adoption active case management report - som - state of michigan

32
Adoption Active Caseload Management Report SWS-004 October 31, 1999 SWSS Project USER REQUIREMENTS

Upload: others

Post on 03-Feb-2022

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Adoption Active Case Management Report - SOM - State of Michigan

Adoption Active Caseload Management Report

SWS-004

October 31, 1999

SWSS Project USER REQUIREMENTS

Page 2: Adoption Active Case Management Report - SOM - State of Michigan

SWSS Project October 31, 1999 User Requirements

Adoption Active Caseload Management Report

File: Adoption Active Case Management Report.doc

Printed: 3/9/2010 5:10:00 PM

i

Table of Contents 1 INTRODUCTION....................................................................................................2 1.1 Purpose ..........................................................................................................2 1.2 Target Audience ..............................................................................................2

2 MODULE NARRATIVE ...........................................................................................3 3 NAVIGATION FLOW ..............................................................................................4 3.1 Screen Interaction...........................................................................................4 3.2 System Flow ...................................................................................................4

4 REQUIREMENTS LIST...........................................................................................5 4.1 Screen, Data, Out-of-Module, Output, Out-of-Module and Miscellaneous Requirements...........................................................................................................5

5 EXAMPLE OUTPUT ...............................................................................................5 6 DATA ELEMENT DESCRIPTIONS...........................................................................7 7 HELP MESSAGES .................................................................................................9 7.1 SCREEN (Section or Module level. Offers an entry point to the big help file.) ....9 7.2 CONTEXT-SENSITIVE (“F1”, aka “detail”) ........................................................9 7.3 STATUS PANEL MESSAGES (formerly known as “Field Level” and “Baby” before that.) ......................................................................................................................9

8 MODULE DEPENDENCIES..................................................................................10 9 SCENARIOS........................................................................................................11 10 TEST PLANS ....................................................................................................12 11 Source Material................................................................................................13 11.1 Original Requirement 11.2 Memos..........................................................................................................21 11.3 Test Plans.....................................................................................................28 11.3.1 Test Plan Created by Policy .....................................................................28 11.3.2 Test Plan Created by SWSS Development ................................................29

12 Outstanding issues ..........................................................................................30 12.1 The following items require a decision or some direction from Policy staff: ......30

Page 3: Adoption Active Case Management Report - SOM - State of Michigan

SWSS Project October 31, 1999 User Requirements

Adoption Active Caseload Management Report

File: Adoption Active Case Management Report.doc

Printed: 3/9/2010 5:10:00 PM

2

1 INTRODUCTION 1.1 Purpose

Caseload Counts are currently generated by data output into the CIS system. The Management Information Reports are then generated and sent to the local office. The information in these reports may be as dated as four to six weeks old. Automation will give adoption supervisors immediate up to date information on the adoption caseloads under their supervision.

1.2 Target Audience

This document is for the SWSS developers who are charged with creating a detailed design document for this module, as well as implementing the requirements listed herein. It will also be of interest to development staff charged with maintaining the SWSS automated System The following personnel may also be interested:

• F.I.A. Trainers

• F.I.A. Help Desk Personnel

• SWSS Advance Users

• SWSS Project Staff Tasked With Developing the User’s Guide

• Zone Children Services Specialists

• ASSIST Operators / CIS Clerks

• CFS Policy Staff

Page 4: Adoption Active Case Management Report - SOM - State of Michigan

SWSS Project October 31, 1999 User Requirements

Adoption Active Caseload Management Report

File: Adoption Active Case Management Report.doc

Printed: 3/9/2010 5:10:00 PM

3

2 MODULE NARRATIVE The report will be accessed by the supervisor from the Report Generation Menu found within the Main Menu of the SWSS application. The report is generated by selecting, the Adoption Active Caseload Report icon. The County Code, Supervisor’s Name, and Supervisor’s Identification Number appear in the report identification box in the upper left hand corner, in the report. A list of adoption workers assigned to that specific supervisor unit is listed below. It would begin with the Supervisor, and their load number (Referred cases not accepted / assigned or accepted, but not assigned to a worker). The names of adoption workers assigned to that supervisor follow. Current information available for each listed worker is Load Number, number of Assigned Referred cases, number of Open Adoption cases, number of Purchase of Service cases, and Total of all adoption cases.

Page 5: Adoption Active Case Management Report - SOM - State of Michigan

SWSS Project October 31, 1999 User Requirements

Adoption Active Caseload Management Report

File: Adoption Active Case Management Report.doc

Printed: 3/9/2010 5:10:00 PM

4

3 NAVIGATION FLOW 3.1 Screen Interaction

This Function is accessed from the Main Menu Screen. The Report Generation icon is selected from the Main Menu screen. Among the icon choices within the Report Generation Menu, is Adoption Active Caseload Report. A printed report will be generated when that icon is selected.

3.2 System Flow

There is no data entered in this module.

Page 6: Adoption Active Case Management Report - SOM - State of Michigan

SWSS Project October 31, 1999 User Requirements

Adoption Active Caseload Management Report

File: Adoption Active Case Management Report.doc

Printed: 3/9/2010 5:10:00 PM

5

4 REQUIREMENTS LIST The comprehensive (we hope) list of requirements derived from the original requirements, ensuing memos, emails, and test plan documentation.

4.1 Screen, Data, Out-of-Module, Output, Out-of-Module and Miscellaneous Requirements

The following requirements were derived from the original requirements documents written by policy staff for the SWSS project. Any ensuing memos, emails, or test plans regarding the project were also searched. It is intended to be a comprehensive list of all requirements pertaining to the Adoption Active Caseload module. Each individual requirement has a unique identifier; the two letter prefix identifies this particular module (ACR = Adoption Active Caseload). The list is to be used in a Requirements Traceability Matrix, which will be comprised of all the requirements for all the SWSS modules, so that the status of each requirement can be tracked and verified.

ACR-1 SCREEN REQUIREMENTS:

ACR -1.1 User must be able to select specified report or cancel report.

ACR -1.2 Must notify user that either printing is in process or that an error occurred.

ACR-2 DATA EDITING REQUIREMENTS:

ACR -2.1 No data editing is done here.

ACR-3 OUT-OF-MODULE REQUIREMENTS:

ACR -3.1 Report Generation module allows selection of this report.

ACR-4 MODULE REQUIREMENTS:

ACR -4.1 The module must generate a statistical report of active Adoption and Foster Care cases for a specific worker. Cases displayed on the report will be those with the SWSS statuses of Registered – Assigned, Active – Assigned (Legal Status = 41,42,44 and 52) and Active Adoption (Legal status = 43). Foster Care cases that have been referred to Adoption, but not yet assigned, should be displayed under the supervisor’s load number.

ACR -4.2 If the user performs an action upon the database after the database has timed the user out, SWSS must automatically reconnect to the database and continue working.

ACR -4.3 Central Office users (county 84) need inquiry access for case information.

ACR-5 OUTPUT REQUIREMENTS:

Page 7: Adoption Active Case Management Report - SOM - State of Michigan

SWSS Project October 31, 1999 User Requirements

Adoption Active Caseload Management Report

File: Adoption Active Case Management Report.doc

Printed: 3/9/2010 5:10:00 PM

6

ACR -5.1 Adoption Active Caseload Report

ACR -5.1.1 Supervisor Name

ACR -5.1.2 Supervisor Load No.

ACR -5.1.3 Worker Name

ACR -5.1.4 Load No.

ACR -5.1.5 Referred Cases

ACR -5.1.5.1 Cases that have been referred to the adoption supervisor, but not accepted or assigned.

ACR -5.1.5.1.1 This would be supervisor Only. Status would = registered/active – accepted.

ACR -5.1.6 Accepted Cases

ACR -5.1.6.1 Cases that have been accepted only. Supv. Has not assigned these to a worker.

ACR -5.1.6.1.1 Supv. Only. Status would be registered/active – accepted.

ACR -5.1.7 Referred/Active – Assigned Cases

ACR -5.1.7.1 Registered/active foster care cases that were assigned to an adoption worker as a secondary worker.

ACR -5.1.8 Active Adoption Cases

ACR -5.1.8.1 Legal status = 43 only

ACR -5.1.9 Purchase of Services Cases

ACR -5.1.10 Total (Worker)

ACR -5.1.11 Number of Finalized Adoptions

ACR -5.1.11.1 Include all adoptions with order type “Order of Adoption” entered on the legal screen within the past 90 days.

ACR -5.1.12 Totals (Category)

ACR-6 MISCELLANEOUS REQUIREMENTS:

ACR -6.1 None

Page 8: Adoption Active Case Management Report - SOM - State of Michigan

SWSS Project October 31, 1999 User Requirements

Adoption Active Caseload Management Report

File: Adoption Active Case Management Report.doc

Printed: 3/9/2010 5:10:00 PM

7

5 EXAMPLE OUTPUT Gather and include the forms and letters generated by this module. If possible, mark up the examples to explain the data fields to show the source or whether or not it is required.

Page 9: Adoption Active Case Management Report - SOM - State of Michigan

SWSS Project October 31, 1999 User Requirements

Adoption Active Caseload Management Report

File: Adoption Active Case Management Report.doc

Printed: 3/9/2010 5:10:00 PM

8

6 DATA ELEMENT DESCRIPTIONS A table of all the data elements entered within this module. For each item, describe its range of acceptable values. Designate items as being required for ASSIST, CIS, LICENSING or AFCARS (and any combination thereof). Also describe what other modules check these values. None

Page 10: Adoption Active Case Management Report - SOM - State of Michigan

SWSS Project October 31, 1999 User Requirements

Adoption Active Caseload Management Report

File: Adoption Active Case Management Report.doc

Printed: 3/9/2010 5:10:00 PM

9

7 HELP MESSAGES There are to be three levels of help available: Screen, which describes how the process for the current module is supposed to work, Context-Sensitive, which describes a particular data field on the screen, and Status Panel, which offer hints about the field or command button with the current focus.

7.1 SCREEN (Section or Module level. Offers an entry point to the big help file.)

7.2 CONTEXT-SENSITIVE (“F1”, aka “detail”)

7.3 STATUS PANEL MESSAGES (formerly known as “Field Level” and “Baby” before that.)

Page 11: Adoption Active Case Management Report - SOM - State of Michigan

SWSS Project October 31, 1999 User Requirements

Adoption Active Caseload Management Report

File: Adoption Active Case Management Report.doc

Printed: 3/9/2010 5:10:00 PM

10

8 MODULE DEPENDENCIES What data must be entered in other modules before this module can be used? What changes in data within other modules effect this module? There are no data dependencies in this module.

Page 12: Adoption Active Case Management Report - SOM - State of Michigan

SWSS Project October 31, 1999 User Requirements

Adoption Active Caseload Management Report

File: Adoption Active Case Management Report.doc

Printed: 3/9/2010 5:10:00 PM

11

9 SCENARIOS The requirements scenarios that call for data entered by this module. This is just a cross reference into the

Page 13: Adoption Active Case Management Report - SOM - State of Michigan

SWSS Project October 31, 1999 User Requirements

Adoption Active Caseload Management Report

File: Adoption Active Case Management Report.doc

Printed: 3/9/2010 5:10:00 PM

12

10 TEST PLANS The updated test plans written by the Program Office and/or the developer to verify the correctness of the finished application.

Page 14: Adoption Active Case Management Report - SOM - State of Michigan

SWSS Project October 31, 1999 User Requirements

Adoption Active Caseload Management Report

File: Adoption Active Case Management Report.doc

Printed: 3/9/2010 5:10:00 PM

13

11 SOURCE MATERIAL

11.1 Original Requirement

Page 15: Adoption Active Case Management Report - SOM - State of Michigan

SWSS Project October 31, 1999 User Requirements

Adoption Active Caseload Management Report

File: Adoption Active Case Management Report.doc

Printed: 3/9/2010 5:10:00 PM

14

Page 16: Adoption Active Case Management Report - SOM - State of Michigan

SWSS Project October 31, 1999 User Requirements

Adoption Active Caseload Management Report

File: Adoption Active Case Management Report.doc

Printed: 3/9/2010 5:10:00 PM

15

Page 17: Adoption Active Case Management Report - SOM - State of Michigan

SWSS Project October 31, 1999 User Requirements

Adoption Active Caseload Management Report

File: Adoption Active Case Management Report.doc

Printed: 3/9/2010 5:10:00 PM

16

Page 18: Adoption Active Case Management Report - SOM - State of Michigan

SWSS Project October 31, 1999 User Requirements

Adoption Active Caseload Management Report

File: Adoption Active Case Management Report.doc

Printed: 3/9/2010 5:10:00 PM

17

Page 19: Adoption Active Case Management Report - SOM - State of Michigan

SWSS Project October 31, 1999 User Requirements

Adoption Active Caseload Management Report

File: Adoption Active Case Management Report.doc

Printed: 3/9/2010 5:10:00 PM

18

Page 20: Adoption Active Case Management Report - SOM - State of Michigan

SWSS Project October 31, 1999 User Requirements

Adoption Active Caseload Management Report

File: Adoption Active Case Management Report.doc

Printed: 3/9/2010 5:10:00 PM

19

Page 21: Adoption Active Case Management Report - SOM - State of Michigan

SWSS Project October 31, 1999 User Requirements

Adoption Active Caseload Management Report

File: Adoption Active Case Management Report.doc

Printed: 3/9/2010 5:10:00 PM

20

Page 22: Adoption Active Case Management Report - SOM - State of Michigan

SWSS Project October 31, 1999 User Requirements

Adoption Active Caseload Management Report

File: Adoption Active Case Management Report.doc

Printed: 3/9/2010 5:10:00 PM

21

11.2 Memos and E-Mail

Page 23: Adoption Active Case Management Report - SOM - State of Michigan

SWSS Project October 31, 1999 User Requirements

Adoption Active Caseload Management Report

File: Adoption Active Case Management Report.doc

Printed: 3/9/2010 5:10:00 PM

22

Page 24: Adoption Active Case Management Report - SOM - State of Michigan

SWSS Project October 31, 1999 User Requirements

Adoption Active Caseload Management Report

File: Adoption Active Case Management Report.doc

Printed: 3/9/2010 5:10:00 PM

23

Page 25: Adoption Active Case Management Report - SOM - State of Michigan

SWSS Project October 31, 1999 User Requirements

Adoption Active Caseload Management Report

File: Adoption Active Case Management Report.doc

Printed: 3/9/2010 5:10:00 PM

24

Page 26: Adoption Active Case Management Report - SOM - State of Michigan

SWSS Project October 31, 1999 User Requirements

Adoption Active Caseload Management Report

File: Adoption Active Case Management Report.doc

Printed: 3/9/2010 5:10:00 PM

25

Page 27: Adoption Active Case Management Report - SOM - State of Michigan

SWSS Project October 31, 1999 User Requirements

Adoption Active Caseload Management Report

File: Adoption Active Case Management Report.doc

Printed: 3/9/2010 5:10:00 PM

26

Page 28: Adoption Active Case Management Report - SOM - State of Michigan

SWSS Project October 31, 1999 User Requirements

Adoption Active Caseload Management Report

File: Adoption Active Case Management Report.doc

Printed: 3/9/2010 5:10:00 PM

27

Page 29: Adoption Active Case Management Report - SOM - State of Michigan

SWSS Project October 31, 1999 User Requirements

Adoption Active Caseload Management Report

File: Adoption Active Case Management Report.doc

Printed: 3/9/2010 5:10:00 PM

28

11.3 Test Plans

11.3.1 Test Plan Created by Policy

Page 30: Adoption Active Case Management Report - SOM - State of Michigan

SWSS Project October 31, 1999 User Requirements

Adoption Active Caseload Management Report

File: Adoption Active Case Management Report.doc

Printed: 3/9/2010 5:10:00 PM

29

11.3.2 Test Plan Created by SWSS Development

Page 31: Adoption Active Case Management Report - SOM - State of Michigan

SWSS Project October 31, 1999 User Requirements

Adoption Active Caseload Management Report

File: Adoption Active Case Management Report.doc

Printed: 3/9/2010 5:10:00 PM

30

12 OUTSTANDING ISSUES 12.1 The following items require a decision or some direction from Policy

staff:

1

Page 32: Adoption Active Case Management Report - SOM - State of Michigan

SWSS Project October 31, 1999 User Requirements

Adoption Active Caseload Management Report

File: Adoption Active Case Management Report.doc

Printed: 3/9/2010 5:10:00 PM

31

Attachment A: List of SWSS Module Prefixes