Advanced Reactors and New Reactors Topics Briefing Commission Meeting February 6, 2020 1

Upload: others

Post on 25-Apr-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Advanced Reactors and New Reactors Topics Briefing · 2020-02-04 · ARC Westinghouse TerraPower Columbia Basin Hydromine Framatome X-energy StarCore General Atomics Kairos Terrestrial

Advanced Reactors and New Reactors Topics

BriefingCommission Meeting

February 6, 2020

1

Page 2: Advanced Reactors and New Reactors Topics Briefing · 2020-02-04 · ARC Westinghouse TerraPower Columbia Basin Hydromine Framatome X-energy StarCore General Atomics Kairos Terrestrial

Opening Remarks

Margaret Doane

Executive Director for Operations

Page 3: Advanced Reactors and New Reactors Topics Briefing · 2020-02-04 · ARC Westinghouse TerraPower Columbia Basin Hydromine Framatome X-energy StarCore General Atomics Kairos Terrestrial

Vision and Direction for Regulatory Reviews of

New and Advanced Reactors

Robert Taylor

Deputy Office Director for New Reactors

Page 4: Advanced Reactors and New Reactors Topics Briefing · 2020-02-04 · ARC Westinghouse TerraPower Columbia Basin Hydromine Framatome X-energy StarCore General Atomics Kairos Terrestrial

UNIFIED NRR

RESEARCH AND TEST REACTORS

SUBSEQUENT LICENSE RENEWAL

OPERATING REACTORS

ADVANCED REACTORS

NEW REACTORS

MEDICAL ISOTOPES

We Make SAFE Use of Nuclear Technology POSSIBLE

4

Page 5: Advanced Reactors and New Reactors Topics Briefing · 2020-02-04 · ARC Westinghouse TerraPower Columbia Basin Hydromine Framatome X-energy StarCore General Atomics Kairos Terrestrial

SAFE, TIMELY, AND EFFECTIVE LICENSING & OVERSIGHT OF VOGTLE 3&4

Closing ITAAC

Overseeing Vogtle Construction

Resolving

License Amendment

Requests 5

Photos Courtesy of Southern Nuclear Operating Company

Page 6: Advanced Reactors and New Reactors Topics Briefing · 2020-02-04 · ARC Westinghouse TerraPower Columbia Basin Hydromine Framatome X-energy StarCore General Atomics Kairos Terrestrial

SUSTAINING SMALL MODULAR REACTOR (SMR) PROGRESS

Phase 2

Phase 3

Phase 4

Phase 5

Phase 6

Rulemaking

Phase 1

Design Certification

on Schedule

Standard Design

Approval

ON THE HORIZON

BWRX-300 SMR

Construction

Permit

Combined License

HITACHI

6

Page 7: Advanced Reactors and New Reactors Topics Briefing · 2020-02-04 · ARC Westinghouse TerraPower Columbia Basin Hydromine Framatome X-energy StarCore General Atomics Kairos Terrestrial

ADVANCED REACTORS STAKEHOLDERS

NEIMA NEICA

PUBLIC

7

Page 8: Advanced Reactors and New Reactors Topics Briefing · 2020-02-04 · ARC Westinghouse TerraPower Columbia Basin Hydromine Framatome X-energy StarCore General Atomics Kairos Terrestrial

Commitment

Execution

Execution

ENABLING the SAFE Use of

New NUCLEARTechnologies

COMMITMENT

PREPARATION EXECUTION

SUCCESS

8

Page 9: Advanced Reactors and New Reactors Topics Briefing · 2020-02-04 · ARC Westinghouse TerraPower Columbia Basin Hydromine Framatome X-energy StarCore General Atomics Kairos Terrestrial

Michael King, Director

Vogtle Project Office

Office of Nuclear Reactor Regulation

9

Photo Courtesy of Southern Nuclear Operating Company

Page 10: Advanced Reactors and New Reactors Topics Briefing · 2020-02-04 · ARC Westinghouse TerraPower Columbia Basin Hydromine Framatome X-energy StarCore General Atomics Kairos Terrestrial

Leveraging technology and innovation to ensure safe oversight of Vogtle project

10

ITAAC CLOSURE

Photos Courtesy of Southern Nuclear Operating Company

Page 11: Advanced Reactors and New Reactors Topics Briefing · 2020-02-04 · ARC Westinghouse TerraPower Columbia Basin Hydromine Framatome X-energy StarCore General Atomics Kairos Terrestrial

11

Page 12: Advanced Reactors and New Reactors Topics Briefing · 2020-02-04 · ARC Westinghouse TerraPower Columbia Basin Hydromine Framatome X-energy StarCore General Atomics Kairos Terrestrial

0

10

20

30

40

50

60

0

50

100

150

200

250

2013 2014 2015 2016 2017 2018 2019

Nu

mb

er o

f LA

Rs

Day

s

Fiscal Year

Modern Risk-Informed Licensing for Faster Decision-Making

12

Page 13: Advanced Reactors and New Reactors Topics Briefing · 2020-02-04 · ARC Westinghouse TerraPower Columbia Basin Hydromine Framatome X-energy StarCore General Atomics Kairos Terrestrial

13

0

10

20

30

40

50

60

70

JUN JULY AUG SEPT OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT

2019 2020 2021

All Vogtle UINs Are Accepted

Enabling Efficient ICN Reviews

UNIT 3 ICNs UNIT 4 ICNs UINs

Page 14: Advanced Reactors and New Reactors Topics Briefing · 2020-02-04 · ARC Westinghouse TerraPower Columbia Basin Hydromine Framatome X-energy StarCore General Atomics Kairos Terrestrial

14

Continuously Adapting Inspection to Incorporate Lessons Learned from First Part 52

Construction

Page 15: Advanced Reactors and New Reactors Topics Briefing · 2020-02-04 · ARC Westinghouse TerraPower Columbia Basin Hydromine Framatome X-energy StarCore General Atomics Kairos Terrestrial

Initiatives to Modernize Advanced Reactor Licensing

John Segala

Chief, Advanced Reactor Policy Branch

Page 16: Advanced Reactors and New Reactors Topics Briefing · 2020-02-04 · ARC Westinghouse TerraPower Columbia Basin Hydromine Framatome X-energy StarCore General Atomics Kairos Terrestrial

Executing the Vision

16

Page 17: Advanced Reactors and New Reactors Topics Briefing · 2020-02-04 · ARC Westinghouse TerraPower Columbia Basin Hydromine Framatome X-energy StarCore General Atomics Kairos Terrestrial

Facilitating Innovation with an Integrated Safety Approach

Fuel

Performance

Functional

Containment

Siting

Emergency

Preparedness

Environmental Insurance

SSC

Classification

& Event

Selection

Holistically

Considering

Consequences &

Safety Margins

17

Page 18: Advanced Reactors and New Reactors Topics Briefing · 2020-02-04 · ARC Westinghouse TerraPower Columbia Basin Hydromine Framatome X-energy StarCore General Atomics Kairos Terrestrial

Developing a Modern Risk-Informed Framework

SECY-19-0117NEI-18-04

DG-13536 LMP Pilots

LicensingModernizationProject (LMP)

18

Page 19: Advanced Reactors and New Reactors Topics Briefing · 2020-02-04 · ARC Westinghouse TerraPower Columbia Basin Hydromine Framatome X-energy StarCore General Atomics Kairos Terrestrial

Risk-Informing the Content of Applications

Application

LMPBDBE

Safety-Related SSCs

Non-Safety-RelatedSSCs

Non-Safety-Related SSCs With Special Treatment

Safety ClassificationAdvanced Reactor Design

19

Page 20: Advanced Reactors and New Reactors Topics Briefing · 2020-02-04 · ARC Westinghouse TerraPower Columbia Basin Hydromine Framatome X-energy StarCore General Atomics Kairos Terrestrial

Working Group on the Safety of Advanced Reactors (WGSAR)

Cooperating Internationally

Sharing Regulatory Experience

Advancing Risk-Informed and Performance-Based Licensing Approaches

Memorandum of Cooperationwith Canada

20

Page 21: Advanced Reactors and New Reactors Topics Briefing · 2020-02-04 · ARC Westinghouse TerraPower Columbia Basin Hydromine Framatome X-energy StarCore General Atomics Kairos Terrestrial

Implementing NEIMA Provisions

Nuclear Energy Innovation and

Modernization Act (NEIMA)

• Issued Reports to Congress- Staged Licensing Process - Risk-Informed Guidance

• Developing Guidance within Existing Framework- Source Term- Event Selection- Containment Performance- Emergency Preparedness

• Developing a Technology-Inclusive, Risk-Informed and Performance-Based Regulatory Framework- 10 CFR Part 53

21

Page 22: Advanced Reactors and New Reactors Topics Briefing · 2020-02-04 · ARC Westinghouse TerraPower Columbia Basin Hydromine Framatome X-energy StarCore General Atomics Kairos Terrestrial

Readiness to ReviewNon-LWR Applications

Ben Beasley, Chief

Advanced Reactor Licensing Branch

Page 23: Advanced Reactors and New Reactors Topics Briefing · 2020-02-04 · ARC Westinghouse TerraPower Columbia Basin Hydromine Framatome X-energy StarCore General Atomics Kairos Terrestrial

Readiness: Staff Preparations

Guidance

for industry

Guidance for

NRC Staff

Training for

NRC Staff

23

Page 24: Advanced Reactors and New Reactors Topics Briefing · 2020-02-04 · ARC Westinghouse TerraPower Columbia Basin Hydromine Framatome X-energy StarCore General Atomics Kairos Terrestrial

• Pre-application interaction:

– White paper, audit

– Topical report, Preliminary Safety

Information Document

• Integrated approach to reasonable assurance

of adequate protection

• Environmental reviews

Write SER

No SER

24

Readiness: New Approaches

Page 25: Advanced Reactors and New Reactors Topics Briefing · 2020-02-04 · ARC Westinghouse TerraPower Columbia Basin Hydromine Framatome X-energy StarCore General Atomics Kairos Terrestrial

25

Readiness: Project Team

Page 26: Advanced Reactors and New Reactors Topics Briefing · 2020-02-04 · ARC Westinghouse TerraPower Columbia Basin Hydromine Framatome X-energy StarCore General Atomics Kairos Terrestrial

Potential Applicants

26

High-Temperature Gas-

Cooled Reactors

(HTGR)

Liquid Metal Cooled Fast

Reactors

(LMFR)

Molten Salt Reactors

(MSR)

GE-H PRISM (VTR)

ARC

TerraPowerWestinghouse

Columbia Basin

Hydromine

Framatome

X-energy

StarCore

General Atomics

Kairos

Terrestrial

Thorcon

Flibe

TerraPower

Elysium

Liquid Salt Fueled

TRISO FuelSodium-Cooled

Lead-Cooled

Alpha Tech

Muons

Micro

Reactors

Oklo

Stationary

Transportable

Others

Others

Westinghouse

Liquid Salt Cooled

Developers that have submitted a RIS response

Page 27: Advanced Reactors and New Reactors Topics Briefing · 2020-02-04 · ARC Westinghouse TerraPower Columbia Basin Hydromine Framatome X-energy StarCore General Atomics Kairos Terrestrial

Current and Anticipated Work

27

Page 28: Advanced Reactors and New Reactors Topics Briefing · 2020-02-04 · ARC Westinghouse TerraPower Columbia Basin Hydromine Framatome X-energy StarCore General Atomics Kairos Terrestrial

Oklo Review Status

Oklo Aurora PowerhousePhoto Courtesy of Oklo, Inc

28

Page 29: Advanced Reactors and New Reactors Topics Briefing · 2020-02-04 · ARC Westinghouse TerraPower Columbia Basin Hydromine Framatome X-energy StarCore General Atomics Kairos Terrestrial

• AOO – anticipated operational occurrence

• BDBE – beyond design basis event

• CFR – Code of Federal Regulations

• COL – combined license

• DBA – design basis accident

• DBE – design basis event

• DG – draft guide

• GE-H – GE Hitachi Nuclear Energy

• HTGR – high-temperature gas-cooled reactor

Acronyms

29

Page 30: Advanced Reactors and New Reactors Topics Briefing · 2020-02-04 · ARC Westinghouse TerraPower Columbia Basin Hydromine Framatome X-energy StarCore General Atomics Kairos Terrestrial

• ICN – ITAAC closure notification

• ITAAC – inspections, tests, analyses, and acceptance

criteria

• LAR – license amendment request

• MSR – molten salt reactor

• NEICA – Nuclear Energy Innovation Capabilities Act

• NEIMA – Nuclear Energy Innovation and Modernization Act

• NRR – Office of Nuclear Reactor Regulation

• LMP – licensing modernization project

30

Acronyms

Page 31: Advanced Reactors and New Reactors Topics Briefing · 2020-02-04 · ARC Westinghouse TerraPower Columbia Basin Hydromine Framatome X-energy StarCore General Atomics Kairos Terrestrial

• LMFR – liquid metal cooled fast reactor

• LWR – light-water reactor

• NEI – Nuclear Energy Institute

• NRC – U.S. Nuclear Regulatory Commission

• QA – quality assurance

• PISD – preliminary safety information document

• RIS – regulatory issue summary

• SER – safety evaluation report

• SMR – small modular reactor

31

Acronyms

Page 32: Advanced Reactors and New Reactors Topics Briefing · 2020-02-04 · ARC Westinghouse TerraPower Columbia Basin Hydromine Framatome X-energy StarCore General Atomics Kairos Terrestrial

• SSC – systems, structures and components

• TRISO – tristructural-isotropic

• UAMPS – Utah Associated Municipal Power Systems

• UIN – uncompleted ITAAC notification

• VPO – Vogtle Project Office

• VRG – Vogtle Readiness Group

• VTR – versatile test reactor

• WGSAR – Working Group on the Safety of Advanced

Reactors

32