Axis: 4 Storey: 1 Material: C20/25 / Grade 500 (Type 2) (Links: Grade 500 (Type 2)) 1B27 L=2570mm 1B28 L=4147.7mm 1B29 L=2825mm BwXH (mm) 200 X 450 200 X 450 200 X 450 Flange BfXHf --- --- --- Loads 0.1 G=10.22 1.62 10.22 11.82 2.57 11.82 0.1 Q=3.14 1.62 3.14 3.64 2.57 3.64 UDL G=14.25 Q=0 kN/m 11.82 11.82 27.8 2.97 27.8 15.98 4.15 15.98 3.64 3.64 8.55 2.97 8.55 4.92 4.15 4.92 UDL G=14.25 Q=0 kN/m 15.98 1.2 15.98 4.92 1.2 4.92 UDL G=14.25 Q=0 kN/m Shear Force (Env.) -14.682 84.698 -138.192 136.795 -116.442 36.164 Moment (Env.) -3.78 95.573 93.492 -61.986 89.268 91.91 -34.143 Bending (Top Edge) ... M (kN.m) 4.1 46.1 95.6 93.5 0.9 89.3 91.9 14.9 8.5 d (mm) 407.0 407.0 404.5 404.5 409.0 407.0 407.0 409.0 409.0 K/K' 0.03 0.34 0.71 0.69 0.01 0.65 0.67 0.11 0.06 x (mm) 50.88 66.82 153.64 149.59 51.13 140.30 145.28 51.13 51.13 Asm (mm2) 24.23 278.70 640.79 623.89 5.33 585.15 605.90 88.45 50.53 Asv (mm2) 63.26 167.77 243.52 397.33 200.84 393.31 334.79 233.36 103.98 As (mm2) 87.50 446.47 640.79 623.89 206.17 585.15 605.90 321.82 88.45 As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 As-min 105.82 105.82 105.17 105.17 106.34 105.82 105.82 106.34 106.34 Bending (Bottom Edge) ... M (kN.m) 3.8 2.9 3.7 62.0 0.0 34.1 12.8 d (mm) 409.0 409.0 392.0 409.0 392.0 409.0 409.0 K/K' 0.03 0.02 0.03 0.45 0.00 0.25 0.09 x (mm) 51.13 51.13 49.00 91.82 49.00 51.13 51.13 Asm (mm2) 22.31 16.95 22.59 382.97 0.04 202.11 76.04 Asv (mm2) 63.26 167.77 397.33 200.84 393.31 233.36 103.98 As (mm2) 22.31 22.31 382.97 382.97 382.97 202.11 180.01 As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 As-min 106.34 106.34 101.92 101.92 106.34 101.92 101.92 106.34 106.34 Shear and Torsion Design ... Vd (kN) 22.0 84.7 138.2 136.8 116.4 36.2 Vd @d(kN) 22.0 65.3 107.6 113.8 93.5 28.9 v (N/mm2) 0.27 1.05 1.71 1.68 1.43 0.44 v-Rdc (N/mm2) 0.51 0.00 0.59 0.59 0.00 0.51 0.51 0.00 0.44 v-Rdmax (N/mm2) 3.31 3.31 3.31 3.31 3.31 3.31 V-Rd (kN) 134.1 128.5 128.5 128.5 128.5 134.1 Vnom (kN) 134.1 134.1 134.1 Td (kN.m) 0.2 0.4 0.2 T-min (kN.m) 2.6 2.6 2.6 b-sup (mm) 0.0 0.0 0.0 0.0 0.0 0.0 Links H8-300 H8-300 H8-300 H8-300 H8-300 H8-300 H8-300 H8-300 H8-300 Deflection Check ... L/d 6.28 < 1921.42 OK 10.14 < 27.42 OK 6.91 < 65.47 OK Provided Steel Areas (mm2) Top Edge 628.32 628.32 981.75 981.75 402.12 628.32 628.32 603.19 603.19 Bottom Edge 402.12 402.12 402.12 402.12 402.12 402.12 402.12 402.12 402.12 Steel Bars ... Top Bar 2H20 2H16 3H16 Top SupBar 2H25 2H25 2H20 2H20 Top SupBar Bottom Bar 2H16 2H16 2H16 Bottom Bar Bot SupBar Side Bars BEAM DESIGN RESULTS CSEC (U) LTD. (*17S-N56S-XY6R-2MF7) Orion Building Design System 18.0 (04.2012) / Page: BD-1 Project: AHMED_MUSISI_RESIDENCE_1

Upload: akankwasa

Post on 21-Nov-2015

9 views

Category:

Documents


0 download

DESCRIPTION

BEAM DESIGN

TRANSCRIPT

  • Axis: 4 Storey: 1 Material: C20/25 / Grade 500 (Type 2) (Links: Grade 500 (Type 2))1B27 L=2570mm 1B28 L=4147.7mm 1B29 L=2825mm

    BwXH (mm) 200 X 450 200 X 450 200 X 450Flange BfXHf --- --- ---

    Loads 0.1

    G=10.22

    1.62

    10.2211.82

    2.57

    11.82

    0.1

    Q=3.14

    1.62

    3.143.64

    2.57

    3.64

    UDL G=14.25 Q=0 kN/m

    11.8211.82

    27.8

    2.97

    27.815.98

    4.15

    15.983.643.64

    8.55

    2.97

    8.554.92

    4.15

    4.92

    UDL G=14.25 Q=0 kN/m

    15.98

    1.2

    15.984.92

    1.2

    4.92

    UDL G=14.25 Q=0 kN/m

    ShearForce(Env.)

    -14.682

    84.698

    -138.192

    136.795

    -116.442

    36.164

    Moment(Env.) -3.78

    95.573 93.492

    -61.986

    89.268 91.91

    -34.143

    Bending (Top Edge) ... M (kN.m) 4.1 46.1 95.6 93.5 0.9 89.3 91.9 14.9 8.5 d (mm) 407.0 407.0 404.5 404.5 409.0 407.0 407.0 409.0 409.0 K/K' 0.03 0.34 0.71 0.69 0.01 0.65 0.67 0.11 0.06 x (mm) 50.88 66.82 153.64 149.59 51.13 140.30 145.28 51.13 51.13 Asm (mm2) 24.23 278.70 640.79 623.89 5.33 585.15 605.90 88.45 50.53 Asv (mm2) 63.26 167.77 243.52 397.33 200.84 393.31 334.79 233.36 103.98 As (mm2) 87.50 446.47 640.79 623.89 206.17 585.15 605.90 321.82 88.45 As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 As-min 105.82 105.82 105.17 105.17 106.34 105.82 105.82 106.34 106.34

    Bending (Bottom Edge) ... M (kN.m) 3.8 2.9 3.7 62.0 0.0 34.1 12.8 d (mm) 409.0 409.0 392.0 409.0 392.0 409.0 409.0 K/K' 0.03 0.02 0.03 0.45 0.00 0.25 0.09 x (mm) 51.13 51.13 49.00 91.82 49.00 51.13 51.13 Asm (mm2) 22.31 16.95 22.59 382.97 0.04 202.11 76.04 Asv (mm2) 63.26 167.77 397.33 200.84 393.31 233.36 103.98 As (mm2) 22.31 22.31 382.97 382.97 382.97 202.11 180.01 As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 As-min 106.34 106.34 101.92 101.92 106.34 101.92 101.92 106.34 106.34

    Shear and Torsion Design ... Vd (kN) 22.0 84.7 138.2 136.8 116.4 36.2 Vd @d(kN) 22.0 65.3 107.6 113.8 93.5 28.9 v (N/mm2) 0.27 1.05 1.71 1.68 1.43 0.44 v-Rdc (N/mm2) 0.51 0.00 0.59 0.59 0.00 0.51 0.51 0.00 0.44 v-Rdmax (N/mm2) 3.31 3.31 3.31 3.31 3.31 3.31 V-Rd (kN) 134.1 128.5 128.5 128.5 128.5 134.1 Vnom (kN) 134.1 134.1 134.1 Td (kN.m) 0.2 0.4 0.2 T-min (kN.m) 2.6 2.6 2.6 b-sup (mm) 0.0 0.0 0.0 0.0 0.0 0.0 Links H8-300 H8-300 H8-300 H8-300 H8-300 H8-300 H8-300 H8-300 H8-300

    Deflection Check ... L/d 6.28 < 1921.42 OK 10.14 < 27.42 OK 6.91 < 65.47 OK

    Provided Steel Areas (mm2)Top Edge 628.32 628.32 981.75 981.75 402.12 628.32 628.32 603.19 603.19Bottom Edge 402.12 402.12 402.12 402.12 402.12 402.12 402.12 402.12 402.12

    Steel Bars ...Top Bar 2H20 2H16 3H16 Top SupBar 2H25 2H25 2H20 2H20

    Top SupBar

    Bottom Bar 2H16 2H16 2H16 Bottom BarBot SupBar

    Side Bars

    BEAM DESIGN RESULTSCSEC (U) LTD. (*17S-N56S-XY6R-2MF7)

    Orion Building Design System 18.0 (04.2012) / Page: BD-1

    Project: AHMED_MUSISI_RESIDENCE_1

  • Axis: 4 Storey: 2 Material: C20/25 / Grade 500 (Type 2) (Links: Grade 500 (Type 2))2B27 L=2570mm 2B28 L=4147.7mm 2B29 L=2825mm

    BwXH (mm) 200 X 450 200 X 450 200 X 450Flange BfXHf --- --- ---

    Loads UDL G=6.75 Q=0 kN/m UDL G=6.75 Q=0 kN/m UDL G=6.75 Q=0 kN/m

    ShearForce(Env.)

    -2.021

    20.997

    -22.811

    26.24

    -26.433

    15.942

    Moment(Env.) -0.326

    26.136 24.06

    -7.942

    17.012 17.468

    -14.468

    Bending (Top Edge) ... M (kN.m) 1.6 13.6 26.1 24.1 4.3 17.0 17.5 3.6 d (mm) 409.0 409.0 409.0 409.0 409.0 409.0 409.0 409.0 K/K' 0.01 0.10 0.19 0.17 0.03 0.12 0.13 0.03 x (mm) 51.13 51.13 51.13 51.13 51.13 51.13 51.13 51.13 Asm (mm2) 9.44 80.67 154.71 142.42 25.17 100.70 103.40 21.41 Asv (mm2) 17.70 43.57 60.37 65.59 39.22 75.45 76.00 45.84 As (mm2) 27.13 124.24 154.71 142.42 64.39 100.70 103.40 21.41 As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 As-min 106.34 106.34 106.34 106.34 106.34 106.34 106.34 106.34 0.00

    Bending (Bottom Edge) ... M (kN.m) 0.3 7.9 1.1 2.1 14.5 5.7 d (mm) 409.0 409.0 392.0 392.0 409.0 409.0 K/K' 0.00 0.06 0.01 0.02 0.10 0.04 x (mm) 51.13 51.13 49.00 49.00 51.13 51.13 Asm (mm2) 1.93 47.01 6.59 12.96 85.64 33.81 Asv (mm2) 17.70 39.22 75.45 76.00 57.05 45.84 As (mm2) 1.93 47.01 47.01 85.64 85.64 79.65 As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 As-min 106.34 106.34 101.92 101.92 106.34 101.92 101.92 106.34 0.00

    Shear and Torsion Design ... Vd (kN) 6.2 21.0 22.8 26.2 26.4 15.9 Vd @d(kN) 6.2 16.7 18.5 21.9 22.1 12.5 v (N/mm2) 0.08 0.26 0.28 0.32 0.32 0.19 v-Rdc (N/mm2) 0.44 0.00 0.44 0.44 0.00 0.44 0.44 0.00 0.44 v-Rdmax (N/mm2) 3.31 3.31 3.31 3.31 3.31 3.31 V-Rd (kN) 134.1 128.5 128.5 128.5 128.5 134.1 Vnom (kN) 134.1 134.1 134.1 Td (kN.m) 0.1 0.2 0.1 T-min (kN.m) 2.6 2.6 2.6 b-sup (mm) 0.0 0.0 0.0 0.0 0.0 0.0 Links H8-300 H8-300 H8-300 H8-300 H8-300 H8-300 H8-300

    Deflection Check ... L/d 6.28 < 74770.63 OK 10.14 < 710.83 OK 6.91 < 55.56 OK

    Provided Steel Areas (mm2)Top Edge 402.12 402.12 402.12 402.12 402.12 402.12 402.12 X 0.00 X 0.00Bottom Edge 402.12 402.12 402.12 402.12 402.12 402.12 402.12 402.12 402.12

    Steel Bars ...Top Bar 2H16 2H16 Top SupBar 2H16 2H16 2H16 2H16

    Top SupBar

    Bottom Bar 2H16 2H16 2H16 Bottom BarBot SupBar

    Side Bars

    BEAM DESIGN RESULTSCSEC (U) LTD. (*17S-N56S-XY6R-2MF7)

    Orion Building Design System 18.0 (04.2012) / Page: BD-2

    Project: AHMED_MUSISI_RESIDENCE_1

  • Axis: 7 Storey: 1 Material: C20/25 / Grade 500 (Type 2) (Links: Grade 500 (Type 2))1B31 L=600mm 1B32 L=5117.7mm

    BwXH (mm) 200 X 450 200 X 450Flange BfXHf --- ---

    Loads UDL G=14.25 Q=0 kN/m

    3.7

    10.22

    5.12

    2.17

    3.7

    3.14

    5.12

    0.67

    UDL G=14.25 Q=0 kN/m

    ShearForce(Env.)

    44.963

    -82.979

    92.894

    Moment(Env.)

    23.796

    80.175

    -108.299Bending (Top Edge) ... M (kN.m) 4.5 14.1 23.8 80.2 27.1 d (mm) 409.0 409.0 407.0 407.0 409.0 K/K' 0.03 0.10 0.17 0.59 0.20 x (mm) 51.13 51.13 50.88 123.66 51.13 Asm (mm2) 26.36 83.66 141.55 515.76 160.27 Asv (mm2) 109.03 117.76 129.28 238.58 267.09 As (mm2) 83.66 141.55 141.55 515.76 160.27 As' (mm2) 0.00 0.00 0.00 0.00 0.00 As-min 0.00 106.34 105.82 105.82 106.34 106.34

    Bending (Bottom Edge) ... M (kN.m) 0.0 18.5 108.3 65.4 d (mm) 392.0 392.0 404.5 404.5 K/K' 0.00 0.15 0.80 0.48 x (mm) 49.00 49.00 179.52 98.75 Asm (mm2) 0.04 114.48 748.70 411.84 Asv (mm2) 109.03 238.58 166.65 267.09 As (mm2) 0.04 353.06 748.70 678.93 As' (mm2) 0.00 0.00 0.00 0.00 As-min 0.00 106.34 101.92 101.92 105.17 105.17

    Shear and Torsion Design ... Vd (kN) 37.9 45.0 83.0 92.9 Vd @d(kN) 37.9 36.9 72.2 80.7 v (N/mm2) 0.46 0.55 1.02 1.14 v-Rdc (N/mm2) 0.44 0.00 0.51 0.51 0.00 0.59 v-Rdmax (N/mm2) 3.31 3.31 3.31 3.31 V-Rd (kN) 128.5 128.5 128.5 132.6 Vnom (kN) 134.1 132.6 Td (kN.m) 0.9 0.1 T-min (kN.m) 2.6 2.6 b-sup (mm) 0.0 0.0 0.0 0.0 Links H8-300 H8-300 H8-300 H8-300

    Deflection Check ... L/d 1.47 < 33.87 OK 12.65 < 24.28 OK

    Provided Steel Areas (mm2)Top Edge X 0.00 X 0.00 628.32 628.32 402.12 402.12Bottom Edge 402.12 402.12 402.12 981.75 981.75 981.75

    Steel Bars ...Top Bar 2H16 Top SupBar 2H20 2H20

    Top SupBar

    Bottom Bar 2H16 2H25 Bottom BarBot SupBar

    Side Bars

    BEAM DESIGN RESULTSCSEC (U) LTD. (*17S-N56S-XY6R-2MF7)

    Orion Building Design System 18.0 (04.2012) / Page: BD-3

    Project: AHMED_MUSISI_RESIDENCE_1

  • Axis: 7 Storey: 2 Material: C20/25 / Grade 500 (Type 2) (Links: Grade 500 (Type 2))2B31 L=600mm 2B45 L=2226.4mm

    BwXH (mm) 200 X 450 200 X 450Flange BfXHf --- ---

    Loads UDL G=6.75 Q=0 kN/m UDL G=6.75 Q=0 kN/m

    ShearForce(Env.)

    21.161

    -26.62

    Moment(Env.)

    11.255

    37.814

    Bending (Top Edge) ... M (kN.m) 2.2 6.7 11.3 37.8 21.7 5.5 d (mm) 409.0 409.0 409.0 409.0 409.0 409.0 K/K' 0.02 0.05 0.08 0.27 0.16 0.04 x (mm) 51.13 51.13 51.13 53.82 51.13 51.13 Asm (mm2) 12.77 39.71 66.62 224.46 128.27 32.33 Asv (mm2) 51.25 55.38 60.84 76.54 60.00 38.97 As (mm2) 39.71 66.62 66.62 224.46 188.28 71.30 As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 As-min 0.00 106.34 106.34 106.34 106.34 106.34

    Bending (Bottom Edge) ... M (kN.m) 1.0 d (mm) 409.0 K/K' 0.01 x (mm) 51.13 Asm (mm2) 5.88 Asv (mm2) 38.97 As (mm2) 5.88 As' (mm2) 0.00 As-min 0.00 106.34 101.92 101.92 106.34 106.34

    Shear and Torsion Design ... Vd (kN) 17.8 21.2 26.6 13.6 Vd @d(kN) 17.8 17.3 21.5 13.6 v (N/mm2) 0.22 0.26 0.33 0.17 v-Rdc (N/mm2) 0.44 0.00 0.44 0.44 0.00 0.44 v-Rdmax (N/mm2) 3.31 3.31 3.31 3.31 V-Rd (kN) 128.5 128.5 128.5 134.1 Vnom (kN) 134.1 134.1 Td (kN.m) 0.3 0.3 T-min (kN.m) 2.6 2.6 b-sup (mm) 0.0 0.0 0.0 0.0 Links H8-300 H8-300 H8-300 H8-300

    Deflection Check ... L/d 1.47 < 110.42 OK 5.44 < 14187.79 OK

    Provided Steel Areas (mm2)Top Edge X 0.00 X 0.00 402.12 402.12 402.12 402.12Bottom Edge 402.12 402.12 402.12 402.12 402.12 402.12

    Steel Bars ...Top Bar 2H16 Top SupBar 2H16 2H16

    Top SupBar

    Bottom Bar 2H16 2H16 Bottom BarBot SupBar

    Side Bars

    BEAM DESIGN RESULTSCSEC (U) LTD. (*17S-N56S-XY6R-2MF7)

    Orion Building Design System 18.0 (04.2012) / Page: BD-4

    Project: AHMED_MUSISI_RESIDENCE_1

  • Axis: A Storey: 1 Material: C20/25 / Grade 500 (Type 2) (Links: Grade 500 (Type 2))1B1 L=3716.4mm 1B2 L=2200mm

    BwXH (mm) 200 X 450 200 X 450Flange BfXHf --- ---

    Loads 0.1

    G=16.25

    3.72

    16.25

    0.1

    Q=5

    3.72

    5

    UDL G=14.25 Q=0 kN/m

    16.25

    2.1

    16.255

    2.1

    5

    UDL G=14.25 Q=0 kN/m

    ShearForce(Env.)

    -77.218

    100.154

    -66.785

    34.276

    Moment(Env.)

    26.62

    -53.332

    56.57937.487

    -14.175

    Bending (Top Edge) ... M (kN.m) 26.6 56.6 37.5 6.4 3.5 d (mm) 409.0 409.0 409.0 409.0 409.0 K/K' 0.19 0.41 0.27 0.05 0.03 x (mm) 51.13 83.03 53.33 51.13 51.13 Asm (mm2) 157.57 346.29 222.41 37.60 20.98 Asv (mm2) 222.02 287.96 192.02 113.31 98.55 As (mm2) 157.58 346.29 222.41 150.92 37.60 As' (mm2) 0.00 0.00 0.00 0.00 0.00 As-min 106.34 106.34 106.34 106.34 106.34 106.34

    Bending (Bottom Edge) ... M (kN.m) 38.2 53.3 4.5 14.2 10.3 d (mm) 409.0 409.0 392.0 409.0 409.0 K/K' 0.28 0.39 0.04 0.10 0.07 x (mm) 54.36 77.83 49.00 51.13 51.13 Asm (mm2) 226.71 324.62 28.08 83.91 60.98 Asv (mm2) 222.02 162.80 287.96 113.31 98.55 As (mm2) 324.62 324.62 316.05 83.91 83.91 As' (mm2) 0.00 0.00 0.00 0.00 0.00 As-min 106.34 106.34 101.92 101.92 106.34 106.34

    Shear and Torsion Design ... Vd (kN) 77.2 100.2 66.8 34.3 Vd @d(kN) 52.2 76.9 43.6 13.8 v (N/mm2) 0.94 1.22 0.82 0.42 v-Rdc (N/mm2) 0.44 0.00 0.44 0.44 0.00 0.44 v-Rdmax (N/mm2) 3.31 3.31 3.31 3.31 V-Rd (kN) 134.1 128.5 128.5 134.1 Vnom (kN) 134.1 134.1 Td (kN.m) 0.0 0.1 T-min (kN.m) 2.6 2.6 b-sup (mm) 0.0 0.0 0.0 0.0 Links H8-300 H8-300 H8-300 H8-300 H8-300 H8-300

    Deflection Check ... L/d 9.09 < 30.93 OK 5.38 < 250.34 OK

    Provided Steel Areas (mm2)Top Edge 402.12 402.12 402.12 402.12 402.12 402.12Bottom Edge 402.12 402.12 402.12 402.12 402.12 402.12

    Steel Bars ...Top Bar 2H16 2H16 Top SupBar 2H16 2H16

    Top SupBar

    Bottom Bar 2H16 2H16 Bottom BarBot SupBar

    Side Bars

    BEAM DESIGN RESULTSCSEC (U) LTD. (*17S-N56S-XY6R-2MF7)

    Orion Building Design System 18.0 (04.2012) / Page: BD-5

    Project: AHMED_MUSISI_RESIDENCE_1

  • Axis: A Storey: 2 Material: C20/25 / Grade 500 (Type 2) (Links: Grade 500 (Type 2))2B1 L=3716.4mm 2B2 L=2200mm

    BwXH (mm) 200 X 450 200 X 450Flange BfXHf --- ---

    Loads UDL G=6.75 Q=0 kN/m UDL G=6.75 Q=0 kN/m

    ShearForce(Env.)

    -17.683

    14.463

    -4.494

    16.099

    Moment(Env.)

    1.61

    -17.162 -15.031

    Bending (Top Edge) ... M (kN.m) 4.3 4.3 3.7 3.7 d (mm) 409.0 409.0 409.0 409.0 K/K' 0.03 0.03 0.03 0.03 x (mm) 51.13 51.13 51.13 51.13 Asm (mm2) 25.40 25.40 21.70 21.70 Asv (mm2) 50.84 41.59 12.92 46.29 As (mm2) 25.40 25.40 21.70 21.70 As' (mm2) 0.00 0.00 0.00 0.00 As-min 106.34 106.34 106.34 106.34 106.34 106.34

    Bending (Bottom Edge) ... M (kN.m) 8.0 17.2 13.0 15.0 14.7 5.5 d (mm) 409.0 409.0 392.0 392.0 409.0 409.0 K/K' 0.06 0.12 0.10 0.12 0.11 0.04 x (mm) 51.13 51.13 49.00 49.00 51.13 51.13 Asm (mm2) 47.49 101.59 79.99 92.75 86.82 32.40 Asv (mm2) 50.84 27.09 41.59 12.92 31.73 46.29 As (mm2) 98.33 101.59 101.59 92.75 92.75 78.69 As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 As-min 106.34 106.34 101.92 101.92 106.34 106.34

    Shear and Torsion Design ... Vd (kN) 17.7 14.5 4.5 16.1 Vd @d(kN) 13.4 10.2 3.7 11.8 v (N/mm2) 0.22 0.18 0.05 0.20 v-Rdc (N/mm2) 0.44 0.00 0.44 0.44 0.00 0.44 v-Rdmax (N/mm2) 3.31 3.31 3.31 3.31 V-Rd (kN) 134.1 128.5 128.5 134.1 Vnom (kN) 134.1 134.1 Td (kN.m) 0.0 0.1 T-min (kN.m) 2.6 2.6 b-sup (mm) 0.0 0.0 0.0 0.0 Links H8-300 H8-300 H8-300 H8-300 H8-300 H8-300

    Deflection Check ... L/d 9.09 < 185.61 OK 5.38 < 214.01 OK

    Provided Steel Areas (mm2)Top Edge 402.12 402.12 402.12 402.12 402.12 402.12Bottom Edge 402.12 402.12 402.12 402.12 402.12 402.12

    Steel Bars ...Top Bar 2H16 2H16 Top SupBar 2H16 2H16

    Top SupBar

    Bottom Bar 2H16 2H16 Bottom BarBot SupBar

    Side Bars

    BEAM DESIGN RESULTSCSEC (U) LTD. (*17S-N56S-XY6R-2MF7)

    Orion Building Design System 18.0 (04.2012) / Page: BD-6

    Project: AHMED_MUSISI_RESIDENCE_1

  • Axis: C Storey: 1 Material: C20/25 / Grade 500 (Type 2) (Links: Grade 500 (Type 2))1B5 L=1716.4mm 1B6 L=4200mm

    BwXH (mm) 200 X 450 200 X 450Flange BfXHf --- ---

    Loads 0.1

    G=25.88

    1.72

    25.88

    0.1

    Q=7.96

    1.72

    7.96

    UDL G=14.25 Q=0 kN/m

    25.88

    1.39

    25.8816.25

    4.1

    16.257.96

    1.39

    7.965

    4.1

    5

    UDL G=14.25 Q=0 kN/m

    ShearForce(Env.)

    147.194

    -159.618

    66.336

    Moment(Env.)

    161.085 157.948

    -51.958

    Bending (Top Edge) ... M (kN.m) 21.4 94.9 161.1 157.9 26.2 13.0 d (mm) 409.0 409.0 404.5 404.5 407.0 407.0 K/K' 0.15 0.69 1.19 1.17 0.19 0.09 x (mm) 51.13 149.97 242.70 242.70 50.88 50.88 Asm (mm2) 126.83 625.45 1183.42 1162.59 155.81 77.27 Asv (mm2) 209.71 333.20 423.21 458.94 262.52 190.73 As (mm2) 336.54 958.66 1183.42 1162.59 418.33 155.81 As' (mm2) 0.00 0.00 171.20 150.37 0.00 0.00 As-min 0.00 106.34 105.17 105.17 105.82 105.82

    Bending (Bottom Edge) ... M (kN.m) 0.3 52.0 36.4 d (mm) 392.0 409.0 409.0 K/K' 0.00 0.38 0.26 x (mm) 49.00 75.66 51.62 Asm (mm2) 1.86 315.53 215.29 Asv (mm2) 209.71 262.52 190.73 As (mm2) 1.86 315.53 315.53 As' (mm2) 0.00 0.00 0.00 As-min 0.00 106.34 101.92 101.92 106.34 106.34

    Shear and Torsion Design ... Vd (kN) 72.9 147.2 159.6 66.3 Vd @d(kN) 72.9 115.6 128.0 45.9 v (N/mm2) 0.89 1.82 1.97 0.81 v-Rdc (N/mm2) 0.44 0.00 0.68 0.68 0.00 0.44 v-Rdmax (N/mm2) 3.31 3.31 3.31 3.31 V-Rd (kN) 128.5 128.5 128.5 134.1 Vnom (kN) 134.1 134.1 Td (kN.m) 0.1 0.2 T-min (kN.m) 2.6 2.6 b-sup (mm) 0.0 0.0 0.0 0.0 Links H8-300 H8-300 H8-300 H8-300

    Deflection Check ... L/d 4.24 < 6.8 OK 10.27 < 32.62 OK

    Provided Steel Areas (mm2)Top Edge X 0.00 X 0.00 1472.62 1472.62 628.32 628.32Bottom Edge 402.12 402.12 402.12 402.12 402.12 402.12

    Steel Bars ...Top Bar 2H20 Top SupBar 3H25 3H25

    Top SupBar

    Bottom Bar 2H16 2H16 Bottom BarBot SupBar

    Side Bars

    BEAM DESIGN RESULTSCSEC (U) LTD. (*17S-N56S-XY6R-2MF7)

    Orion Building Design System 18.0 (04.2012) / Page: BD-7

    Project: AHMED_MUSISI_RESIDENCE_1

  • Axis: C Storey: 2 Material: C20/25 / Grade 500 (Type 2) (Links: Grade 500 (Type 2))2B5 L=1716.4mm 2B43 L=2826.4mm

    BwXH (mm) 200 X 450 200 X 450Flange BfXHf --- ---

    Loads UDL G=6.75 Q=0 kN/m UDL G=6.75 Q=0 kN/m

    ShearForce(Env.)

    41.357

    -34.424

    Moment(Env.)

    58.466 61.42

    Bending (Top Edge) ... M (kN.m) 11.5 38.7 58.5 61.4 37.2 8.9 d (mm) 409.0 409.0 409.0 409.0 409.0 409.0 K/K' 0.08 0.28 0.42 0.44 0.27 0.06 x (mm) 51.13 55.17 86.08 90.90 52.94 51.13 Asm (mm2) 67.97 230.09 359.01 379.09 220.80 52.75 Asv (mm2) 89.04 106.68 118.91 98.98 80.02 45.70 As (mm2) 157.01 336.77 359.01 379.09 300.82 98.45 As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 As-min 0.00 106.34 106.34 106.34 106.34 0.00

    Bending (Bottom Edge) ... M (kN.m) 0.1 d (mm) 392.0 K/K' 0.00 x (mm) 49.00 Asm (mm2) 0.59 Asv (mm2) 89.04 As (mm2) 0.59 As' (mm2) 0.00 As-min 0.00 106.34 101.92 101.92 106.34 0.00

    Shear and Torsion Design ... Vd (kN) 31.0 41.4 34.4 15.9 Vd @d(kN) 31.0 37.1 30.1 15.9 v (N/mm2) 0.38 0.51 0.42 0.19 v-Rdc (N/mm2) 0.44 0.00 0.44 0.44 0.00 0.35 v-Rdmax (N/mm2) 3.31 3.31 3.31 3.31 V-Rd (kN) 128.5 128.5 128.5 134.1 Vnom (kN) 134.1 134.1 Td (kN.m) 0.0 0.1 T-min (kN.m) 2.6 2.6 b-sup (mm) 0.0 0.0 0.0 0.0 Links H8-300 H8-300

    Deflection Check ... L/d 4.2 < 8.01 OK 6.91 < 7.41 OK

    Provided Steel Areas (mm2)Top Edge X 0.00 X 0.00 402.12 402.12 X 0.00 X 0.00Bottom Edge 402.12 402.12 402.12 402.12 402.12 402.12

    Steel Bars ...Top BarTop SupBar 2H16 2H16

    Top SupBar

    Bottom Bar 2H16 2H16 Bottom BarBot SupBar

    Side Bars

    BEAM DESIGN RESULTSCSEC (U) LTD. (*17S-N56S-XY6R-2MF7)

    Orion Building Design System 18.0 (04.2012) / Page: BD-8

    Project: AHMED_MUSISI_RESIDENCE_1

  • Axis: D Storey: 1 Material: C20/25 / Grade 500 (Type 2) (Links: Grade 500 (Type 2))1B7 L=394.8mm 1B8 L=5405.2mm 1B9 L=3095mm

    BwXH (mm) 200 X 450 200 X 450 200 X 450Flange BfXHf --- --- ---

    Loads 0.1

    G=19.98

    0.39

    19.98

    0.1

    Q=6.15

    0.39

    6.15

    UDL G=14.25 Q=0 kN/m

    19.9819.9840.29

    5.31

    40.2920.3120.31

    6.156.1512.4

    5.31

    12.46.256.25

    UDL G=14.25 Q=0 kN/m

    20.31

    1.2

    20.316.25

    1.2

    6.25

    UDL G=14.25 Q=0 kN/m

    ShearForce(Env.)

    110.008

    -231.311

    241.02

    -159.645

    64.296

    Moment(Env.)

    39.652

    194.687

    -128.519

    215.492131.264

    -48.654

    17.848

    Bending (Top Edge) ... M (kN.m) 7.0 21.3 39.7 194.7 1.7 215.5 131.3 20.8 17.8 d (mm) 409.0 409.0 404.5 404.5 409.0 384.3 384.3 407.0 407.0 K/K' 0.05 0.15 0.29 1.44 0.01 1.77 1.08 0.15 0.13 x (mm) 51.13 51.13 57.31 242.70 51.13 230.55 230.55 50.88 50.88 Asm (mm2) 41.42 126.27 239.00 1406.46 9.99 1620.03 1026.24 123.88 106.17 Asv (mm2) 279.97 290.32 316.29 463.65 346.97 442.74 459.01 334.48 184.86 As (mm2) 126.27 239.00 239.00 1406.46 356.97 1620.03 1026.24 458.36 123.88 As' (mm2) 0.00 0.00 0.00 394.24 0.00 658.48 64.70 0.00 0.00 As-min 0.00 106.34 105.17 105.17 106.34 99.91 99.91 105.82 105.82

    Bending (Bottom Edge) ... M (kN.m) 31.9 128.5 1.2 48.7 19.2 d (mm) 392.0 404.5 392.0 409.0 409.0 K/K' 0.25 0.95 0.01 0.35 0.14 x (mm) 49.00 225.50 49.00 70.46 51.13 Asm (mm2) 197.25 940.48 7.34 293.85 113.52 Asv (mm2) 434.28 346.97 409.71 334.48 184.86 As (mm2) 631.53 940.48 417.04 293.85 293.85 As' (mm2) 0.00 0.00 0.00 0.00 0.00 As-min 0.00 106.34 101.92 101.92 105.17 101.92 101.92 106.34 106.34

    Shear and Torsion Design ... Vd (kN) 97.4 110.0 231.3 241.0 159.6 64.3 Vd @d(kN) 0.0 0.0 173.7 192.0 132.9 55.2 v (N/mm2) 1.19 1.36 2.86 3.14 2.08 0.79 v-Rdc (N/mm2) 0.44 0.00 0.68 0.68 0.00 0.71 0.71 0.00 0.44 v-Rdmax (N/mm2) 3.31 3.31 3.31 3.31 3.31 3.31 V-Rd (kN) 128.5 128.5 171.4 232.7 128.5 134.1 Vnom (kN) 134.1 132.6 134.1 Td (kN.m) 2.3 0.1 1.1 T-min (kN.m) 2.6 2.6 2.6 b-sup (mm) 0.0 0.0 1350.0 1350.0 0.0 0.0 Links H8-300 H8-225 H8-300 H8-150 H8-300 H8-300 H8-300

    Deflection Check ... L/d 0.98 < 15.85 OK 13.36 < 21.26 OK 7.57 < 37.51 OK

    Provided Steel Areas (mm2)Top Edge X 0.00 X 0.00 1472.62 1472.62 402.12 1874.75 1874.75 628.32 628.32Bottom Edge 402.12 402.12 402.12 981.75 981.75 981.75 402.12 402.12 402.12

    Steel Bars ...Top Bar 2H16 2H20 Top SupBar 3H25 3H25 3H25 3H25

    Top SupBar 2H16 2H16

    Bottom Bar 2H16 2H25 2H16 Bottom BarBot SupBar

    Side Bars

    BEAM DESIGN RESULTSCSEC (U) LTD. (*17S-N56S-XY6R-2MF7)

    Orion Building Design System 18.0 (04.2012) / Page: BD-9

    Project: AHMED_MUSISI_RESIDENCE_1

  • Axis: D Storey: 2 Material: C20/25 / Grade 500 (Type 2) (Links: Grade 500 (Type 2))2B8 L=5405.2mm 2B9 L=3095mm

    BwXH (mm) 200 X 450 200 X 450Flange BfXHf --- ---

    Loads UDL G=6.75 Q=0 kN/m UDL G=6.75 Q=0 kN/m

    ShearForce(Env.)

    -22.082

    25.586

    -36.352

    34.377

    Moment(Env.)

    20.005

    -10.04

    29.694

    15.718

    -27.067

    8.467

    Bending (Top Edge) ... M (kN.m) 20.0 1.9 29.7 15.7 8.5 d (mm) 409.0 409.0 409.0 409.0 409.0 K/K' 0.14 0.01 0.21 0.11 0.06 x (mm) 51.13 51.13 51.13 51.13 51.13 Asm (mm2) 118.42 11.49 175.77 93.04 50.12 Asv (mm2) 63.49 38.96 73.57 104.52 98.84 As (mm2) 118.42 50.45 175.77 93.04 50.12 As' (mm2) 0.00 0.00 0.00 0.00 0.00 As-min 106.34 106.34 106.34 106.34 106.34 106.34

    Bending (Bottom Edge) ... M (kN.m) 2.6 10.0 6.4 27.1 10.2 d (mm) 409.0 409.0 392.0 409.0 409.0 K/K' 0.02 0.07 0.05 0.20 0.07 x (mm) 51.13 51.13 49.00 51.13 51.13 Asm (mm2) 15.53 59.43 39.69 160.22 60.17 Asv (mm2) 63.49 38.96 104.52 84.53 98.84 As (mm2) 59.43 59.43 144.20 160.22 159.02 As' (mm2) 0.00 0.00 0.00 0.00 0.00 As-min 106.34 106.34 101.92 101.92 106.34 106.34

    Shear and Torsion Design ... Vd (kN) 22.1 25.6 36.4 34.4 Vd @d(kN) 16.1 20.4 32.1 30.1 v (N/mm2) 0.27 0.31 0.44 0.42 v-Rdc (N/mm2) 0.44 0.00 0.44 0.44 0.00 0.44 v-Rdmax (N/mm2) 3.31 3.31 3.31 3.31 V-Rd (kN) 134.1 128.5 128.5 134.1 Vnom (kN) 134.1 134.1 Td (kN.m) 0.0 0.3 T-min (kN.m) 2.6 2.6 b-sup (mm) 0.0 0.0 0.0 0.0 Links H8-300 H8-300 H8-300 H8-300 H8-300 H8-300

    Deflection Check ... L/d 13.22 < 428.59 OK 7.57 < 91.88 OK

    Provided Steel Areas (mm2)Top Edge 402.12 402.12 402.12 402.12 402.12 402.12Bottom Edge 402.12 402.12 402.12 402.12 402.12 402.12

    Steel Bars ...Top Bar 2H16 2H16 Top SupBar 2H16 2H16

    Top SupBar

    Bottom Bar 2H16 2H16 Bottom BarBot SupBar

    Side Bars

    BEAM DESIGN RESULTSCSEC (U) LTD. (*17S-N56S-XY6R-2MF7)

    Orion Building Design System 18.0 (04.2012) / Page: BD-10

    Project: AHMED_MUSISI_RESIDENCE_1

  • BEAM DESIGN RESULTSCSEC (U) LTD. (*17S-N56S-XY6R-2MF7)

    Orion Building Design System 18.0 (04.2012) / Page: BD-11

    Project: AHMED_MUSISI_RESIDENCE_1