agile methods with performance-based earned value
TRANSCRIPT
![Page 1: Agile Methods with Performance-Based Earned Value](https://reader033.vdocuments.us/reader033/viewer/2022052905/62900ef4d544c2034503a196/html5/thumbnails/1.jpg)
©Copyright Paul Solomon 2009
Agile Methods withPerformance-Based
Earned Value
1
Paul Solomon, PMPPerformance-Based Earned Value®
www.PB-EV.com
Systems & Software Technology ConferenceSalt Lake City April 20, 2009
![Page 2: Agile Methods with Performance-Based Earned Value](https://reader033.vdocuments.us/reader033/viewer/2022052905/62900ef4d544c2034503a196/html5/thumbnails/2.jpg)
©Copyright Paul Solomon 2009
Agenda
• Customer wants valid Earned Value (EV)
• Agile methods and EV
• DOD, CMMI and Systems Engineering guidance
• Incremental functionality
• Scrum application
• Agile EV Summary
2
![Page 3: Agile Methods with Performance-Based Earned Value](https://reader033.vdocuments.us/reader033/viewer/2022052905/62900ef4d544c2034503a196/html5/thumbnails/3.jpg)
©Copyright Paul Solomon 2009
Value of Earned Value
3
EVM data will be reliable and accurate only if:
• The right base measures of technical performance
are selected
and
• Progress is objectively assessed
PB-EV link, Integrating SE with EVM, Defense AT&L Magazine, May 2004
![Page 4: Agile Methods with Performance-Based Earned Value](https://reader033.vdocuments.us/reader033/viewer/2022052905/62900ef4d544c2034503a196/html5/thumbnails/4.jpg)
©Copyright Paul Solomon 2009
EVM Not Working for DOD
7/07 USD AT&L Memo, Use of EVM in the DOD
• Use of EVM …department-wide, is insufficient
• EVM is not serving its intended function
in the internal control process
2/08 Dept. of the Navy Memo, EVM Reviews
• Broad deficiencies in EVM compliance
• Failure to manage and document changes to the
baseline
• Lack of integration across the cost, schedule,
and work authorization systems
• Intentional masking of cost and schedule variances
• Inadequate reporting of EAC
4
![Page 5: Agile Methods with Performance-Based Earned Value](https://reader033.vdocuments.us/reader033/viewer/2022052905/62900ef4d544c2034503a196/html5/thumbnails/5.jpg)
©Copyright Paul Solomon 20095
Deficiencies in Use of EVM
GAO Report
Title Findings and Recommendations
08-448 Defense Acquisitions: Progress Made in Fielding Missile Defense, but Program Short of Meeting Goals (Missile Defense Agency (MDA)
Deferred Functionality MDA did not track the cost of work deferred from one block to another.
• Cost of first block understated.
• Cost of second block overstated.
5
![Page 6: Agile Methods with Performance-Based Earned Value](https://reader033.vdocuments.us/reader033/viewer/2022052905/62900ef4d544c2034503a196/html5/thumbnails/6.jpg)
©Copyright Paul Solomon 2009 6
Agile Methods and EV
![Page 7: Agile Methods with Performance-Based Earned Value](https://reader033.vdocuments.us/reader033/viewer/2022052905/62900ef4d544c2034503a196/html5/thumbnails/7.jpg)
©Copyright Paul Solomon 2009
Agile Methods Characteristics
• Next iteration of work is detail planned in work
package
• Product burndown is a planning package for
remaining features
• Features often deferred from the current
iteration to the product burndown
• Features and priorities frequently revised
7
![Page 8: Agile Methods with Performance-Based Earned Value](https://reader033.vdocuments.us/reader033/viewer/2022052905/62900ef4d544c2034503a196/html5/thumbnails/8.jpg)
©Copyright Paul Solomon 2009
Agile and EVMS Constraints
But EVMS Guideline requires maintaining the
Performance Measurement Baseline (PMB)
– Time-phased scope, schedule, and
associated budget through the end of the
contract (a)
8
RE
SO
UR
CE
S
BUDGET AT COMPLETION -BAC
EARNED VALUE -BCWP
Behind Schedule
CostVarianceScheduleVariance
ACTUALS-ACWP
EAC
RE
SO
UR
CE
S
PMB = BCWS-
BUDGET AT COMPLETION -BACBAC -
EARNED VALUE -EARNED VALUE
Behind Schedule
CostVarianceScheduleVariance
ACTUALS-ACWPACTUALS-
EACEAC
(a) National Defense Industrial Association, EVMS Intent Guideline 8
![Page 9: Agile Methods with Performance-Based Earned Value](https://reader033.vdocuments.us/reader033/viewer/2022052905/62900ef4d544c2034503a196/html5/thumbnails/9.jpg)
©Copyright Paul Solomon 2009
Agile Focus on Near Term May Break Link with PMB
Giving full credit to meeting near term goals
• May break link with the PMB
• Loses track of progress of plan to satisfy requirements
9
![Page 10: Agile Methods with Performance-Based Earned Value](https://reader033.vdocuments.us/reader033/viewer/2022052905/62900ef4d544c2034503a196/html5/thumbnails/10.jpg)
©Copyright Paul Solomon 2009 10
DOD, CMMI and Systems
Engineering GuidanceAugment EVMS,Support Agile
![Page 11: Agile Methods with Performance-Based Earned Value](https://reader033.vdocuments.us/reader033/viewer/2022052905/62900ef4d544c2034503a196/html5/thumbnails/11.jpg)
©Copyright Paul Solomon 2009
DoDI 5000.02, Operation of the Defense Acquisition
System (POL), 12/2008
Defense Acquisition Guidebook (DAG) 10/8/04
Systems Engineering Plan (SEP) Preparation Guide 4/08
WBS Handbook, Mil-HDBK-881A (WBS) 7/30/05
Integrated Master Plan (IMP) & Integrated Master
Schedule Preparation & Use Guide (IMS) 10/21/05
DOD Guides:Technical Baselines
Guide for Integrating SE into DOD Acquisition Contracts
(Integ SE) 12/06
11
![Page 12: Agile Methods with Performance-Based Earned Value](https://reader033.vdocuments.us/reader033/viewer/2022052905/62900ef4d544c2034503a196/html5/thumbnails/12.jpg)
©Copyright Paul Solomon 2009
System DemonstrationSystem Integration
Design Readiness
Review
B C
System
Functional
Baseline
SFR PDR
Product
Baseline
CDR
Allocated
Baseline
Product
Baseline
PRR
Technical Baselines
DAG:
IEEE Validated Verified Physical Architecture
1220: Requirements
PMBOK Guide: Performance Measurement Baseline (PMB) including technical and quality
parameters12
![Page 13: Agile Methods with Performance-Based Earned Value](https://reader033.vdocuments.us/reader033/viewer/2022052905/62900ef4d544c2034503a196/html5/thumbnails/13.jpg)
©Copyright Paul Solomon 2009
Technical Baselines
DoD Policy or Guide POL DAG SEP
WBS IMP/ IMS
Integ SE
Technical Reviews:
Event-driven timing X X X X X X
Success criteria X X X X X X
Include entry and exit criteria in IMP and IMS
X X
Assess technical maturity X X X X
13
![Page 14: Agile Methods with Performance-Based Earned Value](https://reader033.vdocuments.us/reader033/viewer/2022052905/62900ef4d544c2034503a196/html5/thumbnails/14.jpg)
©Copyright Paul Solomon 2009
Guidance fromSE Standards and CMMI
• Processes for Engineering a System (ANSI/EIA-632)
• Standard for Application and Management of the SE
Process (IEEE 1220)
• Capability Maturity Model Integration (CMMI®)
• CMMI for Development, Version 1.2
• CMMI for Acquisition, Version 1.2
14
![Page 15: Agile Methods with Performance-Based Earned Value](https://reader033.vdocuments.us/reader033/viewer/2022052905/62900ef4d544c2034503a196/html5/thumbnails/15.jpg)
©Copyright Paul Solomon 2009
CMMI: Traceability
• CMMI: Traceability and consistency
Product
Require-
ments
Baseline
Task 1
Task 2
Task 3
•Project Plans
•Activities
•Work Products
Requirements Work
Source: CMMI Requirements Management Process Area (PA), Specific
Practice (SP) 1.5
15
![Page 16: Agile Methods with Performance-Based Earned Value](https://reader033.vdocuments.us/reader033/viewer/2022052905/62900ef4d544c2034503a196/html5/thumbnails/16.jpg)
©Copyright Paul Solomon 2009
CMMI
• CMMI Process and Product Quality Assurance PA,
SP 1.2
• Objectively evaluate work products against
clearly stated criteria
• Evaluate at selected milestones in their
development
16
![Page 17: Agile Methods with Performance-Based Earned Value](https://reader033.vdocuments.us/reader033/viewer/2022052905/62900ef4d544c2034503a196/html5/thumbnails/17.jpg)
©Copyright Paul Solomon 2009
Requirements and Product Metrics
IEEE 1220 EIA-632
6.8.1.5 Performance-based
progress measurement
4.2.1 Req. 10: Progress
against requirements
6.8.1.5 d) Assess
• Development maturity
• Product’s ability to satisfy
requirements
6.8.6 Product metrics atpre-established control points:
• Evaluate system quality• Compare to planned goals and
targets
Assess progress …
• Compare system definition
against requirements
a) Identify product metricsand expected values
▪ Quality of product
▪ Progress towards
satisfying requirements
d) Compare results against
requirements
17
![Page 18: Agile Methods with Performance-Based Earned Value](https://reader033.vdocuments.us/reader033/viewer/2022052905/62900ef4d544c2034503a196/html5/thumbnails/18.jpg)
©Copyright Paul Solomon 2009 18
Incremental Functionality
![Page 19: Agile Methods with Performance-Based Earned Value](https://reader033.vdocuments.us/reader033/viewer/2022052905/62900ef4d544c2034503a196/html5/thumbnails/19.jpg)
©Copyright Paul Solomon 2009
Incremental Software Capability
• Document baseline content of each build
– Testable, functional requirements (TR)
• Establish build milestones and completion criteria
• Establish work packages and EV metrics for builds
• Take EV based on enabling work products and
functionality achieved
• Account for deferred (to next build) functionality
19
PB-EV link, PBEV Webinar, DOD Data and Analysis Center for
Software (DACS), August 2008
![Page 20: Agile Methods with Performance-Based Earned Value](https://reader033.vdocuments.us/reader033/viewer/2022052905/62900ef4d544c2034503a196/html5/thumbnails/20.jpg)
©Copyright Paul Solomon 2009
Internal Replanningof Deferred Functionality
• If build is released short of planned functionality:
– Take partial EV and leave work package open or
– Take partial EV and close work package
• Transfer deferred scope and budget to first month of work package for next build
– EV mirrors technical performance
– Schedule variance retained
• Disclose shortfall and slips on higher schedules
20
![Page 21: Agile Methods with Performance-Based Earned Value](https://reader033.vdocuments.us/reader033/viewer/2022052905/62900ef4d544c2034503a196/html5/thumbnails/21.jpg)
©Copyright Paul Solomon 2009
Example: Deferred Functionality
SOW: Software Requirements in 2 Builds:
Build Allocated TRs Budget/TR BAC
A 100 5 500
B 60 5 300
21
![Page 22: Agile Methods with Performance-Based Earned Value](https://reader033.vdocuments.us/reader033/viewer/2022052905/62900ef4d544c2034503a196/html5/thumbnails/22.jpg)
©Copyright Paul Solomon 2009
SW Build Plan
Jan Feb Mar Apr May Jun Jul Total
Build A
Planned Reqs. met 25 25 25 25 100
Budget/Req.: 5 hours
BCWS current (cur) 125 125 125 125 500
BCWS cumulative (cum) 125 250 375 500 500
Build B
Planned Reqs. Met 20 20 20 60
BCWS cur 100 100 100 300
22
![Page 23: Agile Methods with Performance-Based Earned Value](https://reader033.vdocuments.us/reader033/viewer/2022052905/62900ef4d544c2034503a196/html5/thumbnails/23.jpg)
©Copyright Paul Solomon 2009
Deferred Functionality Status
Jan Feb Mar Apr Total
Build A
Planned Reqs. Met cur 25 25 25 25 100
Actual Reqs. Met cur 20 20 25 25 90
BCWS cur 125 125 125 125 500
EV cur 100 100 125 125 450
BCWS cum 125 250 375 500
EV cum 100 200 325 450
Schedule variance (SV):
Reqs. Met -5 -10 -10 -10
SV -25 -50 -50 -50
23
![Page 24: Agile Methods with Performance-Based Earned Value](https://reader033.vdocuments.us/reader033/viewer/2022052905/62900ef4d544c2034503a196/html5/thumbnails/24.jpg)
©Copyright Paul Solomon 2009
Apr May Jun Jul Total
Close Build A work package
Schedule variance (cum.):
Req Not Met - 10 -10
BCWP remaining - 50 -50
Build B
Before Replan
Planned Req Met 20 20 20 60
BCWS cur 100 100 100 300
Plus transfer budget from Build A:
Req Not Met +10
BCWP remaining +50
After replan:
Planned Req Met 30 20 20 70
BCWS cur 150 100 100 350
Deferred Functionality Replan
24
Transfer to 1st month of receiving work package to retain schedule variance
![Page 25: Agile Methods with Performance-Based Earned Value](https://reader033.vdocuments.us/reader033/viewer/2022052905/62900ef4d544c2034503a196/html5/thumbnails/25.jpg)
©Copyright Paul Solomon 2009
Deferred Functionality Status
May Jun Jul Total
Build B After Replan:
Planned Reqs. Met 30 20 20 70
BCWS cur 150 100 100 350
Actual Reqs. Met cur 20 20
EV cur 100 100
Schedule variance cum:
Reqs. Met -10
SV -50
25
May status: 20 reqs met, but still behind schedule
![Page 26: Agile Methods with Performance-Based Earned Value](https://reader033.vdocuments.us/reader033/viewer/2022052905/62900ef4d544c2034503a196/html5/thumbnails/26.jpg)
©Copyright Paul Solomon 2009 26
Scrum Application
![Page 27: Agile Methods with Performance-Based Earned Value](https://reader033.vdocuments.us/reader033/viewer/2022052905/62900ef4d544c2034503a196/html5/thumbnails/27.jpg)
©Copyright Paul Solomon 2009
Sprint Review Meeting
Replanning/EV Actions
• Agree on features that were not delivered
• Product Owner reviews/changes priorities
of Product Breakdown Items (PBI)
• Better understanding of needed features
• Revise Estimate at Completion (EAC)
• Develop revised Product Backlog and
burndown chart
27
![Page 28: Agile Methods with Performance-Based Earned Value](https://reader033.vdocuments.us/reader033/viewer/2022052905/62900ef4d544c2034503a196/html5/thumbnails/28.jpg)
©Copyright Paul Solomon 2009
Burndown Chart
• How many features remain to be completed
• Captures scope change
• “Features” to be developed could be story points,
use cases or other nonfunctional requirements
• “Completion” based on acceptance or unit tests
passed
28
![Page 29: Agile Methods with Performance-Based Earned Value](https://reader033.vdocuments.us/reader033/viewer/2022052905/62900ef4d544c2034503a196/html5/thumbnails/29.jpg)
©Copyright Paul Solomon 2009
Burndown Chart
Burndown chart showing scope or estimate increase
after each iteration. From A. Cockburn, Crystal Clear.
# of PBIs still to complete
29
![Page 30: Agile Methods with Performance-Based Earned Value](https://reader033.vdocuments.us/reader033/viewer/2022052905/62900ef4d544c2034503a196/html5/thumbnails/30.jpg)
©Copyright Paul Solomon 2009
Sprint Review Meeting:EV Constraints
Budget baseline considerations
• Most features/PBIs are derived requirements
• Derived from higher level functionality
• Features changes usually do not change
contract scope or total budget
• Maintain PMB and technical baseline
• Account for deferred features
• Transfer budget with SOW
• Maintain schedule variance (SV)
30
![Page 31: Agile Methods with Performance-Based Earned Value](https://reader033.vdocuments.us/reader033/viewer/2022052905/62900ef4d544c2034503a196/html5/thumbnails/31.jpg)
©Copyright Paul Solomon 2009
Agile Method
31
Product Backlog
PBI 3 - nProduct Backlog
Item (PBI) 1, 2
(TR 1, 2)
Release 1 Release 2 Release 3
Task 1
Task 2
Task 3
Task 4
Task n
Sprint 1
Task 1
Task 2
Task 3
Task 4
Task n
Sprint 2
Task 1
Task 2
Task 3
Task 4
Task n
Sprint 3
Task 1
Task 2
Task 3
Task 4
Task n
Sprint 5
PBI 3 - ? PBI ? - ? PBI ? - n
Task 1
Task 2
Task 3
Task 4
Task n
Sprint 4
![Page 32: Agile Methods with Performance-Based Earned Value](https://reader033.vdocuments.us/reader033/viewer/2022052905/62900ef4d544c2034503a196/html5/thumbnails/32.jpg)
©Copyright Paul Solomon 2009
Constraints & Assumptions 1/2
Baseline Constraints/Assumptions:
• Set of TRs = Product Backlog Items (PBIs)
• Functionality/PBIs traceable to
– Releases
– Modules
• Baseline Release milestones established
• Budget allocated to
– 3 Releases (Rel)
– 4 Modules (Mod)
– 11 PBIs
32
![Page 33: Agile Methods with Performance-Based Earned Value](https://reader033.vdocuments.us/reader033/viewer/2022052905/62900ef4d544c2034503a196/html5/thumbnails/33.jpg)
©Copyright Paul Solomon 2009
Constraints & Assumptions (2/2)
Baseline Constraints/Assumptions (continued):
• Budget = 5,000 hours
• Budget based on estimated hours/PBI
• Each PBI has 5 features
– Each feature has equal estimated hours
• Sprint 1 in a work package (WP)
• Future sprints in a planning package (PP)
• Period of Performance : Jan 1 – May 31
33
![Page 34: Agile Methods with Performance-Based Earned Value](https://reader033.vdocuments.us/reader033/viewer/2022052905/62900ef4d544c2034503a196/html5/thumbnails/34.jpg)
©Copyright Paul Solomon 2009
Product Backlog
5/21/201834
Release Function PBI Priority Function
1 Login 1 1 Validate member’s pin number
and 2 2 Withdraw Menu
Menu 3 3 Deposit Menu
4 4 Balance Inquiry Menu
5 5 Access Funds in Other Banks/Credit Cards
6 6 Transfer Between Accounts
2 Withdraw 7 7 Enter Amount
Functions 8 8 Select Fast Pay Amount
9 9 Select Account (Checking, Savings)
3 Deposit 10 10 Enter Amount
Functions 11 11 Select Account (Checking, Savings)
![Page 35: Agile Methods with Performance-Based Earned Value](https://reader033.vdocuments.us/reader033/viewer/2022052905/62900ef4d544c2034503a196/html5/thumbnails/35.jpg)
©Copyright Paul Solomon 2009
Plan
35
Function/ Est./ Features/Month
Release Module PBI PBI Jan Feb Mar Apr May Total
1 1 1 200 1-5
2 200 1-5
2 3 250 1-5
4 150 1-5
5 300 1-5
6 100 1-5
Total/Rel 1200
2 3 7 500 1-5
8 600 1-3 4,5
9 900 1-5
Total/Rel 2000
3 4 10 800 1-5
11 1000 1,2 3-5
Total/Rel 1800
Total 5000
BCWS/Month 1200 860 1140 1200 600 5000
![Page 36: Agile Methods with Performance-Based Earned Value](https://reader033.vdocuments.us/reader033/viewer/2022052905/62900ef4d544c2034503a196/html5/thumbnails/36.jpg)
©Copyright Paul Solomon 2009
Accomplishment & EV Status
1 Determine EV and conduct Sprint Review at end of
Sprint 1, Jan. 31
• All PBIs completed except PBI #5
• PBI #5, Access other funds: 2 of 5 features completed
• Customer adds 3 new features to existing functions/backlog
• Customer decision on remaining features:
36
Remaining Features Decision EV/budget impact
1. Draw cash from other bank
accounts
Defer Behind schedule:
•Transfer to backlog
• Maintain SV
4. Draw cash from affiliated credit
cards
5. Draw cash from other credit cards
Descope Behind schedule:
•Transfer to new
features
• Maintain SV
![Page 37: Agile Methods with Performance-Based Earned Value](https://reader033.vdocuments.us/reader033/viewer/2022052905/62900ef4d544c2034503a196/html5/thumbnails/37.jpg)
©Copyright Paul Solomon 2009
EV and Schedule Variance
37
Function/ Est./ Features/MonthRelease TR TR Jan EV Feb Mar Apr May Total
1 1-4, 6 900 900
5 300300, 120
or 0?
Total/Rel 12002 7 500 500
8 600 360 2409 900 900
Total/Rel 20003 10 800 800
11 1000 400 600Total/Rel 1800
Total 5000
BCWS/Month 1200 860 1140 1200 600 5000
ScheduleVariance?
0, -180,-300?
![Page 38: Agile Methods with Performance-Based Earned Value](https://reader033.vdocuments.us/reader033/viewer/2022052905/62900ef4d544c2034503a196/html5/thumbnails/38.jpg)
©Copyright Paul Solomon 2009 38
Agile EV Summary
![Page 39: Agile Methods with Performance-Based Earned Value](https://reader033.vdocuments.us/reader033/viewer/2022052905/62900ef4d544c2034503a196/html5/thumbnails/39.jpg)
©Copyright Paul Solomon 2009
Agile EV Constraints
Internal replanning guidance:
• Maintain PMB when PBI burndown changes
• Baseline finish dates of major releases
• Technical baseline
• Cumulative BCWS
• Transfer budget for deferred features to first
period of next iteration/sprint
• Reallocate budget for descoped features to
PBI unless a function was also descoped
• Maintain reported schedule variances
• Reallocate remaining EV (BAC – Cum. EV) to
revised product backlog after each iteration
• Revise EAC, compare to funding, reprioritize
39
![Page 40: Agile Methods with Performance-Based Earned Value](https://reader033.vdocuments.us/reader033/viewer/2022052905/62900ef4d544c2034503a196/html5/thumbnails/40.jpg)
©Copyright Paul Solomon 2009
Maintain Link with PMB
• Performance-Based EV
– Measure delivered features vs. plan
• Flexible planning for new priorities
• But measure progress towards meeting all requirements in the technical baseline
40
![Page 41: Agile Methods with Performance-Based Earned Value](https://reader033.vdocuments.us/reader033/viewer/2022052905/62900ef4d544c2034503a196/html5/thumbnails/41.jpg)
©Copyright Paul Solomon 2009
PBEV Resources in Online Media
DODDOD SEI NAVAIR
ICFAI U.
Press, India
PMI College of
Performance Mgt.,
“Measurable News”
41
![Page 42: Agile Methods with Performance-Based Earned Value](https://reader033.vdocuments.us/reader033/viewer/2022052905/62900ef4d544c2034503a196/html5/thumbnails/42.jpg)
©Copyright Paul Solomon 2009
Book includes
• Examples
• Templates
• Tips
• Standards
• Acquisition
guidance
Published by:
Process Improvement Resources
Consulting:
Paul Solomon, PMPPerformance-Based
Earned Value®
818-212-8462
• Process improvement
• EV training
• EV compliance
• Acquisition guidance
• IBR leadership
• Assess EAC and risk
Credentials:
www.pb-ev.com
42
![Page 43: Agile Methods with Performance-Based Earned Value](https://reader033.vdocuments.us/reader033/viewer/2022052905/62900ef4d544c2034503a196/html5/thumbnails/43.jpg)
©Copyright Paul Solomon 2009
Acronyms
BCWP: Budgeted Cost of Work Planned
BCWS: Budgeted Cost of Work Scheduled
EVM: Earned Value Management
CPI: Cost Performance Index
EAC: Estimate at Completion
PBI: Product Backlog Item
PMB: Performance Measurement Baseline
RTM: Requirements Traceability Matrix
SE: Systems Engineering
SEP: Systems Engineering Plan
SV: Schedule Variance
TR: Testable requirements
43