AIIC UTPUH meeting
WASATEX PROJECTWaste Saving Processes
for Textile Production
Speaker : Mr. Silvano Storti
Abbazia, 7th November 2014
PROJECT PURPOSE
• ENERGY SAVING
• WATER SAVING (6.500 ab.eq)
• PRODUCTION OF HIGH WATER
QUALITY (permeate) at 35 °C
• SIGNIFICANT RECOVERY AND
REUSE OF WATER :
in rinsing processes (medium water quality)
and in dyeing processes and boiler ( high water quality)
ECONOMIC SAVING
• Saving on water costsTotal water costs: 1,05 €/m³
Total saving: 315.000 €/year• Saving on natural gas costTotal heat needed: 12.144.000 kcal/dayTotal natural gas needed: 435.789 Nm³/year
Total saving: 206.128 €/year• O&M costsTotal O&M costs: 135.000 €/year
YEARLY NET SAVING
Total saving 521.128
€/year
Total costs 135.000 /year
TOTAL NET SAVING 386.128
€/year
ECO-INNOVATION PROJECT
• Possibility funding by Croatian government for projects with
reducing of enviromental impact
• Co-funded project by Eco-innovation
• Replication of this technoclogy in
other plants/sectors
• Current contacts in Mexico, India
and North Africa
FINANCING
Project was made possible thanks to the support and participation of the insurance and financial group
SACE
Export of goods and services
Payment of exported goods and services
Insurance Policy
Foreign BuyerForeign BuyerItalian Company
Italian Company
Foreign Subsidiary
Foreign Subsidiary