Implementation Plan
2014 – 2018 (Revised January, 2016)
Implementation Plan
2
TableofContentsAbbreviations ............................................................................................................................. 3
1. BRIEF NARRATIVE SUMMARY .......................................................................................... 4
2. OVERVIEW OF PLANNED OUTPUTS, ACTIVITIES AND COST FOR FIRST YEAR ........ 6
3. TIMING OF PLANNED ACTIVITIES FOR ENTIRE PROJECT PERIOD (Gantt chart) .... 16
4. IMPLEMENTATION ARRANGEMENTS ............................................................................ 20
4.1 Guiding rules and regulations ...................................................................................... 20
4.2 Governance structures ................................................................................................. 20
4.3 Incentive structures ...................................................................................................... 23
4.4 Roles and responsibilities ............................................................................................ 23
4.5 Environment safeguards .............................................................................................. 24
5. PERFORMANCE MONITORING ........................................................................................ 27
6. DETAILED BUDGET .......................................................................................................... 35
7. DETAILED ACTIVITY SHEETS (one for each activity) ................................................... 36
Annexe 1: Procurement Plan .................................................................................................. 69
Annexe 2: Potential Benefits of ACE to Internal and External Stakeholders ..................... 69
Annexe 3 ................................................................................................................................... 69
Implementation Plan
3
Abbreviations
AAU Association of African Universities
ACE Africa Centre of Excellence
ACTU Anticorruption Transparency Unit
ARCN Agricultural Research Council of Nigeria
BUK Bayero University, Kano
CDA Centre for Dryland Agriculture
CL Centre Leader
DCL Deputy Centre Leader
ICPC Independent Corrupt Practices Commission
ICRISAT International Crops Research Institute for the Semi‐Arid Tropics
ICT Information and Communication Technology
ILRI International Livestock Research Institute
KNARDA Kano State Agricultural and Rural Development Authority
ROPPA Network of Farmers' and Agricultural Producers' Organizations of West Africa SERVICOM Service Compact with All Nigerians UK United Kingdom WCA West and Central Africa
Implementation Plan
4
1. BRIEFNARRATIVESUMMARY
More than 40% of the earth surface and over 2 billion people reside in dryland areas. In Africa, about 43% of land is estimated to fall within the drylands, where approximately 325 million people reside. Drylands are among the World’s most fragile ecosystems, characterized by high evapotranspiration, low rainfall, high vulnerability to the negative impacts of climate change, low crop yields, high levels of poverty, and conflicts in the use of natural resources. The rate of population increase in the drylands of West and Central Africa (WCA) is very high, resulting in more pressure and further degradation of the fragile agro-ecosystem. There is a multi-dimensional linkage between policy and institutional failures, land degradation, poverty, rapid population growth and poor agricultural production in drylands. Degradation in drylands leads to poor agricultural yield, food insecurity and poverty. Poor rural people in dry areas, in their quest for food and other livelihood needs, expand cultivation into forest, hillsides and other fragile areas that are easily degraded. This leads to recursive relationship between poverty and natural resource degradation. The principal constraints to the livelihoods of people in the WCA region are very closely related to those that affect agricultural productivity, given that about 70 – 85% of the people in the region derive their livelihoods directly or indirectly from agriculture. These contraints can be grouped into four: constraints to sustainable intensification of farming systems; constraints to sustainable management of natural resources in the face of changing climate; constraints to accessibility & efficiency of markets; and policy constraints. In order to respond to the needs of the WCA dryland region through relevant high level human capacity development and demand-driven research, Bayero University, Kano (BUK) established the Centre for Dryland Agriculture (CDA) in 2012 with the support of MacArthur Foundation. The existing framework of the CDA is now being consolidated into true regional centre of excellence in dryland agriculture through the World Bank Africa Centre of Excellence project. Through the activities of the CDA Bayero University aims to strongly link education and research with the development needs of the region, thus contributing to food security, improved livelihood, and reduction in poverty and conflicts. The main objective of the CDA is to specialize as a regional Centre of excellence in dryland agriculture delivering quality training and applied research in response to the needs of the WCA dryland region. The CDA will rest on the tripod of training, research and outreach activities. Postgraduate trainings in conventional academic Departments are often limited in scope, and do not match labor market demand and development requirements of the region. The training components of the Centre will be targeted at producing high level manpower that will work in various agricultural research and development organizations, colleges of agriculture and other higher institutions to address the problems and realize available opportunities. The research activities of the centre will be interdisciplinary focusing climate change and the dryland cropping and animal production environment aimed understanding complexities of the interaction and developing technological options for climate-smart agriculture and sustainable use of dryland natural resource. The thematic research areas of the centre and their interrelationship are depicted in chart 1. Students will be required to spend at least one month period in relevant industry/institution during which they will identify real issues around which their research proposals will be developed. By the end of the fourth year of the project the Centre would have enrolled at least 43 PhD and 220 MSc students and trained 1,074 students in short courses of more than 40 hours. At least 30% of these numbers will be regional students. To ensure gender equity, at least 30% of all students will be female. All MSc and PGD students will undertake at least one month internship in relevant industry/institution. All relevant teaching and research facilities will be procured, installed and made functional by the second year to provide students and faculty with opportunity to carry out cutting-edge research and publish in reputable Journals. To facilitate strong collaborations with educational, research and development bodies as well as the private sector partners across the region, specific memoranda of agreements will be signed between CDA and specific partners towards the implementation of the project activities. The CDA has already signed broad memoranda of understanding with the University of Maradi, University of Nairobi, University of Alexandria, and Galilee International Management Institute.
Implementation Plan
5
In order to specialize as a Centre of Excellence, the CDA will concentrate on post graduate trainings and research only in four thematic areas of Dryland Crops and Cropping Systems, Dryland Range and Livestock Management, Climate Change and Natural Resources Management and Drylands Livelihood and Natural Resources Economics. The Centre will not provide Bachelor degree training. Some of the new and special aspects in the ACE include the internship in relevant industry/institution by students and faculty of the Centre; and the bringing together of a critical mass of high level material and human resources from across the region for effective teaching, learning and research. The proposal has addressed gender inclusiveness and equity by ensuring that at least 30% of all student intakes must be female. To ensure social inclusion the ACE shall uphold equal opportunity policy by identifying special learner types (e.g. students with disabilities, deprived or pregnant students) and make specific provision as well as personalised study plans where possible. As part of the strategy to attract regional students and faculty, the Centre will ensure that its curricula are relevant and attractive to students in the region. Publicity will be given to the programmes of the Centre through adverts in newspapers and websites of regional institutions the CDA is collaborating with. Specific number of fellowships will be reserved for regional students, especially in the first two years. Language support will be provided for students from francophone countries. The centre will make arrangement to secure accommodation for regional students within the University campus to ensure that they settle smoothly. The management of BUK has also promised to build an international students’ hostel from its own funds to accommodate ACE students from the region. To ensure sustainability of the Centre, funds generating activities will be vigorously pursued through: proposals to donors for research grants; tuition fees; and charges for specialized laboratory services amongst others. It is envisaged that at least $ 1,200,000 will be generated externally within the four years of the project. The figure is realistic considering that the Centre has already generated more than $ 1,000,000 within the last two years. These external streams of revenue are essential for the continuity of ACE activities after the expiration of the World Bank funding tenure. The ACE has sizeable pool PhD-level faculty from the participating departments capable of containing its varied responsibilities without compromising corporate management and individual staff efficiencies.
2. OVERVIEWOFPLANNEDOUTPUTS,ACTIVITIESANDCOSTFORFIRSTYEAR
Table1:Overviewoffirstprojectyear(thistableiscloselylinkedtosection7,aseachactivityrowhereintable1willrequireaseparateactivitysheetinsection7)Activity
No. Sub-
Component Activities Objective Justification Output Estimated Budget ($) Year 2016
Total ACE Partners Responsibl
e Office
r Jan
ua
ry
Fe
bru
ary
Ma
rch
Ap
ril
Ma
y
Jun
e
Ju
ly
Au
gu
st
Se
pte
mb
er
Oc
tob
et
No
ve
mb
er
Dec
em
ber
Procurement of XYZ
To acquire and install xyz
This is necessary to
establish ……….
the output of this
activity is …..
1.1 Strengthened capacity to provide relevant quality
trainings in key areas of Dryland
agriculture
Engage Natural Resources
Institute (NRI), University of Greenwich to conduct an
assessment of the existing dryland programmes
To review and carry out gap assessment of existing
ACE programmes
This necessary in order to provide peer evaluation and
possible certification of
existing programmes
Existing gaps in current
programmes
documented
$30,000.00 $30,000.00 CL
1.2 Workshop involving local and regional
partners/stakeholders to define new/revised
curricula for MSc, and PhD
programmes; and to identify
training areas for short courses
To review current ACE curricula and get input
from various stakeholders for possible improvement
To ensure that trainings
provided by ACE are
relevant to regional needs
Revised/new needs‐based
curricula
$25,000.00 $5,000.00 $20,000.00 DCL
Implementation Plan
7
1.3 Upgrade of four classrooms with modern teaching and learning
facilities including back‐up power
solutions
To renovate four ACE
lecture rooms and equip them with teaching
facilities and power back‐
up
To provide conducive
teaching and learning
environment
Renovated and
equiped lecture rooms
$50,000.00 $50,000.00 Procurement Officer
1.4 Renovate and upgrade
International students hostels with relevant furnishing and power back up
Renovate and furnish a block
consisting of 48 rooms for
use by regional students
To provide serene
accommodation for effective learning
Renovated and
furnished regional students hostel.
$90,000.00 $90,000.00 Procurement Officer
1.5 Subscription to NgREN
To provide acces to relevant
literature to ACE and partners
Acess to current and relevant information is indispensable in teaching and research
ACE and partners get access to pay per
view articles
$225,000.00 $225,000.00 DCL
1.6 Construction of a mast with radio
links and uninterrupted power supply equipment to facilitate
unhindered access to the
internet through the University MTN bandwidth subscription for the activities of
ACE
To improve internet
access at the ACE
Acess to current and relevant information is indispensable in teaching and research
Improved internet access by staff and students
$20,000.00 $20,000.00 Procurement Officer & ICT Officer
1.7 Provision of video conferencing facility in the Seminar room
To procure and install video
conferencing facilities
To provide possibility for virtual learning through video conferencing and webnars.
Installed and
functional video
conferencing facility
$15,000.00 $15,000.00 DCL, Procurement Officer
Implementation Plan
8
1.8 MSc and PhD fellowships (including
research costs) to regional
candidates
To provide fellowships to
regional students
This is necessary at this stage in order to encourage
enrolment of regional students
Regional students enrolled into ACE
programmes
$240,000.00 $240,000.00 DCL
1.9 Mount specialized language courses for francophone
students
To provide English language training to francophone students
This will enable the students improve their
English language skills
Regional students taught english language
$20,000.00 $20,000.00 DCL, CT
1.10 Exchange of staff through short stay, sabbatical and visiting lectureship
To have highly skilled manpower involved in training of students in
ACE programmes
Specialized skills and
competencies exist in ACE and
partner institutions that can be tapped to the benefit
of all stakeholders through staff exchange and
visiting lectureship
Staff exchage between ACE and partners
$140,000.00 $40,000.00 $100,000.00 DCL, CT, CO
1.11 Procure a 30‐seater training
bus
To procure a 30‐seater bus
To enable easy movement of students and staff during
study visits and excursions
A 30‐seater bus
$72,600.00 $72,600.00 Procurement Officer
1.12 Organize joint short courses to address specific capacity needs of ACE, partners, industry and
other stakeholders
To organize short corses of not less
than 40 hours
Such courses will address specific skill
needs and build capacities of ACE and partners
Short courses
conducted
$187,250.00 $87,250.00 $100,000.00 DCL, CT, CO
Implementation Plan
9
1.13
Conduct regional survey to assess the training and research needs of
the sector
To understand the training and research needs of
institutions and industry
This is will provide basis for designing the ACE’s
programmes to address
relevant needs of stakeholders
Regional training and
research needs
documented
Funds for this activity will be
sourced outside the ACE project
funds
2.1 Strengthened capacity for research
excellence in dryland
agriculture related fields
Implementation of research
related trainings for ACE academic and technical staff
To organize trainings for academic and technical staff
on new research
equipments and
techniques provided by the ACE
There is often a gap between the research facilities
available and the skills to use such facilities, and this need to be adressed
through hands‐on trainings
Trainings conducted
and capacities
of academic
and technical staff to used new equipments enhanced
$30,000.00 $30,000.00 DCL, CT,CR
2.2 Selection and engagement of post‐doctoral
fellows
To engage 4 postdoctoral fellows to be involved in research in the thematic research
areas of the ACE
Working with post‐doctoral felows from the
region will enhance regional
collaboration in research and
training
Post‐doctoral fellows engaged
$144,000.00 $144,000.00 DCL, CR
2.3 Furnishing of a specialized Tissue‐
Culture Laboratory (BUK has constructed and provided to
CDA a new laboratory
building for this purpose)
To furnish a tissue culture laboratory
Required for research and
teaching on the fast
propagation of dryland species
Tissue culture
laboratory furnished
$100,000.00 $100,000.00 Procurement Officer, CR
Implementation Plan
10
2.4 Equiping of a specialized Tissue‐
Culture Laboratory (BUK has constructed and provided to
CDA a new laboratory
building for this purpose)
To equip a tissue culture laboratory
Required for research and
teaching on the fast
propagation of dryland species
Tissue culture
laboratory equiped and being utilized
$241,000.00 $241,000.00 Procurement Officer, CR
2.5 Development of proposals and protocols and implementation of research
programmes in the thematic
research areas of the ACE (research driven by post doc
fellows)
To carry out research
activites that adress revant
issues affecting dryland
agriculture in the region
Research is needed to address identified
problems that impact
Agriculture in region
Research conducted and results published in high impact journals
$150,000.00 $100,000.00 $50,000.00 DCL, CR, CT
2.6 Upgrade of research farm, including a 5ha drip irrigation
facility
To upgrade and equip
research farm
Required for research and teaching
Research farm
upgraded
$220,000.00 $220,000.00 DCL, CR,
Procurement Officer
2.7 Procurement and installation of 3 screen houses
To procure and install 2 Russell and one tunel
screenhouses
Required for research and teaching
Screenhouses procured
and installed
$120,000.00 $120,000.00 Procurement Officer, CR
2.8 Furnishing of PG Research
Laboratories
To furnish molecular biology
laboratory
Required for research and teaching
Furnished laboratory
$60,000.00 $60,000.00 Procurement Officer
2.9 Furnishing of a specialized
Instrumentation Laboratory
Furnish central
instrumentation laboratory
Required for research and teaching
Furnished laboratory
$30,000.00 $30,000.00 Procurement Officer
2.10 Furnishing of
Remote sensing & GIS laboratory
Furnish GIS and emote sensing
laboratory
Required for research and teaching
Furnished laboratory
$45,000.00 $45,000.00 Procurement Officer
Implementation Plan
11
2.11 Equiping of a specialized
Instrumentation Laboratory
Equip centarl instrumentation laboratory
Required for research and teaching
Laboratory equiped
and utilized
$400,000.00 $400,000.00 Procurement Officer
2.12 Equiping of
Remote Sensing & GIS laboratory
Equip remote sensing and
GIS laboratory
Required for research and teaching
Laboratory equiped
and utilized
$100,000.00 $100,000.00 Procurement Officer
3.1 Improved relevance, regionality
and stakeholder participation
in ACE training and research
programmes
Conduct a regional
workshop to discuss ACE
programmes/activities with
industry/sector partners
To conduct a workshop to
engage stakeholders
on the relevance of
ACE programmes to them
Exchange of information and feedback from
various stakeholders is important in order to make
ACE programmes relevant
Stakeholder workshop conducted
$50,000.00 $20,000.00 $30,000.00 CL, CO
3.2 Identify and facilitate students
and staff internship in
industries, public and private
sectors, as well as development organizations.
Students and ACE staff do internship of atleast 1 month in relevant
sector/industry
Such internships will
provide students and staff of Ace
with insight into the relevant
sector/industry problems that need to be tackled and opportunities that need be harnessed;
Internships in relevant sector/indu
stry
$120,000.00 $40,000.00 $80,000.00 DCL, CT
3.3 ACE and identified parners/stakeholders engaged in
exchange of staff and students, short visits, lectures by captains of industries
Students and staff carry out academic
visits/exchanges
Such visits and exchanges are required to improve
collaboration with various
stakeholders in the region
Academic visits/excha
nges carried out
$40,000.00 $20,000.00 $20,000.00 DCL
Implementation Plan
12
3.4 Sharing and exchange of information
between ACE and partners,
including library resources
To share and exchange
informationa nd library resources
with partners
Exchange of information and
library resources will strengthen the collaboration between the ACE partners
Information and library
resources exchanged
$10,000.00 $2,000.00 $8,000.00 CO, CT
4.1 Strengthened education
and research governance
and administrative capacity
Provide trainings to key project staff on various
aspects of projects
management
To provide ACE project staff with training on project
management and use of Microsoft Project
Skills in project management are required in order to run the ACE project
more effectively
Training conducted
$50,000.00 $25,000.00 $25,000.00 DCL, CO
4.2 Hold regular meetings of ACE teams, technical committee, and advisory board
To hold regular
meetings of ACE team, technical committee and ACE Advisory Board
Important for smooth
management of the project
Meetings held with documented minutes
$25,000.00 $25,000.00 CL
4.3 Preparation of end of the year procurement, financial and external audit
report.
To prepare end of year procurement, finacial and audit reports
The reports are important
yardsticks for measurig the governance of the project
Reports produced
$15,000.00 $15,000.00 M&E Officer
4.4 Organise and facilitate regular partner meetings and workshops including annual planning meeting.
To hold regular
meetings of project partners
Important for smooth
management of the project
Meetings held with documented minutes
$40,000.00 $10,000.00 $30,000.00 DCL, CO
4.5 General administration and coordination
To administer and
coordinate the activities of the project
Important for smooth
management of the project
Various reports
$150,000.00 $150,000.00 Admin Officer
Implementation Plan
13
Total $3,254,850.00 $2,761,850.00 $493,000.00
Table2:Overviewdistributionamongpartners(thistableisabreakdownofthepartnerbudgetintable1,sothelastcolumnhereintable2mustmatchthesecondlastcolumnintable1)
Code Result/Activity/Task
BudgetEstimate(US)
NationalPartners RegionalPartners InternationalPartners
TOTAL
IAR KUST BUCOA KNARDA IER MARADI NAIROBI ICRISAT IITA GIMI NRI
Outcome 1 Result 1.1 Strengthening Africa Centres of Excellence
Activity 1.1 Engage Natural Resources Institute (NR), University of Greenwich to conduct an assessment of the existing dryland programmes
30,000 30,000.00
Activity 1.2 Workshop involving local and regional partners/stakeholders to define new/revised curricula for MSc, and PhD programmes; and to identify training areas for short courses
1,000 1,000 1,0000 1,000 3,000 3,000 3,000 2,000 2,000 3,000 20,000.00
Activity 1.10 Exchange of staff through short stay, sabbatical and visiting lectureship
5,000 5,000 5,000 15,000 15,000 15,000 20,000 20,000 100,000.00
Activity 1.12 Organize joint short courses to address specific capacity needs of ACE, partners,
5,000 5,000 10,000 15,000 5,000 10,000 25,000 25,000 100,000.00
Implementation Plan
14
Code Result/Activity/Task
BudgetEstimate(US)
NationalPartners RegionalPartners InternationalPartners
TOTAL
IAR KUST BUCOA KNARDA IER MARADI NAIROBI ICRISAT IITA GIMI NRI
industry and other stakeholders
Outcome 2 Result 2.1: Strengthened capacity for research excellence in dryland agriculture related fields
Activity 2.5 Development of proposals and protocols and implementation of research programmes in the thematic research areas of the ACE (research driven by post doc fellows)
10,000 10,000 10,000 10,000 10,000 50,000.00
Outcome 3 Result 3.1 Improved relevance, regionality and stakeholder participation in ACE training and research programmes
Activity 3.1 Conduct a regional workshop to discuss ACE programmes/activities with industry/sector partners
2,500 2,500 2,500 2,500 5,000 5,000 5,000 2,500 2,500 30,000.00
Activity 3.2 Identify and facilitate students and staff internship in industries, public and private sectors, as well as development organizations.
10,000 10,000 10,000 10,000 10,000 10,000 10,000 80,000.00
Implementation Plan
15
Code Result/Activity/Task
BudgetEstimate(US)
NationalPartners RegionalPartners InternationalPartners
TOTAL
IAR KUST BUCOA KNARDA IER MARADI NAIROBI ICRISAT IITA GIMI NRI
Activity 3.3 ACE and identified partners/stakeholders engaged in exchange of staff and students, short visits, lectures by captains of industries
5,000 5,000 10,000 20,000.00
Activity 3.4 Sharing and exchange of information between ACE and partners, including library resources
2,000 2,000 1,000 1,000 1,000 1,000 8,000.00
Outcome 4 Result 4.1 Strengthened education and research governance and administrative capacity
Activity 4.1 Provide trainings to key project staff on various aspects of projects management
25,000 25,000.00
Activity 4.4 Organise and facilitate regular partner meetings and workshops including annual planning meeting.
3,000 3,000 3,000 3,000 4,000 3,000 4,000 2,000 2,000 30, 000.00
Total 38,500 38,500 37,500 47,500 53,000 67,000 27,000 61,500 61,500 25,000 36,000 493,000.00
3. TIMINGOFPLANNEDACTIVITIESFORENTIREPROJECTPERIOD(Ganttchart)Table3:Workplanfortheproject
Outcomes/Results/Activities Year 1 Year 2 Year 3 Year 4
Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
Outcome 1: Strengthened capacity to provide relevant quality trainings in key areas of dryland agriculture
Result 1.1: New needs‐based curricula in key aspects of dryland agriculture developed
Activity 1.1.1: Conduct training needs assessment of relevant stakeholders in the West and central African sub‐region
Activity 1.1.2: Gap assessment by internationally recognised body or team and self assessment of existing dryland PG programmes
Activity 1.1.3: Workshop involving local and regional partners/stakeholders to define new/revised curricula for MSc, and PhD programmes; and to identify training areas for short courses
Result 1.2: Increased enrolment of national and regional students into ACE programmes
Activity 1.2.1: Announcement of programmes and commencing intake of students into short courses and new/revised PG programmes
Activity 1.2.2: Engagement of relevant competent faculty from national, regional and international partners on sabbatical, visiting lectureship, and lectures via video links
Activity 1.2.3: Mount short English Language courses to support students for regional‐Francophone partners
Result 1.3: Lecture rooms upgraded, and international Students hostel created.
Activity 1.3.1: Upgrade of four classrooms with modern teaching and learning facilities including back‐up power solutions
Activity 1.3.2: Upgrade of hostels to studio rooms with relevant furnishing and power back up for international students
Implementation Plan
17
Outcomes/Results/Activities Year 1 Year 2 Year 3 Year 4
Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
Result 1.4: Expanded access to indexed electronic journal databases, video conferencing facility and other learning and research facilities provided.
Activity 1.4.1: Provision of pay‐per‐view access to other relevant none‐open access databases in addition to the existing University subscriptions
X
Activity 1.4.2: Construction of a mast with radio links and uninterrupted power supply equipment to facilitate unhindered access to the to internet through the University MTN bandwidth subscription for the activities of ACE
Activity 1.4.3: Provision of video conferencing facility in the Seminar room
Activity 1.4.4: Construction and furnishing of a building complex to house instrumentation laboratory, library, and seminar room
Result 1.5: Competence of ACE and partner faculty to support postgraduate training in dryland agriculture enhanced through short training courses/postgraduate training in identified areas of skill gap.
Activity 1.5.1: Identification of staff training and skill needs
Activity 1.5.2: Enrolment of ACE/partner staff in at least 5 different short courses (locally and internationally) in areas of need based on Activity 1.5.1
Outcome 2: Strengthened capacity for research excellence in dryland agriculture related fields
Result 2.1: Improved research capacity of staff of ACE and partner institutions in the field of dryland agriculture
Activity 2.1.1: Implementation of research related trainings for academic and technical staff
Activity 2.1.2: Selection and engagement of PhD and post doctoral fellows among staff of ACE and partner institutions
Activity 2.1.3: Furnishing of Tissue‐Culture & Molecular Biology and Microbiology & Plant Pathology Laboratories
Implementation Plan
18
Outcomes/Results/Activities Year 1 Year 2 Year 3 Year 4
Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
Activity 2.1.4: Development of proposals and protocols and implementation of joint research programmes with partner institutions
Result 2.2: ACE research facilities upgraded and functional
Activity 2.2.1: Renovation and furnishing of laboratories
Activity 2.2.2: upgrade of research farm, including a 5ha drip irrigation facility
Activity 2.2.3: Procurement and installation of screen houses
Outcome 3: Improved relevance, regionality and stakeholder participation in ACE programmes
Result 3.1: Relevant human capacity and research needs of public and private institutions, industry and development organizations understood and documented
Activity 3.1.1: Conduct diagnostic survey on regional needs assessment
Activity 3.1.2. Conduct a regional workshop to discuss/validate results of the needs assessment
Result 3.2: Robust outreach programmes to address relevant skill needs of the WCA dryland region developed.
Activity 3.2.1: Identify and facilitate students and staff internship inindustries, public and private sectors, as well as development organizations.
Activity 3.2.2: Establish and activate collaboration network with identified partners
Outcome 4: Strengthened research and education governance and administrative capacity of ACE to provide coordinating role for dryland agricultural development in WCA
Result 4.1: Competent ACE project management team constituted and operationalized adopting international best practices
Activity 4.1.1: Appointment of key ACE team members and other key personnel
Implementation Plan
19
Outcomes/Results/Activities Year 1 Year 2 Year 3 Year 4
Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
Activity 4.1.2: Development of ACE project implementation plans and project operations manuals
Activity 4.1.3: Provide trainings to key project staff on various aspects of projects management
Activity 4.1.4: Constitution of ACE technical Committee and Advisory Boards
Activity 4.1.5: Hold regular meetings of ACE Technical committee and Advisory board
Activity 4.1.6: Preparation of end of the year procurement, financial and external audit report.
Result 4.2: Relevant educational, research and development bodies in the WCA region involved in the activities of ACE
4.2.1: identify relevant partners and sign partnership agreements based on their specific competencies
Activity 4.2.2: Organise and facilitate regular partner meetings and workshops including annual planning meeting
Activity 4.2.3: Regularly update website information on ACE programmes, activities and management (including minutes of project meetings, financial reports)
Result 4.3: Strengthen internal working, reporting and accountability systems
4.3.1 Organise and conduct training for key Project administrative, M&E and financial management personnel
4.3.2 Project administration and coordination
Implementation Plan
20
4. IMPLEMENTATIONARRANGEMENTS
4.1 Guidingrulesandregulations
Activities of the Centre will be conducted in a transparent manner at all times. The Centre will publish budgets, financial reports and other project related documents on the project’s website. The Centre will put in place an independent complaint handling mechanism where complaints will be made and responded to with a good recording system to show the related details including the time the complaint was reported and the time the response was made. The University also has several mechanisms for dealing with risk management and anticorruption. They include:
a. SERVICOM Unit, which receives complaints from end-users on University service delivery and reports to the Federal Government.
b. Anticorruption transparency unit (ACTU), which is chaired by the Deputy Vice-Chancellor (Administration) and reports to the Independent Corrupt Practices Commission (ICPC) of the Federal Government of Nigeria.
c. Existing statutory structures of the University, including the Internal Audit Unit, Budget monitoring Committee, and the University Council Standing Disciplinary Committee.
The ACE has the assurances of BUK management that the project team has a free hand in the running the Centre without any undue interference and unnecessary bureaucracies. It is sometimes possible to have delays in some procurement processes of some works and services. As part of the strategy to mitigate such delays, the Project Team will identify the detail of each requirement so that related work packages are known. These work packages identified are to be given to potential contractors to bid for. The project team will find it easier to properly supervise and assess the performance of the work being done and immediately know if the time target is being achieved or not. It is only strong, willing and competent suppliers are allowed to handle each of the work packages. The tendering process should ensure only such suppliers emerge. Complex projects, like the building and equipping of laboratory, will be broken down to easily manageable units that will facilitate easy and smooth execution. In this case, physical structure may be one package, office and laboratory furnishing may be another while equipping/installation is another package. There may not be one contractor with the required competences to handle all the packages at the same time. If these are to be handled individually it then becomes easier for control and better coordination by the project team.
4.2 Governancestructures
(Briefly describeACE governance structures bothwithin the host university and among the partnerinstitutions,atfaculty/centrelevelanduniversity/institutionlevel)
To achieve excellence in governance and administration the leadership and implementation team of the ACE must be transparent, accountable, responsive and promote the rule of law. The day to day running CDA will be done by the ACE project team comprising of the Centre Leader (CL), a Deputy Centre Leader (DCL), Programme Coordinators, ICT officer, Procurement Officer, Financial Management Officer, Project Accountant, and Monitoring and Evaluation officer.
Key tasks of the ACE project team include implementing activities of the project and preparing annual work plans based on the project objectives. The work plan will be reviewed on an annual basis. A summary of these tasks include:
(i) Implementing activities towards strengthening the quality of education through enhanced teaching capacity to modern standards within the focus areas of the CDA.
Implementation Plan
21
(ii) Serving as a hub for a network of partner institutions within Nigeria and the sub-region. A detailed partnership agreement between the CDA and each partner institution will specify the nature of the partnership between the two institutions. The CDA and the partner institution/network will agree to an annual implementation plan to be implemented by the partners. Funds for capacity building in partner institutions will be held and managed by the CDA, who will be responsible for all fiduciary and M&E matters related to the use of these partnership funds.
(iii) The Bayero University will be responsible for CDA’s fiduciary and safeguards functions. This includes undertaking procurement, maintaining Project financial accounts according to Project requirements and implementing the ACEs Project’s monitoring and evaluation plan as well as the Environmental Management Plan.
The ACE also has an Advisory Board of experts in various aspects of dryland agriculture and a Technical Committee. The governing structure of the ACE and the roles of the various key actors are provided in chart 2 and Table 4, respectively.
Implementation Plan
22
Chart 2: Organogram of the Africa Centre of Excellence in Dryland AgriculturAdvisory Board
E. A. Oloffin (Chair, representing VC), J. M. Jibrin (Secretary, CL), M. Mortimore (UK), Ramadjita Tabo (ICRISAT, WCA), D. Kone (Cote d'Ivoire), M. D. Magaji (ARCN), A. A. Yakasai (BUK), E. U.
Essiet (BUK), A. I. Tanko (BUK), M. H. Bichi (BUK), J. A. Falola (BUK), Dean of Faculty of Agriculture (BUK), Representative of ROPPA (to be appointed)
Technical Committee Centre Leader (Chair), Deputy Centre Leader, Dean of BUK Faculty of
Agriculture, Heads of the various BUK Academic Departments contributing to the ACE programmes, Programme Coordinators, as well as
representatives from the Kano Offices of KNARDA, ICRISAT and ILRI
Centre Leader Jibrin M. Jibrin
M & E Officer Amina Mustapha
Administrative Officer Aliyu S. Zubairu
Deputy Centre Leader Sanusi G. Mohammed
ICT Officer (Adam Mustapha)
Financial Officer Usman G. Ohikere
Auditor Auwalu Muazu
Procurement Officer Rabiu Sagagi
Project Accountant
Opeoluwa Falola
Coordinator (Research) Kabir M. Umar
Environmental Officer Mustapha M. Bello
Coordinator (Training) Yusuf Garba
Coordinator (Outreach) Saleh Momale
4.3 Incentivestructures
The ACE implementation will integrate a number of team building initiatives that will sustain interest of key teaching and research staff (including academics, technologists and administrative personnel). These include the following strategies: i) The inclusion of members from key regional institutions in the ACE Advisory Board,
thereby integrating these institutions into the decision making processes of ACE. This will endear and strengthen the current collaborative linkages with the partners within the Region.
ii) Rallying points for team building will be created, including interactive academic discussion forums, seminars to be delivered by Faculty, visiting scholars, and captains of industry, joint tours/field visits to key sites of interests and other physical activities that will bring key faculty academics together. Annual review and planning meetings involving stakeholders within the University and immediate environs involved in implementation will be organised.
iii) Information sharing will be highly organized and conducted to ensure that all Faculty academics, admin and technical staff are fully abreast of all activities and their expected roles. Valuable information will be periodically circulated through various channels, especially the ACE website. Opportunities for training and professional development will be announced, including calls for proposals, conference participation and other important academic developments. This will help keep Faculty academics, technologists and administration personnel always glued to ACE for such kind of data and information.
The major incentives for academic staff and researchers within the ACE and partner institutions is the access to improved teaching and research facilities as well as short trainings, which will greatly impact on their professional development and competence. It is well understood that the focus of the ACE is to evolve into an excellent regional training Centre. The ACE will align its teaching doctrines and students’ MSc and PhD research activities towards addressing the specific challenges of the region. However, excellent application of knowledge at instructing students as well as innovative and practical approaches to answering research questions begets high impact academic publications. The possibility of producing research outputs that can be published in prestigious Journals is a very strong motivation for the involvement of these faculties. The internship and outreach activities of the project as well as the development of curricula that address the needs of industry and labour market are strong incentives for involvement of the private sector. Project staff will be provided with ample opportunities for training both within and outside Nigeria. Annexe 2 provides the potential benefits to internal and external stakeholders.
4.4 Rolesandresponsibilities(BriefTermsofReference(TOR)foreachACEteammemberandprojectfinancedsupportstaff*)*Justificationfornotusingexistinguniversityadministrativeandsupportstaffisrequired.
Table 4: Roles and responsibilities of members of the ACE implementation Team Position Responsibility Advisory Board The board, comprising of national, regional and international experts, shall
meet biannually to receive progress reports from the CL on all activities of the ACE and (i) advise the Centre on its training research and outreach agenda (ii) review all planned activities and suggest adjustments, where necessary ( iii) receive and review financial reports of the ACE.
Technical Committee The Committee shall normally meet every two months, but in the first year of the ACE it shall meet monthly to plan activities and review progress towards implementation of the ACE project. The committee shall provide direction for the implementation of the ACE project; monitor and evaluate the progress of the various implementing units against the set targets; and facilitate the implementation of the project work plan.
Implementation Plan
24
Centre Leader The CL is responsible for the overall coordination and management of the activities of the ACE and its partners. The CL is responsible for reporting the activities to the ACE to the Advisory Board and the Technical Committee.
Deputy Centre Leader The DCL shall assist the CL in coordinating and managing the ACE. He will follow-up on all planned activities of the ACE to ensure that they are executed correctly and on time.
Coordinator, Training The training coordinator shall work with the DCL to coordinate all training programmes of the ACE.
Coordinator, Research The research coordinator shall work with the DCL to coordinate and keep track of all research programmes of the ACE.
Coordinator, Outreach The outreach coordinator shall work with the DCL to coordinate and keep track of all outreach programmes of ACE, including internship activities.
Procurement Officer The procurement officer shall be responsible for all activities related to purchase of services, items and equipment.
Financial Officer The Financial officer is responsible to the project leadership in the management of the ACE finances. The Financial Officer shall ensure that all accounting records are maintained in line with approved accounting standards and in line with the World Bank’s requirement and government regulations.
Project Accountant The Project Accountant shall work under the finance officer and manage the accounts of the project. The job of the Project Accountant include updating and maintaining the project cash books; preparing bank payment mandates; preparation of monthly bank reconciliations for all bank accounts of the project; handling all banking transactions that relate to the project.
ICT Officer The ICT officer shall be responsible for designing, building and maintaining the project databases and website as well as managing the ICT facilities of the Centre.
M&E officer The M&E officer shall be responsible for tracking and keeping records of all project deliverables to ensure adherence to regulations and guidelines.
Auditor The Project Auditor shall supervise the internal audit function of all activities of the project and provide quality assurance reviews
Environmental Officer The environmental officer is for ensuring adherence to environment safeguards as well as tracking and collecting data related to implementation of environmental management plan.
Heads of Participating Department
Heads of Participating Departments shall be the focal persons for ACE activities involving their Departments.
At each partner institution with which the ACE has an MoA there shall be a Coordinator to serve as focal person responsible for overseeing the implementation of partnership agreements with that Institution. The coordinator will be responsible for sending timely technical and financial reports of his/her institutions activities to the ACE under the agreed MoA. The ACE has drawn up a list of enterprises that could provide very good internship opportunities for its students. Specific agreements will be signed to ensure that the students are given roles and get experiential learning opportunities. During the internship periods the enterprises will have full supervisory role over the interns. The interns will be subjected to the performance evaluation scheme of the receiving enterprises and not just academic evaluation of their internship by the ACE. Each intern will be required to present case studies of some interesting aspects of the internship experience.
4.5 Environmentsafeguards(InserttheEnvironmentalManagementPlananddisclosedonyourwebsite,pleaselistresponsiblestaff)
The Centre of Excellence in Dryland Agriculture is established to solve problems of the inhabitants of drylands in West Africa by enhancing the capacity of Bayero University and the collaborating partners to produce demand-driven research outputs which will contribute to the management of more productive and
Implementation Plan
25
sustainable dryland environments as well as producing high quality performing graduates that will address the challenges of the dryland.
4.5.1 Project Description The Centre is located at Bayero University Kano (11.5000° N, 8.5000° E) Nigeria. It is within the Semi-arid agro-ecological zone of Africa, which is heavily populated. The people in this region of West Africa traditionally rely on subsistence farming, which is increasingly becoming unsustainable because of population growth, degradation of the soil and poor farming practices.
4.5.2 Operation Processes The official operation hours of the centre is 8:00am to 4:00pm (16:00 Hrs GMT). Nevertheless, field and laboratory research activities will continue as appropriate. 4.5.3 EMP Context
Civil works will be minimal as such environmental and social impacts will be managed. There will be some rehabilitation and extension of the laboratories. The project will focus on quality enhancements of faculty, curriculum development, and learning resources.
4.4.4 EMP Objectives To ensure compliance to:
i. environmental best practice of the country in liaison with National Environmental Standard and Regulation Enforcement Agency (NESREA); Standard Organisation of Nigeria (SON); National Agency for Food and Drug Administration and Control (NAFDAC), National Emergency Management Agency (NEMA); Nigerian Quarantine Service (NQS).
ii. standard laboratory practice according to WHO (World Health Organisation) (MOPs; Manual of Operation of Equipment according to manufacturer’s specifications, MSDS; Material Safety Data Sheets.
iii. promote green fuels and conservation of natural resource. iv. convert waste to wealth (bio-resource technology) v. add value to agricultural products and produce
vi. promote animal welfare
4.5.5 Environmental Management: The staff responsible for environmental management will be Engineer Mustapha M. Bello 4.5.6 Approval and Licensing requirements Compliance with laid down standards of regulatory bodies in accordance with legislations of Federal Environmental Acts National Environmental Standard and Regulation Enforcement Agency (NESREA); Standard Organisation of Nigeria (SON); National Agency for Food and Drug Administration and Control (NAFDAC), National Emergency Management Agency (NEMA); Nigerian Quarantine Service (NQS). A dedicated staff will be responsible for obtaining the licences, approvals and permits.
S/N Project conditions compliance 1 Green fuels and conservation of natural
resource Prevention of practices that increase efficiency in the use of energy, water or other natural resources. No action that results in taking off plant (flowers, grasses and trees) and animal species (birds, insects, fish, reptiles, mammals) or adversely affects the ecosystem. Adherence to regulation of import, export, inter-state and foreign plant and animal species.
2 Bio-resource technology
Recycling, source reduction and sustainable agriculture.
Implementation Plan
26
3 Value addition on agricultural products and produce
Licensed, labelled and registered materials for value addition.
4.5.7 Reporting Petition from any person(s) on illegal usage of research materials that will affect plant and animal biodiversity in the region. The documentation unit will prepare reports, protocols and dissemination of information. 4.5.8 Environmental Training All personnel will undergo training on general and specific environmental management practices through workshops. Employees will be sent on short- and medium-term mandatory training on best Environmental Management Practices. Staff will be made aware of standard protocols in response to emergency and peculiar situations. Adequate track records on staff training in respect of the type and general descriptions of training will be collated and stored. Emergency Contacts and Response telephone numbers of person(s) will be made available in every location. Contact person will be given full authority to take decisions as appropriate. In addition, telephone numbers of emergency services including ambulance, fire brigade and other relevant government agencies will be made available. Staff will be made aware of notes on emergency responses, nature of chemical substances in use with their material safety data sheet. Sign post of assembly points will be made large in appropriate locations. 4.5.9 Monitoring and Review Development of checklist on environmental monitoring and compliance with manufacturer’s service guide will be done frequently. Monitoring and evaluation of routine equipment will be done occasionally. There will be provision of log books for monitoring the environmental variables which will contain due date for activities to be carried out. Adequate record keeping of activities and protocols will be ensured. Environmental Auditing will be done regularly to ensure adherence to the standard protocols of environmental monitoring. Corrective actions for dealing with non-compliance of standard procedures will be made available.
5. PERFORMANCEMONITORING
(PleaseinserttheResultFrameworksharedwithAAU,andpleaseindicateplanneddisbursementasafunctionoftheexpectedresults*)Disbursement linked Indicator
Action to be completed Minimum target (project duration)
Importance (Share of grant)
Regional emphasis
Computed amount based on new targets & rates
Subtotals per indicator
Institution qualified, Regional specialization endorsed and Institutional readiness (DLR #1)
Steering Committee created and regional specialization through ACEs endorsed
10% NO
Constitution of ACE team and creation of ACE designated account
800,000
800,000
Approval of project implimentation plan by AAU and WorlD Bank
Excellence in education and research capacity and development impact (DLI #2)
N# of new students in ACE courses (30% must be regional students):
Yes
· New PhD students (DLR #2.3)
43
· New PhD students (male national)
20 8% 200,000
· New PhD students (female national)
10 125,000
Implementation Plan
28
Disbursement linked Indicator
Action to be completed Minimum target (project duration)
Importance (Share of grant)
Regional emphasis
Computed amount based on new targets & rates
Subtotals per indicator
· New PhD students (male regional)
10 200,000
· New PhD students (female regional)
3 75,000
600,000
· New Master Students (DLR #2.2)
220
· New Master Students (male national)
114 7% 228,000
· New Master Students (fem national)
48 120,000
· New Master Students (regional)
39 156,000
· New Master Students (fem regional)
17 85,000
589,000
· New Short term (DLR #2.1)
1074
· New Short term (male national)
475 7% 190,000
Implementation Plan
29
Disbursement linked Indicator
Action to be completed Minimum target (project duration)
Importance (Share of grant)
Regional emphasis
Computed amount based on new targets & rates
Subtotals per indicator
· New Short term (female national)
226 113,000
· New Short term (male regional)
225 180,000
· New Short term (female regional)
94 94,000
577,000
· N# of outreach “periods” (DLR #2.4)
236 8%
· N# of new students ( national)
154 308,000
· N# of new students (regional)
66 264,000
· N# of new faculty 11 National 22,000
· N# of non national faculty
5 Regional 20,000
614,000
International evaluation and accreditation (DLR #2.5)
3%
Implementation Plan
30
Disbursement linked Indicator
Action to be completed Minimum target (project duration)
Importance (Share of grant)
Regional emphasis
Computed amount based on new targets & rates
Subtotals per indicator
Gap assessment certified 1 100,000
Self-evaluation using international best practices
1 100,000
200,000
N# of published articles in internationally recognized and peer reviewed journals (DLR #2.6)
53 13%
National 44 Simple 660,000
Regional 12 Co-authored regionally
360,000
1,020,000
· $ externally generated revenue (DLR #2.7)
1,200,000 15%
National 200,000 National 200,000
Regional - Regional
International 1,000,000 International 1,000,000
1,200,000
. Begin civil works, furnishing and equipping of tissue culture
· Meeting 4 milestones
20% No 400,000
1,600,000
Implementation Plan
31
Disbursement linked Indicator
Action to be completed Minimum target (project duration)
Importance (Share of grant)
Regional emphasis
Computed amount based on new targets & rates
Subtotals per indicator
laboratory; upgrading of research farm; and installation of 3 screen houses. Evidence of this include:
i. Tender opening and evaluation documents
ii. Signed awarded contracts with bill of quantities
iii. Contract on website
iv. Environmental and Social Management Plan (ESMP) conformity certificate
400,000
. 100% completion of civil works, furnishing and renovation of tissue culture laboratory evidenced by:
i. Installation of all tissue-culture laboratory equipment and training of staff to run the equipment
ii. Pictures of the tissue culture laboratory being
Implementation Plan
32
Disbursement linked Indicator
Action to be completed Minimum target (project duration)
Importance (Share of grant)
Regional emphasis
Computed amount based on new targets & rates
Subtotals per indicator
utilized by faculty and students shared on ACE’s website
400,000 400,000
. 100% completion of research farm upgrade; and furnishing and equipping of Central Instrumentation Laboratory; evidence of which include:
i. Pictures of upgraded farm shared on ACE’s website showing demarcated research plots, and drip irrigation facility
ii. Procurement contract for Central Instrumentation Laboratory signed
. 100% installation of screen houses and equipping of central instrumentation laboratory, evidence of which include:
i. Screen houses installed and
Implementation Plan
33
Disbursement linked Indicator
Action to be completed Minimum target (project duration)
Importance (Share of grant)
Regional emphasis
Computed amount based on new targets & rates
Subtotals per indicator
being used by students and faculty
ii. Equipment in Central instrumentation laboratory procured, installed and personnel trained to run them
iii. Pictures of completed screen houses and fully equipped central instrumentation laboratory being utilized by students and faculty shared on ACE’s website.
Implementation Plan
34
Disbursement linked Indicator
Action to be completed Minimum target (project duration)
Importance (Share of grant)
Regional emphasis
Computed amount based on new targets & rates
Subtotals per indicator
Financial Management (DLI #3)
· Submission of timely withdrawal application by ACE to the Bank through the coordinating government agency on an annual basis. The Withdrawal application should be submitted with quality documentation related to the achievements made on the DLIs and certified EEPs.
· Timely submission
5% No 400,000
Procurement (DLI #4) Timely procurement audit Timely and Satisfactory Procurement Progress
5% No 400,000
TOTAL 100% 8,000,000
ACE TEMPLATE
Implementation Plan
6. DETAILEDBUDGET
Table5:Budget,2014–2018withsplitbetweenpartners
ExpenditureCategoryEstimatedCostsin(US$)
YR1 YR2 YR3 YR4 Total %oftotal
A:BudgetbyActivityPlan
Outcome1:Strengthenedcapacityexcellenceforqualitytrainingindrylandagriculture 871,000 500,000 800,000 80,000
2,251,000 28.5
Outcome2:Strengthenedcapacityforresearchindrylandagriculture 583,000 1,520,596 941,958 683,023
3,728,577 47.2Outcome3:Improvedrelevance,regionalityandstakeholderparticipationinACEtrainingandresearchprogrammes
97,000 125,000 125,000 125,000
472,000 6.0Outcome4:Strengthenededucationsandresearchgovernanceandadministrativecapacity
187,000 300000 320000 320000
1,127,000 14.3
Contingency 52140 97823.84 109347.9 60401.15 319,713 4.0TOTAL 1,790,140 2543419.84 2296306 1268424 7,898,290 100.0% 22.7 32.2 29.1 16.0 100
B:Budgetbypartners
(LeadInstitution)
BayeroUniversityKano
1,478,050 2,034,736 1,837,045 1,014,739 6,364,570 80.6
(Partners)
312,090 508,684 459,261.2 253,684.8 1,533,720 19.4
RegionalPartners 189,520 254,342 229,630.6 126,842.4 800,335 10.1
NationalPartners 90,125 127,171 114,815.3 63,421.21 395,532 5.0
InternationalPartners 32,445 127,171 114,815.3 63,421.21 337,852.5 4.3
TOTAL 7,898,290
ACE TEMPLATE
Implementation Plan
36
7. DETAILEDACTIVITYSHEETS(oneforeachactivity)ActionPlan:1.StrengthenEducationCapacity&DevelopmentImpact Timeframe:Quarter1ofyear2(January2016toMarch,2016) Activity:1.1. EngageNaturalResourcesInstitute(NR),UniversityofGreenwichtoconductanassessmentoftheexisting
drylandprogrammes
Result1.1 Newneeds‐basedcurriculainkeyaspectsofdrylandagriculturedeveloped
Activity1.1.1 EngageNaturalResourcesInstitute (NRI),UniversityofGreenwich toconductanassessmentoftheexistingdrylandprogrammes
Outcome1 Strengthenedcapacitytoproviderelevantqualitytrainingsinkeyareasofdrylandagriculture
OutcomeINDICATOR4MSc,4PhDand1PGDcurriculasubstantiallyreviewed/developed
SOURCEOFVERIFICATIONCopyofneedsassessmentreportCopiesofreviewed/developedcurricula
IMPLEMENTATIONMILESTONES
PreparationofToR,methodologyandtoolsforconductoftrainingneedsassessment Sensitizationofbroadspectrumofinternational,regionalandnationalstakeholders(includingtheprivatesector)
Conductoftheneedassessment
PROCUREMENT Consultanttofacilitateconductofthetrainingneedsassessment
RESPONSIBILITYFORIMPLEMENTATION
CL,DCL,AGRHYMET,IDR
DURATION:3Months Commencement:1st January,2016
Completion:31stMarch,2016
PRIMARYCONSTITUENTS:Universities,CollegesofAgriculture,MinistriesofcommerceandIndustry,Agriculture,Education,Science&Technology,Farmercooperatives
PARTICIPANTS:Universities,CollegesofAgriculture,Farmercooperatives,Industries,ADPs.
ASSUMPTIONS Partneragencies/Institutionswithalignedpolicymandatearesupportive.
FINANCIALIMPLICATIONS ACEbudgetfortheactivity
BudgetLineAnalysis
1stQtr 2ndQtr 3rdQtr 4thQtr 5thQtr 6thQtr Total
1 PreparationofToRforconductoftrainingneedsassessment
500 500
2 Sensitizationandinvitationofstakeholders
500 500
3 EngagementofConsultant 10,000 10,000
4 Conductoftheneedassessment 19,000 19,000
TOTALS 30,000 30,000
ACE TEMPLATE
Implementation Plan
37
ActionPlan:1.StrengthenEducationCapacity&DevelopmentImpact Timeframe:Quarter2ofyear2(April,2016toJune,2016)Activity:1.2.Workshopinvolvinglocalandregionalpartners/stakeholderstodefinenew/revisedcurriculafor MSc,andPhDprogrammes;andtoidentifytrainingareasforshortcourses
Result1.1 Newneeds‐basedcurriculainkeyaspectsof drylandagriculturedeveloped
Activity1.2 Workshopinvolvinglocalandregionalpartners/stakeholderstodefinenew/revisedcurriculaforMSc,andPhDprogrammes;andtoidentifytrainingareasforshortcourses
Outcome1 Strengthenedcapacitytoproviderelevantqualitytrainingsinkeyareasofdrylandagriculture
OutcomeINDICATOR4MSc,4PhDand1PGDcurriculasubstantiallyreviewed/developed;Numberofnewtrainingareasforshortcoursesidentified
SOURCEOFVERIFICATIONCopyofreviewedcurriculaofMSc,andPhDprogrammes.,Copyofreportforidentifiedshortcourses
IMPLEMENTATIONMILESTONES
Sensitizationandinvitationofbroadspectrumofinternational,regionalandnationalstakeholders(includingtheprivatesector) Reviewofexistingcurriculaatastakeholderworkshop CompilationofreviewedcurricularandCirculationtokeystakeholdersforvalidation
PROCUREMENT NA
RESPONSIBILITYFORIMPLEMENTATION
CL,DCL
DURATION:3Months Commencement:1stApril,2016
Completion:30thJune,2016
PRIMARYCONSTITUENTS:Universities,CollegesofAgriculture,MinistriesofcommerceandIndustry,Agriculture,Education,Science&Technology,Farmercooperatives
PARTICIPANTS:Universities,CollegesofAgriculture,Farmercooperatives,Industries,ADPs,professionalassociations
ASSUMPTIONS Partneragencies/Institutionswithalignedpolicymandatewillbesupportive.
FINANCIALIMPLICATIONS ACEbudgetfortheactivity
BudgetLineAnalysis
1stQtr 2ndQtr 3rdQtr 4thQtr 5thQtr 6thQtr Total
1 Sensitizationandinvitationofstakeholders
1,000 1,000
2 Reviewofexistingcurriculaatastakeholderworkshop
20,000 20,000
3 CompilationofreviewedcurricularandCirculationtokeystakeholdersforvalidation
4,000 4,000
4
5
TOTALS 25,000 25,000
ACE TEMPLATE
Implementation Plan
38
Action Plan: 1. StrengthenEducationCapacity&DevelopmentImpact Timeframe: Quarter 1 of year 2 (January, 2016 to March, 2016) Activity: 1.3. Upgradeoftwoclassroomswithmodernteachingandlearningfacilitiesincludingback‐uppowersolutionsbytheendofQ2‐Y1
RESULT1.3 Lectureroomsupgraded,andinternationalstudent’shostelcreated.
ACTIVITY1.3 Upgradeoffourclassroomswithmodernteachingandlearningfacilitiesincludingback‐uppowersolutions
Outcome1 Strengthenedcapacitytoproviderelevantqualitytrainingsinkeyareasofdrylandagriculture
Outcome INDICATOR
4 classrooms upgraded
SOURCE OF VERIFICATION
Inventory of facilities in class rooms before and after upgrading.
IMPLEMENTATION MILESTONES
Sensitization of Contractors and selection Placing order of Equipment and upgrading of classes
Receiving supplies and authentication Installations and testing
PROCUREMENT Open Tender
RESPONSIBILITY FOR IMPLEMENTATION
CL, Procurement officer, Finance Officer, Auditor
DURATION: 3 Months Commencement: 1st January,2016
Completion: 31st March,2016
PRIMARY CONSTITUENTS: Contractors PARTICIPANTS: Contractors, participating departments
ASSUMPTIONS The University provides the required structures for upgrade
FINANCIAL IMPLICATIONS ACE budget for the activity
Budget Line Analysis 1stQtr 2ndQtr 3rdQtr 4thQtr 5thQtr 6thQtr Total
1 Sensitization of Consultants and selection
1,000 1,000
2 Placing order, Receiving supplies and authentication, Installations and testing
49,000 49,000
3
4
5
TOTALS 50,000 50,000
ACE TEMPLATE
Implementation Plan
39
Action Plan: 1. StrengthenEducationCapacity&DevelopmentImpact Timeframe: Quarter 1 of year 2 (January, 2016 to March, 2016) Activity1.4:Upgradeofhostelswithrelevantfurnishingforinternationalstudents
RESULT1.3 Lectureroomsupgraded,andinternationalstudent’shostelcreated.
ACTIVITY1.4 Upgradeofhostelswithrelevantfurnishingforinternationalstudents
Outcome1 Strengthenedcapacitytoproviderelevantqualitytrainingsinkeyareasofdrylandagriculture
Outcome INDICATOR Internationalstudentshostelcreated
SOURCE OF VERIFICATION
Inventory of facilities in hostel before and after upgrading.
IMPLEMENTATION MILESTONES
Advert and selection of Contractors Renovation and upgrading of rooms
Supplies of bedding facilities
PROCUREMENT Open Tender
RESPONSIBILITY FOR IMPLEMENTATION
DCL, Procurement Officer
DURATION: 3 Months Commencement: 1st January,2016
Completion: 31st March,2016
PRIMARY CONSTITUENTS: Contractors PARTICIPANTS: CL, Procurement Officer, MSD
ASSUMPTIONS The University provides the required structures for upgrade
FINANCIAL IMPLICATIONS ACE budget for the activity
Budget Line Analysis 1stQtr 2ndQtr 3rdQtr 4thQtr 5thQtr 6thQtr Total
1 Advert and selection of contractors
1000 1,000
2 Renovation and supplies 89,000 89,000
3
4
5
TOTALS 90,000 90,000
ACE TEMPLATE
Implementation Plan
40
Action Plan: 1. StrengthenEducationCapacity&DevelopmentImpact Timeframe: Quarter‐ of year 2 (September 2016 to November, 2016)
Activity: 1.5.Subscription to NgREN
RESULT1.4 Expandedaccesstoindexedelectronicjournaldatabasesandvideoconferencingfacilityintheseminarroomprovided.
ACTIVITY1.5 Subscription to NgREN
Outcome1 Strengthenedcapacitytoproviderelevantqualitytrainingsinkeyareasofdrylandagriculture
Outcome INDICATOR No. of non‐open access databases
SOURCE OF VERIFICATIONInventory of internet facilities and databases
IMPLEMENTATION MILESTONES
Subscription to NgREN
PROCUREMENT Direct Subscription
RESPONSIBILITY FOR IMPLEMENTATION
CL, Procurement Officer; ICT Officer
DURATION: 3 Months Commencement: Completion:
PRIMARY CONSTITUENTS: Procurement Officer PARTICIPANTS: Procurement Officer; ICT Officer
ASSUMPTIONS NgREN subscription is current.
FINANCIAL IMPLICATIONS ACE budget for the activity
Budget Line Analysis 1stQtr 2ndQtr 3rdQtr 4thQtr 5thQtr 6thQtr Total
1 Subscription to NgREN
225,000 225,000
2
3
4
5
TOTALS 225,000 225,000
ACE TEMPLATE
Implementation Plan
41
Action Plan: 1. StrengthenEducationCapacity&DevelopmentImpact Timeframe: Quarter 1 of year 2 (January, 2016 to March, 2016)
Activity: 1.6:ConstructionofamastwithradiolinksanduninterruptedpowersupplyequipmenttofacilitateunhinderedaccesstotheinternetthroughtheUniversityMTNbandwidthsubscriptionfortheactivitiesofACE
RESULT1.4 Expandedaccesstoindexedelectronicjournaldatabasesandvideoconferencingfacilityintheseminarroomprovided.
ACTIVITY1.6 ConstructionofamastwithradiolinksanduninterruptedpowersupplyequipmenttofacilitateunhinderedaccesstotheinternetthroughtheUniversityMTNbandwidthsubscriptionfortheactivitiesofACE
Outcome1 Strengthenedcapacitytoproviderelevantqualitytrainingsinkeyareasofdrylandagriculture
Outcome INDICATOR Individual user name and password to staff and students to enable full access to science direct, Scopus and other databases provided. Functional video conferencing facility.
SOURCE OF VERIFICATION Records of Users Record of videoconferencingfacilityuse
IMPLEMENTATION MILESTONES
Constructionofamastwithradiolinksanduninterruptedpowersupplyequipment Installation of equipment
PROCUREMENT Open Tender
RESPONSIBILITY FOR IMPLEMENTATION
Procurement Officer; ICT Officer
DURATION: 3 Months Commencement: 1st January, 2016 Completion: 31st March,2016
PRIMARY CONSTITUENTS: Procurement Officer PARTICIPANTS: Procurement Officer; ICT Officer
ASSUMPTIONS The University MTN subscription is current and efficient.
FINANCIAL IMPLICATIONS ACE budget for the activity
Budget Line Analysis 1stQtr 2ndQtr 3rdQtr 4thQtr 5thQtr 6thQtr Total
1 Constructionofamastwithradiolinksanduninterruptedpowersupplyequipment
13,000 13,000
2 Purchase of radio‐link equipment
5,000 5,000
3 Installation of equipment 2,000 2,000
4
5
TOTALS 20,000 20,000
ACE TEMPLATE
Implementation Plan
42
Action Plan: 1. StrengthenEducationCapacity&DevelopmentImpact Timeframe: Quarter 1 of year 2 (January, 2016 to March, 2016)
Activity 1.7:Provision of video conferencing facility in the Seminar room
RESULT1.4 Expandedaccesstoindexedelectronicjournaldatabasesandvideoconferencingfacilityintheseminarroomprovided.
ACTIVITY1.7 Provision of video conferencing facility in the Seminar room.
Outcome1 Strengthenedcapacitytoproviderelevantqualitytrainingsinkeyareasofdrylandagriculture
Outcome INDICATOR No. of Video conferencing used to facilitate Teachingandlearning
SOURCE OF VERIFICATION Record of videoconferencingfacilityuse
IMPLEMENTATION MILESTONES
Sensitization of contractors and selection Upgrading of Video conferencing facility and Installation
PROCUREMENT Open Tender
RESPONSIBILITY FOR IMPLEMENTATION
Procurement Officer; ICT Officer
DURATION: 3 Months Commencement: 1st January,2016 Completion:31st March,2016
PRIMARY CONSTITUENTS: Procurement Officer PARTICIPANTS: Procurement Officer
ASSUMPTIONS NA
FINANCIAL IMPLICATIONS ACE budget for the activity
Budget Line Analysis 1stQtr 2ndQtr 3rdQtr 4thQtr 5thQtr 6thQtr Total
1 Advert and selection of contractors
1000 1,000
2 Procurement of Video conferencing facility and Installation
14,000 14,000
3
4
5
TOTALS 15,000 15,000
ACE TEMPLATE
Implementation Plan
43
Action Plan: 1. StrengthenEducationCapacity&DevelopmentImpact Timeframe: The whole of Year 2 (January, 2016 to December, 2016) Activity 1.8: MScandPhDfellowships(includingresearchcosts)toregionalcandidates
RESULT1.1 IncreasedenrolmentofnationalandregionalstudentsintoACEpostgraduateprogrammes
ACTIVITY1.8 MScandPhDfellowships(includingresearchcosts)toregionalcandidates
Outcome1 Strengthenedcapacityforteachingandlearningexcellenceindrylandagriculturerelatedfields
Outcome INDICATOR
No. of PhD regional students admitted and on fellowshipNo.ofMSc regional students admitted and on fellowship
SOURCE OF VERIFICATION Records of staff of students admission and registration from school of postgraduate studies Records of payments of fellowship to students from bursary
IMPLEMENTATION MILESTONES
Enrolment of M.Sc and Ph.D students ConductofM.Sc and Ph.D studies
PROCUREMENT NA
RESPONSIBILITY FOR IMPLEMENTATION
CL, DCL, Finance Officer
DURATION: 12 Months Commencement: 1st January, 2016
Completion:31st December,2016
PRIMARY CONSTITUENTS: ACE Partners PARTICIPANTS: Postgraduate students
ASSUMPTIONS Suitable candidates with requisite qualifications are available and are willing to study in Nigeria
FINANCIAL IMPLICATIONS ACE budget for the activity
Budget Line Analysis 1stQtr 2ndQtr 3rdQtr 4thQtr 5thQtr 6thQtr Total
1 Identification and advertising fellowshippositionswithintheregion
2,000 2,000
2 ConductofM.ScandPh.Dstudies
238,000 238,000
3
4
5
TOTALS 240,000 240,000
ACE TEMPLATE
Implementation Plan
44
Action Plan: 1.StrengthenEducationCapacity&DevelopmentImpact Timeframe: The whole of Year 2 (January, 2016 to December, 2016) Activity 1.9: MountshortEnglishLanguagecoursestosupportstudentsfromregional‐Francophonecountries
RESULT1.2 IncreasedenrolmentofnationalandregionalstudentsintoACEprogrammes.
ACTIVITY1.9 MountshortEnglishLanguagecoursestosupportstudentsfromFrancophonestudents.
Outcomes1and3 Strengthen Education Capacity & Development Impact&Improved relevance, regionality andstakeholderparticipationinACEprogrammes
Outcome INDICATOR Numberofregionalstudentsenrolled
SOURCE OF VERIFICATION Records of students enrolment
IMPLEMENTATION MILESTONES
students enrolment
Running EnglishLanguagecourses
PROCUREMENT Direct Purchase
RESPONSIBILITY FOR IMPLEMENTATION
DCL, Relevant Department
DURATION: 12 months Commencement:1st January,2016
Completion: 31st December,2016
PRIMARY CONSTITUENTS: ACE, Partners PARTICIPANTS: Academic Departments
ASSUMPTIONS Students and staff of partner institutions from francophone countries will require English language proficiency courses
FINANCIAL IMPLICATIONS ACE budget for the activity
Budget Line Analysis 1stQtr 2ndQtr 3rdQtr 4thQtr 5thQtr 6thQtr Total
1 Students enrolment
2 Running EnglishLanguagecourses
8,000 8,000
3 Procurement of English language learning software and books
12,000 12,000
4
5
TOTALS 20,000 20,000
ACE TEMPLATE
Implementation Plan
45
Action Plan: 1. StrengthenEducationCapacity&DevelopmentImpact Timeframe: The whole of Year 2 (January, 2016 to December, 2016) Activity 1.10: Exchange of staff through short stay, sabbatical and visiting lectureship
RESULT1.2 IncreasedenrolmentofnationalandregionalstudentsintoACEprogrammes.
ACTIVITY1.10 Exchange of staff through short stay, sabbatical and visiting lectureship
Outcome1 Strengthenedcapacitytoproviderelevantqualitytrainingsinkeyareasofdrylandagriculture
Outcome INDICATOR No. of Staff on sabbaticalandvisitinglectureship/fellowshipNo.oflectures via video links
SOURCE OF VERIFICATIONRecords of staff engagement/exchange Records of lectures via video links
IMPLEMENTATION MILESTONES
Identification and advertising of visitinglectureship/fellowshippositionsSelectionofstaffforexchangestaffexchange
PROCUREMENT NA
RESPONSIBILITY FOR IMPLEMENTATION
CL
DURATION: 12 months Commencement:1st January, 2016
Completion: 31st December, 2016
PRIMARY CONSTITUENTS: ACE Partners PARTICIPANTS: National and Regional Institutions/organizations and agencies, professional bodies
ASSUMPTIONS Partner National and Regional Institutions/organizations and agencies with aligned mandate will be supportive.
FINANCIAL IMPLICATIONS ACE budget for the activity
Budget Line Analysis 1stQtr 2ndQtr 3rdQtr 4thQtr 5thQtr 6thQtr Total
1 Identification and advertising of visitinglectureship/fellowshippositions
1,000 1,000
2 Selectionofstaffforexchange 1,000 1,000
3 staffexchange 138,000 138,000
4
5
TOTALS 140,000 140,000
ACE TEMPLATE
Implementation Plan
46
Action Plan:1.StrengthenEducationCapacity&DevelopmentImpact Timeframe: Quarter 2 of Year 2 (April,2016 to July,2016)
Activity 1.11: Procure a 30‐seater training bus
RESULT1. Easymovementofstudentsandstaffduringstudyvisitsandexcursions
ACTIVITY1.11 Procurementofa30‐seatertrainingbus
Outcome1 Strengthenedcapacityforteachingandlearningexcellenceindrylandagriculturerelatedfields
Outcome INDICATOR Three laboratories upgraded and furnished according to specification
SOURCE OF VERIFICATION Inventory of laboratories
IMPLEMENTATION MILESTONES
Advert and selection of Contractors Supply of 30 seater training bus Verification and handing over
PROCUREMENT Open Tender
RESPONSIBILITY FOR IMPLEMENTATION
CL, Procurement officer
DURATION: 3 Months Commencement: 1st April,2016 Completion: 31st July, 2016
PRIMARY CONSTITUENTS: CL, Procurement officer PARTICIPANTS: Contractors
ASSUMPTIONS NA
FINANCIAL IMPLICATIONS ACE budget for the activity
Budget Line Analysis 1stQtr 2ndQtr 3rdQtr 4thQtr 5thQtr 6thQtr Total
1 Advert and selection of Contractors
1000 1000
2 Supply of 30‐seater training bus
70,600 70,600
3 Verification and handing over 1,000 1,000
4
5
TOTALS 72,600 72,600
ACE TEMPLATE
Implementation Plan
47
Action Plan: 1. StrengthenEducationCapacity&DevelopmentImpact Timeframe: The whole of Year 2 (January, 2016 to December, 2016) Activity 1.12: Organize joint short courses to address specific capacity needs of ACE, partners, industry and other stakeholders
RESULT1.5 CompetenceofACEandpartnerfacultytosupportpostgraduatetrainingindrylandagricultureenhancedthroughshorttrainingcourses/postgraduatetraininginidentifiedareasofskillgap.
ACTIVITY1.12 OrganizejointshortcoursestoaddressspecificcapacityneedsofACE,partners,industryandotherstakeholders
Outcome Strengthenedcapacityforteachingandlearningexcellenceindrylandagriculturerelatedfields
Outcome INDICATOR 40ACEstaff/partners(outofwhichatleast12females)trainedinrelevantareasincluding:
1. Climateandagriculturalsystemsmodelling2. Watermanagementandconservationtechniques3. Advancesincropimprovementandadaptationtoheatandwaterstress4. Advancesinlivestockimprovementandadaptationtoheatandwaterstress
SOURCE OF VERIFICATION Report/proceedings of trainings conducted, Training materials on ACE website
IMPLEMENTATION MILESTONES
Developmentoftrainingmodules Identificationofresourcespersonsandresourcecentres Conductofthetrainings
PROCUREMENT NA
RESPONSIBILITY FOR IMPLEMENTATION
DCL
DURATION: 12 Months Commencement: 1st January,2016 Completion:31st December,2016
PRIMARY CONSTITUENTS: resource persons, trainee staff
PARTICIPANTS: ACE staff, participating departments staff
ASSUMPTIONS Training and capacity building opportunities relevant to needs available
FINANCIAL IMPLICATIONS ACE budget for the activity
Budget Line Analysis 1stQtr 2ndQtr 3rdQtr 4thQtr 5thQtr 6thQtr Total
1 Participation of ACE and partner faculty in short trainings both locally and internationally
52,250 45,000 45,000 45,000 187,250
2
3
4
5
TOTALS 52,250 45,000 45,000 45,000 187,250
ACE TEMPLATE
Implementation Plan
48
Action Plan: 2 StrengthenCapacityforResearchExcellenceinDrylandAgriculturerelatedFields Timeframe: The whole of Year 2 (January, 2016 to December, 2016) Activity 2.1.1: Implementationofresearchrelatedtrainingsforacademicandtechnicalstaff
RESULT2.1 ImprovedresearchcapacityofstaffofACEandpartnerinstitutionsinthefieldofdrylandagriculture
ACTIVITY2.1 Implementationofresearchrelatedtrainingsforacademicandtechnicalstaff
Outcome2 Strengthenedcapacityforresearchexcellenceindrylandagriculturerelatedfields
Outcome INDICATOR ‐ 5 academic and 5 technical staff trained on laboratory practices and proper use of some the equipment already available in BUK including GC and HPLC
SOURCE OF VERIFICATION ‐Record of training reports.
IMPLEMENTATION MILESTONES
Develop training modules
Identify and engage resource person Conduct trainings
PROCUREMENT NA
RESPONSIBILITY FOR IMPLEMENTATION
CL, DCL
DURATION: 12 Months Commencement:1st January,2016
Completion:31st December,2016
PRIMARY CONSTITUENTS: Consultants PARTICIPANTS: Consultants, ACE partners (Trainees)
ASSUMPTIONS Relevant and competent resource persons are available within the region the provide the trainings
FINANCIAL IMPLICATIONS ACE budget for the activity
Budget Line Analysis 1stQtr 2ndQtr 3rdQtr 4thQtr 5thQtr 6thQtr Total
1 Identify training opportunities
2 Sponsor staff for training 7,500 7,500 7,500 7,500 30,000
3
4
5
TOTALS 7,500 7,500 7,500 7,500 30,000
ACE TEMPLATE
Implementation Plan
49
Action Plan: 2 StrengthenCapacityforResearchExcellenceinDrylandAgriculturerelatedFields Timeframe: Quarter 2 to 4 of Yr2 (April, 2016 to December, 2016) Activity 2.2: Selectionandengagementofpost‐doctoralfellows
RESULT2.1 ImprovedresearchcapacityofstaffofACEandpartnerinstitutionsinthefieldofdrylandagriculture
ACTIVITY2.2 Selectionandengagementofpostdoctoralfellows
Outcome2 Strengthenedcapacityforresearchexcellenceindrylandagriculturerelatedfields
Outcome INDICATOR 4 Post‐doctoral fellows of ACE and partner institutions selected
SOURCE OF VERIFICATION Records of postdoctoral fellowship
IMPLEMENTATION MILESTONES
Identification and advertising of post‐doctoral fellows from among ACE/Partner staff Selectionofpost‐doctoral fellowship. Conductofpost‐doctoral studies
PROCUREMENT NA
RESPONSIBILITY FOR IMPLEMENTATION
VC BUK; CL
DURATION: 9 months Commencement:1st April,2016
Completion:31st December,2016
PRIMARY CONSTITUENTS: ACE Partners PARTICIPANTS: National and Regional Institutions/organizations and agencies
ASSUMPTIONS Academics of ACE and partner institutions meets the minimum standards for the fellowship as designed in the guidelines
FINANCIAL IMPLICATIONS ACE budget for the activity
Budget Line Analysis 1stQtr 2ndQtr 3rdQtr 4thQtr 5thQtr 6thQtr Total
1 Identification and advertising of staff post‐doctoral fellows from among ACE/Partner staff
1,000 1,000
2 Selectionofstaffforpost‐doctoral fellowship.
2,000 2,000
3 Conductofstaffpost‐doctoral studies
47,000 47,000 47,000 141,000
4
5
TOTALS 50,000 47,000 47,000 144,000
ACE TEMPLATE
Implementation Plan
50
Action Plan: 2 StrengthenCapacityforResearchExcellenceinDrylandAgriculturerelatedFields Timeframe: Quarter 1 of year 2 (January, 2016 to March, 2016) Activity 2.3: FurnishingofaspecializedTissue‐CultureLaboratory
RESULT2.1 ImprovedresearchcapacityofstaffofACEandpartnerinstitutionsinthefieldofdrylandagriculture
ACTIVITY2.3 FurnishingandofaspecializedTissue‐CultureLaboratory
Outcome2 Strengthenedcapacityforresearchexcellenceindrylandagriculturerelatedfields
Outcome INDICATOR Three laboratories upgraded and furnished according to specification
SOURCE OF VERIFICATION Inventory of laboratories
IMPLEMENTATION MILESTONES
Advert and selection of Contractors Supply and installation of furnishing of Laboratories Verification and handing over
PROCUREMENT Open Tender
RESPONSIBILITY FOR IMPLEMENTATION
CL, Procurement officer
DURATION: 3 Months Commencement:1st January, 2016 Completion: 31st March, 2016
PRIMARY CONSTITUENTS: CL, Procurement officer PARTICIPANTS: Contractors
ASSUMPTIONS NA
FINANCIAL IMPLICATIONS ACE budget for the activity
Budget Line Analysis 1stQtr 2ndQtr 3rdQtr 4thQtr 5thQtr 6thQtr Total
1 Advert and selection of Contractors
1000 1000
2 Supply and installation of laboratory furnishing, gas piping, digital film cupboards, etc
97,000 97,000
3 Verification and handing over 2,000 2,000
4
5
TOTALS 100,000 100,000
ACE TEMPLATE
Implementation Plan
51
Action Plan: 2 StrengthenCapacityforResearchExcellenceinDrylandAgriculturerelatedFields Timeframe: Quarter 1 of year 2 (January, 2016 to March, 2016) Activity 2.4: EquippingofaspecializedTissue‐CultureLaboratory
RESULT2.1 ImprovedresearchcapacityofstaffofACEandpartnerinstitutionsinthefieldofdrylandagriculture
ACTIVITY2.4 EquippingofaspecializedTissue‐CultureLaboratory
Outcome2 Strengthenedcapacityforresearchexcellenceindrylandagriculturerelatedfields
Outcome INDICATOR Three laboratories upgraded and furnished according to specification
SOURCE OF VERIFICATION Inventory of laboratories
IMPLEMENTATION MILESTONES
Advert and selection of Contractors Supply and installation of Laboratory equipment Verification and handing over
PROCUREMENT Open Tender
RESPONSIBILITY FOR IMPLEMENTATION
CL, Procurement officer
DURATION: 3 Months Commencement:1st January, 2016 Completion: 31st March, 2016
PRIMARY CONSTITUENTS: CL, Procurement officer PARTICIPANTS: Contractors
ASSUMPTIONS NA
FINANCIAL IMPLICATIONS ACE budget for the activity
Budget Line Analysis 1stQtr 2ndQtr 3rdQtr 4thQtr 5thQtr 6thQtr Total
1 Advert and selection of Contractors
1000 1000
2 Supply and installation of laboratory furnishing, gas piping, digital film cupboards, etc
238,000 238,000
3 Verification and handing over 2,000 2,000
4
5
TOTALS 241,000 241,000
ACE TEMPLATE
Implementation Plan
52
Action Plan: 2 StrengthenCapacityforResearchExcellenceinDrylandAgriculturerelatedFields. Timeframe: Quarter 2 to 4 of year 2 (April, 2016 to December, 2016) Activity 2.5: DevelopmentofproposalsandprotocolsandimplementationofresearchprogrammesinthethematicresearchareasoftheACE(researchdrivenbypostdoctoralfellows)
RESULT2.1 ImprovedresearchcapacityofstaffofACEandpartnerinstitutionsinthefieldofdrylandagriculture
ACTIVITY2.5 DevelopmentofproposalsandprotocolsandimplementationofresearchprogrammesinthethematicresearchareasoftheACE(researchdrivenbypostdocfellows)
Outcome2 Strengthenedcapacityforresearchexcellenceindrylandagriculturerelatedfields
Outcome INDICATOR ‐ 3 research proposals developed ‐ 3 joint research projects initiated
SOURCE OF VERIFICATION
Annual work plan Research Reports Publications
IMPLEMENTATION MILESTONES
Preparation of research proposals and protocols by postdoctoral fellows in ACEandpartnerinstitutions.
ImplementationofresearchprogrammesbypostdoctoralfellowsunderthesupervisionofcompetentfacultyfromACEandpartnerinstitutions
PROCUREMENT NA
RESPONSIBILITY FOR IMPLEMENTATION
ACE Team in consultation with partners
DURATION: 10 Months Commencement: 1st April, 2016 Completion:31st December, 2016
PRIMARY CONSTITUENTS: ACE Partners PARTICIPANTS: National and Regional Institutions/organizations and agencies
ASSUMPTIONS Partner institutions supportive and willing to participate in joint research
FINANCIAL IMPLICATIONS ACE budget for the activity
Budget Line Analysis 1stQtr 2ndQtr 3rdQtr 4thQtr 5thQtr 6thQtr Total
1 Preparation of research proposals and protocols by ACEandpartnerinstitutions.
6,000 6,000
2 Implementationofjointresearchprogrammeswithpartnerinstitutions
48,000 48,000 48,000 144,000
3
4
5
TOTALS 54,000 48,000 48,000 150,000
ACE TEMPLATE
Implementation Plan
53
Action Plan: 2 StrengthenCapacityforResearchExcellenceinDrylandAgriculturerelatedFields Timeframe: Quarter 2 to 3 of year 2 (April, 2016 to September, 2016) Activity 2.6: upgrade of research farm, including a 5ha drip irrigation facility by end of year1
RESULT2.2 ACEresearchfacilitiesupgradedandfunctional
ACTIVITY2.6 upgradeofresearchfarm,includinga5hadripirrigationfacility
Outcome2 Strengthenedcapacityforresearchexcellenceindrylandagriculturerelatedfields
OUTPUT INDICATOR One upgraded researchandtrainingfarm
SOURCE OF VERIFICATION Record of status of researchandtrainingfarm before and after upgrade
IMPLEMENTATION MILESTONES
Advert and selection of contractors Upgrading of farm
PROCUREMENT Open Tender
RESPONSIBILITY FOR IMPLEMENTATION
CL, DCL, Procurement Officer
DURATION: 6 Months Commencement:1st April,2016
Completion:30th September,2016
PRIMARY CONSTITUENTS: Contractors PARTICIPANTS: Contractors, Scientist &Technologist in all participating departments
ASSUMPTIONS NA
FINANCIAL IMPLICATIONS ACE budget for the activity
Budget Line Analysis 1stQtr 2ndQtr 3rdQtr 4thQtr 5thQtr 6thQtr Total
1 Sensitization of Consultants and selection
10,000 10,000
2 Upgrading of farm 210,000 210,000
3
4
5
TOTALS 220,000 220,000
ACE TEMPLATE
Implementation Plan
54
Action Plan: 1. StrengthenEducationCapacity&DevelopmentImpact Timeframe: Quarter 2 to 3 of year 1 (December 2014 to May 2015) Activity 2.7: Procurement and installation of screen houses
RESULT2.2 ACEresearchfacilitiesupgradedandfunctional
ACTIVITY2.7 Procurement and installation of screen houses
Outcome2 Strengthenedcapacityforresearchexcellenceindrylandagriculturerelatedfields
Outcome INDICATOR 3 screen houses provided
SOURCE OF VERIFICATION Inventory of screen houses.
IMPLEMENTATION MILESTONES
Advert and selection of Contractors Placing order of Equipment
Receiving supplies and authentication Installations and testing
PROCUREMENT Open Tender
RESPONSIBILITY FOR IMPLEMENTATION
CL, DCL, Procurement Officer
DURATION: 6 Months Commencement:1st April,2016
Completion:30th September,2016
PRIMARY CONSTITUENTS: Contractors PARTICIPANTS: Contractors, Scientist &Technologist in all participating departments
ASSUMPTIONS BUK provide site for screen houses
FINANCIAL IMPLICATIONS ACE budget for the activity
Budget Line Analysis 1stQtr 2ndQtr 3rdQtr 4thQtr 5thQtr 6thQtr Total
1 Sensitization of Consultants and selection
1,000 1,000
2 Placing order of Equipment 112,000 112,000
3 Receiving supplies and authentication
1,000 1,000
4 Installations and testing 6,000 6,000
5
TOTALS 114,000 6,000 120,000
ACE TEMPLATE
Implementation Plan
55
Action Plan: 1. StrengthenEducationCapacity&DevelopmentImpact Timeframe: Quarter 2 of year 2 (April, 2016 to June, 2016) Activity 2.8: Furnishing of PG Research Laboratories
RESULT2.2 ACEresearchfacilitiesupgradedandfunctional
ACTIVITY2.8 Furnishing of PG Research Laboratories
Outcome2 Strengthenedcapacityforresearchexcellenceindrylandagriculturerelatedfields
Outcome INDICATOR Furnished laboratory
SOURCE OF VERIFICATION Inventory of furniture in PG Research Laboratories
IMPLEMENTATION MILESTONES
Advert and selection of Contractors Placing order of Equipment
Receiving supplies and authentication Installations and testing
PROCUREMENT Open Tender
RESPONSIBILITY FOR IMPLEMENTATION
CL, DCL, Procurement Officer
DURATION: 3 Months Commencement:1st April, 2016
Completion: 30th June,2016
PRIMARY CONSTITUENTS: Contractors PARTICIPANTS: Contractors, Scientist &Technologist in all participating departments
ASSUMPTIONS BUK provide building for housing the PG Research Laboratories
FINANCIAL IMPLICATIONS ACE budget for the activity
Budget Line Analysis 1stQtr 2ndQtr 3rdQtr 4thQtr 5thQtr 6thQtr Total
1 Sensitization of Consultants and selection
1,000 1,000
2 Placing order of Equipment 52,000 52,000
3 Receiving supplies and authentication
1,000 1,000
4 Installations and testing 6,000 6,000
5
TOTALS 54,000 6,000 60,000
ACE TEMPLATE
Implementation Plan
56
Action Plan: 1. StrengthenEducationCapacity&DevelopmentImpact Timeframe: Quarter 2 of year 2 (April, 2016 to June, 2016) Activity 2.9: Furnishing of a specialized Instrumentation Laboratory
RESULT2.2 ACEresearchfacilitiesupgradedandfunctional
ACTIVITY2.9 Furnishing of a specialized Instrumentation Laboratory
Outcome2 Strengthenedcapacityforresearchexcellenceindrylandagriculturerelatedfields
Outcome INDICATOR Furnished laboratory
SOURCE OF VERIFICATION Inventory of furniture in specialized Instrumentation Laboratory
IMPLEMENTATION MILESTONES
Advert and selection of Contractors Placing order of Equipment
Receiving supplies and authentication Installations and testing
PROCUREMENT Open Tender
RESPONSIBILITY FOR IMPLEMENTATION
CL, DCL, Procurement Officer
DURATION: 3 Months Commencement:1st April, 2016
Completion: 30th June,2016
PRIMARY CONSTITUENTS: Contractors PARTICIPANTS: Contractors, Scientist &Technologist in all participating departments
ASSUMPTIONS BUK provide building for housing the Instrumentation laboratory
FINANCIAL IMPLICATIONS ACE budget for the activity
Budget Line Analysis 1stQtr 2ndQtr 3rdQtr 4thQtr 5thQtr 6thQtr Total
1 Sensitization of Consultants and selection
1,000 1,000
2 Placing order of Equipment 25,000 25,000
3 Receiving supplies and authentication
1,000 1,000
4 Installations and testing 3,000 3,000
5
TOTALS 27,000 3,000 30,000
ACE TEMPLATE
Implementation Plan
57
Action Plan: 1. StrengthenEducationCapacity&DevelopmentImpact Timeframe: Quarter 2 of year 2 (April, 2016 to June, 2016) Activity 2.10: Furnishing of Remote Sensing & GIS laboratory
RESULT2.2 ACEresearchfacilitiesupgradedandfunctional
ACTIVITY2.10 Furnishing of Remote Sensing & GIS laboratory
Outcome2 Strengthenedcapacityforresearchexcellenceindrylandagriculturerelatedfields
Outcome INDICATOR Furnished laboratory
SOURCE OF VERIFICATION Inventory of furniture in Remote sensing laboratory.
IMPLEMENTATION MILESTONES
Advert and selection of Contractors Placing order of Equipment
Receiving supplies and authentication Installations and testing
PROCUREMENT Open Tender
RESPONSIBILITY FOR IMPLEMENTATION
CL, DCL, Procurement Officer
DURATION: 3 Months Commencement:1st April, 2016
Completion: 30th June,2016
PRIMARY CONSTITUENTS: Contractors PARTICIPANTS: Contractors, Scientist &Technologist in all participating departments
ASSUMPTIONS BUK provide building for housing the Remote sensing laboratory
FINANCIAL IMPLICATIONS ACE budget for the activity
Budget Line Analysis 1stQtr 2ndQtr 3rdQtr 4thQtr 5thQtr 6thQtr Total
1 Sensitization of Consultants and selection
1,000 1,000
2 Placing order of Equipment 41,000 41,000
3 Receiving supplies and authentication
1,000 1,000
4 Installations and testing 2,000 2,000
5
TOTALS 43,000 2,000 45,000
ACE TEMPLATE
Implementation Plan
58
Action Plan: 1. StrengthenEducationCapacity&DevelopmentImpact Timeframe: Quarter 3 to 4 of year 2 (July, 2016 to December, 2016) Activity 2.11: Equipping of a specialized Instrumentation Laboratory
RESULT2.2 ACEresearchfacilitiesupgradedandfunctional
ACTIVITY2.11 Equipping of a specialized Instrumentation Laboratory
Outcome2 Strengthenedcapacityforresearchexcellenceindrylandagriculturerelatedfields
Outcome INDICATOR Laboratory equipped and utilized
SOURCE OF VERIFICATION Inventory of equipments in specialized Instrumentation Laboratory
IMPLEMENTATION MILESTONES
Advert and selection of Contractors Placing order of Equipment
Receiving supplies and authentication Installations and testing
PROCUREMENT Open Tender
RESPONSIBILITY FOR IMPLEMENTATION
CL, DCL, Procurement Officer
DURATION: 6 Months Commencement:1st July,2016
Completion:31st December,2016
PRIMARY CONSTITUENTS: Contractors PARTICIPANTS: Contractors, Scientist &Technologist in all participating departments
ASSUMPTIONS BUK provide building for housing the Instrumentation laboratory
FINANCIAL IMPLICATIONS ACE budget for the activity
Budget Line Analysis 1stQtr 2ndQtr 3rdQtr 4thQtr 5thQtr 6thQtr Total
1 Sensitization of Consultants and selection
1,000 1,000
2 Placing order of Equipment 364,000 364,000
3 Receiving supplies and authentication
5,000 5,000
4 Installations and testing 30,000 30,000
5
TOTALS 370,000 30,000 400,000
ACE TEMPLATE
Implementation Plan
59
Action Plan: 1. StrengthenEducationCapacity&DevelopmentImpact Timeframe: Quarter 3 to 4 of year 1 (July, 2016 to December, 2016) Activity 2.12: Equipping of Remote Sensing & GIS laboratory
RESULT2.2 ACEresearchfacilitiesupgradedandfunctional
ACTIVITY2.12 Equipping of Remote Sensing & GIS laboratory
Outcome2 Strengthenedcapacityforresearchexcellenceindrylandagriculturerelatedfields
Outcome INDICATOR Laboratory equipped and utilized
SOURCE OF VERIFICATION Inventory of equipments in Remote sensing laboratory.
IMPLEMENTATION MILESTONES
Advert and selection of Contractors Placing order of Equipment
Receiving supplies and authentication Installations and testing
PROCUREMENT Open Tender
RESPONSIBILITY FOR IMPLEMENTATION
CL, DCL, Procurement Officer
DURATION: 6 Months Commencement:1st July,2016
Completion:31st December,2016
PRIMARY CONSTITUENTS: Contractors PARTICIPANTS: Contractors, Scientist &Technologist in all participating departments
ASSUMPTIONS BUK provide building for housing the Remote sensing laboratory
FINANCIAL IMPLICATIONS ACE budget for the activity
Budget Line Analysis 1stQtr 2ndQtr 3rdQtr 4thQtr 5thQtr 6thQtr Total
1 Sensitization of Consultants and selection
1,000 1,000
2 Placing order of Equipment 92,000 92,000
3 Receiving supplies and authentication
1,000 1,000
4 Installations and testing 6,000 6,000
5
TOTALS 94,000 6,000 100,000
ACE TEMPLATE
Implementation Plan
60
Action Plan 3: Improvedrelevance,regionalityandstakeholderparticipationinACEactivities Timeframe: Quarter 2 of year 2 (April,2016) Activity: 3.1: ConductaregionalworkshoptodiscussACEprogrammes/activitieswithindustry/sectorpartners
RESULT3.1 Relevanthumancapacityandresearchneedsofpublicandprivateinstitutions,industryanddevelopmentorganizationsunderstoodanddocumented
ACTIVITY3.1 ConductaregionalworkshoptodiscussACEprogrammes/activitieswithindustry/sectorpartners
Outcome3 Improvedrelevance,regionalityandstakeholderparticipationinACEprogrammes
Outcome INDICATOR OneWorkshopconducted
SOURCE OF VERIFICATION Workshop report
IMPLEMENTATION MILESTONES
Workshop preparation Identificationandinvitationofworkshopparticipantsandresourcepersons ConductofWorkshop
PROCUREMENT NA
RESPONSIBILITY FOR IMPLEMENTATION
,CL, DCL; ACE Partner Institutions
DURATION: 1 month Commencement:1st April, 2016
Completion: 30th april,2016
PRIMARY CONSTITUENTS: ACE Partners PARTICIPANTS: National and Regional Institutions/organizations and agencies
ASSUMPTIONS Affiliated National and Regional Institutions/organizations and agencies with aligned mandate will be supportive.
FINANCIAL IMPLICATIONS ACE budget for the activity
Budget Line Analysis 1stQtr 2ndQtr 3rdQtr 4thQtr 5thQtr 6thQtr Total
1 Workshop preparation
1,000 1,000
2 Identificationandinvitationofworkshopparticipantsandresourcepersons
1,000 1,000
3 ConductofWorkshop 48,000 48,000
4
5
TOTALS 50,000 50,000
ACE TEMPLATE
Implementation Plan
61
Action Plan 3: Improvedrelevance,regionalityandstakeholderparticipationinACEactivities Timeframe: The whole of year 2 (January, 2016 to December, 2016) Activity 3.2: Identify and facilitate students and staff internship in industries, public and private sectors, as well as developmentorganizations
RESULT3.2 RobustoutreachprogrammestoaddressrelevantskillneedsoftheWCAdrylandregiondeveloped.
ACTIVITY3.2 Identifyandfacilitatestudentsandstaffinternshipinindustries,publicandprivatesectors,aswellasdevelopmentorganizations
Outcome3 Improvedrelevance,regionalityandstakeholderparticipationinACEprogrammes
OUTPUT INDICATOR NumberofstaffandstudentsofACEoninternship
SOURCE OF VERIFICATION
Records of staff and students internship
IMPLEMENTATION MILESTONES
Identification of enterprises for student and staff internships SigningofagreementsbetweenenterprisesandACEtofacilitatesmoothconductofinternship Conductofinternships
PROCUREMENT NA
RESPONSIBILITY FOR IMPLEMENTATION
ACE Team, Partners
DURATION: 12 months Commencement:1st January,2016
Completion: 31st December,2016
PRIMARY CONSTITUENTS: Students, Staff, ACE Partners PARTICIPANTS: National and Regional agro‐industries and enterprises,Institutions/organizations and agencies
ASSUMPTIONS Internship opportunities available at industries and public and private institutions
FINANCIAL IMPLICATIONS ACE budget for the activity
Budget Line Analysis 1stQtr 2ndQtr 3rdQtr 4thQtr 5thQtr 6thQtr Total
1 Identification and advertising of students internshippositions
2 Facilitationofstudents internship
30,000 30,000 30,000 30,000 120,000
3
4
5
TOTALS 30,000 30,000 30,000 30,000 120,000
ACE TEMPLATE
Implementation Plan
62
Action Plan 3: Improvedrelevance,regionalityandstakeholderparticipationinACEactivities Timeframe: Quarter 2 to 4 of year 2 (April, 2016 to December, 2016) Activity 3.3: ACE and identified partners/stakeholders engaged in exchange of staff and students, short visits, lectures by captains ofindustries
RESULT3.2 RobustoutreachprogrammestoaddressrelevantskillneedsoftheWCAdrylandregiondeveloped.
ACTIVITY 3.3. ACEand identifiedpartners/stakeholdersengaged inexchangeofstaff andstudents,shortvisits,lecturesbycaptainsofindustries
Outcome3 Improvedrelevance,regionalityandstakeholderparticipationinACEprogrammes
OUTPUT INDICATOR Numberofexchangeofstaffandstudents,shortvisits,lecturesbycaptainsofindustries
SOURCE OF VERIFICATION
Records of exchangeofstaffandstudents,shortvisits,lecturesbycaptainsofindustries
IMPLEMENTATION MILESTONES
Identification of potential staff and students Organisation of exchange visits
PROCUREMENT NA
RESPONSIBILITY FOR IMPLEMENTATION
ACE Team, Partners
DURATION: 9 months Commencement: 1st April,2016 Completion: 31st December,2016
PRIMARY CONSTITUENTS: Students, Staff, ACE Partners PARTICIPANTS: National and Regional agro‐industries and enterprises,Institutions/organizations and agencies
ASSUMPTIONS Opportunities for exchangeofstaffandstudents,shortvisits,lecturesbycaptainsofindustries available
FINANCIAL IMPLICATIONS ACE budget for the activity
Budget Line Analysis 1stQtr 2ndQtr 3rdQtr 4thQtr 5thQtr 6thQtr Total
1 Identificationofstaffandstudents
500 500 1,000
2 Conduct of exchange visits 9,000 15,000 15,000 39,000
3
4
5
TOTALS 9,500 15,500 15,000 40,000
ACE TEMPLATE
Implementation Plan
63
Action Plan 3:Improvedrelevance,regionalityandstakeholderparticipationinACEactivities Timeframe:TheWholeofyear2(January,2016toDecember,2016) Activity 3.4: SharingandexchangeofinformationbetweenACEandpartners,includinglibraryresources
RESULT3.2 RobustoutreachprogrammestoaddressrelevantskillneedsoftheWCAdrylandregiondeveloped.
ACTIVITY3.4 SharingandexchangeofinformationbetweenACEandpartners,includinglibraryresources
Outcome3 Improvedrelevance,regionalityandstakeholderparticipationinACEprogrammes
Outcome INDICATOR Numberoflibraryresourcesshared
SOURCE OF VERIFICATION Number of MOUs signed
No. of information materials shared
No. of Newsletters, periodicals, etc prepared and shared
IMPLEMENTATION MILESTONES
Signing of MOUs
Sustained communication and information sharing
PROCUREMENT NA
RESPONSIBILITY FOR IMPLEMENTATION
CL, DCL
DURATION: 12 months Commencement: January, 2016 Completion: December,2016
PRIMARY CONSTITUENTS: ACE Partners PARTICIPANTS: Staff and students of partner institutions
ASSUMPTIONS ACE partners utilise the information and library resources made available by ACE
FINANCIAL IMPLICATIONS ACE budget for the activity
Budget Line Analysis 1stQtr 2ndQtr 3rdQtr 4thQtr 5thQtr 6thQtr Total
1 Drafting of MoUs
2 Signing of the MoUs
3 Sustained communication, information sharing and collaborative networking with partners
2,500 2,500 2,500 2,500 10,000
4
5
TOTALS 2,500 2,500 2,500 2,500 10,000
ACE TEMPLATE
Implementation Plan
64
Action Plan: 4 StrengthenededucationandresearchgovernanceandadministrativecapacityofACE Timeframe: Quarter 1 of year 2 (March, 2016) Activity 4.1: OrganiseandconducttrainingforkeyProjectadministrative,M&Eandfinancialmanagementpersonnel
RESULT4.1 Strengtheninternalworking,reportingandaccountabilitysystems
ACTIVITY4.1 Organise and conduct training for key Project administrative, M&E and financial managementpersonnel
Outcome4 Strengthened research and education governance and administrative capacity of ACE to providecoordinatingrolefordrylandagriculturaldevelopmentinWCA
OUTCOME INDICATOR i) OnetrainingforM&Epersonnelonbestinternationaldatamanagementpractices
conductedii) Onetrainingforfinancialmanagementpersonneloncomputerizedandbest
internationalfinancialmanagementsystemsheld
SOURCE OF VERIFICATIONMinutesofmeetingsReportsoftrainings
IMPLEMENTATION MILESTONES
Preparation of trainings
Selection of participants
Conduct of trainings
PROCUREMENT NA
RESPONSIBILITY FOR IMPLEMENTATION
CL, DCL
DURATION: 1 month Commencement: 1st March, 2016
Completion: 31st March, 2016
PRIMARY CONSTITUENTS: CL, DCL PARTICIPANTS: ACE team, Partner institutions and other stakeholders
ASSUMPTIONS NA
FINANCIAL IMPLICATIONS ACE budget for the activity
Budget Line Analysis 1stQtr 2ndQtr 3rdQtr 4thQtr 5thQtr 6thQtr Total
1 Preparation of trainings
1,000 1,000
2 Selection of participants
500 500
3 Conduct of trainings 48,500 48,500
4
5
TOTALS 50,000 50,000
ACE TEMPLATE
Implementation Plan
65
Action Plan: 4 StrengthenededucationandresearchgovernanceandadministrativecapacityofACE Timeframe: The whole of year 2 (January, 2016 to December, 2016) Activity 4.2: HoldregularmeetingsofACEteams,TechnicalCommittee,andAdvisoryBoard
RESULT4.2 CompetentACEprojectmanagementteamconstitutedandoperationalizedadoptinginternationalbestpractices
ACTIVITY4.2 HoldregularmeetingsofACEteams,TechnicalcommitteeandAdvisoryBoard
Outcome4 Strengthened education and research governance and administrative capacity of ACE to providecoordinatingrolefordrylandagriculturaldevelopmentinWCA
OUTCOME INDICATOR i) 6MeetingsofACESteeringCommitteeheldii) 2meetingsofCDABoardheld
SOURCE OF VERIFICATIONMinutesofmeetings
IMPLEMENTATION MILESTONES
Formulation of agenda
Circulation of invitation Conduct of meeting
PROCUREMENT NA
RESPONSIBILITY FOR IMPLEMENTATION
CL
DURATION: 12 months Commencement:1st January,2016
Completion:31st December,2016
PRIMARY CONSTITUENTS: CL, DCL, PARTICIPANTS: ACE team and Partners
ASSUMPTIONS BUK Management sustain support for ACE
FINANCIAL IMPLICATIONS ACE budget for the activity
Budget Line Analysis 1stQtr 2ndQtr 3rdQtr 4thQtr 5thQtr 6thQtr Total
1 Conduct of meeting (travels for local and international participants, accommodation, etc)
6,250 6,250 6,250 6,250 25,000
2
3
4
5
TOTALS 6,250 6,250 6,250 6,250 25,000
ACE TEMPLATE
Implementation Plan
66
Action Plan: 4 StrengthenededucationandresearchgovernanceandadministrativecapacityofACE Timeframe: Quarter 4 of year 2 (October, 2016 to December, 2016) Activity 4.3: Preparationofendoftheyearprocurement,financialandexternalauditreport.
RESULT4.2 CompetentACEprojectmanagementteamconstitutedandoperationalizedadoptinginternationalbestpractices
ACTIVITY4.3 Preparationofendoftheyearprocurement,financialandexternalauditreport.
Outcome4 Strengthened research and education governance and administrative capacity of ACE to providecoordinatingrolefordrylandagriculturaldevelopmentinWCA
OUTCOME INDICATOR Onefinancial and external AuditreportpreparedOneProcurementreportprepared
SOURCE OF VERIFICATION financial and external AuditReportProcurementreport
IMPLEMENTATION MILESTONES
Preparation of procurement, financial and external audit reports
PROCUREMENT NA
RESPONSIBILITY FOR IMPLEMENTATION
CL, DCL
DURATION: 3 months Commencement: 1st October,2016
Completion: 31st December,2016
PRIMARY CONSTITUENTS: CL, DCL, PARTICIPANTS: External Auditor
ASSUMPTIONS BUK Management sustain support for ACE
FINANCIAL IMPLICATIONS ACE budget for the activity
Budget Line Analysis 1stQtr 2ndQtr 3rdQtr 4thQtr 5thQtr 6thQtr Total
1 Preparation of procurement, financial reports, including conduct of external audit
15,000 15,000
2
3
4
5
TOTALS 15,000 15,000
ACE TEMPLATE
Implementation Plan
67
Action Plan: 4 StrengthenededucationandresearchgovernanceandadministrativecapacityofACE Timeframe: Quarter 2 and 4 of year (May, 2016 and October, 2016) Activity 4.4: Organizeandfacilitateregularpartnermeetingsandworkshops
RESULT4.3 Relevanteducational,researchanddevelopmentbodiesintheWCAregioninvolvedintheactivitiesofthecentre
ACTIVITY4.4 Organizeandfacilitateregularpartnermeetingsandworkshops
Outcome4 Strengthened research and education governance and administrative capacity of ACE to providecoordinatingrolefordrylandagriculturaldevelopmentinWCA
OUTCOME INDICATOR i) Modalitiesforpartnersmeetingdevelopedii) oneconsultativemeetingofpartnerswith30membersattendingheldiii) 2jointworkshopswithpartnersheld
SOURCE OF VERIFICATION Minutesofmeetings
IMPLEMENTATION MILESTONES
Preparation of meetings and agenda
Circulation of notice Conduct of meetings
PROCUREMENT NA
RESPONSIBILITY FOR IMPLEMENTATION
CL
DURATION: 9 months Commencement:1st May,2016
Completion: 31st October,2016
PRIMARY CONSTITUENTS: CL PARTICIPANTS: ACE team, Partner institutions and other stakeholders
ASSUMPTIONS Partner Institutions sustain interest in activities of ACE
FINANCIAL IMPLICATIONS ACE budget for the activity
Budget Line Analysis 1stQtr 2ndQtr 3rdQtr 4thQtr 5thQtr 6thQtr Total
1 Preparation of meetings and agenda
1,500 1,500 3,000
2 Circulation of notice
1,500 1,500 3,000
3 Conduct of meetings 17,000 17,000 34,000
4
5
TOTALS 20,000 20,000 40,000
ACE TEMPLATE
Implementation Plan
68
Action Plan: 4 StrengthenededucationandresearchgovernanceandadministrativecapacityofACE Timeframe: The whole of year 2 (January, 2016 to December, 2016) Activity 4.5: Generaladministrationandcoordination.
RESULT4.4 Strengtheninternalworking,reportingandaccountabilitysystems
ACTIVITY4.5 Generaladministration andcoordination.
Outcome4 Strengthened research and education governance and administrative capacity of ACE to providecoordinatingrolefordrylandagriculturaldevelopmentinWCA
OUTCOME INDICATOR RequisitestationeryandofficeconsumablesutilizedforeffectiveProjectimplementation
SOURCE OF VERIFICATIONOfficeinventoryofconsumables
IMPLEMENTATION MILESTONES
Procurement of computers, printers, requisitestationeryandofficeconsumables
PROCUREMENT Goods
RESPONSIBILITY FOR IMPLEMENTATION
CL, Admin Officer
DURATION: 12 months Commencement:1st January,2016
Completion: 31st December,2016
PRIMARY CONSTITUENTS: CL, Admin Officer PARTICIPANTS
ASSUMPTIONS
FINANCIAL IMPLICATIONS ACE budget for the activity
Budget Line Analysis 1stQtr 2ndQtr 3rdQtr 4thQtr 5thQtr 6thQtr Total
1 Procurement of computers, printers, requisitestationery,officeconsumables,paymentforutilities,electricity,communicationexpenses,localtravels,etc
50,000 40,000 30,000 30,000 150,000
2
3
4
5
TOTALS 50,000 40,000 30,000 30,000 150,000
ACE TEMPLATE
Implementation Plan
69
Annexe1:ProcurementPlan
Annexe2:PotentialBenefitsofACEtoInternalandExternalStakeholders
Annexe3