Advanced-RNP
Jack of all Trades
Master of None
1 of 13 IFPD Workshop – Wellington, 20 Nov 2014 – Prepared & presented by P Haubourdin
![Page 2: Advanced-RNP - WordPress.com · · 2015-02-062015-02-06 · Background •Under development since 2001 in Europe •Successor to P-RNAV •First mention of A-RNP by ICAO in 3rd](https://reader031.vdocuments.us/reader031/viewer/2022022010/5b06b2f37f8b9a56408c00ba/html5/thumbnails/2.jpg)
Background
• Under development since 2001 in Europe
• Successor to P-RNAV
• First mention of A-RNP by ICAO in 3rd edition of PBN Manual (2008) – Advanced-RNP 1
2 of 13
• RNP = navigation performance
• A = functionality
Overview RF Turns
Departures En-route Arrivals
Approaches Charting
![Page 3: Advanced-RNP - WordPress.com · · 2015-02-062015-02-06 · Background •Under development since 2001 in Europe •Successor to P-RNAV •First mention of A-RNP by ICAO in 3rd](https://reader031.vdocuments.us/reader031/viewer/2022022010/5b06b2f37f8b9a56408c00ba/html5/thumbnails/3.jpg)
What is A-RNP
• Nav Spec for various phases of flight
– En-route, Terminal, Approach, Departure
• Advanced functionality for efficiency
3 of 13
RNP AR Light
Super RNP APCH – Scalable RNP
– BaroVNAV
– TOAC
– RF
– Holding
– FRT
– RF
– Holding
– FRT
![Page 4: Advanced-RNP - WordPress.com · · 2015-02-062015-02-06 · Background •Under development since 2001 in Europe •Successor to P-RNAV •First mention of A-RNP by ICAO in 3rd](https://reader031.vdocuments.us/reader031/viewer/2022022010/5b06b2f37f8b9a56408c00ba/html5/thumbnails/4.jpg)
General Limitations
• GNSS only
• Buffer area outside of primary area
4 of 13
![Page 5: Advanced-RNP - WordPress.com · · 2015-02-062015-02-06 · Background •Under development since 2001 in Europe •Successor to P-RNAV •First mention of A-RNP by ICAO in 3rd](https://reader031.vdocuments.us/reader031/viewer/2022022010/5b06b2f37f8b9a56408c00ba/html5/thumbnails/5.jpg)
RF Turns
• No RF from FAF to Final MA
• Minimum segment length and maximum turn angle in approach phase
• Minimum turn radius 2 x RNP
• Maximum nominal bank angle 25°
5 of 13
![Page 6: Advanced-RNP - WordPress.com · · 2015-02-062015-02-06 · Background •Under development since 2001 in Europe •Successor to P-RNAV •First mention of A-RNP by ICAO in 3rd](https://reader031.vdocuments.us/reader031/viewer/2022022010/5b06b2f37f8b9a56408c00ba/html5/thumbnails/6.jpg)
Departures
• Turns allowed: 2-358°
• Spiral splay for joining different semi-widths
• OIS height calculation: d based on arc length with smaller radius (r – 186m)
• Turns before achieving 90m MOC
Spec <15NM 15-30NM >30NM
RNP 1 2 2.5 3.5
RNP 0.3 0.95 1.45 2.45
6 of 13
![Page 7: Advanced-RNP - WordPress.com · · 2015-02-062015-02-06 · Background •Under development since 2001 in Europe •Successor to P-RNAV •First mention of A-RNP by ICAO in 3rd](https://reader031.vdocuments.us/reader031/viewer/2022022010/5b06b2f37f8b9a56408c00ba/html5/thumbnails/7.jpg)
En-route
• No change in design criteria
• Optional features?
7 of 13
Spec Oceanic En-route
RNP 2 5 5
RNP 1 N/A 3.5
![Page 8: Advanced-RNP - WordPress.com · · 2015-02-062015-02-06 · Background •Under development since 2001 in Europe •Successor to P-RNAV •First mention of A-RNP by ICAO in 3rd](https://reader031.vdocuments.us/reader031/viewer/2022022010/5b06b2f37f8b9a56408c00ba/html5/thumbnails/8.jpg)
Arrivals
• No change in design criteria
• Holding functionality
• Optional features?
8 of 13
Spec <30NM >30NM
RNP 1 2.5 3.5
RNP 0.3 1.45 2.45
![Page 9: Advanced-RNP - WordPress.com · · 2015-02-062015-02-06 · Background •Under development since 2001 in Europe •Successor to P-RNAV •First mention of A-RNP by ICAO in 3rd](https://reader031.vdocuments.us/reader031/viewer/2022022010/5b06b2f37f8b9a56408c00ba/html5/thumbnails/9.jpg)
Approaches - Initial
• Default RNP 1 = RNP APCH
• RNP 0.3 = 1.45NM ½AW
• Turns >90° using RF
9 of 13
![Page 10: Advanced-RNP - WordPress.com · · 2015-02-062015-02-06 · Background •Under development since 2001 in Europe •Successor to P-RNAV •First mention of A-RNP by ICAO in 3rd](https://reader031.vdocuments.us/reader031/viewer/2022022010/5b06b2f37f8b9a56408c00ba/html5/thumbnails/10.jpg)
A-RNP Approach - Intermediate
• Default RNP 1 = RNP APCH
• RNP 0.3 = 1.45NM ½AW
• Min segment 1.5NM, max 15NM
• Turns up to 30°/15° at FAF or use RF
• RF criteria when connecting to FAF: – Max 45° track angle change
– Min radius 2.55NM
– Min segment 2NM
10 of 13
![Page 11: Advanced-RNP - WordPress.com · · 2015-02-062015-02-06 · Background •Under development since 2001 in Europe •Successor to P-RNAV •First mention of A-RNP by ICAO in 3rd](https://reader031.vdocuments.us/reader031/viewer/2022022010/5b06b2f37f8b9a56408c00ba/html5/thumbnails/11.jpg)
A-RNP Approach – Final & MA
• Final Approach, Initial and Intermediate Missed approach = RNP APCH
• Final Missed Approach:
– RF turns (same d0 calculation as Departure)
– Optional features
11 of 13
![Page 12: Advanced-RNP - WordPress.com · · 2015-02-062015-02-06 · Background •Under development since 2001 in Europe •Successor to P-RNAV •First mention of A-RNP by ICAO in 3rd](https://reader031.vdocuments.us/reader031/viewer/2022022010/5b06b2f37f8b9a56408c00ba/html5/thumbnails/12.jpg)
Charting Issues
• 30 Nov 2022 RNAV(GNSS) & RNAV(RNP) -> RNP • PBN requirements box to include
– Nav specification – Nav requirements
• Chart designation to include suffix for: – LPV only – LNAV/VNAV only – LPV, LNAV/VNAV only –
LP only – AR
• Variable RNP accuracy requirements charted by notes