Risk Management at AECOM ECRI Meeting - Amsterdam - November 2016 GOLDEN 1 CENTER United States Anticipated to be completed later this year, Golden 1 Center will be the world’s most comfortable, connected and sustainable sports venue.

Upload: others

Post on 27-Jul-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: AECOM Risk Management Overviewecrisponsor.org/presentations/Ams 1-4.pdf · Project images (from top left): Rio Olympic & Paralympic Games, Brazil; Istanbul New Airport, ... – Marketplace

Risk Management at AECOMECRI Meeting - Amsterdam - November 2016

GOLDEN 1 CENTER

United States

Anticipated to be completed later this year, Golden 1 Center

will be the world’s most comfortable, connected and

sustainable sports venue.

Page 2: AECOM Risk Management Overviewecrisponsor.org/presentations/Ams 1-4.pdf · Project images (from top left): Rio Olympic & Paralympic Games, Brazil; Istanbul New Airport, ... – Marketplace

the Design. Build. Finance. Operate Vision.

Project images (from top left): Rio Olympic & Paralympic Games, Brazil; Istanbul New Airport, Turkey; Olmsted Dam, PA, U.S.; Unmanned Aerial Systems Operation Center Support; Halley VI, Antarctica; Barclays Center, NY, U.S.; Taizhou Bridge, China; Spaceport America, NM, U.S.

7 continents

92k employees

150+ countries

#156 Fortune 500

$18b revenue (2016)

$38b backlog

$5b market cap

NYSE:ACM ticker

• Leading fully integrated infrastructure services firm

• Consistently ranked #1 in key categories, including U.S. and global design

• Executing the world’s most complex and iconic projects

Page 3: AECOM Risk Management Overviewecrisponsor.org/presentations/Ams 1-4.pdf · Project images (from top left): Rio Olympic & Paralympic Games, Brazil; Istanbul New Airport, ... – Marketplace

Vision: Leading Fully Integrated Infrastructure Services Firm

DBFO Delivers Differentiated Value For Our Clients

AECOM Integrated Delivery Design / Build Public-Private

Partnerships

• Our unique DBFO capabilities, enable us to offer clients a wide range of integrated services across our segments

• Providing lower total costs and quicker time to market

• Filling sizable public sector infrastructure funding gap

• AECOM plays multiple roles in P3 opportunities incl. adviser (Sell Side or Buy Side), designer, builder or sponsor

• AECOM Capital provides additional avenues to participate in significant market trend

• Significant trend towards design-build in transportation and water markets

Infrastructure investment needed through 2025

Increase in alternative delivery transportation projects in industry since 2002

(Over 1,000 projects in industry as of 2016)

Increase in design-build water and wastewater projects in industry

(More than half of projects in industry were design-build in 2015 versus less than a third in 2009)

Faster delivery speed compared with traditional methods

Page 2

Page 4: AECOM Risk Management Overviewecrisponsor.org/presentations/Ams 1-4.pdf · Project images (from top left): Rio Olympic & Paralympic Games, Brazil; Istanbul New Airport, ... – Marketplace

Leveraging Our Global Scale and ServicesThink Global, Act Local

Page 3

Our unique size, scale and diversity enables significant intellectual capital sharing, creating added client value:

• Human capital from 92,000 employees delivers a global network with local expertise

• Unique scale with operations in over 150 countries on 7 continents lowers project delivery costs

• Cross-functional collaboration enables increased revenue opportunities with clients while lowering project sourcing costs

• Advanced technology such as BIM, drones, robotics, 3D printing and mixed reality increases safety and efficiency

92K+ employees

150+ Countries

7 Continents

AECOM

Page 5: AECOM Risk Management Overviewecrisponsor.org/presentations/Ams 1-4.pdf · Project images (from top left): Rio Olympic & Paralympic Games, Brazil; Istanbul New Airport, ... – Marketplace

Global Risk Management SystemsNovember 2016

GOLDEN 1 CENTER

United States

Anticipated to be completed later this year, Golden 1 Center

will be the world’s most comfortable, connected and

sustainable sports venue.

Page 6: AECOM Risk Management Overviewecrisponsor.org/presentations/Ams 1-4.pdf · Project images (from top left): Rio Olympic & Paralympic Games, Brazil; Istanbul New Airport, ... – Marketplace

Office of Risk ManagementGlobal Presence - Independence from Operations – A sit at the table

Page 5

Carla ChristoffersonAECOM General Counsel

Regis DamourAECOM Chief Risk Officer

Chris MosesDirector C-0 Project

Reviews

Bill QuartermanEMIA

Mike BurnsDirector Global Risk

Programs

John KouchoukosDCS Americas

Richard BarrettAPAC

John CookeMS

Amy WinckoCS

ERM@AECOM

Page 7: AECOM Risk Management Overviewecrisponsor.org/presentations/Ams 1-4.pdf · Project images (from top left): Rio Olympic & Paralympic Games, Brazil; Istanbul New Airport, ... – Marketplace

Global Risk Management Systems

Page 6

Enterprise Risk Management (ERM)

• Protects shareholder value by active monitoring of our Inherent and Strategic risk profile

• Measuring Exposure, Readiness and Performance driving continuous improvement

Approval Matrices• Sets decision making responsibilities to the appropriate levels: DCS, CS, MS and ACAP

• Considering Project matters; Safety & Security, Scope & Terms, Contract Type & Size, and

• Non Project matters; Acquisition, Legal & Compliance, Finance, HR and Insurance

Approval Processes• Enterprise Risk Committee, Group Committees and the Hub, comprised of senior leaders, reviewing and approving key pursuits and non

project matters with DoA triggers

• Defining Project Review Categories (C3 to C0) for each project based on the level of risk to AECOM

Office of Risk Management (ORM)

• An integrated group of Corporate and Operational Risk professionals, working closely with Legal and Insurance colleagues

• Driving early engagement with relevant resources, for key pursuits, to allow planning/pricing of adequate mitigation (prevention, avoidance, transfer) and early feedback to clients

• Active participation in claim resolution before these escalate to legal dispute

• Extracting and disseminating lessons learned including through Ecosystem tools and PM training

Integrated Management System

(IMS)

• Capturing, disseminating and perfecting: Policies, Procedures and Instructions (PPIs) in line with our DBFO Vision

• Provides a structured forum for cross functional policy implementation

Project Reviews• Projects are rated for risk level (C3 to C0) and reviewed accordingly and at the appropriate level

• Corporate oversight on C0 Projects with the highest financial, legal and/or technical risk (<50 projects)

• Allow reporting and early detection for quarterly Business Group Reviews

ERM@AECOM

Page 8: AECOM Risk Management Overviewecrisponsor.org/presentations/Ams 1-4.pdf · Project images (from top left): Rio Olympic & Paralympic Games, Brazil; Istanbul New Airport, ... – Marketplace

Office of Risk Management (ORM)Mission

Page 7

• ORM Roles in Supporting Global Operations

– An Integrated group of Corporate and Operational Risk professionals, working closely with Legal and Insurance colleagues

– Driving early engagement with relevant resources, for key pursuits, to allow planning/pricing of adequate mitigation (prevention, avoidance, transfer) and early feedback to clients

– Active participation in claim resolution before these escalate to legal dispute

– Extracting and disseminating lessons learned including through AECOM in-house tools (intranet, chatter, etc.) and PM training

ERM@AECOM

Page 9: AECOM Risk Management Overviewecrisponsor.org/presentations/Ams 1-4.pdf · Project images (from top left): Rio Olympic & Paralympic Games, Brazil; Istanbul New Airport, ... – Marketplace

Integrated Management System (IMS)Comprehensive Program

Page 8

Department Policy

• Overarching Requirements

• Not How To

Procedures and

Guidance

• Business Group Customization

• Geographic Customization

Disseminate• Linked from IMS

Repository

ERM@AECOM

• Email or posting on Intranet

• link to “What’s New” changing

Communicate

Disseminate Policies Procedures and InstructionsMaturing Business Requirements

Page 10: AECOM Risk Management Overviewecrisponsor.org/presentations/Ams 1-4.pdf · Project images (from top left): Rio Olympic & Paralympic Games, Brazil; Istanbul New Airport, ... – Marketplace

Enterprise Risk Management (ERM)

LOS ANGELES INTERNATIONAL AIRPORT (LAX)

United States

“Gateway to the World” boasting the most point of origin / point

of destination travelers in the world with 66+ million passengers

travelling in and out of LAX annually.

Page 11: AECOM Risk Management Overviewecrisponsor.org/presentations/Ams 1-4.pdf · Project images (from top left): Rio Olympic & Paralympic Games, Brazil; Istanbul New Airport, ... – Marketplace

Enterprise Risk Management (ERM)Mission

Page 10

• Enterprise Risk Management (ERM) provides an established continuous improvement platform to periodically assess AECOM's top risks , develop cross-functional mitigations, monitor these risks in a consistent manner and report quarterly to management and BoD

• Our mission is to protect shareholder value through this active management of AECOM's top risks:

– Conserving, retaining and increasing cash flow with investments aligned to our risk appetite; and

– Setting expectations, minimizing surprises to continuously improve investor confidence

• ERM risk portfolio and mitigation strategies accounts for both:

– AECOM's strategic goals as the premier fully-integrated infrastructure firm offering a progressive range of services in 150 countries and all our end markets, and

– Marketplace demands and trends

ERM@AECOM

Page 12: AECOM Risk Management Overviewecrisponsor.org/presentations/Ams 1-4.pdf · Project images (from top left): Rio Olympic & Paralympic Games, Brazil; Istanbul New Airport, ... – Marketplace

Enterprise Risk Management (ERM)Roadmap

Page 11

FY’10 Initiate ERM

FY’11 – 12 Initial Assessment, Analysis and Mitigation

FY’13Implement Monitoring and Controls

FY’14Reassess, Analyze and Plan Mitigation

FY’15 – 16 Validate Risk Profile thru URS Integration

Structured Board of Directors Reporting

FY’17 - 19

Embedding Inherent Risk Systems

Maturing Strategic Capabilities

Continuously Monitor Emerging Risks

ERM@AECOM

Page 13: AECOM Risk Management Overviewecrisponsor.org/presentations/Ams 1-4.pdf · Project images (from top left): Rio Olympic & Paralympic Games, Brazil; Istanbul New Airport, ... – Marketplace

Enterprise Risk Management (ERM)Program launched in 2010

Page 12

Identify, Analyze

and Mitigate

• Key Risks (impact, probability, speed of onset)

• Opportunities

Monitor and

Control

• Emerging Risks

• Top 10 Risks

• Enterprise Enablers

Report Key Risk

Indicators

• Exposure

• Readiness

• Performance

Progress Mitigation

• Delivery Excellence

• eCMO

• IMS

Key Risk Indicators Top Risk Dashboard BoD Oversights

ERM@AECOM

Page 14: AECOM Risk Management Overviewecrisponsor.org/presentations/Ams 1-4.pdf · Project images (from top left): Rio Olympic & Paralympic Games, Brazil; Istanbul New Airport, ... – Marketplace

Enterprise Risk Management (ERM)Risks and Enablers

Page 13ERM@AECOM

Top 10 RisksRisk Owners and Managers

Actively Managing and Reporting

• Inherent Risks:

– Safety

– Ethics & Compliance

– Global Resilience

– Errors & Omissions / Quality

– Talent

– Information Security

– U.S. Government Compliance

• Strategic Risks:

– Political (Sovereign & Contractual)

– Mega (Cross-Border) and Integrated Projects

– At Risk (Build) Delivery

EnablersOrganizational enhancements, Tools & Systems,

Processes

• Organization:

– Delivery Excellence

– Operational Excellence & Global Design Solutions

– Assurance: Audit Service Group

• Tools & Systems:

– Ecosystem / ePM

– Integrated Management System (IMS)

• Processes & Guidance:

– DoA Continuous Improvement

– Healthy Start

– AECOM University

– PM Training

– Guidance; Integrated Delivery, MSAs, JVs, etc.

Page 15: AECOM Risk Management Overviewecrisponsor.org/presentations/Ams 1-4.pdf · Project images (from top left): Rio Olympic & Paralympic Games, Brazil; Istanbul New Airport, ... – Marketplace

Inherent RisksSafety

Page 14ERM@AECOM

Achieving World Class Safety Results

Page 16: AECOM Risk Management Overviewecrisponsor.org/presentations/Ams 1-4.pdf · Project images (from top left): Rio Olympic & Paralympic Games, Brazil; Istanbul New Airport, ... – Marketplace

Inherent RisksGlobal Resilience

Page 15ERM@AECOM

Economic Power Shift

Enabling Technology

Demographic Disparity

Increased Urbanization

Climatic ShiftsResource

Stress

Developing countries will account for an estimated

of global GDP by 2030

Increase in global internet users from 2000 to 2012

Of the world’s population will live in cities by 2030 (Up from 50% in

2013)

Of world’s unemployed are

15-24 years of age

By 2050, costs of extreme weather could reach up to

of world GDP per annum (USD 720b)

Estimate global gap between water supply and

demand by 2030

Global Instability

Navigating Global Instability

Page 17: AECOM Risk Management Overviewecrisponsor.org/presentations/Ams 1-4.pdf · Project images (from top left): Rio Olympic & Paralympic Games, Brazil; Istanbul New Airport, ... – Marketplace

Inherent RisksTalent

Page 16ERM@AECOM

for TODAY and TOMORROW

Page 18: AECOM Risk Management Overviewecrisponsor.org/presentations/Ams 1-4.pdf · Project images (from top left): Rio Olympic & Paralympic Games, Brazil; Istanbul New Airport, ... – Marketplace

Inherent RisksCompliance

Page 17ERM@AECOM

Ethics + Compliance US Government Compliance

Page 19: AECOM Risk Management Overviewecrisponsor.org/presentations/Ams 1-4.pdf · Project images (from top left): Rio Olympic & Paralympic Games, Brazil; Istanbul New Airport, ... – Marketplace

Inherent RisksInformation Security

Page 18ERM@AECOM

Cyber Security Transformation

Page 20: AECOM Risk Management Overviewecrisponsor.org/presentations/Ams 1-4.pdf · Project images (from top left): Rio Olympic & Paralympic Games, Brazil; Istanbul New Airport, ... – Marketplace

Inherent RisksErrors & Omissions / Quality

Page 19ERM@AECOM

Internal Capabilities reducing Insurance Demands

Page 21: AECOM Risk Management Overviewecrisponsor.org/presentations/Ams 1-4.pdf · Project images (from top left): Rio Olympic & Paralympic Games, Brazil; Istanbul New Airport, ... – Marketplace

Strategic RisksStrengthening the Foundation Aligned to Our Vision

Page 20ERM@AECOM

Political Risk (Sovereign & Contractual)Facilitating Capture and Profitability in Higher Risk Countries

Build Delivery – Fixed Price EPCPursuing Preferred Scenarios to Achieve a Healthy Balance of Risk and Reward

Mega Projects and Integrated Delivery (cross border & cross groups)DBFO Delivering Differentiated Value For Our Clients

• Leading fully integrated infrastructure services firm

• Consistently ranked #1 in key categories, including U.S. and global design

• Executing the world’s most complex and iconic projects

Page 22: AECOM Risk Management Overviewecrisponsor.org/presentations/Ams 1-4.pdf · Project images (from top left): Rio Olympic & Paralympic Games, Brazil; Istanbul New Airport, ... – Marketplace

Thank YouMichael Burns, P.E. PgMP

[email protected] Global Risk Programs

BARCLAYS CENTER

United States

The 670,000-square-foot multi-purpose center with

18,000 seats, and105 suites set a new standard in arena

design and construction.

Regis [email protected] Risk Officer