aeronautics explorer post 630 2011 lets get started!!! theory design/ implement test/confirm

18
AERONAUTICS EXPLORER POST 630 2011

Upload: wesley-tyler

Post on 24-Dec-2015

221 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: AERONAUTICS EXPLORER POST 630 2011 LETS GET STARTED!!!  THEORY  DESIGN/ IMPLEMENT  TEST/CONFIRM

AERONAUTICS EXPLORER POST 630

2011

Page 2: AERONAUTICS EXPLORER POST 630 2011 LETS GET STARTED!!!  THEORY  DESIGN/ IMPLEMENT  TEST/CONFIRM

LETS GET STARTED!!!

THEORY

DESIGN/

IMPLEMENT

TEST/CONFIRM

Page 3: AERONAUTICS EXPLORER POST 630 2011 LETS GET STARTED!!!  THEORY  DESIGN/ IMPLEMENT  TEST/CONFIRM

TEAM WORK!!!!

Each person was put into individual groups

to work on different components of the rocket

The groups were

Vehicles

Payload

Glider

Page 4: AERONAUTICS EXPLORER POST 630 2011 LETS GET STARTED!!!  THEORY  DESIGN/ IMPLEMENT  TEST/CONFIRM

FUN ON THE RUN

Page 5: AERONAUTICS EXPLORER POST 630 2011 LETS GET STARTED!!!  THEORY  DESIGN/ IMPLEMENT  TEST/CONFIRM

EGG DROP!!!

DESIGNED, BUILT, AND TESTED EGG DROP

SAFETY DEVICES

Page 6: AERONAUTICS EXPLORER POST 630 2011 LETS GET STARTED!!!  THEORY  DESIGN/ IMPLEMENT  TEST/CONFIRM

ASTRONAUT

Mike

Foreman

Page 7: AERONAUTICS EXPLORER POST 630 2011 LETS GET STARTED!!!  THEORY  DESIGN/ IMPLEMENT  TEST/CONFIRM

WIND TUNNEL VISIT

Page 8: AERONAUTICS EXPLORER POST 630 2011 LETS GET STARTED!!!  THEORY  DESIGN/ IMPLEMENT  TEST/CONFIRM

THE HANGER VISIT

Page 9: AERONAUTICS EXPLORER POST 630 2011 LETS GET STARTED!!!  THEORY  DESIGN/ IMPLEMENT  TEST/CONFIRM

MODEL ROCKET PROJECT

Page 10: AERONAUTICS EXPLORER POST 630 2011 LETS GET STARTED!!!  THEORY  DESIGN/ IMPLEMENT  TEST/CONFIRM

IT’S ELECTRIC!!!

Electronics package• Battery• Radio Transmitter• GPS Locater• Camera• Pitot tubes• Thermo Coupling

Temperature Gauge

Page 11: AERONAUTICS EXPLORER POST 630 2011 LETS GET STARTED!!!  THEORY  DESIGN/ IMPLEMENT  TEST/CONFIRM

TAKE FLIGHT!

Glider

Total Surface

Area: 23.65623

square inches

Page 12: AERONAUTICS EXPLORER POST 630 2011 LETS GET STARTED!!!  THEORY  DESIGN/ IMPLEMENT  TEST/CONFIRM

DESIGN & ANALYZE & BUILD

Page 13: AERONAUTICS EXPLORER POST 630 2011 LETS GET STARTED!!!  THEORY  DESIGN/ IMPLEMENT  TEST/CONFIRM

ENGINE REQUIRED

Engine Size: F20-4W (EXX-

7)

Mass: 140 grams

Impulse: 60.45 N(s)

Page 14: AERONAUTICS EXPLORER POST 630 2011 LETS GET STARTED!!!  THEORY  DESIGN/ IMPLEMENT  TEST/CONFIRM

DETAILED MASS INFO.

Nose Cone: 81 grams

Payload: 264.4 grams

Booster: 140 grams

Page 15: AERONAUTICS EXPLORER POST 630 2011 LETS GET STARTED!!!  THEORY  DESIGN/ IMPLEMENT  TEST/CONFIRM

PERFORMANCE PREDICTIONS

The velocity of the rocket will be

76.68 m/s

The impulse will be 44.47 N(s)

The goal is to get the rocket 300

meters in the air

Page 16: AERONAUTICS EXPLORER POST 630 2011 LETS GET STARTED!!!  THEORY  DESIGN/ IMPLEMENT  TEST/CONFIRM

ALL SYSTEMS GO!

Page 17: AERONAUTICS EXPLORER POST 630 2011 LETS GET STARTED!!!  THEORY  DESIGN/ IMPLEMENT  TEST/CONFIRM

CONCLUSION

In conclusion this program has taught the

post members to work as a team.

It was quite an experience to be able to

learn about the mechanics that go into

designing and building a rocket and the

aeronautical concepts that goes into it.

Page 18: AERONAUTICS EXPLORER POST 630 2011 LETS GET STARTED!!!  THEORY  DESIGN/ IMPLEMENT  TEST/CONFIRM

THANK YOU!!!

Special thanks to:• Jinho Lee• Justin Gray• Jen klettlinger• Tom Benson• Mike Foreman• Giovanna E. Mignosa