ADDENDUM NO. 1
PROJECT: Prince George Airport - Rehabilitation of Apron I
The Contract Documents for this work are revised as noted herein. All such revisions become a part ofthe work and shall be included in your Tender. No consideration will be allowed for extras due to thetenderer not being familiar with this addendum.
1. REFERENCE: SECTION 00100 INVITATION TO TENDERERS1. PRE-TENDER SITE VISIT
DELETE: BRALORNE MINE SITE
REPLACE WITH: PRINCE GEORGE AIRPORT BOARDROOM IN THE TERMINALBUILDING
2. REFERENCE: SECTION 00300 APPENDICES TO TENDER FORM APPENDIX A - E
DELETE: APPENDIX A – E in its entirety
REPLACE WITH: SECTION 00300 APPENDICES TO TENDER FORM APPENDIX A – EREVISED BY ADDENDUM NO. 1 (attached)
3. REFERENCE: SECTION 00 00 00 INDEX TO SPECIFICATIONS
DELETE: INDEX TO SPECIFICATIONS in its entirety
REPLACE WITH: SECTION 00 00 00 INDEX TO SPECIFICATIONS REVISED BYADDENDUM NO. 1 (attached)
4. REFERENCE: SECTION 00 11 00 SUMMARY OF WORK
DELETE: SUMMARY OF WORK in its entirety
REPLACE WITH: SECTION 00 11 00 SUMMARY OF WORK REVISED BY ADDENDUMNO. 1 (attached)
5. REFERENCE: SECTION 00 21 00 ALLOWANCES
ADD: SECTION 00 21 00 ALLOWANCES ADDENDUM NO. 1 (attached)
END OF ADDENDUM NO. 1
REHABILITATION OF APRON IAPPENDICES TO TENDER FORM
Prince George AirportAddendum No. 1
Section 00300May 2016
Page 1 of 7
APPENDIX "A" to Tender Form
TenderSubmitted by: _________________________________________________
LIST OF TENDER DOCUMENTSThe following is the list of the Tender Documents Referred to in the Tender for the above namedProject.
SectionNumber
Section Title No. of Pages
00100
00200
00300
00500
00710
00810
-------
Invitation To Tender
Instructions To Tenderers
Tender Form (Including Appendices A-E)
Form of Agreement
General Conditions
Supplementary General Conditions
CCDC 18 Including Agreement
2
8
9
1
1
10
35
SPECIFICATIONS
00 00 00
01 11 00
Index to Specifications
GENERAL REQUIREMENTS
Summary of Work
2
3
01 14 00
01 21 00
Work Restrictions
Allowances
2
1
01 31 19 Project Meetings 3
01 32 16.07 Construction Progress Schedule - Bar (GANTT) Chart 4
01 33 00 Submittal Procedures 5
01 35 13.13 Special Procedures: Airports in Use 3
01 35 43 Environmental Procedures 4
01 45 00 Quality Control 4
01 52 00 Construction Facilities 5
01 71 00 Examination and Preparation 3
REHABILITATION OF APRON IAPPENDICES TO TENDER FORM
Prince George AirportAddendum No. 1
Section 00300May 2016
Page 2 of 7
01 74 11 Cleaning 4
01 78 00 Closeout Submittals 5
EXISTING CONDITIONS
02 41 13.14 Asphalt Paving Removal 3
CONCRETE
03 10 00 Concrete Forming and Accessories 6
03 30 20 Sawcutting and Sealing of Airfield Panel Joints 2
31 23 33.01
32 01 11.01
32 12 13.16
CIVIL WORKS
Excavating, Trenching and Backfilling
Pavement Cleaning and Marking Removal
Asphalt Tack Coat
14
2
4
32 12 16
32 13 13
32 17 23
Asphalt Paving
Concrete Paving
Pavement Markings
16
31
4
33 41 00 Storm Utility Drainage Piping 5
APPENDIX A Plan of Construction Operations 27
Drawings List - Bound Separately:
COVER SHEETC1.0 SITE PLANC2.0 PLAN OF CONSTRUCTION OPERATIONS – DAY TIME WORKC2.1 PLAN OF CONSTRUCTION OPERATIONS – NIGHT TIME WORKC3.0 MILLING / PAVING GRADING PLANC4.0 CROSS SECTIONSC5.0 STORM PIPE REHABILITATIONC6.0 PERMANENT PAINT MARKING PLANC6.1 TEMPORARY PAINT MARKING PLANC7.0 CONCRETE PANELS PLAN (PROVISIONAL WORK)C8.0 CONCRETE PANELS DETAILS (PROVISIONAL WORK)
REHABILITATION OF APRON IAPPENDICES TO TENDER FORM
Prince George AirportAddendum No. 1
Section 00300May 2016
Page 3 of 7
APPENDIX "B" to Tender Form
TenderSubmitted by: _________________________________________________
LIST OF SUBCONTRACTORS
The following are the Subcontractors we propose to use for the Divisions or Sections of Work listedhereunder.
(If not used, bar and initial the space below)
____________________________________________________
Division or Section of Work Name of Subcontractor____________________________________________________
REHABILITATION OF APRON IAPPENDICES TO TENDER FORM
Prince George AirportAddendum No. 1
Section 00300May 2016
Page 4 of 7
APPENDIX "C" to Tender Form
TenderSubmitted by: _________________________________________________
Schedule of Contract Unit Prices
ItemNo.
Description of Work UnitEstimatedQuantity
Unit Price Total Cost
A General Requirements
1
Section 01 35 13.13 - Mobilization/Demobilization/ Permits/ Facilities/ Bonding/Insurance/ Night Lighting/Temporary ClosureMarkers/Barriers
LS 1
2 Section 01 71 00 - Construction Survey / As-built Survey
LS1
3 Cash Allowance for Security EscortsAllow 1 $20,000 $20,000
Subtotal A
B Civil Site Works
1Section 02 41 13.14 - Mill and Dispose ofExisting HMAC Millings On-SIte (mostly65mm Depth) m2 17,000
2 Section 02 41 13.14 - Sawcut Existing HMACPavement (at 65mm Depth) m 390
3 Section 32 12 13.16 - Supply and Install TackCoat on Milled Surface m2 17,000
4 Section 32 12 16 - Supply and Place NewHMAC Pavement (at 65mm Depth) m2 17,000
5 Section 32 17 23 – Paint /Remove TemporaryApron Paint Markings LS 1
6 Section 32 17 23 - Paint Permanent ApronPaint Markings LS 1
Subtotal B
REHABILITATION OF APRON IAPPENDICES TO TENDER FORM
Prince George AirportAddendum No. 1
Section 00300May 2016
Page 5 of 7
ItemNo.
Description of Work UnitEstimatedQuantity
Unit Price Total Cost
C Storm Pipe Rehabilitation
1Section 33 41 00 - Pressure Grout All LeakingJoints and Circumferential Cracks AlongLength of Pipe Identified MH1-MH7
m 275
Subtotal C
DPROVISIONAL WORK – New Concrete
Panels
1 Section 01 35 13.13 - Temporary Fencing(Red Lights Supplied by Owner)
LS 1
2
Section 02 41 13.14 - Sawcut and RemoveExisting HMAC/Underlying ConcretePavement (at Full Depth) and Dispose Off-Site m2 760
3Section 31 23 33.01 - Remove ExistingGranular Base Course and Dispose On-Site /Compact Subgrade m3 100
4Section 32 13 13 - Supply and InstallConcrete Transition Ramp c/w OwnerSupplied Tie-Bars m 100
5Section 32 13 13 - Supply and Install New350mm Thick PCC Panels c/w OwnerSupplied Dowels and Baskets m2 654
6 Section 03 30 20 - Sawcut and SealPCC/PCC and PCC/HMAC Joints m 296
7 Section 02 41 13.14 - Existing HMAC CrackTreatment m 350
Subtotal D (Provisional Work)
SUBTOTAL A, B, C & D
5% GST
TOTAL TENDER PRICE (WITH GST)
REHABILITATION OF APRON IAPPENDICES TO TENDER FORM
Prince George AirportAddendum No. 1
Section 00300May 2016
Page 6 of 7
APPENDIX "D" to Tender Form
TenderSubmitted by: _________________________________________________
CONTRACTOR'S QUALIFICATIONS
The Contractor states that the following is a true account of its qualifications and experience onWork similar to the Work in this project.
Construction ConsultingProject Year Cost Engineer
REHABILITATION OF APRON IAPPENDICES TO TENDER FORM
Prince George AirportAddendum No. 1
Section 00300May 2016
Page 7 of 7
APPENDIX "E" to Tender Form
TenderSubmitted by: _________________________________________________
EQUIPMENT AND PERSONNEL STATEMENT
1. Personnel Work Classification Hourly Charge Out Rate*By Trade
2. Equipment Hourly Charge Out Rate*
* To be used for force account work if authorized by the Owner.All rates to be all-inclusive, equipment rates include the operator.
REHABILITATION OF APRON I
INDEX TO SPECIFICATIONSPrince George Airport
Addendum No. 1
Section 00 00 00Page 1 of 2
Section Title Pages
01 11 00
GENERAL REQUIREMENTS
Summary of Work 3
01 14 00
01 21 00
Work Restrictions
Allowances
2
1
01 31 19 Project Meetings 3
01 32 16.07 Construction Progress Schedule - Bar (GANTT) Chart 4
01 33 00 Submittal Procedures 5
01 35 13.13 Special Procedures: Airports in Use 3
01 35 43 Environmental Procedures 4
01 45 00 Quality Control 4
01 52 00 Construction Facilities 5
01 71 00 Examination and Preparation 3
01 74 11 Cleaning 4
01 78 00 Closeout Submittals 5
EXISTING CONDITIONS
02 41 13.14 Asphalt Paving Removal 3
CONCRETE
03 10 00 Concrete Forming and Accessories 6
03 30 20 Sawcutting and Sealing of Airfield Panel Joints 2
31 23 33.01
32 01 11.01
32 12 13.16
CIVIL WORKS
Excavating, Trenching and Backfilling
Pavement Cleaning and Marking Removal
Asphalt Tack Coat
14
2
4
32 12 16
32 13 13
Asphalt Paving
Concrete Paving
16
31
REHABILITATION OF APRON I
INDEX TO SPECIFICATIONSPrince George Airport
Addendum No. 1
Section 00 00 00Page 2 of 2
32 17 23 Pavement Markings 4
33 41 00 Storm Utility Drainage Piping 5
APPENDIX A Plan of Construction Operations 27
END OF SECTION
REHABILITATION OF APRON I
SUMMARY OF WORKPrince George Airport
Addendum No. 1
Section 01 11 00Page 1 of 3
PART 1 - GENERAL
1. RELATED SECTIONS
.1 Section 01 35 13.13 – Special Project Procedures: Airport in Use
2. WORK COVERED BY CONTRACT DOCUMENTS
.1 Work of this Contract comprises of milling and paving, to specified depth, existingasphalt on Apron 1, construction of new concrete aircraft parking on stand 1 and1A (Optional Work), and pressure grouting cracks and joints of existing stormsystem under Apron 1. Work to be undertaken includes, but is not limited to thefollowing:
1. Coordination with the Prince George Airport Authority and AirportSecurity to schedule the Commissionaires, airside access, closuresand general airside movements.
2. Paint temporary line markings;
3. Mill existing asphalt surface to specified depths;
4. Clean the milled surface and apply tack coat;
5. Asphalt crack treatment on the milled surface (Provisional Item);
6. Supply and installation of new asphalt overlay;
7. Paint permanent line markings;
8. Temporary fencing with red obstruction lights (Provisional Item);
9. Sawcut and asphalt removal (Provisional Item);
10. Remove existing granular base course to depth specified (ProvisionalItem);
11. Prepare existing granular base surface and apply prime coat(Provisional Item);
12. Supply and installation of new non-reinforced concrete panels,incorporating Owner supplied dowels, dowel baskets and tie-bars intothe Work. (Provisional Item);
13. Pressure grout cracks on existing concrete storm pipes;
14. Survey layout and quantities;
15. Quality control testing.
REHABILITATION OF APRON I
SUMMARY OF WORKPrince George Airport
Addendum No. 1
Section 01 11 00Page 2 of 3
3. CONTRACT METHOD
.1 Construct Work under unit price contract.
4. WORK SEQUENCE
.1 Construct Work in stages as shown on the drawings to provide forcontinuous airport usage. Do not close off public usage of facilities untiluse of one stage of Work will provide alternate usage.
.2 Maintain fire access/control.
5. OWNER OCCUPANCY
.1 Co-operate with Owner in scheduling operations to minimize conflict and tofacilitate Owner usage.
6. OWNER FURNISHED ITEMS
.1 Owner furnished items are as identified in tender documents and are as follows:
.1 Epoxy coated Smooth Dowel Bars required for the longitudinaland construction PCC panel joints. (Provisional Work)
.2 Wire Dowel Baskets c/w Dowels required for the transverse PCCpanel joints. Baskets will be in (4) groups of 3 and (1) group of 2dowels to account for 14 dowel spacing in 6.000m transversejoints. (Provisional Work)
.3 Epoxy coated Tie Bars required for the concrete transition ramparound the perimeter of new PCC Panels. (Provisional Work)
.4 Temporary plastic low barricades, fillable with water to provideresistance to movement by jet blast.
.5 Steady burning red lights (solar powered).
7. EXISTING SERVICES
.1 Notify the Owner and utility companies of intended interruption of servicesand obtain required permission.
.2 Where Work involves breaking into or connecting to existing services,give the Owner 72 hours’ notice for necessary interruption of mechanicalor electrical service throughout course of work. Minimize duration ofinterruptions. Carry out work at times as directed by Owner withminimum disturbance to operation.
.3 Submit schedule to and obtain approval from Owner for any shut-down orclosure of active service or facility including power and communicationsservices. Adhere to approved schedule and provide notice to affectedparties.
REHABILITATION OF APRON I
SUMMARY OF WORKPrince George Airport
Addendum No. 1
Section 01 11 00Page 3 of 3
.4 Where unknown services are encountered, immediately advise Engineerand confirm findings in writing.
.5 Protect, relocate or maintain existing active services. When inactiveservices are encountered, cap off in manner approved by authoritieshaving jurisdiction.
.6 Record locations of maintained, re-routed and abandoned service lines.
8. DOCUMENTS REQUIRED
.1 Maintain at job site, one copy each document as follows:
.1 Contract Drawings;
.2 Specifications;
.3 Addenda;
.4 Approved Plan of Construction Operations (PCO);
.5 Reviewed Shop Drawings and Submittals;
.6 List of Outstanding Shop Drawings;
.7 Change Orders;
.8 Other Modifications to Contract;
.9 Field Test Reports;
.10 Copy of Approved Work Schedule;
.11 Health and Safety Plan and Other Safety Related Documents;
.12 Other documents as specified.
PART 2 - PRODUCTS
1. NOT USED
PART 3 - EXECUTION
1. NOT USED
END OF SECTION
REHABILITATION OF APRON I
ALLOWANCESPrince George Airport
Addendum No. 1
Section 01 21 00Page 1 of 1
Part 1 General
1.1 CASH ALLOWANCES
.1 Include in Tender Price specified cash allowances.
.2 Cash allowances, unless otherwise specified, cover net cost to the Contractor ofservices, products, construction machinery and equipment, freight to the PrinceGeorge Airport, handling, unloading, storage, installation and other authorizedexpenses incurred in performing Work including Provincial Sales Tax (PST) ifapplicable.
.3 Tender Price, and not cash allowance, includes Contractor's overhead and profitin connection with such cash allowance.
.4 Tender Price will be adjusted by written order to provide for excess or deficit toeach cash allowance.
.5 Where costs under a cash allowance exceed amount of allowance, theContractor will be compensated for any excess cost incurred and substantiatedplus a 10% allowance on the excess amount to cover Contractor handling costs.
.6 Include progress payments on accounts of work authorized under cashallowances in Consultant's monthly certificate for payment.
.7 Prepare schedule jointly with Consultant to show when items called for undercash allowances must be authorized by Consultant for ordering purposes so thatprogress of Work will not be delayed.
.8 Cash allowances for Work specified in the Contract Documents are as follows:
.1 Security Escorts – A cash allowance has been provided to cover theprovision of security escorts for the project. The Contractor shall beresponsible for payment of the security escorts and escort vehicle basedon submitted timesheets approved by the Consultant.
END OF SECTION