advance procurment

Upload: father

Post on 08-Mar-2016

227 views

Category:

Documents


0 download

DESCRIPTION

It is common in engineering projects for critical components with long and unreliable delivery times to be purchased at an early stage in the project much before the project activities in which the

TRANSCRIPT

  • SAP Project System Structures

    - * -667990 Asset accounting-29.pptx

    Overview of the basic data used in a project and what this data is used for:

    WBS elements Activities Documents PS texts Milestones

    Understand the Project Builder, and the various options it provides for working with basic dataPart 2 Project Structures

    - * -667990 Asset accounting-29.pptx

    The project definition is an outline of all objects created within a project. The project definition contains data that affects the entire project (start and finish dates, for example, and organizational data).

    The work breakdown structure (WBS) shows the individual elements of a project in a hierarchical structure. A WBS is the operative basis for planning further steps in a project. Here the focus is on planning, analysis, description, control, and monitoring costs, basic dates, and budgets.Workbreakdown Structures

    - * -667990 Asset accounting-29.pptx

    Work Breakdown Structures : Structure

    - * -667990 Asset accounting-29.pptx

    Work Breakdown Structures : Functions

    - * -667990 Asset accounting-29.pptx

    The Project Builder

    - * -667990 Asset accounting-29.pptx

    Work Breakdown Structures Operative Indicators

    - * -667990 Asset accounting-29.pptx

    WBS: Organization and Responsibilities

    - * -667990 Asset accounting-29.pptx

    WBS: Maintenance Options

    - * -667990 Asset accounting-29.pptx

    WBS : Hierarchy Graphic

    - * -667990 Asset accounting-29.pptx

    Activities describe the various tasks and work involved in the project, and the temporal and causal relationships between these tasks.

    Here, the focus is on planning, analyzing, describing, controlling, and evaluating costs, scheduled dates, resources, and material requirements.

    In the Project Builder and the project planning board, you can create both WBS elements and activities, and maintain data for these.Activities and Networks

    - * -667990 Asset accounting-29.pptx

    Activities and Networks: Structure

    - * -667990 Asset accounting-29.pptx

    Activities and Networks: Functions

    - * -667990 Asset accounting-29.pptx

    Different ways of Defining Activities

    - * -667990 Asset accounting-29.pptx

    Network Graphic

    - * -667990 Asset accounting-29.pptx

    Relationships

    - * -667990 Asset accounting-29.pptx

    Mass Change

    - * -667990 Asset accounting-29.pptx

    Sales Pricing

    - * -667990 Asset accounting-29.pptx

    PS Texts, Documents, Milestones : Assignments

    - * -667990 Asset accounting-29.pptx

    Milestones

    - * -667990 Asset accounting-29.pptx

    Copyright 2010 Deloitte Development LLC. All rights reserved.

  • SAP Project System Planning

    - * -667990 Asset accounting-29.pptx

    The different planning methods will be demonstrated for projects with and without network activities:

    If projects have activities , then dates , costs , payments, capacity requirements and material requirements can be planned automatically If projects do not have activities , you can plan dates, costs and payments manually Revenues can be planned using billing elements or the SD documents assigned to the projectPlanning Business Scenario

    - * -667990 Asset accounting-29.pptx

    Aspects of Planning

    - * -667990 Asset accounting-29.pptx

    The project planning board is a tool that enables you to process the entire project structure (WBS elements, activities and the objects assigned to them) in an integrated environment.

    You can simulate projects at various stages, and use this information for planning:

    To estimate costs, deadlines, and capacities during the quotation phase

    To compare various options during the course of the project. You can then use the best option in your operative project.

    The Project Planning Board and Simulations

    - * -667990 Asset accounting-29.pptx

    The Project Planning Board : Objects

    - * -667990 Asset accounting-29.pptx

    The Project Planning Board : Integration

    - * -667990 Asset accounting-29.pptx

    Icons used in Project Planning Board

    - * -667990 Asset accounting-29.pptx

    Simulation : Process

    - * -667990 Asset accounting-29.pptx

    Simulation: Data Transfer

    - * -667990 Asset accounting-29.pptx

    You can schedule dates manually for WBS elements (as basic dates).

    You can also use activities to schedule automatically.

    Scheduling

    - * -667990 Asset accounting-29.pptx

    Dates in Projects

    - * -667990 Asset accounting-29.pptx

    Basic Dates for WBS Elements

    - * -667990 Asset accounting-29.pptx

    Scheduling

    - * -667990 Asset accounting-29.pptx

    Basic Dates : Effects on Scheduling

    - * -667990 Asset accounting-29.pptx

    Resource planning refers to the following:

    Planning internal processing by means of internal processing activities. You can evaluate capacity requirements for work centers, and use the project planning board to level capacities. At the same time, you can also use the project planning board to distribute the work among employees (workforce planning).

    Planning external services by means of external processing or service activities. In this case, purchase requisitions are generated in Purchasing (at the latest, when the activity is released). The purchasing department then procures the services in question externally.Resource Planning

    - * -667990 Asset accounting-29.pptx

    Resource Planning

    - * -667990 Asset accounting-29.pptx

    Internal Processing

    - * -667990 Asset accounting-29.pptx

    Distribution of Work among Workforce

    - * -667990 Asset accounting-29.pptx

    External Processing

    - * -667990 Asset accounting-29.pptx

    You plan material requirements by assigning material components to activities. Material requirements form the basis for procurement - whether the material is to be produced in-house (production) or procured externally (purchasing).

    You can assign material components to activities manually. Alternatively, you can use the BOM-PS interface to assign BOM components automatically to activities.

    Material Requirement Planning ( MRP )

    - * -667990 Asset accounting-29.pptx

    Materials in Projects

    - * -667990 Asset accounting-29.pptx

    Integration with MM and PP

    - * -667990 Asset accounting-29.pptx

    Procurement using Requirements Planning

    - * -667990 Asset accounting-29.pptx

    Direct Procurement

    - * -667990 Asset accounting-29.pptx

    BOM PS Interface

    - * -667990 Asset accounting-29.pptx

    BOM PS Interface

    - * -667990 Asset accounting-29.pptx

    You also plan costs in your projects:Manually for WBS elements - using structure-oriented planning, cost-element-based detailed planning, or unit costingAutomatically - using the costing data of the assigned activitiesYou plan revenues for projects by means of structure-oriented planning, revenue-element-based detailed planning, or PS billing plans. By assigning SD documents to WBS elements, you can update planned revenues automatically for projects.You can either plan payments manually using detailed planning, or write them automatically to the project using the quantity structure of the network or billing plans.You can store different cost planning, revenue planning and payment planning scenarios in CO plan versions, and evaluate these at a later point in time.

    Planning Costs and Revenues

    - * -667990 Asset accounting-29.pptx

    Cost Planning in Projects

    - * -667990 Asset accounting-29.pptx

    Planned Costs in Networks

    - * -667990 Asset accounting-29.pptx

    Planning Revenues - Methods

    - * -667990 Asset accounting-29.pptx

    Project T- 200##: Incoming Orders and Billing Plan

    - * -667990 Asset accounting-29.pptx

    Copyright 2010 Deloitte Development LLC. All rights reserved.

  • SAP Project System Budgeting

    - * -667990 Asset accounting-29.pptx

    You allocate budgets for the various work packages in your investment project

    You use the investment program to budget the top WBS element

    You then distribute the budget of the top WBS elements among the level 2 WBS elementsBudget : Business Scenario

    - * -667990 Asset accounting-29.pptx

    Cost Planning and Budgeting

    - * -667990 Asset accounting-29.pptx

    Distributing Budget from the Investment Program

    - * -667990 Asset accounting-29.pptx

    Budget Overview

    - * -667990 Asset accounting-29.pptx

    Availability Control

    - * -667990 Asset accounting-29.pptx

    Copyright 2010 Deloitte Development LLC. All rights reserved.

  • SAP Project System Execution

    - * -667990 Asset accounting-29.pptx

    You use various business transactions to post actual data ( actual dates, actual costs and actual revenues ) in both your projects

    You can use the information system to evaluate aggregated actual data in the project structureExecution: Business Scenario

    - * -667990 Asset accounting-29.pptx

    Aspects of Project Execution

    - * -667990 Asset accounting-29.pptx

    Basic Dates for WBS elements

    - * -667990 Asset accounting-29.pptx

    Confirmation Options

    - * -667990 Asset accounting-29.pptx

    Individual and Collective Confirmations

    - * -667990 Asset accounting-29.pptx

    Cross Application Time Sheet ( CATS )

    - * -667990 Asset accounting-29.pptx

    Cost Integration Using Account Assignment

    - * -667990 Asset accounting-29.pptx

    Cost Integration using Assignment

    - * -667990 Asset accounting-29.pptx

    Internal Activity Allocation

    - * -667990 Asset accounting-29.pptx

    The Purchasing Process

    - * -667990 Asset accounting-29.pptx

    Milestone Billing

    - * -667990 Asset accounting-29.pptx

    Milestone Billing

    - * -667990 Asset accounting-29.pptx

    Copyright 2010 Deloitte Development LLC. All rights reserved.

  • SAP Project System Period End Closing

    - * -667990 Asset accounting-29.pptx

    You calculate overheads for your projects. You then settle projects. You use Schedule Manager to perform period- end closing.

    You draw up a results analysis for your customer project ( T-200## ) , and you settle the project to a profitability segment.

    You settle your investment project ( E-99## ) to an asset under construction / assetPeriod End Closing Business Scenario

    - * -667990 Asset accounting-29.pptx

    Period End closing : Procedure

    - * -667990 Asset accounting-29.pptx

    Schedule Manager

    - * -667990 Asset accounting-29.pptx

    Overheads

    - * -667990 Asset accounting-29.pptx

    Settlement

    - * -667990 Asset accounting-29.pptx

    Generating a Settlement rule for a WBS

    - * -667990 Asset accounting-29.pptx

    Settlement Rules for Activities

    - * -667990 Asset accounting-29.pptx

    Archiving Steps

    - * -667990 Asset accounting-29.pptx

    Copyright 2010 Deloitte Development LLC. All rights reserved.

  • SAP Project System Reporting

    - * -667990 Asset accounting-29.pptx

    You use the Structures and Controlling Information systems to evaluate key figures for your project

    Reporting : Business Scenario

    - * -667990 Asset accounting-29.pptx

    Information Systems

    - * -667990 Asset accounting-29.pptx

    Information Systems: Degree of Detail

    - * -667990 Asset accounting-29.pptx

    The structure information system evaluates the structural and logistical aspects of projects, but it is also possible to display costs, revenues, and other data in the structure.Benefits of using this information system:It is possible to edit all objects interactively (create, change, display, confirm)Flexible selection of columns for fields to be displayedYou can customize icon toolbars in line with the functions usedYou can save all settings in profiles or overview variants

    Structure Information System

    - * -667990 Asset accounting-29.pptx

    Structure Overview and Individual Overviews

    - * -667990 Asset accounting-29.pptx

    Functions in the Structure / Dates Info System

    - * -667990 Asset accounting-29.pptx

    Editing All Objects

    - * -667990 Asset accounting-29.pptx

    Graphical Evaluation

    - * -667990 Asset accounting-29.pptx

    Importing and Exporting Data

    - * -667990 Asset accounting-29.pptx

    Progress Analysis

    - * -667990 Asset accounting-29.pptx

    Progress Analysis : Measurement Techniques

    - * -667990 Asset accounting-29.pptx

    The controlling information system evaluates, above all, the commercial key figures of projects.The following types of report are available here: Hierarchy reports Cost element reports Line item reports (ABAP List Viewer)

    The Controlling Information System

    - * -667990 Asset accounting-29.pptx

    Hierarchy Reports

    - * -667990 Asset accounting-29.pptx

    Going to other Reports

    - * -667990 Asset accounting-29.pptx

    Cost Element Reports

    - * -667990 Asset accounting-29.pptx

    ABAP List Viewer ( ALV ) for Line Items

    - * -667990 Asset accounting-29.pptx

    Copyright 2010 Deloitte Development LLC. All rights reserved.

    *******