Airport Construct Perimeter Fencing $0 $500,000 $500,000

524 Columbia Airport Install AWOS $0 $230,100 $230,100

525 Columbia Airport Mitigate Wastewater Treatment Facility $0 $187,200 $187,200

526 Columbia Airport Terminal Building $0 $50,000 $50,000

527 Natchitoches Regional Airport Rehabilitate Access Road - Phase II $0 $400,000 $400,000

528 Natchitoches Regional Airport Rehabilitate Access Road - Phase I $0 $50,000 $50,000

Tuesday, February 19, 2019 Page 30 of 32General Aviation Capital Outlay

Page 58: Air Carrier and General Aviation - Louisiana · General Aviation Capital Outlay 18 ST LANDRY PARISH-AHART FIELD Perimeter Fencing - Phase II (Construction) $345,150 $38,350 $0 $383,500

Item Airport Project Description

Federal/

Other Funds State Funds Total Funds

General Aviation Capital Outlay Long Range Unfunded Program

529 Natchitoches Regional Airport Wildlife Hazard Study $0 $75,000 $75,000

530 Natchitoches Regional Airport Repair Hangar Taxilanes $0 $125,000 $125,000

531 Red River Parish Airport Construct Parallel Taxiway $1,100,000 $122,222 $1,222,222

532 Ruston Regional Airport Rehabilitate Runway - Phase I $153,000 $17,000 $170,000

533 Natchitoches Regional Airport Rehabilitate Taxiway A $2,115,000 $235,000 $2,350,000

534 Ruston Regional Airport Construct Runway Extension - Phase II (Construction) $2,430,000 $270,000 $2,700,000

535 Jena Airport T-hangar Apron $0 $75,000 $75,000

536 Jena Airport Fuel Farm Installation $20,000 $65,000 $85,000

537 Jena Airport Apron Rehabilitation - Phase III $0 $280,000 $280,000

538 St John The Baptist Parish Airport Taxiway Relocation and Widening - Phase II $855,000 $95,000 $950,000

539 St John The Baptist Parish Airport Taxiway Relocation and Widening - Phase I $1,350,000 $150,000 $1,500,000

540 Harry P. Williams Memorial Airport Dredge and Stabilize Seaway - Phase II (Construction) $742,500 $82,500 $825,000

541 Harry P. Williams Memorial Airport Dredge and Stabilize Seaway - Phase I (Design) $0 $100,000 $100,000

542 Marksville Municipal Airport LPV Obstruction Survey $0 $60,000 $60,000

543 False River Regional Airport 7 Row T-Hangars $499,500 $55,500 $555,000

544 Vivian Airport Construct New Runway 9/27 $1,822,500 $427,500 $2,250,000

545 Vivian Airport Site Preparation for New Runway 9/27 $2,227,500 $522,500 $2,750,000

546 Vivian Airport Land Acquisition for New Runway 9/27 $0 $350,000 $350,000

547 Vivian Airport Environmental Assessment to Construct New Runway 9/27 $0 $150,000 $150,000

548 Columbia Airport Perimeter Fencing $0 $356,200 $356,200

549 Acadiana Regional Airport Heavy Jet Apron Expansion - Phase I of V (Design) $810,000 $90,000 $900,000

550 Concordia Parish Airport Rehabilitate Southwest Apron - Phase II $475,000 $52,778 $527,778

551 Ruston Regional Airport Taxiways Rehabilitation $0 $125,000 $125,000

552 Concordia Parish Airport Construct Segmented Circle $0 $30,000 $30,000

Tuesday, February 19, 2019 Page 31 of 32General Aviation Capital Outlay

Page 59: Air Carrier and General Aviation - Louisiana · General Aviation Capital Outlay 18 ST LANDRY PARISH-AHART FIELD Perimeter Fencing - Phase II (Construction) $345,150 $38,350 $0 $383,500

Item Airport Project Description

Federal/

Other Funds State Funds Total Funds

General Aviation Capital Outlay Long Range Unfunded Program

553 Hart Airport Construct T-Hangars $20,000 $280,000 $300,000

554 South Lafourche Leonard Miller, Jr. Airport Runway Pavement Strengthening - Phase II (Construction) $0 $4,450,000 $4,450,000

555 Red River Parish Airport Design New Apron $54,000 $6,000 $60,000

556 Natchitoches Regional Airport Construct Partial Parallel Taxiway $405,000 $45,000 $450,000

557 John H.hooks Jr. Memorial Construct Hangar Access Taxiway Phase II $540,000 $60,000 $600,000

558 Acadiana Regional Airport Heavy Jet Apron Expansion - Phase II of V (Construction) $4,500,000 $500,000 $5,000,000

559 Natchitoches Regional Airport Construct Agricultural Ramp & Wash Rack $0 $325,000 $325,000

560 Columbia Airport Survey Approaches $0 $80,000 $80,000

561 C.e. (rusty) Williams Airport Seal Coat Runway and Taxiways $0 $150,000 $150,000

562 Concordia Parish Airport Construct Taxilane $0 $375,000 $375,000

563 George R. Carr Memorial Airport Design Parallel Taxiway - Phase III $0 $120,000 $120,000

564 Louisiana Regional Airport Land Acquisition North (T-Hangar Development) $20,000 $200,000 $220,000

General Aviation Capital Outlay Totals

Local/Other: $7,090,400

Federal: $227,310,929

State: $161,454,340

Total: $395,855,669

Tuesday, February 19, 2019 Page 32 of 32General Aviation Capital Outlay

Page 60: Air Carrier and General Aviation - Louisiana · General Aviation Capital Outlay 18 ST LANDRY PARISH-AHART FIELD Perimeter Fencing - Phase II (Construction) $345,150 $38,350 $0 $383,500

Cancelled Projects

and Addendum

Page 61: Air Carrier and General Aviation - Louisiana · General Aviation Capital Outlay 18 ST LANDRY PARISH-AHART FIELD Perimeter Fencing - Phase II (Construction) $345,150 $38,350 $0 $383,500

PAGE 1 OF 1

FISCAL YEAR 2017-2018 GENERAL AVIATION PROGRAMLine Item Airport Project State Amount

10GA SHREVEPORT DOWNTOWN AIRPORT NORTHWEST RAMP REHABILITATION (DESIGN & CONSTRUCTION) $ 400,000

15GA MOREHOUSE MEMORIAL AIRPORT OBSTRUCTION REMOVAL (RUNWAY 16 AND 34 APPROACH) $ 45,000 25GA C.E. RUSTY WILLIAMS AIRPORT DESIGN RUNWAY REHABILITATION $ 10,000

TOTAL GA FY 17-18 $ 455,000

FISCAL YEAR 2017-2018 AIR CARRIER PROGRAM6AC ALEXANDRIA INTERNATIONAL AIRPORT REHABILITATE RUNWAY 14/32 - PHHSE II $ 80,600

10AC MONROE REGIONAL AIRPORT REHABILITATE RUNWAY 4/22 BLAST PADS $ 50,000 15AC SHREVEPORT REGIONAL AIRPORT SECURITY IMPROVEMENTS - PHASE II $ 85,000

17AC SHREVEPORT REGIONAL AIRPORTATC RELOCATION & CONCOURSE MODERNIZATION - ENVIRONMENTAL/FEASIBILITY

$ 40,000

TOTAL AC FY 17-18 $ 255,600

FISCAL YEAR 2016-2017 GENERAL AVIATION PROGRAM10GA JENA AIRPORT OBSTRUCTION REMOVAL PHASE - II $ 175,000

14GASOUTH LAFOURCHE LEONARD MILLER JR AIRPORT

OBSTRUCTION REMOVAL - RWY 18 APPROACH PHASE I (ACQUISITION)

$ 60,000

40GA VICKSBURG-TALLULAH REGIONAL AIRPORT DESIGN TO CONSTRUCT ACCESS ROAD REHAB $ 5,000 TOTAL GA FY 16-17 $ 240,000

FISCAL YEAR 2007-2008 GENERAL AVIATION PROGRAM11GA ESLER REGIONAL AIRPORT UPGRADE AIRFIELD LIGHTING FOR RUNWAY 14-32 $ 47,222

TOTAL GA FY 07-08 $ 47,222

FISCAL YEAR 2007-2008 AIR CARRIER PROGRAM19AC SHREVEPORT REGIONAL AIRPORT SECURITY UPGRADES - PHASE III $ 25,000

TOTAL AC FY 07-08 25,000$

FISCAL YEAR 2006-2007 GENERAL AVIATION PROGRAM001GA SHREVEPORT DOWNTOWN AIRPORT INSTALL GUIDANCE SIGNS $ 29,224

025GA RUSTON REGIONAL AIRPORTELECTRONIC GATES AND ENVIRONMENTAL ASSESSMENT FOR RUNWAY EXTENSION

$ 4,000

028GA THIBODAUX MUNICIPAL AIRPORT AVIGATION EASEMENTS $ 6,316 TOTAL GA FY 06-07 $ 39,540

Listed below are projects in the Airport Construction and Development Priority Program for the Fiscal Years indicated. These projects are either idle or outdated, and their scopes of work are no longer valid. Therefore, we recommend approval of the sponsor’s request to withdraw the following projects from the Airport Construction and Development Priority Program.

PROJECTS RECOMMENDED FOR CANCELLATION

Page 62: Air Carrier and General Aviation - Louisiana · General Aviation Capital Outlay 18 ST LANDRY PARISH-AHART FIELD Perimeter Fencing - Phase II (Construction) $345,150 $38,350 $0 $383,500

Program Addendum for

FY 2019-2020 Airport Construction & Development Priority Program

The actual project cost, on a project by project basis, may be below or above the estimate. The total amount approved for the Airport Construction and Development Priority Program (hereinafter referred to as the Program), for fiscal year 2019-2020 approved by the Louisiana Legislature, will not be exceeded.

In accordance with Act 451, 1989 regular Session, Louisiana Revised Statutes 2 §803 (B) states, “…if governing authority of an airport authority, district, parish or of any local unit of government obtains ninety percent or more funding for an airport, or for an airport project, from federal sources or from sources other than state funds, the legislature shall give priority to funding the remaining amount necessary for the airport or for the airport project, even if the project is not on the priority list of projects.”

With the passage of the Federal Omnibus bill and the recent passage of the FAA Appropriation Bill, additional federal discretionary funding may be available for governing authorities of airports that are in the National Plan of Integrated Airport Systems (NPIAS). State funding may be required to ensure the match to additional federal funding through this program. The availability of funds will be determined by the Department and distributed in accordance with the following as approved by the Louisiana Legislature: 1) Any other project or eligible enhancements to previously approved or new projects which receives 90% funding from any federal source through special appropriations packages. 2) Any other project or eligible enhancements to previously approved projects which receives 90% funding from any source, other than another State source, but which has not been processed and prioritized and is not in either the FY 2019-2020 funded or the FY 2020-2024 supplemental unfunded and long-range portion of the Program. 3) The General Aviation and Reliever Airports Maintenance Grant Program shall be funded in accordance with the conditions specified in L.R.S. 2 Chapter 8. 4) In the event that additional funds become available through underruns, project cancellations, or unplanned appropriations, state only projects required for safety or infrastructure preservation at airports may be moved from the Unfunded FY 2019-2024 Unfunded portion of the Program to the funded list. 5) Aviation Appropriations in the Transportation Trust Fund (TTF) will not be used as a match for projects funded with Passenger Facility Charges (PFC) as PFCs can be applied for and approved by the FAA at 100% of the project cost.