agenda for meeting (cable)

1
Agenda for Meeting (Gulf Salman Project) ASG 0.1) Scope of work for ALGIHAZ Contractor at Khulais BSP 0.2) The responsibility for Foundation of Sealing End and CSE (steel structure) at Khulaise BSP 0.3) Earthing inside khulaise BSP 0.4) Location of Management Rack 0.5) NMFOC Rout inside khulaise BSP up to Telecommunication room.

Upload: mahnooranjum

Post on 17-Nov-2015

3 views

Category:

Documents


1 download

DESCRIPTION

agenda

TRANSCRIPT

Agenda for Meeting (Gulf Salman Project)ASG0.1) Scope of work for ALGIHAZ Contractor at Khulais BSP

0.2) The responsibility for Foundation of Sealing End and CSE (steel structure) at Khulaise BSP

0.3)Earthing inside khulaise BSP

0.4) Location of Management Rack

0.5)NMFOC Rout inside khulaise BSP up to Telecommunication room.