CONTRIBUTORS
March 1, 2021
Advancing Student Learning Opportunities
Duneland School Corporation
Click the icon to the left on each slide for further information
Inspire
Engage
Empower
March 1, 2021
DISTRICT-WIDE REVIEW
Overview of Educational Needs & Objectives
2
Inspire
Engage
Empower
March 1, 2021
DISTRICT-WIDE REVIEW
v 2018 - District-wide Demographic/Enrollment Study v 2019 - District-wide Facility Assessment
w Safety and Security Updatesw Building Heating Systems; Boilers & relatedw Building Cooling Systems; Chillers & relatedw Temperature Controls modernizationw Plumbing Systems for domestic waterw Piping for HVAC systems – some buildingsw Electrical Service & power distributionw Electrical outlets to support Technologyw Fire Alarm Systems throughout District
Facility Asset & Preventative Maintenance Priorities
3
GOAL: Provide the school district modern, efficient, and lower [cost] maintenance building systems for Learning Environment comfort while reducing district operating costs.
Inspire
Engage
Empower
March 1, 2021
DISTRICT-WIDE REVIEW
v2020 – FallwConstruction Management - Skillman
v2021 – WinterwArchitect - GibraltarwFinancial Advisor – Baker TillywBond Counsel – ICE MillerwUnderwriter – Raymond JameswLegal Counsel – Harris, Welsh & Lukmann
PROFESSIONAL SUPPORT
4
Inspire
Engage
Empower
March 1, 2021
DISTRICT-WIDE REVIEW
v Continue the mission of providing safe and secure Learning Environments for the DSC students
v Elementary Learning Environments equal across the District appropriate to DSC standards
v Middle Learner opportunities aligned with DSC educational programming & learning objectives
v Provide CHS students expanded and extended opportunities in Performing Arts, Robotics, Personal Fitness, and Athletics
v Maximize learning opportunities for all K-12 children within DSCv Preserve, update, and protect facility assets with prudent financial stewardship
for the long-term investment of DSC
Overview of Educational Needs & Objectives
5
Inspire
Engage
Empower
March 1, 2021
PRIMARY OBJECTIVES OF ANY DUNELAND FACILITY
FUNCTIONMaximizing formal, collaborative, and spontaneous learning opportunities throughout the schools.
VALUEBalance ease of maintenance, sustainability, durability, and quality within required educational needs to maximize the potential of the budgeted resources.
EFFICIENCYCost Savings for DSC will be attained by achieving operational cost objectives, such as Energy Star for heating & cooling, and related operational cost savings through practical solutions.
AESTHETICSA pleasing appearance will be an integral part of the design concept and not derived from spending big dollars on contrived design enhancements.
SCHOOL FOR THE FUTUREThe final result will be a flexible and AGILE facility that can be easily modified or rearranged to respond to best practices while anticipating new teaching techniques and accommodating any potential future growth.
6
Inspire
Engage
Empower
March 1, 2021
DISTRICT-WIDE REVIEW
v Individualized Instructional Spacesv Student Cubbiesv Extended Learning
w Small Group Instruction (SGI) w FLEX Classrooms
v Media Center as “Hub of Learning”v Maker Spacev Student Support
w Counselor’s Officew Social Emotional Learning (SEL) Officew Calming Room
v Restroom wash stations in corridors
Elementary Level Priorities
7
Inspire
Engage
Empower
March 1, 2021
DISTRICT-WIDE REVIEW
v Increase opportunities and reduce school transitions for the Intermediate and Middle Learners
v Improve functionality of school buildings
Intermediate & Middle Learner Priorities
8
GOAL: To provide the students of Duneland Schools maximum learning, opportunity, and achievement with quality school facilities.
v New [Complete] Drive Loop to Improve Safety & Securityw Parking solutions for buses, students, staff and community
v Provide new and expanded opportunities for:w Performing Arts, Robotics, Physical Education, Project-based learning, Athletics and Extra-
Curricular
High School Priorities
Inspire
Engage
Empower
March 1, 2021
PROPOSED SOLUTIONS TO MEET NEEDS
vReduce from 9 school buildings to 8 school buildingswCMS will be vacated and the site repurposed
vInterior Renovations at Four Elementary SchoolswBailly, Brummitt, Jackson, Liberty
vNew Yost School
vLiberty & Westchester Intermediate RenovationswBuilding expansion to include Grades 5 - 8
vChesterton High School Specialty Updates to Meet Emerging Needs and Related Campus Work All Projects to Include Safety, Security, Preventative Maintenance & Related Technology Priorities
9
Inspire
Engage
Empower
March 1, 2021
SUMMARY OF ELEMENTARY IMPROVEMENTS
Floor Plan Concept Diagram
10
Considerationsv Address Classroom PODs &
Accessibility
v Create Extended Learning Areas
v Student Needs; ie. Coat Cubbies, Individualized Instruction spaces
v Media Center as Learning Hub
v Maker Space
v Change Restrooms for Corridor Access; sinks on corridor side
v Appropriate Interior Renovation
Liberty
Jackson
Brummitt
Inspire
Engage
Empower
March 1, 2021
SUMMARY OF ELEMENTARY IMPROVEMENTS
Floor Plan Concept Diagram
11
Considerationsv Maker Space
v Media Center as Learning Hub
v Flex Classroom as Extended Learning Area
v Change Restrooms for Corridor Access; sinks on corridor side
v Appropriate Interior Renovation; Bailly
Bailly
New Newton Yost
Inspire
Engage
Empower
March 1, 2021
WESTCHESTER GRADE 5-8 SCHOOL
Floor Plan ConceptvNew Additions to expand
Grade Level “Houses”v5th & 6th Grade Entry with
Main OfficevNew 7th & 8th Grade
School “Main” Office [south side]
vExpand CafeteriavPerforming Arts expansion
and updatesvMedia Center featurevSTEM/RoboticsvBuilding Systems updates
[HVAC, Electrical, Other]v Interior updates
12
Considerations
Inspire
Engage
Empower
March 1, 2021
LIBERTY GRADE 5-8 SCHOOL
Floor Plan ConceptvNew Addition to expand
Grade Level “Houses”v5th & 6th Grade Entry with
Main OfficevNew 7th & 8th Grade
School “Main” Office [south side]
vExpand CafeteriavPerforming Arts updatesvMedia Center with
STEM/RoboticsvNew Auxiliary GymvBuilding Systems updates
[HVAC, Electrical, Other]v Interior updates
Considerations
13
Inspire
Engage
Empower
March 1, 2021
CHESTERTON HIGH SCHOOL IMPROVEMENTS
Building & Site Diagram
A. Performing Arts ImprovementsB. Add Project-Based Labs &
Competitive Robotics Area C. Life Fitness [Performance Lab]D. Fieldhouse Expansion
[Gymnastics]E. Main Gym Mezzanine Upper
Level Access and Bleacher Update
Considerations
14
B
B
A
ED
C1) Safety & Security Drive and
Parking Enhancements2) Improvements to soccer,
football, baseball, softball, tennis and marching band practice and competition venues
Site
1
Building
2
2
12
Inspire
Engage
Empower
March 1, 2021
2021 BUDGET - $71 Million
15
$32.9 Million $22 Million $7.7 Million $8.4 Million46% 31% 11% 12%
Inspire
Engage
Empower
March 1, 2021
DISTRICT-WIDE REVIEW
DEBT SERVICE
16
Inspire
Engage
Empower
March 1, 2021
FINANCING
17
Inspire
Engage
Empower
March 1, 2021
FINANCING
18
Inspire
Engage
Empower
March 1, 2021
Duneland School Tax Rate 2008-2021 Actual – 2022-2027 Estimated
19
Inspire
Engage
Empower
March 1, 2021
Comparable Lake & Porter County School Tax Rates
20
Inspire
Engage
Empower
March 1, 2021
NEXT STEPS
March 1 Board authorization to publish notice of Public/Project Hearings in April
April 5 1st Preliminary Determination HearingApril 12 Project Hearing & 2nd Preliminary
Determination HearingJune 7 Board authorization for architects and
construction managers to proceedAug.– Dec. Input from staff and stakeholder groups Winter 2022 Construction Begins2023-24 Projects Completed
Timeline
Inspire
Engage
Empower
March 1, 2021
THANK YOU for supporting YOURDuneland School Corporation