Africa Centre of Excellence in Dryland Agriculture [ACE 016] Implementation Plan 2014 – 2018 (Revised January, 2016)

Upload: others

Post on 26-Oct-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Africa Centre of Excellence in Dryland Agriculture...NgREN To provide acces to relevant literature to ACE and partners Acess to current and relevant information is indispensable in

Africa Centre of Excellence in

Dryland Agriculture

[ACE 016]

Implementation Plan

2014 – 2018 (Revised January, 2016)

Page 2: Africa Centre of Excellence in Dryland Agriculture...NgREN To provide acces to relevant literature to ACE and partners Acess to current and relevant information is indispensable in

Implementation Plan 

2

TableofContentsAbbreviations ............................................................................................................................. 3 

1.  BRIEF NARRATIVE SUMMARY .......................................................................................... 4 

2.  OVERVIEW OF PLANNED OUTPUTS, ACTIVITIES AND COST FOR FIRST YEAR ........ 6 

3.  TIMING OF PLANNED ACTIVITIES FOR ENTIRE PROJECT PERIOD (Gantt chart) .... 16 

4.  IMPLEMENTATION ARRANGEMENTS ............................................................................ 20 

4.1  Guiding rules and regulations ...................................................................................... 20 

4.2  Governance structures ................................................................................................. 20 

4.3  Incentive structures ...................................................................................................... 23 

4.4  Roles and responsibilities ............................................................................................ 23 

4.5  Environment safeguards .............................................................................................. 24 

5.  PERFORMANCE MONITORING ........................................................................................ 27 

6.  DETAILED BUDGET .......................................................................................................... 35 

7.  DETAILED ACTIVITY SHEETS (one for each activity) ................................................... 36 

Annexe 1: Procurement Plan .................................................................................................. 69 

Annexe 2: Potential Benefits of ACE to Internal and External Stakeholders ..................... 69 

Annexe 3 ................................................................................................................................... 69 

Page 3: Africa Centre of Excellence in Dryland Agriculture...NgREN To provide acces to relevant literature to ACE and partners Acess to current and relevant information is indispensable in

Implementation Plan 

3

Abbreviations

AAU  Association of African Universities 

ACE  Africa Centre of Excellence

ACTU  Anticorruption Transparency Unit

ARCN  Agricultural Research Council of Nigeria 

BUK  Bayero University, Kano 

CDA  Centre for Dryland Agriculture 

CL  Centre Leader 

DCL  Deputy Centre Leader

ICPC  Independent Corrupt Practices Commission 

ICRISAT  International Crops Research Institute for the Semi‐Arid Tropics 

ICT  Information and Communication Technology 

ILRI  International Livestock Research Institute

KNARDA  Kano State Agricultural and Rural Development Authority 

ROPPA  Network of Farmers' and Agricultural Producers' Organizations of West Africa SERVICOM  Service Compact with All Nigerians UK  United Kingdom WCA  West and Central Africa 

Page 4: Africa Centre of Excellence in Dryland Agriculture...NgREN To provide acces to relevant literature to ACE and partners Acess to current and relevant information is indispensable in

Implementation Plan 

4

1. BRIEFNARRATIVESUMMARY

More than 40% of the earth surface and over 2 billion people reside in dryland areas. In Africa, about 43% of land is estimated to fall within the drylands, where approximately 325 million people reside. Drylands are among the World’s most fragile ecosystems, characterized by high evapotranspiration, low rainfall, high vulnerability to the negative impacts of climate change, low crop yields, high levels of poverty, and conflicts in the use of natural resources. The rate of population increase in the drylands of West and Central Africa (WCA) is very high, resulting in more pressure and further degradation of the fragile agro-ecosystem. There is a multi-dimensional linkage between policy and institutional failures, land degradation, poverty, rapid population growth and poor agricultural production in drylands. Degradation in drylands leads to poor agricultural yield, food insecurity and poverty. Poor rural people in dry areas, in their quest for food and other livelihood needs, expand cultivation into forest, hillsides and other fragile areas that are easily degraded. This leads to recursive relationship between poverty and natural resource degradation. The principal constraints to the livelihoods of people in the WCA region are very closely related to those that affect agricultural productivity, given that about 70 – 85% of the people in the region derive their livelihoods directly or indirectly from agriculture. These contraints can be grouped into four: constraints to sustainable intensification of farming systems; constraints to sustainable management of natural resources in the face of changing climate; constraints to accessibility & efficiency of markets; and policy constraints. In order to respond to the needs of the WCA dryland region through relevant high level human capacity development and demand-driven research, Bayero University, Kano (BUK) established the Centre for Dryland Agriculture (CDA) in 2012 with the support of MacArthur Foundation. The existing framework of the CDA is now being consolidated into true regional centre of excellence in dryland agriculture through the World Bank Africa Centre of Excellence project. Through the activities of the CDA Bayero University aims to strongly link education and research with the development needs of the region, thus contributing to food security, improved livelihood, and reduction in poverty and conflicts. The main objective of the CDA is to specialize as a regional Centre of excellence in dryland agriculture delivering quality training and applied research in response to the needs of the WCA dryland region. The CDA will rest on the tripod of training, research and outreach activities. Postgraduate trainings in conventional academic Departments are often limited in scope, and do not match labor market demand and development requirements of the region. The training components of the Centre will be targeted at producing high level manpower that will work in various agricultural research and development organizations, colleges of agriculture and other higher institutions to address the problems and realize available opportunities. The research activities of the centre will be interdisciplinary focusing climate change and the dryland cropping and animal production environment aimed understanding complexities of the interaction and developing technological options for climate-smart agriculture and sustainable use of dryland natural resource. The thematic research areas of the centre and their interrelationship are depicted in chart 1. Students will be required to spend at least one month period in relevant industry/institution during which they will identify real issues around which their research proposals will be developed. By the end of the fourth year of the project the Centre would have enrolled at least 43 PhD and 220 MSc students and trained 1,074 students in short courses of more than 40 hours. At least 30% of these numbers will be regional students. To ensure gender equity, at least 30% of all students will be female. All MSc and PGD students will undertake at least one month internship in relevant industry/institution. All relevant teaching and research facilities will be procured, installed and made functional by the second year to provide students and faculty with opportunity to carry out cutting-edge research and publish in reputable Journals. To facilitate strong collaborations with educational, research and development bodies as well as the private sector partners across the region, specific memoranda of agreements will be signed between CDA and specific partners towards the implementation of the project activities. The CDA has already signed broad memoranda of understanding with the University of Maradi, University of Nairobi, University of Alexandria, and Galilee International Management Institute.

Page 5: Africa Centre of Excellence in Dryland Agriculture...NgREN To provide acces to relevant literature to ACE and partners Acess to current and relevant information is indispensable in

Implementation Plan 

5

In order to specialize as a Centre of Excellence, the CDA will concentrate on post graduate trainings and research only in four thematic areas of Dryland Crops and Cropping Systems, Dryland Range and Livestock Management, Climate Change and Natural Resources Management and Drylands Livelihood and Natural Resources Economics. The Centre will not provide Bachelor degree training. Some of the new and special aspects in the ACE include the internship in relevant industry/institution by students and faculty of the Centre; and the bringing together of a critical mass of high level material and human resources from across the region for effective teaching, learning and research. The proposal has addressed gender inclusiveness and equity by ensuring that at least 30% of all student intakes must be female. To ensure social inclusion the ACE shall uphold equal opportunity policy by identifying special learner types (e.g. students with disabilities, deprived or pregnant students) and make specific provision as well as personalised study plans where possible. As part of the strategy to attract regional students and faculty, the Centre will ensure that its curricula are relevant and attractive to students in the region. Publicity will be given to the programmes of the Centre through adverts in newspapers and websites of regional institutions the CDA is collaborating with. Specific number of fellowships will be reserved for regional students, especially in the first two years. Language support will be provided for students from francophone countries. The centre will make arrangement to secure accommodation for regional students within the University campus to ensure that they settle smoothly. The management of BUK has also promised to build an international students’ hostel from its own funds to accommodate ACE students from the region. To ensure sustainability of the Centre, funds generating activities will be vigorously pursued through: proposals to donors for research grants; tuition fees; and charges for specialized laboratory services amongst others. It is envisaged that at least $ 1,200,000 will be generated externally within the four years of the project. The figure is realistic considering that the Centre has already generated more than $ 1,000,000 within the last two years. These external streams of revenue are essential for the continuity of ACE activities after the expiration of the World Bank funding tenure. The ACE has sizeable pool PhD-level faculty from the participating departments capable of containing its varied responsibilities without compromising corporate management and individual staff efficiencies.

Page 6: Africa Centre of Excellence in Dryland Agriculture...NgREN To provide acces to relevant literature to ACE and partners Acess to current and relevant information is indispensable in

2. OVERVIEWOFPLANNEDOUTPUTS,ACTIVITIESANDCOSTFORFIRSTYEAR

Table1:Overviewoffirstprojectyear(thistableiscloselylinkedtosection7,aseachactivityrowhereintable1willrequireaseparateactivitysheetinsection7)Activity

No. Sub-

Component Activities  Objective Justification Output Estimated Budget ($) Year 2016

Total ACE  Partners Responsibl

e Office

r  Jan

ua

ry 

Fe

bru

ary 

Ma

rch 

Ap

ril 

Ma

Jun

Ju

ly 

Au

gu

st 

Se

pte

mb

er 

Oc

tob

et 

No

ve

mb

er 

Dec

em

ber 

    Procurement of XYZ 

To acquire and install xyz 

This is necessary to 

establish ………. 

the output of this 

activity is ….. 

 

                       

1.1  Strengthened capacity to provide relevant quality 

trainings in key areas of Dryland 

agriculture 

Engage Natural Resources 

Institute (NRI), University of Greenwich to conduct an 

assessment of the existing dryland programmes 

To review and carry out gap assessment of existing 

ACE programmes 

This necessary in order to provide peer evaluation and 

possible certification of 

existing programmes 

Existing gaps in current 

programmes 

documented 

$30,000.00   $30,000.00 CL

           

1.2  Workshop involving local and regional 

partners/stakeholders to define new/revised 

curricula for MSc, and PhD 

programmes; and to identify 

training areas for short courses 

To review current ACE curricula and get input 

from various stakeholders for possible improvement 

To ensure that trainings 

provided by ACE are 

relevant to regional needs 

Revised/new needs‐based 

curricula 

$25,000.00 $5,000.00  $20,000.00 DCL

       

Page 7: Africa Centre of Excellence in Dryland Agriculture...NgREN To provide acces to relevant literature to ACE and partners Acess to current and relevant information is indispensable in

Implementation Plan 

7

1.3  Upgrade of four classrooms with modern teaching and learning 

facilities including back‐up power 

solutions 

To renovate four ACE 

lecture rooms and equip them with teaching 

facilities and power back‐

up 

To provide conducive 

teaching and learning 

environment 

Renovated and 

equiped lecture rooms 

$50,000.00 $50,000.00  Procurement Officer 

           

1.4  Renovate and upgrade 

International students hostels with relevant furnishing and power back up 

Renovate and furnish a block 

consisting of 48 rooms for 

use by regional students 

To provide serene 

accommodation for effective learning 

Renovated and 

furnished regional students hostel. 

$90,000.00 $90,000.00  Procurement Officer 

           

1.5  Subscription to NgREN 

To provide acces to relevant 

literature to ACE and partners 

Acess to current and relevant information is indispensable in teaching and research 

ACE and partners get access to pay per 

view articles 

$225,000.00 $225,000.00  DCL

           

1.6  Construction of a mast with radio 

links and uninterrupted power supply equipment to facilitate 

unhindered access to the 

internet through the University MTN bandwidth subscription for the activities of 

ACE 

To improve internet 

access at the ACE 

Acess to current and relevant information is indispensable in teaching and research 

Improved internet access by staff and students 

$20,000.00 $20,000.00  Procurement Officer & ICT Officer 

           

1.7  Provision of video conferencing facility in the Seminar room 

To procure and install video 

conferencing facilities 

To provide possibility for virtual learning through video conferencing and webnars. 

Installed and 

functional video 

conferencing facility 

$15,000.00 $15,000.00  DCL, Procurement Officer 

           

Page 8: Africa Centre of Excellence in Dryland Agriculture...NgREN To provide acces to relevant literature to ACE and partners Acess to current and relevant information is indispensable in

Implementation Plan 

8

1.8  MSc and PhD fellowships (including 

research costs) to regional 

candidates 

To provide fellowships to 

regional students 

This is necessary at this stage in order to encourage 

enrolment of regional students 

Regional students enrolled into ACE 

programmes 

$240,000.00 $240,000.00  DCL

1.9  Mount specialized language courses for francophone 

students 

To provide English language training to francophone students 

This will enable the students improve their 

English language skills 

Regional students taught english language 

$20,000.00 $20,000.00  DCL, CT 

1.10  Exchange of staff through short stay, sabbatical and visiting lectureship 

To have highly skilled manpower involved in training of students in 

ACE programmes 

Specialized skills and 

competencies exist in ACE and 

partner institutions that can be tapped to the benefit 

of all stakeholders through staff exchange and 

visiting lectureship 

Staff exchage between ACE and partners 

$140,000.00 $40,000.00  $100,000.00 DCL, CT, CO 

1.11  Procure a 30‐seater training 

bus 

To procure a 30‐seater bus 

To enable easy movement of students and staff during 

study visits and excursions 

A 30‐seater bus 

$72,600.00 $72,600.00  Procurement Officer 

         

1.12  Organize joint short courses to address specific capacity needs of ACE, partners, industry and 

other stakeholders 

To organize short corses of not less 

than 40 hours 

Such courses will address specific skill 

needs and build capacities of ACE and partners 

Short courses 

conducted 

$187,250.00 $87,250.00  $100,000.00 DCL, CT, CO 

Page 9: Africa Centre of Excellence in Dryland Agriculture...NgREN To provide acces to relevant literature to ACE and partners Acess to current and relevant information is indispensable in

Implementation Plan 

9

1.13 

 

Conduct regional survey to assess the training and research needs of 

the sector 

To understand the training and research needs of 

institutions and industry 

This is will provide basis for designing the ACE’s 

programmes to address 

relevant needs of stakeholders 

Regional training and 

research needs 

documented 

Funds for this activity will be 

sourced outside the ACE project 

funds 

 

2.1  Strengthened capacity for research 

excellence in dryland 

agriculture related fields 

Implementation of research 

related trainings for ACE academic and technical staff 

To organize trainings for academic and technical staff 

on new research 

equipments and 

techniques provided by the ACE 

There is often a gap between the research facilities 

available and the skills to use such facilities, and this need to be adressed 

through hands‐on trainings 

Trainings conducted 

and capacities 

of academic 

and technical staff to used new equipments enhanced 

$30,000.00 $30,000.00  DCL, CT,CR 

         

2.2  Selection and engagement of  post‐doctoral 

fellows 

To engage 4 postdoctoral fellows to be involved in research in the thematic research 

areas of the ACE 

Working with post‐doctoral felows from the 

region will enhance regional 

collaboration in research and 

training 

Post‐doctoral fellows engaged 

$144,000.00 $144,000.00  DCL, CR 

 

2.3  Furnishing of a specialized Tissue‐

Culture Laboratory (BUK has constructed and provided to 

CDA a new laboratory 

building for this purpose) 

To furnish a tissue culture laboratory 

Required for research and 

teaching  on the fast 

propagation of dryland species 

Tissue culture 

laboratory furnished 

$100,000.00 $100,000.00  Procurement Officer, CR 

           

Page 10: Africa Centre of Excellence in Dryland Agriculture...NgREN To provide acces to relevant literature to ACE and partners Acess to current and relevant information is indispensable in

Implementation Plan 

10

2.4  Equiping of a specialized Tissue‐

Culture Laboratory (BUK has constructed and provided to 

CDA a new laboratory 

building for this purpose) 

To equip a tissue culture laboratory 

Required for research and 

teaching  on the fast 

propagation of dryland species 

Tissue culture 

laboratory equiped and being utilized 

$241,000.00 $241,000.00  Procurement Officer, CR 

     

2.5  Development of proposals and protocols and implementation of research 

programmes in the thematic 

research areas of the ACE (research driven by post doc 

fellows) 

To carry out research 

activites that adress revant 

issues  affecting dryland 

agriculture in the region 

Research is needed to address identified 

problems that impact 

Agriculture in region 

Research conducted and results published in high impact journals 

$150,000.00 $100,000.00  $50,000.00 DCL, CR, CT 

2.6  Upgrade of research farm, including a 5ha drip irrigation 

facility 

To upgrade and equip 

research farm 

Required for research and teaching 

Research farm 

upgraded 

$220,000.00 $220,000.00  DCL, CR, 

Procurement Officer         

2.7  Procurement and installation of 3 screen houses 

To procure and install 2 Russell and one tunel 

screenhouses 

Required for research and teaching 

Screenhouses procured 

and installed 

$120,000.00 $120,000.00  Procurement Officer, CR 

     

2.8  Furnishing of  PG Research 

Laboratories 

To furnish molecular biology 

laboratory 

Required for research and teaching 

Furnished laboratory 

$60,000.00 $60,000.00  Procurement Officer 

               

2.9  Furnishing of a specialized 

Instrumentation Laboratory 

Furnish central 

instrumentation laboratory 

Required for research and teaching 

Furnished laboratory 

$30,000.00 $30,000.00  Procurement Officer 

               

2.10 Furnishing of 

Remote sensing & GIS laboratory 

Furnish GIS and emote sensing 

laboratory 

Required for research and teaching 

Furnished laboratory 

$45,000.00 $45,000.00  Procurement Officer 

       

Page 11: Africa Centre of Excellence in Dryland Agriculture...NgREN To provide acces to relevant literature to ACE and partners Acess to current and relevant information is indispensable in

Implementation Plan 

11

2.11  Equiping  of a specialized 

Instrumentation Laboratory 

Equip centarl instrumentation laboratory 

Required for research and teaching 

Laboratory equiped 

and utilized 

$400,000.00 $400,000.00  Procurement Officer 

         

2.12 Equiping  of 

Remote Sensing & GIS laboratory 

Equip remote sensing and 

GIS laboratory 

Required for research and teaching 

Laboratory equiped 

and utilized 

$100,000.00 $100,000.00  Procurement Officer 

           

3.1  Improved relevance, regionality 

and stakeholder participation 

in ACE training and research 

programmes 

Conduct a regional 

workshop to discuss ACE 

programmes/activities with 

industry/sector partners 

To conduct a workshop to 

engage  stakeholders 

on the relevance of 

ACE programmes to them 

Exchange of information and feedback from 

various stakeholders is important in order to make 

ACE programmes relevant 

Stakeholder workshop conducted 

$50,000.00 $20,000.00  $30,000.00 CL, CO

         

3.2  Identify and facilitate students 

and staff internship in 

industries, public and private 

sectors, as well as  development organizations. 

Students and ACE staff do internship of atleast 1 month in relevant 

sector/industry 

Such internships will 

provide students and staff of Ace 

with insight into the relevant 

sector/industry problems that need to be tackled and opportunities that need be harnessed;  

Internships in relevant sector/indu

stry 

$120,000.00 $40,000.00  $80,000.00 DCL, CT 

3.3  ACE and identified parners/stakeholders engaged in 

exchange of staff and students, short visits, lectures by captains of industries 

Students and staff carry out academic 

visits/exchanges 

Such visits and exchanges are required to improve 

collaboration with various 

stakeholders in the region 

Academic visits/excha

nges carried out 

$40,000.00 $20,000.00  $20,000.00 DCL

 

Page 12: Africa Centre of Excellence in Dryland Agriculture...NgREN To provide acces to relevant literature to ACE and partners Acess to current and relevant information is indispensable in

Implementation Plan 

12

3.4  Sharing and exchange of information 

between ACE and partners, 

including library resources 

To share and exchange 

informationa nd library resources 

with partners 

Exchange of information and 

library resources will strengthen the collaboration between the ACE partners 

Information and library 

resources exchanged 

$10,000.00 $2,000.00  $8,000.00 CO, CT

4.1  Strengthened education 

and research governance 

and administrative capacity 

Provide trainings to key project staff on various 

aspects of projects 

management 

To provide ACE project staff with training on project 

management and use of Microsoft Project 

Skills in project management are required in order to run the ACE project 

more effectively 

Training conducted 

$50,000.00 $25,000.00  $25,000.00 DCL, CO 

         

4.2  Hold regular meetings of ACE teams, technical committee, and advisory board 

To hold regular 

meetings of ACE team, technical committee and ACE Advisory Board 

Important for smooth 

management of the project 

Meetings held with documented minutes 

$25,000.00 $25,000.00  CL

4.3  Preparation of end of the year procurement, financial and external audit 

report. 

To prepare end of year procurement, finacial and audit reports 

The reports are important 

yardsticks for measurig the governance of the project 

Reports produced 

$15,000.00 $15,000.00  M&E Officer 

           

4.4  Organise and facilitate regular partner meetings and workshops including annual planning meeting. 

To hold regular 

meetings of project partners 

Important for smooth 

management of the project 

Meetings held with documented minutes 

$40,000.00 $10,000.00  $30,000.00 DCL, CO 

         

4.5  General administration and coordination 

To administer and 

coordinate the activities of the project 

Important for smooth 

management of the project 

Various reports 

$150,000.00 $150,000.00  Admin Officer 

Page 13: Africa Centre of Excellence in Dryland Agriculture...NgREN To provide acces to relevant literature to ACE and partners Acess to current and relevant information is indispensable in

Implementation Plan 

13

                               

Total  $3,254,850.00 $2,761,850.00 $493,000.00

Table2:Overviewdistributionamongpartners(thistableisabreakdownofthepartnerbudgetintable1,sothelastcolumnhereintable2mustmatchthesecondlastcolumnintable1)

Code Result/Activity/Task

BudgetEstimate(US)

NationalPartners RegionalPartners InternationalPartners

TOTAL

IAR KUST BUCOA KNARDA IER MARADI NAIROBI ICRISAT IITA GIMI NRI

Outcome 1  Result 1.1 Strengthening Africa Centres of Excellence   

                                 

Activity 1.1  Engage Natural Resources Institute (NR), University of Greenwich to conduct an assessment of the existing dryland programmes 

  30,000 30,000.00

Activity 1.2  Workshop involving local and regional partners/stakeholders to define new/revised curricula for MSc, and PhD programmes; and to identify training areas for short courses 

1,000 1,000 1,0000 1,000 3,000 3,000 3,000 2,000 2,000 3,000 20,000.00

Activity 1.10  Exchange of staff through short stay, sabbatical and visiting lectureship 

5,000  5,000  5,000    15,000  15,000  15,000  20,000  20,000      100,000.00 

Activity 1.12  Organize joint short courses to address specific capacity needs of ACE, partners, 

5,000  5,000  10,000  15,000  5,000  10,000    25,000  25,000      100,000.00 

Page 14: Africa Centre of Excellence in Dryland Agriculture...NgREN To provide acces to relevant literature to ACE and partners Acess to current and relevant information is indispensable in

Implementation Plan 

14

Code Result/Activity/Task

BudgetEstimate(US)

NationalPartners RegionalPartners InternationalPartners

TOTAL

IAR KUST BUCOA KNARDA IER MARADI NAIROBI ICRISAT IITA GIMI NRI

industry and other stakeholders 

 Outcome 2  Result 2.1: Strengthened capacity for research excellence in dryland agriculture related fields 

  

Activity 2.5  Development of proposals and protocols and implementation of research programmes in the thematic research areas of the ACE (research driven by post doc fellows) 

10,000 10,000 10,000 10,000 10,000   50,000.00

Outcome 3   Result 3.1 Improved relevance, regionality and stakeholder participation in ACE training and research programmes 

                                 

Activity 3.1  Conduct a regional workshop to discuss ACE programmes/activities with industry/sector partners 

2,500  2,500  2,500  2,500   5,000  5,000  5,000   2,500   2,500       30,000.00 

Activity 3.2  Identify and facilitate students and staff internship in industries, public and private sectors, as well as development organizations. 

10,000 10,000 10,000 10,000 10,000   10,000 10,000 80,000.00 

Page 15: Africa Centre of Excellence in Dryland Agriculture...NgREN To provide acces to relevant literature to ACE and partners Acess to current and relevant information is indispensable in

Implementation Plan 

15

Code Result/Activity/Task

BudgetEstimate(US)

NationalPartners RegionalPartners InternationalPartners

TOTAL

IAR KUST BUCOA KNARDA IER MARADI NAIROBI ICRISAT IITA GIMI NRI

Activity 3.3  ACE and identified partners/stakeholders engaged in exchange of staff and students, short visits, lectures by captains of industries 

    5,000  5,000    10,000            20,000.00 

Activity 3.4  Sharing and exchange of information between ACE and partners, including library resources 

2,000 2,000 1,000 1,000 1,000 1,000  8,000.00 

 Outcome 4  Result 4.1 Strengthened education and research governance and administrative capacity 

                                 

Activity 4.1   Provide trainings to key project staff on various aspects of projects management 

                  25,000    25,000.00 

Activity 4.4  Organise and facilitate regular partner meetings and workshops including annual planning meeting. 

3,000  3,000  3,000  3,000  4,000  3,000  4,000  2,000  2,000      30, 000.00 

   Total  38,500 38,500 37,500 47,500 53,000 67,000  27,000 61,500 61,500 25,000 36,000 493,000.00 

Page 16: Africa Centre of Excellence in Dryland Agriculture...NgREN To provide acces to relevant literature to ACE and partners Acess to current and relevant information is indispensable in

3. TIMINGOFPLANNEDACTIVITIESFORENTIREPROJECTPERIOD(Ganttchart)Table3:Workplanfortheproject

Outcomes/Results/Activities Year 1  Year 2  Year 3  Year 4 

Q1  Q2  Q3  Q4  Q1  Q2  Q3  Q4  Q1  Q2  Q3  Q4  Q1  Q2  Q3  Q4 

Outcome 1: Strengthened capacity to provide relevant quality trainings in key areas of dryland agriculture 

                               

Result 1.1: New needs‐based curricula in key aspects of dryland agriculture developed                                 

Activity 1.1.1: Conduct training needs assessment of relevant stakeholders in the West and central African sub‐region                                  

Activity 1.1.2: Gap assessment by internationally recognised body or team and self assessment of existing dryland PG programmes                                 

Activity 1.1.3: Workshop involving local and regional partners/stakeholders to define new/revised curricula for MSc, and PhD programmes; and to identify training areas for short courses 

                               

Result 1.2: Increased enrolment of national and regional students into ACE programmes 

                               

Activity 1.2.1: Announcement of programmes and commencing intake of students into short courses and new/revised PG programmes 

                               

Activity 1.2.2: Engagement of relevant competent faculty from national, regional and international partners on sabbatical, visiting lectureship, and lectures via video links 

                               

Activity 1.2.3: Mount short English Language courses to support students for regional‐Francophone partners                                 

Result 1.3:  Lecture rooms upgraded, and international Students hostel created.                                  

Activity 1.3.1: Upgrade of four classrooms with modern teaching and learning facilities including back‐up power solutions                                 

Activity 1.3.2: Upgrade of hostels to studio rooms with relevant furnishing and power back up for international students                                 

Page 17: Africa Centre of Excellence in Dryland Agriculture...NgREN To provide acces to relevant literature to ACE and partners Acess to current and relevant information is indispensable in

Implementation Plan 

17

Outcomes/Results/Activities Year 1  Year 2  Year 3  Year 4 

Q1  Q2  Q3  Q4  Q1  Q2  Q3  Q4  Q1  Q2  Q3  Q4  Q1  Q2  Q3  Q4 

Result 1.4: Expanded access to indexed electronic journal databases, video conferencing facility and other learning and research facilities provided.  

                               

Activity 1.4.1: Provision of pay‐per‐view access to other relevant none‐open access databases in addition to the existing University subscriptions 

                              X 

Activity 1.4.2: Construction of a mast with radio links and uninterrupted power supply equipment to facilitate unhindered access to the to internet through the University MTN bandwidth subscription for the activities of ACE  

                               

Activity 1.4.3: Provision of video conferencing facility in the Seminar room                                 

Activity 1.4.4: Construction and furnishing of a building complex to house instrumentation laboratory, library, and seminar room                                 

Result 1.5: Competence of ACE and partner faculty to support postgraduate training in dryland agriculture enhanced through short training courses/postgraduate training in identified areas of skill gap. 

                               

Activity 1.5.1: Identification of staff training and skill needs                                 

Activity 1.5.2: Enrolment of ACE/partner staff in at least 5 different short courses (locally and internationally) in areas of need based on Activity 1.5.1  

                               

Outcome 2: Strengthened capacity for research excellence in dryland agriculture related fields                                 

Result 2.1: Improved research capacity of staff of ACE and partner institutions in the field of dryland agriculture                                 

Activity 2.1.1: Implementation of research related trainings for academic and technical staff                                 

Activity 2.1.2: Selection and engagement of PhD and post doctoral fellows among staff of ACE and partner institutions                                 

Activity 2.1.3: Furnishing of Tissue‐Culture & Molecular Biology and Microbiology & Plant Pathology Laboratories 

                               

Page 18: Africa Centre of Excellence in Dryland Agriculture...NgREN To provide acces to relevant literature to ACE and partners Acess to current and relevant information is indispensable in

Implementation Plan 

18

Outcomes/Results/Activities Year 1  Year 2  Year 3  Year 4 

Q1  Q2  Q3  Q4  Q1  Q2  Q3  Q4  Q1  Q2  Q3  Q4  Q1  Q2  Q3  Q4 

Activity 2.1.4:  Development of proposals and protocols and implementation of joint research programmes with partner institutions                                 

Result 2.2: ACE research facilities upgraded and functional                                 

Activity 2.2.1: Renovation and furnishing of laboratories                               

Activity 2.2.2: upgrade of research farm, including a 5ha drip irrigation facility 

                               

Activity 2.2.3: Procurement and installation of screen houses                                

Outcome 3: Improved relevance, regionality and stakeholder participation in ACE programmes                                 

Result 3.1: Relevant human capacity and research needs of public and private institutions, industry and development organizations understood and documented 

                               

Activity 3.1.1:  Conduct diagnostic survey on regional needs assessment                                 

Activity 3.1.2. Conduct a regional workshop to discuss/validate results of the needs assessment                                 

Result 3.2: Robust outreach programmes to address relevant skill needs of the WCA dryland region developed. 

                               

Activity 3.2.1: Identify and facilitate students and staff internship inindustries,  public and  private sectors, as well as  development organizations. 

                               

Activity 3.2.2: Establish and activate  collaboration network with identified partners  

                               

Outcome 4: Strengthened research and education governance and administrative capacity of ACE to provide coordinating role for dryland agricultural development in WCA  

                               

Result 4.1: Competent  ACE project management team constituted and operationalized adopting international best practices 

                               

Activity 4.1.1: Appointment of key ACE team members and other key personnel                                 

Page 19: Africa Centre of Excellence in Dryland Agriculture...NgREN To provide acces to relevant literature to ACE and partners Acess to current and relevant information is indispensable in

Implementation Plan 

19

Outcomes/Results/Activities Year 1  Year 2  Year 3  Year 4 

Q1  Q2  Q3  Q4  Q1  Q2  Q3  Q4  Q1  Q2  Q3  Q4  Q1  Q2  Q3  Q4 

Activity 4.1.2: Development of ACE project implementation plans and project operations manuals                                 

Activity 4.1.3: Provide trainings to key project staff on various aspects of projects management                                 

Activity 4.1.4: Constitution of ACE technical Committee and Advisory Boards 

                               

Activity 4.1.5: Hold regular meetings of ACE Technical committee and Advisory board                                 

Activity 4.1.6: Preparation of end of the year procurement, financial and external audit report.                                  

Result 4.2: Relevant educational, research and development bodies in the WCA region involved in the activities of ACE 

                               

4.2.1: identify relevant partners and sign partnership agreements based on their specific competencies                                 

Activity 4.2.2: Organise and facilitate regular partner meetings and workshops including annual planning meeting 

                               

Activity 4.2.3: Regularly update website information on ACE programmes, activities and management (including minutes of project meetings, financial reports) 

                               

Result 4.3: Strengthen internal working,  reporting and accountability systems 

                               

4.3.1 Organise and conduct training for key Project administrative, M&E and financial management personnel                                 

4.3.2  Project administration and coordination                                 

Page 20: Africa Centre of Excellence in Dryland Agriculture...NgREN To provide acces to relevant literature to ACE and partners Acess to current and relevant information is indispensable in

Implementation Plan 

20

4. IMPLEMENTATIONARRANGEMENTS

4.1 Guidingrulesandregulations

Activities of the Centre will be conducted in a transparent manner at all times. The Centre will publish budgets, financial reports and other project related documents on the project’s website. The Centre will put in place an independent complaint handling mechanism where complaints will be made and responded to with a good recording system to show the related details including the time the complaint was reported and the time the response was made. The University also has several mechanisms for dealing with risk management and anticorruption. They include:

a. SERVICOM Unit, which receives complaints from end-users on University service delivery and reports to the Federal Government.

b. Anticorruption transparency unit (ACTU), which is chaired by the Deputy Vice-Chancellor (Administration) and reports to the Independent Corrupt Practices Commission (ICPC) of the Federal Government of Nigeria.

c. Existing statutory structures of the University, including the Internal Audit Unit, Budget monitoring Committee, and the University Council Standing Disciplinary Committee.

The ACE has the assurances of BUK management that the project team has a free hand in the running the Centre without any undue interference and unnecessary bureaucracies. It is sometimes possible to have delays in some procurement processes of some works and services. As part of the strategy to mitigate such delays, the Project Team will identify the detail of each requirement so that related work packages are known. These work packages identified are to be given to potential contractors to bid for. The project team will find it easier to properly supervise and assess the performance of the work being done and immediately know if the time target is being achieved or not. It is only strong, willing and competent suppliers are allowed to handle each of the work packages. The tendering process should ensure only such suppliers emerge. Complex projects, like the building and equipping of laboratory, will be broken down to easily manageable units that will facilitate easy and smooth execution. In this case, physical structure may be one package, office and laboratory furnishing may be another while equipping/installation is another package. There may not be one contractor with the required competences to handle all the packages at the same time. If these are to be handled individually it then becomes easier for control and better coordination by the project team.

4.2 Governancestructures

(Briefly describeACE governance structures bothwithin the host university and among the partnerinstitutions,atfaculty/centrelevelanduniversity/institutionlevel)

To achieve excellence in governance and administration the leadership and implementation team of the ACE must be transparent, accountable, responsive and promote the rule of law. The day to day running CDA will be done by the ACE project team comprising of the Centre Leader (CL), a Deputy Centre Leader (DCL), Programme Coordinators, ICT officer, Procurement Officer, Financial Management Officer, Project Accountant, and Monitoring and Evaluation officer.

Key tasks of the ACE project team include implementing activities of the project and preparing annual work plans based on the project objectives. The work plan will be reviewed on an annual basis. A summary of these tasks include:

(i) Implementing activities towards strengthening the quality of education through enhanced teaching capacity to modern standards within the focus areas of the CDA.

Page 21: Africa Centre of Excellence in Dryland Agriculture...NgREN To provide acces to relevant literature to ACE and partners Acess to current and relevant information is indispensable in

Implementation Plan 

21

(ii) Serving as a hub for a network of partner institutions within Nigeria and the sub-region. A detailed partnership agreement between the CDA and each partner institution will specify the nature of the partnership between the two institutions. The CDA and the partner institution/network will agree to an annual implementation plan to be implemented by the partners. Funds for capacity building in partner institutions will be held and managed by the CDA, who will be responsible for all fiduciary and M&E matters related to the use of these partnership funds.

(iii) The Bayero University will be responsible for CDA’s fiduciary and safeguards functions. This includes undertaking procurement, maintaining Project financial accounts according to Project requirements and implementing the ACEs Project’s monitoring and evaluation plan as well as the Environmental Management Plan.

The ACE also has an Advisory Board of experts in various aspects of dryland agriculture and a Technical Committee. The governing structure of the ACE and the roles of the various key actors are provided in chart 2 and Table 4, respectively.

Page 22: Africa Centre of Excellence in Dryland Agriculture...NgREN To provide acces to relevant literature to ACE and partners Acess to current and relevant information is indispensable in

Implementation Plan 

22

Chart 2: Organogram of the Africa Centre of Excellence in Dryland AgriculturAdvisory Board

E. A. Oloffin (Chair, representing VC), J. M. Jibrin (Secretary, CL), M. Mortimore (UK), Ramadjita Tabo (ICRISAT, WCA), D. Kone (Cote d'Ivoire), M. D. Magaji (ARCN), A. A. Yakasai (BUK), E. U.

Essiet (BUK), A. I. Tanko (BUK), M. H. Bichi (BUK), J. A. Falola (BUK), Dean of Faculty of Agriculture (BUK), Representative of ROPPA (to be appointed)

Technical Committee Centre Leader (Chair), Deputy Centre Leader, Dean of BUK Faculty of

Agriculture, Heads of the various BUK Academic Departments contributing to the ACE programmes, Programme Coordinators, as well as

representatives from the Kano Offices of KNARDA, ICRISAT and ILRI

Centre Leader Jibrin M. Jibrin

M & E Officer Amina Mustapha

Administrative Officer Aliyu S. Zubairu

Deputy Centre Leader Sanusi G. Mohammed

ICT Officer (Adam Mustapha)

Financial Officer Usman G. Ohikere

Auditor Auwalu Muazu

Procurement Officer Rabiu Sagagi

Project Accountant

Opeoluwa Falola

Coordinator (Research) Kabir M. Umar

Environmental Officer Mustapha M. Bello

Coordinator (Training) Yusuf Garba

Coordinator (Outreach) Saleh Momale

Page 23: Africa Centre of Excellence in Dryland Agriculture...NgREN To provide acces to relevant literature to ACE and partners Acess to current and relevant information is indispensable in

4.3 Incentivestructures

The ACE implementation will integrate a number of team building initiatives that will sustain interest of key teaching and research staff (including academics, technologists and administrative personnel). These include the following strategies: i) The inclusion of members from key regional institutions in the ACE Advisory Board,

thereby integrating these institutions into the decision making processes of ACE. This will endear and strengthen the current collaborative linkages with the partners within the Region.

ii) Rallying points for team building will be created, including interactive academic discussion forums, seminars to be delivered by Faculty, visiting scholars, and captains of industry, joint tours/field visits to key sites of interests and other physical activities that will bring key faculty academics together. Annual review and planning meetings involving stakeholders within the University and immediate environs involved in implementation will be organised.

iii) Information sharing will be highly organized and conducted to ensure that all Faculty academics, admin and technical staff are fully abreast of all activities and their expected roles. Valuable information will be periodically circulated through various channels, especially the ACE website. Opportunities for training and professional development will be announced, including calls for proposals, conference participation and other important academic developments. This will help keep Faculty academics, technologists and administration personnel always glued to ACE for such kind of data and information.

The major incentives for academic staff and researchers within the ACE and partner institutions is the access to improved teaching and research facilities as well as short trainings, which will greatly impact on their professional development and competence. It is well understood that the focus of the ACE is to evolve into an excellent regional training Centre. The ACE will align its teaching doctrines and students’ MSc and PhD research activities towards addressing the specific challenges of the region. However, excellent application of knowledge at instructing students as well as innovative and practical approaches to answering research questions begets high impact academic publications. The possibility of producing research outputs that can be published in prestigious Journals is a very strong motivation for the involvement of these faculties. The internship and outreach activities of the project as well as the development of curricula that address the needs of industry and labour market are strong incentives for involvement of the private sector. Project staff will be provided with ample opportunities for training both within and outside Nigeria. Annexe 2 provides the potential benefits to internal and external stakeholders.

4.4 Rolesandresponsibilities(BriefTermsofReference(TOR)foreachACEteammemberandprojectfinancedsupportstaff*)*Justificationfornotusingexistinguniversityadministrativeandsupportstaffisrequired.

Table 4: Roles and responsibilities of members of the ACE implementation Team Position Responsibility Advisory Board The board, comprising of national, regional and international experts, shall

meet biannually to receive progress reports from the CL on all activities of the ACE and (i) advise the Centre on its training research and outreach agenda (ii) review all planned activities and suggest adjustments, where necessary ( iii) receive and review financial reports of the ACE.

Technical Committee The Committee shall normally meet every two months, but in the first year of the ACE it shall meet monthly to plan activities and review progress towards implementation of the ACE project. The committee shall provide direction for the implementation of the ACE project; monitor and evaluate the progress of the various implementing units against the set targets; and facilitate the implementation of the project work plan.

Page 24: Africa Centre of Excellence in Dryland Agriculture...NgREN To provide acces to relevant literature to ACE and partners Acess to current and relevant information is indispensable in

Implementation Plan 

24

Centre Leader The CL is responsible for the overall coordination and management of the activities of the ACE and its partners. The CL is responsible for reporting the activities to the ACE to the Advisory Board and the Technical Committee.

Deputy Centre Leader The DCL shall assist the CL in coordinating and managing the ACE. He will follow-up on all planned activities of the ACE to ensure that they are executed correctly and on time.

Coordinator, Training The training coordinator shall work with the DCL to coordinate all training programmes of the ACE.

Coordinator, Research The research coordinator shall work with the DCL to coordinate and keep track of all research programmes of the ACE.

Coordinator, Outreach The outreach coordinator shall work with the DCL to coordinate and keep track of all outreach programmes of ACE, including internship activities.

Procurement Officer The procurement officer shall be responsible for all activities related to purchase of services, items and equipment.

Financial Officer The Financial officer is responsible to the project leadership in the management of the ACE finances. The Financial Officer shall ensure that all accounting records are maintained in line with approved accounting standards and in line with the World Bank’s requirement and government regulations.

Project Accountant The Project Accountant shall work under the finance officer and manage the accounts of the project. The job of the Project Accountant include updating and maintaining the project cash books; preparing bank payment mandates; preparation of monthly bank reconciliations for all bank accounts of the project; handling all banking transactions that relate to the project.

ICT Officer The ICT officer shall be responsible for designing, building and maintaining the project databases and website as well as managing the ICT facilities of the Centre.

M&E officer The M&E officer shall be responsible for tracking and keeping records of all project deliverables to ensure adherence to regulations and guidelines.

Auditor The Project Auditor shall supervise the internal audit function of all activities of the project and provide quality assurance reviews

Environmental Officer The environmental officer is for ensuring adherence to environment safeguards as well as tracking and collecting data related to implementation of environmental management plan.

Heads of Participating Department

Heads of Participating Departments shall be the focal persons for ACE activities involving their Departments.

At each partner institution with which the ACE has an MoA there shall be a Coordinator to serve as focal person responsible for overseeing the implementation of partnership agreements with that Institution. The coordinator will be responsible for sending timely technical and financial reports of his/her institutions activities to the ACE under the agreed MoA. The ACE has drawn up a list of enterprises that could provide very good internship opportunities for its students. Specific agreements will be signed to ensure that the students are given roles and get experiential learning opportunities. During the internship periods the enterprises will have full supervisory role over the interns. The interns will be subjected to the performance evaluation scheme of the receiving enterprises and not just academic evaluation of their internship by the ACE. Each intern will be required to present case studies of some interesting aspects of the internship experience.

4.5 Environmentsafeguards(InserttheEnvironmentalManagementPlananddisclosedonyourwebsite,pleaselistresponsiblestaff)

The Centre of Excellence in Dryland Agriculture is established to solve problems of the inhabitants of drylands in West Africa by enhancing the capacity of Bayero University and the collaborating partners to produce demand-driven research outputs which will contribute to the management of more productive and

Page 25: Africa Centre of Excellence in Dryland Agriculture...NgREN To provide acces to relevant literature to ACE and partners Acess to current and relevant information is indispensable in

Implementation Plan 

25

sustainable dryland environments as well as producing high quality performing graduates that will address the challenges of the dryland.

4.5.1 Project Description The Centre is located at Bayero University Kano (11.5000° N, 8.5000° E) Nigeria. It is within the Semi-arid agro-ecological zone of Africa, which is heavily populated. The people in this region of West Africa traditionally rely on subsistence farming, which is increasingly becoming unsustainable because of population growth, degradation of the soil and poor farming practices.

4.5.2 Operation Processes The official operation hours of the centre is 8:00am to 4:00pm (16:00 Hrs GMT). Nevertheless, field and laboratory research activities will continue as appropriate. 4.5.3 EMP Context

Civil works will be minimal as such environmental and social impacts will be managed. There will be some rehabilitation and extension of the laboratories. The project will focus on quality enhancements of faculty, curriculum development, and learning resources.

4.4.4 EMP Objectives To ensure compliance to:

i. environmental best practice of the country in liaison with National Environmental Standard and Regulation Enforcement Agency (NESREA); Standard Organisation of Nigeria (SON); National Agency for Food and Drug Administration and Control (NAFDAC), National Emergency Management Agency (NEMA); Nigerian Quarantine Service (NQS).

ii. standard laboratory practice according to WHO (World Health Organisation) (MOPs; Manual of Operation of Equipment according to manufacturer’s specifications, MSDS; Material Safety Data Sheets.

iii. promote green fuels and conservation of natural resource. iv. convert waste to wealth (bio-resource technology) v. add value to agricultural products and produce

vi. promote animal welfare

4.5.5 Environmental Management: The staff responsible for environmental management will be Engineer Mustapha M. Bello 4.5.6 Approval and Licensing requirements Compliance with laid down standards of regulatory bodies in accordance with legislations of Federal Environmental Acts National Environmental Standard and Regulation Enforcement Agency (NESREA); Standard Organisation of Nigeria (SON); National Agency for Food and Drug Administration and Control (NAFDAC), National Emergency Management Agency (NEMA); Nigerian Quarantine Service (NQS). A dedicated staff will be responsible for obtaining the licences, approvals and permits.

S/N Project conditions compliance 1 Green fuels and conservation of natural

resource Prevention of practices that increase efficiency in the use of energy, water or other natural resources. No action that results in taking off plant (flowers, grasses and trees) and animal species (birds, insects, fish, reptiles, mammals) or adversely affects the ecosystem. Adherence to regulation of import, export, inter-state and foreign plant and animal species.

2 Bio-resource technology

Recycling, source reduction and sustainable agriculture.

Page 26: Africa Centre of Excellence in Dryland Agriculture...NgREN To provide acces to relevant literature to ACE and partners Acess to current and relevant information is indispensable in

Implementation Plan 

26

3 Value addition on agricultural products and produce

Licensed, labelled and registered materials for value addition.

4.5.7 Reporting Petition from any person(s) on illegal usage of research materials that will affect plant and animal biodiversity in the region. The documentation unit will prepare reports, protocols and dissemination of information. 4.5.8 Environmental Training All personnel will undergo training on general and specific environmental management practices through workshops. Employees will be sent on short- and medium-term mandatory training on best Environmental Management Practices. Staff will be made aware of standard protocols in response to emergency and peculiar situations. Adequate track records on staff training in respect of the type and general descriptions of training will be collated and stored. Emergency Contacts and Response telephone numbers of person(s) will be made available in every location. Contact person will be given full authority to take decisions as appropriate. In addition, telephone numbers of emergency services including ambulance, fire brigade and other relevant government agencies will be made available. Staff will be made aware of notes on emergency responses, nature of chemical substances in use with their material safety data sheet. Sign post of assembly points will be made large in appropriate locations. 4.5.9 Monitoring and Review Development of checklist on environmental monitoring and compliance with manufacturer’s service guide will be done frequently. Monitoring and evaluation of routine equipment will be done occasionally. There will be provision of log books for monitoring the environmental variables which will contain due date for activities to be carried out. Adequate record keeping of activities and protocols will be ensured. Environmental Auditing will be done regularly to ensure adherence to the standard protocols of environmental monitoring. Corrective actions for dealing with non-compliance of standard procedures will be made available.

Page 27: Africa Centre of Excellence in Dryland Agriculture...NgREN To provide acces to relevant literature to ACE and partners Acess to current and relevant information is indispensable in

5. PERFORMANCEMONITORING

(PleaseinserttheResultFrameworksharedwithAAU,andpleaseindicateplanneddisbursementasafunctionoftheexpectedresults*)Disbursement linked Indicator

Action to be completed Minimum target (project duration)

Importance (Share of grant)

Regional emphasis

Computed amount based on new targets & rates

Subtotals per indicator

Institution qualified, Regional specialization endorsed and Institutional readiness (DLR #1)

Steering Committee created and regional specialization through ACEs endorsed

10% NO

Constitution of ACE team and creation of ACE designated account

800,000

800,000

Approval of project implimentation plan by AAU and WorlD Bank

Excellence in education and research capacity and development impact (DLI #2)

N# of new students in ACE courses (30% must be regional students):

Yes

· New PhD students (DLR #2.3)

43

· New PhD students (male national)

20 8% 200,000

· New PhD students (female national)

10 125,000

Page 28: Africa Centre of Excellence in Dryland Agriculture...NgREN To provide acces to relevant literature to ACE and partners Acess to current and relevant information is indispensable in

Implementation Plan 

28

Disbursement linked Indicator

Action to be completed Minimum target (project duration)

Importance (Share of grant)

Regional emphasis

Computed amount based on new targets & rates

Subtotals per indicator

· New PhD students (male regional)

10 200,000

· New PhD students (female regional)

3 75,000

600,000

· New Master Students (DLR #2.2)

220

· New Master Students (male national)

114 7% 228,000

· New Master Students (fem national)

48 120,000

· New Master Students (regional)

39 156,000

· New Master Students (fem regional)

17 85,000

589,000

· New Short term (DLR #2.1)

1074

· New Short term (male national)

475 7% 190,000

Page 29: Africa Centre of Excellence in Dryland Agriculture...NgREN To provide acces to relevant literature to ACE and partners Acess to current and relevant information is indispensable in

Implementation Plan 

29

Disbursement linked Indicator

Action to be completed Minimum target (project duration)

Importance (Share of grant)

Regional emphasis

Computed amount based on new targets & rates

Subtotals per indicator

· New Short term (female national)

226 113,000

· New Short term (male regional)

225 180,000

· New Short term (female regional)

94 94,000

577,000

· N# of outreach “periods” (DLR #2.4)

236 8%

· N# of new students ( national)

154 308,000

· N# of new students (regional)

66 264,000

· N# of new faculty 11 National 22,000

· N# of non national faculty

5 Regional 20,000

614,000

International evaluation and accreditation (DLR #2.5)

3%

Page 30: Africa Centre of Excellence in Dryland Agriculture...NgREN To provide acces to relevant literature to ACE and partners Acess to current and relevant information is indispensable in

Implementation Plan 

30

Disbursement linked Indicator

Action to be completed Minimum target (project duration)

Importance (Share of grant)

Regional emphasis

Computed amount based on new targets & rates

Subtotals per indicator

Gap assessment certified 1 100,000

Self-evaluation using international best practices

1 100,000

200,000

N# of published articles in internationally recognized and peer reviewed journals (DLR #2.6)

53 13%

National 44 Simple 660,000

Regional 12 Co-authored regionally

360,000

1,020,000

· $ externally generated revenue (DLR #2.7)

1,200,000 15%

National 200,000 National 200,000

Regional - Regional

International 1,000,000 International 1,000,000

1,200,000

. Begin civil works, furnishing and equipping of tissue culture

· Meeting 4 milestones

20% No 400,000

1,600,000

Page 31: Africa Centre of Excellence in Dryland Agriculture...NgREN To provide acces to relevant literature to ACE and partners Acess to current and relevant information is indispensable in

Implementation Plan 

31

Disbursement linked Indicator

Action to be completed Minimum target (project duration)

Importance (Share of grant)

Regional emphasis

Computed amount based on new targets & rates

Subtotals per indicator

laboratory; upgrading of research farm; and installation of 3 screen houses. Evidence of this include:

i. Tender opening and evaluation documents

ii. Signed awarded contracts with bill of quantities

iii. Contract on website

iv. Environmental and Social Management Plan (ESMP) conformity certificate

400,000

. 100% completion of civil works, furnishing and renovation of tissue culture laboratory evidenced by:

i. Installation of all tissue-culture laboratory equipment and training of staff to run the equipment

ii. Pictures of the tissue culture laboratory being

Page 32: Africa Centre of Excellence in Dryland Agriculture...NgREN To provide acces to relevant literature to ACE and partners Acess to current and relevant information is indispensable in

Implementation Plan 

32

Disbursement linked Indicator

Action to be completed Minimum target (project duration)

Importance (Share of grant)

Regional emphasis

Computed amount based on new targets & rates

Subtotals per indicator

utilized by faculty and students shared on ACE’s website

400,000 400,000

. 100% completion of research farm upgrade; and furnishing and equipping of Central Instrumentation Laboratory; evidence of which include:

i. Pictures of upgraded farm shared on ACE’s website showing demarcated research plots, and drip irrigation facility

ii. Procurement contract for Central Instrumentation Laboratory signed

. 100% installation of screen houses and equipping of central instrumentation laboratory, evidence of which include:

i. Screen houses installed and

Page 33: Africa Centre of Excellence in Dryland Agriculture...NgREN To provide acces to relevant literature to ACE and partners Acess to current and relevant information is indispensable in

Implementation Plan 

33

Disbursement linked Indicator

Action to be completed Minimum target (project duration)

Importance (Share of grant)

Regional emphasis

Computed amount based on new targets & rates

Subtotals per indicator

being used by students and faculty

ii. Equipment in Central instrumentation laboratory procured, installed and personnel trained to run them

iii. Pictures of completed screen houses and fully equipped central instrumentation laboratory being utilized by students and faculty shared on ACE’s website.

Page 34: Africa Centre of Excellence in Dryland Agriculture...NgREN To provide acces to relevant literature to ACE and partners Acess to current and relevant information is indispensable in

Implementation Plan 

34

Disbursement linked Indicator

Action to be completed Minimum target (project duration)

Importance (Share of grant)

Regional emphasis

Computed amount based on new targets & rates

Subtotals per indicator

Financial Management (DLI #3)

· Submission of timely withdrawal application by ACE to the Bank through the coordinating government agency on an annual basis. The Withdrawal application should be submitted with quality documentation related to the achievements made on the DLIs and certified EEPs.

· Timely submission

5% No 400,000

Procurement (DLI #4) Timely procurement audit Timely and Satisfactory Procurement Progress

5% No 400,000

TOTAL 100% 8,000,000

Page 35: Africa Centre of Excellence in Dryland Agriculture...NgREN To provide acces to relevant literature to ACE and partners Acess to current and relevant information is indispensable in

ACE TEMPLATE 

Implementation Plan 

6. DETAILEDBUDGET

Table5:Budget,2014–2018withsplitbetweenpartners

ExpenditureCategoryEstimatedCostsin(US$)

YR1 YR2 YR3 YR4 Total %oftotal

A:BudgetbyActivityPlan

Outcome1:Strengthenedcapacityexcellenceforqualitytrainingindrylandagriculture 871,000 500,000 800,000 80,000

2,251,000 28.5

Outcome2:Strengthenedcapacityforresearchindrylandagriculture 583,000 1,520,596 941,958 683,023

3,728,577 47.2Outcome3:Improvedrelevance,regionalityandstakeholderparticipationinACEtrainingandresearchprogrammes

97,000 125,000 125,000 125,000

472,000 6.0Outcome4:Strengthenededucationsandresearchgovernanceandadministrativecapacity

187,000 300000 320000 320000

1,127,000 14.3

Contingency 52140 97823.84 109347.9 60401.15 319,713 4.0TOTAL 1,790,140 2543419.84 2296306 1268424 7,898,290 100.0% 22.7 32.2 29.1 16.0 100

B:Budgetbypartners

(LeadInstitution)

BayeroUniversityKano

1,478,050 2,034,736 1,837,045 1,014,739 6,364,570 80.6

(Partners)

312,090 508,684 459,261.2 253,684.8 1,533,720 19.4

RegionalPartners 189,520 254,342 229,630.6 126,842.4 800,335 10.1

NationalPartners 90,125 127,171 114,815.3 63,421.21 395,532 5.0

InternationalPartners 32,445 127,171 114,815.3 63,421.21 337,852.5 4.3

TOTAL 7,898,290

Page 36: Africa Centre of Excellence in Dryland Agriculture...NgREN To provide acces to relevant literature to ACE and partners Acess to current and relevant information is indispensable in

ACE TEMPLATE 

Implementation Plan 

36

7. DETAILEDACTIVITYSHEETS(oneforeachactivity)ActionPlan:1.StrengthenEducationCapacity&DevelopmentImpact Timeframe:Quarter1ofyear2(January2016toMarch,2016) Activity:1.1. EngageNaturalResourcesInstitute(NR),UniversityofGreenwichtoconductanassessmentoftheexisting

drylandprogrammes

Result1.1 Newneeds‐basedcurriculainkeyaspectsofdrylandagriculturedeveloped

Activity1.1.1 EngageNaturalResourcesInstitute (NRI),UniversityofGreenwich toconductanassessmentoftheexistingdrylandprogrammes

Outcome1 Strengthenedcapacitytoproviderelevantqualitytrainingsinkeyareasofdrylandagriculture

OutcomeINDICATOR4MSc,4PhDand1PGDcurriculasubstantiallyreviewed/developed

SOURCEOFVERIFICATIONCopyofneedsassessmentreportCopiesofreviewed/developedcurricula

IMPLEMENTATIONMILESTONES

PreparationofToR,methodologyandtoolsforconductoftrainingneedsassessment Sensitizationofbroadspectrumofinternational,regionalandnationalstakeholders(includingtheprivatesector)

Conductoftheneedassessment

PROCUREMENT Consultanttofacilitateconductofthetrainingneedsassessment

RESPONSIBILITYFORIMPLEMENTATION

CL,DCL,AGRHYMET,IDR

DURATION:3Months Commencement:1st January,2016

Completion:31stMarch,2016

PRIMARYCONSTITUENTS:Universities,CollegesofAgriculture,MinistriesofcommerceandIndustry,Agriculture,Education,Science&Technology,Farmercooperatives

PARTICIPANTS:Universities,CollegesofAgriculture,Farmercooperatives,Industries,ADPs.

ASSUMPTIONS Partneragencies/Institutionswithalignedpolicymandatearesupportive.

FINANCIALIMPLICATIONS ACEbudgetfortheactivity

BudgetLineAnalysis

1stQtr 2ndQtr 3rdQtr 4thQtr 5thQtr 6thQtr Total

1 PreparationofToRforconductoftrainingneedsassessment

500 500

2 Sensitizationandinvitationofstakeholders

500 500

3 EngagementofConsultant 10,000 10,000

4 Conductoftheneedassessment 19,000 19,000

TOTALS 30,000 30,000

Page 37: Africa Centre of Excellence in Dryland Agriculture...NgREN To provide acces to relevant literature to ACE and partners Acess to current and relevant information is indispensable in

ACE TEMPLATE 

Implementation Plan 

37

ActionPlan:1.StrengthenEducationCapacity&DevelopmentImpact Timeframe:Quarter2ofyear2(April,2016toJune,2016)Activity:1.2.Workshopinvolvinglocalandregionalpartners/stakeholderstodefinenew/revisedcurriculafor MSc,andPhDprogrammes;andtoidentifytrainingareasforshortcourses

Result1.1 Newneeds‐basedcurriculainkeyaspectsof drylandagriculturedeveloped

Activity1.2 Workshopinvolvinglocalandregionalpartners/stakeholderstodefinenew/revisedcurriculaforMSc,andPhDprogrammes;andtoidentifytrainingareasforshortcourses

Outcome1 Strengthenedcapacitytoproviderelevantqualitytrainingsinkeyareasofdrylandagriculture

OutcomeINDICATOR4MSc,4PhDand1PGDcurriculasubstantiallyreviewed/developed;Numberofnewtrainingareasforshortcoursesidentified

SOURCEOFVERIFICATIONCopyofreviewedcurriculaofMSc,andPhDprogrammes.,Copyofreportforidentifiedshortcourses

IMPLEMENTATIONMILESTONES

Sensitizationandinvitationofbroadspectrumofinternational,regionalandnationalstakeholders(includingtheprivatesector) Reviewofexistingcurriculaatastakeholderworkshop CompilationofreviewedcurricularandCirculationtokeystakeholdersforvalidation

PROCUREMENT NA

RESPONSIBILITYFORIMPLEMENTATION

CL,DCL

DURATION:3Months Commencement:1stApril,2016

Completion:30thJune,2016

PRIMARYCONSTITUENTS:Universities,CollegesofAgriculture,MinistriesofcommerceandIndustry,Agriculture,Education,Science&Technology,Farmercooperatives

PARTICIPANTS:Universities,CollegesofAgriculture,Farmercooperatives,Industries,ADPs,professionalassociations

ASSUMPTIONS Partneragencies/Institutionswithalignedpolicymandatewillbesupportive.

FINANCIALIMPLICATIONS ACEbudgetfortheactivity

BudgetLineAnalysis

1stQtr 2ndQtr 3rdQtr 4thQtr 5thQtr 6thQtr Total

1 Sensitizationandinvitationofstakeholders

1,000 1,000

2 Reviewofexistingcurriculaatastakeholderworkshop

20,000 20,000

3 CompilationofreviewedcurricularandCirculationtokeystakeholdersforvalidation

4,000 4,000

4

5

TOTALS 25,000 25,000

  

Page 38: Africa Centre of Excellence in Dryland Agriculture...NgREN To provide acces to relevant literature to ACE and partners Acess to current and relevant information is indispensable in

ACE TEMPLATE 

Implementation Plan 

38

Action Plan: 1. StrengthenEducationCapacity&DevelopmentImpact   Timeframe: Quarter 1 of year 2 (January, 2016 to March, 2016)   Activity: 1.3.  Upgradeoftwoclassroomswithmodernteachingandlearningfacilitiesincludingback‐uppowersolutionsbytheendofQ2‐Y1

RESULT1.3 Lectureroomsupgraded,andinternationalstudent’shostelcreated. 

ACTIVITY1.3 Upgradeoffourclassroomswithmodernteachingandlearningfacilitiesincludingback‐uppowersolutions

Outcome1 Strengthenedcapacitytoproviderelevantqualitytrainingsinkeyareasofdrylandagriculture

Outcome INDICATOR 

4 classrooms upgraded 

SOURCE OF VERIFICATION 

Inventory of facilities in class rooms before and after upgrading.

IMPLEMENTATION MILESTONES 

Sensitization of Contractors and selection  Placing order of Equipment and upgrading of classes 

Receiving supplies and authentication  Installations and testing 

PROCUREMENT  Open Tender 

   

RESPONSIBILITY FOR IMPLEMENTATION 

CL, Procurement officer, Finance Officer, Auditor 

DURATION: 3 Months  Commencement: 1st January,2016 

Completion: 31st March,2016

PRIMARY CONSTITUENTS: Contractors  PARTICIPANTS: Contractors, participating departments 

ASSUMPTIONS  The University provides the required structures for upgrade 

FINANCIAL IMPLICATIONS  ACE budget for the activity 

Budget Line Analysis  1stQtr 2ndQtr 3rdQtr 4thQtr 5thQtr  6thQtr  Total 

1  Sensitization of Consultants and selection 

1,000     1,000

2  Placing order, Receiving supplies and authentication, Installations and testing 

49,000     49,000

3       

4       

5       

TOTALS  50,000     50,000

    

Page 39: Africa Centre of Excellence in Dryland Agriculture...NgREN To provide acces to relevant literature to ACE and partners Acess to current and relevant information is indispensable in

ACE TEMPLATE 

Implementation Plan 

39

Action Plan: 1. StrengthenEducationCapacity&DevelopmentImpact   Timeframe: Quarter 1 of year 2 (January, 2016 to March, 2016)   Activity1.4:Upgradeofhostelswithrelevantfurnishingforinternationalstudents 

RESULT1.3 Lectureroomsupgraded,andinternationalstudent’shostelcreated. 

ACTIVITY1.4 Upgradeofhostelswithrelevantfurnishingforinternationalstudents 

Outcome1 Strengthenedcapacitytoproviderelevantqualitytrainingsinkeyareasofdrylandagriculture

Outcome INDICATOR Internationalstudentshostelcreated 

SOURCE OF VERIFICATION

Inventory of facilities in hostel before and after upgrading. 

IMPLEMENTATION MILESTONES  

Advert and selection of Contractors  Renovation and upgrading of rooms 

Supplies of bedding facilities 

PROCUREMENT  Open Tender

RESPONSIBILITY FOR IMPLEMENTATION 

DCL, Procurement Officer

DURATION: 3 Months  Commencement: 1st January,2016 

Completion: 31st March,2016

PRIMARY CONSTITUENTS: Contractors  PARTICIPANTS: CL, Procurement Officer, MSD 

ASSUMPTIONS  The University provides the required structures for upgrade 

FINANCIAL IMPLICATIONS  ACE budget for the activity 

Budget Line Analysis  1stQtr 2ndQtr 3rdQtr 4thQtr 5thQtr  6thQtr  Total 

1  Advert and selection of contractors 

1000     1,000

2  Renovation and supplies  89,000     89,000

3       

4       

5       

TOTALS    90,000       90,000

      

Page 40: Africa Centre of Excellence in Dryland Agriculture...NgREN To provide acces to relevant literature to ACE and partners Acess to current and relevant information is indispensable in

ACE TEMPLATE 

Implementation Plan 

40

Action Plan: 1. StrengthenEducationCapacity&DevelopmentImpact   Timeframe: Quarter‐ of year 2 (September 2016 to November, 2016) 

Activity: 1.5.Subscription to NgREN    

RESULT1.4 Expandedaccesstoindexedelectronicjournaldatabasesandvideoconferencingfacilityintheseminarroomprovided.

ACTIVITY1.5 Subscription to NgREN

Outcome1 Strengthenedcapacitytoproviderelevantqualitytrainingsinkeyareasofdrylandagriculture

Outcome INDICATOR No. of non‐open access databases 

SOURCE OF VERIFICATIONInventory of internet facilities and databases 

IMPLEMENTATION MILESTONES 

Subscription to NgREN  

PROCUREMENT  Direct Subscription

RESPONSIBILITY FOR IMPLEMENTATION 

CL, Procurement Officer; ICT Officer

DURATION: 3 Months  Commencement:   Completion:  

PRIMARY CONSTITUENTS: Procurement Officer  PARTICIPANTS: Procurement Officer; ICT Officer 

ASSUMPTIONS  NgREN  subscription is current. 

FINANCIAL IMPLICATIONS  ACE budget for the activity

Budget Line Analysis  1stQtr 2ndQtr 3rdQtr 4thQtr 5thQtr  6thQtr  Total

1  Subscription to NgREN 

 225,000     225,000

2       

3       

4       

5       

TOTALS  225,000     225,000

     

Page 41: Africa Centre of Excellence in Dryland Agriculture...NgREN To provide acces to relevant literature to ACE and partners Acess to current and relevant information is indispensable in

ACE TEMPLATE 

Implementation Plan 

41

 Action Plan: 1. StrengthenEducationCapacity&DevelopmentImpact   Timeframe: Quarter 1 of year 2 (January, 2016 to March, 2016) 

Activity: 1.6:ConstructionofamastwithradiolinksanduninterruptedpowersupplyequipmenttofacilitateunhinderedaccesstotheinternetthroughtheUniversityMTNbandwidthsubscriptionfortheactivitiesofACE

RESULT1.4 Expandedaccesstoindexedelectronicjournaldatabasesandvideoconferencingfacilityintheseminarroomprovided.

ACTIVITY1.6 ConstructionofamastwithradiolinksanduninterruptedpowersupplyequipmenttofacilitateunhinderedaccesstotheinternetthroughtheUniversityMTNbandwidthsubscriptionfortheactivitiesofACE

Outcome1 Strengthenedcapacitytoproviderelevantqualitytrainingsinkeyareasofdrylandagriculture

Outcome INDICATOR Individual user name and password to staff and students to enable full access to science direct, Scopus and other databases provided.                 Functional video conferencing facility. 

SOURCE OF VERIFICATION  Records of Users Record of videoconferencingfacilityuse 

IMPLEMENTATION MILESTONES 

Constructionofamastwithradiolinksanduninterruptedpowersupplyequipment  Installation of equipment 

PROCUREMENT  Open Tender 

RESPONSIBILITY FOR IMPLEMENTATION 

Procurement Officer; ICT Officer

DURATION: 3 Months  Commencement: 1st January, 2016 Completion: 31st March,2016

PRIMARY CONSTITUENTS: Procurement Officer  PARTICIPANTS: Procurement Officer; ICT Officer 

ASSUMPTIONS  The University MTN subscription is current and efficient. 

FINANCIAL IMPLICATIONS  ACE budget for the activity 

Budget Line Analysis  1stQtr 2ndQtr 3rdQtr 4thQtr 5thQtr  6thQtr  Total 

1  Constructionofamastwithradiolinksanduninterruptedpowersupplyequipment 

13,000     13,000

2  Purchase of radio‐link equipment 

5,000     5,000

3  Installation of equipment  2,000     2,000

4       

5       

TOTALS  20,000     20,000

      

Page 42: Africa Centre of Excellence in Dryland Agriculture...NgREN To provide acces to relevant literature to ACE and partners Acess to current and relevant information is indispensable in

ACE TEMPLATE 

Implementation Plan 

42

Action Plan: 1. StrengthenEducationCapacity&DevelopmentImpact   Timeframe:  Quarter 1 of year 2 (January, 2016 to March, 2016) 

Activity 1.7:Provision of video conferencing facility in the Seminar room   

RESULT1.4 Expandedaccesstoindexedelectronicjournaldatabasesandvideoconferencingfacilityintheseminarroomprovided.

ACTIVITY1.7 Provision of video conferencing facility in the Seminar room.

Outcome1 Strengthenedcapacitytoproviderelevantqualitytrainingsinkeyareasofdrylandagriculture

Outcome INDICATOR No. of Video conferencing used to facilitate Teachingandlearning 

SOURCE OF VERIFICATION Record of videoconferencingfacilityuse 

IMPLEMENTATION MILESTONES 

Sensitization of contractors and selection  Upgrading of Video conferencing facility and Installation 

PROCUREMENT  Open Tender 

RESPONSIBILITY FOR IMPLEMENTATION 

Procurement Officer; ICT Officer 

DURATION: 3 Months  Commencement: 1st January,2016 Completion:31st March,2016 

PRIMARY CONSTITUENTS: Procurement Officer PARTICIPANTS: Procurement Officer

ASSUMPTIONS  NA 

FINANCIAL IMPLICATIONS  ACE budget for the activity 

Budget Line Analysis  1stQtr 2ndQtr 3rdQtr 4thQtr 5thQtr  6thQtr  Total 

1  Advert and selection of contractors 

1000     1,000

2  Procurement of Video conferencing facility and Installation 

14,000     14,000

3       

4       

5       

TOTALS  15,000     15,000

         

Page 43: Africa Centre of Excellence in Dryland Agriculture...NgREN To provide acces to relevant literature to ACE and partners Acess to current and relevant information is indispensable in

ACE TEMPLATE 

Implementation Plan 

43

Action Plan: 1. StrengthenEducationCapacity&DevelopmentImpact Timeframe:  The whole of Year 2 (January, 2016 to December, 2016) Activity 1.8: MScandPhDfellowships(includingresearchcosts)toregionalcandidates

RESULT1.1 IncreasedenrolmentofnationalandregionalstudentsintoACEpostgraduateprogrammes

ACTIVITY1.8 MScandPhDfellowships(includingresearchcosts)toregionalcandidates  

Outcome1 Strengthenedcapacityforteachingandlearningexcellenceindrylandagriculturerelatedfields

Outcome INDICATOR 

No. of PhD regional students admitted and on fellowshipNo.ofMSc regional students admitted and on fellowship  

SOURCE OF VERIFICATION Records of staff of students admission and registration from school of postgraduate studies Records of payments of fellowship to students from bursary 

IMPLEMENTATION MILESTONES 

Enrolment of M.Sc and Ph.D students ConductofM.Sc and Ph.D studies 

PROCUREMENT  NA 

RESPONSIBILITY FOR IMPLEMENTATION 

CL, DCL, Finance Officer 

DURATION: 12 Months  Commencement: 1st January, 2016 

Completion:31st December,2016 

PRIMARY CONSTITUENTS: ACE Partners  PARTICIPANTS: Postgraduate students

ASSUMPTIONS  Suitable candidates with requisite qualifications are available and are willing to study in Nigeria   

FINANCIAL IMPLICATIONS  ACE budget for the activity

Budget Line Analysis  1stQtr 2ndQtr 3rdQtr 4thQtr 5thQtr  6thQtr  Total

1  Identification and advertising fellowshippositionswithintheregion

2,000     2,000

2  ConductofM.ScandPh.Dstudies 

238,000     238,000

3       

4       

5       

TOTALS  240,000     240,000

   

Page 44: Africa Centre of Excellence in Dryland Agriculture...NgREN To provide acces to relevant literature to ACE and partners Acess to current and relevant information is indispensable in

ACE TEMPLATE 

Implementation Plan 

44

Action Plan: 1.StrengthenEducationCapacity&DevelopmentImpact Timeframe:   The whole of Year 2 (January, 2016 to December, 2016)     Activity 1.9: MountshortEnglishLanguagecoursestosupportstudentsfromregional‐Francophonecountries

RESULT1.2 IncreasedenrolmentofnationalandregionalstudentsintoACEprogrammes.

ACTIVITY1.9 MountshortEnglishLanguagecoursestosupportstudentsfromFrancophonestudents.

Outcomes1and3 Strengthen Education Capacity & Development Impact&Improved relevance, regionality andstakeholderparticipationinACEprogrammes

Outcome INDICATOR Numberofregionalstudentsenrolled

SOURCE OF VERIFICATION Records of students enrolment 

IMPLEMENTATION MILESTONES 

students enrolment 

Running EnglishLanguagecourses 

PROCUREMENT  Direct Purchase

RESPONSIBILITY FOR IMPLEMENTATION 

DCL, Relevant Department

DURATION: 12 months  Commencement:1st January,2016 

Completion: 31st December,2016 

PRIMARY CONSTITUENTS: ACE, Partners  PARTICIPANTS: Academic Departments

ASSUMPTIONS  Students and staff of partner institutions from francophone countries will require English language proficiency courses 

FINANCIAL IMPLICATIONS  ACE budget for the activity

Budget Line Analysis  1stQtr 2ndQtr 3rdQtr 4thQtr 5thQtr  6thQtr  Total

1  Students enrolment   

   

2  Running EnglishLanguagecourses 

8,000     8,000

3  Procurement of English language learning software and books 

12,000     12,000

4       

5       

TOTALS  20,000     20,000

   

Page 45: Africa Centre of Excellence in Dryland Agriculture...NgREN To provide acces to relevant literature to ACE and partners Acess to current and relevant information is indispensable in

ACE TEMPLATE 

Implementation Plan 

45

Action Plan: 1. StrengthenEducationCapacity&DevelopmentImpact Timeframe: The whole of Year 2 (January, 2016 to December, 2016)   Activity 1.10: Exchange of staff through short stay, sabbatical and visiting lectureship 

RESULT1.2 IncreasedenrolmentofnationalandregionalstudentsintoACEprogrammes. 

ACTIVITY1.10 Exchange of staff through short stay, sabbatical and visiting lectureship  

Outcome1 Strengthenedcapacitytoproviderelevantqualitytrainingsinkeyareasofdrylandagriculture

Outcome INDICATOR No. of Staff on sabbaticalandvisitinglectureship/fellowshipNo.oflectures via video links 

SOURCE OF VERIFICATIONRecords of staff engagement/exchange Records of lectures via video links 

IMPLEMENTATION MILESTONES 

Identification and advertising of visitinglectureship/fellowshippositionsSelectionofstaffforexchangestaffexchange

PROCUREMENT  NA 

RESPONSIBILITY FOR IMPLEMENTATION 

CL 

DURATION: 12 months  Commencement:1st January, 2016  

Completion: 31st  December, 2016  

PRIMARY CONSTITUENTS: ACE Partners PARTICIPANTS: National and Regional Institutions/organizations and agencies, professional bodies 

ASSUMPTIONS  Partner National and Regional Institutions/organizations and agencies with aligned mandate will be supportive.   

FINANCIAL IMPLICATIONS  ACE budget for the activity 

Budget Line Analysis  1stQtr 2ndQtr 3rdQtr 4thQtr 5thQtr  6thQtr  Total 

1  Identification and advertising of visitinglectureship/fellowshippositions

1,000     1,000

2  Selectionofstaffforexchange  1,000     1,000

3  staffexchange  138,000     138,000

4       

5       

TOTALS  140,000     140,000

      

Page 46: Africa Centre of Excellence in Dryland Agriculture...NgREN To provide acces to relevant literature to ACE and partners Acess to current and relevant information is indispensable in

ACE TEMPLATE 

Implementation Plan 

46

Action Plan:1.StrengthenEducationCapacity&DevelopmentImpact   Timeframe: Quarter 2 of Year 2 (April,2016 to July,2016)    

Activity 1.11: Procure a 30‐seater training bus 

RESULT1. Easymovementofstudentsandstaffduringstudyvisitsandexcursions

ACTIVITY1.11 Procurementofa30‐seatertrainingbus

Outcome1 Strengthenedcapacityforteachingandlearningexcellenceindrylandagriculturerelatedfields

Outcome INDICATOR Three laboratories upgraded and furnished according to specification 

SOURCE OF VERIFICATION Inventory of laboratories 

IMPLEMENTATION MILESTONES 

Advert and selection of Contractors  Supply of 30 seater training bus  Verification and handing over 

PROCUREMENT  Open Tender

RESPONSIBILITY FOR IMPLEMENTATION 

CL, Procurement officer

DURATION: 3 Months  Commencement: 1st April,2016 Completion: 31st July, 2016 

PRIMARY CONSTITUENTS: CL, Procurement officer PARTICIPANTS: Contractors

ASSUMPTIONS  NA 

FINANCIAL IMPLICATIONS  ACE budget for the activity

Budget Line Analysis  1stQtr 2ndQtr 3rdQtr 4thQtr 5thQtr  6thQtr  Total

1  Advert and selection of Contractors 

1000     1000

2  Supply of 30‐seater training bus 

70,600     70,600

3  Verification and handing over  1,000     1,000

4       

5       

TOTALS  72,600     72,600

   

Page 47: Africa Centre of Excellence in Dryland Agriculture...NgREN To provide acces to relevant literature to ACE and partners Acess to current and relevant information is indispensable in

ACE TEMPLATE 

Implementation Plan 

47

Action Plan: 1. StrengthenEducationCapacity&DevelopmentImpact Timeframe:  The whole of Year 2 (January, 2016 to December, 2016)   Activity 1.12: Organize joint short courses to address specific capacity needs of ACE, partners, industry and other stakeholders 

RESULT1.5 CompetenceofACEandpartnerfacultytosupportpostgraduatetrainingindrylandagricultureenhancedthroughshorttrainingcourses/postgraduatetraininginidentifiedareasofskillgap.

ACTIVITY1.12 OrganizejointshortcoursestoaddressspecificcapacityneedsofACE,partners,industryandotherstakeholders

Outcome Strengthenedcapacityforteachingandlearningexcellenceindrylandagriculturerelatedfields

Outcome INDICATOR 40ACEstaff/partners(outofwhichatleast12females)trainedinrelevantareasincluding:

1. Climateandagriculturalsystemsmodelling2. Watermanagementandconservationtechniques3. Advancesincropimprovementandadaptationtoheatandwaterstress4. Advancesinlivestockimprovementandadaptationtoheatandwaterstress

SOURCE OF VERIFICATION Report/proceedings of trainings conducted, Training materials on ACE website 

IMPLEMENTATION MILESTONES 

Developmentoftrainingmodules  Identificationofresourcespersonsandresourcecentres  Conductofthetrainings 

PROCUREMENT  NA 

RESPONSIBILITY FOR IMPLEMENTATION 

DCL 

DURATION: 12 Months  Commencement: 1st January,2016  Completion:31st December,2016  

PRIMARY CONSTITUENTS: resource persons, trainee staff 

PARTICIPANTS: ACE staff, participating departments staff

ASSUMPTIONS  Training and capacity building opportunities relevant to needs available   

FINANCIAL IMPLICATIONS  ACE budget for the activity 

Budget Line Analysis  1stQtr 2ndQtr 3rdQtr 4thQtr 5thQtr  6thQtr  Total 

1  Participation of ACE and partner faculty in short trainings both locally and internationally 

52,250 45,000 45,000 45,000     187,250

2       

3       

4       

5       

TOTALS  52,250 45,000 45,000 45,000     187,250

   

Page 48: Africa Centre of Excellence in Dryland Agriculture...NgREN To provide acces to relevant literature to ACE and partners Acess to current and relevant information is indispensable in

ACE TEMPLATE 

Implementation Plan 

48

Action Plan: 2 StrengthenCapacityforResearchExcellenceinDrylandAgriculturerelatedFields  Timeframe:  The whole of Year 2 (January, 2016 to December, 2016)   Activity 2.1.1: Implementationofresearchrelatedtrainingsforacademicandtechnicalstaff 

RESULT2.1 ImprovedresearchcapacityofstaffofACEandpartnerinstitutionsinthefieldofdrylandagriculture

ACTIVITY2.1 Implementationofresearchrelatedtrainingsforacademicandtechnicalstaff 

Outcome2 Strengthenedcapacityforresearchexcellenceindrylandagriculturerelatedfields 

Outcome INDICATOR ‐ 5 academic and 5 technical staff trained on laboratory practices and proper use of some the equipment already available in BUK including GC and HPLC 

SOURCE OF VERIFICATION ‐Record of training reports.  

IMPLEMENTATION MILESTONES 

Develop training modules 

Identify and engage resource person  Conduct trainings 

PROCUREMENT  NA 

RESPONSIBILITY FOR IMPLEMENTATION 

CL, DCL 

DURATION: 12 Months  Commencement:1st January,2016 

Completion:31st December,2016 

PRIMARY CONSTITUENTS: Consultants  PARTICIPANTS: Consultants, ACE partners (Trainees) 

ASSUMPTIONS  Relevant and competent resource persons are available within the region the provide the trainings 

FINANCIAL IMPLICATIONS  ACE budget for the activity

Budget Line Analysis  1stQtr 2ndQtr 3rdQtr 4thQtr 5thQtr  6thQtr  Total

1  Identify training opportunities     

2  Sponsor staff for training  7,500 7,500 7,500 7,500     30,000

3       

4       

5       

TOTALS  7,500 7,500 7,500 7,500     30,000

        

Page 49: Africa Centre of Excellence in Dryland Agriculture...NgREN To provide acces to relevant literature to ACE and partners Acess to current and relevant information is indispensable in

ACE TEMPLATE 

Implementation Plan 

49

Action Plan: 2 StrengthenCapacityforResearchExcellenceinDrylandAgriculturerelatedFields   Timeframe:  Quarter 2 to 4 of Yr2  (April, 2016 to December, 2016)   Activity 2.2: Selectionandengagementofpost‐doctoralfellows

RESULT2.1 ImprovedresearchcapacityofstaffofACEandpartnerinstitutionsinthefieldofdrylandagriculture

ACTIVITY2.2 Selectionandengagementofpostdoctoralfellows

Outcome2 Strengthenedcapacityforresearchexcellenceindrylandagriculturerelatedfields 

Outcome INDICATOR 4 Post‐doctoral fellows of ACE and partner institutions selected 

SOURCE OF VERIFICATION Records of postdoctoral fellowship 

IMPLEMENTATION MILESTONES 

Identification and advertising of post‐doctoral fellows from among ACE/Partner staff  Selectionofpost‐doctoral fellowship. Conductofpost‐doctoral studies 

PROCUREMENT  NA 

RESPONSIBILITY FOR IMPLEMENTATION 

VC BUK; CL

DURATION: 9 months  Commencement:1st April,2016 

Completion:31st December,2016 

PRIMARY CONSTITUENTS: ACE Partners  PARTICIPANTS: National and Regional Institutions/organizations and agencies 

ASSUMPTIONS  Academics of ACE and partner institutions meets the minimum standards for the fellowship as designed in the guidelines 

FINANCIAL IMPLICATIONS  ACE budget for the activity

Budget Line Analysis  1stQtr 2ndQtr 3rdQtr 4thQtr 5thQtr  6thQtr  Total

1  Identification and advertising of staff post‐doctoral fellows from among ACE/Partner staff  

1,000     1,000

2  Selectionofstaffforpost‐doctoral fellowship. 

2,000     2,000

3  Conductofstaffpost‐doctoral studies 

47,000 47,000 47,000     141,000

4       

5       

TOTALS  50,000 47,000 47,000     144,000

Page 50: Africa Centre of Excellence in Dryland Agriculture...NgREN To provide acces to relevant literature to ACE and partners Acess to current and relevant information is indispensable in

ACE TEMPLATE 

Implementation Plan 

50

Action Plan: 2 StrengthenCapacityforResearchExcellenceinDrylandAgriculturerelatedFields   Timeframe:  Quarter 1 of year 2 (January, 2016 to March, 2016)   Activity 2.3: FurnishingofaspecializedTissue‐CultureLaboratory

RESULT2.1 ImprovedresearchcapacityofstaffofACEandpartnerinstitutionsinthefieldofdrylandagriculture

ACTIVITY2.3 FurnishingandofaspecializedTissue‐CultureLaboratory

Outcome2 Strengthenedcapacityforresearchexcellenceindrylandagriculturerelatedfields 

Outcome INDICATOR Three laboratories upgraded and furnished according to specification 

SOURCE OF VERIFICATION Inventory of laboratories 

IMPLEMENTATION MILESTONES 

Advert and selection of Contractors  Supply and installation of furnishing of Laboratories  Verification and handing over 

PROCUREMENT  Open Tender

RESPONSIBILITY FOR IMPLEMENTATION 

CL, Procurement officer

DURATION: 3 Months  Commencement:1st January, 2016 Completion: 31st March, 2016 

PRIMARY CONSTITUENTS: CL, Procurement officer PARTICIPANTS: Contractors

ASSUMPTIONS  NA 

FINANCIAL IMPLICATIONS  ACE budget for the activity

Budget Line Analysis  1stQtr 2ndQtr 3rdQtr 4thQtr 5thQtr  6thQtr  Total

1  Advert and selection of Contractors 

1000     1000

2  Supply and installation of laboratory furnishing, gas piping, digital film cupboards, etc 

97,000     97,000

3  Verification and handing over  2,000     2,000

4       

5       

TOTALS  100,000     100,000

     

Page 51: Africa Centre of Excellence in Dryland Agriculture...NgREN To provide acces to relevant literature to ACE and partners Acess to current and relevant information is indispensable in

ACE TEMPLATE 

Implementation Plan 

51

Action Plan: 2 StrengthenCapacityforResearchExcellenceinDrylandAgriculturerelatedFields   Timeframe:  Quarter 1 of year 2 (January, 2016 to March, 2016)   Activity 2.4: EquippingofaspecializedTissue‐CultureLaboratory

RESULT2.1 ImprovedresearchcapacityofstaffofACEandpartnerinstitutionsinthefieldofdrylandagriculture

ACTIVITY2.4 EquippingofaspecializedTissue‐CultureLaboratory

Outcome2 Strengthenedcapacityforresearchexcellenceindrylandagriculturerelatedfields 

Outcome INDICATOR Three laboratories upgraded and furnished according to specification 

SOURCE OF VERIFICATION Inventory of laboratories 

IMPLEMENTATION MILESTONES 

Advert and selection of Contractors  Supply and installation of Laboratory equipment  Verification and handing over 

PROCUREMENT  Open Tender

RESPONSIBILITY FOR IMPLEMENTATION 

CL, Procurement officer

DURATION: 3 Months  Commencement:1st January, 2016 Completion: 31st March, 2016 

PRIMARY CONSTITUENTS: CL, Procurement officer PARTICIPANTS: Contractors

ASSUMPTIONS  NA 

FINANCIAL IMPLICATIONS  ACE budget for the activity

Budget Line Analysis  1stQtr 2ndQtr 3rdQtr 4thQtr 5thQtr  6thQtr  Total

1  Advert and selection of Contractors 

1000     1000

2  Supply and installation of laboratory furnishing, gas piping, digital film cupboards, etc 

238,000     238,000

3  Verification and handing over  2,000     2,000

4       

5       

TOTALS  241,000     241,000

         

Page 52: Africa Centre of Excellence in Dryland Agriculture...NgREN To provide acces to relevant literature to ACE and partners Acess to current and relevant information is indispensable in

ACE TEMPLATE 

Implementation Plan 

52

Action Plan: 2 StrengthenCapacityforResearchExcellenceinDrylandAgriculturerelatedFields.   Timeframe:  Quarter 2 to 4 of year 2 (April, 2016 to December, 2016)   Activity 2.5:  DevelopmentofproposalsandprotocolsandimplementationofresearchprogrammesinthethematicresearchareasoftheACE(researchdrivenbypostdoctoralfellows)

RESULT2.1 ImprovedresearchcapacityofstaffofACEandpartnerinstitutionsinthefieldofdrylandagriculture

ACTIVITY2.5 DevelopmentofproposalsandprotocolsandimplementationofresearchprogrammesinthethematicresearchareasoftheACE(researchdrivenbypostdocfellows) 

Outcome2 Strengthenedcapacityforresearchexcellenceindrylandagriculturerelatedfields 

Outcome INDICATOR ‐ 3 research proposals developed                    ‐ 3 joint research projects initiated  

SOURCE OF VERIFICATION 

Annual work plan  Research Reports  Publications 

IMPLEMENTATION MILESTONES 

Preparation of research proposals and protocols by postdoctoral fellows in ACEandpartnerinstitutions.

ImplementationofresearchprogrammesbypostdoctoralfellowsunderthesupervisionofcompetentfacultyfromACEandpartnerinstitutions 

PROCUREMENT  NA 

RESPONSIBILITY FOR IMPLEMENTATION 

ACE Team in consultation with partners

DURATION: 10 Months  Commencement: 1st April, 2016 Completion:31st December, 2016 

PRIMARY CONSTITUENTS: ACE Partners  PARTICIPANTS: National and Regional Institutions/organizations and agencies 

ASSUMPTIONS  Partner institutions supportive and willing to participate in joint research

FINANCIAL IMPLICATIONS  ACE budget for the activity

Budget Line Analysis  1stQtr 2ndQtr 3rdQtr 4thQtr 5thQtr  6thQtr  Total

1  Preparation of research proposals and protocols by ACEandpartnerinstitutions. 

6,000     6,000

2  Implementationofjointresearchprogrammeswithpartnerinstitutions 

48,000 48,000 48,000     144,000

3       

4       

5       

TOTALS  54,000 48,000 48,000     150,000

      

Page 53: Africa Centre of Excellence in Dryland Agriculture...NgREN To provide acces to relevant literature to ACE and partners Acess to current and relevant information is indispensable in

ACE TEMPLATE 

Implementation Plan 

53

Action Plan: 2 StrengthenCapacityforResearchExcellenceinDrylandAgriculturerelatedFields   Timeframe:  Quarter 2 to 3 of year 2 (April, 2016 to September, 2016)   Activity 2.6: upgrade of research farm, including a 5ha drip irrigation facility by end of year1   

RESULT2.2 ACEresearchfacilitiesupgradedandfunctional

ACTIVITY2.6 upgradeofresearchfarm,includinga5hadripirrigationfacility

Outcome2 Strengthenedcapacityforresearchexcellenceindrylandagriculturerelatedfields 

OUTPUT INDICATOR One upgraded researchandtrainingfarm 

SOURCE OF VERIFICATION Record of status of researchandtrainingfarm before and after upgrade 

IMPLEMENTATION MILESTONES 

Advert and selection of contractors  Upgrading of farm 

PROCUREMENT  Open Tender

RESPONSIBILITY FOR IMPLEMENTATION 

CL, DCL, Procurement Officer

DURATION: 6 Months  Commencement:1st April,2016 

Completion:30th September,2016 

PRIMARY CONSTITUENTS: Contractors  PARTICIPANTS: Contractors, Scientist &Technologist in all participating departments 

ASSUMPTIONS  NA 

FINANCIAL IMPLICATIONS  ACE budget for the activity

Budget Line Analysis  1stQtr 2ndQtr 3rdQtr 4thQtr 5thQtr  6thQtr  Total

1  Sensitization of Consultants and selection 

10,000     10,000

2  Upgrading of farm  210,000     210,000

3       

4       

5       

TOTALS  220,000     220,000

Page 54: Africa Centre of Excellence in Dryland Agriculture...NgREN To provide acces to relevant literature to ACE and partners Acess to current and relevant information is indispensable in

ACE TEMPLATE 

Implementation Plan 

54

Action Plan: 1. StrengthenEducationCapacity&DevelopmentImpact   Timeframe: Quarter 2 to 3 of year 1 (December 2014 to May 2015)   Activity 2.7: Procurement and installation of screen houses  

RESULT2.2 ACEresearchfacilitiesupgradedandfunctional

ACTIVITY2.7 Procurement and installation of screen houses 

Outcome2 Strengthenedcapacityforresearchexcellenceindrylandagriculturerelatedfields 

Outcome INDICATOR 3 screen houses provided 

SOURCE OF VERIFICATION Inventory of screen houses. 

IMPLEMENTATION MILESTONES 

Advert and selection of Contractors  Placing order of Equipment 

Receiving supplies and authentication  Installations and testing 

PROCUREMENT  Open Tender

RESPONSIBILITY FOR IMPLEMENTATION 

CL, DCL,  Procurement Officer

DURATION: 6 Months  Commencement:1st April,2016 

Completion:30th September,2016 

PRIMARY CONSTITUENTS: Contractors  PARTICIPANTS: Contractors, Scientist &Technologist in all participating departments 

ASSUMPTIONS  BUK provide site for screen houses

FINANCIAL IMPLICATIONS  ACE budget for the activity

Budget Line Analysis  1stQtr 2ndQtr 3rdQtr 4thQtr 5thQtr  6thQtr  Total

1  Sensitization of Consultants and selection 

1,000     1,000

2  Placing order of Equipment  112,000     112,000

3  Receiving supplies and authentication 

1,000     1,000

4  Installations and testing  6,000     6,000

5       

TOTALS  114,000 6,000     120,000

  

  

Page 55: Africa Centre of Excellence in Dryland Agriculture...NgREN To provide acces to relevant literature to ACE and partners Acess to current and relevant information is indispensable in

ACE TEMPLATE 

Implementation Plan 

55

Action Plan: 1. StrengthenEducationCapacity&DevelopmentImpact   Timeframe: Quarter 2 of year 2 (April, 2016 to June, 2016)   Activity 2.8: Furnishing of PG Research Laboratories 

RESULT2.2 ACEresearchfacilitiesupgradedandfunctional

ACTIVITY2.8 Furnishing of  PG Research Laboratories

Outcome2 Strengthenedcapacityforresearchexcellenceindrylandagriculturerelatedfields 

Outcome INDICATOR Furnished laboratory 

SOURCE OF VERIFICATION Inventory of furniture in PG Research Laboratories 

IMPLEMENTATION MILESTONES 

Advert and selection of Contractors  Placing order of Equipment 

Receiving supplies and authentication  Installations and testing 

PROCUREMENT  Open Tender

RESPONSIBILITY FOR IMPLEMENTATION 

CL, DCL,  Procurement Officer

DURATION: 3 Months  Commencement:1st April, 2016 

Completion: 30th June,2016 

PRIMARY CONSTITUENTS: Contractors  PARTICIPANTS: Contractors, Scientist &Technologist in all participating departments 

ASSUMPTIONS  BUK provide building for housing the PG Research Laboratories

FINANCIAL IMPLICATIONS  ACE budget for the activity

Budget Line Analysis  1stQtr 2ndQtr 3rdQtr 4thQtr 5thQtr  6thQtr  Total

1  Sensitization of Consultants and selection 

1,000     1,000

2  Placing order of Equipment  52,000     52,000

3  Receiving supplies and authentication 

1,000     1,000

4  Installations and testing  6,000     6,000

5       

TOTALS  54,000 6,000     60,000

     

Page 56: Africa Centre of Excellence in Dryland Agriculture...NgREN To provide acces to relevant literature to ACE and partners Acess to current and relevant information is indispensable in

ACE TEMPLATE 

Implementation Plan 

56

Action Plan: 1. StrengthenEducationCapacity&DevelopmentImpact   Timeframe: Quarter 2 of year 2 (April, 2016 to June, 2016)   Activity 2.9: Furnishing of a specialized Instrumentation Laboratory 

RESULT2.2 ACEresearchfacilitiesupgradedandfunctional

ACTIVITY2.9 Furnishing  of a specialized Instrumentation Laboratory

Outcome2 Strengthenedcapacityforresearchexcellenceindrylandagriculturerelatedfields 

Outcome INDICATOR Furnished laboratory 

SOURCE OF VERIFICATION Inventory of furniture in  specialized Instrumentation Laboratory 

IMPLEMENTATION MILESTONES 

Advert and selection of Contractors  Placing order of Equipment 

Receiving supplies and authentication  Installations and testing 

PROCUREMENT  Open Tender

RESPONSIBILITY FOR IMPLEMENTATION 

CL, DCL,  Procurement Officer

DURATION: 3 Months  Commencement:1st April, 2016 

Completion: 30th June,2016 

PRIMARY CONSTITUENTS: Contractors  PARTICIPANTS: Contractors, Scientist &Technologist in all participating departments 

ASSUMPTIONS  BUK provide building for housing the Instrumentation laboratory

FINANCIAL IMPLICATIONS  ACE budget for the activity

Budget Line Analysis  1stQtr 2ndQtr 3rdQtr 4thQtr 5thQtr  6thQtr  Total

1  Sensitization of Consultants and selection 

1,000     1,000

2  Placing order of Equipment  25,000     25,000

3  Receiving supplies and authentication 

1,000     1,000

4  Installations and testing  3,000     3,000

5       

TOTALS  27,000 3,000     30,000

     

Page 57: Africa Centre of Excellence in Dryland Agriculture...NgREN To provide acces to relevant literature to ACE and partners Acess to current and relevant information is indispensable in

ACE TEMPLATE 

Implementation Plan 

57

Action Plan: 1. StrengthenEducationCapacity&DevelopmentImpact   Timeframe: Quarter 2 of year 2 (April, 2016 to June, 2016)   Activity 2.10: Furnishing of Remote Sensing & GIS laboratory 

RESULT2.2 ACEresearchfacilitiesupgradedandfunctional

ACTIVITY2.10 Furnishing  of Remote Sensing & GIS laboratory

Outcome2 Strengthenedcapacityforresearchexcellenceindrylandagriculturerelatedfields 

Outcome INDICATOR Furnished laboratory 

SOURCE OF VERIFICATION Inventory of furniture in Remote sensing laboratory. 

IMPLEMENTATION MILESTONES 

Advert and selection of Contractors  Placing order of Equipment 

Receiving supplies and authentication  Installations and testing 

PROCUREMENT  Open Tender

RESPONSIBILITY FOR IMPLEMENTATION 

CL, DCL,  Procurement Officer

DURATION: 3 Months  Commencement:1st April, 2016 

Completion: 30th June,2016 

PRIMARY CONSTITUENTS: Contractors  PARTICIPANTS: Contractors, Scientist &Technologist in all participating departments 

ASSUMPTIONS  BUK provide building for housing the Remote sensing laboratory

FINANCIAL IMPLICATIONS  ACE budget for the activity

Budget Line Analysis  1stQtr 2ndQtr 3rdQtr 4thQtr 5thQtr  6thQtr  Total

1  Sensitization of Consultants and selection 

1,000     1,000

2  Placing order of Equipment  41,000     41,000

3  Receiving supplies and authentication 

1,000     1,000

4  Installations and testing  2,000     2,000

5       

TOTALS  43,000 2,000     45,000

      

Page 58: Africa Centre of Excellence in Dryland Agriculture...NgREN To provide acces to relevant literature to ACE and partners Acess to current and relevant information is indispensable in

ACE TEMPLATE 

Implementation Plan 

58

Action Plan: 1. StrengthenEducationCapacity&DevelopmentImpact   Timeframe: Quarter 3 to 4 of year 2 (July, 2016 to December, 2016)   Activity 2.11: Equipping of a specialized Instrumentation Laboratory 

RESULT2.2 ACEresearchfacilitiesupgradedandfunctional

ACTIVITY2.11 Equipping  of a specialized Instrumentation Laboratory

Outcome2 Strengthenedcapacityforresearchexcellenceindrylandagriculturerelatedfields 

Outcome INDICATOR Laboratory equipped and utilized 

SOURCE OF VERIFICATION Inventory of equipments in  specialized Instrumentation Laboratory 

IMPLEMENTATION MILESTONES 

Advert and selection of Contractors  Placing order of Equipment 

Receiving supplies and authentication  Installations and testing 

PROCUREMENT  Open Tender

RESPONSIBILITY FOR IMPLEMENTATION 

CL, DCL,  Procurement Officer

DURATION: 6 Months  Commencement:1st July,2016 

Completion:31st December,2016

PRIMARY CONSTITUENTS: Contractors  PARTICIPANTS: Contractors, Scientist &Technologist in all participating departments 

ASSUMPTIONS  BUK provide building for housing the Instrumentation laboratory

FINANCIAL IMPLICATIONS  ACE budget for the activity

Budget Line Analysis  1stQtr 2ndQtr 3rdQtr 4thQtr 5thQtr  6thQtr  Total

1  Sensitization of Consultants and selection 

1,000     1,000

2  Placing order of Equipment  364,000     364,000

3  Receiving supplies and authentication 

5,000     5,000

4  Installations and testing  30,000     30,000

5       

TOTALS  370,000 30,000     400,000

      

Page 59: Africa Centre of Excellence in Dryland Agriculture...NgREN To provide acces to relevant literature to ACE and partners Acess to current and relevant information is indispensable in

ACE TEMPLATE 

Implementation Plan 

59

Action Plan: 1. StrengthenEducationCapacity&DevelopmentImpact   Timeframe: Quarter 3 to 4 of year 1 (July, 2016 to December, 2016)   Activity 2.12: Equipping of Remote Sensing & GIS laboratory 

RESULT2.2 ACEresearchfacilitiesupgradedandfunctional

ACTIVITY2.12 Equipping  of Remote Sensing & GIS laboratory

Outcome2 Strengthenedcapacityforresearchexcellenceindrylandagriculturerelatedfields 

Outcome INDICATOR Laboratory equipped and utilized 

SOURCE OF VERIFICATION Inventory of equipments in Remote sensing laboratory. 

IMPLEMENTATION MILESTONES 

Advert and selection of Contractors  Placing order of Equipment 

Receiving supplies and authentication  Installations and testing 

PROCUREMENT  Open Tender

RESPONSIBILITY FOR IMPLEMENTATION 

CL, DCL,  Procurement Officer

DURATION: 6 Months  Commencement:1st July,2016 

Completion:31st December,2016

PRIMARY CONSTITUENTS: Contractors  PARTICIPANTS: Contractors, Scientist &Technologist in all participating departments 

ASSUMPTIONS  BUK provide building for housing the Remote sensing laboratory

FINANCIAL IMPLICATIONS  ACE budget for the activity

Budget Line Analysis  1stQtr 2ndQtr 3rdQtr 4thQtr 5thQtr  6thQtr  Total

1  Sensitization of Consultants and selection 

1,000     1,000

2  Placing order of Equipment  92,000     92,000

3  Receiving supplies and authentication 

1,000     1,000

4  Installations and testing  6,000     6,000

5       

TOTALS  94,000 6,000     100,000

           

Page 60: Africa Centre of Excellence in Dryland Agriculture...NgREN To provide acces to relevant literature to ACE and partners Acess to current and relevant information is indispensable in

ACE TEMPLATE 

Implementation Plan 

60

    Action Plan 3: Improvedrelevance,regionalityandstakeholderparticipationinACEactivities  Timeframe: Quarter 2 of year 2 (April,2016)   Activity: 3.1: ConductaregionalworkshoptodiscussACEprogrammes/activitieswithindustry/sectorpartners

RESULT3.1 Relevanthumancapacityandresearchneedsofpublicandprivateinstitutions,industryanddevelopmentorganizationsunderstoodanddocumented

ACTIVITY3.1 ConductaregionalworkshoptodiscussACEprogrammes/activitieswithindustry/sectorpartners

Outcome3 Improvedrelevance,regionalityandstakeholderparticipationinACEprogrammes

Outcome INDICATOR OneWorkshopconducted

SOURCE OF VERIFICATION Workshop report 

IMPLEMENTATION MILESTONES 

Workshop preparation Identificationandinvitationofworkshopparticipantsandresourcepersons ConductofWorkshop 

PROCUREMENT  NA 

RESPONSIBILITY FOR IMPLEMENTATION 

,CL, DCL; ACE Partner Institutions

DURATION: 1 month  Commencement:1st April, 2016 

Completion: 30th april,2016  

PRIMARY CONSTITUENTS: ACE Partners  PARTICIPANTS: National and Regional Institutions/organizations and agencies 

ASSUMPTIONS  Affiliated National and Regional Institutions/organizations and agencies with aligned mandate will be supportive.   

FINANCIAL IMPLICATIONS  ACE budget for the activity

Budget Line Analysis  1stQtr 2ndQtr 3rdQtr 4thQtr 5thQtr  6thQtr  Total

1  Workshop preparation

1,000     1,000

2  Identificationandinvitationofworkshopparticipantsandresourcepersons

1,000     1,000

3  ConductofWorkshop  48,000     48,000

4       

5       

TOTALS  50,000     50,000

      

Page 61: Africa Centre of Excellence in Dryland Agriculture...NgREN To provide acces to relevant literature to ACE and partners Acess to current and relevant information is indispensable in

ACE TEMPLATE 

Implementation Plan 

61

Action Plan 3: Improvedrelevance,regionalityandstakeholderparticipationinACEactivities Timeframe: The whole of year 2 (January, 2016 to December, 2016)     Activity  3.2:  Identify and facilitate students and staff internship in industries, public and private sectors, as well as developmentorganizations

RESULT3.2 RobustoutreachprogrammestoaddressrelevantskillneedsoftheWCAdrylandregiondeveloped.

ACTIVITY3.2 Identifyandfacilitatestudentsandstaffinternshipinindustries,publicandprivatesectors,aswellasdevelopmentorganizations

Outcome3 Improvedrelevance,regionalityandstakeholderparticipationinACEprogrammes

OUTPUT INDICATOR NumberofstaffandstudentsofACEoninternship

SOURCE OF VERIFICATION 

Records of staff and students internship 

IMPLEMENTATION MILESTONES 

Identification of enterprises for student and staff internships SigningofagreementsbetweenenterprisesandACEtofacilitatesmoothconductofinternship Conductofinternships 

PROCUREMENT  NA 

RESPONSIBILITY FOR IMPLEMENTATION 

ACE Team, Partners

DURATION: 12 months  Commencement:1st January,2016 

Completion: 31st December,2016 

PRIMARY CONSTITUENTS: Students, Staff, ACE Partners PARTICIPANTS: National and Regional agro‐industries and enterprises,Institutions/organizations and agencies 

ASSUMPTIONS  Internship opportunities available at industries and public and private institutions 

FINANCIAL IMPLICATIONS  ACE budget for the activity

Budget Line Analysis  1stQtr 2ndQtr 3rdQtr 4thQtr 5thQtr  6thQtr  Total

1  Identification and advertising of students internshippositions

   

2  Facilitationofstudents internship 

30,000 30,000 30,000 30,000     120,000

3       

4       

5       

TOTALS  30,000 30,000 30,000 30,000     120,000

      

Page 62: Africa Centre of Excellence in Dryland Agriculture...NgREN To provide acces to relevant literature to ACE and partners Acess to current and relevant information is indispensable in

ACE TEMPLATE 

Implementation Plan 

62

Action Plan 3: Improvedrelevance,regionalityandstakeholderparticipationinACEactivities Timeframe: Quarter  2 to 4 of year 2 (April, 2016 to December, 2016)     Activity 3.3: ACE and identified partners/stakeholders engaged in exchange of staff and students, short visits, lectures by captains ofindustries

RESULT3.2 RobustoutreachprogrammestoaddressrelevantskillneedsoftheWCAdrylandregiondeveloped.

ACTIVITY 3.3. ACEand identifiedpartners/stakeholdersengaged inexchangeofstaff andstudents,shortvisits,lecturesbycaptainsofindustries

Outcome3 Improvedrelevance,regionalityandstakeholderparticipationinACEprogrammes

OUTPUT INDICATOR Numberofexchangeofstaffandstudents,shortvisits,lecturesbycaptainsofindustries

SOURCE OF VERIFICATION 

Records of exchangeofstaffandstudents,shortvisits,lecturesbycaptainsofindustries 

IMPLEMENTATION MILESTONES 

Identification of potential staff and students  Organisation of exchange visits 

PROCUREMENT  NA 

RESPONSIBILITY FOR IMPLEMENTATION 

ACE Team, Partners

DURATION: 9 months  Commencement: 1st April,2016 Completion: 31st December,2016 

PRIMARY CONSTITUENTS: Students, Staff, ACE Partners PARTICIPANTS: National and Regional agro‐industries and enterprises,Institutions/organizations and agencies 

ASSUMPTIONS  Opportunities  for exchangeofstaffandstudents,shortvisits,lecturesbycaptainsofindustries available 

FINANCIAL IMPLICATIONS  ACE budget for the activity

Budget Line Analysis  1stQtr 2ndQtr 3rdQtr 4thQtr 5thQtr  6thQtr  Total

1  Identificationofstaffandstudents

500 500     1,000

2  Conduct of exchange visits  9,000 15,000 15,000     39,000

3       

4       

5       

TOTALS  9,500 15,500 15,000     40,000

   

Page 63: Africa Centre of Excellence in Dryland Agriculture...NgREN To provide acces to relevant literature to ACE and partners Acess to current and relevant information is indispensable in

ACE TEMPLATE 

Implementation Plan 

63

Action Plan 3:Improvedrelevance,regionalityandstakeholderparticipationinACEactivities Timeframe:TheWholeofyear2(January,2016toDecember,2016)     Activity 3.4: SharingandexchangeofinformationbetweenACEandpartners,includinglibraryresources

RESULT3.2 RobustoutreachprogrammestoaddressrelevantskillneedsoftheWCAdrylandregiondeveloped.

ACTIVITY3.4 SharingandexchangeofinformationbetweenACEandpartners,includinglibraryresources

Outcome3 Improvedrelevance,regionalityandstakeholderparticipationinACEprogrammes

Outcome INDICATOR Numberoflibraryresourcesshared

SOURCE OF VERIFICATION Number of MOUs signed 

No. of information materials shared 

No. of Newsletters, periodicals, etc prepared and shared 

IMPLEMENTATION MILESTONES 

Signing of MOUs 

Sustained communication and information sharing 

PROCUREMENT  NA 

RESPONSIBILITY FOR IMPLEMENTATION 

CL, DCL 

DURATION: 12 months  Commencement: January, 2016  Completion: December,2016 

PRIMARY CONSTITUENTS: ACE Partners  PARTICIPANTS:  Staff and students of partner institutions 

ASSUMPTIONS  ACE partners utilise the information and library resources made available by ACE 

FINANCIAL IMPLICATIONS  ACE budget for the activity 

Budget Line Analysis  1stQtr 2ndQtr 3rdQtr 4thQtr 5thQtr  6thQtr  Total

1  Drafting of MoUs     

2  Signing of the MoUs     

3  Sustained communication, information sharing and collaborative networking with partners 

2,500 2,500 2,500 2,500     10,000

4       

5       

TOTALS  2,500 2,500 2,500 2,500     10,000

   

   

Page 64: Africa Centre of Excellence in Dryland Agriculture...NgREN To provide acces to relevant literature to ACE and partners Acess to current and relevant information is indispensable in

ACE TEMPLATE 

Implementation Plan 

64

Action Plan: 4 StrengthenededucationandresearchgovernanceandadministrativecapacityofACE Timeframe: Quarter 1 of year 2 (March, 2016)     Activity 4.1: OrganiseandconducttrainingforkeyProjectadministrative,M&Eandfinancialmanagementpersonnel

RESULT4.1 Strengtheninternalworking,reportingandaccountabilitysystems

ACTIVITY4.1 Organise and conduct training for key Project administrative, M&E and financial managementpersonnel

Outcome4 Strengthened research and education governance and administrative capacity of ACE to providecoordinatingrolefordrylandagriculturaldevelopmentinWCA

OUTCOME INDICATOR i) OnetrainingforM&Epersonnelonbestinternationaldatamanagementpractices

conductedii) Onetrainingforfinancialmanagementpersonneloncomputerizedandbest

internationalfinancialmanagementsystemsheld

SOURCE OF VERIFICATIONMinutesofmeetingsReportsoftrainings 

IMPLEMENTATION MILESTONES 

Preparation of trainings 

Selection of participants 

Conduct of trainings

PROCUREMENT  NA 

RESPONSIBILITY FOR IMPLEMENTATION 

CL, DCL 

DURATION: 1 month  Commencement: 1st March, 2016  

Completion: 31st March, 2016  

PRIMARY CONSTITUENTS: CL, DCL  PARTICIPANTS:  ACE team, Partner institutions and other stakeholders 

ASSUMPTIONS  NA 

FINANCIAL IMPLICATIONS  ACE budget for the activity 

Budget Line Analysis  1stQtr 2ndQtr 3rdQtr 4thQtr 5thQtr  6thQtr  Total 

1  Preparation of trainings  

1,000     1,000

2  Selection of participants  

500     500

3  Conduct of trainings  48,500     48,500

4       

5       

TOTALS  50,000     50,000

 

 

    

Page 65: Africa Centre of Excellence in Dryland Agriculture...NgREN To provide acces to relevant literature to ACE and partners Acess to current and relevant information is indispensable in

ACE TEMPLATE 

Implementation Plan 

65

Action Plan: 4 StrengthenededucationandresearchgovernanceandadministrativecapacityofACE Timeframe: The whole of year 2 (January, 2016 to December, 2016)     Activity 4.2: HoldregularmeetingsofACEteams,TechnicalCommittee,andAdvisoryBoard 

RESULT4.2 CompetentACEprojectmanagementteamconstitutedandoperationalizedadoptinginternationalbestpractices

ACTIVITY4.2 HoldregularmeetingsofACEteams,TechnicalcommitteeandAdvisoryBoard

Outcome4 Strengthened education and research governance and administrative capacity of ACE to providecoordinatingrolefordrylandagriculturaldevelopmentinWCA

OUTCOME INDICATOR i) 6MeetingsofACESteeringCommitteeheldii) 2meetingsofCDABoardheld

SOURCE OF VERIFICATIONMinutesofmeetings 

IMPLEMENTATION MILESTONES 

Formulation of agenda 

Circulation of invitation  Conduct of meeting

PROCUREMENT  NA 

RESPONSIBILITY FOR IMPLEMENTATION 

CL 

DURATION: 12 months  Commencement:1st January,2016 

Completion:31st December,2016 

PRIMARY CONSTITUENTS:  CL, DCL,   PARTICIPANTS: ACE team and Partners 

ASSUMPTIONS  BUK Management sustain support for ACE 

FINANCIAL IMPLICATIONS  ACE budget for the activity 

Budget Line Analysis  1stQtr 2ndQtr 3rdQtr 4thQtr 5thQtr  6thQtr  Total 

1  Conduct of meeting (travels for local and international participants, accommodation, etc) 

6,250 6,250 6,250 6,250     25,000

2       

3       

4       

5       

TOTALS  6,250 6,250 6,250 6,250     25,000

          

Page 66: Africa Centre of Excellence in Dryland Agriculture...NgREN To provide acces to relevant literature to ACE and partners Acess to current and relevant information is indispensable in

ACE TEMPLATE 

Implementation Plan 

66

Action Plan: 4 StrengthenededucationandresearchgovernanceandadministrativecapacityofACE Timeframe: Quarter 4 of year 2 (October, 2016 to December, 2016)     Activity 4.3: Preparationofendoftheyearprocurement,financialandexternalauditreport.

RESULT4.2 CompetentACEprojectmanagementteamconstitutedandoperationalizedadoptinginternationalbestpractices

ACTIVITY4.3 Preparationofendoftheyearprocurement,financialandexternalauditreport.

Outcome4 Strengthened research and education governance and administrative capacity of ACE to providecoordinatingrolefordrylandagriculturaldevelopmentinWCA

OUTCOME INDICATOR Onefinancial and external AuditreportpreparedOneProcurementreportprepared

SOURCE OF VERIFICATION financial and external AuditReportProcurementreport 

IMPLEMENTATION MILESTONES 

Preparation of procurement, financial and external audit reports 

PROCUREMENT  NA 

RESPONSIBILITY FOR IMPLEMENTATION 

CL, DCL 

DURATION: 3 months  Commencement: 1st October,2016  

Completion: 31st December,2016  

PRIMARY CONSTITUENTS:  CL, DCL,   PARTICIPANTS: External Auditor 

ASSUMPTIONS  BUK Management sustain support for ACE

FINANCIAL IMPLICATIONS  ACE budget for the activity

Budget Line Analysis  1stQtr 2ndQtr 3rdQtr 4thQtr 5thQtr  6thQtr  Total

1  Preparation of procurement, financial reports, including conduct of external audit  

15,000     15,000

2       

3       

4       

5       

TOTALS  15,000     15,000

       

Page 67: Africa Centre of Excellence in Dryland Agriculture...NgREN To provide acces to relevant literature to ACE and partners Acess to current and relevant information is indispensable in

ACE TEMPLATE 

Implementation Plan 

67

Action Plan: 4 StrengthenededucationandresearchgovernanceandadministrativecapacityofACE Timeframe: Quarter 2 and 4 of year  (May, 2016 and October, 2016)     Activity 4.4: Organizeandfacilitateregularpartnermeetingsandworkshops

RESULT4.3 Relevanteducational,researchanddevelopmentbodiesintheWCAregioninvolvedintheactivitiesofthecentre

ACTIVITY4.4 Organizeandfacilitateregularpartnermeetingsandworkshops

Outcome4 Strengthened research and education governance and administrative capacity of ACE to providecoordinatingrolefordrylandagriculturaldevelopmentinWCA

OUTCOME INDICATOR i) Modalitiesforpartnersmeetingdevelopedii) oneconsultativemeetingofpartnerswith30membersattendingheldiii) 2jointworkshopswithpartnersheld

SOURCE OF VERIFICATION Minutesofmeetings 

IMPLEMENTATION MILESTONES 

Preparation of meetings and agenda 

Circulation of notice   Conduct of meetings 

PROCUREMENT  NA 

RESPONSIBILITY FOR IMPLEMENTATION 

CL 

DURATION: 9 months  Commencement:1st May,2016  

Completion: 31st October,2016  

PRIMARY CONSTITUENTS: CL  PARTICIPANTS:  ACE team, Partner institutions and other stakeholders 

ASSUMPTIONS  Partner Institutions sustain interest in activities of  ACE

FINANCIAL IMPLICATIONS  ACE budget for the activity 

Budget Line Analysis  1stQtr 2ndQtr 3rdQtr 4thQtr 5thQtr  6thQtr  Total 

1  Preparation of meetings and agenda  

1,500 1,500     3,000

2  Circulation of notice   

1,500 1,500     3,000

3  Conduct of meetings  17,000 17,000     34,000

4       

5       

TOTALS  20,000 20,000     40,000

    

Page 68: Africa Centre of Excellence in Dryland Agriculture...NgREN To provide acces to relevant literature to ACE and partners Acess to current and relevant information is indispensable in

ACE TEMPLATE 

Implementation Plan 

68

 

Action Plan: 4 StrengthenededucationandresearchgovernanceandadministrativecapacityofACE Timeframe: The whole of year 2 (January, 2016 to December, 2016)     Activity 4.5: Generaladministrationandcoordination.

RESULT4.4 Strengtheninternalworking,reportingandaccountabilitysystems

ACTIVITY4.5 Generaladministration andcoordination.

Outcome4 Strengthened research and education governance and administrative capacity of ACE to providecoordinatingrolefordrylandagriculturaldevelopmentinWCA

OUTCOME INDICATOR RequisitestationeryandofficeconsumablesutilizedforeffectiveProjectimplementation

SOURCE OF VERIFICATIONOfficeinventoryofconsumables 

IMPLEMENTATION MILESTONES 

Procurement of computers, printers, requisitestationeryandofficeconsumables 

PROCUREMENT  Goods 

RESPONSIBILITY FOR IMPLEMENTATION 

CL, Admin Officer 

DURATION: 12 months  Commencement:1st January,2016  

Completion: 31st December,2016 

PRIMARY CONSTITUENTS: CL, Admin Officer PARTICIPANTS

ASSUMPTIONS   

FINANCIAL IMPLICATIONS  ACE budget for the activity

Budget Line Analysis  1stQtr 2ndQtr 3rdQtr 4thQtr 5thQtr  6thQtr  Total 

1  Procurement of computers, printers, requisitestationery,officeconsumables,paymentforutilities,electricity,communicationexpenses,localtravels,etc 

50,000 40,000 30,000 30,000     150,000

2       

3       

4       

5       

TOTALS  50,000 40,000 30,000 30,000     150,000

      

Page 69: Africa Centre of Excellence in Dryland Agriculture...NgREN To provide acces to relevant literature to ACE and partners Acess to current and relevant information is indispensable in

ACE TEMPLATE 

Implementation Plan 

69

   

Annexe1:ProcurementPlan

 

Annexe2:PotentialBenefitsofACEtoInternalandExternalStakeholders

 

Annexe3