aia puerto rico 2011 honor awards submitted projects conceptual design
DESCRIPTION
Projects submitted for teh Conceptual Design Category for the AIA Puerto Rico 2011 Honor AwardsTRANSCRIPT
submission deadlinenovember/18/20115:00pm
awards presentationdecember/3/2011
categories /built workunbuilt workurban planningresearch & publicationsconceptual projectsstudent work
for rules, guidelines and more information, visit:aiapr.org 787.793.6100 x.1011
invited jury/anthony piermarini AIAsteve dumez FAIAcarlos cubillos
submission deadlinenovember/18/20115:00pm
awards presentationdecember/3/2011
categories /built workunbuilt workurban planningresearch & publicationsconceptual projectsstudent work
for rules, guidelines and more information, visit:aiapr.org 787.793.6100 x.1011
invited jury/anthony piermarini AIAsteve dumez FAIAcarlos cubillos
conceptual designdiseno conceptual
submission deadlinenovember/18/20115:00pm
awards presentationdecember/3/2011
categories /built workunbuilt workurban planningresearch & publicationsconceptual projectsstudent work
for rules, guidelines and more information, visit:aiapr.org 787.793.6100 x.1011
invited jury/anthony piermarini AIAsteve dumez FAIAcarlos cubillos
HISTORY AS OPTICS: LA CRUZ CALLE DE LA CRUZ 01Jorge Rigau, FAIA
ECOXPLORATORIO: MUSEO DE CIENCIAS DE PUERTO RICO 02Astrid Díaz, AIA
ARCHITECTURE OF JUSTICE 04Yasmín Crespo, AIA
WILLIAMSBURG WATERFRONT VENUE HONORABLE MENTION / MENCION DE HONOR 06Francisco J. Rodríguez, AIA / Alberto Fernandez, AIA
proj
ects
/ pr
oyec
tos
E AS T R IVE R
K E NT AV E NUE
1
2
3
4
5
76
8
9
10
11
12
13
13
14
15
15 16
17
1. Bathroom Facility
2. Multipurpose Plaza
3. Storage / Maintenance
4. Dodgeball / Basketball Court
5. Vendor Kiosks
6. Storage / Maintenance
7. Food and Bar Tents
8. Main Stage seating / standing area
9. Main Stage (two 30’ x 20‘ )
10. Main Stage Storage / Support
11. Ticket Booths
12. Entrance Plaza
13. Water Features
14. Secondary Stage seating /
standing area
15. Secondary Stage
16. Vendor Kiosks
17. Visitors Center
- Bathroom facilities
- Administration
- Café / Exhibition Hall
- Staff Parking
Main Floor Plan
0 20 70 120 170 FT
0 20 70 120 170 FTa
b
b
a
Section a_a
Original track lines of the Brooklyn Eastern District Terminal
Willi
amsb
urg W
aterfr
ont P
erfor
manc
e Ven
ueCa
tegor
y: Co
ncep
tual D
esign
Broo
klyn,
NYC
AIA Puerto Rico
HONOR AWARDS
2011
0 20 70 120 170 FT
Main Stages Rail
Secondary Stages
Rail
The Main Stage can be divided into two
30’ x 20’ units which can be positioned along
the park at strategic points allowing for
maximum flexibility in venue types and sizes. The
sculptural roof of the Center Stage provides a
dramatic backdrop for the concert inside the park
while respecting the residents on the other side.
Not all events are mega concerts. Two
10’ x 30’ stages traverse the site offering
gathering spots for a variety of smaller
venues. The stages pass through the
Visitors Center ending on the new public
plaza allowing for free enterntainment even
while the park grounds are closed.
Food and Bar Rail
In conjunction with the stages, the
Food and Bar Kiosks can be strategically
positioned for easy and efficient access
by the visitors. Thier flexibility alone allows for
spectacular waterfront dining at a variety of
culinary events such as; local organic markets,
food and wine festivals, Barbecues and
Oktoberfests.
Vendor Kiosks Rail
10 kiosks flank the park on two separate
rails, 5 on each rail, and as with all other
stages and kiosks, can be discretely put
into storage when not in use.
Section b_b Willi
amsb
urg W
aterfr
ont P
erfor
manc
e Ven
ueCa
tegor
y: Co
ncep
tual D
esign
Broo
klyn,
NYC
AIA Puerto Rico
HONOR AWARDS
2011
submission deadlinenovember/18/20115:00pm
awards presentationdecember/3/2011
categories /built workunbuilt workurban planningresearch & publicationsconceptual projectsstudent work
for rules, guidelines and more information, visit:aiapr.org 787.793.6100 x.1011
invited jury/anthony piermarini AIAsteve dumez FAIAcarlos cubillos
submission deadlinenovember/18/20115:00pm
awards presentationdecember/3/2011
categories /built workunbuilt workurban planningresearch & publicationsconceptual projectsstudent work
for rules, guidelines and more information, visit:aiapr.org 787.793.6100 x.1011
invited jury/anthony piermarini AIAsteve dumez FAIAcarlos cubillos
submission deadlinenovember/18/20115:00pm
awards presentationdecember/3/2011
categories /built workunbuilt workurban planningresearch & publicationsconceptual projectsstudent work
for rules, guidelines and more information, visit:aiapr.org 787.793.6100 x.1011
invited jury/anthony piermarini AIAsteve dumez FAIAcarlos cubillos
submission deadlinenovember/18/20115:00pm
awards presentationdecember/3/2011
categories /built workunbuilt workurban planningresearch & publicationsconceptual projectsstudent work
for rules, guidelines and more information, visit:aiapr.org 787.793.6100 x.1011
invited jury/anthony piermarini AIAsteve dumez FAIAcarlos cubillos
submission deadlinenovember/18/20115:00pm
awards presentationdecember/3/2011
categories /built workunbuilt workurban planningresearch & publicationsconceptual projectsstudent work
for rules, guidelines and more information, visit:aiapr.org 787.793.6100 x.1011
invited jury/anthony piermarini AIAsteve dumez FAIAcarlos cubillos