Location Dates and hours of work Type of work Additional barge (Coronation Drive side of the River) Movements between Merivale Bridge and Murarrie Thursday 22 to Saturday 24 June Thursday 29 to Friday 30 June Monday 17 to Tuesday 18 July Thursday 20 to Sunday 23 July (approximate dates) Establish anchorage for additional barge Movement of equipment within the rail corridor Removal of materials and equipment and crane operation Intermittent barge movements between Merivale Bridge and Murarrie. Barge (South Brisbane side and Coronation Drive side of the River) Early June until mid-August (previously notified) Painting works Scaffolding works on the bridge to support painting works Movement of equipment within the rail corridor Use of small equipment and machinery Vehicle movements. Signs will be posted on the barge to indicate limited wash from vessels in the area. All water vessel operators and river users should be aware of this operation to ensure the safety of their vessels and barge activities. Every effort will be made to carry out these works with minimal disruption. Queensland Rail thanks river users, businesses and the local community for their cooperation during these important works. June 2017 Merivale Bridge maintenance Queensland Rail is undertaking essential maintenance works on the Merivale Bridge over the Brisbane River. In addition to the previously advised barge arrival in early June 2017, a second barge will be anchored on the Coronation Drive (Milton) side of the river from Thursday 22 June 2017, with intermittent movements between Merivale Bridge and Murarrie for the removal of materials from the worksite. Additional barge activity

Upload: others

Post on 02-Apr-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Additional - Queensland Rail€¦ · Web viewThe first barge will remain in use until mid-August 2017. Brisbane River operators and users are advised to expect changed conditions

Location Dates and hours of work Type of work

Additional barge (Coronation Drive side of the River)Movements between Merivale Bridge and Murarrie

Thursday 22 to Saturday 24 June

Thursday 29 to Friday 30 June

Monday 17 to Tuesday 18 July

Thursday 20 to Sunday 23 July

(approximate dates)

Establish anchorage for additional barge Movement of equipment within the rail

corridor Removal of materials and equipment

and crane operation Intermittent barge movements between

Merivale Bridge and Murarrie.

Barge (South Brisbane side and Coronation Drive side of the River)

Early June untilmid-August

(previously notified)

Painting works Scaffolding works on the bridge to

support painting works Movement of equipment within the rail

corridor Use of small equipment and machinery Vehicle movements.

Signs will be posted on the barge to indicate limited wash from vessels in the area. All water vessel operators and river users should be aware of this operation to ensure the safety of their vessels and barge activities.Every effort will be made to carry out these works with minimal disruption. Queensland Rail thanks river users, businesses and the local community for their cooperation during these important works.

June 2017

Merivale Bridge maintenance Queensland Rail is undertaking essential maintenance works on the Merivale Bridge over the Brisbane River. In addition to the previously advised barge arrival in early June 2017, a second barge will be anchored on the Coronation Drive (Milton) side of the river from Thursday 22 June 2017, with intermittent movements between Merivale Bridge and Murarrie for the removal of materials from the worksite.The first barge will remain in use until mid-August 2017. Brisbane River operators and users are advised to expect changed conditions during

Additional barge activity