addendum no. 2 rochester city school district dr. walter ...€¦ · addendum no. 2 january 11th,...
TRANSCRIPT
![Page 1: ADDENDUM NO. 2 Rochester City School District Dr. Walter ...€¦ · Addendum No. 2 January 11th, 2019 224 Mill Street Rochester, NY 14614 p 585.442.7010 f 585.442.7019 SECTION 004116](https://reader034.vdocuments.us/reader034/viewer/2022051918/600af59262e4c86b7244d9da/html5/thumbnails/1.jpg)
224 Mill Street Rochester, NY 14614 p 585.442.7010 f 585.442.7019 www.seidesigngroup.com
ADDENDUM NO. 2
Rochester City School District
Dr. Walter Cooper, School #10
SED Control#: 26-16-00-01-0-037-021
SED DWT Control #: 26-16-00-01-7-999-020
SEI Project No.: 17-3016
January 11th, 2019
GENERAL INSTRUCTIONS: • Include this Addendum as part of the Construction Documents. This Addendum supplements portions of
the original Drawings and Specifications, the intent of which shall remain, except as revised herein. • Work described in this Addendum shall be in accordance with the Specifications for like items in remainder
of project and complete with all labor and materials included.
REVISIONS TO THE PROJECT MANUAL:
SECTION 035416 – HYDRAULIC CEMENT UNDERLAYMENT
Item 2-1 REVISE Subparagraph 2.1-A.3 “Ardex America, Ardex SD-P – instant patch self drying, fast setting concrete underlayment patch” to read “Ardex America, Ardex K 15 – rapid setting self-leveling underlayment.”
Item 2-2 REVISE Subparagraph 2.1-A.4 “Cement Binder: ASTM C 150, portland cement, or hydraulic or blended hydraulic cement as defined by ASTM C 219.” to read “Cement Binder: Provide manufacturers approved binder.”
![Page 2: ADDENDUM NO. 2 Rochester City School District Dr. Walter ...€¦ · Addendum No. 2 January 11th, 2019 224 Mill Street Rochester, NY 14614 p 585.442.7010 f 585.442.7019 SECTION 004116](https://reader034.vdocuments.us/reader034/viewer/2022051918/600af59262e4c86b7244d9da/html5/thumbnails/2.jpg)
Addendum No. 2 January 11th, 2019
224 Mill Street Rochester, NY 14614 p 585.442.7010 f 585.442.7019 www.seidesigngroup.com
SECTION 004116 – BID FORM
Item 2-3 ADD Subparagraph 1.4-UC-11 as follows:
SECTION 004322 – UNIT PRICES
Item 2-4 ADD Subparagraph 3.1-UC-11 as follows: “UC-11 Add the removal and the replacement of existing stone curb on the west side of
Virginia Ave. Remove the existing stone curbing for the entire length of the school property and replace with standard City of Rochester stone curbing. Include removing and replacing a 2 foot wide strip of the asphalt road pavement. All new work shall meet the City of Rochester construction details and specifications (Per LF)”
SECTION 087100 – DOOR HARDWARE
Item 2-5 DELETE door C203B from Article 3.4, hardware group number 63. Item 2-6 DELETE hardware group number 80 from Article 3.4 in its entirety. Item 2-7 ADD doors C201B and C203B to Article 3.4, hardware group number 44. Item 2-8 ADD the following hardware to Article 3.4, hardware group number 55:
“1 EA OVERHEAD STOP 100S 630 GLY” Item 2-9 ADD the following hardware to Article 3.4, hardware group number 76:
“1 EA OVERHEAD STOP 100S 630 GLY”
SECTION 088770 – GLAZING FILMS
Item 2-10 DELETE Article 2.2 safety and security film in its entirety. Item 2-11 DELETE Article 2.3 privacy film in its entirety.
SECTION 122413 – ROLLER WINDOW SHADES
Item 2-12 DELETE Subparagraph 2.2-F.1.b, light-blocking fabric in its entirety.
REVISIONS TO THE DRAWINGS:
UC-11 Add the removal and the replacement of existing stone curb on the west side of Virginia Ave. Remove the existing stone curbing for the entire length of the school property and replace with standard City of Rochester stone curbing. Include removing and replacing a 2 foot wide strip of the asphalt road pavement. All new work shall meet the City of Rochester construction details and specifications
$ LF
![Page 3: ADDENDUM NO. 2 Rochester City School District Dr. Walter ...€¦ · Addendum No. 2 January 11th, 2019 224 Mill Street Rochester, NY 14614 p 585.442.7010 f 585.442.7019 SECTION 004116](https://reader034.vdocuments.us/reader034/viewer/2022051918/600af59262e4c86b7244d9da/html5/thumbnails/3.jpg)
Addendum No. 2 January 11th, 2019
224 Mill Street Rochester, NY 14614 p 585.442.7010 f 585.442.7019 www.seidesigngroup.com
DRAWING NO. S2001 – PARTIAL FOUNDATION PLAN
Item 2-13 REVISE note “T/WALL EL. -4’-6”” near column A4 to read “T/WALL EL. -2’-0”.”
DRAWING NO. A1004 – DEMOLITION PLAN – SECOND FLOOR AREA B
Item 2-14 REVISE note “ALTERNATE NO. 01” to read “ALTERNATE NO. 02” on Plan 1 SECOND FLOOR DEMOLITION PLAN – AREA B.
DRAWING NO. A1102 – FLOOR PLAN – FIRST FLOOR AREA A
Item 2-15 REVISE Plan 1 FIRST FLOOR PLAN – AREA A as detailed on AD2-A3 PARTIAL FIRST FLOOR PLAN AREA A (dated 01/11/19).
DRAWING NO. A1104 – FLOOR PLAN – SECOND FLOOR AREA A
Item 2-16 REVISE Plan 1 SECOND FLOOR PLAN – AREA A as detailed on AD2-A1 PARTIAL SECOND FLOOR PLAN AREA A (dated 01/11/19).
Item 2-17 REVISE Plan 1 SECOND FLOOR PLAN – AREA as detailed on AD2-A4 PARTIAL SECOND FLOOR PLAN AREA A (dated 01/11/19).
DRAWING NO. A1134 – REFLECTED CEILING PLAN – SECOND FLOOR AREA A
Item 2-18 REVISE Plan 1 PARTIAL SECOND FLOOR REFLECTED CEILING PLAN – AREA A as detailed on AD2-A2 PARTIAL SECOND FLOOR RCP AREA A (dated 01/11/19).
DRAWING NO. A1160 – ROOF PLAN – AREA A
Item 2-19 REVISE general note number 4 “ROOFS ON 1/A1160 ARE NEW CONSTRUCTION, REFER TO TYPICAL EPDM ON METAL DECK ROOF SYSTEM ON A0001” to read as “ALL ROOFS SHOWN ON THIS DRAWING ARE BASE BID. THE CONTRACTOR SHALL REFER TO DRAWING A0001 FOR THE TYPICAL EPDM ROOF ASSEMBLY DETAIL.”
Item 2-20 DELETE general note number 5 “ROOFS ON 1/A1161 ARE EXISTING TO REMAIN, THE NEW ROOF SHOULD MATCH THE ADJACENT EXISTING ROOF ASSEMBLY” in its entirety.
DRAWING NO. A1161 – ROOF PLAN – AREA B
Item 2-21 REVISE general note number 4 “ROOFS ON 1/A1160 ARE NEW CONSTRUCTION, REFER TO TYPICAL EPDM ON METAL DECK ROOF SYSTEM ON A0001” to read as “THE CONTRACTOR SHALL FIELD VERIFY THE EXISTING ROOF ASSEMBLY AS SHOWN ON THIS DRAWING. ANY ROOF PATCHING THAT IS THE RESULT OF SPECIFIED PLUMBING SCOPE, SPECIFIED MECHANICAL SCOPE, SPECIFIED ELECTRICAL SCOPE, CHIMNEY
![Page 4: ADDENDUM NO. 2 Rochester City School District Dr. Walter ...€¦ · Addendum No. 2 January 11th, 2019 224 Mill Street Rochester, NY 14614 p 585.442.7010 f 585.442.7019 SECTION 004116](https://reader034.vdocuments.us/reader034/viewer/2022051918/600af59262e4c86b7244d9da/html5/thumbnails/4.jpg)
Addendum No. 2 January 11th, 2019
224 Mill Street Rochester, NY 14614 p 585.442.7010 f 585.442.7019 www.seidesigngroup.com
DEMOLITION, ETC. SHALL BE PROVIDED BY THE GENERAL CONTRACTOR AND SHALL MATCH THE EXISTING ADJACENT ROOF ASSEMBLY UNLESS OTHERWISE NOTED.”
Item 2-22 DELETE general note number 5 “ROOFS ON 1/A1161 ARE EXISTING TO REMAIN, THE NEW ROOF SHOULD MATCH THE ADJACENT EXISTING ROOF ASSEMBLY” in its entirety.
DRAWING NO. A1230 – DOOR SCHEDULE AND FRAME TYPES
Item 2-23 DELETE drawing A1230 DOOR SCHEDULE AND FRAME TYPES (dated 12/13/2018) in its entirety. ADD drawing A1230 DOOR SCHEDULE AND FRAME TYPES (revision date 01/11/19) in its entirety.
DRAWING NO. A1610 – DETAILS
Item 2-24 DELETE the following note from drawing 2/A1610: “EXTERIOR CAN LIGHT, REFER TO ELECTRICAL DWGS”
Item 2-25 DELETE the following note from drawing 2/A1610: “ELECTRICAL CONDUIT, COORDINATE w/ NEW BENCHES”
DRAWING NO. A1700 – ROOM FINISH SCHEDULE AND PATTERN DETAILS
Item 2-26 ADD the following comment to the room finish schedule, room # 120: “DO NOT PROVIDE FLOORING IN OR UNDER THE FREEZER AND COOLER. FLOORING IN THE FREEZER AND COOLER IS BY OTHERS, REFER TO DRAWING QF1401 FOR ADDITIONAL INFORMATION”
DRAWING NO. A1800 – FURNITURE PLAN – FIRST FLOOR AREA A & LOWER LEVEL
Item 2-27 DELETE drawing A1800 FURNITURE PLAN – FIRST FLOOR AREA A & LOWER LEVEL (dated 12/13/2018) in its entirety. ADD drawing A1800 FURNITURE PLAN – FIRST FLOOR AREA A & LOWER LEVEL (revision date 01/11/19) in its entirety.
DRAWING NO. A1801 – FURNITURE PLAN – FIRST FLOOR AREA B
Item 2-28 DELETE drawing A1801 FURNITURE PLAN – FIRST FLOOR AREA B (dated 12/13/2018) in its entirety. ADD drawing A1801 FURNITURE PLAN – FIRST FLOOR AREA B (revision date 01/11/19) in its entirety.
DRAWING NO. A1802 – FURNITURE PLAN – SECOND FLOOR AREA A
Item 2-29 DELETE drawing A1802 FURNITURE PLAN – SECOND FLOOR AREA A (dated 12/13/2018) in its entirety. ADD drawing A1802 FURNITURE PLAN – SECOND FLOOR AREA A (revision date 01/11/19) in its entirety.
![Page 5: ADDENDUM NO. 2 Rochester City School District Dr. Walter ...€¦ · Addendum No. 2 January 11th, 2019 224 Mill Street Rochester, NY 14614 p 585.442.7010 f 585.442.7019 SECTION 004116](https://reader034.vdocuments.us/reader034/viewer/2022051918/600af59262e4c86b7244d9da/html5/thumbnails/5.jpg)
Addendum No. 2 January 11th, 2019
224 Mill Street Rochester, NY 14614 p 585.442.7010 f 585.442.7019 www.seidesigngroup.com
DRAWING NO. A1803 – FURNITURE PLAN – SECOND FLOOR AREA B
Item 2-30 DELETE drawing A1803 FURNITURE PLAN – SECOND FLOOR AREA B (dated 12/13/2018) in its entirety. ADD drawing A1803 FURNITURE PLAN – SECOND FLOOR AREA B (revision date 01/11/19) in its entirety.
DRAWING NO. A1900 – SIGNAGE PLAN – LOWER LEVEL
Item 2-31 DELETE drawing A1900 SIGNAGE PLAN – LOWER LEVEL (dated 12/13/2018) in its entirety. ADD drawing A1900 SIGNAGE PLAN – LOWER LEVEL (revision date 01/11/19) in its entirety.
DRAWING NO. A1901 – SIGNAGE PLAN – FIRST AND SECOND FLOOR
Item 2-32 DELETE drawing A1901 SIGNAGE PLAN – FIRST AND SECOND FLOOR (dated 12/13/2018) in its entirety. ADD drawing A1901 SIGNAGE PLAN – FIRST AND SECOND FLOOR (revision date 01/11/19) in its entirety.
DRAWING NO. A1902 – SIGNAGE SCHEDULE
Item 2-33 DELETE drawing A1902 SIGNAGE SCHEDULE (dated 12/13/2018) in its entirety. ADD drawing A1902 SIGNAGE SCHEDULE (revision date 01/11/19) in its entirety.
DRAWING NO. H1204 – PARTIAL SECOND FLOOR PLAN - HVAC
Item 2-34 REVISE 70x48 outside air intake ductwork to include motorized damper at roof penetration per AD2-H2 (dated 01/11/19).
Item 2-35 REVISE 12x10(L) supply air ductwork to include smoke damper and duct smoke detector at corridor smoke door crossing per AD2-H3 (dated 01/11/19).
DRAWING NO. H1301 – PARTIAL LOWER LEVEL PLAN – HVAC PIPING
Item 2-36 REVISE boiler piping size to 3" per AD2-H4 (dated 01/11/19).
DRAWING NO. H1401 – ENLARGED FLOOR PLANS - HVAC
Item 2-37 REVISE note number seven per AD2-H1 (dated 01/11/19).
DRAWING NO. H1600 – SCHEDULES - HVAC
Item 2-38 REVISE cabinet unit heater schedule to remove duplicates per drawing AD2-H5 (dated 01/11/19). Item 2-39 REVISE pump schedule per drawing AD2-H6 (dated 01/11/19).
![Page 6: ADDENDUM NO. 2 Rochester City School District Dr. Walter ...€¦ · Addendum No. 2 January 11th, 2019 224 Mill Street Rochester, NY 14614 p 585.442.7010 f 585.442.7019 SECTION 004116](https://reader034.vdocuments.us/reader034/viewer/2022051918/600af59262e4c86b7244d9da/html5/thumbnails/6.jpg)
Addendum No. 2 January 11th, 2019
224 Mill Street Rochester, NY 14614 p 585.442.7010 f 585.442.7019 www.seidesigngroup.com
DRAWING NO. E1204 – PARTIAL SECOND FLOOR PLAN - POWER AND SS - AREA A
Item 2-40 REVISE magnetic door holders, rooftop receptacle, smoke damper, duct smoke detector, and remote test station per AD2-E1 (dated 01/11/19).
DRAWING NO. E1205 – PARTIAL SECOND FLOOR PLAN - POWER AND SS - AREA B
Item 2-41 REVISE magnetic door holders per AD2-E2 (dated 01/11/19).
DRAWING NO. E1304 – PARTIAL SECOND FLOOR PLAN - LIGHTING - AREA A
Item 2-1 REVISE lighting and light switches per AD2-E3 (dated 01/11/19).
DRAWING NO. E1305 – PARTIAL SECOND FLOOR PLAN - LIGHTING - AREA B
Item 2-2 REVISE lighting and light switches per AD2-E4 (dated 01/11/19).
ATTACHMENTS:
AD2-A1 PARTIAL SECOND FLOOR PLAN AREA A (dated 01/11/19) AD2-A2 PARTIAL SECOND FLOOR RCP AREA A (dated 01/11/19) AD2-A3 PARTIAL FIRST FLOOR PLAN (dated 01/11/19) AD2-A4 PARTIAL SECOND FLOOR PLAN (dated 01/11/19) AD2-H1 PARTIAL LOWER LEVEL FLOOR PLAN – HVAC (dated 01/11/19) AD2-H2 PARTIAL SECOND FLOOR PLAN - HVAC (dated 01/11/19) AD2-H3 PARTIAL SECOND FLOOR PLAN - HVAC (dated 01/11/19) AD2-H4 PARTIAL LOWER LEVEL FLOOR PLAN - HVAC PIPING (dated 01/11/19) AD2-H5 CABINET UNIT HEATER SCHEDULE - HVAC (dated 01/11/19) AD2-H6 PUMP SCHEDULE - HVAC (dated 01/11/19) AD2-E1 PARTIAL SECOND FLOOR PLAN - POWER AND SS - AREA A (dated 01/11/19) AD2-E2 PARTIAL SECOND FLOOR PLAN - POWER AND SS - AREA B (dated 01/11/19) AD2-E3 PARTIAL SECOND FLOOR PLAN - LIGHTING - AREA A (dated 01/11/19) AD2-E4 PARTIAL SECOND FLOOR PLAN - LIGHTING - AREA B (dated 01/11/19) A1230 DOOR SCHEDULE AND FRAME TYPES (revision date 01/11/19) A1800 FURNITURE PLAN – FIRST FLOOR AREA A & LOWER LEVEL (revision date 01/11/19) A1801 FURNITURE PLAN – FIRST FLOOR AREA B (revision date 01/11/19) A1802 FURNITURE PLAN – SECOND FLOOR AREA A (revision date 01/11/19) A1803 FURNITURE PLAN – SECOND FLOOR AREA B (revision date 01/11/19) A1900 SIGNAGE PLAN – LOWER LEVEL (revision date 01/11/19) A1901 SIGNAGE PLAN – FIRST AND SECOND FLOOR (revision date 01/11/19) A1902 SIGNAGE SCHEDULE (revision date 01/11/19) Pre-Bid RFI log (dated 01/11/19)
End of Addendum No. 2
![Page 7: ADDENDUM NO. 2 Rochester City School District Dr. Walter ...€¦ · Addendum No. 2 January 11th, 2019 224 Mill Street Rochester, NY 14614 p 585.442.7010 f 585.442.7019 SECTION 004116](https://reader034.vdocuments.us/reader034/viewer/2022051918/600af59262e4c86b7244d9da/html5/thumbnails/7.jpg)
UPUP
UPUPUP
FOURTH GRADECLASSROOM
213
ELEVATORE02
DATA214
OFFICE: SSO215
213-1
CORRIDORC204
216-1215-1
STAIRST04
A1512
214-1
ST04-5
C203B
8 10
D
E
G
F
M34A
S20S20
S20AS20A
C80
M31
3' -
0"
1
M34
EQ EQ
12 13
J
14
H.7
EX J
EX L
EX KSPECIALEDUCATION
15:1CLASSROOM
226
FIFTH GRADECLASSROOM
205
CORRIDORC201A
CORRIDORC202A
C201B
205-2
206-1
ST03-5
STAIRST03
M34A
M33A
M34A
1
EQEQ
© SEI design group Architects, DPC
SED Control No.
SEI Project No.
Revisions
Date
Reference DWG.1/11
/201
9 10
:45:
3 1 A
M
AD2 - A1
PARTIAL SECOND FLOOR PLANAREA A
353 CONGRESS AVE.ROCHESTER, NEW YORK 14619
DR. WALTERCOOPER, SCHOOL#10
ROCHESTER CITYSCHOOL DISTRICT
SCHOOL 10
26-16-00-01-0-037-021
17-301601/11/19
1/A1104
1 01/11/19 ADDENDUM
1/8" = 1'-0"2 PARTIAL SECOND FLOOR PLAN 1/8" = 1'-0"1 PARTIAL SECOND FLOOR PLAN
![Page 8: ADDENDUM NO. 2 Rochester City School District Dr. Walter ...€¦ · Addendum No. 2 January 11th, 2019 224 Mill Street Rochester, NY 14614 p 585.442.7010 f 585.442.7019 SECTION 004116](https://reader034.vdocuments.us/reader034/viewer/2022051918/600af59262e4c86b7244d9da/html5/thumbnails/8.jpg)
FOURTHGRADE
CLASSROOM213
GIRLSTOILET
216
ELEVATORE02
OFFICE: SSO215
DATA214
9' - 0"AC2
CORRIDORC203B
CORRIDORC204
9' - 0"AC1
9' - 0"AC1
9' - 0"AC1
9' - 0"AC1
STAIRST04
9' - 0"AC1
1
9' - 0"AC1 1
SPECIALEDUCATION
15:1CLASSROOM
226
FIFTHGRADE
CLASSROOM205
CORRIDORC201A
9' - 0"AC1
9' - 0"AC1
CORRIDORC202A
9' - 0"AC1
9' - 0"AC1
9' - 0"AC1
9' - 0"GB
STAIRST03
DIS
PLAY
CAS
E
1
© SEI design group Architects, DPC
SED Control No.
SEI Project No.
Revisions
Date
Reference DWG.1/11
/201
9 11
:01:
1 9 A
M
AD2 - A2
PARTIAL SECOND FLOOR RCPAREA A
353 CONGRESS AVE.ROCHESTER, NEW YORK 14619
DR. WALTERCOOPER, SCHOOL#10
ROCHESTER CITYSCHOOL DISTRICT
SCHOOL 10
26-16-00-01-0-037-021
17-301601/11/19
1/A1134
1 01/11/19 ADDENDUM
1/8" = 1'-0"2 PARTIAL SECOND FLOOR RCP 1/8" = 1'-0"1 PARTIAL SECOND FLOOR RCP
GENERAL NOTE:COORDINATE THE LOCATION OF EXIT SIGNS, AREA OF REFUGE SIGNS, DOOR HOLD OPENS AND OTHER ELECTRICAL DEVICES WITH THE REVISED LOCATION OF DOORS C201B AND C203B
![Page 9: ADDENDUM NO. 2 Rochester City School District Dr. Walter ...€¦ · Addendum No. 2 January 11th, 2019 224 Mill Street Rochester, NY 14614 p 585.442.7010 f 585.442.7019 SECTION 004116](https://reader034.vdocuments.us/reader034/viewer/2022051918/600af59262e4c86b7244d9da/html5/thumbnails/9.jpg)
A1508
5
3 4 5 6 7 8
A
B
C
DA1508
3
A13131
A13123
A1608
TYP.6
A1609
SIM1
VEST.V3
KITCHEN120
STORAGE120A
OFFICEKITCHEN
120B
JAN. CL.120D
LOCKER ROOM120E
SERVING120C
3' -
4"
ST04-3
V3-4 V3-3
120-1
120-2
119-2
120-3
120C-1
120C-2
120B120A
120F
120E
C80 KITCHEN120
SERVING120C
120D
53
V3-1 V3-2
C80
C80
C80
C80
C80
C80
C80
C80
C60PH
C60C60
2' -
8"
3' - 6"
2' - 8"
2' -
0"
C60
© SEI design group Architects, DPC
SED Control No.
SEI Project No.
Revisions
Date
Reference DWG.1/11
/201
9 10
:48:
5 8 A
M
AD2 - A3
PARTIAL FIRST FLOOR PLANAREA A
353 CONGRESS AVE.ROCHESTER, NEW YORK 14619
DR. WALTERCOOPER, SCHOOL#10
ROCHESTER CITYSCHOOL DISTRICT
SCHOOL 10
26-16-00-01-0-037-021
17-301601/11/19
1/A1102
1 01/11/19 ADDENDUM
1/8" = 1'-0"1 FIRST FLOOR PLAN
11
1
![Page 10: ADDENDUM NO. 2 Rochester City School District Dr. Walter ...€¦ · Addendum No. 2 January 11th, 2019 224 Mill Street Rochester, NY 14614 p 585.442.7010 f 585.442.7019 SECTION 004116](https://reader034.vdocuments.us/reader034/viewer/2022051918/600af59262e4c86b7244d9da/html5/thumbnails/10.jpg)
13
E.9
F
14EX 13EX 15 15
A150510
11
12
9
FIFTH GRADECLASSROOM
207
207-1
207-2 M33
M31
M33A
911001636
49
57
911001636
49
911001636
49
911001636
4991100
163649
911001636
49
911001636
49
911001636
49
C60PH
57C60
PH1'-6
" MIN
1'-6
" MIN
EQ.
EQ.91100
163649
4' - 8"
4' - 8"
© SEI design group Architects, DPC
SED Control No.
SEI Project No.
Revisions
Date
Reference DWG.1/11
/201
9 10
:49:
3 4 A
M
AD2 - A4
PARTIAL SECOND FLOOR PLANAREA A
353 CONGRESS AVE.ROCHESTER, NEW YORK 14619
DR. WALTERCOOPER, SCHOOL#10
ROCHESTER CITYSCHOOL DISTRICT
SCHOOL 10
26-16-00-01-0-037-021
17-301601/11/19
1/A1104
1 01/11/19 ADDENDUM
1/4" = 1'-0"2 SECOND FLOOR PLAN - AREA A
1
CONSTRUCTION KEYNOTE
57. 5’-4” HIGH WALL PARTITION W/ A CONTINUOUS 8” X ¾” SOLID SURFACE CAP. PROVIDE BULL NOSE AT ALL EXPOSED EDGES.
1
![Page 11: ADDENDUM NO. 2 Rochester City School District Dr. Walter ...€¦ · Addendum No. 2 January 11th, 2019 224 Mill Street Rochester, NY 14614 p 585.442.7010 f 585.442.7019 SECTION 004116](https://reader034.vdocuments.us/reader034/viewer/2022051918/600af59262e4c86b7244d9da/html5/thumbnails/11.jpg)
EX 10 EX 9 EX 8
EX G.2
EX G
EX F.5
EX F
EX E.5
B-1
B-2
AHU-5
FD
FD
FD
D
R
BOILER ROOM
003
78x26
78x26
MECHANICAL
ROOM
003A
FD
DSD
44x26(L)
8" UP
50x24
10"
80x36
© SEI design group Architects, DPC
SED Control No.
SEI Project No.
Revisions
Date
Reference DWG.1/1
0/2
019 1
1:3
6:1
4 A
M
AD2-H1
PARTIAL LOWER LEVEL FLOOR
PLAN - HVAC
353 CONGRESS AVE.ROCHESTER, NEW YORK 14619
DR. WALTER COOPER
ROCHESTER CITY
SCHOOL DISTRICT
SCHOOL 10
26-16-00-01-0-037-021
17-301601/11/19
H1401
1/4" = 1'-0"1
PARTIAL LOWER LEVEL PLAN - HVAC DUCTWORK
AD2-H1 DRAWING NOTES
5 PROVIDE 8" FLUE DAMPER KIT MODEL 100141561 AS MANUFACTURED BY LOCHINVAR AT FLUE
OUTLET. PROVIDE INLINE DRAIN ABOVE DAMPER.
6 INSTALL BOILER COMMON VENT PIPING IN ACCORDANCE WITH MANUFACTURER
RECOMMENDATIONS. PROVIDE STAINLESS STEEL PIPING MODEL FasNSeal AS MANUFACTURED BY
PROTECH SYSTEMS OR EQUIVALENT STAINLESS STEEL VENT APPROVED BY BOILER
MANUFACTURER. PITCH FLUE AIR DUCTWORK DOWN TOWARDS BOILERS MINIMUM 1/4" PER FOOT.
7 ROUTE 10" DIAMETER FLUE PIPING UP THROUGH ROOF. PROVIDE DRAIN CONNECTION AT BOTTOM
OF T CONNECTION. PROVIDE DRAIN PIPING TO CONDENSATE NEUTRALIZER.
8 ROUTE 8" COMBUSTION AIR PIPING UP THROUGH FLOOR ABOVE AND THROUGH ROOF. PROVIDE
GOOSENECK TERMINATION. REFER TO DETAIL.
11 PROVIDE 4" HIGH CONCRETE EQUIPMENT PAD. EQUIPMENT PAD SHALL EXTEND 6" BEYOND THE
FOOTPRINT OF THE UNIT ON ALL SIDES.
6
7
8
5
11
11
1 01/11/09 ADDENDUM 2
2
2
![Page 12: ADDENDUM NO. 2 Rochester City School District Dr. Walter ...€¦ · Addendum No. 2 January 11th, 2019 224 Mill Street Rochester, NY 14614 p 585.442.7010 f 585.442.7019 SECTION 004116](https://reader034.vdocuments.us/reader034/viewer/2022051918/600af59262e4c86b7244d9da/html5/thumbnails/12.jpg)
12
HRESOURCE
ROOM
227
42x20
8" TYP.
34x20 DSD
FD/SD
FD/SD
8"
M
© SEI design group Architects, DPC
SED Control No.
SEI Project No.
Revisions
Date
Reference DWG.1/1
0/2
019
11
:37:1
0 A
M
AD2-H2
PARTIAL SECOND FLOOR PLAN
- HVAC
353 CONGRESS AVE.ROCHESTER, NEW YORK 14619
DR. WALTER
COOPER
ROCHESTER CITY
SCHOOL DISTRICT
SCHOOL 10
26-16-00-01-0-037-021
17-301601/11/19
H1204
1/8" = 1'-0"1
PARTIAL SECOND FLOOR PLAN - HVAC DUCTWORK
2
![Page 13: ADDENDUM NO. 2 Rochester City School District Dr. Walter ...€¦ · Addendum No. 2 January 11th, 2019 224 Mill Street Rochester, NY 14614 p 585.442.7010 f 585.442.7019 SECTION 004116](https://reader034.vdocuments.us/reader034/viewer/2022051918/600af59262e4c86b7244d9da/html5/thumbnails/13.jpg)
8 9
E.9
F
FD/SD
ELEVATOR
E02
DATA
214
STAIR
ST04
16x10
A
30x6
675
12x10
B
22x10
-
TYP.=2
FD12x10(L)
SD
DSD
CORRIDOR
C203B
CORRIDOR
C204
2
© SEI design group Architects, DPC
SED Control No.
SEI Project No.
Revisions
Date
Reference DWG.1/1
0/2
019
11
:37:1
1 A
M
AD2-H3
PARTIAL SECOND FLOOR PLAN
- HVAC
353 CONGRESS AVE.ROCHESTER, NEW YORK 14619
DR. WALTER
COOPER
ROCHESTER CITY
SCHOOL DISTRICT
SCHOOL 10
26-16-00-01-0-037-021
17-301601/11/19
H1204
1/8" = 1'-0"1
PARTIAL SECOND FLOOR PLAN - HVAC DUCTWORK
![Page 14: ADDENDUM NO. 2 Rochester City School District Dr. Walter ...€¦ · Addendum No. 2 January 11th, 2019 224 Mill Street Rochester, NY 14614 p 585.442.7010 f 585.442.7019 SECTION 004116](https://reader034.vdocuments.us/reader034/viewer/2022051918/600af59262e4c86b7244d9da/html5/thumbnails/14.jpg)
15EX 12 EX 11 EX 10 EX 9
EX H
EX G.5
EX G.2
EX G
EX F.5
EX FG
G.4
H
HWP-002
B-1
B-2
AHU-5
MECHANICAL
ROOM
003ABOILER ROOM
003
HW
R
3" TYP. 4" G
5"
5"
HWP-001
5" 5"
5"
5" 1 1/2"
1 1/2"
HWS
4"
3/4"
2
© SEI design group Architects, DPC
SED Control No.
SEI Project No.
Revisions
Date
Reference DWG.1/1
0/2
019
11
:40:0
1 A
M
AD2-H4
PARTIAL LOWER LEVEL FLOOR
PLAN - HVAC PIPING
353 CONGRESS AVE.ROCHESTER, NEW YORK 14619
DR. WALTER
COOPER
ROCHESTER CITY
SCHOOL DISTRICT
SCHOOL 10
26-16-00-01-0-037-021
17-301601/11/19
H1301
1/8" = 1'-0"1
PARTIAL LOWER LEVEL PLAN - HVAC PIPING
![Page 15: ADDENDUM NO. 2 Rochester City School District Dr. Walter ...€¦ · Addendum No. 2 January 11th, 2019 224 Mill Street Rochester, NY 14614 p 585.442.7010 f 585.442.7019 SECTION 004116](https://reader034.vdocuments.us/reader034/viewer/2022051918/600af59262e4c86b7244d9da/html5/thumbnails/15.jpg)
AD2 - H5
ROCHESTER, NEW YORK 14619
353 CONGRESS AVE.
#10
COOPER, SCHOOL
DR. WALTER
SCHOOL DISTRICT
ROCHESTER CITY
SCHOOL 10
26-16-00-01-0-037-021
17-301601/11/19
© SEI design group Architects, DPC
SED Control No.
SEI Project No.
Revisions
Date
Reference DWG.H1600
WATER HOT - SCHEDULE HEATER UNITCABINET
NO.UNIT LOCATION TYPE(MBH)
CAPACITY
SIDEAIR SIDEWATER MOTORFAN
(CFM)
FLOW
AIR
F)(DEG.
TEMP
AIRENT.
(GPM)
RATE
FLOW
HD)(Ft.
P.D.WATER
F) (DEG.TEMP
WATERENT.
F) (DEG.TEMP
WATERLVG.FLUID QTY RPM HP VOLTS PHASE
CUH-01 ST02STAIR RECESSED 36.0 420 60 2.5 1.32 180 150 WATER 1 1050 1/10 120 1
CUH-02 ST01STAIR RECESSED 36.0 420 60 2.5 1.32 180 150 WATER 1 1050 1/10 120 1
CUH-03 V4VESTIBULE RECESSED 78.3 1040 60 5 3.5 180 150 WATER 2 1050 1/15 120 1
CUH-04 V4VESTIBULE RECESSED 78.3 1040 60 5 3.5 180 150 WATER 2 1050 1/15 120 1
CUH-05 V3VESTIBULE RECESSED 78.3 1040 60 5 3.5 180 150 WATER 2 1050 1/15 120 1
CUH-06 V3VESTIBULE RECESSED 78.3 1040 60 5 3.5 180 150 WATER 2 1050 1/15 120 1
CUH-07 ST04STAIR SURFACE 53.6 630 60 3 1.32 180 150 WATER 1 1050 1/10 120 1
CUH-08 ST03STAIR SURFACE 53.6 630 60 3 1.32 180 150 WATER 1 1050 1/10 120 1
CUH-09 132GIRLS RECESSED 36.0 420 60 2.5 1.32 180 150 WATER 1 1050 1/10 120 1
CUH-10 142BOYS RECESSED 36.0 420 60 2.5 1.32 180 150 WATER 1 1050 1/10 120 1
CUH-11 V5VESTIBULE RECESSED 78.3 1040 60 5 3.5 180 150 WATER 2 1050 1/15 120 1
CUH-12 V2VESTIBULE RECESSED 78.3 1040 60 5 3.5 180 150 WATER 2 1050 1/15 120 1
CUH-13 V1VESTIBULE RECESSED 78.3 1040 60 5 3.5 180 150 WATER 2 1050 1/15 120 1
REMARKS:
1. SWITCH. 3-SPEED AND MOTOR ECM WITH UNITPROVIDE
2. ARCHITECT. BY SELECTED COLOR WITH UNITPROVIDE
3. SWITCH. DISCONNECT WITH UNITPROVIDE
4. TRANSFORMER. & RELAY OP. FAN AND RELAY S/S WITH UNITPROVIDE
5. COIL. ROW TWO WITH UNITPROVIDE
6. COLLARS. DUCT RETURN AND SUPPLYPROVIDE
DIMENSIONSNOMINAL
No. MODEL &MANUFACTURER REMARKS
(In.)
LENGTH
(In.)
HEIGHT
(In.)
DEPTH
47 25 9.5 RC-1200-04STERLING 1,2,3,4,5
47 25 9.5 RC-1200-04STERLING 1,2,3,4,5
66 25 9.5 RC-1200-10STERLING 1,2,3,4,5
66 25 9.5 RC-1200-10STERLING 1,2,3,4,5
66 25 9.5 RC-1200-10STERLING 1,2,3,4,5
66 25 9.5 RC-1200-10STERLING 1,2,3,4,5
59 25 9.5 W-1080-06STERLING 1,2,3,4,5
59 25 9.5 W-1080-06STERLING 1,2,3,4,5
47 25 9.5 RC-1200-04STERLING 1,2,3,4,5
47 25 9.5 RC-1200-04STERLING 1,2,3,4,5
66 25 9.5 RC-1200-10STERLING 1,2,3,4,5
66 25 9.5 RC-1200-10STERLING 1,2,3,4,5
66 25 9.5 RC-1200-10STERLING 1,2,3,4,5
2
2
SCHEDULE - HVAC
CABINET UNIT HEATER
![Page 16: ADDENDUM NO. 2 Rochester City School District Dr. Walter ...€¦ · Addendum No. 2 January 11th, 2019 224 Mill Street Rochester, NY 14614 p 585.442.7010 f 585.442.7019 SECTION 004116](https://reader034.vdocuments.us/reader034/viewer/2022051918/600af59262e4c86b7244d9da/html5/thumbnails/16.jpg)
AD2 - H6
ROCHESTER, NEW YORK 14619
353 CONGRESS AVE.
#10
COOPER, SCHOOL
DR. WALTER
SCHOOL DISTRICT
ROCHESTER CITY
SCHOOL 10
26-16-00-01-0-037-021
17-301601/11/19
© SEI design group Architects, DPC
SED Control No.
SEI Project No.
Revisions
Date
Reference DWG.H1600
PUMP SCHEDULE
PUMP NO. LOCATION SERVICEDESCRIPTION
UNIT TYPE &
PUMP CAPACITY
MAX WWP
MOTOR CHARACTERISTICS
(DIA. In.)
SIZE
IMPELLER
TEMP.
FLUID
(%)
EFF.
PUMP
MIN.
(GPM)
FLOW
IN FEET
TOTAL HEADRPM HP VOLTS PHASE STARTER
BP-001 MECH ROOM B-001 INLINE PUMP 113 20 - 1750 1 460 3 VFD BY DIV 26 5.7" 180 63
BP-002 MECH ROOM B-002 INLINE PUMP 113 20 - 1750 1 460 3 VFD BY DIV 26 5.7" 180 65
HWP-001 MECH ROOM HW LOOP BASE MTD 415 90 - 1750 15 460 3 VFD BY DIV 26 9.9" 180 76
HWP-002 MECH ROOM HW LOOP BASE MTD 415 90 - 1750 15 460 3 VFD BY DIV 26 9.9" 180 76
HWCP-1 MECH ROOM AHU-1 INLINE 42.1 20 - 3450 1/2 115 1 BY DIV 26 N/A 180 N/A
HWCP-2 MECH ROOM AHU-2 INLINE 10.1 15 - 3450 1/8 115 1 BY DIV 26 N/A 180 N/A
HWCP-3 MECH ROOM AHU-3 INLINE 10.1 15 - 3450 1/8 115 1 BY DIV 26 N/A 180 N/A
HWCP-4 MECH ROOM AHU-4 INLINE 14.3 15 - 3450 1/8 115 1 BY DIV 26 N/A 180 N/A
HWCP-5 MECH ROOM AHU-5 INLINE 14 15 - 3450 1/8 115 1 BY DIV 26 N/A 180 N/A
HWCP-6 MECH ROOM AHU-6 INLINE 10.1 15 - 3450 1/8 115 1 BY DIV 26 N/A 180 N/A
CWP-001 MECH ROOM CW LOOP BASE MTD 390 80 - 1750 15 460 3 VFD BY DIV 26 9.6" 44 77
CWP-002 MECH ROOM CW LOOP BASE MTD 390 80 - 1750 15 460 3 VFD BY DIV 26 9.6" 44 77
CWP-003 MECH ROOM CH-1 PUMP BASE MTD 287 40 - 1750 5 460 3 VFD BY DIV 26 7.1" 44 77
CWP-004 MECH ROOM CH-2 PUMP INLINE 46 35 - 1750 1 460 3 VFD BY DIV 26 6.4" 44 50
REMARKS:
1. PROVIDE INTERTIA BASE.
(%)
EFF.
PUMP
MIN.
BHP
MAX.
SIZES
DISCHARGE
SUCTION &
VALVE SIZE
PURPOSE
MULTI
SIZE
DIFFUSER
SUCTION
MANUFACTURER & MODEL No. REMARKS
63 .95 2"x 2" N/A N/A TACO 1935
65 .95 2"x 2" N/A N/A TACO 1935
76 13.07 4"x 3" 4" 5"x 4" TACO FI3011D
76 13.07 4"x 3" 4" 5"x 4" TACO FI3011D
N/A N/A 1-1/2" N/A N/A TACO 2400-70
N/A N/A 1-1/2" N/A N/A TACO 0011-F4
N/A N/A 1-1/2" N/A N/A TACO 0011-F4
N/A N/A 1-1/2" N/A N/A TACO 0011-F4
N/A N/A 1-1/2" N/A N/A TACO 0011-F4
N/A N/A 1-1/2" N/A N/A TACO 0011-F4
77 11.39 3"x 21/2" 4" 5"x 3" TACO FI2510C 1
77 11.39 3"x 21/2" 4" 5"x 3" TACO FI2510C 1
77 4.29 3"x 21/2" 3" 4"x 3" TACO FI2507D 1
50 .95 2"x 2" 11/2" NA TACO 1935
2
HVAC
PUMP SCHEDULE -
![Page 17: ADDENDUM NO. 2 Rochester City School District Dr. Walter ...€¦ · Addendum No. 2 January 11th, 2019 224 Mill Street Rochester, NY 14614 p 585.442.7010 f 585.442.7019 SECTION 004116](https://reader034.vdocuments.us/reader034/viewer/2022051918/600af59262e4c86b7244d9da/html5/thumbnails/17.jpg)
M
EC
DH
ADH
F
EGB
S
M
M
F
S S
S
S
S
F
DH
DH
F
HD
HD
FDH
S V
M
SD
S
K
K
F
SD
DSD
RTS
8 9 10
E.9
F
F.5
5
30
1
1
LVP6
DATA
214
OFFICE: SSO
215
GIRLS TOILET
216
ELEVATOR
E02
1T
50B
50A
6
1
5
20
22
LVP6
1820
22
99
9
2D,2P
36
6
8
3
1
1
GFI, WP
© SEI design group Architects, DPC
SED Control No.
SEI Project No.
Revisions
Date
Reference DWG.1/1
0/2
019
1:4
8:5
6 P
M
AD2-E1
PARTIAL SECOND FLOOR PLAN
- POWER AND SS - AREA A
353 CONGRESS AVE.ROCHESTER, NEW YORK 14619
DR. WALTER
COOPER
ROCHESTER CITY
SCHOOL DISTRICT
SCHOOL 10
26-16-00-01-0-037-021
17-301601/11/19
E1204
1/8" = 1'-0"1
PARTIAL SECOND FLOOR PLAN - POWER AND SS
![Page 18: ADDENDUM NO. 2 Rochester City School District Dr. Walter ...€¦ · Addendum No. 2 January 11th, 2019 224 Mill Street Rochester, NY 14614 p 585.442.7010 f 585.442.7019 SECTION 004116](https://reader034.vdocuments.us/reader034/viewer/2022051918/600af59262e4c86b7244d9da/html5/thumbnails/18.jpg)
DH
DHF F
F
S S
F
DHDH
12 13 EX 15
H
CORRIDOR
C201B
CORRIDOR
C201A
33
33
1
1
1
© SEI design group Architects, DPC
SED Control No.
SEI Project No.
Revisions
Date
Reference DWG.1/7
/20
19 4
: 34:2
6 P
M
AD2-E2
PARTIAL SECOND FLOOR PLAN
- POWER AND SS - AREA B
353 CONGRESS AVE.ROCHESTER, NEW YORK 14619
DR. WALTER
COOPER
ROCHESTER CITY
SCHOOL DISTRICT
SCHOOL 10
26-16-00-01-0-037-021
17-301601/11/19
E1205
1/8" = 1'-0"1
PARTIAL SECOND FLOOR PLAN - POWER AND SS
![Page 19: ADDENDUM NO. 2 Rochester City School District Dr. Walter ...€¦ · Addendum No. 2 January 11th, 2019 224 Mill Street Rochester, NY 14614 p 585.442.7010 f 585.442.7019 SECTION 004116](https://reader034.vdocuments.us/reader034/viewer/2022051918/600af59262e4c86b7244d9da/html5/thumbnails/19.jpg)
3K
a
VS
K
MDD
OS
OS
3Kb
M
abD
OS
8 9 10
E.9
F
F.5
1 L3L2
L1
NL
L1L1
L1
GIRLS TOILET
216
DATA
214
ELEVATOR
E02
L3 L3
EM EM
L2
L1L1 L1
NL22
2
2L1
L1
b
b
b
a
a
a
1
© SEI design group Architects, DPC
SED Control No.
SEI Project No.
Revisions
Date
Reference DWG.1/7
/20
19 4
: 34:2
8 P
M
AD2-E3
PARTIAL SECOND FLOOR PLAN
- LIGHTING - AREA A
353 CONGRESS AVE.ROCHESTER, NEW YORK 14619
DR. WALTER
COOPER
ROCHESTER CITY
SCHOOL DISTRICT
SCHOOL 10
26-16-00-01-0-037-021
17-301601/11/19
E1304
1/8" = 1'-0"1
PARTIAL SECOND FLOOR PLAN - LIGHTING
![Page 20: ADDENDUM NO. 2 Rochester City School District Dr. Walter ...€¦ · Addendum No. 2 January 11th, 2019 224 Mill Street Rochester, NY 14614 p 585.442.7010 f 585.442.7019 SECTION 004116](https://reader034.vdocuments.us/reader034/viewer/2022051918/600af59262e4c86b7244d9da/html5/thumbnails/20.jpg)
M
OS
OS
K c
Kd
4Ka
13 EX 15 EX 13 14 15EX 12
EX J
EX H
H
H.7
NL
L2 L2
b b
L2 L2 L2
b b a
L1 NL
L1 L1
L1
d NLd
a
2
2
ac
NL
NL
L8
7
1
© SEI design group Architects, DPC
SED Control No.
SEI Project No.
Revisions
Date
Reference DWG.1/7
/20
19 4
: 34:2
8 P
M
AD2-E4
PARTIAL SECOND FLOOR PLAN
- LIGHTING - AREA B
353 CONGRESS AVE.ROCHESTER, NEW YORK 14619
DR. WALTER
COOPER
ROCHESTER CITY
SCHOOL DISTRICT
SCHOOL 10
26-16-00-01-0-037-021
17-301601/11/19
E1305
1/8" = 1'-0"1
PARTIAL SECOND FLOOR PLAN - LIGHTING
![Page 21: ADDENDUM NO. 2 Rochester City School District Dr. Walter ...€¦ · Addendum No. 2 January 11th, 2019 224 Mill Street Rochester, NY 14614 p 585.442.7010 f 585.442.7019 SECTION 004116](https://reader034.vdocuments.us/reader034/viewer/2022051918/600af59262e4c86b7244d9da/html5/thumbnails/21.jpg)
AS SCHED.
AS S
CH
ED.
AS SCHED.
AS S
CH
ED.
AS SCHED.
AS S
CH
ED.
5"
6" 6"
AS S
CH
ED.
AS SCHED.6" 6"
3' -
6"
6"
3' -
6"
6"
5" 5"
10"
2' -
0"8"
DOUBLE LITE
DL
HALF LITE
HL
NARROW LITE
NL
FLUSH
F
AS SCHED.
AS S
CH
ED.
6" 6"
2' -
10"
3' -
8"6"
DECORATIVE
D
AS SCHED.
AS S
CH
ED.
DUTCH
DD
EQEQ
SIMULATED DIVIDED LITE MUNTINS, TYP.
GENERAL NOTES1. VERIFY EXISTING FRAMES AND OPENINGS PRIOR TO FABRICATION.2. GLASS TYPE TO MATCH GLAZING SCHEDULED FOR DOOR. SEE DOOR
SCHEDULE FOR ADDITIONAL INFORMATION.
F1 F2
2" AS SCHED. 2" 2" AS SCHED. 2"
AS S
CH
ED.
2"
AS S
CH
ED.
4"
F3
2" AS SCHED. 2"
AS S
CH
ED.
4"
REMOVABLE MULLION. REFER TO HARDWARE SCHEDULE
F4
AS S
CH
ED.
2"2'
- 4"
2"
2 1/2" AS SCHED. 2 1/2"
V.I.F
.9'
- 8"
F5
AS S
CH
ED.
2"5'
- 0"
2"
2" AS SCHED. 2"
F6
AS S
CH
ED.
2"2'
- 4"
2"
2" AS SCHED. 2"
F7
AS S
CH
ED.
2"1'
- 4"
2"
2" AS SCED. 2"
F8
AS S
CH
ED.
2"1'
- 8"
2"
2" AS SCHED. 2"
F9
2"1'
- 2"
2"AS
SC
HED
.
2" AS SCHED. 2"
R 4' - 11"
AS S
CH
ED.
2"
2" AS SCHED. 2"
F11
3' -
2 3/
4"
EQ. EQ.
IG-3
REMOVABLE MULLION. REFER TO HARDWARE SCHEDULE
SIMULATED DIVIDED LITE MUNTINS, TYP.
SIMULATED DIVIDED LITE MUNTINS, TYP.
SIMULATED DIVIDED LITE MUNTINS, TYP.
F13
2"EQ.2"EQ.2"AS SCHED.2"EQ.2"
AS S
CH
ED.
2"1'
- 8"
2"3'
- 5"
2"
2' -
7"10
"
9' -
0"
14' - 5"
F14
AS S
CH
ED.
2"1'
- 8"
2"2"EQ.2"EQ.2"AS SCHED.2"
10"
2' -
7"2"
3' -
5"2"
1' -
8" 2"9'
- 0"
8' - 2"
AS S
CH
ED.
2 1/
2"2'
- 7"
2 1/
2"
V.I.F
.10
"
14' - 8 1/2"
10' -
0"
AS SCHED. AS SCHED.
2 1/2"EQ.
2 1/2"EQ. 2 1/2"
2 1/2"EQ.
2 1/2"EQ.
2 1/2"
F10REMOVABLE MULLION. REFER TO HARDWARE SCHEDULE
DOOR SCHEDULE LEGENDHM - PT = PAINTED HOLLOW METAL
HM - SW = FACTORY FINISHED SIMULATED WOOD GRAIN HOLLOW METAL DOOR
FRP - FF = FACTORY FINISHED FIBERGLASS REINFORNCED POLYESTER
ALUM - FF = FACTORY FINISHED ALUMINUM
STEEL - FF = FACTORY FINISHED STEEL
AMP - FF = FACTORY FINISHED ACRYLIC MODIFIED POLYSTER
AS S
CH
ED.
2"4'
- 2"
2"2'
- 10
"2"
2' -
10"
2"3'
- 10
"2"
3' -
10"
2"4'
- 2"
2"
F16
AS SCHED.
6' - 4"
2" EQ.2"
EQ. 2"
29' -
10"
REMOVABLE MULLION. REFER TO HARDWARE SCHEDULE
F15
2"1'
- 8"
2"AS
SC
HED
.
9' -
0"
19' - 7"
2" AS SCHED.2"
3' - 6"2"
1' - 5" 2"2"
1' - 5"2"
3' - 6"2"
AS SCHED. 2"
10"
2" EQ. 2" AS SCHED. 2" EQ. 2"
F12
8' - 10"
2"1'
- 8"
2"
9' -
0"
AS S
CH
ED.
REMOVABLE MULLION. REFER TO HARDWARE SCHEDULE
2"1'
- 4"
2"AS
SC
HED
.
F17
8' -
8"
2" AS SCHED. 2"
© SEI design group Architects
It is a violation of Title VIII, Article 147 of NYS Education Law for any person, unless acting under the direction of a licensed architect, to alter any item on this document in any way. Any licensee who alters this document is required
by law to affix his or her seal and the notation "altered by" followed by his or her signature and a specific description of the alterations made.
SEI Project No.
Revisions
Date
Key Plan
SED Control No.
A B
1/11
/201
9 10
:42:
46 A
M
A1230DOOR SCHEDULE AND
FRAME TYPES
17-301612/13/2018
353 CONGRESS AVE.ROCHESTER, NEW YORK 14619
DR. WALTERCOOPER, SCHOOL#10
ROCHESTER CITYSCHOOL DISTRICT
SCHOOL 10
26-16-00-01-0-037-021
1/4" = 1'-0"
DOOR TYPES
DOOR SCHEDULE
DOORNO.
HARDWARE
DOOR FRAME RATING(IN
MINUTES)GLAZING
TYPE REMARKSSIZE
TYPEMATERIAL
- FINISH TYPEMATERIAL -
FINISHJAMB
DETAILHEAD
DETAILLEAFS WIDTH HEIGHT THICK
224-1 26 1 3' - 0" 7' - 0" 0' - 1 3/4" NL WD - ST F1 HM - PT J1 H1 20 FG-1225-1 38 1 3' - 0" 7' - 0" 0' - 1 3/4" F WD - ST F1 HM - PT J1 H1 20 -226-1 26 1 3' - 0" 7' - 0" 0' - 1 3/4" NL WD - ST F1 HM - PT J1 H1 20 FG-1227-1 26 1 3' - 0" 7' - 0" 0' - 1 3/4" NL WD - ST F1 HM - PT J1 H1 20 FG-1228-1 23 1 3' - 0" 7' - 0" 0' - 1 3/4" F HM - PT F2 HM - PT J2 H2 90 -228-2 62 2 3' - 0" 7' - 0" 0' - 1 3/4" F FRP - FF F1 ALUM - FF J4 H4 - -C001 13 2 3' - 0" 7' - 0" 0' - 1 3/4" F HM - PT F2 HM - PT J11 H10 180 -C001-1 07 1 3' - 0" 7' - 0" 0' - 1 3/4" F HM - PT F2 HM - PT J6 H6 - - V.I.F.C001-2 07 1 3' - 0" 7' - 0" 0' - 1 3/4" F HM - PT F2 HM - PT J2 H2 - -C003-1 49 2 3' - 0" 7' - 0" 0' - 1 3/4" F HM - PT F2 HM - PT J2 H2 - -C003-2 41 1 10' - 0" 8' - 0" 0' - 1 1/2" SEE SPEC STEEL - FF F1 MFR. J12 H8 - COILING STEEL OVERHEAD DOORC101A 63 2 3' - 0" 7' - 0" 0' - 1 3/4" NL WD - ST F2 HM - PT J1 H1 FG-1C101B 63 2 3' - 0" 7' - 0" 0' - 1 3/4" NL HM - PT F2 HM - PT J2 H2 FG-6 ALTERNATE NO. 10C101C 64 2 3' - 0" 7' - 0" 0' - 1 3/4" NL HM - PT F3 HM - PT J2 H2 120 FG-5 ALTERNATE NO. 10C102A 63 2 3' - 0" 7' - 0" 0' - 1 3/4" NL WD - ST F2 HM - PT J1 H1 FG-1C102B 63 2 3' - 0" 7' - 0" 0' - 1 3/4" NL HM - PT F2 HM - PT J2 H2 FG-6 ALTERNATE NO. 10C102C 64 2 3' - 0" 7' - 0" 0' - 1 3/4" NL HM - PT F3 HM - PT J2 H1 90 FG-4 ALTERNATE NO. 10C201B 44 2 3' - 0" 7' - 0" 0' - 1 3/4" NL WD - ST F4 HM - PT J1 H1 20 FG-1C202B 63 2 3' - 0" 7' - 0" 0' - 1 3/4" NL WD - ST F1 HM - PT J1 H1 FG-1C203B 44 2 3' - 0" 7' - 0" 0' - 1 3/4" NL WD - ST F4 HM - PT J1 H1 20 FG-1ST01-1 67 1 3' - 2" 7' - 0" 0' - 1 3/4" NL HM - PT F1 HM - PT J6 H6 90 FG-4 V.I.F. / ALTERNATE NO. 10ST02-1 68 1 3' - 2" 7' - 0" 0' - 1 3/4" NL HM - PT F1 HM - PT J6 H6 90 FG-4 V.I.F. / ALTERNATE NO. 10ST02-2 69 1 3' - 0" 7' - 0" 0' - 1 3/4" F FRP - FF F2 ALUM - FF J6 H6 90 - V.I.F.ST03-1 66 1 3' - 0" 7' - 0" 0' - 1 3/4" NL HM - PT F2 HM - PT J2 H2 90 FG-4ST03-2 70 2 3' - 0" 7' - 0" 0' - 1 3/4" NL HM - PT F3 HM - PT J2 H2 90 FG-4 ALTERNATE NO. 10ST03-3 31 2 3' - 0" 7' - 0" 0' - 1 3/4" F AMP - FF F9 ALUM - FF J4 H4 90 FG-4ST03-4 06 1 3' - 0" 7' - 0" 0' - 1 3/4" NL HM - PT F2 HM - PT J2 H2 90 FG-4 ALTERNATE NO. 10ST03-5 65 2 3' - 0" 7' - 0" 0' - 1 3/4" NL HM - PT F3 HM - PT J2 H2 90 FG-4 ALTERNATE NO. 10ST04-1 66 1 3' - 0" 7' - 0" 0' - 1 3/4" NL HM - PT F2 HM - PT J2 H2 90 FG-4ST04-2 71 2 3' - 0" 7' - 0" 0' - 1 3/4" NL HM - PT F3 HM - PT J2 H2 90 FG-4 ALTERNATE NO. 10ST04-3 73 2 3' - 0" 7' - 0" 0' - 1 3/4" NL FRP - FF F9 ALUM - FF J4 H4 90 FG-4ST04-4 06 1 3' - 0" 7' - 0" 0' - 1 3/4" NL HM - PT F2 HM - PT J2 H2 90 FG-4 ALTERNATE NO. 10ST04-5 65 2 3' - 0" 7' - 0" 0' - 1 3/4" NL HM - PT F3 HM - PT J2 H2 90 FG-4 ALTERNATE NO. 10V1-1 31 2 3' - 0" 6' - 10" 0' - 1 3/4" D AMP - FF F11 ALUM - FF J6 H6 - IG-1 V.I.F.V1-2 32 2 3' - 0" 7' - 0" 0' - 1 3/4" DL WD - ST F12 HM - PT J8 H9 20 FG-1V2-1 30 1 3' - 0" 7' - 0" 0' - 1 3/4" D AMP - FF F5 ALUM - FF J6 H6 - IG-1 V.I.F.V2-2 74 1 3' - 0" 7' - 0" 0' - 1 3/4" NL WD - ST F1 HM - PT J1 H1 20 FG-1V2-3 74 1 3' - 0" 7' - 0" 0' - 1 3/4" NL WD - ST F1 HM - PT J1 H1 20 FG-1V3-1 55 2 3' - 0" 7' - 0" 0' - 1 3/4" DL ALUM - FF F10 ALUM - FF J4, J8 H9 - IG-1V3-2 75 2 3' - 0" 7' - 0" 0' - 1 3/4" DL ALUM - FF F10 ALUM - FF J4, J8 H9 - IG-1V3-3 76 2 3' - 0" 7' - 0" 0' - 1 3/4" DL ALUM - FF F10 ALUM - FF J8, J11 H9 - IG-1V3-4 77 2 3' - 0" 7' - 0" 0' - 1 3/4" DL ALUM - FF F10 ALUM - FF J8, J11 H9 - IG-1V4-1 55 2 3' - 0" 7' - 0" 0' - 1 3/4" DL ALUM - FF F10 ALUM - FF J4, J8 H9 - IG-1V4-2 75 2 3' - 0" 7' - 0" 0' - 1 3/4" DL ALUM - FF F10 ALUM - FF J4, J8 H9 - IG-1V4-3 76 2 3' - 0" 7' - 0" 0' - 1 3/4" DL ALUM - FF F10 ALUM - FF J8, J11 H9 - IG-1V4-4 77 2 3' - 0" 7' - 0" 0' - 1 3/4" DL ALUM - FF F10 ALUM - FF J8, J11 H9 - IG-1V5-1 31 2 2' - 8" 7' - 0" 0' - 1 3/4" D AMP - FF F6 ALUM - FF J4 H4 - IG-1 V.I.F.V5-2 72 2 2' - 8" 7' - 0" 0' - 1 3/4" D WD - ST F6 HM - PT J1 H1 45 FG-2
DOOR SCHEDULE
DOORNO.
HARDWARE
DOOR FRAME RATING(IN
MINUTES)GLAZING
TYPE REMARKSSIZE
TYPEMATERIAL
- FINISH TYPEMATERIAL -
FINISHJAMB
DETAILHEAD
DETAILLEAFS WIDTH HEIGHT THICK
001-1 01 1 3' - 0" 7' - 0" 0' - 1 3/4" F HM - PT F2 HM - PT J2 H2 - -002-1 02 1 3' - 0" 7' - 0" 0' - 1 3/4" F HM - PT F2 HM - PT J6 H6 45 - V.I.F.002A-1 01 1 3' - 0" 7' - 0" 0' - 1 3/4" F HM - PT F2 HM - PT J2 H2 45 -003-1 08 2 3' - 0" 6' - 8" 0' - 1 3/4" F HM - PT F2 HM - PT J6 H6 90 - V.I.F.003-2 01 1 3' - 0" 7' - 0" 0' - 1 3/4" F HM - PT F1 HM - PT J6 H6 90 - V.I.F.003A-1 9 2 3' - 0" 7' - 0" 0' - 1 3/4" F HM - PT F2 HM - PT J2 H2 90 -004-1 03 1 3' - 0" 7' - 0" 0' - 1 3/4" F HM - PT F2 HM - PT J6 H6 45 - V.I.F.004-2 11 2 2' - 6" 8' - 0" 0' - 1 3/4" F HM - PT F2 HM - PT J6 H6 45 - ALTERNATE NO. 10005-1 08 2 3' - 0" 7' - 0" 0' - 1 3/4" F HM - PT F2 HM - PT J2 H2 90 -006-1 08 2 3' - 0" 7' - 0" 0' - 1 3/4" F HM - PT F2 HM - PT J2 H2 - -007-1 14 2 3' - 0" 7' - 0" 0' - 1 3/4" F HM - PT F3 HM - PT J2 H2 90 -008-1 03 1 3' - 0" 7' - 0" 0' - 1 3/4" F HM - PT F2 HM - PT J2 H2 - -009-1 03 1 3' - 0" 7' - 0" 0' - 1 3/4" F HM - PT F2 HM - PT J2 H2 - -100-1 15 1 3' - 0" 7' - 0" 0' - 1 3/4" D WD - ST F1 HM - PT J1 H1 20 FG-1100-2 16 1 3' - 0" 7' - 0" 0' - 1 3/4" D WD - ST F1 HM - PT J6 H6 20 FG-1100A 17 1 3' - 0" 7' - 0" 0' - 1 3/4" F WD - ST F1 WD - ST J13 H1 - -100B 18 1 3' - 0" 7' - 0" 0' - 1 3/4" F WD - ST F1 HM - PT J1 H1 - -100C-1 20 1 3' - 0" 7' - 0" 0' - 1 3/4" F WD - ST F1 HM - PT J1 H1 - -100C-2 21 1 3' - 0" 6' - 0" 0' - 1 3/4" F WD - ST F1 HM - PT J1 H1 90 -101-1 15 1 3' - 0" 7' - 0" 0' - 1 3/4" D WD - ST F1 HM - PT J6 H6 20 FG-1101-2 24 1 3' - 0" 7' - 0" 0' - 1 3/4" D WD - ST F1 HM - PT J6 H6 20 FG-1101A 18 1 3' - 0" 7' - 0" 0' - 1 3/4" F WD - ST F1 HM - PT J1 H1 - -101B-1 21 1 3' - 0" 7' - 0" 0' - 1 3/4" F WD - ST F1 HM - PT J1 H1 - -102-1 1 1 3' - 0" 7' - 0" 0' - 1 3/4" NL WD - ST F1 HM - PT J1 H1 20 FG-1102-2 26 1 3' - 0" 7' - 0" 0' - 1 3/4" NL WD - ST F1 HM - PT J1 H1 20 FG-1103 78 1 3' - 0" 7' - 0" 0' - 1 3/4" NL ALUM - FF F15 ALUM - FF J8 H1 - IG-1103-1 26 1 3' - 0" 7' - 0" 0' - 1 3/4" NL WD - ST F1 HM - PT J1 H1 20 FG-1104-1 26 1 3' - 0" 7' - 0" 0' - 1 3/4" NL WD - ST F1 HM - PT J1 H1 20 FG-1105-1 26 1 3' - 0" 7' - 0" 0' - 1 3/4" NL WD - ST F1 HM - PT J1 H1 20 FG-1105-2 29 1 3' - 0" 7' - 0" 0' - 1 3/4" D AMP - FF F5 ALUM - FF J6 H6 - IG-1 V.I.F.106-1 26 1 3' - 0" 7' - 0" 0' - 1 3/4" NL WD - ST F1 HM - PT J1 H1 20 FG-1106-2 31 2 2' - 6" 7' - 0" 0' - 1 3/4" D AMP - FF F6 ALUM - FF J6 H6 - IG-1 V.I.F.106A 33 1 3' - 0" 7' - 0" 0' - 1 3/4" DD WD - ST F1 HM - PT J1 H1 - -106B 34 1 3' - 0" 7' - 0" 0' - 1 3/4" F WD - ST F1 HM - PT J1 H1 - -107-1 26 1 3' - 0" 7' - 0" 0' - 1 3/4" NL WD - ST F1 HM - PT J1 H1 20 FG-1108-1 26 1 3' - 0" 7' - 0" 0' - 1 3/4" NL WD - ST F1 HM - PT J1 H1 20 FG-1108-2 31 2 2' - 6" 7' - 0" 0' - 1 3/4" D AMP - FF F7 ALUM - FF J6 H6 - IG-1 V.I.F.108A 33 1 3' - 0" 7' - 0" 0' - 1 3/4" DD WD - ST F1 HM - PT J1 H1 - -108B 34 1 3' - 0" 7' - 0" 0' - 1 3/4" F WD - ST F1 HM - PT J1 H1 - -109-1 26 1 3' - 0" 7' - 0" 0' - 1 3/4" NL WD - ST F1 HM - PT J1 H1 20 FG-1109-2 31 2 2' - 6" 7' - 0" 0' - 1 3/4" D AMP - FF F7 ALUM - FF J6 H6 - IG-1109A 33 1 3' - 0" 7' - 0" 0' - 1 3/4" DD WD - ST F1 HM - PT J1 H1 - -110-1 26 1 3' - 0" 7' - 0" 0' - 1 3/4" NL WD - ST F1 HM - PT J1 H1 20 FG-1110A 34 1 3' - 0" 7' - 0" 0' - 1 3/4" F WD - ST F1 HM - PT J1 H1 - -110B 35 1 3' - 0" 7' - 0" 0' - 1 3/4" F WD - ST F1 HM - PT J1 H1 - -111-1 26 1 3' - 0" 7' - 0" 0' - 1 3/4" NL WD - ST F1 HM - PT J1 H1 20 FG-1111-2 29 1 3' - 0" 7' - 0" 0' - 1 3/4" D AMP - FF F8 ALUM - FF J4 H4 - IG-1111A 33 1 3' - 0" 7' - 0" 0' - 1 3/4" DD WD - ST F1 HM - PT J1 H1 - -112-1 26 1 3' - 0" 7' - 0" 0' - 1 3/4" NL WD - ST F1 HM - PT J1 H1 20 FG-1113-1 26 1 3' - 0" 7' - 0" 0' - 1 3/4" NL WD - ST F1 HM - PT J1 H1 20 FG-1114-1 27 1 3' - 0" 7' - 0" 0' - 1 3/4" NL WD - ST F1 HM - PT J1 H1 20 FG-1115-1 39 2 3' - 0" 7' - 0" 0' - 1 3/4" F HM - PT F2 HM - PT J2 H2 90 - ALTERNATE NO. 10115-2 40 1 3' - 0" 7' - 0" 0' - 1 3/4" NL FRP - FF F2 ALUM - FF J4 H4 90 FG-4115-3 41 1 12' - 0" 8' - 0" 0' - 1 1/2" SEE SPEC STEEL - FF F1 MFR. J12 H8 90 - COILING STEEL OVERHEAD DOOR115A 20 1 3' - 0" 7' - 0" 0' - 1 3/4" NL HM - PT F2 HM - PT J2 H2 - MG-1115B 19 1 3' - 0" 7' - 0" 0' - 1 3/4" F HM - PT F2 HM - PT J2 H2 - -115C-1 41 1 8' - 0" 8' - 0" 0' - 1 1/2" SEE SPEC WD - ST F1 MFR. J12 H8 90 - COILING STEEL OVERHEAD DOOR115C-2 41 1 8' - 0" 8' - 0" 0' - 1 1/2" SEE SPEC WD - ST F1 MFR. J12 H8 90 - COILING STEEL OVERHEAD DOOR116-1 26 1 3' - 0" 7' - 0" 0' - 1 3/4" NL WD - ST F1 HM - PT J1 H1 20 FG-1117-1 42 1 3' - 0" 7' - 0" 0' - 1 3/4" F WD - ST F1 HM - PT J2 H2 20 -118-1 42 1 3' - 0" 7' - 0" 0' - 1 3/4" F WD - ST F1 HM - PT J1 H1 20 -119-1 43 1 3' - 4" 7' - 0" 0' - 1 3/4" DL FRP - FF F8 ALUM - FF J4 H4 IG-1119-2 44 2 3' - 0" 7' - 0" 0' - 1 3/4" NL HM - PT F3 HM - PT J2 H2 20 FG-1 ALTERNATE NO. 10119-3 44 2 3' - 0" 7' - 0" 0' - 1 3/4" NL HM - PT F3 HM - PT J2 H2 20 FG-1 ALTERNATE NO. 10119A 61 1 3' - 0" 7' - 0" 0' - 1 3/4" F HM - PT F2 HM - PT J2 H2 - - ALTERNATE NO. 10119B 46 2 3' - 0" 7' - 0" 0' - 1 3/4" F HM - PT F2 HM - PT J2 H2 - - ALTERNATE NO. 10120-1 50 1 3' - 8" 7' - 0" 0' - 1 3/4" NL FRP - FF F8 ALUM - FF J4 H4 45 FG-2120-2 51 1 3' - 0" 7' - 0" 0' - 1 3/4" NL FRP - FF F8 ALUM - FF J4 H4 - IG-1120-3 26 1 3' - 0" 7' - 0" 0' - 1 3/4" NL HM - PT F2 HM - PT J2 H2 45 FG-2 ALTERNATE NO. 10120A 34 1 3' - 0" 7' - 0" 0' - 1 3/4" F HM - PT F2 HM - PT J2 H2 - - ALTERNATE NO. 10120B 20 1 3' - 0" 7' - 0" 0' - 1 3/4" NL HM - PT F2 HM - PT J2 H2 - MG-1 ALTERNATE NO. 10120C-1 52 1 3' - 0" 7' - 0" 0' - 1 3/4" DL ALUM - FF F13 ALUM - FF J8 H9 45 FG-2120C-2 52 1 3' - 0" 7' - 0" 0' - 1 3/4" DL ALUM - FF F14 ALUM - FF J8 H9 45 FG-2120D 04 1 3' - 0" 7' - 0" 0' - 1 3/4" F HM - PT F2 HM - PT J2 H2 - - ALTERNATE NO. 10120E 53 1 3' - 0" 7' - 0" 0' - 1 3/4" F HM - PT F2 HM - PT J2 H2 - - ALTERNATE NO. 10120F 18 1 3' - 0" 7' - 0" 0' - 1 3/4" F HM - PT F2 HM - PT J2 H2 - - ALTERNATE NO. 10121-1 12 2 3' - 0" 7' - 0" 0' - 1 3/4" F HM - PT F2 HM - PT J2 H2 90 - ALTERNATE NO. 10122-1 45 2 3' - 0" 7' - 0" 0' - 1 3/4" NL HM - PT F3 HM - PT J2 H2 20 FG-1 ALTERNATE NO. 10122-2 45 2 3' - 0" 7' - 0" 0' - 1 3/4" NL HM - PT F3 HM - PT J2 H2 20 FG-1 ALTERNATE NO. 10122-3 54 2 3' - 0" 7' - 0" 0' - 1 3/4" NL FRP - FF F16 ALUM - FF J4 H8 - IG-1122-4 54 2 3' - 0" 7' - 0" 0' - 1 3/4" NL FRP - FF F16 ALUM - FF J4 H8 - IG-1122-5 47 2 2' - 6" 7' - 0" 0' - 1 3/4" F HM - PT F2 HM - PT J2 H2 - ALTERNATE NO. 10122B 56 1 3' - 0" 7' - 0" 0' - 1 3/4" NL HM - PT F2 HM - PT J2 H2 - MG-1 ALTERNATE NO. 10122C 20 1 3' - 0" 7' - 0" 0' - 1 3/4" F HM - PT F2 HM - PT J2 H2 - - ALTERNATE NO. 10122D 18 1 3' - 0" 7' - 0" 0' - 1 3/4" F HM - PT F2 HM - PT J2 H2 - -122E 48 2 3' - 0" 7' - 0" 0' - 1 3/4" F HM - PT F2 HM - PT J2 H2 - - ALTERNATE NO. 10123-1 57 1 3' - 0" 7' - 0" 0' - 1 3/4" F HM - PT F2 HM - PT J2 H2 90 - ALTERNATE NO. 10124-1 57 1 3' - 0" 7' - 0" 0' - 1 3/4" F HM - PT F2 HM - PT J2 H2 90 - ALTERNATE NO. 10125-1 27 1 3' - 0" 7' - 0" 0' - 1 3/4" NL WD - ST F1 HM - PT J1 H1 20 FG-1126-1 27 1 3' - 0" 7' - 0" 0' - 1 3/4" NL WD - ST F1 HM - PT J1 H1 20 FG-1126A 20 1 3' - 0" 7' - 0" 0' - 1 3/4" NL WD - ST F1 HM - PT J1 H1 - MG-1126B 20 1 3' - 0" 7' - 0" 0' - 1 3/4" NL WD - ST F1 HM - PT J1 H1 - MG-1127-1 26 1 3' - 0" 7' - 0" 0' - 1 3/4" NL WD - ST F1 HM - PT J1 H1 20 FG-1128-1 27 1 3' - 0" 7' - 0" 0' - 1 3/4" NL WD - ST F1 HM - PT J1 H1 20 FG-1128-2 79 1 3' - 0" 7' - 0" 0' - 1 3/4" NL WD - ST F1 HM - PT J1 H1 - -128A 36 1 3' - 0" 7' - 0" 0' - 1 3/4" F WD - ST F1 HM - PT J1 H1 - -129-1 26 1 3' - 0" 7' - 0" 0' - 1 3/4" NL WD - ST F1 HM - PT J1 H1 20 FG-1130-1 42 1 3' - 0" 7' - 0" 0' - 1 3/4" F WD - ST F1 HM - PT J1 H1 20 -131-1 42 1 3' - 0" 7' - 0" 0' - 1 3/4" F WD - ST F1 HM - PT J1 H1 20 -132-1 57 1 3' - 0" 7' - 0" 0' - 1 3/4" F WD - ST F1 HM - PT J6 H6 20 -133-1 05 1 2' - 10" 7' - 0" 0' - 1 3/4" F WD - ST F2 HM - PT J6 H6 90 - V.I.F.133A 58 1 3' - 0" 7' - 0" 0' - 1 3/4" F HM - PT F1 HM - PT J6 H6 - -134-1 26 1 3' - 0" 7' - 0" 0' - 1 3/4" NL WD - ST F1 HM - PT J6 H6 20 FG-1134-2 29 1 3' - 0" 7' - 0" 0' - 1 3/4" D AMP - FF F5 ALUM - FF J4 H4 - IG-1 V.I.F.135-1 06 1 3' - 0" 7' - 0" 0' - 1 3/4" F WD - ST F2 HM - PT J6 H6 20 - V.I.F.136-1 26 1 3' - 0" 7' - 0" 0' - 1 3/4" NL WD - ST F1 HM - PT J6 H6 20 FG-1136-2 29 1 3' - 0" 7' - 0" 0' - 1 3/4" D AMP - FF F5 ALUM - FF J4 H4 - IG-1 V.I.F.137-1 59 1 3' - 0" 7' - 0" 0' - 1 3/4" DL WD - ST F17 HM - PT J1 H9 20 FG-1137-2 59 1 3' - 0" 7' - 0" 0' - 1 3/4" DL WD - ST F17 HM - PT J1 H9 20 FG-1137A 20 1 3' - 0" 7' - 0" 0' - 1 3/4" NL ALUM - FF F15 ALUM - FF J8 H1 - IG-1137B 37 1 3' - 0" 7' - 0" 0' - 1 3/4" F WD - ST F1 HM - PT J6 H6 - -138-1 26 1 3' - 0" 7' - 0" 0' - 1 3/4" NL WD - ST F1 HM - PT J6 H6 20 FG-1138-2 29 1 3' - 0" 7' - 0" 0' - 1 3/4" D AMP - FF F5 ALUM - FF J4 H4 - IG-1 V.I.F.139-1 26 1 3' - 0" 7' - 0" 0' - 1 3/4" NL WD - ST F1 HM - PT J1, J6 H1 20 FG-1140-1 38 1 3' - 0" 7' - 0" 0' - 1 3/4" F WD - ST F1 HM - PT J1 H1 20 -141-1 60 1 3' - 0" 7' - 0" 0' - 1 3/4" F WD - ST F1 HM - PT J1 H1 20 -142-1 57 1 3' - 0" 7' - 0" 0' - 1 3/4" F WD - ST F1 HM - PT J1 H1 20 -143-1 27 1 3' - 0" 7' - 0" 0' - 1 3/4" NL WD - ST F1 HM - PT J6 H6 20 FG-1143-2 29 1 3' - 0" 7' - 0" 0' - 1 3/4" D AMP - FF F5 ALUM - FF J4 H4 - IG-1 V.I.F.200-1 27 1 3' - 0" 7' - 0" 0' - 1 3/4" NL WD - ST F1 HM - PT J6 H6 20 FG-1 V.I.F.200A 18 1 3' - 0" 7' - 0" 0' - 1 3/4" F WD - ST F1 HM - PT J1 H1 - -201-1 26 1 3' - 0" 7' - 0" 0' - 1 3/4" NL WD - ST F1 HM - PT J1 H1 20 FG-1 V.I.F.202-1 26 1 3' - 0" 7' - 0" 0' - 1 3/4" NL WD - ST F1 HM - PT J6 H6 20 FG-1 V.I.F.203-1 26 1 3' - 0" 7' - 0" 0' - 1 3/4" NL WD - ST F1 HM - PT J6 H6 20 FG-1 V.I.F.204-1 26 1 3' - 0" 7' - 0" 0' - 1 3/4" NL WD - ST F1 HM - PT J6 H6 20 FG-1 V.I.F.205-1 27 1 3' - 0" 7' - 0" 0' - 1 3/4" NL WD - ST F1 HM - PT J1 H1 20 FG-1205-2 27 1 3' - 0" 7' - 0" 0' - 1 3/4" NL WD - ST F1 HM - PT J1 H1 20 FG-1206-1 28 1 3' - 0" 7' - 0" 0' - 1 3/4" NL WD - ST F1 HM - PT J1 H1 20 FG-1206-2 28 1 3' - 0" 7' - 0" 0' - 1 3/4" NL WD - ST F1 HM - PT J1 H1 20 FG-1207-1 26 1 3' - 0" 7' - 0" 0' - 1 3/4" NL WD - ST F1 HM - PT J1 H1 20 FG-1207-2 26 1 3' - 0" 7' - 0" 0' - 1 3/4" NL WD - ST F1 HM - PT J1 H1 20 FG-1208-1 26 1 3' - 0" 7' - 0" 0' - 1 3/4" NL WD - ST F1 HM - PT J1 H1 20 FG-1209-1 26 1 3' - 0" 7' - 0" 0' - 1 3/4" NL WD - ST F1 HM - PT J1 H1 20 FG-1210-1 26 1 3' - 0" 7' - 0" 0' - 1 3/4" NL WD - ST F1 HM - PT J1 H1 20 FG-1211-1 26 1 3' - 0" 7' - 0" 0' - 1 3/4" NL WD - ST F1 HM - PT J1 H1 20 FG-1212-1 26 1 3' - 0" 7' - 0" 0' - 1 3/4" NL WD - ST F1 HM - PT J1 H1 20 FG-1213-1 26 1 3' - 0" 7' - 0" 0' - 1 3/4" NL WD - ST F1 HM - PT J1 H1 20 FG-1214-1 25 1 3' - 0" 7' - 0" 0' - 1 3/4" F WD - ST F1 HM - PT J1 H1 20 -215-1 26 1 3' - 0" 7' - 0" 0' - 1 3/4" NL WD - ST F1 HM - PT J1 H1 20 FG-1216-1 57 1 3' - 0" 7' - 0" 0' - 1 3/4" F WD - ST F1 HM - PT J1 H1 20 -217-1 26 1 3' - 0" 7' - 0" 0' - 1 3/4" NL WD - ST F1 HM - PT J1 H1 20 FG-1218-1 57 1 3' - 0" 7' - 0" 0' - 1 3/4" F WD - ST F1 HM - PT J1 H1 20 -219-1 26 1 3' - 0" 7' - 0" 0' - 1 3/4" NL WD - ST F1 HM - PT J1 H1 20 FG-1220-1 26 1 3' - 0" 7' - 0" 0' - 1 3/4" NL WD - ST F1 HM - PT J1 H1 20 FG-1221-1 42 1 3' - 0" 7' - 0" 0' - 1 3/4" F WD - ST F1 HM - PT J1 H1 20 -222-1 26 1 3' - 0" 7' - 0" 0' - 1 3/4" NL WD - ST F1 HM - PT J1 H1 20 FG-1223-1 42 1 3' - 0" 7' - 0" 0' - 1 3/4" F WD - ST F1 HM - PT J1 H1 20 -
1/4" = 1'-0"
DOOR FRAME TYPES
1 01/11/19 ADDENDUM
1
![Page 22: ADDENDUM NO. 2 Rochester City School District Dr. Walter ...€¦ · Addendum No. 2 January 11th, 2019 224 Mill Street Rochester, NY 14614 p 585.442.7010 f 585.442.7019 SECTION 004116](https://reader034.vdocuments.us/reader034/viewer/2022051918/600af59262e4c86b7244d9da/html5/thumbnails/22.jpg)
D-1
.1
TS-1
D-1
.1
S-1.3A-1
.3
SF-1.3SF-1.3
S-5.2
A-1.3
D-1.1
A-1.3
SF-3
.1SF
-1.2
SF-3
.1SF
-1.2
SF-3
.1SF
-1.2
SF-3
.1SF
-1.2
A-4
TS-2
SF-1.2
SF-1
.2
SF-1.2 SF-1.2
A-4
TS-2
SF-1.2
SF-1.2
SF-1.2
SF-1.2
A-1.3
SF-3
.1SF
-1.2
SF-3
.1SF
-1.2
P-1.1
D-1.1TS-1
S-1.3
S-5.2
S-2.3
TS-4.1
TS-1
D-1.1TS-1
S-1.3
S-5.
2
S-2.
3
SF-1.3 SF-1.3
TS-1
CAF-2.2
CAF-2.2
CAF-2.2
CAF-2.2
CAF-2.2
CAF-2.2
CAF-2.2
CAF-2.2
CAF-2.2
CAF-2.2
CAF-2.2
CAF-2.2
CAF-2.2
CAF-2.2
CAF-2.3
CAF-2.2
CAF-2.2
P-1.1
A-1
.3
TS-1
SF-3
.1SF
-1.3
SF-3
.1SF
-1.3
SF-3
.1SF
-1.3
SF-3
.1SF
-1.3
SF-3
.1SF
-1.3
SF-3
.1SF
-1.3
SF-3
.1SF
-1.3
SF-3
.1SF
-1.3
SF-3
.1SF
-1.3
SF-3
.1SF
-1.3
SF-3
.1SF
-1.3
SF-3
.1SF
-1.3
SF-3
.1SF
-1.3
SF-3
.1SF
-1.3
SF-3
.1SF
-1.3
A-4
TS-2
SF-1.2
SF-1
.2
SF-1.2
SF-1.2
A-4
TS-2
SF-1.3 SF-1.3
SF-1.3
SF-1
.3
TS-1
TS-2SF-1
.3
SF-1.3
SF-1.3SF-1.3
S-1.3
SF-3
.1SF
-1.3
SF-3
.1SF
-1.3
SF-3
.1SF
-1.3
SF-3
.1SF
-1.3
SF-3
.1SF
-1.3
SF-3
.1SF
-1.3
SF-3
.1SF
-1.3
SF-3
.1SF
-1.3
SF-3
.1SF
-1.3
SF-3
.1SF
-1.3
SF-3
.1SF
-1.3
SF-3
.1SF
-1.3
SF-3
.1SF
-1.3
SF-3
.1SF
-1.3
SF-3
.1SF
-1.3
SF-3
.1SF
-1.3
SF-3
.1SF
-1.3
SF-3
.1SF
-1.3
SF-3
.1SF
-1.3
SF-3
.1SF
-1.3
SF-3
.1SF
-1.3
SF-3
.1SF
-1.3
SF-3
.1SF
-1.3
A-1
.3
D-1.1
TS-1
S-5.2 S-2.3
D-1.1
S-5.
2
TS-1
S-1.3
A-1
.3SF-1
.3SF
-1.3
S-2.
3S-
2.3
D-1.1
S-5.
2
TS-1
S-1.3
D-1.1TS-1
P-1.4
A-1.3
SF-1.1SF-1.1
SF-1.1SF-1.1
A-1.3
SF-1.1SF-1.1
SF-1.1SF-1.1
A-1.3
SF-1.1SF-1.1
SF-1.1SF-1.1
A-1.3
SF-1.1SF-1.1
SF-1.1SF-1.1
A-1.3
SF-1.1SF-1.1
SF-1.1SF-1.1
A-1.3
SF-1.1 SF-1.1
SF-1.1 SF-1.1SF-1.1
TB-3.7
TB-3.7
A-4
TS-2
SF-1.1
SF-1.1
SF-1.1
SF-1.1P-1. 6
P-1.2
S-5.
2
TS -4.1
S-2.
3
ART-6.2
ART-6.2
ART-6.2
ART-6.2 ART-6.2
SF-5 SF-5
SF-5 SF-5
SF-5 SF-5
SF-5 SF-5
SF-5 SF-5
SF-5 SF-5
SF-5 SF-5
SF-5 SF-5
SF-5 SF-5
SF-5 SF-5
ART-4ART-1
ART-5
ART-6.2
SF-5 SF-5
SF-5 SF-5
TS-1
D-1.1
S-1.3
ART-6.2
SF-5 SF-5
SF-5 SF-5
A-4
D-1.1TS-1S-
2.3
S-1.3
S-6.6S-6.6
S-6.
6S-
6.6
S-6.
6S-
6.6
S-6.
4
S-6.6S-6.6 S-6.4S-6.
4
S-6.
6S-
6.6
S-6.
6
D-1.1
S-1.3 D-1.1
S-1.3
SF-3
.1SF
-1.3
TS-5TS-5TS-5TS-5TS-5TS-5TS-5TS-5TS-5TS-5TS-5TS-5TS-5TS-5TS-5TS-5TS-5TS-5TS-5TS-5 TS-5TS-5TS-5TS-5TS-5TS-5TS-5TS-5TS-5TS-5TS-5TS-5TS-5TS-5TS-5TS-5TS-5TS-5TS-5TS-5 TS-5TS-5TS-5TS-5TS-5TS-5TS-5TS-5TS-5TS-5TS-5TS-5TS-5TS-5TS-5TS-5TS-5TS-5TS-5TS-5TS-5TS-5TS-5TS-5TS-5TS-5TS-5TS-5TS-5TS-5TS-5TS-5TS-5TS-5TS-5TS-5TS-5TS-5TS-5TS-5TS-5TS-5TS-5TS-5TS-5TS-5TS-5TS-5TS-5TS-5TS-5TS-5TS-5TS-5TS-5TS-5TS-5TS-5TS-5TS-5TS-6 TS-6TS-6
SF-3
.1SF
-1.3
SF-3
.1SF
-1.3
SF-3
.1SF
-1.3
P-1.1
A-1
.3
CONF-6.1
TS-5
TS-5
TS-5
TS-5
CONF-6.1
TS-5
TS-5
TS-5
TS-5
D-1.1
TS-1
S-1.3
CF-7.2
TS-2
SF-1
.3
SF-1.3
SF-1.3
SF-1.3
SF-1.3
SF-1.3CF-7.2
TS-2
SF-1.3
SF-1
.3
SF-1.3
SF-1.3 SF-1.3
SF-1
.3
CF-7
.2TS-2
SF-1
.3
SF-1.3
SF-1.3
SF-1.3
SF-1.3
SF-1.3
P-1.3
SF-1.1
SF-1.1SF-1.1
CF-7.2
TS-2
SF-1.3
SF-1
.3
SF-1.3
SF-1.3
SF-1.3 SF-1
.3
TS-1
D-1.1
SF-3
.1SF
-1.3
SF-3
.1SF
-1.3
SF-3
.1SF
-1.3
SF-3
.1SF
-1.3
SF-3
.1SF
-1.3
SF-3
.1SF
-1.3
A-1
.3
SF-3
.1SF
-1.3
SF-3
.1SF
-1.3
SF-3
.1SF
-1.3
SF-3
.1SF
-1.3
SF-3
.1SF
-1.3
SF-3
.1SF
-1.3
S-1.3
TS-2
SF-1.3
SF-1.3
SF-1
.3
SF-1.3
A-4
P-1.1
S-1.3
TS-1
D-1.1
S-1.3
TS-1
D-1.1
S-1.3
SF-3
.1SF
-1.2
SF-3
.1SF
-1.2
SF-3
.1SF
-1.2
SF-3
.1SF
-1.2
SF-3
.1SF
-1.2
SF-3
.1SF
-1.2
TS-2
TB-1.2TB-1.1TB-1.1TB-1.1TB-1.1TB-1.1TB-1.1TB-1.1TB-1.1TB-1.1TB-1.1
S-6.
6S-
6.6
S-6.
6S-
6.6
S-6.6 S-6.6 S-6.6 S-6.6
TB-1.2TB-1.1TB-1.1TB-1.1TB-1.1TB-1.1TB-1.1TB-1.1TB-1.1TB-1.1TB-1.1
SF-3
.1SF
-1.3
SF-3
.1SF
-1.3
S-6.6 S-6.6 S-6.6 S-6.6 S-6.6 S-6.6 S-6.6 S-6.6 S-6.6
S-6.6 S-6.6 S-6.6 S-6.6 S-6.6 S-6.6
S-6.
6S-
6.6
S-6.
6S-
6.6
S-6.
6S-
6.6
S-6.
6S-
6.6
S-6.
6S-
6.6
S-6.
6S-
6.6
S-6.
6S-
6.6
S-6.
6
S-6.
6S-
6.6
S-6.
6S-
6.6
S-6.
6S-
6.6
S-6.
6S-
6.6
S-6.
6S-
6.6
S-6.
6S-
6.6
S-6.
6S-
6.6
S-6.
6S-
6.6
S-6.
6
S-6.
6
S-6.6
S-6.
6S-
6.6
S-6.
6S-
6.6
S-6.
6S-
6.6
S-6.
6
S-6.6 S-6.6
S-6.6 S-6.6 S-6.6 S-6.6
S-6.
6S-
6.6
S-6.
6S-
6.6
S-6.
6S-
6.6
S-6.
6S-
6.6
S-6.
6
S-6.6 S-6.6 S-6.6
S-6.
6
STORAGE
122E
CAFETERIA
119
OFFICE: KITCHEN
120B
OFFICE: P.E.
122C
OFFICE:CUSTODIAL
115A
SPECIALEDUCATION 12:1:1
113
KINDERGARTENCLASSROOM
111
MAKER SPACE
110
READING
112
OT/PT
114
TEACHERLOUNGE
116
ESOLCLASSROOM
128
READING/SPEECHSUITE
126
OFFICE: SPEECH
126B
OFFICE: SPEECH
126AKILN
110A
THIRD GRADECLASSROOM
129
SPECIALEDUCATION 12:1:1
125
THIRD GRADECLASSROOM
127
STORAGE
121
STAIR
ST04
ELEVATOR
E02
/1 A1801
STORAGE
009
STORAGE
006
GENERATORROOM
007
STORAGE
008
ELEVATOR
E02
STAIR
ST04
© SEI design group Architects
It is a violation of Title VIII, Article 147 of NYS Education Law for any person, unless acting under the direction of a licensed architect, to alter any item on this document in any way. Any licensee who alters this document is required
by law to affix his or her seal and the notation "altered by" followed by his or her signature and a specific description of the alterations made.
SEI Project No.
Revisions
Date
Key Plan
SED Control No.
A B
1/11
/19
9:52
:01
AM
A1800FURNITURE PLAN -
FIRST FLOOR AREA A& LOWER LEVEL
BID DOCUMENTS17-301612/13/2018
353 CONGRESS AVE.ROCHESTER, NEW YORK 14619
DR. WALTER COOPER
ROCHESTER CITYSCHOOL DISTRICT
SCHOOL 10
26-16-00-01-0-037-021
1/8" = 1'-0"1 FIRST FLOOR FURNITURE PLAN - AREA A
1 Date 1 Revision 1
1/8" = 1'-0"2 PARTIAL LOWER LEVEL FURNITURE PLAN
1 01/11/19 ADDENDUM
1
GENERAL NOTE:THE FURNITURE WILL BE FURNISHED BY OTHERS AND THE INTENT OF THIS DRAWING IS FOR COORDINATION PURPOSES ONLY.
![Page 23: ADDENDUM NO. 2 Rochester City School District Dr. Walter ...€¦ · Addendum No. 2 January 11th, 2019 224 Mill Street Rochester, NY 14614 p 585.442.7010 f 585.442.7019 SECTION 004116](https://reader034.vdocuments.us/reader034/viewer/2022051918/600af59262e4c86b7244d9da/html5/thumbnails/23.jpg)
CO
NF-
2.4
TS-2
TS-2
TS-2
TS-2
TS-2
TS-2
TS-2
TS-2
TS-2
TS-2
CO
NF-
3
P-1.2
SF-1
.1
T B -3 .7
A-1.3
SF-1.1 SF-1.1
SF-1.1 SF-1.1
A-1.3
SF-1.1 SF-1.1
SF-1.1 SF-1.1
TB-3
.7
A-1.3
SF-1.1 SF-1.1
SF-1.1 SF-1.1
A-1.3
SF-1.1 SF-1.1
SF-1.1 SF-1.1
A-1.3
SF-1.1 SF-1.1
SF-1.1 SF-1.1
LIB-17
LIB-17
TS-4
.1
A-4
TS-2
SF-1.1
SF-1.1
SF-1.1
SF-1.1
D-1.1
TS-1S-1.3
P-1.2
A-4
TS-2
SF-1.2 SF-1
.2SF-1
.2
SF-1.2
TS-4.2
NG
-1
NG-6
TS-1 TS-1
P-1.1
A-1.3
TS-1
D-1.1
S-1.3
A-4
TS-2
SF-1.3
SF-1.3
SF-1.3 SF-1
.3
S-1.3
D-1
.1
TS-1
S-1.3D-1.1
TS-1S-5.2
S-1.3 D
-1.1
TS-1
S-5.2
S-1.3
P-1.2
A-4
TS-2
SF-1
.2
SF-1.2
P-1.6
SF-1.2 SF-1.2
A-1.3
SF-1.2SF-1.2
SF-1.2SF-1.2
A-1.3
SF-1.2SF-1.2
SF-1.2SF-1.2
A-1.3
SF-1.2SF-1.2
SF-1.2SF-1.2
SF-1
.2SF
-1.2 T B
-3.7
A-1.3
SF-1.2SF-1.2
SF-1.2SF-1.2
A-1.3
SF-1.2SF-1.2
SF-1.2SF-1.2
S-2.3
D-3.4
TS-4
.1
TS-4
.1
TS-4.1
TS-4.1
D-1.1
TS-1
A-1
.3
A-4
TS-2
SF-1.2 SF-1
.2SF-1.2
SF-1
.2
D-1.1
TS-1
S-1.3
P-1.2
TS-1
TS-4.2
TS-4.2
TS-4
.1
TS-4.2
NG
-1
TS-5
SF-3
.1SF
-1.3
SF-3
.1SF
-1.3
SF-3
.1SF
-1.3
SF-3
.1SF
-1.3
SF-3
.1SF
-1.3
SF-3
.1SF
-1.3
PK-1PK-2
PK-3
PK-4
PK-6
.1
PK-6.3
PK-7 PK-7
PK-8
PK-9
PK-1
0
PK-11
PK-1
4
PK-15PK-15
PK-16
PK-17
PK-18
PK-20
PK-21
PK-2
4
PK-25PK-25
PK-27 PK-25PK-26
PK-2
9
PK-3
2
PK-3
4PK
-35
PK-36
PK-3
8PK
-37
PK-39
PK-41
PK-6.3
PK-6
.1 PK-6
.1PK
-6.1 PK
-6.1
PK-6
.1
PK-6.1
PK-6.1
PK-6
.1PK
-6.1 PK
-6.1
PK-6
.1
PK-6.1
PK-6.1
PK-27
PK-6.1PK-6.1
PK-4PK-6
.1PK
-6.1 PK
-6.1
PK-6
.1
PK-6.1
PK-6.1 PK-1
4
PK-6
.1
PK-6
.1
PK-31.1
PK-22
PK-1
2
PK-25
PK-2
3
PK-20PK-33.1
PK-40
PK-11PK-11
PK-36
PK-39
S-1.3
PK-1PK-2
PK-3
PK-4
PK-6
.2
PK-6.3
PK-7PK-7
PK-8
PK-9
PK-1
0
PK-11
PK-1
4
PK-15 PK-15
PK-16
PK-17
PK-18
PK-20
PK-21
PK-2
4
PK-25 PK-25
PK-27PK-25 PK-26
PK-2
9
PK-3
2
PK-3
4PK
-35
PK-36
PK-3
8PK
-37
PK-39PK-41
PK-6.3
PK-6
.2PK-6
.2PK
-6.2PK
-6.2
PK-6
.2
PK-6.2
PK-6.2
PK-6
.2PK
-6.2PK
-6.2
PK-6
.2PK-6.2
PK-6.2PK-27
PK-6.2PK-6.2PK-4 PK
-6.2
PK-6
.2PK-6
.2PK
-6.2
PK-6.2
PK-6.2
PK-1
4
PK-6
.2
PK-6
.2
PK-31.1
PK-22
PK-1
2
PK-25
PK-3
3.2
PK-20
PK-33.1
PK-40
PK-11PK-11
PK-36
PK-39
S-1.3
A-1.3
SF-1.1SF-1.1
SF-1.1SF-1.1
P-1.6
S-2.
3
A-1
.3
SF-1
.3SF
-1.3
P-1.4
TS-1
LIB-1.1 LIB-1.1 LIB-1.1 LIB-1.1LIB-1.1LIB-1.1 LIB-1.1 LIB-1.1 LIB-1.1LIB-1.1
LIB-1.1 LIB-1.1 LIB-1.1 LIB-1.1LIB-1.1LIB-1.1 LIB-1.1 LIB-1.1 LIB-1.1LIB-1.1
LIB-1.1 LIB-1.1 LIB-1.1 LIB-1.1LIB-1.1LIB-1.1 LIB-1.1 LIB-1.1 LIB-1.1LIB-1.1
LIB-1.1 LIB-1.1 LIB-1.1 LIB-1.1LIB-1.1LIB-1.1 LIB-1.1 LIB-1.1 LIB-1.1LIB-1.1
LIB-1.1 LIB-1.1 LIB-1.1 LIB-1.1LIB-1.1LIB-1.1 LIB-1.1 LIB-1.1 LIB-1.1LIB-1.1
S-1.3
S-1.3
TS-4.2
LIB8.3
LIB-9.1
LIB-
9.1LIB-9.1
LIB-
9.1
LIB8.3
LIB-9.1
LIB-
9.1LIB-9.1
LIB-
9.1
LIB8.3
LIB-9.1
LIB-
9.1 LIB-9.1
LIB-
9.1
LIB8.3
LIB-9.1
LIB-
9.1 LIB-9.1
LIB-
9.1
S-1.3S-1.3
S-1.3S-1.3
MC7-4445
SF-1
.2SF
-1.2 T B
-3.4
SF-1
.2SF
-1.2
T B-3
.4
P-1.6
P-1.6
CF-7.2
TS-2
SF-1
.3
SF-1.3
SF-1.3
SF-1.3
SF-1.3
SF-1.3
SF-1
.2SF
-1.2
T B -3 .7A-1.3
SF-1.2SF-1.2
SF-1.2SF-1.2SF-1.2 SF-1.2
TB-3.7
SF-1.2 SF-1.2
TB-3.7
TS-5
TS-3
SF-1
.1
SF-1
.1SF-
1.1
P-1.3
TB-3
.3TB
-3.3
LIB-
9.1
LIB-
9.1
LIB-
9.1
LIB-
9.1
D-1.1
TS-1
S-1.3
LIB-1.1 LIB-1.1 LIB-1.1LIB-1.1
LIB-
1.1
SF-3.1SF-1.2
SF-3.1SF-1.2
SF-3.1SF-1.2
SF-3.1SF-1.2
SF-3.1SF-1.2
SF-3.1SF-1.2
SF-3.1SF-1.2
SF-3.1SF-1.2
SF-3.1SF-1.2
SF-3.1SF-1.2
SF-3.1SF-1.2
SF-3.1SF-1.2
SF-3.1SF-1.2
SF-3.1SF-1.2
SF-3.1SF-1.2
SF-3.1SF-1.2
SF-3.1SF-1.2
SF-3.1SF-1.2
SF-3.1SF-1.2
SF-3.1SF-1.2
A-4
TS-2
SF-1.2 SF-1
.2SF-1.2
SF-1
.2
SF-1
.2SF
-1.2 T B
-3.4
SF-1
.2SF
-1.2
T B-3
.4
SF-3.1SF-1.2
SF-3.1SF-1.2
SF-3.1SF-1.2
SF-3.1SF-1.2
SF-3.1SF-1.2
SF-3.1SF-1.2
SF-3.1SF-1.2
SF-3.1SF-1.2
SF-3.1SF-1.2
SF-3.1SF-1.2
SF-3.1SF-1.2
SF-3.1SF-1.2
SF-3.1SF-1.2
SF-3.1SF-1.2
SF-3.1SF-1.2
SF-3.1SF-1.2
SF-3.1SF-1.2
SF-3.1SF-1.2
SF-3.1SF-1.2
SF-3.1SF-1.2
A-1.3
SF-1.2SF-1.2
SF-1.2SF-1.2
A-1.3
SF-1.2SF-1.2
SF-1.2SF-1.2
A-1.3
SF-1.2SF-1.2
SF-1.2SF-1.2
A-1.3
SF-1.2SF-1.2
SF-1.2SF-1.2
A-1.3
SF-1.2SF-1.2
SF-1.2SF-1.2
D-1
.1
TS-1
S-1.3
A-1.3
SF-1.2SF-1.2
SF-1.2SF-1.2
LIB-
1.1LI
B-1.1
LIB-
1.1LI
B-1.1
LIB-
1.1
LIB-1.1 LIB-1.1 LIB-1.1 LIB-1.1
TB-3
.3TB
-3.3
LIB-
9.1
LIB-
9.1
LIB-
9.1
LIB-
9.1
TB-3
.3TB
-3.3
LIB-
9.1
LIB-
9.1
LIB-
9.1
LIB-
9.1
TB-3
.3TB
-3.3
LIB-
9.1
LIB-
9.1
LIB-
9.1
LIB-
9.1
TB-3
.3TB
-3.3
LIB-
9.1
LIB-
9.1
LIB-
9.1
LIB-
9.1
TB-3
.3TB
-3.3
LIB-
9.1
LIB-
9.1
LIB-
9.1
LIB-
9.1
TB-3
.3TB
-3.3
LIB-
9.1
LIB-
9.1
LIB-
9.1
LIB-
9.1
TB-3
.3TB
-3.3
LIB-
9.1
LIB-
9.1
LIB-
9.1
LIB-
9.1
S-1.3
SF-3
.1SF
-1.3
SF-3
.1SF
-1.3
SF-1.2 SF-1.2
TB-3.7
SF-1.2 SF-1.2
TB-3.7
SF-3
.1SF
-1.3
SF-3
.1SF
-1.3
SF-3
.1SF
-1.3
SF-3
.1SF
-1.3
SF-3
.1SF
-1.3
SF-3
.1SF
-1.3
SF-3
.1SF
-1.3
S-1.3
SECOND GRADECLASSROOM
134
SECOND GRADECLASSROOM
136
FIRST GRADECLASSROOM
138
SPEECH
139
GENERALLIBRARY
137
CONFERENCE
103
PARENT LIASON
104
OFFICE
137A NURSE'S OFFICE
101
EXAM
101B
MAIN OFFICE
100
FIRST GRADECLASSROOM
143
OFFICE:PRINCIPAL
100C
SPECIALEDUCATION 15:1
105
(PRE-SCHOOL)PRE-KINDRGARTEN
CLASSROOM
106
KINDERGARTENCLASSROOM
109
(PRE-SCHOOL)PRE-KINDERGARTEN
CLASSROOM
108
ELA OFFICE
107
/1 A1800
© SEI design group Architects
It is a violation of Title VIII, Article 147 of NYS Education Law for any person, unless acting under the direction of a licensed architect, to alter any item on this document in any way. Any licensee who alters this document is required
by law to affix his or her seal and the notation "altered by" followed by his or her signature and a specific description of the alterations made.
SEI Project No.
Revisions
Date
Key Plan
SED Control No.
A B
1/11
/19
9:48
:56
AM
A1801FURNITURE PLAN -
FIRST FLOOR AREA B
BID DOCUMENTS17-301612/13/2018
353 CONGRESS AVE.ROCHESTER, NEW YORK 14619
DR. WALTER COOPER
ROCHESTER CITYSCHOOL DISTRICT
SCHOOL 10
26-16-00-01-0-037-021
1/8" = 1'-0"1 FIRST FLOOR FURNITURE PLAN - AREA A
1 Date 1 Revision 11 01/11/19 ADDENDUM
1
GENERAL NOTE:THE FURNITURE WILL BE FURNISHED BY OTHERS AND THE INTENT OF THIS DRAWING IS FOR COORDINATION PURPOSES ONLY.
![Page 24: ADDENDUM NO. 2 Rochester City School District Dr. Walter ...€¦ · Addendum No. 2 January 11th, 2019 224 Mill Street Rochester, NY 14614 p 585.442.7010 f 585.442.7019 SECTION 004116](https://reader034.vdocuments.us/reader034/viewer/2022051918/600af59262e4c86b7244d9da/html5/thumbnails/24.jpg)
TS-1
S-3.
6
TS-4.1
D-2.1
D-3.3
TS-4.1
TS-1
D-1.1
S-1.3
P-1.1
A-4
TS-2
SF-1.3
SF-1
.3
SF-1.3
SF-1
.3
TS-1
D-1.1
S-1.3
A-1.3
SF-1
.3SF
-1.3
A-1
.3
SF-3
.1SF
-1.3
SF-3
.1SF
-1.3
SF-3
.1SF
-1.3
SF-3
.1SF
-1.3
SF-3
.1SF
-1.3
SF-3
.1SF
-1.3
A-4
TS-2
SF-1.3
SF-1
.3
SF-1.3 SF-1.3
A-4
TS-2
SF-1.3
SF-1.3
SF-1.3SF-1.3
A-1
.3
TS-1D-1.1
S-5.
2
S-5.2
TS-1
D-1
.1S-
1.3
SF-3
.1SF
-1.4
SF-3
.1SF
-1.4
SF-3
.1SF
-1.4
SF-3
.1SF
-1.4
SF-3
.1SF
-1.4
SF-3
.1SF
-1.4
SF-3
.1SF
-1.4
SF-3
.1SF
-1.4
SF-3
.1SF
-1.4
SF-3
.1SF
-1.4
SF-3
.1SF
-1.4
SF-3
.1SF
-1.4
SF-3
.1SF
-1.4
SF-3
.1SF
-1.4
SF-3
.1SF
-1.4
A-4
TS-2
SF-1.4SF-1.4
SF-1
.4
SF-1.4
A-1.3
SF-3.1SF-1.4
SF-3.1SF-1.4
SF-3.1SF-1.4
SF-3.1SF-1.4
SF-3.1SF-1.4
SF-3.1SF-1.4
A-1.3
TS-1
D-1
.1
S-1.3
A-1.3
SF-1
.3SF
-1.3
S-5.2
SF-3
.1SF
-1.3
TS-1
D-1.1
S-1.3
SF-3
.1SF
-1.3
SF-3
.1SF
-1.3
SF-3
.1SF
-1.3
SF-3
.1SF
-1.3
SF-3
.1SF
-1.3
SF-3
.1SF
-1.3
SF-3
.1SF
-1.3
SF-3
.1SF
-1.3
TS-1
D-1.1
S-1.3
P-1.1
A-1.3
S-1.3
TS-1
D-1
.1S-
1.3
A-1.3
TS-1
D-1
.1
S-1.3
A-1.3
S-5.2
M-4
M-1.1
M-3
M-1.1
M-3M-1.1
M-3M-1.1
M-3M-1.1
M-3M-1.1
M-3
M-1.1
M-3
M-1.1
M-3M-1.1
M-3M-1.1
M-3M-1.1
M-3M-1.1
M-3M-1.1
M-3M-1.1
M-3
M-1.1
M-3
M-1.1
M-3M-1.1
M-3M-1.1
M-3M-1.1
M-3M-1.1
M-3M-1.1
M-3M-1.1
M-3
D-1.1
TS-1S-1.3
M-1.1
M-3
M-1.1
M-3M-1.1
M-3M-1.1
M-3M-1.1
M-3
M-1.1
M-3
M-1.1
M-3
M-1.1
M-3
M-1.1
M-3
SF-1
.3SF
-1.3
SF-1
.3SF
-1.3
SF-1
.3SF
-1.3
A-4
TS-2
SF-1.4
SF-1
.4
SF-1.4 SF-1
.4
TS-1
D-1.1
S-1.3
TS-1
D-1.1
S-1.3
TS-5
TS-5
SF-3
.1SF
-1.3
SF-3
.1SF
-1.3
SF-3
.1SF
-1.3
SF-3
.1SF
-1.3
SF-3
.1SF
-1.3
SF-3
.1SF
-1.3
SF-3
.1SF
-1.3
SF-3
.1SF
-1.3
SF-3
.1SF
-1.3
SF-3
.1SF
-1.3
SF-3
.1SF
-1.3
SF-3
.1SF
-1.3
SF-3
.1SF
-1.3
SF-3
.1SF
-1.3
SF-3
.1SF
-1.3
SF-3
.1SF
-1.3
SF-3
.1SF
-1.3
SF-3
.1SF
-1.3
SF-3
.1SF
-1.3
SF-3
.1SF
-1.3
A-4
TS-2
SF-1.3
SF-1.3
SF-1.3SF-1.3
SF-3
.1SF
-1.3
SF-3
.1SF
-1.3
SF-3
.1SF
-1.3
A-1.3 SF-1
.3SF
-1.3
SF-3
.1SF
-1.3
SF-3
.1SF
-1.3
SF-3
.1SF
-1.3
SF-3
.1SF
-1.3
SF-3
.1SF
-1.3
SF-3
.1SF
-1.3
SF-3
.1SF
-1.3
SF-3
.1SF
-1.3
SF-3
.1SF
-1.3
SF-3
.1SF
-1.3
SF-3
.1SF
-1.3
SF-3
.1SF
-1.3
SF-3
.1SF
-1.3
SF-3
.1SF
-1.3
SF-3
.1SF
-1.3
SF-3
.1SF
-1.3
SF-3
.1SF
-1.3
SF-3
.1SF
-1.3
SF-3
.1SF
-1.3
SF-3
.1SF
-1.3
M-1.1
M-3M-1.1
M-3
M-1.1
M-3
A-1.3
SF-1
.3SF
-1.3
TS-1D-1.1
S-5.
2A-1.3
S-1.3
SF-1
.3SF
-1.3
A-1.3
SF-1
.3SF
-1.3
A-4
TS-2
SF-1.4SF-1.4
SF-1
.4
SF-1.4
SF-3
.1SF
-1.4
SF-3
.1SF
-1.4
SF-3
.1SF
-1.4
SF-3
.1SF
-1.4
SF-3
.1SF
-1.4
SF-3
.1SF
-1.4
SF-3
.1SF
-1.4
SF-3
.1SF
-1.4
SF-3
.1SF
-1.4
SF-3
.1SF
-1.4
SF-3
.1SF
-1.4
SF-3
.1SF
-1.4
SF-3
.1SF
-1.4
SF-3
.1SF
-1.4
SF-3
.1SF
-1.4
SF-3
.1SF
-1.4
SF-3
.1SF
-1.4
SF-3
.1SF
-1.4
SF-3
.1SF
-1.4
SF-3
.1SF
-1.4
SF-3
.1SF
-1.4
SF-3
.1SF
-1.4
SF-3
.1SF
-1.4
SF-3
.1SF
-1.4
SF-3
.1SF
-1.4
SF-3
.1SF
-1.4
TS-1
D-1.1
S-1.3
A-1
.3
A-4
TS-2
SF-1.4SF-1.4
SF-1
.4
SF-1.4
SF-3
.1SF
-1.4
SF-3
.1SF
-1.4
SF-3
.1SF
-1.4
SF-3
.1SF
-1.4
SF-3
.1SF
-1.4
SF-3
.1SF
-1.4
SF-3
.1SF
-1.4
SF-3
.1SF
-1.4
SF-3
.1SF
-1.4
SF-3
.1SF
-1.4
SF-3
.1SF
-1.4
SF-3
.1SF
-1.4
SF-3
.1SF
-1.4
SF-3
.1SF
-1.4
SF-3
.1SF
-1.4
SF-3
.1SF
-1.4
SF-3
.1SF
-1.4
SF-3
.1SF
-1.4
SF-3
.1SF
-1.4
SF-3
.1SF
-1.4
SF-3
.1SF
-1.4
SF-3
.1SF
-1.4
SF-3
.1SF
-1.4
SF-3
.1SF
-1.4
SF-3
.1SF
-1.4
SF-3
.1SF
-1.4
TS-1
D-1.1
S-1.3
TS-1
D-1.1
S-1.3
SF-1
.2SF
-1.2 T B
-3.7 SF
-1.2
SF-1
.2
T B -3 .7
SF-3.1SF-1.4
SF-3.1SF-1.4
SF-3.1SF-1.4
SF-3.1SF-1.4
SF-3.1SF-1.4
SF-3.1SF-1.4
SF-3.1SF-1.4
SF-3.1SF-1.4
SF-3.1SF-1.4
SF-3.1SF-1.4
SF-3.1SF-1.4
SF-3.1SF-1.4
SF-3.1SF-1.4
SF-3.1SF-1.4
SF-3.1SF-1.4
SF-3.1SF-1.4
SF-3.1SF-1.4
SF-3.1SF-1.4
SF-3.1SF-1.4
SF-3.1SF-1.4
SF-3.1SF-1.4
SF-3.1SF-1.4
SF-3.1SF-1.4
SF-3.1SF-1.4
SF-3.1SF-1.4
SF-3.1SF-1.4
SF-3.1SF-1.4
SF-3.1SF-1.4
SF-3.1SF-1.4
SF-3.1SF-1.4
SF-3.1SF-1.4
SF-3.1SF-1.4
SF-3.1SF-1.4
SF-3.1SF-1.4
SF-3.1SF-1.4
SF-3.1SF-1.4
A-4
TS-2
SF-1.4
SF-1.4
SF-1.4 SF-1
.4
SF-3.1SF-1.4
SF-3.1SF-1.4
SF-3.1SF-1.4
SF-3.1SF-1.4
SF-3.1SF-1.4
ROOF
OPEN TO BELOW
/1 A1803
ROOF
FOURTH GRADECLASSROOM
213
FOURTH GRADECLASSROOM
211
OFFICE: SSO
215
OFFICE: PYSCH
217
OFFICE: SOCIAL
219
OFFICE: V.P.
220
SIXTH GRADECLASSROOM
222
SIXTH GRADECLASSROOM
224RESOURCE
ROOM
227
SPECIAL ED 15:1CLASSROOM
226
MUSIC
206
OFFICE: MATH
212
OFFICE: CSC
210
PRIMARYPROJECT
208
SPECIAL ED 12:1CLASSROOM
209
© SEI design group Architects
It is a violation of Title VIII, Article 147 of NYS Education Law for any person, unless acting under the direction of a licensed architect, to alter any item on this document in any way. Any licensee who alters this document is required
by law to affix his or her seal and the notation "altered by" followed by his or her signature and a specific description of the alterations made.
SEI Project No.
Revisions
Date
Key Plan
SED Control No.
A B
1/11
/19
9:49
:12
AM
A1802FURNITURE PLAN -
SECOND FLOOR AREA A
BID DOCUMENTS17-301612/13/2018
353 CONGRESS AVE.ROCHESTER, NEW YORK 14619
DR. WALTER COOPER
ROCHESTER CITYSCHOOL DISTRICT
SCHOOL 10
26-16-00-01-0-037-021
1/8" = 1'-0"1 SECOND FLOOR FURNITURE PLAN - AREA A
1 Date 1 Revision 11 01/11/19 ADDENDUM
1
GENERAL NOTE:THE FURNITURE WILL BE FURNISHED BY OTHERS AND THE INTENT OF THIS DRAWING IS FOR COORDINATION PURPOSES ONLY.
![Page 25: ADDENDUM NO. 2 Rochester City School District Dr. Walter ...€¦ · Addendum No. 2 January 11th, 2019 224 Mill Street Rochester, NY 14614 p 585.442.7010 f 585.442.7019 SECTION 004116](https://reader034.vdocuments.us/reader034/viewer/2022051918/600af59262e4c86b7244d9da/html5/thumbnails/25.jpg)
S-1.3
D-3.3S-5.2S-5.2
A-1
.3
SF-3.1SF-1.4
SF-3.1SF-1.4
SF-3.1SF-1.4
SF-3.1SF-1.4
SF-3.1SF-1.4
SF-3.1SF-1.4
SF-3.1SF-1.4
SF-3.1SF-1.4
SF-3.1SF-1.4
TS-1
D-1.1 S-1.3
SF-3.1SF-1.4
SF-3.1SF-1.4
SF-3.1SF-1.4
SF-3.1SF-1.4
SF-3.1SF-1.4
SF-3.1SF-1.4
SF-3.1SF-1.4
SF-3.1SF-1.4
SF-3.1SF-1.4
S-2.3
TS-1
D-2
.1
TS-2TS-2
S-2.
3
D-3.3S-5.2S-5.2
TS-2TS-2S-2.3
TS-1
D-1.1
S-1.3
S-6.6
S-6.
4S-6.
6S-
6.4
TS-1
D-1.1
S-1.3
S-6.
5
S-6.6
SF-3.1SF-1.4
SF-3
.1SF
-1.4
SF-3
.1SF
-1.4
SF-3
.1SF
-1.4
SF-3
.1SF
-1.4
SF-3
.1SF
-1.4
SF-3
.1SF
-1.4
SF-3
.1SF
-1.4
SF-3
.1SF
-1.4
SF-3
.1SF
-1.4
SF-3
.1SF
-1.4
SF-3
.1SF
-1.4
SF-3
.1SF
-1.4
ROOF
ROOF
ROOF
OPEN TO
BELOW
/1 A1802
ALTERNATE NO. 2
FLEXCLASSROOM
200
OFFICE
204
OFFICE
203
STORAGE
202A
RESOURCE
202
© SEI design group Architects
It is a violation of Title VIII, Article 147 of NYS Education Law for any person, unless acting under the direction of a licensed architect, to alter any item on this document in any way. Any licensee who alters this document is required
by law to affix his or her seal and the notation "altered by" followed by his or her signature and a specific description of the alterations made.
SEI Project No.
Revisions
Date
Key Plan
SED Control No.
A B
1/11
/19
9:49
:29
AM
A1803FURNITURE PLAN -
SECOND FLOOR AREA B
BID DOCUMENTS17-301612/13/2018
353 CONGRESS AVE.ROCHESTER, NEW YORK 14619
DR. WALTER COOPER
ROCHESTER CITYSCHOOL DISTRICT
SCHOOL 10
26-16-00-01-0-037-021
1/8" = 1'-0"1 SECOND FLOOR FURNITURE PLAN - AREA B
1 Date 1 Revision 11 01/11/19 ADDENDUM
1
GENERAL NOTE:THE FURNITURE WILL BE FURNISHED BY OTHERS AND THE INTENT OF THIS DRAWING IS FOR COORDINATION PURPOSES ONLY.
![Page 26: ADDENDUM NO. 2 Rochester City School District Dr. Walter ...€¦ · Addendum No. 2 January 11th, 2019 224 Mill Street Rochester, NY 14614 p 585.442.7010 f 585.442.7019 SECTION 004116](https://reader034.vdocuments.us/reader034/viewer/2022051918/600af59262e4c86b7244d9da/html5/thumbnails/26.jpg)
142A
CHICOS
GENERAL NOTES:
CHICAS
INTERIOR SIGN TYPES
6"x3" ROOM NUMBERREFER TO DOOR SCHEDULE
FOR TEXT 6"x8" RESTROOM SIGN6"x8" RESTROOM SIGN
1. MATERIAL TO BE 1/8" MELAMINE PLASTIC
2. KEYNOTES ON PLANS REFERENCING SIGNAGE ARE LOCATION BY GENERAL AREA ONLY, LOCATE SIGNS ON ENTRY SIDE OF DOOR/ OPENING. SIGN SHOULD BE COMPLETELY VISIBLE WHEN DOOR IS FULLY OPEN.
3. GRADE II BRAILE SHOWN ON THESE DRAWINGS IS NOT TO SCALE AND DOES NOT INDICATE ACTUAL WORDING INDICATED ON SIGNS, IT ACTS AS A REPRESENTATION ONLY.
4. SIGNS SHALL COMPLY WITH "AMERICAN NATIONAL STANDARDS":ICC/ANSI A117.1 - 2003, CHAPTER 7. COMMUNICATION ELEMENTS AND FEATURES.
5. CORNERS TO HAVE 1/2" RADIUS
6. ATTACH SIGN TO WALL WITH BRASS SCREWS
7. ALL SIGNAGE TEXT TO BE REVIEWED AND APPROVED BY ARCHITECT AND OWNER
8. ALL SIGNS SHALL BE BILINGUALS INCLUDING BRAILLE TEXT
SIGNLOCATION
DO
OR
HEI
GH
T V
ARI
ES
VARIES
2"
48" M
IN. 6
0"
MA
X.
TO B
OTT
OM
OF
TEX
T
11"x8" ROOM NUMBER
A B C D
ESCALERAS
6"x8" STAIRS SIGN
I
ASCENSOR
6"x8" ELEVATOR SIGN
J
IN CASE OF FIRE DO NOT USE ELEVATOR -
USE STAIRS
6"x8" FIRE SAFETY SIGN
K L
6"x8" AREA OF REFUGE SIGN
AREA OF REFUGE LOCATED IN EXIT
HOMBRESMUJERES
6"x8" RESTROOM SIGN6"x8" RESTROOM SIGN
E F
BAÑO
6"x8" RESTROOM SIGN
G
MAIN OFFICE
OFICINA PRINCIPAL
11"x8" ROOM NAME & NUMBERREFER TO DOOR SCHEDULE FOR TEXT
H
123BOYSGIRLS MENWOMEN RESTROOM STAIRS ELEVATOR
TYPICAL SIGN MOUNTING
M
10"x14" OCCUPANCY SIGNREFER TO CODE COMPLIANCE PLANS OCCUPANCY TAGS FOR OCCUPANCY
NO. "XXX"
MAXIMUM OCCUPANCY
NOT TO EXCEEDPERSONSXXX
ROOM
CENTRO DE RECREACION
101-104
RECREATION CENTER
CAFETERIA
AULASROOMS
N
10"x14" DIRECTIONAL SIGNTEXT AND DIRECTIONAL ARROWS TO BE
SELECTED BY ARCHITECT & OWNER
REFER TO DOOR SCHEDULE FOR SIGN TYPE
ALL VISITORS MUST REPORT TO THE
MAIN OFFICE
Q
EN CASO DE INCENDIO NO USE LOS ASCENSORES -
USE LAS ESCALERAS
LOS VISITANTES DEBEN
PRESENTARSE EN LA OFICINA
6"x8" VISITORS SIGN
123
NO ENTRE
6"x8" NO ENTRY SIGN
R
NO ENTRY
ROOF-NO RE-ENTRY WITHOUT KEY
S
TECHO-NO RE ENTRADA
SIN LLAVE
6"x8" NO RE-ENTRY SIGN
AREA DE REFUGIO SITUADO EN SALIDA
O
6"x6" POWERED PARTITION SIGN
CAUTIONELECTRICALLY-POWERED PARTITION
ONLY APPROPRIATELY-TRAINED STAFF MAY OPERATE THIS PARTITION
CONTROL STATIONS MUST BE ATTENDED BY STAFF MEMBERS WHILE THE
PARTITION IS IN MOTION
STAFF MEMBERS MUST STAND ON OPPOSITE SIDES OF THE OPENING OR CLOSING
PARTITION
STUDENTS MUST STAY AWAY FROM THE PARTITION WHEN IN MOTION
PROHIBIDO FUMAR
6"x8" NO SMOKING SIGN
P
NO SMOKING
GYMNASIUM
CAFETERIA
BIBLIOTECA
T
10"x14" DIRECTIONAL SIGNTEXT AND DIRECTIONAL ARROWS TO BE
SELECTED BY ARCHITECT & OWNER
LIBRARYcafeteria
GYMNASIUM
library
KINDER Y PRESCOLAR
KINDERGARTEN AND PRESCHOOL
GRADES 1, 2 & 3
U
10"x14" DIRECTIONAL SIGNTEXT AND DIRECTIONAL ARROWS TO BE
SELECTED BY ARCHITECT & OWNER
1ST, 2ND AND 3RD GRADES
−K
AULAS DE 1,2 & 3
ELEVADORELEVATOR
GRADES 4, 5 & 6
V
10"x14" DIRECTIONAL SIGNTEXT AND DIRECTIONAL ARROWS TO BE
SELECTED BY ARCHITECT & OWNER
4TH, 5TH 6TH GRADES
ELEVATOR
AULAS DE 4,5 & 6
W
10"x14" DIRECTIONAL SIGNTEXT AND DIRECTIONAL ARROWS TO BE
SELECTED BY ARCHITECT & OWNER
MAIN OFFICE
MAIN OFFICEOFICINA PRINCIPAL
BIBLIOTECALIBRARY
libraryBIBLIOTECA
X
10"x14" DIRECTIONAL SIGNTEXT AND DIRECTIONAL ARROWS TO BE
SELECTED BY ARCHITECT & OWNER
LIBRARY
library
MAIN OFFICE
MAIN OFFICEOFICINA PRINCIPAL
GYMNASIUMGYMNASIUM
BIBLIOTECA
Y
LIBRARY
library
MAIN OFFICE
MAIN OFFICEOFICINA PRINCIPAL
GYMNASIUMGYMNASIUM
10"x14" DIRECTIONAL SIGNTEXT AND DIRECTIONAL ARROWS TO BE
SELECTED BY ARCHITECT & OWNER
JK
I L H HH
H
H
H
I LH H
H
H
H
STORAGE
009
STORAGE
006
GENERATORROOM
007
STORAGE
008
MECHANICAL
005ELEVATOR
E02
LOWERMECHANICAL
ROOM
004
BOILER ROOM
003
MECHANICALROOM
003ACRAWL SPACE
CRAWL SPACE
CRAWL SPACE
STAIR
ST03
CORRIDOR
C001
ELECTRICALROOM
002
ELECTRICALROOM
002A
PLUMBINGEQUIPMENT
ROOM
001
STAIR
ST04
A
A
A
© SEI design group Architects
It is a violation of Title VIII, Article 147 of NYS Education Law for any person, unless acting under the direction of a licensed architect, to alter any item on this document in any way. Any licensee who alters this document is required
by law to affix his or her seal and the notation "altered by" followed by his or her signature and a specific description of the alterations made.
SEI Project No.
Revisions
Date
Key Plan
SED Control No.
A B
1/11
/19
9:49
:57
AM
A1900SIGNAGE PLAN -
LOWER LEVEL
BID DOCUMENTS17-301612/13/2018
353 CONGRESS AVE.ROCHESTER, NEW YORK 14619
DR. WALTER COOPER
ROCHESTER CITYSCHOOL DISTRICT
SCHOOL 10
26-16-00-01-0-037-021
1 Date 1 Revision 1
1/16" = 1'-0"1 LOWER LEVEL SIGNAGE
1 01/11/19 ADDENDUM
1
![Page 27: ADDENDUM NO. 2 Rochester City School District Dr. Walter ...€¦ · Addendum No. 2 January 11th, 2019 224 Mill Street Rochester, NY 14614 p 585.442.7010 f 585.442.7019 SECTION 004116](https://reader034.vdocuments.us/reader034/viewer/2022051918/600af59262e4c86b7244d9da/html5/thumbnails/27.jpg)
G
G
G G
G
G
G
G
G
G
A
C
C
J
I
I
I
I
H
H
B
B
H
B
G G B B
BBH
B B A
H
H
B
H
B
H
H
H
H
H
B
H
L
L
K
R
H
R
R
R
B
Q R
H
R
R
Q R
H
BB RRRR
R
BD
B
G G
JK
A
Q
B
H
H
H
A
R
B
A
B
RQ
H
G
A
A
A
A
D
H
R
R
SPECIALEDUCATION 15:1
105
PRE-KINDERGARTENCLASSROOM
(PRE-SCHOOL)
106
GENERALLIBRARY
137
RESOURCEROOM
103
WORK ROOM
102
PRE-KINDERGARTENCLASSROOM
(PRE-SCHOOL)
108
KINDERGARTENCLASSROOM
109
UPPER FANROOM
004 OPEN ELAOFFICE
107
ELEVATOR
E01
PARENT LIASON
104 OFFICE
137A
NURSE'S OFFICE
101
EXAM
101B
STAIR
ST02
TOILET
101A
VEST.
V1
CORRIDOR
C100
OFFICE:PRINCIPAL
100C
MAIN OFFICE
100
COPIER
100A
TOILET
100B
STAIR
ST01
FIRST GRADECLASSROOM
143
SPEECH(RELATEDSERVICE)
139
FIRST GRADECLASSROOM
138
SECOND GRADECLASSROOM
136
VEST
V5
BOYS TOILET
142
SECOND GRADECLASSROOM
134
STORAGE
137BUPPER BOILER
ROOM
003
UPPERMECHANICAL
ROOM
003A
STORAGE
135
DATA
133A
CORRIDOR
C103
STAIR
ST03
THIRD GRADECLASSROOM
129
THIRD GRADECLASSROOM
127
CORRIDOR
C102B
ESOLCLASSROOM
128
READING SUITE(RELATEDSERVICE)
126
READING(RELATEDSERVICE)
126B
READING(RELATEDSERVICE)
126A
KILN
110A
MAKER ROOM
110
SPEECH(RELATEDSERVICE)
112
OT/PT
114
PROFESSIONALDEVELOPMENT
116
STORAGE
121
TOILET
118
TOILET
117
CORRIDOR
C101B
KINDERGARTENCLASSROOM
111
SPECIALEDUCATION 12:1:1
113
OUTDOORSTORAGE
115C
RECEIVING
115
STAIR 4
ST04EVENT LOBBY
C104
VEST.
V3
TOILET ROOM
115B
OFFICE:CUSTODIAL
115A
KITCHEN
120
STORAGE
120A
OFFICE KITCHEN
120B
SERVING
120C
TOILET ROOM
120F
LOCKER ROOM
120E
JAN. CL.
120D
CAFETERIA
119
PLATFORM
122B
GYM
122
STORAGE
122E
VEST
V4 SPECIALEDUCATION 12:1:1
125
GIRLS TOILET
124
BOYS TOILET
123
?
?
?
?
TOILET
119A
OFFICE: P.E.
122C
TOILET
122D
STORAGE
122F
GIRLS TOILET
132
TOILET
130
TOILET
131
J.C.
140
TOILET
141
H
TOILET
111A
TOILET
109A
P
P
A
H
A
STORAGE
119B
AA
A
A
A A
A
ASTORAGE
128AA
VEST
V2
O
M
0
M
W
W
Y
X
TUV
M
ROOF
OPEN TO BELOW
ROOF
ROOF
ROOF
OPEN TO
BELOW
G
G
C
D
J
I
I
I
I
B B
BH
B
B
B
HH
B B
L
L
K
H
SB
H
H
PRIMARYPROJECT
208
OFFICE: CSC
210
OPEN OFFICE:MATH
212
DATA
214
A
BB
B
B
MUSIC
206
FIFTH GRADECLASSROOM
205
FIFTH GRADECLASSROOM
207
FOURTH GRADECLASSROOM
211
FOURTH GRADECLASSROOM
213
RESOURCEROOM
227
SPECIALEDUCATION 15:1
CLASSROOM
226
STAIR
ST03
SIXTH GRADECLASSROOM
224
SIXTH GRADECLASSROOM
222
STAIR
ST04
ELEVATOR
E02
OFFICE: PYSCH
217
OFFICE: SOCIAL
219
OFFICE: VP
220TOILET
221
?
?
?
?
BOYS TOILET
218
GIRLS TOILET
216
G
ROOF
J K
FLEX CLASROOM
200
OFFICE
204
OFFICE
203
OFFICE: SSO
215
SPECIAL ED 12:1CLASSROOM
209
STAIR
ST02
TOILET
200A
STORAGE
202A
ELEVATOR
E01
B
A
A
A
H
H
RESOURCE
202
© SEI design group Architects
It is a violation of Title VIII, Article 147 of NYS Education Law for any person, unless acting under the direction of a licensed architect, to alter any item on this document in any way. Any licensee who alters this document is required
by law to affix his or her seal and the notation "altered by" followed by his or her signature and a specific description of the alterations made.
SEI Project No.
Revisions
Date
Key Plan
SED Control No.
A B
1/11
/19
9:50
:24
AM
A1901SIGNAGE PLAN -
FIRST AND SECOND FLOOR
BID DOCUMENTS17-301612/13/2018
353 CONGRESS AVE.ROCHESTER, NEW YORK 14619
DR. WALTER COOPER
ROCHESTER CITYSCHOOL DISTRICT
SCHOOL 10
26-16-00-01-0-037-021
1/16" = 1'-0"1 FIRST FLOOR SIGNAGE PLAN
1/16" = 1'-0"2 SECOND SIGNAGE PLAN
1 Date 1 Revision 11 01/11/19 ADDENDUM
1
![Page 28: ADDENDUM NO. 2 Rochester City School District Dr. Walter ...€¦ · Addendum No. 2 January 11th, 2019 224 Mill Street Rochester, NY 14614 p 585.442.7010 f 585.442.7019 SECTION 004116](https://reader034.vdocuments.us/reader034/viewer/2022051918/600af59262e4c86b7244d9da/html5/thumbnails/28.jpg)
© SEI design group Architects
It is a violation of Title VIII, Article 147 of NYS Education Law for any person, unless acting under the direction of a licensed architect, to alter any item on this document in any way. Any licensee who alters this document is required
by law to affix his or her seal and the notation "altered by" followed by his or her signature and a specific description of the alterations made.
SEI Project No.
Revisions
Date
Key Plan
SED Control No.
A B
1/11
/19
9:50
:33
AM
A1902SIGNAGE SCHEDULE
BID DOCUMENTS17-301612/13/2018
353 CONGRESS AVE.ROCHESTER, NEW YORK 14619
DR. WALTER COOPER
ROCHESTER CITYSCHOOL DISTRICT
SCHOOL 10
26-16-00-01-0-037-021
1 Date 1 Revision 1
SIGNAGE SCHEDULERoom Name Sign Number Sign Type Copy Line 1 Copy Line 2 Remarks
PLUMBING EQUIPMENT ROOM 001 H PLUMBING EQUIPMENT ROOM 001ELECTRICAL ROOM 002 H ELECTRICAL ROOM 002ELECTRICAL ROOM 002A A 002ABOILER ROOM 003 H BOILER ROOM 003UPPER BOILER ROOM 003 A 003MECHANICAL ROOM 003A A 003ALOWER MECHANICAL ROOM 004 A 004UPPER FAN ROOM 004 H FAN ROOM 004MECHANICAL 005 H MECHANICAL ROOM 005STORAGE 006 H STORAGE 006GENERATOR ROOM 007 H GENERATOR ROOM 007STORAGE 008 H STORAGE 008STORAGE 009 H STORAGE 009MAIN OFFICE 100 H 100 MAIN OFFICECOPIER 100A ATOILET 100B GSTORAGE 100B A 110BOFFICE: PRINCIPAL 100C H PRINCIPAL'S OFFICE 100CNURSE'S OFFICE 101 H NURSE'S OFFICE 101TOILET 101A GEXAM 101B H EXAM ROOM 101BWORK ROOM 102, 102.1 H, H WORK ROOM 102 BOTH DOORS TO THE ROOM GET A SIGNCONFERENCE 103, 103.1 H, H CONFERENCE ROOM 103 BOTH DOORS TO THE ROOM GET A SIGNPARENT LIASON 104 H PARENT LIASON ROOM 104SPECIAL EDUCATION 15:1 105 B 118(PRE-SCHOOL) PRE-KINDRGARTEN CLASSROOM 106, 106.1 B, B 106 BOTH DOORS TO THE ROOM GET A SIGNTOILET 106A GSTORAGE 106B A 106BELA OFFICE 107 A 107(PRE-SCHOOL) PRE-KINDERGARTEN CLASSROOM 108 B, B 108 BOTH DOORS TO THE ROOM GET A SIGNTOILET 108A GSTORAGE 108B A 108BKINDERGARTEN CLASSROOM 109 B 109TOILET 109A GMAKER SPACE 110 B ART 110KILN 110A A 110AKINDERGARTEN CLASSROOM 111 B 111TOILET 111A GREADING 112 B 112SPECIAL EDUCATION 12:1:1 113 B 113OT/PT 114 B 114RECEIVING 115 H RECEIVING 115OFFICE: CUSTODIAL 115A A 115ATOILET ROOM 115B GTEACHER LOUNGE 116 B 116TOILET 117 GTOILET 118 GCAFETERIA 119, 119.1 H, M CAFETERIA 119TOILET 119A GSTORAGE 119B A 119BKITCHEN 120 H KITCHEN 120STORAGE 120A A 120AOFFICE: KITCHEN 120B A 120BJ.C. 120D A 120DLOCKER ROOM 120E A 120DTOILET 120F GSTORAGE 121 A 121GYM 122, 122.1, 122.2, 122.3 H,H, M, O GYMNASIUM 122 BOTH DOORS TO THE ROOM GET A SIGNSTOR 122A A 122AOFFICE: P.E. 122C A 122CTOILET 122D GSTORAGE 122E A 122EBOY'S TOILET 123 DGIRL'S TOILET 124 CSPECIAL EDUCATION 12:1:1 125 B 125READING/SPEECH SUITE 126 B 126OFFICE: SPEECH 126A A 126AOFFICE: SPEECH 126B A 126BTHIRD GRADE CLASSROOM 127 B 127ESOL CLASSROOM 128 B 128STORAGE 128A A 128ATHIRD GRADE CLASSROOM 129 B 129TOILET 130 GTOILET 131 GGIRL'S TOILET 132 CVESTIBULE 133 H 133 - DATA 003 - BOILER ROOMDATA 133A A 133ASECOND GRADE CLASSROOM 134 B 134STORAGE 135 A 135SECOND GRADE CLASSROOM 136 B 136GENERAL LIBRARY 137, 137.1, 137.2 H, H, M LIBRARY 137 BOTH DOORS TO THE ROOM GETS A SIGNOFFICE 137A A 137ASTORAGE 137B A 137BFIRST GRADE CLASSROOM 138 B 138SPEECH 139 B 139J.C. 140 A 140TOILET 141 CBOY'S TOILET 142 DFIRST GRADE CLASSROOM 143 B 143FLEX CLASSROOM 200 B 200TOILET 200A GRESOURCE 202 B 202STORAGE 202A A 202AOFFICE 203 A 203OFFICE 204 A 204FIFTH GRADE CLASSROOM 205 B 205MUSIC 206 B MUSIC 206FIFTH GRADE CLASSROOM 207 B 207PRIMARY PROJECT 208 BSPECIAL ED 12:1 CLASSROOM 209 B 209OFFICE: CSC 210 A 210FOURTH GRADE CLASSROOM 211 B 211OFFICE: MATH 212 H MATH ROOM 212FOURTH GRADE CLASSROOM 213 B 213DATA 214 H DATA ROOM 214OFFICE: SSO 215 H SSO C104GIRL'S TOILET 216 COFFICE: PYSCH 217 A PSYCHOLOGIST 217BOY'S TOILET 218 DOFFICE: SOCIAL 219 A SOCIAL WORKER 219OFFICE: V.P. 220 H VICE PRINCIPAL 220TOILET 221 GSIXTH GRADE CLASSROOM 222 B 222TOILET 223 GSIXTH GRADE CLASSROOM 224 BJ.C. 225 H JANITOR 225SPECIAL ED 15:1 CLASSROOM 226 B 226RESOURCE ROOM 227 B 227ELEVATOR E01, E01.1 J, K J SIGN ABOVE K SIGNELEVATOR E01.2, E01.3 J, K J SIGN ABOVE K SIGNELEVATOR E02, E02.1 J, K J SIGN ABOVE K SIGNELEVATOR E02.2,E02.3 J, K J SIGN ABOVE K SIGNELEVATOR E02.4, E02.5 J + K J SIGN ABOVE K SIGNSTAIR ST01 ISTAIR ST01 ISTAIR ST02 ISTAIR ST02 ISTAIR ST03 I + LSTAIR ST03, ST03.1 I, LSTAIR ST03.2, ST03.3 I, LSTAIR ST04 I + LSTAIR ST04, ST04.1 I, LSTAIR ST04.2, ST04.3 I, L
1 01/11/19 ADDENDUM
1
![Page 29: ADDENDUM NO. 2 Rochester City School District Dr. Walter ...€¦ · Addendum No. 2 January 11th, 2019 224 Mill Street Rochester, NY 14614 p 585.442.7010 f 585.442.7019 SECTION 004116](https://reader034.vdocuments.us/reader034/viewer/2022051918/600af59262e4c86b7244d9da/html5/thumbnails/29.jpg)
RCSD Dr. Walter Cooper School #10
Pre-Bid RFI's
1/11/2019
This document is not an offical part of the construction documents and is being provided to the bidders for information purposes only.
RFI # Date Company Question Responded by: Answer
1 2-Jan-19 DCI
Can Ardex V1200 be used in lieu of the Ardex SDP at the areas requiring ¼” minimum underlayment? Ardex V1200 is a self-leveling/flowable product whereas the Ardex SDP is a troweled application. Please clarify the intent for the moisture control system listed in specification section 035416. Should the basis of design, Ardex MC Rapid be included in the base bid in all areas to receive floor covering.
SEI Refer to RFI # 3 response.
2 2-Jan-19Apex Window Films
I see your company had drawn up the plans for the Rochester School #10 project. I was asked to quote the filming in the project and saw three films types in the spec. However I did not see anything in the drawings or alternatives section calling out the films? Could you possibly help or direct me to the person in charge of this particular project so I could pose the question? I appreciate your business and any help you can provide.
SEIRefer to sheet A1231 for the location of decorative window film.
Refer to addendum # 2, item 2-10 and item 2-11 for revisions to the glazing film specification.
3 2-Jan-19Manning Squires Hennig Co. Inc
1. Please provide clarification for spec section 035416 Hydraulic Cement Underlayment: Can Ardex V1200 be used in lieu of the Ardex SDP at the areas requiring 1/4" minimum underlayment? Ardex V1200 is a self-leveling/flowable product whereas the Ardex SDP is a troweled application.
2. Please clarify the intent for the moisture control system listed in specification section 035416. Should the basis of design, Ardex MC Rapid be included in the base bid in all areas to receive floor covering?
SEI
1. Refer to addendum # 2, item 2-1 and item 2-2 for revisions to the hydraulic cement underlayment specification.
2. No, provide a unit cost. Refer to addendum # 1, item 1-4 and item 1-5 for additional information.
4 7-Jan-19Manning Squires Hennig Co. Inc
Please clarify if any moisture control system should be carried in the general contractor’s base bid. We interpret UC-10 will only be utilized if the concrete slabs exceed the manufacturers allowable relative humidity and this price would be an add to our base bid contract. Please confirm if this is the intent.
SEI
Moisture mitigation is not a part of the projects base scope and it will only be added (via change order) when the relative humidity of the concrete exceeds the flooring manufacturer’s allowable relative humidity. This does not relieve the general contractor from providing a permanent enclosure by the date listed in the project manual. In addition, the owner will enlist a third party to sample the concrete at strategic intervals in order to verify that the relative humidity of the concrete is lowering.
5 7-Jan-19Apex Window Films
I see the three films mentioned in the specs. Looked at all drawings did not see any window films called out on any? Please provide some direction on where these can or should be located.
SEI Refer to RFI #2 response.
6 8-Jan-19 BRG CorporationDoors schedule A1230 door #s 115-2, 120-1, 120C-1, 120C-2, ST02-2, ST03-3, and ST04-3. Are these doors to be rated?
SEIThe complete door and frame assembly needs to meet the fire rating requirement as noted in the door schedule, refer to sheet A1230 for the door schedule.
7 9-Jan-19 Manning Squires Hennig Co. Inc
Per spec section 12 24 13-Roller Window Shades, there isn’t a specific light-filtering and light-blocking fabric specified. Please advise
SEI Refer to addendum #2, item 2-12 for revisions to the roller window shades specification.
8 9-Jan-19 Manning Squires Hennig Co. Inc
Per section 011000 1.9 & 1.10 contract #1 needs to include portable all toilets and dumpsters for all other contracts. Can an allowance be established into contract #1 for the general contractor to provide these items?
LeChase No
9 9-Jan-19 Manning Squires Hennig Co. Inc
Per section 015000 4.6 contract #1 shall provide temporary heat during construction operations. Please provide the anticipated duration of when temporary heating will be required within the addition and renovated portions of the building. What is the anticipated date of when new mechanical systems will be turned over to the owner? Can an allowance be established into contract #1 for this item?
LeChaseAnticipated duration of temporary heating will be Oct 4th 2019 thru May 1st 2020. New mechanical systems will be turned over to the owner at Substantial Completion.
10 9-Jan-19 Manning Squires Hennig Co. Inc
Section 004383 does not detail any milestones when or dates for critical path items. Please provide anticipated milestones for the following:
1. Removal of existing Area A
2. Enclosure of new Area A
LeChase Please refer to Specification Section 01 32 16A
11 9-Jan-19 Concord Good morning, what is your electrical budget for this including alternates? LeChase Base bid, without Alternates, EC budget is $2.7 mil.
12 9-Jan-19 Tint Shop
I hope your having a great day. I am reaching out because we would love to be part of this project. I noticed a few windows were notated for decorative film but I did not see where the privacy and security film was indicated on the window schedule. If you could clarify for me so I can provide a proper quote I would appreciate it. Thank you.
SEI Refer to RFI #2 response.
13 9-Jan-19Manning Squires Hennig Co. Inc
Per foundation note 3 top of the wall shall match the top of the slab. On S2001 at column line A4 top of the wall is indicated to be -4’6”. This does not match the top of slab elevation at that location which is -2’0”. Please clarify if this is top of the wall or top of the brick ledge
Popli Refer to addendum #2, item 2-13 for revisions to the foundation plan.
Page 1