ADDENDUM NO. 1, City of Gresham, Oregon, to the Contract Documents for the construction of WWTP Upper Bar Screens Replacement CIP 321800 Date: July 2, 2020 Page 1 of 1
TO: PROSPECTIVE BIDDERS AND PLANHOLDERS FOR THE PROJECT SUBJECT: CHANGES AND CLARIFICATIONS TO THE CONTRACT DOCUMENTS The Contract Documents for the above project are not modified in any way by this Addendum No.1 except as provided below. OTHER ATTACHMENTS
1. PRE-BID MEETING AGENDA
The agenda from the virtual Pre-Bid Meeting is included as an attachment.
2. PRE-BID MEETING REGISTERED ATTENDEE SHEET
The registered attendee sheet from the virtual Pre-Bid Meeting is included as an
attachment.
3. PRE-BID MEETING POWERPOINT PRESENTATION
The attached slides are for information purposes only and do not change the bid
documents.
4. UPPER HEADWORKS RECORD DRAWINGS
The architectural and structural record drawings for the upper headworks are
included as an attachment. These drawings show the existing skylights.
Contractor is permitted to remove skylights and use openings for removal and
installation of equipment. If removed, skylights shall be reinstalled appropriately
with proper fasteners and weather sealing.
Each bidder shall acknowledge receipt of this addendum by signing below and submitting it with the Offer and Schedule of Prices at bid closing.
Bidder’s Signature Date
Company Name
1. PRE-BID MEETING AGENDA
Pre-bid Conference Agenda Tuesday, June 23, 2020, 9:00 a.m.
WWTP Upper Plant Bar Screens Replacement
1) Introductions
Alan Johnston, City of Gresham (Project Manager)
Tim Mills, Brown and Caldwell
Quinn Behnke, Brown and Caldwell
Christian Aristizabal, Brown and Caldwell
2) Contract/Bidding
Contract Documents and any future addenda available from Precision Images
Virtual Plan Center, www.precisionimages.com.
Refer to Part 1, Bid Offer Documents for required list of documents to be
submitted with offer. Do not forget to sign any addenda and include them with
bid offer.
Bids due July 9, 2020, 2 p.m. at front desk, main lobby, City Hall. Call main desk
at City Hall at 503.661.3000 if door is locked and no answer.
Bids opened publicly at 2 p.m. on July 9, 2020 in front of City Hall near main
entrance (outdoors)
First-Tier Subcontractor Disclosure due July 9, 2020, 4 p.m. at front desk, main
lobby, City Hall or by email to [email protected].
Issue Intent of Notice to Award to apparent low bidder followed by a Notice of
Award within 1 week following end of protest period.
5% retainage on all pay estimates. 2-year warranty period.
E-mail questions to Alan Johnston: [email protected]
As referenced in Part III of the Contract Documents, we are using the City of
Gresham Public Works Standards available at www.greshamoregon.gov.
Special specs and plans take precedence over Public Works Standards.
3) Description of Work (Tim Mills, Quinn Behnke and Christian Aristizabal,
Brown and Caldwell)
4) Logistics
Jacobs, the City’s contract operator, to coordinate process interruptions needed for
project.
We will be using EADOC – web based construction management software
for all aspects of project communications: submittals, RFCs, pay estimates, plans,
specifications, schedule, meeting notes, inspection reports, photos, etc.
City will apply and pay for building and other permits. Contractor will pick up
permits from Gresham City Hall
Long lead time submittals and deferred structural submittals
Weekend work must be approved in advance.
Plant gate opens at 7:00 a.m. and closes at 4:00 p.m. Work hours are 7:00 a.m. to
5:00 p.m.
Staging area near secondary clarifier number 4
Contractor use of on-site utilities to be arranged with City
5) Questions
2. PRE-BID MEETING REGISTERED ATTENDEE SHEET
Pre-bid Conference Registered Attendee List
Tuesday, June 23, 2020, 9:00 a.m.
WWTP Upper Plant Bar Screens Replacement
Registered Attendee List
• Alan Johnston, City of Gresham
• Andrew Degner, City of Gresham
• Jeff Egan, Jacobs
• Ron Gillenardo, Jacobs
• Christian Aristizabal, Brown and Caldwell
• Tim Mills, Brown and Caldwell
• Quinn Behnke, Brown and Caldwell
• Alex McCoy, Stellar J
• Brint DeVilling, Stellar J
• Brandon Hagemen, Stettler Supply
• Jason Pitts, Five Star Electric
• John Ogorsolka, McClure and Sons
• Patrick Randles, McClure and Sons
• Richard McElligott, JW Fowler
• Rylan Hersey, Tapani
• Hans Schmeusser, Rotschy, Inc.
• Scott Sarkinen, Rotschy, Inc.
• Josh Smith, HP Civil
• Larry Gescher, HP Civil
• Roger Silbernagel, HP Civil
• Trevor Spires, HP Civil
• James Hoffman, MHW Constructors
• Vanessa Mora, MHW Constructors
3. PRE-BID MEETING POWERPOINT PRESENTATION
6/23/2020
1
Upper Bar Screen Replacement, Chlorine Contact Basins, NPW Line
City of Gresham
June 23rd | 2020
Pre-Bid Meeting
• Project scope
• Photo tour of project area
• Construction sequence and constraints
Agenda
Brown and Caldwell 2
1
2
6/23/2020
2
• Headworks Building• Field measurement• Channel dewatering• Channel improvements• Bar screen replacement• Washer/compactor replacement• Equipment Control Panels
• Chlorine Contact Basins• Slide Gates• Concrete Wall Repair
• Buried Non-Potable Water Line• 3” NPW line
Scope
Brown and Caldwell 3
Brown and Caldwell 4
Headworks Building
HEADWORKS
3
4
6/23/2020
3
Brown and Caldwell 5
Layout
Brown and Caldwell 6
Field Measurement
• Measure existing channel walls and bottom
• Identify necessary channel prep, if any, to meet screen installation requirements
5
6
6/23/2020
4
Brown and Caldwell 7
Channel Dewatering
• Slide gates leak, dewatering needed
• Pump and sandbag each channel to keep dry during construction
Brown and Caldwell 8
Channel Improvements
• Power wash channels
• Remove grit
• Provide owner access for inspection
• No channel opening modifications
7
8
6/23/2020
5
Brown and Caldwell 9
Bar Screens• Replace two bar screens
Brown and Caldwell 10
Bar Screens• Replace two bar screens
9
10
6/23/2020
6
Brown and Caldwell 11
Washer/Compactors
• Replace two washer/compactors
• Existing grit system to remain online
Brown and Caldwell 12
Equipment Control Panels
• Remove existing local control panels
• Install new local control panels
BAR
SCREEN
BAR
SCREEN
11
12
6/23/2020
7
Construction Sequence and Constraints
Brown and Caldwell 13
25 days per channel
Brown and Caldwell 14
Chlorine Contact Basins
CHLORINE
CONTACT
BASINS
13
14
6/23/2020
8
Brown and Caldwell 15
Slide Gates
• Replace slide gates
Brown and Caldwell 16
Slide Gates
• Replace slide gates
Splitter box
15
16
6/23/2020
9
Brown and Caldwell 17
Slide Gates
• Replace slide gates
Brown and Caldwell 18
Concrete Wall Repair
• Two sides need repair
17
18
6/23/2020
10
Brown and Caldwell 19
Concrete Wall Repair
• Two sides need repair
Brown and Caldwell 20
Concrete Wall Repair• Two sides need repair
19
20
6/23/2020
11
Construction Sequence and Constraints
Brown and Caldwell 21
14 days per basin
Brown and Caldwell 22
Buried Non-Potable Water Line
3” NPW
21
22
6/23/2020
12
Brown and Caldwell 23
3” NPW Line
• Abandon a section of line in-place
• Hand excavate along route
HAND EXCAVATE
Brown and Caldwell 24
3” NPW Line
23
24
6/23/2020
13
Construction Sequence and Constraints
Brown and Caldwell 25
2-3 days
25
4. UPPER HEADWORKS RECORD DRAWINGS