Adrian LembongPT Adaro Energy Tbk
To be a Greener Coal Mining Company
Adaro Energy Highlights
3
Adaro Energy Highlights• Adaro is a vertically integrated energy producer operates under eight pillars: Adaro Mining, Adaro
Services, Adaro Logistics, Adaro Power, Adaro Land, Adaro Water, Adaro Capital and AdaroFoundation, with pillar performs as independent profit centers and strive to keep expanding third-party business besides serving Adaro Group
• Adaro is one of the largest coal producers and IPP in Indonesia• Adaro puts best effort to implement Good Mining Practices and to balance the 3Ps — profit, planet
and people — aspects of our operations• Adaro strives to use the latest, most efficient and environmentally friendly technology in all our
power plant projects• Listed in the Indonesia Stock Exchange (ADRO:IJ) since 2008. Adaro is the 18th largest company
by market capitalization
4
Resilient Integrated Business Model
5
Adaro Power is one of the largest IPP in Indonesia
Bhimasena Power Indonesia – CFPP
Size / Tech. 2 x 1,000 MW Ultra Super Critical
Shareholders 34% AP, 34% JPower, 32% Itochu
Project cost USD 4.2 billion
COD 2020 (estimated)
Makmur Sejahtera Wisesa – CFPP
Size / Tech. 2 x 30 MW CFB technology
Shareholders 100% Adaro Power
COD #1 Jun 2013, #2 Feb 2014
Tanjung Power Indonesia – CFPP
Size / Tech. 2 x 100 MW CFB technology
Shareholders 65% AP, 35% Korea EWP
Project cost USD 545 million
COD 2019
Makmur Sejahtera Wisesa – Solar PV
Size 100 kWp
Shareholder 100% Adaro Power
COD Q3 2018
Listrik Vine Industri – Solar Micro Grid
Size 0.9 MW for Phase 1
Shareholder 25% AP
COD Expected 2020
Adaro Mining
7
Adaro Mining as Group’s Core Business Pillar
8
Adaro Mining Production
Carbon Footprint Reduction Project
10
Carbon Footprint Reduction Program
Among the key challenges faced by Adaro are transportation and logistics. Adaro Indonesia has one of the furthest inland coal mines in Indonesia. It is located 80km from the barge-loading river port at Kelanis and a further 240km from the transshipment location at Taboneoin the Java Sea.
11
Carbon Footprint Reduction Program
Coal Hauling
Hauling distance 80 km
Using 120 mt double trailer truck instead of 20 mt truck. Estimated fuel saving 25,000 kiloliter per annum.
MineMine Port
Channel
Transhipment
Coal and Fuel terminal
Power Plant
Coal Processing and Loading
Power demand 4 MW
Ongoing project to develop solar PV upt to 1 MW
Estimated fuel saving up to 400 kiloliter per annum
12
Carbon Footprint Reduction Program
Dredging and channelmaintenance (15 km)
This project has allowed the channel to be navigable for two way traffic on a 24-hour basis.
Estimated fuel saving 5,000 kiloliter per annum
MineMine Port
Barito Channel
Transhipment
Coal and Fuel terminal
Power Plant
Coal Loading
Floating crane to facilitate transfer from barge to vessel. 47.6 Mio ton in 2018
Cut 50% travel distance to coal terminal.
Estimated fuel saving 17,000 kiloliter per annum
13
Carbon Footprint Reduction Program
IBT COAL and FUEL TERMINAL
COAL TERMINAL
80.000 dwt in 2 days
FUEL TERMINAL
The port has been approved as a location for blending B20 fuel. The B20 fuel reduces carbon print of Adaro mine operation.
IBT renders fuel handling services by providing four fuel tanks of 80,000-kiloliter storage capacity and two jetties with loading capacity of 1.4 million kiloliters.
MineMine Port
Barito Channel
Transhipment
Coal and Fuel
terminal
Power Plant
14
Conclusion Remarks
As a national company, Adaro is committed to contributing to the development andprogress of Indonesia’s economy.
Adaro continuously conduct continuous improvement project to be a greener coalmining company.
Adaro invites different companies to support the improvement program.