Page 1: AI-107 Hot Air Sealing Machine - H&H – H&Hhh.com.hk/wp-content/uploads/2017/11/AI-107-manual-R01-e.pdfAI-107 operation manual issue 1 16.04.07 display version 10 . plc controller

www.hh.com.hk

e = [email protected] t = 852.24813068 f = 852.24813727 Room 1117, 11/F, Asia Trade Centre, 79 Lei Muk Road, Kwai Chung, N.T., Hong Kong.

AI-107 Hot Air Sealing Machine

Operation Manual

is powered by

H&H Asia Group Limited

Page 2: AI-107 Hot Air Sealing Machine - H&H – H&Hhh.com.hk/wp-content/uploads/2017/11/AI-107-manual-R01-e.pdfAI-107 operation manual issue 1 16.04.07 display version 10 . plc controller

AI-107 operation manual

issue 1 16.04.07 display version 10 . plc controller version 27 P.1 of 39

Content

  Precautions with regard to Safety ............................................................ 3 

  Name Plate ...................................................................................................... 5 

  Introduction ..................................................................................................... 6 

  Specifications ................................................................................................. 7 

  Features ........................................................................................................... 8 

  Component Names ....................................................................................... 9 

  Principle of Seam Sealing ......................................................................... 13 

  Preparation for Installation ....................................................................... 14 

  Operation & Controls ................................................................................. 17 

  Touch Screen Control .............................................................................................. 17 

  Main page -1 ................................................................................................................ 17 

  Main page -2 ................................................................................................................ 19 

  Main page - 3 ............................................................................................................... 19 

  Tape start ..................................................................................................................... 21 

  Tape middle ................................................................................................................. 21 

  Tape end ...................................................................................................................... 22 

  Preferences ................................................................................................................. 23 

  Alarm ............................................................................................................................ 25 

  Monitor ......................................................................................................................... 27 

  Program version ........................................................................................................ 27 

  Language ..................................................................................................................... 28 

  Password ..................................................................................................................... 28 

  Password ..................................................................................................................... 29 

  Foot pedal control ..................................................................................................... 30 

  Maintenance .................................................................................................. 31 

Page 3: AI-107 Hot Air Sealing Machine - H&H – H&Hhh.com.hk/wp-content/uploads/2017/11/AI-107-manual-R01-e.pdfAI-107 operation manual issue 1 16.04.07 display version 10 . plc controller

AI-107 operation manual

issue 1 16.04.07 display version 10 . plc controller version 27 P.2 of 39

  Preventative ................................................................................................................ 31 

  Procedures for Replacing Parts ............................................................................ 32 

  Appendix A Nozzle Air Flow Cross Reference Table ......................... 35 

  Appendix B Electrical Scheme ................................................................ 36 

  Appendix C Wiring Scheme ...................................................................... 37 

  Appendix D PCB connectors ................................................................... 38 

Page 4: AI-107 Hot Air Sealing Machine - H&H – H&Hhh.com.hk/wp-content/uploads/2017/11/AI-107-manual-R01-e.pdfAI-107 operation manual issue 1 16.04.07 display version 10 . plc controller

AI-107 operation manual

issue 1 16.04.07 display version 10 . plc controller version 27 P.3 of 39

Precautions with regard to Safety

Please observe these safety tips for safe, efficient, an injury-free operation of your

equipment. By strictly following all instruction contained in this manual you will certainly

obtain an excellent performance from the use of this equipment for years.

Page 5: AI-107 Hot Air Sealing Machine - H&H – H&Hhh.com.hk/wp-content/uploads/2017/11/AI-107-manual-R01-e.pdfAI-107 operation manual issue 1 16.04.07 display version 10 . plc controller

AI-107 operation manual

issue 1 16.04.07 display version 10 . plc controller version 27 P.4 of 39

Page 6: AI-107 Hot Air Sealing Machine - H&H – H&Hhh.com.hk/wp-content/uploads/2017/11/AI-107-manual-R01-e.pdfAI-107 operation manual issue 1 16.04.07 display version 10 . plc controller

AI-107 operation manual

issue 1 16.04.07 display version 10 . plc controller version 27 P.5 of 39

Name Plate

Page 7: AI-107 Hot Air Sealing Machine - H&H – H&Hhh.com.hk/wp-content/uploads/2017/11/AI-107-manual-R01-e.pdfAI-107 operation manual issue 1 16.04.07 display version 10 . plc controller

AI-107 operation manual

issue 1 16.04.07 display version 10 . plc controller version 27 P.6 of 39

Introduction

Thank you for your choosing of AI-107 which is manufactured by H&H.

The hot air sealing machine described in this manual is one of the most sophisticated

machines in the market today. Built on pure digital platform and designed for the

professional users, AI-107 incorporated many new features that makes seam sealing

much easier than before. Operators are recommended to have basic knowledge and skill

in seam sealing operation before using this machine.

In order to fully understand how to use this machine properly, and avoid damage to

both the machine and operating personnel, please read this manual carefully and keep it

safe for future reference.

Page 8: AI-107 Hot Air Sealing Machine - H&H – H&Hhh.com.hk/wp-content/uploads/2017/11/AI-107-manual-R01-e.pdfAI-107 operation manual issue 1 16.04.07 display version 10 . plc controller

AI-107 operation manual

issue 1 16.04.07 display version 10 . plc controller version 27 P.7 of 39

Specifications

Model AI-107

Voltage 220 V, single phase

Frequency 50/60 Hz

Power Consumption 3600 W

Compressed Air > 0.4 Mpa

Air Consumption 100 L/min max

Nozzle Temperature 50 – 800°C

Positioning Speed 1 – 60 ft/min

Nozzle Width 22 mm standard, other optional

Upper Roller Width 25.4mm

Lower Roller Width 31 mm

Overall Dimensions 1200mm (L) x 700mm (W) x 1800mm (H)

Overall Weight 120 kg

Note: due to continuous improvement, specifications are subjected to change without prior

notification.

Page 9: AI-107 Hot Air Sealing Machine - H&H – H&Hhh.com.hk/wp-content/uploads/2017/11/AI-107-manual-R01-e.pdfAI-107 operation manual issue 1 16.04.07 display version 10 . plc controller

AI-107 operation manual

issue 1 16.04.07 display version 10 . plc controller version 27 P.8 of 39

Features

Control system – user friendly touch screen interface.

Differential speed control for upper and lower press rollers, a great help to reduce

the stretch and crease of the work piece.

Digital tape releaser for stable operation.

Large size color operate interface.

Power saving mode.

Multi-function foot pedal for an easy one-footed control operation.

Multi-lngual support for touch screen display interface.

Page 10: AI-107 Hot Air Sealing Machine - H&H – H&Hhh.com.hk/wp-content/uploads/2017/11/AI-107-manual-R01-e.pdfAI-107 operation manual issue 1 16.04.07 display version 10 . plc controller

AI-107 operation manual

issue 1 16.04.07 display version 10 . plc controller version 27 P.9 of 39

Component Names

Front View

1. heater

2. lower pedestal

3. adjustable floor stand

4. left foot pedal

5. right foot pedal

6. emergency push button

7. start button

8. the compressed air supply switch

9. roller pressure regulator

10. nozzle air pressure regulator

11. touch screen control panel

12. the heater power outlet

13. the nozzle air inlet connector

1

2

3 4 5

6

7

9

10

11

1213

8

Page 11: AI-107 Hot Air Sealing Machine - H&H – H&Hhh.com.hk/wp-content/uploads/2017/11/AI-107-manual-R01-e.pdfAI-107 operation manual issue 1 16.04.07 display version 10 . plc controller

AI-107 operation manual

issue 1 16.04.07 display version 10 . plc controller version 27 P.10 of 39

Back View

1. the main electrical box

2. compress air filter assembly

3. the motor drive electrical box

4. lower nip roller

5. upper nip roller

6. tape spool

7. tape tensioner

8. the main frame

7

8

1 2 3

4

5

6

Page 12: AI-107 Hot Air Sealing Machine - H&H – H&Hhh.com.hk/wp-content/uploads/2017/11/AI-107-manual-R01-e.pdfAI-107 operation manual issue 1 16.04.07 display version 10 . plc controller

AI-107 operation manual

issue 1 16.04.07 display version 10 . plc controller version 27 P.11 of 39

Cutter assembly

1. small tape clamping cylinder

2. the back blow hole

3. cutter blade

4. presser roller

5. the front blow hole

6. tape stabilizer

1

2

4

6 5

3

Page 13: AI-107 Hot Air Sealing Machine - H&H – H&Hhh.com.hk/wp-content/uploads/2017/11/AI-107-manual-R01-e.pdfAI-107 operation manual issue 1 16.04.07 display version 10 . plc controller

AI-107 operation manual

issue 1 16.04.07 display version 10 . plc controller version 27 P.12 of 39

Partial view - 1

1. swing cylinder

2. heater fixture

3. temperature sensor

4. safety cover

Partial view - 2

1. the heat deflector

2. nozzle

1 2

2

3

1

4

Page 14: AI-107 Hot Air Sealing Machine - H&H – H&Hhh.com.hk/wp-content/uploads/2017/11/AI-107-manual-R01-e.pdfAI-107 operation manual issue 1 16.04.07 display version 10 . plc controller

AI-107 operation manual

issue 1 16.04.07 display version 10 . plc controller version 27 P.13 of 39

Principle of Seam Sealing

The adhesive glue on the seaming tape will becomes vivid after heated up, let it

place on the seaming sections of different clothes can bind them up like bonding after

cool down. That bonding can refrain from water seeps in under a certain pressure.

A hot air machine, like AI-107, produces hot air with precisely controlled

temperature to directly heat up the adhesive glue of seaming tape. Fabrics and the

double faced adhesive tape will be sent into two corresponding positions between the

slewing upper and lower rollers. The linear speed of the press rollers is also called the

fringe pruning or double-side tape positioning speed.

During sealing, hot air is blowing out from the nozzle. The hot air that actually

reaches the surface of the tape is a mixture of hot air from the nozzle and the

surrounding air from the proximity. Hence the actual temperature that reaches on the

tape is lower than the original nozzle temperature. The farther the distance between

the nozzle and the tape, the higher the percentage of surrounding air slips in. On the

other hand, a higher hot air flow rate will reduce the percentage of surrounding air

causing the hot air temperature appears on the tape to be higher. So both the nozzle

position and hot air flow rate are the most important factors for temperature control.

In general, the major factors that can affect the seam sealing are as follows:

Hot air temperature

Positioning speed

Nozzle air pressure

Air flow rate

Nozzle position

For a consistent product, the combination of the above factors have to be set

precisely since their effects towards a proper sealing are all interconnecting.

Page 15: AI-107 Hot Air Sealing Machine - H&H – H&Hhh.com.hk/wp-content/uploads/2017/11/AI-107-manual-R01-e.pdfAI-107 operation manual issue 1 16.04.07 display version 10 . plc controller

AI-107 operation manual

issue 1 16.04.07 display version 10 . plc controller version 27 P.14 of 39

Preparation for Installation

Installation must be carried out by authorized personnel. Follow the steps below:

1. Position the machine on a flat surface and allow at least 50cm clearance on both sides as

well as the back side, this is essential for the hot air ventilation and also to allow enough room for maintenance personnel to carry out necessary service and maintenance

2. Adjust the foot stand so that the machine is level and stable.

3. Loosen all packing cable ties and materials in order to free up all machine movements.

4. Connect the power plug to a suitable outlet with at least 16A capacity.

5. Locate the air hose supplied with the machine. Connect one end to the inlet of the compressed air water filter at the back side of the machine; connect the other end to a compressed air supply such as air compressor or central air supply. Make sure the compressed air supply has at least 0.6 Mpa (6 bar) of pressure and a flow rate of not less than 100L/min.

6. Install the tensioner at the top of the machine and align the tape spool at right angle to the working table of machine. (see diagram below)

Page 16: AI-107 Hot Air Sealing Machine - H&H – H&Hhh.com.hk/wp-content/uploads/2017/11/AI-107-manual-R01-e.pdfAI-107 operation manual issue 1 16.04.07 display version 10 . plc controller

AI-107 operation manual

issue 1 16.04.07 display version 10 . plc controller version 27 P.15 of 39

Fix the tensioner

7. Install a roll of seaming tape with the adhesive side facing the operator (refer to the section on tape feeding).

8. The machine is ready for operation now.

9. Power on. The touch screen panel will on and showing the program loading page. After a while, it will change to show the main control page.

Fix the tensioner

Page 17: AI-107 Hot Air Sealing Machine - H&H – H&Hhh.com.hk/wp-content/uploads/2017/11/AI-107-manual-R01-e.pdfAI-107 operation manual issue 1 16.04.07 display version 10 . plc controller

AI-107 operation manual

issue 1 16.04.07 display version 10 . plc controller version 27 P.16 of 39

Install tape

Sticky facing the operator

Page 18: AI-107 Hot Air Sealing Machine - H&H – H&Hhh.com.hk/wp-content/uploads/2017/11/AI-107-manual-R01-e.pdfAI-107 operation manual issue 1 16.04.07 display version 10 . plc controller

AI-107 operation manual

issue 1 16.04.07 display version 10 . plc controller version 27 P.17 of 39

Operation & Controls

Touch Screen Control

The welcome note & program loading pages will show up once the machine is

powered on.

welcome note program loading

You can input the parameters via the touch screen control panel only as a matter with

a fingertip. Most of the setting and time control parameters can input onto the panel and

change to different pages for different settings. The surface of the panel is covered with a

membrane for protection. It can well protect the panel from gentle scratching.

Nevertheless, we still recommend a careful and soft touch on it.

Warning: Do not attempt to use scissors, awl, needle, etc. to direct contact with it or a permanent

damage will cause.

Main page -1

The page of the panel is named “main” which means it is the main control of the

machine.

Page 19: AI-107 Hot Air Sealing Machine - H&H – H&Hhh.com.hk/wp-content/uploads/2017/11/AI-107-manual-R01-e.pdfAI-107 operation manual issue 1 16.04.07 display version 10 . plc controller

AI-107 operation manual

issue 1 16.04.07 display version 10 . plc controller version 27 P.18 of 39

2

3

1

4

5 6 7 8

9

11

10

12

16

13

14

15

main page - 1

1. Nozzle temperature preset button & display.

2. Machine will be locked when this button was change to red. The machine can not

work when it was locked to protect the user. You can use this button when you

install the tape, and you need to lift this button when you finished or else the

machine can not work.

3. Nozzle temperature feedback (real time temperature feedback). It will display “<

50”, when the temperature less than 50℃. Make sure the temperature is less

than 50℃, when you turn off the power supply and compressed air.

4. This data will display if you turn on the “power save” button.

5. Nozzle heating on/off button. (text will turn red when the heater is on)

6. Press the reverse button to start reversing the rollers.

7. Small clamping cylinder on/off button.

8. To active the cutter. Tape feed will automatic start after cut off the tape.

9. Next page button. Turn to “parameter” page.

10. Next page button. Turn to “tape start” page.

11. Differential speed setting button.

12. The pressure between the upper and lower rollers.

Page 20: AI-107 Hot Air Sealing Machine - H&H – H&Hhh.com.hk/wp-content/uploads/2017/11/AI-107-manual-R01-e.pdfAI-107 operation manual issue 1 16.04.07 display version 10 . plc controller

AI-107 operation manual

issue 1 16.04.07 display version 10 . plc controller version 27 P.19 of 39

13. The pressure of the nozzle.

14. Display the unit of the pressure. (MPa, Bar, Kgf/cm2, psi)

15. Change the pressure unit.

16. Roller speed display & setting button. (3.3 ft≈1 m)

Main page -2

1

main page - 2

1. An alarm will display when there is/are any fault or beyond the parameter setting

range.

Main page - 3

Preset the temperature of the nozzle.

Page 21: AI-107 Hot Air Sealing Machine - H&H – H&Hhh.com.hk/wp-content/uploads/2017/11/AI-107-manual-R01-e.pdfAI-107 operation manual issue 1 16.04.07 display version 10 . plc controller

AI-107 operation manual

issue 1 16.04.07 display version 10 . plc controller version 27 P.20 of 39

1 2

3

4

5

main page - 3

1. Nozzle temperature preset button & display.

2. Input key pad.

3. Input the data of preset.

4. Cancel.

5. Inputs accept.

Press button #1 can preset the nozzle temperature. The key pad #2 for heat

temperature setting will pop up. You can enter the heating setting via this interface (input

range 50~800℃) and confirm with the button #5 “ok” or if the original default setting is

satisfied. Press button #4 “cancel” if there is no need to change.

Other data setting such as speed of the roller, motor delay etc. are similar to the

setting of nozzle temperature. This manual will not describe in detail.

Page 22: AI-107 Hot Air Sealing Machine - H&H – H&Hhh.com.hk/wp-content/uploads/2017/11/AI-107-manual-R01-e.pdfAI-107 operation manual issue 1 16.04.07 display version 10 . plc controller

AI-107 operation manual

issue 1 16.04.07 display version 10 . plc controller version 27 P.21 of 39

Tape start

Press #10 button on the main page, will turn to “tape start” page.

1

2

3

8

9

7

6

5

4

1. Quill delay. Upper roller will delay to press down in the state of tape start.

2. Motor delay. Setting the delay time of motor start in the state of tape start.

3. Soft start. Setting the acceleration and deceleration process of the motor in the

state of tape start.

4. Tape feed delay. Setting delay time of tape feed after cut off the tape.

5. Tape feed speed. Setting the speed of the tape feed after cut off the tape.

6. Tape feed length. Setting the length of the tape feed after cut off the tape.

7. Go back to the “main” page.

8. Go to the next page. The next page is the “tape middle” page.

9. Go back to the previous page. The previous page is the “main” page.

Tape middle

Press #8 button on the “tape start” page, will turn to “tape middle” page.

Page 23: AI-107 Hot Air Sealing Machine - H&H – H&Hhh.com.hk/wp-content/uploads/2017/11/AI-107-manual-R01-e.pdfAI-107 operation manual issue 1 16.04.07 display version 10 . plc controller

AI-107 operation manual

issue 1 16.04.07 display version 10 . plc controller version 27 P.22 of 39

1

3

4

6

7

52

1. Micro reverse. The motor will reverse when the sealing process was paused.

2. Reverse speed. Setting the speed of the motor reverse.

3. Motor delay. Setting the delay time of motor start in the state of tape middle.

4. Soft start. Setting the acceleration and deceleration process of the motor in the

state of tape middle.

5. Go back to the “main” page.

6. Go to the next page. The next page is the “tape end” page.

7. Go back to the previous page. The previous page is the “tape start” page.

Tape end

Press #6 button on the “tape middle” page, will turn to “tape end” page.

Page 24: AI-107 Hot Air Sealing Machine - H&H – H&Hhh.com.hk/wp-content/uploads/2017/11/AI-107-manual-R01-e.pdfAI-107 operation manual issue 1 16.04.07 display version 10 . plc controller

AI-107 operation manual

issue 1 16.04.07 display version 10 . plc controller version 27 P.23 of 39

2

3

5

6

41

1. After cut roller stop. Setting the delay time of the motor stop after cut off the tape.

2. After cut sealing speed. Setting the speed of the motor after cut off the tape.

3. Nozzle retract. Setting delay time of the nozzle retrun back after cut off the tape.

The value of “after cut roller stop”can not be smaller than the value of “nozzle

retract”.

4. Go back to the “main” page.

5. Go to the next page. The next page is the “main” page.

6. Go back to the previous page. The previous page is the “tape middle” page.

Preferences

Press #9 button on the main page, will turn to “preferences” page.

Page 25: AI-107 Hot Air Sealing Machine - H&H – H&Hhh.com.hk/wp-content/uploads/2017/11/AI-107-manual-R01-e.pdfAI-107 operation manual issue 1 16.04.07 display version 10 . plc controller

AI-107 operation manual

issue 1 16.04.07 display version 10 . plc controller version 27 P.24 of 39

2

1

Advanced mode.

When advanced mode is on and no action to the machine, the nozzle will stop beside

the roller a certain time before it return back.

Quill latch.

On. The upper roller will stay in the upper position after cut off the tape.

Off. The upper roller will goes to the lower position aftre cut off the tape.

Foot hold.

On. Machine will run according to the parameters of tape end after cut off the tape.

Off. Machine will run up to the control of operater.

Roller sync.

On. The lower roller will run togother with the upper rooler after cut off the tape.

Off. The lower roller will stop though the upper roller is running after cut off the tape.

Power save.

When power save is on, the main page will show 10 minutes (600 seconds)

countdown (#4 in main page - 1). The heater consumes significant amount of electricity

during operation. The Power save mode enables the machine to turn off the heater after

Page 26: AI-107 Hot Air Sealing Machine - H&H – H&Hhh.com.hk/wp-content/uploads/2017/11/AI-107-manual-R01-e.pdfAI-107 operation manual issue 1 16.04.07 display version 10 . plc controller

AI-107 operation manual

issue 1 16.04.07 display version 10 . plc controller version 27 P.25 of 39

10 minutes of idling, therefore reducing the electricity cost.

Press speed.

Keep press the right foot pedal after cut off the tape. Then, active the left foot pedal.

The speed of the motor is press speed.

Jog speed.

Setting the motor speed when active the right foot pedal only.

Tensioner.

On. The tensioner will work once the left foot padal was actived.

Off. The tensioner will work only when the position sensor of the tensioner was

actived.

1. Go back to the “main” page.

2. Turn to the next page. (the next page is the “alarm” page)

Alarm

The next page after “preferences” page is the “alarm” page.

2

1

Push the “reset” button once to clear the previous alarm.

Page 27: AI-107 Hot Air Sealing Machine - H&H – H&Hhh.com.hk/wp-content/uploads/2017/11/AI-107-manual-R01-e.pdfAI-107 operation manual issue 1 16.04.07 display version 10 . plc controller

AI-107 operation manual

issue 1 16.04.07 display version 10 . plc controller version 27 P.26 of 39

Red background means this item has problem. White background means this item is

normal.

Temperature sensor

If this item has problem, we need to check the connect wire of the sensor. Reset the

alarm when it was modified.

Tensioner over limit

If this item has problem, we need to check the roller of the tensioner. Reset the alarm

when it was modified.

Nozzle pressure low

In order to protect the machine, there will be alarm when the pressure of the nozzle is

less than a certain value. Adjust the pressure and you can reset the alarm.

Roller pressure low

In order to protect the machine, there will be alarm when the pressure of the roller is

less than a certain value. Adjust the pressure and you can reset the alarm.

Not heating up

There will be alarm when the heater can not heating up. If this item has problem,

please check the heater, the temperature and the connectors then reset the alarm.

Master alarm

Any one of the alarm will be reflected in the master alarm. Master alarm reset button

on the right side for a button to reset all alarm items. When the alarm can not be lifted total,

please check the alarms one by one. Reset the alarm when all of the alarms are removed.

#1, go back to the “main” page.

#2, turn to the next page. (The next page is the “monitor” page)

Page 28: AI-107 Hot Air Sealing Machine - H&H – H&Hhh.com.hk/wp-content/uploads/2017/11/AI-107-manual-R01-e.pdfAI-107 operation manual issue 1 16.04.07 display version 10 . plc controller

AI-107 operation manual

issue 1 16.04.07 display version 10 . plc controller version 27 P.27 of 39

Monitor

The next page after “alarm” page is the “monitor” page.

2

1

You can observe which limit switch is/are triggered in green, otherwise it will on red

colour.

#1, go back to the “main” page.

#2, turn to the next page. (The next page is the “program version” page)

Program version

The next page after “monitor” page is “program version” page.

2

1

It is an information page for your reference and we can use these data for future

maintenance usage.

Page 29: AI-107 Hot Air Sealing Machine - H&H – H&Hhh.com.hk/wp-content/uploads/2017/11/AI-107-manual-R01-e.pdfAI-107 operation manual issue 1 16.04.07 display version 10 . plc controller

AI-107 operation manual

issue 1 16.04.07 display version 10 . plc controller version 27 P.28 of 39

#1, go back to the “main” page.

#2, go to the next page. (The next page is the “language” page)

Language

The next page after “program version” page is the “language” page.

3

2

1

#1, you can change the language between English, Chinese and Vietnamese.

#2, go back to the “main” page.

#3, go back to the next page. (The next page is the “password” page)

Password

The next page after “language” page is “password” page.

3

2

1

Page 30: AI-107 Hot Air Sealing Machine - H&H – H&Hhh.com.hk/wp-content/uploads/2017/11/AI-107-manual-R01-e.pdfAI-107 operation manual issue 1 16.04.07 display version 10 . plc controller

AI-107 operation manual

issue 1 16.04.07 display version 10 . plc controller version 27 P.29 of 39

#1, you can input the password. The information of password preset will pop up if the

correctly password was inputted. The initial password is “22222”.

#2, go back to the “main” page.

#3, go back to the previous page. (The previous page is the “main” page)

Password

3

2

1

#1, you can input the new password. Press the button “password change” 5 seconds,

and the password will be changed.

#2 and #3 go back to the “main” page.

Page 31: AI-107 Hot Air Sealing Machine - H&H – H&Hhh.com.hk/wp-content/uploads/2017/11/AI-107-manual-R01-e.pdfAI-107 operation manual issue 1 16.04.07 display version 10 . plc controller

AI-107 operation manual

issue 1 16.04.07 display version 10 . plc controller version 27 P.30 of 39

Foot pedal control

There are 2 foot pedals for the machine. The design of these pedals is such that they

can be operated individually. As a result, the operator’s hands are free to manipulate the

processing fabric.

Left foot pedal

The left pedal is a multi function pedal. You can use it to raise the upper roller and

start sealing.

The status of left foot pedal is “0” when it idel. It can forward to “1” and backward to

“2” and “3”.

To raise the upper roller — heel back the left foot pedal.

To start sealing — press forward.

Right foot pedal

Active right foot pedal, the roller will start to forward and the nozzle not work.

0 1

2 3

Page 32: AI-107 Hot Air Sealing Machine - H&H – H&Hhh.com.hk/wp-content/uploads/2017/11/AI-107-manual-R01-e.pdfAI-107 operation manual issue 1 16.04.07 display version 10 . plc controller

AI-107 operation manual

issue 1 16.04.07 display version 10 . plc controller version 27 P.31 of 39

Maintenance

Preventative

In order to keep the machine in top running condition, regular maintenance is

important for trouble free operation. This will minimize possible down time and to prolong

machine life.

Daily

Check the motion of the machine for smoothness and strange noise.

Check the air hoses for leakage or damage.

Check silicone roller for worn or damaged.

Weekly

Check all rollers for excessive play, all play should be less than 5 mm,

adjust the corresponding cam belt tension if necessary.

Lubricate the cutter blade slightly with machine oil. Wipe off any

excessive oil if necessary.

While the machine is off and cooled, test the circuit breaker by pressing

the test button. The handle should flip to OFF immediately.

Check the speed of the nip roller cylinder. Adjust the speed by the air

speed regulators located under the touch screen control panel if

necessary.

Visually inspect all the electrical and mechanical parts for abnormal

burns and looseness.

Check the nozzle air pressure interlock: lower the nozzle air pressure

gradually to below 0.05 Mpa, an alarm message should appear and the

heater power will be cut off followed by a drop in heater temperature.

Next increase the air pressure, the alarm message ‘pressure low’ in the

page ‘main’ should disappear.

Page 33: AI-107 Hot Air Sealing Machine - H&H – H&Hhh.com.hk/wp-content/uploads/2017/11/AI-107-manual-R01-e.pdfAI-107 operation manual issue 1 16.04.07 display version 10 . plc controller

AI-107 operation manual

issue 1 16.04.07 display version 10 . plc controller version 27 P.32 of 39

As Required

Clean the rollers to remove any adhesive residue, which may cause

fabric wrapping.

Replace the silicone roller by a new one if necessary.

Replace heater element if damaged, be careful not to allow material

being broken off from the old element causing blockage to the air

passages.

If nozzle is blocked, remove the nozzle from the heater and tap it gently

to release foreign material from the inlet side.

Procedures for Replacing Parts

Temperature sensor

The tip of the replaced thermocouple is very important, the location must be

the same as shown in the below diagram. Also inspect and make sure that the tip

is in the center of the pipe and not touching the metal part. This is essential for

the sensor to measure the air temperature correctly.

Heater Element

Remove the heater top cap and the heater securing mount to locate the

heater element. Carefully pull the element off the connecting sockets. Replace

the broken element with a new one; make sure that the red colored sealing

gasket is installed properly. Installation is just the reversal. After replacing a new

Nozzle pipe

Sensor tip

Page 34: AI-107 Hot Air Sealing Machine - H&H – H&Hhh.com.hk/wp-content/uploads/2017/11/AI-107-manual-R01-e.pdfAI-107 operation manual issue 1 16.04.07 display version 10 . plc controller

AI-107 operation manual

issue 1 16.04.07 display version 10 . plc controller version 27 P.33 of 39

heater element, run the machine at 300℃ for at least 10 minutes to break in the

heater before operating at higher temperature.

Rollers

The rollers are needed to be replaced when there are signs of torn or

excessive worn in order to maintain the consistence of quality of the finished

product. Replace the rollers as shown in the illustration below. Please choose the

correct width and softness roller. For best result, always use genuine H&H parts

for replacement. Please contact us for optional sizes.

Heating element

Sealing gasket

Page 35: AI-107 Hot Air Sealing Machine - H&H – H&Hhh.com.hk/wp-content/uploads/2017/11/AI-107-manual-R01-e.pdfAI-107 operation manual issue 1 16.04.07 display version 10 . plc controller

AI-107 operation manual

issue 1 16.04.07 display version 10 . plc controller version 27 P.34 of 39

Trouble Shooting

Problem cause solution

No power in some

places

Power cable or plug faulty Check the power supply connection

Circuit breaker tripped Reset circuit breaker and

investigate the cause

Main power switch not turned on Press the power ON button (start)

Bad connection Check all wires for loose connection

Faulty transformer Check the voltage of switching

power supply

Motor not turning Nozzle in park position Un-park the nozzle

Faulty Main controller Replace a new controller

Temperature display

not stable

Faulty thermocouple Replace a new temperature sensor

Loose thermocouple connection Check and secure the connection

Faulty temperature controller Replace PCB in the main electrical

box

Thermocouple extension wire

short circuit Find the location and fix

Thermocouple not installed in

proper position

Check the position of sensor tip and

fix

Temperature display

read ambient at all

time

Heater is not turned on Press HEAT to enable heater

Air pressure too low Inspect if air supply is cut off

Temperature fluctuate

abnormally

Broken heater element Replace heater element

Faulty thermocouple Replace thermocouple

Hose tangled Check for hose clearance or pinch

during heater movement

Line voltage fluctuation Install voltage regulator

Loose object in air passage Remove nozzle and clean the

foreign material

Heater Not heating

Faulty solid state relay (SSR) Replace solid state relay

Pressure low interlocked Increase nozzle air pressure

Heater broken Replace heater element

Page 36: AI-107 Hot Air Sealing Machine - H&H – H&Hhh.com.hk/wp-content/uploads/2017/11/AI-107-manual-R01-e.pdfAI-107 operation manual issue 1 16.04.07 display version 10 . plc controller

AI-107 operation manual

issue 1 16.04.07 display version 10 . plc controller version 27 P.35 of 39

Appendix A Nozzle Air Flow Cross Reference Table

Nozzle air pressure (Mpa) Air flow (L/min)

0.05 35

0.06 38

0.07 40

0.08 42

0.09 45

0.10 48

Page 37: AI-107 Hot Air Sealing Machine - H&H – H&Hhh.com.hk/wp-content/uploads/2017/11/AI-107-manual-R01-e.pdfAI-107 operation manual issue 1 16.04.07 display version 10 . plc controller

AI-107 operation manual

issue 1 16.04.07 display version 10 . plc controller version 27 P.36 of 39

Appendix B Electrical Scheme

Page 38: AI-107 Hot Air Sealing Machine - H&H – H&Hhh.com.hk/wp-content/uploads/2017/11/AI-107-manual-R01-e.pdfAI-107 operation manual issue 1 16.04.07 display version 10 . plc controller

AI-107 operation manual

issue 1 16.04.07 display version 10 . plc controller version 27 P.37 of 39

Appendix C Wiring Scheme

Page 39: AI-107 Hot Air Sealing Machine - H&H – H&Hhh.com.hk/wp-content/uploads/2017/11/AI-107-manual-R01-e.pdfAI-107 operation manual issue 1 16.04.07 display version 10 . plc controller

AI-107 operation manual

issue 1 16.04.07 display version 10 . plc controller version 27 P.38 of 39

Appendix D PCB connectors

PCB 01

T. sensor for nozzle

Foot R

Foot L

Position sensor for heat swing

LED light

PCB12 SV

PCB02

Pressure sensor for roller

HMI power

DC power supply

Nozzle heater

220V relay

PLC power

Y0 ~ Y7

Y10 ~ Y13

AD0 ~ AD3

X0 ~ X7

Pressure sensor for nozzle

Page 40: AI-107 Hot Air Sealing Machine - H&H – H&Hhh.com.hk/wp-content/uploads/2017/11/AI-107-manual-R01-e.pdfAI-107 operation manual issue 1 16.04.07 display version 10 . plc controller

AI-107 operation manual

issue 1 16.04.07 display version 10 . plc controller version 27 P.39 of 39

PCB 02

Tensioner driver

PC

B01

J12

Low

er m

otor

Upp

er m

otor

PC

B12

for

ten

sion

er

Upper motor driver

Lower motor driver