agenda agenda bashing 5 min status update 10 min (chairs) on-path support 5 min (yjs) requirements...

5
Agenda Agenda bashing 5 min Status update 10 min (chairs) On-path support 5 min (YJS) Requirements for backhaul synchronization 10 min (Xiandong) NTPv5 requirements 10 min (Karen) Internet Time Protocol 10 min (Kurt) NTP gap analysis 10 min (Greg) 1588 profiles 10 min (Silvana) 1588 telecom profiles 10 min (Jacky) 1588 in telecom 10 min (Laurent) Use of GMPLS control plane 10 min (Jacky) Wrap up and call for participation (MIBs, security, etc) 5 min (chairs)

Upload: william-johnson

Post on 27-Mar-2015

212 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Agenda Agenda bashing 5 min Status update 10 min (chairs) On-path support 5 min (YJS) Requirements for backhaul synchronization 10 min (Xiandong) NTPv5

Agenda

• Agenda bashing  5 min

• Status update 10 min  (chairs)

• On-path support 5 min (YJS)

• Requirements for backhaul synchronization 10 min (Xiandong)

• NTPv5 requirements 10 min (Karen)

• Internet Time Protocol 10 min (Kurt) 

• NTP gap analysis 10 min (Greg) 

• 1588 profiles 10 min (Silvana)  

• 1588 telecom profiles 10 min (Jacky)

• 1588 in telecom 10 min (Laurent)

• Use of GMPLS control plane 10 min (Jacky)

• Wrap up and call for participation (MIBs, security, etc)  5 min (chairs)

Page 2: Agenda Agenda bashing 5 min Status update 10 min (chairs) On-path support 5 min (YJS) Requirements for backhaul synchronization 10 min (Xiandong) NTPv5

Status update

WG chartered 6 March, announced 11 MarchThe charter is now on the official TICTOC site http://www.ietf.org/html.charters/tictoc-charter.html

From our three existing drafts 1. Problem statement2. Modularization3. RAN Requirementswe need to create candidate WG drafts

Review and text contributions warmly requested

Page 3: Agenda Agenda bashing 5 min Status update 10 min (chairs) On-path support 5 min (YJS) Requirements for backhaul synchronization 10 min (Xiandong) NTPv5

Goals and Milestones*

Sep 2008Problem statement

Nov 2008Modular Framework documentation

Jan 2009Requirements analysis for use cases, including gap analysis

Apr 20091588v2 profile

Apr 2009NTPv4 extensions

Apr 2009Security document(s)

Aug 2009 MIB for IEEE 1588v2 profile and NTPv4 extensions (TICTOC MIB)

Aug 2009Prioritize second phase deliverables and add milestones or re-charter

* All dates are for exiting WG LC

Page 4: Agenda Agenda bashing 5 min Status update 10 min (chairs) On-path support 5 min (YJS) Requirements for backhaul synchronization 10 min (Xiandong) NTPv5

Work items

The focus of our initial work will be1. NTP extensions2. IEEE 1588v2 profiles

The latter will need careful coordination with ITU-T SG15 Q13

Happily there is significant participant overlapbetween the various SDOs involved

Page 5: Agenda Agenda bashing 5 min Status update 10 min (chairs) On-path support 5 min (YJS) Requirements for backhaul synchronization 10 min (Xiandong) NTPv5

Today's meeting

Due to timing constraints, talks (this time only) were accepted without IDs

We have• 3 talks on NTP extensions• 3 talks on 1588 profiles• 1 talk on requirements• 1 talk on path discovery