Bark Park Parking Options
Presented By: Rick PruittChief of Police
Item # 7City Council Meeting
March 14, 2016
![Page 2: AH City Council Meeting 03.14.16 - Item #7 Bark Park Parking Crosswalk](https://reader033.vdocuments.us/reader033/viewer/2022042906/58a993081a28abc2518b46ad/html5/thumbnails/2.jpg)
2
● Staff has studied several options to provide parking for Bark Park visitors that will relieve parking congestion in the 100-200 blocks Alamo Heights Boulevard, southbound
• The narrow roadway width of 18-20 feet contribute to concerns for fire apparatus travel
Background
![Page 3: AH City Council Meeting 03.14.16 - Item #7 Bark Park Parking Crosswalk](https://reader033.vdocuments.us/reader033/viewer/2022042906/58a993081a28abc2518b46ad/html5/thumbnails/3.jpg)
3
![Page 4: AH City Council Meeting 03.14.16 - Item #7 Bark Park Parking Crosswalk](https://reader033.vdocuments.us/reader033/viewer/2022042906/58a993081a28abc2518b46ad/html5/thumbnails/4.jpg)
4
● The first option is to improve the right-of-way on the west side of the roadway for a distance of 215 feet by widening the roadway 3-4 feet for visitor parking
• This option would include improving the east shoulder by adding 2-3 feet of paved roadway surface for vehicle travel
Parking Option 1
![Page 5: AH City Council Meeting 03.14.16 - Item #7 Bark Park Parking Crosswalk](https://reader033.vdocuments.us/reader033/viewer/2022042906/58a993081a28abc2518b46ad/html5/thumbnails/5.jpg)
5
• Striping would be applied to the roadway surface to push traffic away from the parking area on the west side of the roadway
● This option also creates seven (7) 60°angle head-in parking spaces in the right-of-way adjacent to the little league practice field
Parking Option 1
![Page 6: AH City Council Meeting 03.14.16 - Item #7 Bark Park Parking Crosswalk](https://reader033.vdocuments.us/reader033/viewer/2022042906/58a993081a28abc2518b46ad/html5/thumbnails/6.jpg)
6
![Page 7: AH City Council Meeting 03.14.16 - Item #7 Bark Park Parking Crosswalk](https://reader033.vdocuments.us/reader033/viewer/2022042906/58a993081a28abc2518b46ad/html5/thumbnails/7.jpg)
7
● Projected estimate for Option 1 is $10,000
• Includes the cost of road grade material, asphalt, paver rental, striping and debris removal
Parking Option 1
![Page 8: AH City Council Meeting 03.14.16 - Item #7 Bark Park Parking Crosswalk](https://reader033.vdocuments.us/reader033/viewer/2022042906/58a993081a28abc2518b46ad/html5/thumbnails/8.jpg)
8
● This option improves the right-of-way for visitor parking immediately behind the Bark Park where the Normandy extension is platted
• This option provides an area approximately 260’ long and 45’ deep that could handle 22 to 24 vehicles
Parking Option 2
![Page 9: AH City Council Meeting 03.14.16 - Item #7 Bark Park Parking Crosswalk](https://reader033.vdocuments.us/reader033/viewer/2022042906/58a993081a28abc2518b46ad/html5/thumbnails/9.jpg)
![Page 10: AH City Council Meeting 03.14.16 - Item #7 Bark Park Parking Crosswalk](https://reader033.vdocuments.us/reader033/viewer/2022042906/58a993081a28abc2518b46ad/html5/thumbnails/10.jpg)
Rear gate
Bark Park
Aprx. 260’ available space for improvement 45’ depth from ROW
Attachment 2
rear gate
![Page 11: AH City Council Meeting 03.14.16 - Item #7 Bark Park Parking Crosswalk](https://reader033.vdocuments.us/reader033/viewer/2022042906/58a993081a28abc2518b46ad/html5/thumbnails/11.jpg)
11
● Project estimate for Option 2 is $15,300
• This estimate covers the costs for the same materials, striping and equipment as Option 1
• Additional costs would be incurred for other related improvements or adding restricted parking locations
Option 2
![Page 12: AH City Council Meeting 03.14.16 - Item #7 Bark Park Parking Crosswalk](https://reader033.vdocuments.us/reader033/viewer/2022042906/58a993081a28abc2518b46ad/html5/thumbnails/12.jpg)
12
● Staff studied the viability of a crosswalk from the little league parking area to the southwest corner of Alamo Heights Boulevard at the southbound leg
• This location presents a number of challenges to assure the crosswalk accessibility points meet accessibility standards of the Americans with Disability Act
Crosswalk Option
![Page 13: AH City Council Meeting 03.14.16 - Item #7 Bark Park Parking Crosswalk](https://reader033.vdocuments.us/reader033/viewer/2022042906/58a993081a28abc2518b46ad/html5/thumbnails/13.jpg)
13
● Elevation difference from the little league parking lot to the street would create the need to reduce the grade
• It would also be necessary to cap over a storm water drainage culvert and add safety railing
Crosswalk Option
![Page 14: AH City Council Meeting 03.14.16 - Item #7 Bark Park Parking Crosswalk](https://reader033.vdocuments.us/reader033/viewer/2022042906/58a993081a28abc2518b46ad/html5/thumbnails/14.jpg)
14
![Page 15: AH City Council Meeting 03.14.16 - Item #7 Bark Park Parking Crosswalk](https://reader033.vdocuments.us/reader033/viewer/2022042906/58a993081a28abc2518b46ad/html5/thumbnails/15.jpg)
15
![Page 16: AH City Council Meeting 03.14.16 - Item #7 Bark Park Parking Crosswalk](https://reader033.vdocuments.us/reader033/viewer/2022042906/58a993081a28abc2518b46ad/html5/thumbnails/16.jpg)
16
![Page 17: AH City Council Meeting 03.14.16 - Item #7 Bark Park Parking Crosswalk](https://reader033.vdocuments.us/reader033/viewer/2022042906/58a993081a28abc2518b46ad/html5/thumbnails/17.jpg)
17
![Page 18: AH City Council Meeting 03.14.16 - Item #7 Bark Park Parking Crosswalk](https://reader033.vdocuments.us/reader033/viewer/2022042906/58a993081a28abc2518b46ad/html5/thumbnails/18.jpg)
18
![Page 19: AH City Council Meeting 03.14.16 - Item #7 Bark Park Parking Crosswalk](https://reader033.vdocuments.us/reader033/viewer/2022042906/58a993081a28abc2518b46ad/html5/thumbnails/19.jpg)
19
● Estimated cost of this project is $30,000
• This estimate includes using an outside contractor to construct the accessibility points, painting the crosswalk and crosswalk approaches
• Addition of a concrete or crushed granite pathway would be extra
Crosswalk Option