Addendum No. 5
December 6, 2018
Anna H. Rockwell Elementary School
Renovations & Additions
400 Whittlesey Drive
Bethel, CT 06801
State Project No. 009-0058 RNV
Phase 1 of 2
This addendum shall modify/change and/or clarify the original bidding document for the
above project. Acknowledgement of receipt of this document is provided on the Bid Form.
Failure to acknowledge receipt of this addendum, previous and/or future addenda on the
Bid From may result in disqualification of the bidder.
The modifications, changes and/or clarifications are as follows:
GENERAL INFORMATION:
1. The Bid Due Date remains December 12, 2018 at 11:00am.
2. Invitation to Bid – page 4, Item 3 – delete last sentence and replace with the following:
The surety company shall be qualified and authorized to do business in the State of
Connecticut with an A.M. Best rating of A- or better.
3. Background Check
a. Contractors will need to provide the names of employees as they are on their form
of ID so that original paperwork may be prepare by the Board of Education HR
Department.
b. Once an employee is fingerprinted they will be allowed to begin work on site.
SCOPE CLARIFICATIONS:
1. The following scope shall be added for the Portable Swing Space
a. BP#17 – Site Work shall clear and level the area shown for portables on the Site
Logistic Plan. (approx. 150’ x 150’)
b. BP#17 Site Work shall provide all excavation for footings, sewer, storm piping,
etc. Extend existing sidewalks with asphalt walkways to the portable entrances.
c. BP#17 – Site Work shall include (150) footings 24” diameter x 48” (D) poured
solid concrete footer w/ (3) #5 rebar each way, typ. w/ 16”x16” block pier w/1.7
horizontal reinforcement and w/ (4) #5 rebar tied from footing, and all cells filled
solid w/mortar, grout or concrete, typ. Removal of all for final completion of area
site work scope.
d. BP#17 – Site Work shall tie into the existing sanitary sewer line for Portable Swing
Space Waste and bring lint to within 5’ of connection to trailers.
2
e. BP#16 – Electrical shall furnish and install 600 amp temporary service from the
street (CLP pole 2360?) and connect to the Portable Swing Space. Coordinate
service installation with Rizzo Corp. for procedure to allow Owner to pay for use.
Communications including telephone, PA, and Data shall be from the existing
school. Furnish and install heat trace for all piping not below frost line. Removal
all at completion of use.
f. BP#14 – Plumbing shall extend building water line and make final connection for
water and sewer to the Portable Swing Space. Manifold all plumbing water lines
from the fixtures to a single connection point. Disconnect and remove upon
completion of use.
g. Bid Package #6 – General Trades includes ramps, overhands, stairs, ramps and
scaffold walkways to the main building.
2. BP#16 – Electrical will not be able to pull temporary service for construction from the
existing building. Electrical service for construction will need to be pulled from the
Portable temporary service.
3. BP#1 – Demolition & Abatement shall include cutting penetrations for the MEP
contractors with the following estimated number of penetrations:
a. Sprinkler Piping – 165
b. Plumbing Piping – 90
c. Heating Piping – 635
d. Ductwork – 200 sf
e. Electrical conduit – 165
ATTACHMENTS:
1. RFI Pre-Bid Log
2. RFIs answered since Addendum #4 through 12/6/18
3. Perkins Eastman Addendum No. 5 dated 12/6/18.
End of Addendum No. 5
Renovation Additions to
Rockwell Elementary School
400 Whittlesey Drive
Bethel, CT 06801 Pre-Bid RFI Log
Phase 1 of 2
Rizzo Job # 18032
State Project No. 009-059 RNV
RFI# Sent To Date Sent By BP# Contractor Contractor
RFI #
Date Rec'd Question Answer Ans. Date Addendum
#
001 Perkins Eastman 11/2/18 SMC 4 Marcelli Steel 1 11/1/08 Spec 05 12 00 1.05F states that the Steel Fabricator shall be AISC
certified. Can the AISC certification be waived?
AISC certification will not be waived. 11/5/18 1
002 Perkins Eastman 11/2/18 SMC 4 Steeltech Bldg. Products 1 11/2/18 Can the designation for the Erector to be AISC certified be waived? AISC certification will not be waived. 11/5/18 1
003 Perkins Eastman 11/2/18 SMC 13 Firestop Incorporated 1 11/1/18 There is a discrepancy between the FP Drawings and
Specifications with regard to classifications of areas.
Academic Areas are indicated as "light hazard" and Mechanical
Areas are indicated as "ordinary hazard". The spec further
identifies areas as ordinary hazard 1 and 2. The differences
between the two double the gallons per minute required for
light hazards. Is the .2 FPM over 3,000sf necessary? The water
pressure coming into the schools is already low and there is no
fire pump. There is a concern meeting the requirements
especially in the Gym and Library.
004 Perkins Eastman 11/2/18 SMC 9B & 9D M. Frank Higgins 1 11/2/18 The specs reference the finishes selected on the plans but the
majority of the Manufacturer, Style, and Color columns on IN-
601 are blank. 1) Please specify all finishes.
The Specification is performance based for
ceramic and porcelain tile. The resilient
flooring specification is also performance
based with 3 acceptable manufacturers listed.
For the carpet specification, J&J Flooring's
Kinetex line is basis of design and other
acceptble manufacturers are Tandus, Manning,
Atlas, Shaw, and Bentley.
11/6/18 1
005 Perkins Eastman 11/2/18 SMC 15 CTC Bldg Solutions 1 11/2/18 Would Distech Controls by Connecticut Temperature Controls be
acceptable? Distech Controls is built on the Open Niagara
Platform and can meet or exceed the requirements outlined
within the specification 230923.
No, Distech Controls by CTC are not
acceptable. The manufacturers listed in the
specifications are the only controls
manufacturers permitted by the building
owner.
11/5/18 1
006 Perkins Eastman 11/5/18 SMC 9 Integrated Interiors 1 11/2/18 Is the Integrated Interiors Series 2000 Acoustical Panel an
acceptable alternate ?
Refer to Specification 01 60 00 Section 2.02 -
"Substitutions will not be accepted during the
bid period."
11/9/18 1
007 Rizzo 11/5/18 SMC 17B Avant Garden 1 11/3/18 Will you be including interior plants in this projects? All planting scope is exterior. 11/5/18 1
Are all windows without shade tags to receive manual shades?
Are interior windows, doors, sidelights, and transoms to receive
manual shades?
009 Perkins Eastman 11/5/18 SMC 9 Integrated Interiors 2 11/5/18 What is the specification for ACC-1 Media Center Ceiling Clouds? Provide “Soundscapes” by Armstrong or equal. 11/26/18 2
What is the model # for the Robe Hooks on the back of the
single toilet room doors? (In gang bathrooms the robe hooks
typically come with the toilet compartments
Nonrick Wshroom Equipment, Inc., B-2116
008
11/9/18
11/9/18 1
1
1010 Perkins Eastman 11/6/18 SMC 6 Kilcourse Specialty Prod. 1 11/6/18
11/2/181
11/5/18
12SMC Provide window shades as indicated in the
documents.
Perkins Eastman Alpha Aero Draperies11/5/18
Libraries and gymnasiums shall be Light
Hazard. Density area shall be 1500 square feet.
12/6/18 Page 1 of 33`
Renovation Additions to
Rockwell Elementary School
400 Whittlesey Drive
Bethel, CT 06801 Pre-Bid RFI Log
Phase 1 of 2
Rizzo Job # 18032
State Project No. 009-059 RNV
RFI# Sent To Date Sent By BP# Contractor Contractor
RFI #
Date Rec'd Question Answer Ans. Date Addendum
#
Toilet Accessories Spec calls for grab bars to be smooth. Please
confirm that grab bars should be smooth.
Confirmed
011 Perkins Eastman 1/7/18 SMC 11 H. Weiss, Div of BHS 1 11/7/18 We would like to be added to the list of approved food service
contractors.
Delete articles 1.04;A.3 and 1.04;A.4 from
Specification section 11 40 00 in their entirety.
11/13/18 1
012 Rizzo 11/8/18 SMC 9D ProFloors LLC 1 11/7/18 Is this a Prevailing Wage Project? Is it tax exempt? Project is Prevailing Wage and Tax Exempt 11/8/18 1
013 Rizzo 11/14/18 SMC 15 MJ Daly 1 11/12/18 Spec section 00 41 26 is the proposal form, however there are
three sets of proposal forms (single package, combo bids within
1 school, combo bids for both schools). Since we will be doing all
three, did you want us to provide three separate submissions
per proposal form type, including all the paper work being asked
for in triplicate, all separately? If yes, would the individual bid
bonds suffice for the combo proposals, or are you looking for a
multitude of combo-bid bid-bonds as well?
Bid Form "A" gets all the required Alternates,
Unit Prices and attachments, all in triplicate.
The attachments to Bid Form "A" are
applicable to Bid Forms "A-1" and "A-2" so
duplication is not required. Just submit Forms
"A-1" and "A-2" in triplicate with no other
attachments. With regard to Bid Bonds, submit
a single bid bond with a cover letter from the
Surety indicating the bond is also applicable to
the bids submitted on Forms "A-1" and "A-2".
11/14/18 1
014 Rizzo 11/14/18 SMC 15 MJ Daly 2 11/12/18 Did you want Spec Section 00 45 13 “Contractor Qualification
Statement” submitted by a certain timeframe, or since we have
done work in the recent past together, are we already
prequalified?
Contractor Qualification Statement is required
to be submitted with all bids. See Spec Section
00 22 13 Item #12.
11/14/18 1
015 Perkins Eastman 11/14/18 SMC 5 Nova Wood Products 1 11/12/18 Interior Finish Schedule IN-601 says PL-2 is for FACULTY
MILLWORK and PL-3 is for CLASSROOM MILLWORK. The
elevation titles identify the type of millwork. Which laminate
colour is required at the elevations designated as OFFICE (e.g. A-
213/25)? Are office & faculty intended to have the same finish?
Office millwork shall have pl-2. 11/16/18 4
016 Perkins Eastman 11/14/18 SMC 5 Nova Wood Products 2 11/12/18 Plan view of the casework in 105 OT/PT shows the tall cabinet
on the left and the sink on the right. The elevation tag says “A-
213/16 Sim” (see A101a/1). The actual elevation on A-213 has
the tall cabinet on the right and the sink on the left. Are we
correct in assuming the plan view is accurate and the elevation
tag should say Opp. Instead of Sim.?
Yes. Tag should read Opp. 11/25/18 2
017 Perkins Eastman 11/14/18 SMC 5 Nova Wood Products 3 11/12/18 Enlarged plan view of the 101 Admin Suite shows a low wall &
gate adjacent to the reception desk (see A-401/2). Neither the
wall nor the gate is shown in elevation A-213/8 and there are no
section tags on the floor plan. Is there any millwork required at
the low wall or gate?
Provide swing gate and low wall at height to
match adjacent millwork. Provide spring
loaded closer and cabinet latch on office side.
11/25/18 2
11/9/18 1010 Perkins Eastman 11/6/18 SMC 6 Kilcourse Specialty Prod. 1 11/6/18
12/6/18 Page 2 of 33`
Renovation Additions to
Rockwell Elementary School
400 Whittlesey Drive
Bethel, CT 06801 Pre-Bid RFI Log
Phase 1 of 2
Rizzo Job # 18032
State Project No. 009-059 RNV
RFI# Sent To Date Sent By BP# Contractor Contractor
RFI #
Date Rec'd Question Answer Ans. Date Addendum
#
018 Perkins Eastman 11/14/18 SMC 5 Nova Wood Products 4 11/12/18 Enlarged plan view of the 101 Admin Suite appears to show
something inside 101g Admin Coat Closet. No elevation tag or
section tag is provided. There are no section details for a coat
closet with the millwork details on A-551 through A-553. There
are no specifications for coat closet millwork or hardware in
section 06 40 23. Is millwork required in this closet?
Provide 12” deep shelf with PL-2 and coat rod
with appropriate hardware.
11/25/18 2
019 Perkins Eastman 11/14/18 SMC 5 Nova Wood Products 5 11/12/18 Please clarify what is required at the staff mailboxes. In elevation
A-213/13 they appear to be standard mail slots in an open
cabinet, presumably plastic laminate to match the rest of the
casework. Section detail A-551/4 has no notes to identify the
finishes at the mail slots, but it shows a back panel that appears
to match the rest of the casework, top & bottom panels and
shelves that are a different material, and no sides or gables at
all. The hatch pattern used at the top, bottom & shelves appears
to indicate wood of some kind (solid lumber or wood-veneer-
faced plywood), but the specification in section 06 40 23 do not
include specs for wood species, cut, or finish. If wood veneer is
used is it the same STAINED MAPLE that is used for the bench
seats?
Reference elevation A-214/13. Provide per
detail A-551/4. Use PL-2 for shelves, back
panel, side panels, etc.
11/25/18 2
020 Perkins Eastman 11/14/18 SMC 5 Nova Wood Products 6 11/12/18 There is a note at elevation A-211/1 for SOLID SURFACE AT
WINDOW BENCH at curtain wall CW-01 in 121 Cafeteria. The
section detail is A314/3. That wall section shows precast
concrete bench at those locations. Which is correct? If a solid
surface bench is required, please identify which solid surface
colour and provide a section detail for it.
Provide cast stone bench. 11/25/18 2
021 Perkins Eastman 11/14/18 SMC 5 Nova Wood Products 7 11/12/18 Section details A-553/2,4 include notes for SUPPORT BRACKET at
wall-mounted benches. Specifications in section 06 40 23 do not
include bench support brackets. Please provide specs including
manufacturer, model number, type of metal (steel or
aluminum), and finish.
Support bracket specified in Section 064023 in
Addendum #4.
11/28/18 5
Section details for the reception desks & circulation desks (A-
552) show PL-2 plastic laminate at the face of the desk in detail 1
but veneer-faced plywood at the face of the desk in detail 3.
There is no elevation of the face of the desk.
Nova Wood Products 8 11/12/18 11/27/18 4022 Perkins Eastman 11/14/18 SMC 5
12/6/18 Page 3 of 33`
Renovation Additions to
Rockwell Elementary School
400 Whittlesey Drive
Bethel, CT 06801 Pre-Bid RFI Log
Phase 1 of 2
Rizzo Job # 18032
State Project No. 009-059 RNV
RFI# Sent To Date Sent By BP# Contractor Contractor
RFI #
Date Rec'd Question Answer Ans. Date Addendum
#
a. Which is correct? Should the entire face be plastic laminate
like the desks at Johnson ES (see details A-552/1,2)? Or are both
finishes used? If so, please provide an elevation of the desk face
that shows the extent of both finishes and how they meet/join.
Plastic laminate is correct.
b. If wood veneer is used is it the same STAINED MAPLE that is
used for the bench seats?
N/A
023 Perkins Eastman 11/14/18 SMC 5 Nova Wood Products 9 11/12/18 CW-06 is in Stair #1 and the section tag on Floor plan A-101a and
enlarged plan A-420/2 is for wall section A-312/2, which does
not include a solid surface sill. Section detail A-322/5 is titled
SECTION DETAIL @ STAIR 1 – BOX W/PHENOLIC and it includes a
15” deep solid surface sill. Floor plan and enlarged plan for Stair
#1 do not include tags for section A-322/5. Is there a window sill
required at CW-06?
No. See Rockwell SKA-001 for reissued detail
5/A-322.
11/27/18 4
024 Perkins Eastman 11/14/18 SMC 5 Nova Wood Products 10 11/12/18 Summary in paragraph 1.02 of section 06 40 23 refers to plastic
laminate & solid surface items. Quality Assurance in paragraph
1.06.A refers to sequence-matched wood veneers. Materials in
paragraph 2.01 include plastic laminate and solid surface, but
there are no specifications for wood veneers. There are notes
for STAINED MAPLE in the drawings at the bench seats on A-552
(both sets of drawings). Is it Natural Maple (with colour variation
between sap & heart wood) or is White Maple (sapwood only)?
Is it plain sawn? What face grade is required (“A” is standard for
transparent finishes like this)?
Provide Grade ‘A’ plain sawn Natural maple
wood veneer.
11/25/18 4
Specifications in 06 40 23 indicate there are three (3) colours
required for plastic laminate and three (3) colours required for
solid surface. They are identified as “As scheduled on drawings”
(see paragraph 2.01.D.2 and 2.01.E.2). Interior Finish Schedule IN-
601 indicates there are four (4) colours each but none of the
colours are identified.
a. Which is correct? Are there 3 colours for each or 4 colours?
b. Will specific colours be identified? Cost for plastic laminate
varies widely, depending on manufacturer, colour/pattern, and
finish/texture chosen. Cost for solid surface has an even wider
range, depending on manufacturer & colour/pattern chosen.
Nova Wood Products 8 11/12/18 11/27/18 4022 Perkins Eastman 11/14/18 SMC 5
Nova Wood Products 11 11/12/18 11/15/18 1Provide 4 colors of each per finish schedule.
Colors to be selected from manufacturer’s full
range of standard colors.
025 Perkins Eastman 11/14/18 SMC 5
12/6/18 Page 4 of 33`
Renovation Additions to
Rockwell Elementary School
400 Whittlesey Drive
Bethel, CT 06801 Pre-Bid RFI Log
Phase 1 of 2
Rizzo Job # 18032
State Project No. 009-059 RNV
RFI# Sent To Date Sent By BP# Contractor Contractor
RFI #
Date Rec'd Question Answer Ans. Date Addendum
#
026 Perkins Eastman 11/14/18 SMC 5 Nova Wood Products 12 11/12/18 Specifications in paragraph 2.02 of section 06 40 23 are for fire-
retardant-treated materials. Where are these required?
Fire retardant materials are not required for
Millwork. Revised Ans.: Provide fire retardant
materials as indicated on the drawings
11/15/2018
Rev. 12/4/18
1, 5
027 Perkins Eastman 11/14/18 SMC 5 Nova Wood Products 13 11/12/18 Specifications in paragraph 2.03.G of section 06 40 23 are for a
lockable pencil drawers at the reception desk in each school.
There are no elevations of the staff side of these desks. The
section details (see A-552/1,2 in both drawing sets) do not show
any drawers. How many drawers are required at each desk and
where are they located?
File cabinets at reception desk are to be part of
the FF&E package.
11/25/18 2
028 Perkins Eastman 11/14/18 SMC 5 Nova Wood Products 14 11/12/18 Specification in paragraph 2.05.C indicate the cores of the plastic
laminate casework is to be either medium-density-overlay or
veneer-core plywood. AWS standards require either
particleboard of MDF cores at doors & drawer faces because of
warping & delamination. Please confirm that AWS standards
take precedence over project specifications. (Note that if the
owner/architect insists on another core at the doors & drawer
faces, we will fabricate them, but they will not be covered by the
warranty.)
AWS standards take precedence. 11/15/18 1
Scope of work for BP5 and summary paragraph at front of
section 06 40 23 refer to custom display cases, however there
are no specifications in section 06 40 23 for custom display
cases. There are section details (A-552 for Johnson Elementary &
A-553 for Rockwell Elementary) but the details are missing quite
a bit of information and some of the notes contradict each
other:
a. There are no thicknesses for the tempered glass, just notes
that say “as specified”. How thick are the doors? Are the shelves
the same thickness or are they different?
b. There are finishes for the hardware, but no sizes,
manufacturers, or model numbers. Please provide specifications
for door hinges & locks at swinging doors, door track systems &
locks at sliding doors, and shelf standards & brackets at glass
shelves.
c. The small display cases have notes for both pivot hinges &
sliding doors – which is correct?
d. Please provide specifications for the fabric on the tack
panels in the large cases – manufacturer, pattern, colour, etc.
Also, please provide specs for the tackable core under the fabric.
Nova Wood Products 15 11/12/18 11/28/18 5029 Perkins Eastman 11/14/18 SMC 5 Custom display cases is specified in Section
064023 in Addendum #4. Small display cases
are manufactured units specified in Section
101200 with sliding doors.
12/6/18 Page 5 of 33`
Renovation Additions to
Rockwell Elementary School
400 Whittlesey Drive
Bethel, CT 06801 Pre-Bid RFI Log
Phase 1 of 2
Rizzo Job # 18032
State Project No. 009-059 RNV
RFI# Sent To Date Sent By BP# Contractor Contractor
RFI #
Date Rec'd Question Answer Ans. Date Addendum
#
e. The tack panel in the smaller cases does not include the
description “fabric-wrapped”. Is it the same as the larger cases
or is it something else?
f. There are notes for hardwood veneer panels at the top of
the case. At the bottom there are notes for optional low-
pressure laminate (i.e. melamine) in walnut or oak pattern at the
top, bottom, and ends. Which is correct?
g. Who is responsible for the Reglet trim – millworker or
drywaller? If the millworker is intended to provide it, we need to
know the profile, size (width/height and depth – only the height
is noted on the drawings), and finish. Is the same profile & size
used at the cement block wall location(s) at Johnson
Elementary?
030 Perkins Eastman 11/14/18 SMC 5 Nova Wood Products 16 11/12/18 Millwork section details (A-551 for both drawing sets) show solid
surface countertops dimensioned as 1¼” thick at the front edge.
The enlarged detail of the countertop edge shows the
countertop dimensioned as 1½” thick. Solid surface material is
½” thick and builds up to 1½” as shown in the enlarged detail.
Please confirm that 1½” is the correct thickness.
1 ½” is correct. 11/27/18 4
031 Perkins Eastman 11/14/18 SMC 5 Nova Wood Products 17 11/12/18 Millwork section detail A-551/6 is a section through a work
counter. Is the apron piece below the countertop solid surface
to match the top or plastic laminate to match the rest of the
casework in the room?
Plastic laminate to match. 11/27/18 4
032 Perkins Eastman 11/14/18 SMC 5 Nova Wood Products 18 11/12/18 The section details on A-551 & A-552 (both sets of drawings)
include notes for SUPPORT ANGLE under open countertops.
Specifications in section 06 40 23 do not include countertop
support brackets. Please provide specs including manufacturer,
model number, type of metal (steel or aluminum), and finish.
Support brackets are specified in Section
064023 in Addendum #4
11/28/18 5
Interior Finish Schedule IN-601 says SS-2 is for INDICATED
MILLWORK AND INFORMATION DESK. Where is SS-2 required?
Use SS-2 for solid surface material indicated in
details 1 and 3 on A-552
a. SS-2 is not indicated on the drawings for either school
b. There is a note in the Rockwell drawings that suggests the
circulation desk in the Media Center is also called the
information desk. But the section details are the same ones used
for the reception desk in the Admin Suite, which is not called an
information desk. Neither desk is referred to as an information
desk in the Johnson drawings.
Nova Wood Products 15 11/12/18 11/28/18 5029 Perkins Eastman 11/14/18 SMC 5 Custom display cases is specified in Section
064023 in Addendum #4. Small display cases
are manufactured units specified in Section
101200 with sliding doors.
Nova Wood Products 19 11/12/18 11/27/18 4033 Perkins Eastman 11/14/18 SMC 5
12/6/18 Page 6 of 33`
Renovation Additions to
Rockwell Elementary School
400 Whittlesey Drive
Bethel, CT 06801 Pre-Bid RFI Log
Phase 1 of 2
Rizzo Job # 18032
State Project No. 009-059 RNV
RFI# Sent To Date Sent By BP# Contractor Contractor
RFI #
Date Rec'd Question Answer Ans. Date Addendum
#
034 Perkins Eastman 11/14/18 SMC 5 Nova Wood Products 20 11/12/18 Section details for the reception & circulation desks on A-552
(both drawing sets) show a PL-2 plastic laminate base with a ½”
aluminum reveal in one detail (detail 1 in both sets) but an
aluminum base with no reveal in the other detail (detail 2 at
Johnson and detail 3 at Rockwell). Which is correct?
Provide aluminum base as shown in Detail 3 11/27/18 4
035 Perkins Eastman 11/14/18 SMC 5 Nova Wood Products 21 11/12/18 Do the lockers in the Receiving area (room 128 at Rockwell ES &
room 142 at Johnson ES) require a solid surface cap similar to
the corridor lockers? There are no elevations provided and no
note on the floor plan.
No. 11/27/18 4
036 Perkins Eastman 11/14/18 SMC 5 Nova Wood Products 22 11/12/18 The Art rooms in both schools include open base cabinets with
six shelves each (see elevation A-213/1 at Rockwell ES & A-215/8
at Johnson ES). No section detail is provided for this cabinet. Are
these shelves adjustable or fixed?
Fixed. 11/27/18 4
037 Perkins Eastman 11/14/18 SMC 5 Nova Wood Products 23 11/12/18 All solid surface sills are drawn as if they are fabricated from ¾”
thick material. Many sill details also include a note that reads ¾”
SOLID SURFACE SILL. The solid surface is specified in section 06
40 23 as ½” thick (see paragraph 2.08.B) and standard solid
surface is ½” thick. Please confirm that ½” is correct.
½” is correct. 11/27/18 4
CW-01: See section 3/A314
CW-02: See detail 11/A321
CW-04: See detail 4/A321.
CW-06: See detail 5/A322
CW-07A: See detail 7/A322
CW-07B: See detail 1/A313
ST-01: See detail 2/A321
ST-02, 03, 04, 05, 06, 08, 09, 11: See detail
7/A321
ST-07: See SKA-006, attached.
ST-13L: See detail 1/A321
ST-15: See detail 2/A322
ST-12R&L: ST-12R & ST-12L will now be
designated CW-08R & CW-08L respectively.
See detail 4/A321.
ST-10: ST-10 will now be designated CW-09.
See detail 4/A321.
NOTE: Please reference details from revised
A321 issued with Addendum No. 5.
12/5/18 5Please clarify which sill is required at each window type. Each
drawing set has several different solid surface sill details. There
are no sill detail tags on the window elevations on A-610 & A-
611 in either drawing set to identify which sill goes at which
window type. We are trying to work from building elevations to
building & wall sections to determine which sills go where, but
that is difficult. We’re assuming all windows in the same stretch
of wall have the same sill detail. Some walls do not have any
section tags, so we’re trying to determine the wall type by
looking at the building exteriors so we can match it to the
description in the sill detail titles. Some walls are not shown on
the building exteriors. In addition, there are several locations
that have inconsistent/contradictory information provided.
038 Perkins Eastman 11/14/18 SMC 5 Nova Wood Products 24 11/12/18
12/6/18 Page 7 of 33`
Renovation Additions to
Rockwell Elementary School
400 Whittlesey Drive
Bethel, CT 06801 Pre-Bid RFI Log
Phase 1 of 2
Rizzo Job # 18032
State Project No. 009-059 RNV
RFI# Sent To Date Sent By BP# Contractor Contractor
RFI #
Date Rec'd Question Answer Ans. Date Addendum
#
039 Perkins Eastman 11/15/18 SMC 4 Steeltech Bldg. Products 2 11/12/18 I noted on drawing S-501 typical Roof Top Unit Support. That
doesn’t apply, correct?
All roof mounted mechanical units are to be
mounted using curbs. Roof Top Unit Support
shown on drawing S-501 does not apply on this
project.
11/19/18 2
040 Perkins Eastman 11/5/18 SMC 8 Norwalk Glass 1 11/13/18 Please review the drawing below from A-321/ 5&6. It shows the
floor slab extending into my storefront, which on the verticals
would be in the way. It shows right now separate frames stacked
on top of mullion extensions, which does not work. There is no
way to secure separate frames together using the mullion
extension, as well as there is no way of securing it. The way to
make this work, with the jambs not being intersected with slab,
is to hold the frames out, and use a clip or type of tie back to
secure. This would require some design changes. Please review
and provide a revision, as this is holding me up with pricing due
to the conflict.
Provide 4” curtain wall system. Hold back of
CW ½” from existing 2nd floor slab. See
attached SKA – 002 for revised Details 5 & 6
from A-321 that address the issue.
12/4/18 5
041 Perkins Eastman 11/16/18 SMC 15 MJ Daly 3 11/13/18 Please confirm that the Roof Top Units and DOAS are using the
same specification (23 7416). Also please provide a specification
for the Make Up Air Units (MAU-1s), as they are only listed in the
mechanical equipment schedules.
Yes, specification for RTUs and DOAS units are
the same, with requirements in section 23 74
16. See new spec section 23 74 23.13
“Packaged, Direct-Fired, Outdoor, Heating-
Only Makeup-Air Units”
11/27/18 4
042 Rizzo 11/16/18 SMC 15 MJ Daly 4 11/13/18 Are there any liquidated damages associated with this project? If
so, please define them and their caps?
There are no liquidated damage clauses 11/30/18 4
043 Perkins Eastman 11/16/18 SMC 15 MJ Daly 5 11/13/18Please advise if TACO can be added as an approved
manufacturer for the Plate & Frame Heat Exchangers?
Refer to Specification 01 60 00 Section 2.02 –
“Substitutions will not be accepted during the
bid period.”
11/26/18 4
044 Perkins Eastman 11/16/18 SMC 15 MJ Daly 6 11/13/18Please advise if Nelson could be added as an approved
manufacturer for the heat trace if they can meet the spec, as a
couple approved manufacturers do not have CT representation.
Refer to Specification 01 60 00 Section 2.02 –
“Substitutions will not be accepted during the
bid period.”
11/26/18 4
045 Perkins Eastman 11/16/18 SMC 15 MJ Daly 7 11/13/18 Please advise if TWA & Vulcan could be added as approved
manufacturers for the Radiant Heating Hydronic Panels (RPs)?
Refer to Specification 01 60 00 Section 2.02 –
“Substitutions will not be accepted during the
bid period.”
11/26/18 4
046 Perkins Eastman 11/16/18 SMC 15 MJ Daly 8 11/13/18Can Rittling, Vulcan & Sterling be added as approved
manufacturers for the Cabinet Unit Heaters and Unit Heaters?
There are currently quite a few manufacturers listed in the spec
that cannot meet the spec or listed scheduled data. Also, Rittling
is shown on the schedule but not approved in the spec?
Rittling and Sterling are acceptable
manufacturers for Cabinet Unit Heaters and
Unit Heaters. Vulcan is not acceptable.
11/27/18 4
12/6/18 Page 8 of 33`
Renovation Additions to
Rockwell Elementary School
400 Whittlesey Drive
Bethel, CT 06801 Pre-Bid RFI Log
Phase 1 of 2
Rizzo Job # 18032
State Project No. 009-059 RNV
RFI# Sent To Date Sent By BP# Contractor Contractor
RFI #
Date Rec'd Question Answer Ans. Date Addendum
#
047 Perkins Eastman 11/16/18 SMC 15 MJ Daly 10 11/13/18 Can Carrier be added as an approved manufacturer for the
RTUs?
Refer to Specification 01 60 00 Section 2.02 –
“Substitutions will not be accepted during the
bid period.”
11/27/18 4
048 Perkins Eastman 11/16/18 SMC 15 MJ Daly 11 11/13/18 Can Daikin be added as an approved manufacturer for Chillers &
RTUs?
Refer to Specification 01 60 00 Section 2.02 –
“Substitutions will not be accepted during the
bid period.”
11/27/18 4
049 Perkins Eastman 11/16/18 SMC 15 MJ Daly 12 11/13/18 Can Price be added as an approved manufacturer for the VAV
Boxes?
Refer to Specification 01 60 00 Section 2.02 –
“Substitutions will not be accepted during the
bid period.”
11/27/18 4
050 Rizzo 11/16/18 SMC 14, 15 MJ Daly 13 11/13/18 Please verify that all Condensate Piping for the indoor FCUs and
Ductless Splits will be furnished and installed by the HVAC
Contractor?
Yes 11/30/18 4
051 Perkins Eastman 11/16/18 SMC 15 MJ Daly 14 11/13/18Please advise if Grooved Piping Systems (Victaulic, Anvil, etc.,)
would be acceptable for all aboveground hydronic piping 2-1/2"
and larger in lieu of welded systems? Additionally, please advise
if ProPress Copper Systems (Viega, Nibco, etc.,) would be
acceptable for hydronic piping systems including condensate
systems for piping 2" and smaller? ProPress shown under
section 2.2, but not shown as an option under the piping
application section 3.1?
No, grooved piping systems for steel and
ProPress copper systems for copper piping are
not acceptable. Bids to include piping as
required by 23 21 13 Paragraph 3.1.
11/27/18 4
052 Perkins Eastman 11/16/18 SMC 15 MJ Daly 15 11/13/18Can Danfoss & Yaskawa be added as approved manufacturers
for the VFD drives? 3 approved manufacturers are usually
needed on public projects, unless this is a proprietary spec?
ABB Low Voltage HVAC Drives are required by
the building owner. Danfoss and Yaskawa are
not acceptable to the owner.
11/27/18 4
053 Rizzo 11/16/18 SMC 15 MJ Daly 16 11/13/18Bid docs provide a general statement that the HVAC Contractor
responsible for BIM drawings, but who is responsible for
gatekeeping duties (clash detection, incorporating other trades
drawings into the model, etc.,)? Is Rizzo spearheading this
portion of coordination, will a third-party firm be performing this
work, or will this be on the HVAC Contractor?
HVAC Subcontractor is the coordinator for the
BIM process.
11/30/18 4
054 Perkins Eastman 11/16/18 SMC 14, 15 MJ Daly 17 11/13/18Please advise if Novia Associates (rep'd by Seismic Control
Products) will be acceptable for the Vib-Iso & Seismic Control
Products? They have a stronger representation in the CT area
than most of the other spec'd manufacturer's, they can meet all
specs and provide a PE stamp & calculations where necessary.
Refer to Specification 01 60 00 Section 2.02 –
“Substitutions will not be accepted during the
bid period.”
11/27/18 4
055 Rizzo 11/16/18 SMC 14, 15 MJ Daly 18 11/13/18Please verify that all gas piping, valves, fittings & regulators will
be furnished and installed by the plumbing contractor up to and
including connection to HVAC mechanical equipment?
Confirmed 11/30/18 4
12/6/18 Page 9 of 33`
Renovation Additions to
Rockwell Elementary School
400 Whittlesey Drive
Bethel, CT 06801 Pre-Bid RFI Log
Phase 1 of 2
Rizzo Job # 18032
State Project No. 009-059 RNV
RFI# Sent To Date Sent By BP# Contractor Contractor
RFI #
Date Rec'd Question Answer Ans. Date Addendum
#
056 Perkins Eastman 11/16/18 SMC 14, 15 MJ Daly 19 11/13/18Are there any associated CAD fees with signing over the release
forms from the Architect to start our 3D coordination?
No. 11/27/18 4
057 Rizzo 11/16/18 SMC 4, 15 MJ Daly 20 11/13/18HVAC Scope of Work places part of spec 05 50 00 in our scope?
After reviewing the Metal Fabrications spec (05 50 00), all the
items noted seemed to be related to a separate bid packages
(Metal Ladders, Steel Trim, Bearing and Leveling Plates, One-
Way Barrier Gates, etc.,)? Which of the spec'd items is being
requested by the HVAC Contractor (if any)?
Delete Spec 05 50 00 from BP#15 - HVAC
Scope of Work.
11/30/18 4
058 Rizzo 11/16/18 SMC 7, 15 MJ Daly 21 11/13/18 Please verify that all exterior sheet metal flashing and trim is to
be furnished and installed by a separate roofing or
miscellaneous metals contractor?
Yes 11/30/18 4
059 Rizzo 11/16/18 SMC 14, 15 MJ Daly 23 11/13/18 Who is responsible for patching holes in existing floors & walls
(masonry & sheetrock) when demo is removed (i.e. piping,
ductwork, CUHs, etc.)?
BP#3 - Masonry owns masonry wall patching,
BP#6 - General Trades owns all other wall
patching, BP#5 - Structural Steel & Misc.
Metals owns any metal deck patching & BP#2 -
Concrete owns concrete floor patching.
11/30/18 4
060 Rizzo 11/16/18 SMC 14, 15 MJ Daly 24 11/13/18 Who is responsible for opening & closing existing walls for any
new piping, ductwork, etc.? We are assuming the masons would
own masonry walls, sheetrockers would own sheetrock walls,
etc., but please confirm?
Cutting openings in existing walls is to be done
by BP#1 - Demolition & Abatement. Scope is
being added to BP#1 to cover this work.
Caulking or sealing around the opening is the
responsibilty of the trade providing the item
being installed through the opening.
11/30/18 4
061 Rizzo 11/16/18 SMC 14, 15 MJ Daly 25 11/13/18 Who is responsible for closing up the concrete slabs when
existing piping or ductwork is removed? We are assuming the
concrete contractor, but please advise?
See response to RFI-059 11/30/18 4
062 Rizzo 11/16/18 SMC 14/15 MJ Daly 26 11/13/18 Who owns cutting up any interior slabs for HVAC and Plumbing
UG piping (and ductwork if applicable) for existing and/or new
construction? We are assuming the concrete contractor, but
please advise?
Cutting of interior slabs is by BP#1 - Demolition
& Abatement. There should be no cutting
required for new construction.
11/30/18 4
063 rizzo 11/16/18 SMC 14, 15 MJ Daly 27 11/13/18 Who owns trenching, excavating, and backfilling for the
underground mechanical (PLBG & HVAC) piping? We are
assuming the site contractor owns all of it, please verify?
BP#17 - Site Work 11/30/18 4
064 Rizzo 11/20/18 SMC 1 Sothern CT Demo 1 11/14/18 So there will be no abatement done thru the Xmas holiday?
Feb/Apr vacations? Usually, when we do these large
projects…we go in during vacations to do floor tile so the other
trades have a slight jump by the time summer work arrives?
See Phasing Plans - Flooring is scheduled to be
removed during the first summer. All other
abatement is being done by phase.
11/20/18 2
12/6/18 Page 10 of 33`
Renovation Additions to
Rockwell Elementary School
400 Whittlesey Drive
Bethel, CT 06801 Pre-Bid RFI Log
Phase 1 of 2
Rizzo Job # 18032
State Project No. 009-059 RNV
RFI# Sent To Date Sent By BP# Contractor Contractor
RFI #
Date Rec'd Question Answer Ans. Date Addendum
#
065 Perkins Eastman 11/20/18 SMC 7 Barrett Roofing 1 11/14/18 Has there been roof core samples taken of the existing roof
outlining the composition? i.e. existing decking, deck slope,
insulation type & thickness, membrane etc. If so, where are
these results listed? If not, can this information be obtained and
made available?
Yes. Refer to spec section 00 31 26. 12/4/18 5
066 Bethel Fire
Marshall
11/20/180 SMC 13 Firestop 2 11/15/18 Since the second floor will be fully remodeled in 2019, we will
have to install all components and have them fully tested to
allow for the school to take back the space. However the
sprinkler riser room is on the far side of the building with Phases
4 and 5 in between that won’t be worked on until 2020. Is it the
expected plan that the sprinkler system will be tested but not
live in the earlier phases of the project or are their plans for
temporary removal of ceilings to create access from the
sprinkler riser room to the second floor during phase 2 to allow
the system to be live at the completion of phase 2. (There were
no plans in the phasing to include the ceiling removal work.)
Since there are currently no sprinklers in the building, will the
Fire Marshall allow occupancy in areas with inactive sprinklers?
The Fire Marshall and the Building Official will
require that as sections are turned over that
the fire sprinkler systems be activated in those
areas. This is based on the Ct Fire & Building
codes that stipulate fire sprinklers in "E" use
buildings, as they will fall under the CT Fire &
Building Codes for alterations and new
construction/renovations.
12/5/18 5
067 Rizzo 11/20/18 SMC 13 Firestop 3 11/15/18 In the Volume 1 Scope of work section for Fire Suppression Page
00 24 13.26 – 10 note H states “h. No sanding, scraping or
drilling of existing walls will be permitted.” I would imagine there
will be a fair amount of instances where we will need to
penetrate existing CMU walls with 3” or larger diameter holes to
supply sprinkler piping into classrooms. I believe the reason
behind this requirement is due to the lead paint on the CMU
walls, so I want to know if there is a plan to have another
contractor perform wall drilling for the project as a whole? Or
are other options for getting through existing walls available to
us besides drilling the existing?
See response to RFI-060 11/30//18 4
068 Perkins Eastman 11/20/18 SMC 12 Turner Commercial Prod 1 11/16/18 General Note 4 on Interior Elevation drawings calls for "all
classroom windows/exterior windows adjacent to primary
learning space to receive double roll shades with 2% window
shade and blackout shades". Do all the exterior windows
indicated to receive shades receive single or double shades?
What is meant by the phrase "adjacent to primary learning
space"?
Delete note 4 from interior elevations general
notes. refer to rcp’s and in-601 for required
information.
11/27/18 4
12/6/18 Page 11 of 33`
Renovation Additions to
Rockwell Elementary School
400 Whittlesey Drive
Bethel, CT 06801 Pre-Bid RFI Log
Phase 1 of 2
Rizzo Job # 18032
State Project No. 009-059 RNV
RFI# Sent To Date Sent By BP# Contractor Contractor
RFI #
Date Rec'd Question Answer Ans. Date Addendum
#
069 Perkins Eastman 11/20/18 SMC 6 Turner Commercial Prod 2 11/16/18 1/A-401 for the Nurse & guidance area shows the Cot Area
Cubicle tracks with a different configuration than the same area
on the A-111b RCP plan. The RCP plan show the first cubicle
track starting at the wall between the Exam Room and Cot Area.
The Enlarged plan shows that same track curving into the back
wall, similar to the other cubicles. Which is correct?
1 / A-401 is correct. 11/27/18 4
070 Perkins Eastman 11/20/18 SMC 10C Turner Commercial Prod 3 11/16/18 11/A-214 for Rm 116 Sped does not agree with the floor plan on
A-101b. The elevation shows just (2) WB-2, but the floor plan
also shows (2) TB-2. Which is correct.
Provide (2) wb-2 and (2) tb-2 as indicated on A-
101b.
11/27/18 4
071 Perkins Eastman 11/20/18 SMC 6 Turner Commercial Prod 4 11/16/18 The size of the Projection Screen in the Platform/Gymnasium is
not clearly indicated and the spec appears to provide two
different sizes. Please confirm which is the correct size for the
Platform/Gym projection screen 65 x 111 or 160 x 284?
Provide 160 x 284. 11/27/18 4
072 Perkins Eastman 11/20/18 SMC 12 Turner Commercial Prod 5 11/16/18 Does the interior light in 126/PE office get a roller shade? If so,
what type?
No. 11/27/18 4
073 Perkins Eastman 11/20/18 SMC 12 Turner Commercial Prod 6 11/16/18 The RCP showing WT-1 & WT-2 roller shades does NOT indicate
shades at the following: 101c/Principal Office - ST-05 only; 116/
SPED; 117/Faculty Dining; 120/Music; 112/Kindergarten - ST-02
only; 113/Kindergarten - ST-02 only. Is this correct?
Provide WT-1 at the locations indicated above. 11/27/18 4
074 Perkins Eastman 11/20/18 SMC 12 Turner Commercial Prod 7 11/16/18 10/A-121, head detail for the Media Center curtainwall windows
describes the single motorized shade as "window treatment
pocket", but the detail actually shows the bracket with a wall
angle mount with fascia. Should these roller shades be provided
with a fascia or pocket?
Provide fascia. 11/27/18 4
075 Perkins Eastman 11/20/18 SMC 12 Turner Commercial Prod 8 11/16/18 The Cafeteria RCP detail 1/a-112 indicates the (3) CW-01
windows should receive (4) WT-2 type shades at each CW-01
curtainwall, for a total of 12 shade motors. Would it be
acceptable to band the shades together to reduce the number of
motors?
Yes. 11/27/18 4
076 Perkins Eastman 11/20/18 SMC 12 Turner Commercial Prod 9 11/16/18 Detail 1/A-401 for Nurse's Suite indicated (2) manual roller
shades at HM borrowed lights but does NOT indicate the fabric
type. Same issue at 101a/SPED Secretary office. Will these be
light-filtering or BO shades?
Black out shades. 11/27/18 4
12/6/18 Page 12 of 33`
Renovation Additions to
Rockwell Elementary School
400 Whittlesey Drive
Bethel, CT 06801 Pre-Bid RFI Log
Phase 1 of 2
Rizzo Job # 18032
State Project No. 009-059 RNV
RFI# Sent To Date Sent By BP# Contractor Contractor
RFI #
Date Rec'd Question Answer Ans. Date Addendum
#
077 Perkins Eastman 11/20/18 SMC 12 Turner Commercial Prod 10 11/16/18 The roller shade sections (A-311/1,2,3,4) all describe "Shade
pocket bracket. Provide snap-on fascia. Secured to WD
blocking". The details on A-321 indicate the same. Was the
intent to provide the shades inside of pockets with closures in
order to protect them from the heating effects of the radiant
panels? If the shades are mounted as described, not only would
it be impossible to attach the front fascia that faces the radiant
panels, the proximity of the radiant panels would probably void
any warranty on the shade fabric.
See the attached SKA-003 for clarification. a
2” space has been added between the radiant
panel and the shade pocket allowing adequate
distance for fascia installation and heat
dissipation.
12/4/18 5
078 Perkins Eastman 11/20/18 SMC 5 Turner Commercial Prod 11 11/16/18 What Spec is providing the illuminated display cases? Section 064023-Interior Architectural
Woodwork Specifies the custom built display
cases included in Addendum #4. Section
101200-Display Cases specifies purchased,
manufactured units. Both types are
illuminated.
The CW-05 elevation on A-610 shows the width to be 8'-0" in
two sections, but the interior elevation and the floor plan show
it to be about 6'-6" in width in one section. Which is correct?
CW-05 on A-610 indicates with to be 6’-4 ½”.
Also, as a WT-2 roller shade, what fabric will be used, light-
filtering or BO?
Blackout.
080 Perkins Eastman 11/20/18 SMC 6 Turner Commercial Prod 13 11/16/18 There is a spec for Fire Protection Specialties, 10 44 00, but
there do't appear to be any cabinets or extinguishers on the
plans. Please indicate if there are any required on the project.
Provide Fire extinguishers in the Kitchen.
Coordinate w/Authority Having Jurisdiction for
location.
11/27/18 4
081 Perkins Eastman 11/21/18 SMC 15,16 MJ Daly 26 11/19/18 Please verify that all duct mounted smoke detectors are
furnished by the Fire Alarm Contractor and installed by the HVAC
Contractor?
Duct mounted smoke detectors to be provided
by electrical contractor, installed by
mechanical contractor, connected to alarm
system by fire alarm contractor, and
connected to BMS by mechanical contractor.
11/27/18 4
082 Perkins Eastman 11/21/18 SMC 15 MJ Daly 27 11/19/18Please verify that all required Smoke Detectors, Smoke Dampers
and Fire Dampers required for this project are shown on the
drawings? If not, please update drawings to show all required
dampers and detectors so our Sheet Metal and Controls subs
can account for them with their bids.
Mechanical General Note #2 on drawings M-
101A, M-101B, M-102A, & M-102B applies to
the entire project. HVAC General Note #7 on
page M-001 applies to the entire project.
11/27/18 4
4079 Perkins Eastman 11/20/18 SMC 12 Turner Commercial Prod 12 11/16/18 11/27/18
12/6/18 Page 13 of 33`
Renovation Additions to
Rockwell Elementary School
400 Whittlesey Drive
Bethel, CT 06801 Pre-Bid RFI Log
Phase 1 of 2
Rizzo Job # 18032
State Project No. 009-059 RNV
RFI# Sent To Date Sent By BP# Contractor Contractor
RFI #
Date Rec'd Question Answer Ans. Date Addendum
#
083 Perkins Eastman 11/21/18 SMC 15 MJ Daly 28 11/19/18CUH-4 is defined on the HVAC Equipment Schedule, but none
were found when reviewing the Rockwell E.S. floor plans? Please
verify that these unit types are not required for the Rockwell
E.S? If they are required, please add them to the floor plans.
CUH-4 is not required for Rockwell ES. 11/27/18 4
084 Perkins Eastman 11/21/18 SMC 15 MJ Daly 29 11/19/18 There are some discrepancies between the pipe sizes shown
feeding the FCUs on the floor plans versus the pipe sizes called
out on the Fan Coil Unit Schedule? Please verify that the pipe
sizes shown on the schedule can be used for pipe sizes feeding
the corresponding FCUs shown on the floor plans when there
are discrepancies?
Please verify where discrepancies exist as Fan
Coil Unit Schedule does not list pipe sizes. If
any discrepancies exist, contractor shall install
the larger pipe size.
11/27/18 4
085 Perkins Eastman 11/21/18 SMC 15 MJ Daly 30 11/19/18Please verify that both the Air Intake and Exhaust Vents from the
Condensing Boilers and Gas Water Heaters are to be furnished
and installed using material spec'd under 23 51 23 Gas Vents?
Yes, bids shall be based on requirements from
235123 Gas Vents.
11/27/18 4
086 Perkins Eastman 11/21/18 SMC 15 MJ Daly 31 11/19/18
HVAC Drawings M-001, note #49, states to "Provide handrails if
equipment on the Roof located less 10 feet from roof edge (see
architectural drawings) ". After reviewing the HVAC Roof
drawings, the following equipment was found to be less than 10
feet from the roof:
· Rockwell E.S. - KEF-1 & EF-7
Please advise if these pieces of equipment will need handrails
and please verify who would own this work (assuming
miscellaneous metals contractor if necessary, but please verify)?
It is the requirement of the project to provide
handrails if equipment on rooftop is less than
10’-0” from the roof edge. Coordinate final
installation with equipment manufacturer.
11/27/18 4
087 Perkins Eastman 11/21/18 SMC 14, 15 MJ Daly 32 11/19/18
The Plumbing drawings shows 1 Radon pit with the piping
penetrating through the roof. There is also a Radon Evacuation
Venting Diagram (Detail #2 on P502) that differs from the detail
for Johnson E.S? When reviewing the HVAC drawings, it requests
the piping to be terminated with a gooseneck and bird screen,
but Detail #2 on P502 shows a radon fan as the termination
point? Please clarify if the intent for this school was for the
Plumbing Contractor to penetrate the roof with Radon Piping,
and the HVAC Contractor to furnish and install the inline fan
scheduled and terminate as noted, with a gooseneck and bird
screen, or please correct if this assumption is incorrect?
Radon fan is an inline fan to be mounted above
the roof surface. Gooseneck and bird screen to
be installed downstream (above) radon fan.
11/27/18 4
12/6/18 Page 14 of 33`
Renovation Additions to
Rockwell Elementary School
400 Whittlesey Drive
Bethel, CT 06801 Pre-Bid RFI Log
Phase 1 of 2
Rizzo Job # 18032
State Project No. 009-059 RNV
RFI# Sent To Date Sent By BP# Contractor Contractor
RFI #
Date Rec'd Question Answer Ans. Date Addendum
#
088 Rizzo 11/21/18 SMC 14, 15 MJ Daly 33 11/19/18 For instances where the HVAC Condensate piping is tying into
the plumbers waste pipe, please verify the point of connection
where responsibilities shift? Detail #7 on M-503 shows an
Indirect Connection Detail, with a P-Trap, nipple, and air gap.
Does the HVAC Contractor own getting the piping to the Air Gap,
and the Plumbing Contractor owns from the Air Gap, back to
their main?
BP#15 HVAC owns complete tie in to waste
piping.
11/30/18 4
089 Perkins Eastman 11/21/18 SMC 15 MJ Daly 34 11/19/18Secondary Auxiliary Condensate Drain Pans are shown on M-503
and are being requested for every ducted FCU. FCU Schedule
states to use Stainless Steel Drain Pans? Please advise if stainless
steel is required, or if galvanized pans would be acceptable to
reduce costs? Additionally, regardless of metal type required,
please advise on the acceptable gauge of metal so bidding sheet
metal contractors are accounting for the accurate material (20
gauge?)?
Primary drain pans (inside FCU) to be stainless
steel. Secondary auxiliary drain pans to be 20-
gauge galvanized steel.
11/27/18 4
090 Perkins Eastman 11/21/18 SMC 15 MJ Daly 35 11/19/18 One Chemical Pot Feeder is shown on the drawing M-201, but
hydronic piping spec states to install bypass chemical feeders in
each hydronic system where indicated? Please clarify if two
chemical shot feeders are required for each school (one for
HWS&R and one for CHWS&R system)?
Two chemical feeders are required for each
school (interior HW & CHW Systems) plus one
glycol feed system for the exterior CHW loop.
11/27/18 4
091 Rizzo 11/21/18 SMC 15 MJ Daly 36 11/19/18 Please reaffirm the HVAC Scope of Work Item #1 which states
"Demolition: disconnect and drop to the floor to be removed
by Demolition Subcontractor. " The HVAC specs states to
remove the demoed equipment, piping ductwork, etc., which
carries much more labor and costs than disconnecting &
dropping. Just wanted to confirm that the scope of work trumps
the specs in this case?
HVAC Scope of Work Item #1 is correct. 11/30/18 4
092 Perkins Eastman 11/21/18 SMC 15 MJ Daly 37 11/19/18 The HVAC General Duty Valve Spec currently has High
Performance Butterfly Valves flat spec'd for all butterfly valve
applications (shutoff service and dead-end service for all HVAC
systems)? Please verify that this is required, or if a less expensive
yet equally effective type of butterfly valve would be acceptable
in most cases to save on overall cost (for example all valves
outside of the mechanical room)? If this is acceptable please
provide a spec and approved manufacturer for those valves
(Hammond, Milwaukee, Nibco, Crane, Stockham, etc.,)?
Additionally, if an earlier RFI is accepted and Grooved Piping is
deemed acceptable for hydronic systems 2-1/2" and larger,
please advise if grooved valves would also be acceptable
(Victaulic, Nibco, Anvil, etc.,)
High performance butterfly valves are
required.
11/27/18 4
12/6/18 Page 15 of 33`
Renovation Additions to
Rockwell Elementary School
400 Whittlesey Drive
Bethel, CT 06801 Pre-Bid RFI Log
Phase 1 of 2
Rizzo Job # 18032
State Project No. 009-059 RNV
RFI# Sent To Date Sent By BP# Contractor Contractor
RFI #
Date Rec'd Question Answer Ans. Date Addendum
#
093 Perkins Eastman 11/21/18 SMC 15 MJ Daly 38 11/19/18 The Division 23 HVAC Specs bring up Steam quite often
throughout the specifications? Can you please confirm that
there is no Steam work required for this project by the HVAC
Contractor? Nothing was spotted on the floor plans or the civil
drawings, but just in case we are missing something on the civil
drawings (or another bid package set) can you please let us
know?
No steam work required. 11/27/18 4
094 Perkins Eastman 11/21/18 SMC 15 MJ Daly 39 11/19/18UG HVAC Piping Spec states to "Install cathodic protection
devices and connections for piping and conduit systems. "
However, with the casing piping being constructed of HDPE, can
this spec item be waived? HDPE has excellent corrosion
resistance, is virtually inert, and commonly used in lieu of
expensive maintenance or cathodic protection. However, if it is
still required, please provide locations and spec on cathodic
protection, as this is not common installation practice anymore
and pricing would need to be obtained by a specialty vendor,
separate from the UG piping vendor.
Cathodic protection is not required. 11/27/18 4
095 Perkins Eastman 11/21/18 SMC 15 MJ Daly 40 11/19/18Please verify that the spec requirement shown under spec 23
2513, paragraph 3.5.B, can be waived? Spec states to "Provide a
'how to-use' self-contained breathing apparatus video that
details exact operating procedures of equipment ." After
reviewing the plans and remainder of the spec, a self-contained
breathing apparatus is not requested in any of the docs and with
this chillers being installed outside, this seems to not be
required, correct? Please verify?
Self-containing breathing apparatus not
required.
11/27/18 4
096 Perkins Eastman 11/21/18 SMC 16 The NY-Conn Corp. 1 11/19/18 Specification Section 26 05 48.16-2.1-B-2, states that the Seismic
Restraint performance requirements for the building are to be
"Seismic Design Category: B." It is our understanding that
Seismic Design Category B, requires no seismic restraint for
mechanical and electrical systems. Please clarify if Seismic
Restraints are required for the electrical system installation in
the building.
Confirmed with Structural Engineer, building is
Seismic Design Category B and seismic
restraints are NOT required.
11/27/18 4
097 Perkins Eastman 11/21/18 SMC 16 Rizzo Corp 1 11/21/18 Does Rockwell School have adequate electrical service to
support the temporary classroom complex or is separate service
required?
The school/town will not be able to provide
power to the temporary classrooms.
Anticipate providing temporary service as part
of the bid.
12/4/18 5
Re: Scope of Work Item 29—Site Concrete, paragraph (g) “ The
site work subcontractor shall include site preparation and
footings for the Portable Classroom Swing space in the area
adjacent to the existing Kindergarten addition.”
5J. Iapaluccio 1 11/19/18 See Scope Clarifications on Addendum #5 12/6/18098 Rizzo 11/21/18 SMC 17
12/6/18 Page 16 of 33`
Renovation Additions to
Rockwell Elementary School
400 Whittlesey Drive
Bethel, CT 06801 Pre-Bid RFI Log
Phase 1 of 2
Rizzo Job # 18032
State Project No. 009-059 RNV
RFI# Sent To Date Sent By BP# Contractor Contractor
RFI #
Date Rec'd Question Answer Ans. Date Addendum
#
BP 1B Portable swing Space, Scope of Work Item 23 states “This
is a Design/Build package…….”
There are no plans or specs in the bid documents which identify
the scope of work required by the Site Work Subcontractor. We
need to know the number and size of the footings required for
support of the portable classrooms, we also must have a sketch
showing the proposed utilities— sewer, water, electrical,
communications.
099 Rizzo 11/21/18 SMC 16 The NY-Conn Corp. 7 11/20/18 There are some areas of the existing concrete slab on grade that
will have to be saw cut, trenched and patched in order to
provide electrical and tele-com services to floor boxes, etc.
Some of the areas where cutting into the existing slab will be
required for Divisions 26,27 & 28 scopes of work, are not shown
to be cut out on the architectural demolition drawings. Please
clarify who will be responsible for saw cutting the existing slabs,
trenching, then backfilling and restoring the slab for electrical
floor boxes, services and the like, including any chipping and
patching of existing foundations to allow new services to enter
the existing building.
Cutting slabs and concrete is by BP#1-
Demolition & Abatement; Trenching and back
filling is by BP#17 – Site Work; Slab restoration
and concrete patching is by BP#2 – Concrete.
All these Bid Packages should look at the MEP
and structural drawings to determine any
additional cutting and patching that is required
in their scope of work.
12/6/18 5
The only references to Blasting Operations are included in
paragraphs 1.5 (D/E),
1.6 (A/B) and paragraph 3.2 (B). None of this information
addresses the onsite working conditions such as the allowable
hours of operations and restrictions while the school is occupied.
1.0 Are there limitations to hours of work for drilling operations? 1.0 Drilling will be allowed during school hours
2.0 Are there limitations to days or hours of work for explosives
on site?
3.0 Are there any restrictions on when (days or work hours)
blasting must be performed?
2.0 No blasting will take place during school
hours or while children are on site.
5
100 Bethel Fire
Marshall
11/21/18 SMC 17 J. Iapaluccio 2 11/20/18 12/5/18 5
J. Iapaluccio 1 11/19/18 See Scope Clarifications on Addendum #5 12/6/18098 Rizzo 11/21/18 SMC 17
Barriers such as fencing around the site will be
required. If blasting has to be done after hours
or weekends be advised CT General statute 29-
349-210 prohibits blasting on Sundays or
between sunset and sunrise, except with
Permission of the State or Local FM. So we will
need to discuss this option in detail with the
blaster and have the ok of Zoning Dept as they
may have regulations concerning
weeknd/evening blasting
operations. Preference is to stay away from
night/sunday operations all together.
12/6/18 Page 17 of 33`
Renovation Additions to
Rockwell Elementary School
400 Whittlesey Drive
Bethel, CT 06801 Pre-Bid RFI Log
Phase 1 of 2
Rizzo Job # 18032
State Project No. 009-059 RNV
RFI# Sent To Date Sent By BP# Contractor Contractor
RFI #
Date Rec'd Question Answer Ans. Date Addendum
#
If we are not allowed to perform the rock excavation until the
summer vacation it is questionable as to whether the rear bus
access can be completed prior to the start of the fall session.
Rear bus access is not required until
September 2020. It is not required to be
completed for September 2019. (Rizzo)
101 Perkins Eastman 11/21/18 SMC 16 The NY-Conn Corp. 6 11/20/18 Specification Section 26 41 13-3.4-B, states that the Lightning
Protection contrator is to provide the surge protection devices
per UL96a We are assuming that this would include low voltage
surge suppression devices for incoming telecommunication
services. Typically surge protection for the incoming
telecommunication services is provided and installed by the
service provider, and the quantity and type of surge protection
devices required is typically dictated by the quantity and type of
service cables installed by the telecommunications service
provider. That being the case, please clarify who will be
responsible for furnishing the surge suppression devices on the
incoming telecommunications services. If the lightning
protection contractor is to furnish them, please provide all
pertinent information regarding the incoming
telecommunication service cables to be installed by the service
provider for bidding purposes.
Assume 25 pair copper for bidding. 11/27/18 4
102 Perkins Eastman 11/21/18 SMC 6, 8 Park Roway 1 11/20/18 Are interior borrowed lights STI-11, STI-09, STI-08, STI-06, STI-04,
STI-02, and STI-01 to be Hollow Metal or Aluminum?
Aluminum. See attached sketches regarding
H/J/S conditions at aluminum borrowed lites.
11/29/18 5
103 Perkins Eastman 11/21/18 SMC 12 Ehrlich Interiors 1 11/20/18 Please clarify if/or where shade pockets are required. It is
mentioned in the spec and in a details on A-121, but other
mounting hardware is referenced as well.
All exterior windows receive shades. All
windows will receive snap on fascia panels.
All window shades at the ceiling will be
recessed as shown on A-121 and on window
specific details shown on A-321. note that
there shall be a 2” gap in between the edge of
the radiant ceiling panel and the face of the
shade fascia.
12/5/18 5
104 Perkins Eastman 11/21/18 SMC 9 Central CT Acoustics 1 11/20/18 Spec Sections for ACT ceilings do not match the finish schedule.
Please clarify.
Provide ACT product types described in the
specifications.
11/28/18 4
105 Perkins Eastman 11/21/18 SMC 9 Central CT Acoustics 2 11/20/18 TR-1 on the finish schedule calls for 2" Axiom. Detail 3 on A-121
calls for 4". Please clarify.
Provide 4” 11/28/18 4
106 Perkins Eastman 11/21/18 SMC 9 Central CT Acoustics 3 11/20/18 WDC-1 on the interior finish schedule calls for 3" Armstrong
Plank. Spec. Section 09 51 26 calls for Grille. Please clarify.
Follow as specified in section 09 51 26. 11/28/18 4
100 Bethel Fire
Marshall
11/21/18 SMC 17 J. Iapaluccio 2 11/20/18 12/5/18 5
12/6/18 Page 18 of 33`
Renovation Additions to
Rockwell Elementary School
400 Whittlesey Drive
Bethel, CT 06801 Pre-Bid RFI Log
Phase 1 of 2
Rizzo Job # 18032
State Project No. 009-059 RNV
RFI# Sent To Date Sent By BP# Contractor Contractor
RFI #
Date Rec'd Question Answer Ans. Date Addendum
#
107 Rizzo 11/21/18 SMC 9 Central CT Acoustics 4 11/20/18 Why is the FCU acoustical enclosure in our bid package? BP#6 – General Trades shall furnish and install
FCU enclosure. Delete from BP#9 – Acoustical
Ceilings & Panels.
108 Perkins Eastman 11/21/18 SMC 17 J. Iapaluccio 3 11/20/18 No detail is included in the contract drawings showing the
playground surfacing and drainage. There is one note which
states, ” Flat drains per Wood Fiber Mulch—See Detail”,
however no detail exists. Please provide details for the 12” flat
drains and connections to the 12” collector drains.
See detail 7 on Sheet C-600.3 for the wood
fiber mulch w/ underdrain detail. The flat
drains are to connect to the collector pipe with
a manufactured flat drain to a 12” HDPE fitting.
11/27/18 4
109 Perkins Eastman 11/21/18 SMC 9 Central CT Acoustics 5 11/20/18 What is the Spec for ACC-1? The hexagon floating clouds. Refer to RFI 009 response. 11/28/18 4
110 Perkins Eastman 11/21/18 SMC 9 Central CT Acoustics 6 11/20/15 What is the wall panel type in the Café? See elevations. 11/28/18 4
111 Perkins Eastman 11/21/18 SMC 9 Central CT Acoustics 7 11/20/18 Are the little hexagonal panels in the Gym the Tectum listed in
Spec Section 09 84 13?
There are no hexagonal wall panels in the
Rockwell gym.
11/28/18 4
P101.B Plumbing Level 1-Part Plan B - This drawing indicates the
invert elevations in/out of 402.98/402.77
C300.1 Site Plan – Grading - This drawing indicates the FG over
the middle of the proposed Grease Trap is 402.0. Thus the
invert elevations will be above the proposed finished grade of
the pavement.
Please provide revised invert elevations.
113 Perkins Eastman 11/28/18 SMC 15 Ferguson 1 11/21/18 Spec. Section 233113 Page 8, 2.5 – “Sheet Metal Materials”
Paragraph F – “Factory or Shop applied Antimicrobial Coating.”
This isn’t typically required and would lead to substantial
increase in costs to the project. Is this required on these
projects?
Antimicrobial Coating is not required for this
project.
12/4/18 5
114 Perkins Eastman 11/28/18 SMC 15 Ferguson 2 11/21/18 Spec. Section 233113 Page 10, 2.6 – “Duct Liner” Paragraph C,
Item 9 – “Secure Insulation between perforated Sheet Metal
Inner Duct”. Is it the intent for all Lined Duct to be Double Wall?
Not all lined duct must be double-walled.
Insulated double-wall duct is required in
certain exposed locations per Contract
Documents. In other locations, single-wall duct
with internal duct liner is permitted. Duct liner
to be flexible elastomeric per attached
revisions to spec section 233113, paragraph
2.6 A. Single-wall duct with mineral fiber duct
liner is prohibited.
12/4/18 5
4, 5J. Iapaluccio 4 11/20/18 Revise invert on Drawing P-101B to 397.0' See
drawing C301.1
11/27/2018
12/5/18
112 Perkins Eastman 11/21/18 SMC 17
12/6/18 Page 19 of 33`
Renovation Additions to
Rockwell Elementary School
400 Whittlesey Drive
Bethel, CT 06801 Pre-Bid RFI Log
Phase 1 of 2
Rizzo Job # 18032
State Project No. 009-059 RNV
RFI# Sent To Date Sent By BP# Contractor Contractor
RFI #
Date Rec'd Question Answer Ans. Date Addendum
#
Insulation: While we prefer polyisocyanurate
board insulation, it cannot be accepted
without a prior code variance / exception from
the local AHJ because the smoke-developed
rating does not meet the requirements of the
Mechanical Code. Bids to be based on 6 lb.
density mineral fiber board insulation,
minimum 3-inch thick and minimum R-12.
Thickness must be increased as required to
obtain installed value of R-12. Batt insulation is
prohibited for outdoor ductwork. See revised
spec section 23 07 13.
Insulation Cladding: Install insulation cladding
(VentureClad 1577CW or similar) per revised
spec section 23 07 13.
Metal Jacket: Install aluminum jacket per
revised spec section 23 07 13.
Summary: For bidding, include mineral fiber
board with minimum R-12, insulation cladding
installed over the insulation, and an aluminum
jacket installed over the insulation cladding.
116 Perkins Eastman 11/28/18 SMC 12 CT Lighting 1 11/21/18 Are Draper Shades acceptable for these schools? Draper is a
major supplier to the commercial shade market. We are not
substituting anything, we are supply as per spec with Draper.
You have Mecho and Lutron as acceptable suppliers. Mecho
motorized shades are 110volt and Lutron shades are low
voltage. Please advise.
Provide shades as specified. 11/29/18 4
117 Perkins Eastman 11/28/18 SMC 15 MJ Daly 41 11/26/18 Spec 23 0713, paragraph 3.9: requests a qualified testing agency
to perform tests and inspections? Please verify that the testing
agency is provided by the owner or engineers rather than the
HVAC Contractor? If being requested by the HVAC Contractors,
please provide a list of acceptable firms to perform the testing
(with assistance from the HVAC Insulation Contractor) for this
project?
Insulation testing referenced in above
paragraph not required for this project.
12/4/18 5
Spec. Section230713 – Duct Insulation, Page26, 3.13- “Outdoor,
Field-Applied Jacket Schedule”. The specifications call for
Stainless Steel Jacketing. Drawing M-502 Detail 1 has Aluminum
Jacketing. Would a more cost effective Jacketing such as
Flexglass 400 or Venture Clad 1577 CW be acceptable? Also, for
the Exterior Duct Insulation can R-12, 2” Thick ISO Polystyrene
Board be used in lieu of the specified 2” Thick 2 LB density
Mineral Fiber Board?
12/6/18115 Perkins Eastman 11/28/18 SMC 15 Ferguson 3 11/21/18
12/6/18 Page 20 of 33`
Renovation Additions to
Rockwell Elementary School
400 Whittlesey Drive
Bethel, CT 06801 Pre-Bid RFI Log
Phase 1 of 2
Rizzo Job # 18032
State Project No. 009-059 RNV
RFI# Sent To Date Sent By BP# Contractor Contractor
RFI #
Date Rec'd Question Answer Ans. Date Addendum
#
118 Perkins Eastman 11/28/18 SMC 15 MJ Daly 42 11/26/18There are 2 indoor ductless splits shown in the A-Building on
drawing MP-101A (one in MER-M101 and one in Kiln-201b).
Reviewing the Rooftop drawings there are also two ductless split
condensing units (one on Building A tagged CU-1 and one on
Building B tagged HP-1). Would it be acceptable to move the one
on Building B near the one located on the Building A roof, as that
would be a better location to reach both HP-1 split ACs located
in the A-Building?
Yes, the unit on roof B can be relocated to roof
A. Maintain clearances required by equipment
manufacturers and locate condensing unit
minimum of 10-feet from roof edge.
12/4/18 5
119 Rizzo 11/28/18 SMC 15 MJ Daly 43 11/26/18
Equipment Screen is shown around DOAS-3 (Johnson School) on
drawing M-103A. Please verify which Bid Package owns
furnishing and installing this screen (assuming Misc. Metals)? If
requested by the HVAC Contractor, please provide specs and
schedule for the equipment screen, along with three approved
manufacturers and confirm that equipment screen is only being
requested for DOAS-3 at the Johnson Elementary School?
BP#4 – Structural Steel & Misc. Metals 12/6/18 5
120 Perkins Eastman 11/28/18 SMC 14, 15 MJ Daly 44 11/26/18 The Zoeller sewage ejector pump schedule calls for a 6840,
which is no longer available? Would the 7011 model be
acceptable in its place? The basin specified is floor mounted,
would that be a double walled or free standing basin? Lastly,
please advise on the GPM @ 14’ TDH?
Use Zoeller model 7011, 2 hp, 208V, single
phase, 45 GPM @ 14’ TDH. Basin shall be
fiberglass, single walled, buried application.
11/30/18 5
121 Perkins Eastman 11/28/18 SMC 7 Silktown Roofing 1 11/26/18 Please provide a type of acoustical insulation (all elements)
which need to be install by roofer. If this is a fiberglass butt
insulation or composites assembly labor is lot different.
Refer to RFI Response 141. 12/4/18 5
122 Rizzo 11/28/18 SMC 7 Silktown Roofing 2 11/26/18 Roofing scope should include Ice& snow removal, as nobody can
predict weather could you established fix allowance for this
operation?
No. BP#7 - Roofing must include this scope. 12/6/18 5
123 Rizzo 11/28/18 SMC 7 Silktown Roofing 3 11/26/18 There is PCB and asbestos report for roofing, who is responsible
to removing it?
BP#7 - Roofing 12//6/18 5
124 Rizzo 11/28/18 SMC 7 Silktown Roofing 4 11/26/18 Please confirm roofing contractor will be responsible for his own
carting during reroofing?
Confirmed 12/6/18 5
125 Rizzo 11/28/18 SMC 1 Standard Demolition 1 11/26/18 Please clarify if the hallway floor is to be removed or just
protected during the abatement and demolition phases.
Demolish areas shown on Demolition
Drawings. Protect all other areas of hallway.
12/6/18 5
126 Rizzo 11/28/18 SMC 1 Standard Demolition 2 11/26/18 Is the elevator available for moving material? How much weight
can the elevator hold?
No. 12/6/18 5
127 Rizzo 11/28/18 SMC 1 Standard Demolition 3 11/26/18 In the Mechanical Room, will the Mechanical Equipment be in
the room while we are removing asbestos?
Yes, existing services must be maintained. 12/6/18 5
128 Rizzo 11/28/18 SMC 1 Standard Demolition 4 11/26/18 Who is responsible for the freon removal? BP#1 - Demolition & Abatement 12/6/18 5
12/6/18 Page 21 of 33`
Renovation Additions to
Rockwell Elementary School
400 Whittlesey Drive
Bethel, CT 06801 Pre-Bid RFI Log
Phase 1 of 2
Rizzo Job # 18032
State Project No. 009-059 RNV
RFI# Sent To Date Sent By BP# Contractor Contractor
RFI #
Date Rec'd Question Answer Ans. Date Addendum
#
129 Rizzo 11/28/18 SMC 1 Standard Demolition 5 11/26/18 Please clarify the schedule for demolition and abatement. The
bid schedule provides 68 days to perform the abatement in the
summer. Will the selective demolition be performed in the
summer as well?
Selective Demolition can be done in any areas
shown to be in construction such as Phase 2
and Phase 3A.
12/6/18 5
130 Perkins Eastman 11/28/18 SMC 12 Ehrlich Interiors 2 11/26/18 Can you please clarify fabric for WT-2 Motorized shades. The
specs state 5% and blackout. I don’t see anything referring to
dual shades.
WT-2 shall be blackout only. 11/29/18 4
131 Perkins Eastman 11/28/18 SMC 1A ACV Enviro 1 11/26/18 Can you provide the size and material of the underground tank
to be removed?
The underground storage tank is a 10,000
gallon tank. The material of the tank is
unknown.
11/29/18 4
132 Rizzo 11/28/18 SMC 18 Advantage Maintenance 1 11/26/18 Is the final cleaning contractor going to be responsible for
stripping and wax flooring?
No. The applicable flooring contractor is
responsible.
12/6/18 5
133 Perkins Eastman 11/28/18 SMC 6, 8 Park Roway 2 11/27/18 Opening 101.1 is listed as a full glass (D5) wood door but has a
note saying "Secure Vestibule. Level 4 Ballistic Resistant
Entrance System". The Bullet Resistant Entrance and Storefront
Spec ( 08 41 39) only lists Aluminum assembly. Should this
opening be treated as a Wood Door or Aluminum Bullet
Resistant? Please advise.
Aluminum ballistic resistant. 11/30/18 4
134 Perkins Eastman 11/28/18 SMC 4 Steeltech Bldg. Products 2 11/27/18 In looking at the Alternate Curved Canopy, the Structural
drawings show it as straight steel tube framing S-102b, but the
Arch drawings A-323 call for radiused steel framing. Please
advise.
Provide straight steel tube framing per
structural.
11/30/18 4
135 Perkins Eastman 11/29/18 SMC 9F Mackenzie 1 11/27/18 Are the Custom Digital Wallcoverings going to be supplied by the
owner, or are we to carry the material costs?
Contractor to carry the material costs. 12/4/18 5
136 Rizzo 11/29/18 SMC 9E Everlast Flooring 1 11/27/18 Our concrete surface prep equipment requires 208V/ 3 phase/
70 amps or 480V/ 3 phase / 40 amps. This power will not be
available to us?
You are responsible for the power connection. 12/6/18 5
137 Perkins Eastman 11/29/18 SMC 9 Central CT Acoustics 8 11/27/18 Please provide an item number,color and species for the wood
grille ceilings.
Armstrong Ceilings; WoodWorks Grille #7265
BO Solid wood backer - (Color and species to
be selected by architect)
12/6/18 5
138 Rizzo 11/30/18 SMC 1A ACV Enviro 2 11/27/18 Will there be an engineer on-site to oversee the tank removal
and take samples or is that the responsibility of the contractor?
Consulting Engineer and testing by Owner. 12/6/18 5
Provide options from the following product
lines/manufacturers:
1) Maharam, Manner
2) Momentum Texitles, Pact
3) Bernhardt Textiles, Kavir
Architect to select color from full range within
product line.
139 Perkins Eastman 11/30/18 SMC 9 Central CT Acoustics 9 11/27/18 Please provide fabric and colors for wall panel types AP-1 thru
AP-4.
12/4/18 5
12/6/18 Page 22 of 33`
Renovation Additions to
Rockwell Elementary School
400 Whittlesey Drive
Bethel, CT 06801 Pre-Bid RFI Log
Phase 1 of 2
Rizzo Job # 18032
State Project No. 009-059 RNV
RFI# Sent To Date Sent By BP# Contractor Contractor
RFI #
Date Rec'd Question Answer Ans. Date Addendum
#
140 Perkins Eastman 11/30/18 SMC 9F Mackenzie 2 11/28/18 At both schools the finish schedule indicates Wolf-Gordon as the
manufacturer of the Custom Wall Graphics, but the
Specifications mentions “Level custom graphics”. Wolf-Gordon
Does not manufacturer Level one. Clarification is needed as we
are in able to get pricing at this time.
Provide Custom Wall Graphic by Wolf Gordon,
Level One or Designtex &MDC Studio.
12/4/18 5
141 Rizzo 11/30/18 SMC 7 Barrett Roofing 1 11/28/18 Please verify which contractor is to furnish and install the
Acoustical Elements for the Acoustical Metal Decking.
Per Spec Section 05 31 00 2.02B5 “Sound
absorbing elements and spacers shall be
furnished under this specification section and
installed by the Roofer.”
12/6/18 5
142 Perkins Eastman 11/30/18 SMC 7 Barrett Roofing 2 11/28/18 Please verify the minimum R-Value required for the roof
insulation system. Specifications state minimum 3.5” plus
minimum ¼” thickness for tapered insulation for a total
minimum thickness of 3.75”. Also, notes on details state 4”
minimum thickness.
Provide Min. R-20 insulation. 12/4/18 5
143 Rizzo 11/30/18 SMC 7 Barrett Roofing 3 11/28/18 Exhibit A – BP #7 – Roofing Scope of Work states a Fully Adhered
EPDM Roofing System. Spec Section 075323 specifies a
Mechanically Fastened EPDM Roof System. Please verify if the
desired roof system is to be Fully Adhered EPDM or
Mechanically Fastened EPDM.
Follow the specification. 12/6/18 5
144 Rizzo 11/30/18 SMC All Steeltech Bldg. Products 3 11/28/18 Per our Bid Pkg. 4 Scope of Work, it states that we are
responsible for the costs to identify and the removal of lead
paint? Isn’t Bid Pkg. #1 responsible for all costs relating to lead
paint?
All Contractors are responsible for all costs
related to lead paint wherever they are
attaching to an existing painted surface.
12/6/18 5
145 Rizzo 11/30/18 SMC All Robert Lord 5 11/28/18 Do all Bid Packages have to carry Pollution Insurance? Yes 12/6/18 5
146 CHRO 11/30/18 SMC 1B Vanguard Modular 1 11/28/18 Due to the specialize nature of the delivery/installation
contained in the portable building scope of work Vanguard will
request a waiver to the CHRO labor force requirements. Can a
waiver be granted?
The portable classrooms can be exempt. For
the installation part the vendor should make a
good faith effort in selecting any contractors.
12/6/18 5
147 Rizzo 11/30/18 SMC 1B Vanguard Modular 2 11/28/18 General Project schedule allows from April-August for Portable
Building/site scope to be performed. When will portable building
project site be available for actual placement of proposed
buildings?
June 12/6/18 5
148 Rizzo 11/30/18 SMC All Horizon Services 1 11/28/18 If we submit a bid under $50,000 we do not need a bid bond.
However, if we bid the same trade for both schools combined
the combined bid will be over $50,000. Would we need a bond
in this case?
In a combined bid for the same trade for both
schools, if the breakout prices for both schools
are below $50,000, no bid bond is required.
12/6/18 5
149 Perkins Eastman 11/30/18 SMC 11B Robert Lord 2 11/28/18 Specification section 11 66 23, subsection 2.02 Calls for
Basketball Backstop assemblies but all drawings indicate that the
existing basketball backstops are to remain. Are new backstops
required?
Basketball backstops are existing to remain.
New backstops are not required.
12/4/18 5
12/6/18 Page 23 of 33`
Renovation Additions to
Rockwell Elementary School
400 Whittlesey Drive
Bethel, CT 06801 Pre-Bid RFI Log
Phase 1 of 2
Rizzo Job # 18032
State Project No. 009-059 RNV
RFI# Sent To Date Sent By BP# Contractor Contractor
RFI #
Date Rec'd Question Answer Ans. Date Addendum
#
150 Perkins Eastman 11/30/18 SMC 11B Robert Lord 3 11/28/18 Subsection 2.03 Calls for Volleyball equipment, however, the
drawings seem to indicate that there is no Volleyball court on
this project. Is Volleyball equipment required?
Provide volleyball equipment and installation
as specified.
12/5/18 5
151 Perkins Eastman 11/30/18 SMC 11B Robert Lord 4 11/28/18 Drawing A-101a indicates two Quite Rooms, similar to the one at
the Johnson School but there is no mention of padding these
rooms. Are these rooms to receive wall padding?
Provide wall padding. 12/4/18 5
152 Perkins Eastman 11/30/18 SMC 5 Northeast Interior Syst 2 11/28/18 Detail shows a valence at bottom of wall cabinets. Cabinet
elevations (open cabinets) do not show this valence. Is a valence
required?
Provide panels as indicated in details. 12/4/18 5
Detail shows cabinet door and drawer pulls oriented horizontally
and pulls and locks in specific locations.
1. Elevations show door pulls oriented vertically: which is
correct?
1. Drawer pulls to be horizontal. Cabinet pulls
to be vertical.
2. Can our standard pull and lock locations be used to assure
lock bolt operates correctly? (Distance from receiver/strike plate
is critical).
2. Yes
154 Perkins Eastman 11/30/18 SMC 5 Northeast Interior Syst 4 11/28/18 Detail shows mailbox box as 2" thick panel and horizontal
shelves as 1" thick. For economy and consistency can mailbox
components be made from 3/4" panel material?
Yes. 12/4/18 5
155 Perkins Eastman 11/30/18 SMC 5 Northeast Interior Syst 7 11/28/18 Specification calls for KV 331 shelf support, which is a metal pin
inserted into a hole bored in the cabinet side. This is consistent
with all of the details on sheet A-551 except for 7/A-551, which
calls for recessed metal standard shelf supports. Can the KV 331
shelf pin be used at all cabinet shelves including the full height
wardrobe shown in 7/A-551?
Provide access to metal standard shelf support
as shown in 7A-551.
12/4/18 5
156 Rizzo 11/30/18 SMC 5, 8 Northeast Interior Syst 8 11/28/18 IN-601 Finish Schedule refers to phenolic interior wall panels;
example is 4/A-216. Are these to be provided under 07 42 33
Solid Phenolic Exterior Wall Panels? If not please identify Bid
Package and Specification Section.
Yes 12/6/18 5
157 Perkins Eastman 11/30/18 SMC 5 Northeast Interior Syst 9 11/28/18 The display case in Commons C101c is shown in plan view with a
curved front. We could not find pivot hardware to support the
approximately 39" x 88" doors available for curved applications.
(See CR Lawrence BlumCraft 1301 pivot hinges for one option
for straight doors). In order to accurately price this unit, please
provide greater detail for the construction of the display case
and specify manufacturer and model for the hardware and
curved glass (if glass doors are in fact curved).
Refer to RFI 29 response 12/4/18 5
5153 Perkins Eastman 11/30/18 SMC 5 Northeast Interior Syst 3 11/28/18 12/4/18
12/6/18 Page 24 of 33`
Renovation Additions to
Rockwell Elementary School
400 Whittlesey Drive
Bethel, CT 06801 Pre-Bid RFI Log
Phase 1 of 2
Rizzo Job # 18032
State Project No. 009-059 RNV
RFI# Sent To Date Sent By BP# Contractor Contractor
RFI #
Date Rec'd Question Answer Ans. Date Addendum
#
2,4,6/A-552 various bench types are shown with metal support
pedestals and wall-mount angle support brackets. This is
provided by BP#5 as indicated in RFI-096. Please identify
required make and model.
Refer to RFI 021.
What does the rectangle with the circle at the intersection of the
bench top and front drop-edge represent?
The rectangle with the circle is a drafting error,
and should be blocking for the front drop edge.
159 Perkins Eastman 11/30/18 SMC 16 Dorlen Products 1 11/28/18 Is there a leak detection system required in the boiler room? No leak detection system required for this
project.
12/4/18 5
The electrical power floor plans (EP-101A, EP-101B) dated
7/27/18, include a "General Power Note" directing the electrical
contractor to utilize surface mounted raceways and devices
where new outlets and devices are to be installed on existing
CMU walls. This general note does not appear on any of the
other electrical drawings, nor does the note appear on the
Technology or Security drawings. Please clarify if all installations
at existing CMU walls under the electrical scope of work,
including lighting controls, tele-comm outlets, AV outlets/boxes ,
and security devices and pathways are to be surface mounted
per the general note on the power drawings, when located on
an existing CMU wall.
GENERAL POWER NOTE ON SHEET E-001 IS
APPLICABLE TO ALL ELECTRICAL DRAWINGS.
ALL SYSTEMS WIRING (INCLUDING LIGHTING
CONTROLS) ON EXISTING CMU WALLS TO
UTILIZE SURFACE MOUNTED RACEWAY.
INTENT IS NOT TO CUT EXISTING CMU WALLS,
BUT TO RUN CIRCUIT IN SURFACE MOUNTED
RACEWAY. REFER TO ARCHITECTURAL PLANS
FOR EXISTING WALL TYPES AND LOCATIONS.
REFER TO SPECIFICATION SECTION
260519.3.2.E FOR WIRING METHODS.
If any installations at existing CMU walls are to be flush
mounted, please indicate which installations will require flush
mounting and which contractor shall be responsible for opening
and channeling the existing block and then patching and painting
the same.
This is applicable to IT, AV, Tele/com and
security raceways on existing CMU walls.
We cannot find the electrical requirements for the temporary
classroom structure (s) in the bid documents provided. Please
prvide the following information regarding the electrical,
communication, and electronic safety and security require,ents
for the temporary classroom building(s), in order to foster fair &
level bidding.
- Voltage, ampacity & configuration of the Electrical Service &
the location that electrical service is to be derived.
- Type of electrical service lateral (overhead or underground)
- Equipment required at the sercice entrance (i.e service
entrance disconnect?, meter pan and meter?, etc.)
See Scope Clarifications on Addendum #5
10 11/28/18 12/5/18 5
5
161 Rizzo 11/30/18 SMC 16 The NY-Conn Corp. 5 11/28/18 12/6/18 5
160 Perkins Eastman 11/30/18 SMC 16 The NY-Conn Corp. 4 11/28/18 12/6/18
158 Perkins Eastman 11/30/18 SMC 5 Northeast Interior Syst
12/6/18 Page 25 of 33`
Renovation Additions to
Rockwell Elementary School
400 Whittlesey Drive
Bethel, CT 06801 Pre-Bid RFI Log
Phase 1 of 2
Rizzo Job # 18032
State Project No. 009-059 RNV
RFI# Sent To Date Sent By BP# Contractor Contractor
RFI #
Date Rec'd Question Answer Ans. Date Addendum
#
- Tele-Comm Service Requirements & location of utility
company connection.
- Electronic safety and security requirements in General
162 Rizzo 11/30/18 SMC 17 TD & Sons 1 11/28/18 Where can topsoil be stockpiled? Or does it have to be moved
offsite then returned to spread?
Topsoil can be stockpiled on site. Coordinate
location with Rizzo Corp. Superintendent.
12/6/18 5
163 Rizzo 11/30/18 SMC 17 TD & Sons 2 11/28/18 The logistical Plans does not have a color key of when each
section is suppose to start? The initial gantt chart colors don't
correspond. Can you clarify ?
See Phasing detail for additional Phasing
information.
12/6/18 5
For Plastic Laminate, provide High Pressure
Laminate from one of the following three
manufacturer’s educational product lines:
1) Panolam/Nevamar
2) Wilsonart International; Div. of Premark
International, Inc
3) Formica Corporation
For Solid Surface Material, Provide options
from price group 3 from any of the following
manufacturers:
1) Wilsonart International; Div. of Premark
International, Inc
2) Formica Corporation
3) Corian by du Pont Nemours and Company.
165 Perkins Eastman 11/30/18 SMC 4 Steeltech Bldg. Products 5 11/29/18 Ref: Section 7/A001 - Provide specific details such as size of
angle, spacing and bolts.
Refer to attached sketch SKS-2 for details. 12/6/18 5
166 Perkins Eastman 11/30/18 SMC 11B NEFS 1 11/29/181 Do you have any clarification on the basketball hoops? The two
that are shown in the drawings are listed as to remain but the
specifications are requesting all new ceiling suspended units.
Refer to RFI 149. 12/5/18 5
167 Perkins Eastman 11/30/18 SMC 10 Mulberry Signs 1 11/29/18 The Sign Types listed on Drawing IG-001 has no sizes for the
signs. Only the letter heights. What are the dimensions of the
signs?
See Matrix below. Sizes given are minimum
overall dimensions for the non-decorative
portion of the sign (see area dimensioned in
red below). decorative borders may vary in
size. See detail on attached response to RFI.
12/5/18 5
See Scope Clarifications on Addendum #5161 Rizzo 11/30/18 SMC 16 The NY-Conn Corp. 5 11/28/18 12/6/18 5
12/5/18 5164 Perkins Eastman 11/30/18 SMC 5 Legere Group 1 11/28/18 According to RFI response #25, colors of plastic laminate and
solid surface are “to be selected from manufacturer’s full range
of standard colors.” As it was mentioned in RFI #25, the costs
vary widely depending on color. Please specify specific price
groups for plastic laminate and solid surface materials.
12/6/18 Page 26 of 33`
Renovation Additions to
Rockwell Elementary School
400 Whittlesey Drive
Bethel, CT 06801 Pre-Bid RFI Log
Phase 1 of 2
Rizzo Job # 18032
State Project No. 009-059 RNV
RFI# Sent To Date Sent By BP# Contractor Contractor
RFI #
Date Rec'd Question Answer Ans. Date Addendum
#
168 Perkins Eastman 11/30/18 SMC 10 Mulberry Signs 2 11/29/18 Is there a sign schedule list of the sign types for each room.? It is
impossible to determine which belong to which room. Ex:
Which get decorative borders, which get employee names,
which get Plain Room ID
See signage plans for sign locations. 12/5/18 5
On Plumbing Fixture schedule, revise as
follows:
LAV1-HC revise to LAV-HC
LAV2-HC – delete
LAV3-HC – delete
Also refer to Addendum #4, SKP-2 for
additional information.
170 Hygenics 11/30/18 SMC 1 Enviro Consultants 1 11/29/18 Section 02 84 33-20 Abatement of PCB Containing Material. The
posted table identifies an estimated quantity of 3,200 feet of
wall paint containing PCBs over 50 ppm. Is this footage
indicative of only the walls to be removed? If so does that
footage include both sides of the block partition walls?
The quantity provided is the linear footage of
wall to be removed. It does not account for
weather the wall is painted on one side or
both.
12/4/18 5
171 Perkins Eastman 11/30/18 SMC 11B Robert Lord 5 11/29/18 Electrical drawing EP-101B indicates that the Porter Touch Pad
(as listed in the specifications) are required. Please clarify that
the existing backstop assemblies (including the motors) remain
and that only the Power-Touch control system is to be supplied.
The Power-Touch control system will be delivered to the
electrician.
Existing Basketball backstops are to remain
and are manually positioned. Power-touch
control system is not required.
12/5/18 5
172 Perkins Eastman 11/30/18 SMC 5 OWI 1 11/30/18 Please clarify intent for the tops of the full-height wardrobe
cabinets. Detail A-551/7 shows what looks like a shop-made
plastic laminate countertop on top of the wardrobe instead of a
standard finished cabinet top. There is also a note for PLAM on
moisture-resistant core (which is what we’d use for a shop-made
laminate countertop that had a sink in it). This is very unusual &
also unnecessary for the top of a 7-foot-tall cabinet. Is this
correct or is it an error? Note that specs in 06 40 00 do not
include plastic laminate countertops.
Provide plastic laminate on standard substrate
as indicated in specification section 06 40 23.
12/5/18 5
Please clarify the intent for the semi-exposed interiors of the
closed cabinets (i.e. cabinets with doors/drawers).
169 Perkins Eastman 11/30/18 SMC 14 Performance Plumbing 1 11/29/18 The plumbing fixture schedule specifically calls for three (3)
types of lavatories. (LAV1 – HC, LAV2 – HC & LAV3 – HC) If you
review the plumbing drawings all lavs are marked as LAV – HC
and they do not coincide with the plumbing fixture schedule.
The single lavatory sinks appear to be LAV1 – HC (and the make
& model would be fine, however as per the plumbing schedule
LAV2 – HC & LAV3 – HC call for the same make & model. These
would appear to be Bradley MG3 series – a three (3) sink molded
assembly. However the drawings show only two (2) banks of
three (3) sinks and four (4) banks of four (4) sinks. Please advise
upon how to proceed?
12/5/18 5
5173 Perkins Eastman 11/30/18 SMC 5 OWI 2 11/30/18 12/6/18
12/6/18 Page 27 of 33`
Renovation Additions to
Rockwell Elementary School
400 Whittlesey Drive
Bethel, CT 06801 Pre-Bid RFI Log
Phase 1 of 2
Rizzo Job # 18032
State Project No. 009-059 RNV
RFI# Sent To Date Sent By BP# Contractor Contractor
RFI #
Date Rec'd Question Answer Ans. Date Addendum
#
1. Are standard white interiors acceptable at closed cabinets? Or
should the interiors match the exterior colour?
1. Standard white.
2. Details on A-551 include references to melamine at the
interiors of closed cabinets. Specs in 06 40 00 do not include
melamine (see paragraph 2.05). Which is correct? Note that
melamine would be more cost effective than high pressure
laminate and would meet AWS standards for casework.
2. Melamine.
On Drawing M502 Detail 2/M502 Note#8 says that RTU/DOAS
Roof Curbs must be structurally self-supporting and must include
all steel required to support units without structural steel
beneath units.
Note #8 on Detail 2 / M-502 does not apply to
this project (accidental carry-over from
another project).
Drawing S-102A & S-102B indicate new W8 X 10S beams to
support the RTU’s. Spec. Section 230548 Page 16 calls for
Restrained Vibration Isolation Roof Curb Rails.
Are the RTU’s & DOAS Units Curb mounted or on Dunnage above
the roof with Vibration Rails?
RTUs and DOAS units are all to be curb
mounted.
Detail on S-501 show both Options. If the RTU’s are Curb
mounted Please Clarify if a self-supporting structural curb is
required.
Self-supporting structural curbs are not
required (accidental carry-over from another
project).
175 Perkins Eastman 11/30/18 SMC 17 Rizzo Corp 2 11/30/18 The front parking lot is being raised over 12 feet from its current
elevation. Can the excavated rock from the rear bus loop be
used as part of the fill? If so, what are the requirements for
material size in order to be used? Please provide a cross section
through the raise lot indicating the soil requirements throughout
the various levels of fill
Yes, excavated rock from the rear bus loop can
be used as part of the fill in the front parking
lot. However, in order to do so, the processed
rock must satisfy the structural fill, common
fill, or crushed stone material specifications
outlined in 31 20 00, Earth Moving for the
intended use.
12/4/18 5
176 Perkins Eastman 11/30/18 SMC 1 Rizzo Corp 3 11/30/18 Has existing CMU been tested for loose fill? No 12/5/18 5
177 Perkins Eastman 11/30/18 SMC 17 Rizzo Corp 4 11/30/18 Is the wood fiber mulch part of FF&E with the playground and
site furnishings provided by others, or is it part of construction?
Wood fiber mulch is part of construction. 12/6/18 5
178 Perkins Eastman 11/30/18 SMC 2,3,7 Rizzo Corp 5 11/30/18 Please clarify locations of all required expansion joints. See reissued sheet S-102b. See expansion joint
detail SKA-008 attached.
12/6/18 5
179 Perkins Eastman 11/30/18 SMC 4 Rizzo Corp 6 11/30/18 Please confirm that all site railings are stainless steel. All site railings are to be galvanized steel. See
specification included in this Addendum.
12/6/18 5
180 Perkins Eastman 11/30/18 SMC 7,15 Rizzo Corp 7 11/30/18 Spec Section 07 72 00 2.03 Roof Curbs and 2.04 Equipment
Supports. Why are these in this spec section? Roof Curbs and
Equipment Supports should be by the HVAC Contractor?
Delete section 07 72 00 2.03 roof curbs and
2.04 equipment supports. refer to 23 05 48
and 23 74 16.
12/5/18 5
5
174 Perkins Eastman 11/30/18 SMC 15 Ferguson 4 11/30/18 12/4/18 5
173 Perkins Eastman 11/30/18 SMC 5 OWI 2 11/30/18 12/6/18
12/6/18 Page 28 of 33`
Renovation Additions to
Rockwell Elementary School
400 Whittlesey Drive
Bethel, CT 06801 Pre-Bid RFI Log
Phase 1 of 2
Rizzo Job # 18032
State Project No. 009-059 RNV
RFI# Sent To Date Sent By BP# Contractor Contractor
RFI #
Date Rec'd Question Answer Ans. Date Addendum
#
181 Perkins Eastman 11/30/18 SMC 7 Rizzo Corp 8 11/30/18 Spec Section 07 62 00 Sheet Metal Flashing & Trim has only one
(1) page.
See Attached. 12/5/18 5
182 Perkins Eastman 11/30/18 SMC 16 Rizzo Corp 9 11/30/18 Identify overhead lines on Roof. There are 2 overhead lines that
are only 6 feet off the roof. Are either of them power lines?
These are fiber cables between RES and the
high school (not power lines). Refer to detail
showing this fiber from the pole on T-400.
12/5/18 5
183 Perkins Eastman 11/30/18 SMC 7 Rizzo Corp 10 11/30/18 Masonry Roof Base Flashing – Will detail 4/A-324 be acceptable
by the roofing manufacturer for use on the existing profile CMU?
Detail 4/A-324 is an industry standard and may
work with conditions shown in the photo
provided with this RFI. If additional height is
required due to increased insulation/slope a
similar detail (SKA-007) is attached to work
with the existing ribbed block.
12/6/18 5
EXIT SIGN WARRANTIES AS FOLLOWS:
- SIGN-3 YEARS FULL WARRANTY
- LED LIGHTS- 5 YEARS FULL WARRANTY
- LEAD ACID BATTERY- 1 YEAR FULL
WARRANTY, 2 YEARS PRORATED
185 Rizzo 11/30/18 SMC 3, 6, 7,
8, 10,
16, 17
Mather Corp. 1 11/29/18 A-202 Detail 4 Site Sign: Which Bid Package is providing the site
sign? Which Bid Package furnishes and installs the concrete
foundation?
BP#3 owns CMU and vapor barrier; BP#6 owns
metal channels and wood blocking, BP#7 owns
flashing and peel and stick, BP#8 owns
phenolic resin panels, BP#10 owns stainless
steel letters, BP#16 own light and power to the
sign, BP#17 owns foundation, footing and
excavation & backfill.
12/6/18 5
186 Perkins Eastman 11/30/18 SMC 17 Mather Corp. 1a 11/29/18 A-202 Detail 4 Site Sign: Note says “See Structural Documents”
yet the structural documents do not mention a site sign. Please
clarify.
See structural detail on SKS-1. 12/6/18 5
187 Rizzo 11/30/18 SMC 2, 17 Mather Corp. 2 11/30/18 A-431 Detail 6 Elevator Pit: Which Bid Package furnishes and
installs the waterproofing shown in this detail?
BP#17 – Site Work 12/6/18 5
188 Rizzo 11/30/18 SMC 2, 17 Mather Corp. 3 11/30/18 Alternate 4 & 5: Please confirm that BP#2-Concrete Scope-of-
Work includes furnishing and installing any structural concrete
work shown on the structural plans. Specifically, concrete
footings, walls, stairs and slabs related to the amphitheater and
curved canopy as shown on S-101b.
BP#2 – Concrete owns all concrete on
Structural Drawings.
12/6/18 5
Spec 26 52 13 – 1.9-B-2; Warranty Period for Self-Powered Exit
Sign Batteries: Five years from date of Substantial Completion.
Full warranty shall apply for first year and prorated warranty for
the remaining six years. Please clarify which is correct.
12/5/18 5184 Perkins Eastman 11/30/18 16SMC Rizzo Corp 11 11/30/18
12/6/18 Page 29 of 33`
Renovation Additions to
Rockwell Elementary School
400 Whittlesey Drive
Bethel, CT 06801 Pre-Bid RFI Log
Phase 1 of 2
Rizzo Job # 18032
State Project No. 009-059 RNV
RFI# Sent To Date Sent By BP# Contractor Contractor
RFI #
Date Rec'd Question Answer Ans. Date Addendum
#
189 Rizzo 11/30/18 SMC 2, 17 Mather Corp. 4 11/30/18 BP #2-Concrete Scope Item 1: Please confirm BP#2-Concrete
furnishes and installs vapor barrier and rigid insulation under
slab on grade. Vapor barrier and foundation insulation is also
mentioned in BP#17-Site Work. Please clarify.
BP#2 owns all vapor barrier and rigid insulation
under slab on Grade. BP#17 – Sitework owns
vapor barrier and insulation on all foundations.
12/6/18 5
190 Perkins Eastman C 200.1: There is a new exterior retaining wall shown at the
southwest corner of the gym. Plan C 200.1 states “Retaining
Wall – See Structural Plans for Detail” yet the wall is not detailed
on the structural plans. a. What type of wall is this? Provide
Details.
Refer to SKS-3 for detail. 12/6/18 5
Rizzo b. Who owns furnishing and installing this wall? BP #2 - Concrete owns Concrete; BP#3 -
Masonry owns brick
191 Rizzo 11/30/18 SMC 17 Mather Corp. 8 11/30/18 BP #17-Sitework Scope Item 13: Is this contractor also
responsible for snow and ice removal for the old Police
Department located at 49 Plumtrees Rd where the contractors
are allowed office trailers and storage?
No. Johnson School Project Site Contractor is
responsible for the old Police Department.
12/6/18 5
192 Rizzo 11/30/18 SMC 17 Mather Corp. 9 11/30/18 BP #17-Sitework Item 7: The following spec sections are listed
but not included in the specifications. Section 321400 Concrete
Unit Pavers and Section 323223 Modular Block Retaining Walls.
Please clarify if this work is part of this project and if so where
are these items proposed on site?
Delete from Scope 12/6/18 5
193 Rizzo 11/30/18 SMC 17, 17B Mather Corp. 10 11/30/18 BP #17-Sitework Item 36e: States final topsoil and lawn seeding
is by BP #17B Landscaping. Is it the intent to have BP #17
Sitework contractor strip and stockpile existing topsoil and BP
#17B will screen, amend as necessary and place topsoil? Or is it
up to BP #17 Sitework to remove and dispose of existing topsoil
and BP #17B will furnish and install imported topsoil?
Topsoil can be stockpiled on site. Coordination
location with Rizzo Corp. BP#17B –
Landscaping will screen, amend as necessary
and place topsoil.
12/6/18 5
194 Rizzo 11/30/18 SMC 17 Mather Corp. 11 11/30/18 BP #17-Sitework Item 30: References drawing SL 1.0 as a
logistics plan. Please supply a logistics plan for this site and if
necessary the old Police Station.
Logistics Plans are included in Addendum #4. 12/6/18 5
195 Rizzo 11/30/18 SMC 4, 17 Mather Corp. 12 11/30/18 BP #17-Sitework Item 35e: Refers to crane pads. Please clarify
how many are required and the size of each that should be
installed.
BP#17 shall provide a flat area for crane
placement. Crane Pads are by the Bid Package
using the crane.
12/6/18 5
Rizzo BP #17-Sitework Item 1: Has Timber Guide Rails (spec section
329400) listed as part of the Sitework bid package but does not
list the proposed Round Rail Fence shown on plan sheet C 200.1
and also detail 2/C 600.2. Please clarify if both of these items
should be installed by BP #17 Sitework and not BP #17A Fencing.
There is no specification for the round rail
fence. Bid per detail.
11/30/18 SMC 17 Mather Corp. 6 11/30/18
196 11/30/18 SMC 17, 17A Mather Corp. 13 11/30/18 12/6/18 5
12/6/18 Page 30 of 33`
Renovation Additions to
Rockwell Elementary School
400 Whittlesey Drive
Bethel, CT 06801 Pre-Bid RFI Log
Phase 1 of 2
Rizzo Job # 18032
State Project No. 009-059 RNV
RFI# Sent To Date Sent By BP# Contractor Contractor
RFI #
Date Rec'd Question Answer Ans. Date Addendum
#
Perkins Eastman Please furnish a spec section for the proposed Round Rail Fence. BP#17 shall furnish & install Timber Guide
Rails. (SMC – Rizzo)
197 Perkins Eastman 11/30/18 SMC 17 Mather Corp. 14 11/30/18 Plan Sheet C 200.1: Has a proposed concrete utility pad for
generator. Please furnish a detail for this pad.
REFER TO DETAIL ON SHEET E-501 FOR UTILITY
PAD DETAIL.
12/5/18 5
198 Perkins Eastman 11/30/18 SMC 17 Mather Corp. 15 11/30/18 Plan Sheet C 200.1: For the proposed dumpster pad there is a
call out to use detail 6/C 600.2 but on plan sheet C 600.3 detail 9
dumpster enclosure there is also a detail for the concrete pad.
Which one should be used?
Both details are applicable. Detail 9 is for the
enclosure fencing and the concrete dumpster
pad detail is for the concrete pad.
12/4/18 5
199 Perkins Eastman 11/30/18 SMC 17 Mather Corp. 16 11/30/18 Plan Sheet C 301.1: Has a proposed 4” tapping valve proposed
for the new 6” fire line. What is the size of the existing waterline
to be tapped?
The tapping sleeve should be a 6” tapping
sleeve to match the size of the 6” fire service.
The exact size of the existing water line is
unknown. Please assume that it is an 8” main
that is being tapped.
12/4/18 5
200 Rizzo 11/30/18 SMC 14, 17 Mather Corp. 18 11/30/18 BP #17-Sitework Item 35.g: Has BP #14 Plumbing furnishing and
installing the proposed exterior grease trap. Detail 9/ P-500
shows a 12” concrete pad at finished grade and a 12’ (item F)
prefabricated concrete deadmen. Which trade is responsible for
the furnishing and install of concrete pad and deadmen?
BP#17 - Sitework 12/6/18 5
201 Rizzo 11/30/18 SMC 4 Schenectady Steel 1 11/30/18 Please reconsider the roof top equipment screens and exterior
sound screens to be part of BP6 or 7. There is no structural
support steel shown on the structural drawings or on 9 / A-324.
There are no Rooftop Equipment Screens on
Rockwell.
12/6/18 5
202 Rizzo 11/30/18 SMC 4 Schenectady Steel 2 11/30/18 Does BP#4 own an anchor bolt survey? Yes 12/6/18 5
203 Rizzo 11/30/18 SMC 4 Schenectady Steel 3 11/30/18 All demolition, shoring, and abatement covered by BP#1? Demolition and Shoring by BP#1 – Demolition
& Abatement. All contractors are responsible
for lead removal work and cost wherever they
are attaching to existing painted surfaces.
12/6/18 5
204 Perkins Eastman 11/30/18 SMC 15 MJ Daly 45 11/30/18HVAC Piping Insulation Spec (23 07 19, page 26 #G), states to
insulate the Engine Exhaust Piping and Silencer with Calcium
Silicate: 4 inches thick? There is no engine exhaust piping,
silencer or generator shown on the HVAC drawings? Please
verify this spec section can be ignored for this project?
Engine exhaust / silencer insulation does not
apply to this project.
12/5/18 5
196 11/30/18 SMC 17, 17A Mather Corp. 13 11/30/18 12/6/18 5
12/6/18 Page 31 of 33`
Renovation Additions to
Rockwell Elementary School
400 Whittlesey Drive
Bethel, CT 06801 Pre-Bid RFI Log
Phase 1 of 2
Rizzo Job # 18032
State Project No. 009-059 RNV
RFI# Sent To Date Sent By BP# Contractor Contractor
RFI #
Date Rec'd Question Answer Ans. Date Addendum
#
205 Perkins Eastman 11/30/18 SMC 15 MJ Daly 46 11/30/18HVAC Equipment Insulation Spec (23 07 16, page 24 #J) states
that the Piping system filter-housing insulation shall be one of
the following:
1. Cellular Glass: 3 inches thick.
2. Mineral-Fiber Board: 2 inches thick and 3-lb/cu. ft. nominal
density.
3. Mineral-Fiber Pipe and Tank: 2 inches thick.
Please provide a detail on the filter housings needed so the
HVAC Insulation Contractors can account for this, if necessary?
Piping system filter-housing insulation does
not apply to this project.
12/5/18 5
206 Rizzo 11/30/18 SMC 14 MJ Daly 47 11/30/18Please verify that the Plumbing Contractor would only own
furnishing and installing the heat tracing found on drawing P-
300. The Heat Trace spec has extensive requirements including
Gutters & Downspouts, Snow & Ice Melting on Roofs, etc., but
none of these items are shown on the Plumbing drawings?
Please advise on the scope of work to carry for Heat Tracing, if
additional items are required, other than what is shown on the P-
300 Plumbing drawing.
BP#14 - Plumbing owns heat trace on
plumbing drawings. BP#16 - Electrical owns
final power connection
12/6/18 5
207 Perkins Eastman 11/30/18 SMC 6, 8 Tull Bros. 1 11/30/18 Opening #120 is a single opening asking for hardware set #14
which is for a paired opening. Please confirm correct hardware
set.
Provide HW set #01. 12/5/18 5
208 Perkins Eastman 11/30/18 SMC 6, 8 Tull Bros. 2 11/30/18 Opening # ST-102B is an exterior opening that is calling out for a
wood door and an aluminum frame. Head and jamb detail shows
a hollow metal frame. Should this opening be an aluminum door
and frame seeing it is exterior? Please confirm?
Provide Aluminum door and frame. 12/5/18 5
209 Perkins Eastman 11/30/18 SMC 16 Rizzo Corp 12 11/30/18 EP-101B Kitchen send you to detail 1/E-202. I do not see power
for FCUs (refer to M-101B)
ELECTRICAL DRAWING EP-101B SHOWS
POWER TO FCU-1 IN KITCHEN OFFICE 122A.
(CIRCUIT 18,20,SB-1). FCU NOT LOCATED IN
KITCHEN CALL OUT AREA SHOWN ON E-202.
12/6/18 5
210 Perkins Eastman 11/30/18 SMC 7 Barrett Roofing 4 11/30/18 There are details that call out White EPDM Membrane. The color
of the membrane in Spec Section 075323 is called out as black.
What shall be the color of the furnished EPDM membrane?
EPDM shall be Black as Specified. 12/5/18 5
211 Rizzo 11/30/18 SMC 7 Barrett Roofing 5 11/30/18 Reference detail 3&6/A-322. Is top of the phenolic shelf/box
covered with EPDM, or is that a flashing for the phenolic panel
assembly? Who is responsible for this condition?
BP#7 – Roofing is responsible for flashing on
details 3 & 6/A-322.
12/6/18 5
12/6/18 Page 32 of 33`
Renovation Additions to
Rockwell Elementary School
400 Whittlesey Drive
Bethel, CT 06801 Pre-Bid RFI Log
Phase 1 of 2
Rizzo Job # 18032
State Project No. 009-059 RNV
RFI# Sent To Date Sent By BP# Contractor Contractor
RFI #
Date Rec'd Question Answer Ans. Date Addendum
#
212 Rizzo 11/30/18 SMC 7 Barrett Roofing 6 11/30/18 Please clarify which contractor(s) are to furnish and install the
wood blocking, plywood, sheathing and insulation materials at
the roof edge conditions. Reference details 3, 6, 9 & 12 on A-321
and 3, 6, 7 & 9 on A-322.
BP#6 – General Trades owns details 3,6,9 & 12
on A-321 and details 3,6,7 & 9 on A-322.
12/6/18 5
213 Perkins Eastman 11/30/18 SMC 7 Barrett Roofing 7 11/30/18 Specification section 076200 references a 3-coat fluoropolymer
finish which is an expensive finish. Is a 2-coat finish acceptable?
Provide 3-coat finish as specified. 12/6/18 5
214 Rizzo 11/30/18 SMC 7 Barrett Roofing 8 11/30/18 Please identify which contractor is to furnish and install the
plywood sheathing for the roof deck on the Canopy at the Bus
Loop.
BP#6 - General Trades 12/6/18 5
215 Rizzo 11/30/18 SMC 17 Richards Corp. 1 11/30/18 Which bid package is responsible for screening and placing
topsoil.
BP#17B - Landscaping 12/6/18 5
216 Rizzo 11/30/18 SMC 17 Richards Corp. 2 11/30/18 Please confirm Site Contractor shall furnish the timber rails. BP#17 - Site Work shall furnish and install
timber rails.
12/6/18 5
Per E-401 it shows that the Feeders for the LS panels are to be
run at a 2 Hour Fire rating. The rest of the cabling that runs out
of this panel is not 2 hour rated. Because of this can Normal
Conduit/Conductors be run in lieu of having the 2 hour fire
rating on the main feeder only?
If the 2 hour fire rating is to be maintain can 2 hour fire rated
cable be used in lieu of conduit/conductors?
218 Perkins Eastman 11/30/18 SMC 5 Northeast Interior Syst 1 11/30/18 RFI 040 was asked specifically about the doors and drawer
fronts. My RFI applies to all of the core material. We request
FSC ULEF M2 particleboard be included as an acceptable core
material for the case body and doors of the plastic-laminate
cabinets on this project. (NU GREEN 2 Product Data attached).
FSC ULEF M2 particle board is acceptable for
use for the core material.
12/6/18 5
219 Perkins Eastman 11/30/18 SMC 7 Imperial Roofing 1 11/30/18 Is the Existing Roof insulation to remain in place? See Demo
Note “F” on AD-102A. Indicates Existing Roof Insulation to
remain…..
No. See updated note in Addendum #5. 12/5/18 5
12/6/18 511/30/18217 Perkins Eastman SMC Rizzo Corp16 13 11/30/18 ALL FEEDER CIRCUITS SHALL BE 2 HOUR RATED
(HORIZONTAL AND VERTICAL),
LISTED/LABELED, AND INSTALLED IN
ACCORDANCE WITH UL 2196 (E.G. MINERAL
INSULATED CABLES) AS INDICATED ON E-401.
BRANCH WIRING DOES NOT HAVE TO BE 2
HOUR RATED.
12/6/18 Page 33 of 33`
ANNA H. ROCKWELL ELEMENTARY SCHOOL
Perkins Eastman Project # 68961.00 State Project #009-0058-RNV
Page 1 of 3
ADDENDUM #5 DECEMBER 6, 2018 ____________________________________________________________________________________ ANNA H. ROCKWELL ELEMENTARY SCHOOL State Project # 009-0058-RNV 400 Whittlesey Drive Bethel, CT 06801 Bethel Public Schools 1 School Road Bethel, CT 06801
To All Potential Bidders: The items and attachments set forth herein shall act to qualify, clarify, or otherwise modify the Contract Documents previously issued regarding the above referenced project. These items, whether of omission, addition, substitution, or clarification, shall be incorporated into the proposals submitted by all bidders, and receipt of this document and its attachments must be acknowledged, either in the space provided on the Bid Form or on the Contractor’s Form of Proposal. Failure to do so may subject the Bidder to disqualification. The items and references:
SPECIFICATIONS
1. Table of Contents Description: DELETE Section 08 51 13 – Aluminum Windows. ADD Section 05 52 00 – Metal Railings.
2. 05 52 00 – Metal Railings
Description: ADD Section 05 52 00 – Metal Railings.
3. 06 40 23 – Interior Architectural Woodwork Description: Revisions highlighted in section.
4. 23 07 13 – DUCT INSULATION Section revised.
5. 23 31 13 – METAL DUCTS
Paragraph 2.6 A revised.
6. 23 51 23 – GAS VENTS
ANNA H. ROCKWELL ELEMENTARY SCHOOL
Perkins Eastman Project # 68961.00 State Project #009-0058-RNV
Page 2 of 3
Paragraph 1.6 added.
7. 23 82 19 – FAN COIL UNITS Delete “IEC (International Environmental Corporation); LSB Industries.” from paragraphs 2.2 A and 2.3A.
DRAWINGS
1. C-102.1 SITE PLAN - REMOVALS The existing wood planter and picnic table area shall be removed on the west side of the existing paved play area.
2. C-101.1 ACCESSIBLE ROUTES PLAN The accessible drop ramp at the northeastern corner of the building is to be Type A and the accessible drop ramp across from it is to be Type C. The accessible drop ramp at the front of the building to be Type D, not Type A.
3. C-201.1 SITE PLAN - MATERIALS An 18’-6” long x 8’ wide x 12” thick reinforced concrete relieving slab shall be installed over the grease trap as detailed on the Plumbing plans.
4. C-202.1 SITE PLAN - LANDSCAPING The groundcover perennial planting detail should reference 2/C-600.3. The planting bed detail should reference 4/C-600.3. The lawn detail should reference 3/C-600.3.
5. C-400.1 SEDIMENTATION AND EROSION CONTROL PLAN The Contractor shall inspect and maintain/repair erosion control measures weekly (and after storm events) to prevent eroded materials from leaving the site.
6. C-600.2 – SITE DETAILS Detail 6 (Concrete Dumpster Pad) refers to details for expansion joints and score joints that aren’t on the sheet. Please note that the score joints shall be a 3/8” wide x ½” deep groove and the expansion joint shall be a 3/8” wide x ½” deep groove with joint sealer.
7. AD-102a DEMOLITION ROOF PLAN
DELETE “PART A” from Drawing Title REVISE Roof Demolition Note #7 to the following:
Remove Existing B.U.R. Membrane System in its entirety including existing rigid insulation; Existing Roof Deck to remain U.O.N.
8. A-321 SECTION DETAILS
Revised details 4, 5, 6, 7, 8, 9, and 10
9. IN-601 INTERIOR FINISH SCHEDULE
Revised finish schedule
ANNA H. ROCKWELL ELEMENTARY SCHOOL
Perkins Eastman Project # 68961.00 State Project #009-0058-RNV
Page 3 of 3
10. S-102b STRUCTURAL ROOF PART PLAN B
Indicated locations of expansion joints.
11. P-500: PLUMBING DETAILS
Detail #9, change 2,500 gallon grease separator to 2,000 gallon grease separator.
12. E-601: ELECTRICAL SCHEDULES
Provide 600A/3P circuit breaker in lieu of 400A/3P circuit breaker in MSDB for PV system.
13. ES-101: ELECTRICAL SITE PLAN One light to be one each side of sign due to CT performace restrictions of exterior sign lighting.
14. T-101 TECHNOLOGY OVERALL PLANS
Added Clocks to rooms 118, 121, 123, and 203. Deleted monitors from Lobby C101. Added data drops to rooms 125 and M128.
15. T-101A TECHNOLOGY LEVEL 1 & 2 PART A PLANS Added Clocks to room 203. Deleted monitors from Lobby C101.
16. T-101B TECHNOLOGY LEVEL 1 PART B PLAN Added Clocks to rooms 118, 121, and 123. Added data drops to rooms 125 and M128.