agenda - wednesday

11
Agenda - Wednesday PWE3 - Thursday, November 12, 2009 13:00 - 15:00 CHAIRS: Stewart Bryant and Matthew Bocci 15 min - WG Status - Stewart Bryant and Matthew Bocci 10 min - P2MP PW Accounting Extensions - Bo Wu http://tools.ietf.org/id/draft-wu-pwe3-p2mp-pw-accounting- extensions-00.txt 10 min - Pseudowire (PW) Redundancy - Praveen Muley http://tools.ietf.org/html/draft-ietf-pwe3-redundancy-bit-02.txt http://tools.ietf.org/html/draft-ietf-pwe3-redundancy-02.txt 10 min - Flow Aware Transport of Pseudowires over an MPLS PSN - Stewart Bryant http://tools.ietf.org/html/draft-ietf-pwe3-fat-pw-02 10 min - Packet Pseudowire Encapsulation over an MPLS PSN - Stewart Bryant http://tools.ietf.org/id/draft-bryant-pwe3-packet-pw-02.txt 10 min - Control Word Reserved bit for use in E-Tree - Fred Jounay for Simon Delord http://tools.ietf.org/id/draft-delord-pwe3-cw-bit-etree-00.txt 10 min - Signaling Root-Initiated Point-to-Multipoint Pseudowires using LDP - Luca Martini http://tools.ietf.org/html/draft-martini-pwe3-p2mp-pw-01.txt (Note: (results of merging draft-martini-pwe3-p2mp-pw-00 and draft-jounay-niger-pwe3-source-initiated-p2mp-pw-03 ) 5 min - Closing - Stewart Bryant and Matthew Bocci

Upload: lara-wilson

Post on 31-Dec-2015

17 views

Category:

Documents


1 download

DESCRIPTION

Agenda - Wednesday. PWE3 - Thursday, November 12, 2009 13:00 - 15:00 CHAIRS: Stewart Bryant and Matthew Bocci 15 min - WG Status - Stewart Bryant and Matthew Bocci 10 min - P2MP PW Accounting Extensions - Bo Wu - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Agenda - Wednesday

Agenda - WednesdayPWE3 - Thursday, November 12, 2009 13:00 - 15:00CHAIRS: Stewart Bryant and Matthew Bocci

15 min - WG Status - Stewart Bryant and Matthew Bocci 10 min - P2MP PW Accounting Extensions - Bo Wu http://tools.ietf.org/id/draft-wu-pwe3-p2mp-pw-accounting-extensions-00.txt 10 min - Pseudowire (PW) Redundancy - Praveen Muley http://tools.ietf.org/html/draft-ietf-pwe3-redundancy-bit-02.txt http://tools.ietf.org/html/draft-ietf-pwe3-redundancy-02.txt 10 min - Flow Aware Transport of Pseudowires over an MPLS PSN - Stewart Bryant http://tools.ietf.org/html/draft-ietf-pwe3-fat-pw-02 10 min - Packet Pseudowire Encapsulation over an MPLS PSN - Stewart Bryant http://tools.ietf.org/id/draft-bryant-pwe3-packet-pw-02.txt 10 min - Control Word Reserved bit for use in E-Tree - Fred Jounay for Simon Delord http://tools.ietf.org/id/draft-delord-pwe3-cw-bit-etree-00.txt 10 min - Signaling Root-Initiated Point-to-Multipoint Pseudowires using LDP - Luca Martini http://tools.ietf.org/html/draft-martini-pwe3-p2mp-pw-01.txt (Note: (results of merging draft-martini-pwe3-p2mp-pw-00 and draft-jounay-niger-pwe3-source-initiated-p2mp-pw-03 ) 5 min - Closing - Stewart Bryant and Matthew Bocci

Page 2: Agenda - Wednesday

Agenda - FridayPWE3 - Friday, November 13, 2009 9:00 - 11:30 (MPLS-TP - joint with MPLS WG)CHAIRS: Stewart, Matthew, George and Loa as appropriate

10 min - LDP Extensions for MPLS-TP PW OAM configuration - Fei Zhang http://tools.ietf.org/html/draft-zhang-mpls-tp-pw-oam-config-00

Page 3: Agenda - Wednesday

PWE3 WG StatusIETF-76

Stewart Bryant [email protected]

Matthew Bocci [email protected]

Page 4: Agenda - Wednesday

RFC

• An Architecture for Multi-Segment Pseudowire Emulation Edge-to-Edge

(RFC 5659)

Page 5: Agenda - Wednesday

RFC Editor

• draft-ietf-pwe3-mpls-transport-04.txt – draft-ietf-bfd-base NOT-RECEIVED – draft-ietf-mpls-rsvp-te-no-php-oob-mapping NOT-

RECEIVED– draft-ietf-pwe3-vccv-bfd IN-QUEUE

• draft-ietf-pwe3-vccv-bfd-07.txt – draft-ietf-bfd-base NOT-RECEIVED– draft-ietf-bfd-generic IN-QUEUE – draft-ietf-bfd-v4v6-1hop IN-QUEUE

Page 6: Agenda - Wednesday

With the IESG

• draft-ietf-pwe3-cep-mib– Revised ID Needed

– Chairs need to chase editors

• draft-ietf-pwe3-segmented-pw– Revised ID Needed

– Significant number of DISCUSS

Page 7: Agenda - Wednesday

Work in Progress 1

• draft-ietf-pwe3-oam-msg-map-11.txt

Finished LC, revised draft expected soon• draft-ietf-pwe3-dynamic-ms-pw-10.txt• draft-ietf-pwe3-congestion-frmwk-02.txt • draft-ietf-pwe3-redundancy-bit-02.txt

On agenda• draft-ietf-pwe3-redundancy-02.txt

On agenda

Page 8: Agenda - Wednesday

Work in Progress 2

• draft-ietf-pwe3-p2mp-pw-requirements-01.txt Is this ready to LC?• draft-ietf-pwe3-ldp-aii-reachability-02.txt • draft-ietf-pwe3-mpls-eth-oam-iwk-01.txt • draft-ietf-pwe3-iccp-02.txt • draft-ietf-pwe3-fat-pw-02 - On Agenda• draft-ietf-pwe3-fc-encap-09.txt & draft-ietf-

pwe3-fc-flow-00.txt - Comments sent to authors - waiting revised drafts

Page 9: Agenda - Wednesday

Poll for WG draft

• draft-martini-pwe3-p2mp-pw-01.txt• draft-martini-pwe3-static-pw-status-02.txt– Currently references MPLS-TP

– MPLS-TP will determine applicability of this mechanism to TP, so

reference should be removed

Send yes/no to list by 22nd Nov.

Page 10: Agenda - Wednesday

MPLS-TP

• Mead team was closed and work of MEAD team moved to IETF WGs (MPLS, PWE3, CCAMP, L2VPN).

• Tuesday 4pm UK calls to progress work – co-ordinates announced on MPLS-TP list.

• Friday PWE3 session will be shared with MPLS WG to work on MPLS-TP.

Page 11: Agenda - Wednesday

PWE3 and MPLS-TP

• There are questions about the architectural relationship between PWE3 and MPLS in the MPLS-TP project.

• In particular the applicability of MS-PW to MPLS-TP.

• We believe this is now clarified in the context of the client – MPLS-TP description that is needed in draft-ietf-mpls-tp-framework

• Authors intend to provide an update in the MPLS-TP PWE3 session on Friday