Agile Project Management (APM)Mark Lynch
05/16/17
![Page 2: Agile Project Management (APM)My Relevant Background •PMP –Traditional Project Manager for many years •Been Using Agile Methodologies (Scrum) for 6 years •Certified Scrum Master](https://reader033.vdocuments.us/reader033/viewer/2022042306/5ed2c3862aaea274ff7c874b/html5/thumbnails/2.jpg)
My Relevant Background
•PMP – Traditional Project Manager for many years•Been Using Agile
Methodologies (Scrum) for 6 years •Certified Scrum Master &
PMI-ACP•Certified SAFe Agilist and
Practitioner (Scaled Agile Framework)
![Page 3: Agile Project Management (APM)My Relevant Background •PMP –Traditional Project Manager for many years •Been Using Agile Methodologies (Scrum) for 6 years •Certified Scrum Master](https://reader033.vdocuments.us/reader033/viewer/2022042306/5ed2c3862aaea274ff7c874b/html5/thumbnails/3.jpg)
Learning Objectives
1. What is Agile Project Management?
2. History of Agile Project Management
3. Implementing Agile Project Management (Scrum)
4. Resources for more information
![Page 4: Agile Project Management (APM)My Relevant Background •PMP –Traditional Project Manager for many years •Been Using Agile Methodologies (Scrum) for 6 years •Certified Scrum Master](https://reader033.vdocuments.us/reader033/viewer/2022042306/5ed2c3862aaea274ff7c874b/html5/thumbnails/4.jpg)
![Page 5: Agile Project Management (APM)My Relevant Background •PMP –Traditional Project Manager for many years •Been Using Agile Methodologies (Scrum) for 6 years •Certified Scrum Master](https://reader033.vdocuments.us/reader033/viewer/2022042306/5ed2c3862aaea274ff7c874b/html5/thumbnails/5.jpg)
Traditional Project Management
PMBOK – Gold Standard
![Page 6: Agile Project Management (APM)My Relevant Background •PMP –Traditional Project Manager for many years •Been Using Agile Methodologies (Scrum) for 6 years •Certified Scrum Master](https://reader033.vdocuments.us/reader033/viewer/2022042306/5ed2c3862aaea274ff7c874b/html5/thumbnails/6.jpg)
PMBOK – Traditional Project Management
• Initiating, Planning, Executing, Monitoring and Control, Closing
Five Process Groups
• Integration, Scope, Schedule, Cost, Quality, Resource, Communications, Risk, Procurement, Stakeholder
Ten Knowledge Areas -
Management of:
![Page 7: Agile Project Management (APM)My Relevant Background •PMP –Traditional Project Manager for many years •Been Using Agile Methodologies (Scrum) for 6 years •Certified Scrum Master](https://reader033.vdocuments.us/reader033/viewer/2022042306/5ed2c3862aaea274ff7c874b/html5/thumbnails/7.jpg)
PMBOK – Traditional Project Management
• Schedule
• Cost
• Scope
Historically -Managing the
Triple Constraints
• Quality
• Risk
• Customer Satisfaction
Recently - Added a few more
things to manage
![Page 8: Agile Project Management (APM)My Relevant Background •PMP –Traditional Project Manager for many years •Been Using Agile Methodologies (Scrum) for 6 years •Certified Scrum Master](https://reader033.vdocuments.us/reader033/viewer/2022042306/5ed2c3862aaea274ff7c874b/html5/thumbnails/8.jpg)
Issues with Traditional PM Approach
![Page 9: Agile Project Management (APM)My Relevant Background •PMP –Traditional Project Manager for many years •Been Using Agile Methodologies (Scrum) for 6 years •Certified Scrum Master](https://reader033.vdocuments.us/reader033/viewer/2022042306/5ed2c3862aaea274ff7c874b/html5/thumbnails/9.jpg)
Some Issues with the
Traditional Approach
• You do a lot of planning up front:
• Know the least about what the customer wants
• Know the least about the how you are going to solve the problem
• Know the least about your team & their performance
• Difficult to predict what is going to happen
![Page 10: Agile Project Management (APM)My Relevant Background •PMP –Traditional Project Manager for many years •Been Using Agile Methodologies (Scrum) for 6 years •Certified Scrum Master](https://reader033.vdocuments.us/reader033/viewer/2022042306/5ed2c3862aaea274ff7c874b/html5/thumbnails/10.jpg)
Some Issues with the
Traditional Approach
• You do a lot of planning up front:
• Know the least about what the customer wants
• Know the least about the how you are going to solve the problem
• Know the least about your team & their performance
• Difficult to predict what is going to happen
![Page 11: Agile Project Management (APM)My Relevant Background •PMP –Traditional Project Manager for many years •Been Using Agile Methodologies (Scrum) for 6 years •Certified Scrum Master](https://reader033.vdocuments.us/reader033/viewer/2022042306/5ed2c3862aaea274ff7c874b/html5/thumbnails/11.jpg)
Some Issues with the
Traditional Approach
• You do a lot of planning up front:
• Know the least about what the customer wants
• Know the least about the how you are going to solve the problem
• Know the least about your team & their performance
• Difficult to predict what is going to happen
![Page 12: Agile Project Management (APM)My Relevant Background •PMP –Traditional Project Manager for many years •Been Using Agile Methodologies (Scrum) for 6 years •Certified Scrum Master](https://reader033.vdocuments.us/reader033/viewer/2022042306/5ed2c3862aaea274ff7c874b/html5/thumbnails/12.jpg)
Some Issues with the
Traditional Approach
• You do a lot of planning up front:
• Know the least about what the customer wants
• Know the least about the how you are going to solve the problem
• Know the least about your team & their performance
• Difficult to predict what is going to happen
![Page 13: Agile Project Management (APM)My Relevant Background •PMP –Traditional Project Manager for many years •Been Using Agile Methodologies (Scrum) for 6 years •Certified Scrum Master](https://reader033.vdocuments.us/reader033/viewer/2022042306/5ed2c3862aaea274ff7c874b/html5/thumbnails/13.jpg)
Some Issues with the
Traditional Approach
• You do a lot of planning up front:
• Know the least about what the customer wants
• Know the least about the how you are going to solve the problem
• Know the least about your team & their performance
• Difficult to predict what is going to happen
![Page 14: Agile Project Management (APM)My Relevant Background •PMP –Traditional Project Manager for many years •Been Using Agile Methodologies (Scrum) for 6 years •Certified Scrum Master](https://reader033.vdocuments.us/reader033/viewer/2022042306/5ed2c3862aaea274ff7c874b/html5/thumbnails/14.jpg)
Some Issues with the
Traditional Approach
• Changes generates a lot of extra work:
• Get agreement/approval of stakeholders
• Update the plans
• Update the schedules
• Update the costs
![Page 15: Agile Project Management (APM)My Relevant Background •PMP –Traditional Project Manager for many years •Been Using Agile Methodologies (Scrum) for 6 years •Certified Scrum Master](https://reader033.vdocuments.us/reader033/viewer/2022042306/5ed2c3862aaea274ff7c874b/html5/thumbnails/15.jpg)
Some Issues with the
Traditional Approach
• Changes generates a lot of extra work:
• Get agreement/approval of stakeholders
• Update the plans
• Update the schedules
• Update the costs
![Page 16: Agile Project Management (APM)My Relevant Background •PMP –Traditional Project Manager for many years •Been Using Agile Methodologies (Scrum) for 6 years •Certified Scrum Master](https://reader033.vdocuments.us/reader033/viewer/2022042306/5ed2c3862aaea274ff7c874b/html5/thumbnails/16.jpg)
Some Issues with the
Traditional Approach
• Changes generates a lot of extra work:
• Get agreement/approval of stakeholders
• Update the plans
• Update the schedules
• Update the costs
![Page 17: Agile Project Management (APM)My Relevant Background •PMP –Traditional Project Manager for many years •Been Using Agile Methodologies (Scrum) for 6 years •Certified Scrum Master](https://reader033.vdocuments.us/reader033/viewer/2022042306/5ed2c3862aaea274ff7c874b/html5/thumbnails/17.jpg)
Some Issues with the
Traditional Approach
• Changes generates a lot of extra work:
• Get agreement/approval of stakeholders
• Update the plans
• Update the schedules
• Update the costs
![Page 18: Agile Project Management (APM)My Relevant Background •PMP –Traditional Project Manager for many years •Been Using Agile Methodologies (Scrum) for 6 years •Certified Scrum Master](https://reader033.vdocuments.us/reader033/viewer/2022042306/5ed2c3862aaea274ff7c874b/html5/thumbnails/18.jpg)
Some Issues with the
Traditional Approach
• Changes generates a lot of extra work:
• Get agreement/approval of stakeholders
• Update the plans
• Update the schedules
• Update the costs
![Page 19: Agile Project Management (APM)My Relevant Background •PMP –Traditional Project Manager for many years •Been Using Agile Methodologies (Scrum) for 6 years •Certified Scrum Master](https://reader033.vdocuments.us/reader033/viewer/2022042306/5ed2c3862aaea274ff7c874b/html5/thumbnails/19.jpg)
Some Issues with the Traditional Approach
![Page 20: Agile Project Management (APM)My Relevant Background •PMP –Traditional Project Manager for many years •Been Using Agile Methodologies (Scrum) for 6 years •Certified Scrum Master](https://reader033.vdocuments.us/reader033/viewer/2022042306/5ed2c3862aaea274ff7c874b/html5/thumbnails/20.jpg)
Development Cycles
![Page 21: Agile Project Management (APM)My Relevant Background •PMP –Traditional Project Manager for many years •Been Using Agile Methodologies (Scrum) for 6 years •Certified Scrum Master](https://reader033.vdocuments.us/reader033/viewer/2022042306/5ed2c3862aaea274ff7c874b/html5/thumbnails/21.jpg)
Traditional System Development Cycle
![Page 22: Agile Project Management (APM)My Relevant Background •PMP –Traditional Project Manager for many years •Been Using Agile Methodologies (Scrum) for 6 years •Certified Scrum Master](https://reader033.vdocuments.us/reader033/viewer/2022042306/5ed2c3862aaea274ff7c874b/html5/thumbnails/22.jpg)
Software Development – Waterfall Approach
![Page 23: Agile Project Management (APM)My Relevant Background •PMP –Traditional Project Manager for many years •Been Using Agile Methodologies (Scrum) for 6 years •Certified Scrum Master](https://reader033.vdocuments.us/reader033/viewer/2022042306/5ed2c3862aaea274ff7c874b/html5/thumbnails/23.jpg)
What if Development
Cycle was this?
![Page 24: Agile Project Management (APM)My Relevant Background •PMP –Traditional Project Manager for many years •Been Using Agile Methodologies (Scrum) for 6 years •Certified Scrum Master](https://reader033.vdocuments.us/reader033/viewer/2022042306/5ed2c3862aaea274ff7c874b/html5/thumbnails/24.jpg)
What if we changed the triple constraint?
Fixed time increments.
Fixed costs (resources).
The variable is the Scope.
![Page 25: Agile Project Management (APM)My Relevant Background •PMP –Traditional Project Manager for many years •Been Using Agile Methodologies (Scrum) for 6 years •Certified Scrum Master](https://reader033.vdocuments.us/reader033/viewer/2022042306/5ed2c3862aaea274ff7c874b/html5/thumbnails/25.jpg)
What if we changed our Team Structure?
Small self-contained team.
Self-managed team.
Plan your own work in small increments.
Estimate your own work.
![Page 26: Agile Project Management (APM)My Relevant Background •PMP –Traditional Project Manager for many years •Been Using Agile Methodologies (Scrum) for 6 years •Certified Scrum Master](https://reader033.vdocuments.us/reader033/viewer/2022042306/5ed2c3862aaea274ff7c874b/html5/thumbnails/26.jpg)
Agile Project Management
![Page 27: Agile Project Management (APM)My Relevant Background •PMP –Traditional Project Manager for many years •Been Using Agile Methodologies (Scrum) for 6 years •Certified Scrum Master](https://reader033.vdocuments.us/reader033/viewer/2022042306/5ed2c3862aaea274ff7c874b/html5/thumbnails/27.jpg)
What is Agile Project
Management?
•Group of Methodologies that focus on iterative and incremental delivery of a product.
•Methodologies include new team organization.
![Page 28: Agile Project Management (APM)My Relevant Background •PMP –Traditional Project Manager for many years •Been Using Agile Methodologies (Scrum) for 6 years •Certified Scrum Master](https://reader033.vdocuments.us/reader033/viewer/2022042306/5ed2c3862aaea274ff7c874b/html5/thumbnails/28.jpg)
What drove Agile Project
Management?
•Poor Project Performance•2%•75%
![Page 29: Agile Project Management (APM)My Relevant Background •PMP –Traditional Project Manager for many years •Been Using Agile Methodologies (Scrum) for 6 years •Certified Scrum Master](https://reader033.vdocuments.us/reader033/viewer/2022042306/5ed2c3862aaea274ff7c874b/html5/thumbnails/29.jpg)
Poor Project Performance
Chaos Report
2011 2012 2013 2014 2015
Successful 29% 27% 31% 28% 29%
Challenged 49% 56% 50% 55% 52%
Failed 22% 17% 19% 17% 19%
![Page 30: Agile Project Management (APM)My Relevant Background •PMP –Traditional Project Manager for many years •Been Using Agile Methodologies (Scrum) for 6 years •Certified Scrum Master](https://reader033.vdocuments.us/reader033/viewer/2022042306/5ed2c3862aaea274ff7c874b/html5/thumbnails/30.jpg)
What drove Agile Project
Management?
• Academic Research
• Robert Austin & Richard Nolan (HBS) studies large software projects:
• "The first flawed assumption is that it is possible to plan such a large project.
• The second flawed assumption is that it is possible to protect against late changes.
• The third flawed assumption is that it even makes sense to lock in big projects early.“
![Page 31: Agile Project Management (APM)My Relevant Background •PMP –Traditional Project Manager for many years •Been Using Agile Methodologies (Scrum) for 6 years •Certified Scrum Master](https://reader033.vdocuments.us/reader033/viewer/2022042306/5ed2c3862aaea274ff7c874b/html5/thumbnails/31.jpg)
What drove Agile Project
Management?
• Academic Research
• Uncertainty Principles
• Watts Humphreys (IBM) - "for a new software system, the requirements will not be completely known until after the users have used it.“
• Hadar Ziv (Univ of California) -"Uncertainty is inherent and inevitable in software development processes and products.“
• IKIWISY – I’ll Know It When I See It
![Page 32: Agile Project Management (APM)My Relevant Background •PMP –Traditional Project Manager for many years •Been Using Agile Methodologies (Scrum) for 6 years •Certified Scrum Master](https://reader033.vdocuments.us/reader033/viewer/2022042306/5ed2c3862aaea274ff7c874b/html5/thumbnails/32.jpg)
Agile Project Management derived from:
Uncertainty theory
Lean System Thinking
Toyota Production
System
Development of the Agile
Manifesto
![Page 33: Agile Project Management (APM)My Relevant Background •PMP –Traditional Project Manager for many years •Been Using Agile Methodologies (Scrum) for 6 years •Certified Scrum Master](https://reader033.vdocuments.us/reader033/viewer/2022042306/5ed2c3862aaea274ff7c874b/html5/thumbnails/33.jpg)
Agile Manifesto – Group of people got together at a ski resort (2001) to discuss better ways to do software development projects.
Kent BeckMike Beedle
Arie van BennekumAlistair Cockburn
Ward CunninghamMartin Fowler
James GrenningJim HighsmithAndrew HuntRon Jeffries
Jon KernBrian Marick
Robert C. MartinSteve Mellor
Ken SchwaberJeff SutherlandDave Thomas
![Page 34: Agile Project Management (APM)My Relevant Background •PMP –Traditional Project Manager for many years •Been Using Agile Methodologies (Scrum) for 6 years •Certified Scrum Master](https://reader033.vdocuments.us/reader033/viewer/2022042306/5ed2c3862aaea274ff7c874b/html5/thumbnails/34.jpg)
Agile Manifesto –Values
Individuals and interactions OVER processes and tools
Working software OVER comprehensive documentation
Customer collaboration OVER contract negotiation
Responding to change OVER following a plan
![Page 35: Agile Project Management (APM)My Relevant Background •PMP –Traditional Project Manager for many years •Been Using Agile Methodologies (Scrum) for 6 years •Certified Scrum Master](https://reader033.vdocuments.us/reader033/viewer/2022042306/5ed2c3862aaea274ff7c874b/html5/thumbnails/35.jpg)
Agile Manifesto – 12 Principles• Our highest priority is to satisfy the customer
through early and continuous deliveryof valuable software.
• Welcome changing requirements, even late indevelopment. Agile processes harness change forthe customer's competitive advantage.
• Deliver working software frequently, from acouple of weeks to a couple of months, with apreference to the shorter timescale.
• Business people and developers must worktogether daily throughout the project.
• Build projects around motivated individuals.Give them the environment and support they need, and trust them to get the job done.
• The most efficient and effective method ofconveying information to and within a development team is face-to-face conversation.
• Working software is the primary measure of progress.
• Agile processes promote sustainable development. The sponsors, developers, and users should be able to maintain a constant pace indefinitely.
• Continuous attention to technical excellenceand good design enhances agility.
• Simplicity--the art of maximizing the amountof work not done--is essential.
• The best architectures, requirements, and designsemerge from self-organizing teams.
• At regular intervals, the team reflects on howto become more effective, then tunes and adjustsits behavior accordingly.
![Page 36: Agile Project Management (APM)My Relevant Background •PMP –Traditional Project Manager for many years •Been Using Agile Methodologies (Scrum) for 6 years •Certified Scrum Master](https://reader033.vdocuments.us/reader033/viewer/2022042306/5ed2c3862aaea274ff7c874b/html5/thumbnails/36.jpg)
Agile Manifesto – 12 Principles
• Our highest priority is to satisfy the customer through early and continuous delivery of valuable software.
• Welcome changing requirements, even late indevelopment. Agile processes harness change forthe customer's competitive advantage.
• Deliver working software frequently, from acouple of weeks to a couple of months, with apreference to the shorter timescale.
• Business people and developers must worktogether daily throughout the project.
• Build projects around motivated individuals.Give them the environment and support they need, and trust them to get the job done.
• The most efficient and effective method ofconveying information to and within a development team is face-to-face conversation.
• Working software is the primary measure of progress.
• Agile processes promote sustainable development. The sponsors, developers, and users should be able to maintain a constant pace indefinitely.
• Continuous attention to technical excellenceand good design enhances agility.
• Simplicity--the art of maximizing the amountof work not done--is essential.
• The best architectures, requirements, and designsemerge from self-organizing teams.
• At regular intervals, the team reflects on howto become more effective, then tunes and adjustsits behavior accordingly.
![Page 37: Agile Project Management (APM)My Relevant Background •PMP –Traditional Project Manager for many years •Been Using Agile Methodologies (Scrum) for 6 years •Certified Scrum Master](https://reader033.vdocuments.us/reader033/viewer/2022042306/5ed2c3862aaea274ff7c874b/html5/thumbnails/37.jpg)
Agile Manifesto – 12 Principles• Our highest priority is to satisfy the customer
through early and continuous deliveryof valuable software.
• Welcome changing requirements, even late in development. Agile processes harness change forthe customer's competitive advantage.
• Deliver working software frequently, from acouple of weeks to a couple of months, with apreference to the shorter timescale.
• Business people and developers must worktogether daily throughout the project.
• Build projects around motivated individuals.Give them the environment and support they need, and trust them to get the job done.
• The most efficient and effective method ofconveying information to and within a
• Working software is the primary measure of progress.
• Agile processes promote sustainable development. The sponsors, developers, and users should be able to maintain a constant pace indefinitely.
• Continuous attention to technical excellenceand good design enhances agility.
• Simplicity--the art of maximizing the amountof work not done--is essential.
• The best architectures, requirements, and designsemerge from self-organizing teams.
• At regular intervals, the team reflects on howto become more effective, then tunes and adjustsits behavior accordingly.
![Page 38: Agile Project Management (APM)My Relevant Background •PMP –Traditional Project Manager for many years •Been Using Agile Methodologies (Scrum) for 6 years •Certified Scrum Master](https://reader033.vdocuments.us/reader033/viewer/2022042306/5ed2c3862aaea274ff7c874b/html5/thumbnails/38.jpg)
Agile Manifesto – 12 Principles• Our highest priority is to satisfy the customer
through early and continuous deliveryof valuable software.
• Welcome changing requirements, even late indevelopment. Agile processes harness change forthe customer's competitive advantage.
• Deliver working software frequently, from acouple of weeks to a couple of months, with apreference to the shorter timescale.
• Business people and developers must worktogether daily throughout the project.
• Build projects around motivated individuals.Give them the environment and support they need, and trust them to get the job done.
• The most efficient and effective method ofconveying information to and within a development team is face-to-face conversation.
• Working software is the primary measure of progress.
• Agile processes promote sustainable development. The sponsors, developers, and users should be able to maintain a constant pace indefinitely.
• Continuous attention to technical excellenceand good design enhances agility.
• Simplicity--the art of maximizing the amountof work not done--is essential.
• The best architectures, requirements, and designsemerge from self-organizing teams.
• At regular intervals, the team reflects on howto become more effective, then tunes and adjustsits behavior accordingly.
![Page 39: Agile Project Management (APM)My Relevant Background •PMP –Traditional Project Manager for many years •Been Using Agile Methodologies (Scrum) for 6 years •Certified Scrum Master](https://reader033.vdocuments.us/reader033/viewer/2022042306/5ed2c3862aaea274ff7c874b/html5/thumbnails/39.jpg)
APM Implementation
![Page 40: Agile Project Management (APM)My Relevant Background •PMP –Traditional Project Manager for many years •Been Using Agile Methodologies (Scrum) for 6 years •Certified Scrum Master](https://reader033.vdocuments.us/reader033/viewer/2022042306/5ed2c3862aaea274ff7c874b/html5/thumbnails/40.jpg)
Implementing Scrum
Team
Requirements
Process
![Page 41: Agile Project Management (APM)My Relevant Background •PMP –Traditional Project Manager for many years •Been Using Agile Methodologies (Scrum) for 6 years •Certified Scrum Master](https://reader033.vdocuments.us/reader033/viewer/2022042306/5ed2c3862aaea274ff7c874b/html5/thumbnails/41.jpg)
Team
Self-managed
5-9 Team members
Co-Located
Multi-Disciplined
Self-Contained
![Page 42: Agile Project Management (APM)My Relevant Background •PMP –Traditional Project Manager for many years •Been Using Agile Methodologies (Scrum) for 6 years •Certified Scrum Master](https://reader033.vdocuments.us/reader033/viewer/2022042306/5ed2c3862aaea274ff7c874b/html5/thumbnails/42.jpg)
Team Roles
Product Owner (1)
Scrum Master (1)
• Designer/Developer (4)
• Database (0)
• Tester/QA (1)
• Business Analyst (1)
Other Team member
![Page 43: Agile Project Management (APM)My Relevant Background •PMP –Traditional Project Manager for many years •Been Using Agile Methodologies (Scrum) for 6 years •Certified Scrum Master](https://reader033.vdocuments.us/reader033/viewer/2022042306/5ed2c3862aaea274ff7c874b/html5/thumbnails/43.jpg)
Product Owner -
Team Role
• Person responsible for defining and prioritizing the Team’s Backlog (Requirement – User Story)• Must know the customers’ wants
(VOC)
• The ONLY Person empowered to accept that a requirement is done.
![Page 44: Agile Project Management (APM)My Relevant Background •PMP –Traditional Project Manager for many years •Been Using Agile Methodologies (Scrum) for 6 years •Certified Scrum Master](https://reader033.vdocuments.us/reader033/viewer/2022042306/5ed2c3862aaea274ff7c874b/html5/thumbnails/44.jpg)
Scrum Master - Team Role
• Servant leader and coach for the Agile Team
• Ensures that the Agile Processes are being followed.
• Responsible to remove team impediments
• Fosters an environment for: • Sustainable Pace• High performing team dynamics • Continuous flow/improvement
![Page 45: Agile Project Management (APM)My Relevant Background •PMP –Traditional Project Manager for many years •Been Using Agile Methodologies (Scrum) for 6 years •Certified Scrum Master](https://reader033.vdocuments.us/reader033/viewer/2022042306/5ed2c3862aaea274ff7c874b/html5/thumbnails/45.jpg)
Other Team Members –
Team Role
• All the other people on the team that complete what is agreed upon to do.• Self-contained – all the expertise
you need is on the team.• Self-managed
![Page 46: Agile Project Management (APM)My Relevant Background •PMP –Traditional Project Manager for many years •Been Using Agile Methodologies (Scrum) for 6 years •Certified Scrum Master](https://reader033.vdocuments.us/reader033/viewer/2022042306/5ed2c3862aaea274ff7c874b/html5/thumbnails/46.jpg)
Agile Requirements
![Page 47: Agile Project Management (APM)My Relevant Background •PMP –Traditional Project Manager for many years •Been Using Agile Methodologies (Scrum) for 6 years •Certified Scrum Master](https://reader033.vdocuments.us/reader033/viewer/2022042306/5ed2c3862aaea274ff7c874b/html5/thumbnails/47.jpg)
APM – Requirements
• We use three levels of Requirements (hierarchy)• Epic – A large body of work. (major assemblies)• Feature – Smaller assemblies• User Stories – what the workers use to do their work.
![Page 48: Agile Project Management (APM)My Relevant Background •PMP –Traditional Project Manager for many years •Been Using Agile Methodologies (Scrum) for 6 years •Certified Scrum Master](https://reader033.vdocuments.us/reader033/viewer/2022042306/5ed2c3862aaea274ff7c874b/html5/thumbnails/48.jpg)
APM – Requirements
• Product Backlog• List of Requirements written from the user’s perspective
(Epics, Features and User Stories)• Ranked by Business Value (Product Owner determines)• Analyzed for dependencies• Prioritized based on dependency, business value
![Page 49: Agile Project Management (APM)My Relevant Background •PMP –Traditional Project Manager for many years •Been Using Agile Methodologies (Scrum) for 6 years •Certified Scrum Master](https://reader033.vdocuments.us/reader033/viewer/2022042306/5ed2c3862aaea274ff7c874b/html5/thumbnails/49.jpg)
APM – Requirements
• Product Backlog• Items can start out very broad and general, but then gets
refined over time. (Called grooming)• Product owner and team members do this.
• Highest priority items get groomed first.• Stay ahead of the development effort.• Less wasted effort because you are grooming almost
Just in Time.
![Page 50: Agile Project Management (APM)My Relevant Background •PMP –Traditional Project Manager for many years •Been Using Agile Methodologies (Scrum) for 6 years •Certified Scrum Master](https://reader033.vdocuments.us/reader033/viewer/2022042306/5ed2c3862aaea274ff7c874b/html5/thumbnails/50.jpg)
APM – Requirements
• Product Backlog• Each Backlog Item (requirement) has:
• description • acceptance criteria • definition of done• dependencies
![Page 51: Agile Project Management (APM)My Relevant Background •PMP –Traditional Project Manager for many years •Been Using Agile Methodologies (Scrum) for 6 years •Certified Scrum Master](https://reader033.vdocuments.us/reader033/viewer/2022042306/5ed2c3862aaea274ff7c874b/html5/thumbnails/51.jpg)
Scrum Process
![Page 52: Agile Project Management (APM)My Relevant Background •PMP –Traditional Project Manager for many years •Been Using Agile Methodologies (Scrum) for 6 years •Certified Scrum Master](https://reader033.vdocuments.us/reader033/viewer/2022042306/5ed2c3862aaea274ff7c874b/html5/thumbnails/52.jpg)
Scrum – Process
•Fixed Development Iteration called a SPRINT• Typically a SPRINT is 2 – 4 weeks.
•Typically you plan a release after a few SPRINTS (called a Program Increment).
•Team estimates their own work using Story Points (not hours).
![Page 53: Agile Project Management (APM)My Relevant Background •PMP –Traditional Project Manager for many years •Been Using Agile Methodologies (Scrum) for 6 years •Certified Scrum Master](https://reader033.vdocuments.us/reader033/viewer/2022042306/5ed2c3862aaea274ff7c874b/html5/thumbnails/53.jpg)
Estimating the work
•Team estimates their own work collectively.
•Use story points, not hours.• Fibonacci Sequence (1,2,3,5,8,13,21,…)
•Team discusses the story
•Team votes on their estimate (planning poker).
![Page 54: Agile Project Management (APM)My Relevant Background •PMP –Traditional Project Manager for many years •Been Using Agile Methodologies (Scrum) for 6 years •Certified Scrum Master](https://reader033.vdocuments.us/reader033/viewer/2022042306/5ed2c3862aaea274ff7c874b/html5/thumbnails/54.jpg)
Estimating the work
•Trying to establish how many POINTS the TEAM can complete (called Velocity) within a Sprint. • (Will take several sprints to determine velocity.)
![Page 55: Agile Project Management (APM)My Relevant Background •PMP –Traditional Project Manager for many years •Been Using Agile Methodologies (Scrum) for 6 years •Certified Scrum Master](https://reader033.vdocuments.us/reader033/viewer/2022042306/5ed2c3862aaea274ff7c874b/html5/thumbnails/55.jpg)
![Page 56: Agile Project Management (APM)My Relevant Background •PMP –Traditional Project Manager for many years •Been Using Agile Methodologies (Scrum) for 6 years •Certified Scrum Master](https://reader033.vdocuments.us/reader033/viewer/2022042306/5ed2c3862aaea274ff7c874b/html5/thumbnails/56.jpg)
Sprint Cadence (3 weeks)
•Day One – Sprint Planning Session
•Every Day – Standup meeting• Track Progress
•Last Day of Sprint• Sprint Review• Team Retrospective
![Page 57: Agile Project Management (APM)My Relevant Background •PMP –Traditional Project Manager for many years •Been Using Agile Methodologies (Scrum) for 6 years •Certified Scrum Master](https://reader033.vdocuments.us/reader033/viewer/2022042306/5ed2c3862aaea274ff7c874b/html5/thumbnails/57.jpg)
Sprint Planning Session (6 hours)
• Team plans what they are doing within the Sprint
• Team takes the highest priority requirements and estimates how much effort it will take to complete. (Do not use hours, use story points)
• They estimate at the User Story Level.
![Page 58: Agile Project Management (APM)My Relevant Background •PMP –Traditional Project Manager for many years •Been Using Agile Methodologies (Scrum) for 6 years •Certified Scrum Master](https://reader033.vdocuments.us/reader033/viewer/2022042306/5ed2c3862aaea274ff7c874b/html5/thumbnails/58.jpg)
Sprint Planning Session (6 hours)
•When they fill up their sprint with the work, they commit to complete the work.
• This work is called the SPRINT BACKLOG.
•No changes once the Sprint Starts.
![Page 59: Agile Project Management (APM)My Relevant Background •PMP –Traditional Project Manager for many years •Been Using Agile Methodologies (Scrum) for 6 years •Certified Scrum Master](https://reader033.vdocuments.us/reader033/viewer/2022042306/5ed2c3862aaea274ff7c874b/html5/thumbnails/59.jpg)
Daily Scrum (Standup)
•One mandatory meeting a day for all team members
• Same time each day.
• Lasts no more than 15 minutes
![Page 60: Agile Project Management (APM)My Relevant Background •PMP –Traditional Project Manager for many years •Been Using Agile Methodologies (Scrum) for 6 years •Certified Scrum Master](https://reader033.vdocuments.us/reader033/viewer/2022042306/5ed2c3862aaea274ff7c874b/html5/thumbnails/60.jpg)
Daily Scrum (Standup)
• Each team member answers three questions• What have I accomplished since our last meeting?• What do I plan on accomplishing before next meeting?• What impediments do I have?
•Also Track progress on each story.
• If you want to discuss or demonstrate something , you meet immediately afterwards.
![Page 61: Agile Project Management (APM)My Relevant Background •PMP –Traditional Project Manager for many years •Been Using Agile Methodologies (Scrum) for 6 years •Certified Scrum Master](https://reader033.vdocuments.us/reader033/viewer/2022042306/5ed2c3862aaea274ff7c874b/html5/thumbnails/61.jpg)
Tracking Progress
![Page 62: Agile Project Management (APM)My Relevant Background •PMP –Traditional Project Manager for many years •Been Using Agile Methodologies (Scrum) for 6 years •Certified Scrum Master](https://reader033.vdocuments.us/reader033/viewer/2022042306/5ed2c3862aaea274ff7c874b/html5/thumbnails/62.jpg)
Tracking Progress
![Page 63: Agile Project Management (APM)My Relevant Background •PMP –Traditional Project Manager for many years •Been Using Agile Methodologies (Scrum) for 6 years •Certified Scrum Master](https://reader033.vdocuments.us/reader033/viewer/2022042306/5ed2c3862aaea274ff7c874b/html5/thumbnails/63.jpg)
Sprint Review
• Last day of Sprint• Every requirement completed is demonstrated.• The Product Owner determines if requirement is
completed.• If item is not completed it gets moved to the next
sprint.•Velocity is calculated on the requirements that were
completed. (Add up points of completed User Stories)
![Page 64: Agile Project Management (APM)My Relevant Background •PMP –Traditional Project Manager for many years •Been Using Agile Methodologies (Scrum) for 6 years •Certified Scrum Master](https://reader033.vdocuments.us/reader033/viewer/2022042306/5ed2c3862aaea274ff7c874b/html5/thumbnails/64.jpg)
Sprint Retrospective
• Last day of Sprint• Just the team participates.• First review your metrics (velocity, estimate accuracy)• Team discusses
• What went well?• What did not go well?• Areas for improvement• Shout outs to the team members
![Page 65: Agile Project Management (APM)My Relevant Background •PMP –Traditional Project Manager for many years •Been Using Agile Methodologies (Scrum) for 6 years •Certified Scrum Master](https://reader033.vdocuments.us/reader033/viewer/2022042306/5ed2c3862aaea274ff7c874b/html5/thumbnails/65.jpg)
APM Results
![Page 66: Agile Project Management (APM)My Relevant Background •PMP –Traditional Project Manager for many years •Been Using Agile Methodologies (Scrum) for 6 years •Certified Scrum Master](https://reader033.vdocuments.us/reader033/viewer/2022042306/5ed2c3862aaea274ff7c874b/html5/thumbnails/66.jpg)
Agile Project Management Performance
•On our present development project (on 4th year).
•We have not missed a delivery.• Some functionality had to be delayed a delivery.
•Have kept pretty close to 40 hours/week pace.
![Page 67: Agile Project Management (APM)My Relevant Background •PMP –Traditional Project Manager for many years •Been Using Agile Methodologies (Scrum) for 6 years •Certified Scrum Master](https://reader033.vdocuments.us/reader033/viewer/2022042306/5ed2c3862aaea274ff7c874b/html5/thumbnails/67.jpg)
The Power of APM
• Team Structure is very powerful.• Everyone tries hard.• Estimating your own work.• Self-managed.
• Emphasis on Iterative development• Short iterations allow learning cycles.
• Emphasis on Incremental development• Reduces risk because incrementally getting feedback.
![Page 68: Agile Project Management (APM)My Relevant Background •PMP –Traditional Project Manager for many years •Been Using Agile Methodologies (Scrum) for 6 years •Certified Scrum Master](https://reader033.vdocuments.us/reader033/viewer/2022042306/5ed2c3862aaea274ff7c874b/html5/thumbnails/68.jpg)
Agile Project Management Resources
![Page 69: Agile Project Management (APM)My Relevant Background •PMP –Traditional Project Manager for many years •Been Using Agile Methodologies (Scrum) for 6 years •Certified Scrum Master](https://reader033.vdocuments.us/reader033/viewer/2022042306/5ed2c3862aaea274ff7c874b/html5/thumbnails/69.jpg)
Agile Project Management Resources (Books)
•Scrum – The Art of Doing Twice the Work in Half the Time• By Jeff Sutherland and J.J. Sutherland
•Scrum.org –• Ken Schwaber’s company• The Scrum Guide
•Scaled Agile Framework –www.scaledagileframework.com
![Page 70: Agile Project Management (APM)My Relevant Background •PMP –Traditional Project Manager for many years •Been Using Agile Methodologies (Scrum) for 6 years •Certified Scrum Master](https://reader033.vdocuments.us/reader033/viewer/2022042306/5ed2c3862aaea274ff7c874b/html5/thumbnails/70.jpg)
Agile Project Management Resources