addendum no. 6 - london, ontario · plus revision drawings mr-2, mr-3, er-1 and architectural...
TRANSCRIPT
7132 - 1 -
Lake Huron Primary Water Supply Systemc/o The City of LondonRegional Water Supply DivisionTender T13-96HVAC and Dehumidification Project (No. LH 1203)
Chorley + Bisset Ltd.Consulting EngineersLondon, Ontario
25 October 2013
Page 1 of 6Plus Revision Drawings MR-2, MR-3, ER-1 and Architectural Addendum #1
ADDENDUM NO. 6
Make the following amendments and additions to the Drawings and Specifications, and includethis cost in the Contract Price.
1. GENERAL INFORMATION AND RESPONSES TO QUESTIONS
1. Walls running along Gridline “7A" and Gridline “12" are fire separations. Provide firedampers and fire stopping for services penetrating the separations.
2. For Sealed Hatch Systems called up on Structural Drawing S1.2, use EJ Access HatchSystem, Series ALN, or equivalent. System to be pedestrian rated with epoxy paintedsafety grate for fall through protection; aluminum construction with aluminum cover plate;heavy duty stainless steel hinges. Coordinate and confirm all dimensions on site.
Q1. Are we required to carry the costs of a Building Permit and if so can you pleaseindicate the cost per thousand or a lump sum cost.
A1. Yes. Use 1% of Bid Price for determination of Permit Fees.
Q2. Can you clarify if your intent is to paint the Aluminum ducting on the job.
A2. Aluminum ducting is not required to be painted.
Q3. Section 15260 - 2.4.1.3 - Finish all insulated piping with Aluminum Jacket. Is this required on piping in Concealed spaces (above ceiling)?
A3. See Addendum items below for revisions to Insulation Specifications.
Q4. Is there an Alternate Jacket for Refrigeration Piping?
A4. Yes. See Addendum items below for revisions to Insulation Specifications.
Q5. Does Condensate Drains require Insulation?
A5. Yes. See Addendum items below for revisions to Insulation Specifications.
7132 - 2 -
Q6. On Drawing A3, detail 1, it asks to remove existing glazing and provide newaluminum blank out panels. There is no elevations of this so we do not know thesizes/quantity needed. Can you please clarify?
A6. Blank out panels no longer needed. See Addendum items below and attached forfurther information.
2. ARCHITECTURAL SPECIFICATIONS AND DRAWINGS
1. Refer to attached Architectural Addendum #1 issued by Castle + Associates Architecture,which forms part of this Addendum.
3. MECHANICAL SPECIFICATIONS
1. SECTION 15260 - INSULATION
1. Delete Clause 2.4.1.3.
2. Delete Clause 2.5.1.1.
3. In 2.5.2, add the following rows to the Pipe Insulation Schedule Table:
Condensate Drains
4 - 24 0.033 - 0.039 24 25 25 25 25 25
4. Revise Clause 2.9.1 to read:
Use 0.41 mm (0.016O) aluminum jacket with integral moisture barrier or VentureTape Model 1579CW-E zero permeability, 0.45 mm (0.0175O) thick, self adhesivemulti-ply embossed aluminum cladding. Use Venture Tape Model 1577CW-E tape,minimum 100 mm (4O width) at all butt joints and longitudinal joints.
5. Add to 3.3.1:
- Condensate drains
6. Revise Clause 3.3.4 to read:
Aluminum Covering: In all indoor locations where the insulation will be exposedto view, and for refrigeration piping exposed to weather, finish with aluminum jacket.Apply aluminum jacket over insulation with 15 mm x 0.38 mm (1/2O x 0.015O)stainless steel banding at 300 mm (12O) o/c. Overlap all joints at least 80 mm (3O)with longitudinal joint - lapped to the weather. Self adhesive aluminum covering willbe acceptable in lieu of aluminum covering. Follow manufacturer’s installationrecommendations.
7. Add Clause 3.5.1.4: “Insulate range hood exhaust duct.”
2. SECTION 15600 - LIQUID HEAT TRANSFER
1. Add to 2.16.7: “Sterling”
7132 - 3 -
3. SECTION 15900 - CONTROLS
1. Add Clause 2.19:
“Spare Control Items: Provide spare parts for the following control components.Provide 10% of each type, with no less than 3.”
1. Sensors (Temperature and Humidity)2. Thermostats3. Freezestats4. Firestats5. Control Valves6. Relays7. Contactors8. Transmitters9. Current Sensing Relays10. Pressure Differential Sensors11. Pressure Sensors12. Thermostatic Control Valve
4. MECHANICAL DRAWINGS
1. Drawing M1.2
1. In Fan Schedule, revise the following parameters:
1. LFN-8:
Model: 150 QMXStatic Pressure: 187 PaHorsepower: 3/4 HP
2. DFN-15 and DFN-16:
Model: 90 QMXStatic Pressure: 125 PaHorsepower: 1/2 HP
3. DFN-17:
Manufacturer: FantechModel: FG 10XLStatic Pressure: 187 Pa
4. DFN-20 and DFN-21:
Model: 120 QMXStatic Pressure: 125 PaHorsepower: 1/2 HP
5. FN-13:
Manufacturer: FantechModel: FG 12XL
7132 - 4 -
2. Drawing M2.6
1. Add fire dampers to transfer air ducts located above doors on Gridline “12" (typicalof 2 locations).
3. Drawing M3.1
1. Add solenoid valves to HWS piping serving Unit Heaters UH-401A/B. Valves to belocated close to unit and interlocked with respective thermostat.
4. Drawing M3.2
1. Refer to attached revision drawing MR-2 for revisions and clarifications regardingduct sizes.
5. Drawing M3.3
1. Refer to attached revision drawing MR-3 for revisions to Detail “E”.
2. Building 1D - Sedimentation Mezzanine Plan Above EL. 190.80m (Detail “E”):Delete grille and grille tag shown on Gridline “L”.
3. Building 1D - Sedimentation Enlarged Plan Above EL. 190.80m (Detail “F”): Addfire damper to 510mm diameter duct that penetrates wall at Gridline “7A”.
4. Building 1D - Sedimentation Piping Plan Above EL. 190.80m (Detail “G”):Revise piping nomenclature identified as “D” (drain piping ) to “SW”(service waterpiping).
6. Drawing M3.4
1. Building 1E - Maintenance Boiler Room Plan Above EL. 190.60m (Detail “G”):Delete sanitary lines.
2. Building 1E - Maintenance Boiler Room Plan Above EL. 190.60m (Detail “G”):Add Expansion Tank tag “ET-601B”.
7. Drawing M3.5
1. Building 2 - Low Lift Pumping Station Enlarged Plan Above EL. 187.76m: NearGridlines “L11" and “L7”, complete HWS piping betweem FF-405A and FF-405B.
8. Drawing M5.1
1. Heating System Schematic: Add Expansion Tank tag “ET-601B”.
9. Drawing M6.2
1. Building 1A - High Lift Building - Overall: Add note: “Note 1. Rework existingstarter control to HP-20 and HP-21 to tie into new BAS system. Existing pneumaticselector to remain as-is.”
7132 - 5 -
5. ELECTRICAL SPECIFICATIONS
1. SECTION 16001 - ELECTRICAL GENERAL PROVISIONS
1. Add to Clause 3.11.3: "5. Essential Power Generators".
2. Add Clause:
3.11.4 Test essential power generators, under existing conditions and finalconfiguration. Record the following: phase voltage and current values,frequency, water temperature, oil pressure, test duration, date, time, andgenerator name plate data. Submit test reports to the Consultant forreview. Conduct test with essential power heating and cooling loads on.Coordinate with other trades as required during testing.
2. SECTION 16800 - ELECTRIC HEATERS
1. Revise Clause 2.2.5 to read: "Provide 24V control transformer and relays as shownon drawings. Electric unit heaters to be complete with dual contactors and capableof remote summer/winter control".
6. ELECTRICAL DRAWINGS
1. Drawing E1.1
1. Electric Heaters By Division 16
1. Revise Note 2: “Provide Unit Heaters with dual contactors”
2. Relay Panel Schedule RP-1C1
1. Revise DFN-16 to be fed from 15A-1P breaker in Panel HP-K. Circuit numberto be HP-K-39.
2. Revise DFN-21 to be fed from 15A-1P breaker in Panel HP-K. Circuit numberto be HP-K-40.
2. Drawing E1.2
1. Electric Heaters By Division 16
1. Revise DFN-15, DFN-16, DFN-20 and DFN-21 to be 1/2Hp. 2. Revise LFN-8 to be 3/4Hp.
3. Drawing E2.2
1. Building 1A - High Lift Pumping Station Plan Above El. 181.05m
1. Add note 3: “Rework existing pumps HP-20 and HP-21 controls to suit new.Coordinate with other trades as required.”
7132 - 6 -
4. Drawing E2.3
1. Building 1A - High Lift Pumping Station Plan Above El. 186.64m
1. Provide dual head emergency light on south wall of vestibule. Feed fromunswitched lighting circuit serving area.
5. Drawing E4.1
1. Revise Receptacle Roof Mounting Detail as per ER-1.
END OF ADDENDUM NO. 6
1 of 2
www.castlearchitecture.ca
Architectural Addendum #1
Project: Lake Huron Primary Water Supply System Date: 25 – October – 13 HVAC and Dehumidification Project: 13-003 Project (No. LH1203) Grand Bend, Ontario
The following information supplements and/or supersedes the bid documents issued on September 18, 2013. This Addendum forms part of the contract documents and is to be read, interpreted, and coordinated with all other parts. The cost of all contained herein is to be included in the contract sum. The following revisions supersede the information contained in the original drawings and specifications issued for the above named project to the extent referenced and shall become part thereof. Acknowledge receipt of this Addendum by inserting its number and date on the Tender Form.
1.0 REVISE Section 08710 Door Hardware as follows; 2.11 DOOR STOPS AND HOLDERS
1.1 Machine Screws: In threaded anchors at concrete or masonry.
1.2 Finish: Satin chromium-plated No. 626.
1.3 Types and Manufacturers for Each Leaf:
2.14 KICKPLATES + MOP PLATES
1.1 Solid metal, not plated. Bevel four edges.
1.2 Width of door leaf less 37 mm at single leaf and less 25 mm at pairs.
1.3 Finish: Satin stainless steel No. 630.
1.4 Types and Manufacturers:
No. Type Description Standard Metal B1 Kickplate K10A B2 Mop plate K10A
2.19 HARDWARE SETS
.5 Doors D5 + D6
1 1/2 pair Hinge (x2) H1 1 Lever Set L2 1 Closer C2 1 Overhead stop S2 2 Kickplates K1 2 Mop plates K2 1 set of Flush Bolts (Top + Bottom) B1
No. Type Description Standard Metal Sargent S1 Floor stop S102L - S2 Overhead stop - 598S S3 Door Holder S111 -
2 of 2
www.castlearchitecture.ca
.6 Doors D7 + D8
1 1/2 pair Hinge (x2) H1 1 Lever Set L2 1 Closer C2 1 Overhead stop S2 2 Kickplates K1 2 Mop plates K2 1 set of Flush Bolts (Top + Bottom) B1 1 Door Holder S3
2.0 REVISE Section 09900 Painting as follows; 3.5 EXISTING FINISHES
ADD
Location Room No Description of Work Building 1B 1B-102 Paint previously painted door frame at new doors 1B-103 Paint previously painted door frame at new doors Building 1C 1C-106 Paint previously painted door frames at new
doors 1C-107 Paint previously painted door frame at new doors 1C-109 Paint previously painted door frame at new doors 1C-113 Paint previously painted door frames at new
doors
3.0 REFER to drawing A4 as attached showing four (4) existing doors to be replaced as noted. 4.0 REFER to drawing AR-1 (as attached) showing dimensions added to drawing 2 on A2. 5.0 REFER to drawing AR-2 (as attached) for coordination of ceiling fixtures in Room 1A-201 as
depicted in drawing 2 on A3. 6.0 DELETE all notes to add aluminum blank out panels on drawing 1 on A3. ADD note as
follows at existing exterior curtain wall framing north of gridline ‘Q1’ between gridlines ‘19’ and ‘20’;
PROVIDE 150 mm WIDE PTD. GWB VALENCE FROM HEAD OF EXISTING CURTAIN WALL FRAMING TO U/S OF NEW T-BAR CEILING AND MAINTAIN 100 mm FROM F/O VALENCE TO F/O EX. CURTAIN WALL FRAMING
End of Addendum
Drawing No.Drawn
Scale
Drawing Title
Approved
Project No.Date
Checked
Rev. No.
Project Title
AB
DETAIL NO.
DWG. NO.
AB
REGIONAL WATER SUPPLYPLANT HVAC UPGRADE
WATER SUPPLY SYSTEMGRAND BEND, ONTARIO
LAKE HURON PRIMARY
DO NOT SCALE THE DRAWINGS. ALL MEASUREMENTS ARE TO BE CHECKEDAND VERIFIED ON SITE BY THE CONTRACTOR. ANY DISCREPANCIES ARE TOBE REPORTED TO THE CONSULTANT BEFORE PROCEEDING WITH THE WORK.
COPYRIGHT © ALL RIGHTS RESERVED. ALL DRAWINGS AND RELATEDDOCUMENTS ARE THE COPYRIGHT OF THE CONSULTANT AND MUST BERETURNED UPON REQUEST OR AT THE COMPLETION OF THE WORK.REPRODUCTION OF THESE DRAWINGS OR RELATED DOCUMENTS IN PARTOR IN WHOLE, BY ELECTRONIC OR MECHANICAL MEANS, IS FORBIDDEN BYLAW WITHOUT THE PRIOR WRITTEN PERMISSION OF THE CONSULTANT
OCT 23, 2013 7132
CHEMICAL + FLOCCULATION:
ABOVE EL. 190.80
- TGC -
AS NOTEDA4
-
GARAGE
TO HWY No 83
XX
XX
X
XX
X
XX
X
XX
X
XXXXXX
X
X X
XX
XX
X
X
XX
X
X
X
X XX
XX
X
XX
XX
XX
XX
X
X XX X X
XX
XX
X
XX
X
X X
X X
X
X
X
XX
PIPESTORAGE SHED
CLEARWELL
H W
Y N
o 2 1
HIGH LIFT PUMPING STATIONFILTERS
CHEMICAL & FLOCCULATION
SEDIMENTATION
MAINTENANCE
LOW LIFT PUMPING STATION
CHLORINE
BUILDING KEY
HYDROPNEUMATIC TANK CHAMBER
XXXXXXXX
X
X
CHLORINESCRUBBER
CARBONBUILDING
STANDBY GENERATORRESIDUE MANAGEMENT FACILITY KEY PLAN
1A
1B
1C
1D
1E
2
3
1A
1E
3
1C
1B
2
1F
1F
4
5
4
1D
5
Debbert Engineering inc.London, Ontario27 Buttermere Road
N6G 4L1 www.debberteng.comfacsimile: (519) 668-2067telephone: (519) 668-2022
Project Number: 13-038
Castle + Associates
Architecture969 Colborne Street
London, ON N6A 4A5
p. 519.204.0858
www.castlearchitecture.ca
0 in
P L O T T E D S H E E T S C A L E6 in 4 in 2 in 2 in 4 in 6 in
Drawing No.Drawn
Scale
Drawing Title
Approved
Project No.Date
Checked
Project Title
AB CC DWG. NO. - WHERE DETAILED
DETAIL NO.
DWG. NO. - WHERE REQUIRED
AB
chorley.com
DO NOT SCALE THE DRAWINGS. ALL MEASUREMENTS ARE TO BE CHECKEDAND VERIFIED ON SITE BY THE CONTRACTOR. ANY DISCREPANCIES ARE TO
COPYRIGHT © ALL RIGHTS RESERVED. ALL DRAWINGS AND RELATEDDOCUMENTS ARE THE COPYRIGHT OF THE CONSULTANT AND MUST BERETURNED UPON REQUEST OR AT THE COMPLETION OF THE WORK.REPRODUCTION OF THESE DRAWINGS OR RELATED DOCUMENTS IN PARTOR IN WHOLE, BY ELECTRONIC OR MECHANICAL MEANS, IS FORBIDDEN BYLAW WITHOUT THE PRIOR WRITTEN PERMISSION OF THE CONSULTANT
DateNo. By Revisions
FILE
NAME:13-038 TR
EATM
ENT PLA
NT.DWG
DATE
PLO
TTED:
23-OCT-13 10:00 PM
OCT. 23, 2013- ISSUED BY ADDENDATGC
1B-1031C-109
1C-113
1C-022
1C-021
1C-110
1B-1021C-107
1C-106
1C-105
D7 D6
D8D5
REMOVE EXISTING DOORS+ REPLACE W/ NEW INEX. FRAMED OPENINGS
REMOVE EXISTING DOORS+ REPLACE W/ NEW INEX. FRAMED OPENINGS
9 10 11 12 13
9 10 11 12 13
L
M
N
P
CHEMICAL + FLOCCULATION: PARTIAL FLOOR PLANScale: 1:1002
K
J
H
Q
R
S
L
M
N
P
K
J
H
Q
R
S
DOORS 'D5' + 'D6'1 1/2 HR F.R.R.HM STEEL DOOR IN EXISTINGFRAMED OPENING
2135
915
ACTIVEPASSIVE
915
DOORS 'D7' + 'D8'
HM STEEL DOOR IN EXISTINGFRAMED OPENING
2135
915
ACTIVEPASSIVE
915
DOOR ELEVATIONSScale: 1:201
CHEMICAL + FLOCCULATION:BUILDING 1C - PARTIAL FLOOR PLAN
ABOVE EL. 190.80
FILE
NAME:13-038 TR
EATM
ENT PLA
NT.DWG
DATE
PLO
TTED:
23-OCT-13 10:00 PM
HVAC AND DEHUMIDIFICATION PROJECT (LH 1203)GRAND BEND, ONTARIO
LAKE HURON PRIMARY WATER SUPPLY SYSTEM
Castle + Associates
Architecture969 Colborne Street
London, ON N6A 4A5
p. 519.204.0858
www.castlearchitecture.ca
Project
Title Date
Project No.
Drawing No.
ScaleOct. 23, 2013
13-003
1:100
AR-1
REVISION TO DRAWING 2 ON A2
Issuedby Addenda
ReviewedTGC
ACCESS DOOR W/ MIN. 1000 mmCLEAR OPENING
NEW CORROGATED METAL ENCLOSURETO 2440 mm ABOVE FINISHED GRADE7/8" CORROGATED METAL SIDING(HORIZONTAL) ONGALVANIZED SUB-GIRT STRAPPING ATMIN. 600 mm O.C. OVERGALVANIZED HSS SUB-FRAME(SEE TYPICAL ELEVATION DWG 13 ON A1)
4550
10700
EQ.2
1830 (M
AX)
600EQ.1
1000EQ.1
EQ.2 EQ.2
1830
REFER TO MECHANICAL DRAWINGS FOR ALL EQUIPMENT LAYOUT + SPECIFICATIONS
23
23
23
23
CHEMICAL + FLOCCULATION:BUILDING 1C - PARTIAL FLOOR PLAN
ABOVE EL. 190.80
FILE
NAME:13-038 TR
EATM
ENT PLA
NT.DWG
DATE
PLO
TTED:
24-OCT-13 11:00 AM
HVAC AND DEHUMIDIFICATION PROJECT (LH 1203)GRAND BEND, ONTARIO
LAKE HURON PRIMARY WATER SUPPLY SYSTEM
Castle + Associates
Architecture969 Colborne Street
London, ON N6A 4A5
p. 519.204.0858
www.castlearchitecture.ca
Project
Title Date
Project No.
Drawing No.
ScaleOct. 24, 2013
13-003
1:100
AR-2
REVISION TO DRAWING 2 ON A3
Issuedby Addenda
ReviewedTGC
ACT-1+ 2440 mm
NEW
ACT-1+ 2440 mm
NEW
RETAIN EXISTINGSLOPED BULKHEAD(TYPICAL)
E1
F
G
PIPE FURRINGTO SUIT (REFERDETAIL 12 ON A1)
PIPE FURRINGTO SUIT (REFERDETAIL 12 ON A1)
CONFERENCE1A-201
OFFICE1A-202
1E-110
G
22 23
22 23
F
E1