addendum no. 1 , city of gresham, oregon, wwtp upper bar ... · addendum no. 1, city of gresham,...

42
ADDENDUM NO. 1, City of Gresham, Oregon, to the Contract Documents for the construction of WWTP Upper Bar Screens Replacement CIP 321800 Date: July 2, 2020 Page 1 of 1 TO: PROSPECTIVE BIDDERS AND PLANHOLDERS FOR THE PROJECT SUBJECT: CHANGES AND CLARIFICATIONS TO THE CONTRACT DOCUMENTS The Contract Documents for the above project are not modified in any way by this Addendum No.1 except as provided below. OTHER ATTACHMENTS 1. PRE-BID MEETING AGENDA The agenda from the virtual Pre-Bid Meeting is included as an attachment. 2. PRE-BID MEETING REGISTERED ATTENDEE SHEET The registered attendee sheet from the virtual Pre-Bid Meeting is included as an attachment. 3. PRE-BID MEETING POWERPOINT PRESENTATION The attached slides are for information purposes only and do not change the bid documents. 4. UPPER HEADWORKS RECORD DRAWINGS The architectural and structural record drawings for the upper headworks are included as an attachment. These drawings show the existing skylights. Contractor is permitted to remove skylights and use openings for removal and installation of equipment. If removed, skylights shall be reinstalled appropriately with proper fasteners and weather sealing. Each bidder shall acknowledge receipt of this addendum by signing below and submitting it with the Offer and Schedule of Prices at bid closing. Bidder’s Signature Date Company Name

Upload: others

Post on 13-Jul-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: ADDENDUM NO. 1 , City of Gresham, Oregon, WWTP Upper Bar ... · ADDENDUM NO. 1, City of Gresham, Oregon, to the Contract Documents for the construction of WWTP Upper Bar Screens Replacement

ADDENDUM NO. 1, City of Gresham, Oregon, to the Contract Documents for the construction of WWTP Upper Bar Screens Replacement CIP 321800 Date: July 2, 2020 Page 1 of 1

TO: PROSPECTIVE BIDDERS AND PLANHOLDERS FOR THE PROJECT SUBJECT: CHANGES AND CLARIFICATIONS TO THE CONTRACT DOCUMENTS The Contract Documents for the above project are not modified in any way by this Addendum No.1 except as provided below. OTHER ATTACHMENTS

1. PRE-BID MEETING AGENDA

The agenda from the virtual Pre-Bid Meeting is included as an attachment.

2. PRE-BID MEETING REGISTERED ATTENDEE SHEET

The registered attendee sheet from the virtual Pre-Bid Meeting is included as an

attachment.

3. PRE-BID MEETING POWERPOINT PRESENTATION

The attached slides are for information purposes only and do not change the bid

documents.

4. UPPER HEADWORKS RECORD DRAWINGS

The architectural and structural record drawings for the upper headworks are

included as an attachment. These drawings show the existing skylights.

Contractor is permitted to remove skylights and use openings for removal and

installation of equipment. If removed, skylights shall be reinstalled appropriately

with proper fasteners and weather sealing.

Each bidder shall acknowledge receipt of this addendum by signing below and submitting it with the Offer and Schedule of Prices at bid closing.

Bidder’s Signature Date

Company Name

Page 2: ADDENDUM NO. 1 , City of Gresham, Oregon, WWTP Upper Bar ... · ADDENDUM NO. 1, City of Gresham, Oregon, to the Contract Documents for the construction of WWTP Upper Bar Screens Replacement
Page 3: ADDENDUM NO. 1 , City of Gresham, Oregon, WWTP Upper Bar ... · ADDENDUM NO. 1, City of Gresham, Oregon, to the Contract Documents for the construction of WWTP Upper Bar Screens Replacement

1. PRE-BID MEETING AGENDA

Page 4: ADDENDUM NO. 1 , City of Gresham, Oregon, WWTP Upper Bar ... · ADDENDUM NO. 1, City of Gresham, Oregon, to the Contract Documents for the construction of WWTP Upper Bar Screens Replacement
Page 5: ADDENDUM NO. 1 , City of Gresham, Oregon, WWTP Upper Bar ... · ADDENDUM NO. 1, City of Gresham, Oregon, to the Contract Documents for the construction of WWTP Upper Bar Screens Replacement

Pre-bid Conference Agenda Tuesday, June 23, 2020, 9:00 a.m.

WWTP Upper Plant Bar Screens Replacement

1) Introductions

Alan Johnston, City of Gresham (Project Manager)

Tim Mills, Brown and Caldwell

Quinn Behnke, Brown and Caldwell

Christian Aristizabal, Brown and Caldwell

2) Contract/Bidding

Contract Documents and any future addenda available from Precision Images

Virtual Plan Center, www.precisionimages.com.

Refer to Part 1, Bid Offer Documents for required list of documents to be

submitted with offer. Do not forget to sign any addenda and include them with

bid offer.

Bids due July 9, 2020, 2 p.m. at front desk, main lobby, City Hall. Call main desk

at City Hall at 503.661.3000 if door is locked and no answer.

Bids opened publicly at 2 p.m. on July 9, 2020 in front of City Hall near main

entrance (outdoors)

First-Tier Subcontractor Disclosure due July 9, 2020, 4 p.m. at front desk, main

lobby, City Hall or by email to [email protected].

Issue Intent of Notice to Award to apparent low bidder followed by a Notice of

Award within 1 week following end of protest period.

5% retainage on all pay estimates. 2-year warranty period.

E-mail questions to Alan Johnston: [email protected]

As referenced in Part III of the Contract Documents, we are using the City of

Gresham Public Works Standards available at www.greshamoregon.gov.

Special specs and plans take precedence over Public Works Standards.

3) Description of Work (Tim Mills, Quinn Behnke and Christian Aristizabal,

Brown and Caldwell)

4) Logistics

Page 6: ADDENDUM NO. 1 , City of Gresham, Oregon, WWTP Upper Bar ... · ADDENDUM NO. 1, City of Gresham, Oregon, to the Contract Documents for the construction of WWTP Upper Bar Screens Replacement

Jacobs, the City’s contract operator, to coordinate process interruptions needed for

project.

We will be using EADOC – web based construction management software

for all aspects of project communications: submittals, RFCs, pay estimates, plans,

specifications, schedule, meeting notes, inspection reports, photos, etc.

City will apply and pay for building and other permits. Contractor will pick up

permits from Gresham City Hall

Long lead time submittals and deferred structural submittals

Weekend work must be approved in advance.

Plant gate opens at 7:00 a.m. and closes at 4:00 p.m. Work hours are 7:00 a.m. to

5:00 p.m.

Staging area near secondary clarifier number 4

Contractor use of on-site utilities to be arranged with City

5) Questions

Page 7: ADDENDUM NO. 1 , City of Gresham, Oregon, WWTP Upper Bar ... · ADDENDUM NO. 1, City of Gresham, Oregon, to the Contract Documents for the construction of WWTP Upper Bar Screens Replacement

2. PRE-BID MEETING REGISTERED ATTENDEE SHEET

Page 8: ADDENDUM NO. 1 , City of Gresham, Oregon, WWTP Upper Bar ... · ADDENDUM NO. 1, City of Gresham, Oregon, to the Contract Documents for the construction of WWTP Upper Bar Screens Replacement
Page 9: ADDENDUM NO. 1 , City of Gresham, Oregon, WWTP Upper Bar ... · ADDENDUM NO. 1, City of Gresham, Oregon, to the Contract Documents for the construction of WWTP Upper Bar Screens Replacement

Pre-bid Conference Registered Attendee List

Tuesday, June 23, 2020, 9:00 a.m.

WWTP Upper Plant Bar Screens Replacement

Registered Attendee List

• Alan Johnston, City of Gresham

• Andrew Degner, City of Gresham

• Jeff Egan, Jacobs

• Ron Gillenardo, Jacobs

• Christian Aristizabal, Brown and Caldwell

• Tim Mills, Brown and Caldwell

• Quinn Behnke, Brown and Caldwell

• Alex McCoy, Stellar J

• Brint DeVilling, Stellar J

• Brandon Hagemen, Stettler Supply

• Jason Pitts, Five Star Electric

• John Ogorsolka, McClure and Sons

• Patrick Randles, McClure and Sons

• Richard McElligott, JW Fowler

• Rylan Hersey, Tapani

• Hans Schmeusser, Rotschy, Inc.

• Scott Sarkinen, Rotschy, Inc.

• Josh Smith, HP Civil

• Larry Gescher, HP Civil

• Roger Silbernagel, HP Civil

• Trevor Spires, HP Civil

• James Hoffman, MHW Constructors

• Vanessa Mora, MHW Constructors

Page 10: ADDENDUM NO. 1 , City of Gresham, Oregon, WWTP Upper Bar ... · ADDENDUM NO. 1, City of Gresham, Oregon, to the Contract Documents for the construction of WWTP Upper Bar Screens Replacement
Page 11: ADDENDUM NO. 1 , City of Gresham, Oregon, WWTP Upper Bar ... · ADDENDUM NO. 1, City of Gresham, Oregon, to the Contract Documents for the construction of WWTP Upper Bar Screens Replacement

3. PRE-BID MEETING POWERPOINT PRESENTATION

Page 12: ADDENDUM NO. 1 , City of Gresham, Oregon, WWTP Upper Bar ... · ADDENDUM NO. 1, City of Gresham, Oregon, to the Contract Documents for the construction of WWTP Upper Bar Screens Replacement
Page 13: ADDENDUM NO. 1 , City of Gresham, Oregon, WWTP Upper Bar ... · ADDENDUM NO. 1, City of Gresham, Oregon, to the Contract Documents for the construction of WWTP Upper Bar Screens Replacement

6/23/2020

1

Upper Bar Screen Replacement, Chlorine Contact Basins, NPW Line

City of Gresham

June 23rd | 2020

Pre-Bid Meeting

• Project scope

• Photo tour of project area

• Construction sequence and constraints

Agenda

Brown and Caldwell 2

1

2

Page 14: ADDENDUM NO. 1 , City of Gresham, Oregon, WWTP Upper Bar ... · ADDENDUM NO. 1, City of Gresham, Oregon, to the Contract Documents for the construction of WWTP Upper Bar Screens Replacement

6/23/2020

2

• Headworks Building• Field measurement• Channel dewatering• Channel improvements• Bar screen replacement• Washer/compactor replacement• Equipment Control Panels

• Chlorine Contact Basins• Slide Gates• Concrete Wall Repair

• Buried Non-Potable Water Line• 3” NPW line

Scope

Brown and Caldwell 3

Brown and Caldwell 4

Headworks Building

HEADWORKS

3

4

Page 15: ADDENDUM NO. 1 , City of Gresham, Oregon, WWTP Upper Bar ... · ADDENDUM NO. 1, City of Gresham, Oregon, to the Contract Documents for the construction of WWTP Upper Bar Screens Replacement

6/23/2020

3

Brown and Caldwell 5

Layout

Brown and Caldwell 6

Field Measurement

• Measure existing channel walls and bottom

• Identify necessary channel prep, if any, to meet screen installation requirements

5

6

Page 16: ADDENDUM NO. 1 , City of Gresham, Oregon, WWTP Upper Bar ... · ADDENDUM NO. 1, City of Gresham, Oregon, to the Contract Documents for the construction of WWTP Upper Bar Screens Replacement

6/23/2020

4

Brown and Caldwell 7

Channel Dewatering

• Slide gates leak, dewatering needed

• Pump and sandbag each channel to keep dry during construction

Brown and Caldwell 8

Channel Improvements

• Power wash channels

• Remove grit

• Provide owner access for inspection

• No channel opening modifications

7

8

Page 17: ADDENDUM NO. 1 , City of Gresham, Oregon, WWTP Upper Bar ... · ADDENDUM NO. 1, City of Gresham, Oregon, to the Contract Documents for the construction of WWTP Upper Bar Screens Replacement

6/23/2020

5

Brown and Caldwell 9

Bar Screens• Replace two bar screens

Brown and Caldwell 10

Bar Screens• Replace two bar screens

9

10

Page 18: ADDENDUM NO. 1 , City of Gresham, Oregon, WWTP Upper Bar ... · ADDENDUM NO. 1, City of Gresham, Oregon, to the Contract Documents for the construction of WWTP Upper Bar Screens Replacement

6/23/2020

6

Brown and Caldwell 11

Washer/Compactors

• Replace two washer/compactors

• Existing grit system to remain online

Brown and Caldwell 12

Equipment Control Panels

• Remove existing local control panels

• Install new local control panels

BAR

SCREEN

BAR

SCREEN

11

12

Page 19: ADDENDUM NO. 1 , City of Gresham, Oregon, WWTP Upper Bar ... · ADDENDUM NO. 1, City of Gresham, Oregon, to the Contract Documents for the construction of WWTP Upper Bar Screens Replacement

6/23/2020

7

Construction Sequence and Constraints

Brown and Caldwell 13

25 days per channel

Brown and Caldwell 14

Chlorine Contact Basins

CHLORINE

CONTACT

BASINS

13

14

Page 20: ADDENDUM NO. 1 , City of Gresham, Oregon, WWTP Upper Bar ... · ADDENDUM NO. 1, City of Gresham, Oregon, to the Contract Documents for the construction of WWTP Upper Bar Screens Replacement

6/23/2020

8

Brown and Caldwell 15

Slide Gates

• Replace slide gates

Brown and Caldwell 16

Slide Gates

• Replace slide gates

Splitter box

15

16

Page 21: ADDENDUM NO. 1 , City of Gresham, Oregon, WWTP Upper Bar ... · ADDENDUM NO. 1, City of Gresham, Oregon, to the Contract Documents for the construction of WWTP Upper Bar Screens Replacement

6/23/2020

9

Brown and Caldwell 17

Slide Gates

• Replace slide gates

Brown and Caldwell 18

Concrete Wall Repair

• Two sides need repair

17

18

Page 22: ADDENDUM NO. 1 , City of Gresham, Oregon, WWTP Upper Bar ... · ADDENDUM NO. 1, City of Gresham, Oregon, to the Contract Documents for the construction of WWTP Upper Bar Screens Replacement

6/23/2020

10

Brown and Caldwell 19

Concrete Wall Repair

• Two sides need repair

Brown and Caldwell 20

Concrete Wall Repair• Two sides need repair

19

20

Page 23: ADDENDUM NO. 1 , City of Gresham, Oregon, WWTP Upper Bar ... · ADDENDUM NO. 1, City of Gresham, Oregon, to the Contract Documents for the construction of WWTP Upper Bar Screens Replacement

6/23/2020

11

Construction Sequence and Constraints

Brown and Caldwell 21

14 days per basin

Brown and Caldwell 22

Buried Non-Potable Water Line

3” NPW

21

22

Page 24: ADDENDUM NO. 1 , City of Gresham, Oregon, WWTP Upper Bar ... · ADDENDUM NO. 1, City of Gresham, Oregon, to the Contract Documents for the construction of WWTP Upper Bar Screens Replacement

6/23/2020

12

Brown and Caldwell 23

3” NPW Line

• Abandon a section of line in-place

• Hand excavate along route

HAND EXCAVATE

Brown and Caldwell 24

3” NPW Line

23

24

Page 25: ADDENDUM NO. 1 , City of Gresham, Oregon, WWTP Upper Bar ... · ADDENDUM NO. 1, City of Gresham, Oregon, to the Contract Documents for the construction of WWTP Upper Bar Screens Replacement

6/23/2020

13

Construction Sequence and Constraints

Brown and Caldwell 25

2-3 days

25

Page 26: ADDENDUM NO. 1 , City of Gresham, Oregon, WWTP Upper Bar ... · ADDENDUM NO. 1, City of Gresham, Oregon, to the Contract Documents for the construction of WWTP Upper Bar Screens Replacement
Page 27: ADDENDUM NO. 1 , City of Gresham, Oregon, WWTP Upper Bar ... · ADDENDUM NO. 1, City of Gresham, Oregon, to the Contract Documents for the construction of WWTP Upper Bar Screens Replacement

4. UPPER HEADWORKS RECORD DRAWINGS

Page 28: ADDENDUM NO. 1 , City of Gresham, Oregon, WWTP Upper Bar ... · ADDENDUM NO. 1, City of Gresham, Oregon, to the Contract Documents for the construction of WWTP Upper Bar Screens Replacement
Page 29: ADDENDUM NO. 1 , City of Gresham, Oregon, WWTP Upper Bar ... · ADDENDUM NO. 1, City of Gresham, Oregon, to the Contract Documents for the construction of WWTP Upper Bar Screens Replacement
Page 30: ADDENDUM NO. 1 , City of Gresham, Oregon, WWTP Upper Bar ... · ADDENDUM NO. 1, City of Gresham, Oregon, to the Contract Documents for the construction of WWTP Upper Bar Screens Replacement
Page 31: ADDENDUM NO. 1 , City of Gresham, Oregon, WWTP Upper Bar ... · ADDENDUM NO. 1, City of Gresham, Oregon, to the Contract Documents for the construction of WWTP Upper Bar Screens Replacement
Page 32: ADDENDUM NO. 1 , City of Gresham, Oregon, WWTP Upper Bar ... · ADDENDUM NO. 1, City of Gresham, Oregon, to the Contract Documents for the construction of WWTP Upper Bar Screens Replacement
Page 33: ADDENDUM NO. 1 , City of Gresham, Oregon, WWTP Upper Bar ... · ADDENDUM NO. 1, City of Gresham, Oregon, to the Contract Documents for the construction of WWTP Upper Bar Screens Replacement
Page 34: ADDENDUM NO. 1 , City of Gresham, Oregon, WWTP Upper Bar ... · ADDENDUM NO. 1, City of Gresham, Oregon, to the Contract Documents for the construction of WWTP Upper Bar Screens Replacement
Page 35: ADDENDUM NO. 1 , City of Gresham, Oregon, WWTP Upper Bar ... · ADDENDUM NO. 1, City of Gresham, Oregon, to the Contract Documents for the construction of WWTP Upper Bar Screens Replacement
Page 36: ADDENDUM NO. 1 , City of Gresham, Oregon, WWTP Upper Bar ... · ADDENDUM NO. 1, City of Gresham, Oregon, to the Contract Documents for the construction of WWTP Upper Bar Screens Replacement
Page 37: ADDENDUM NO. 1 , City of Gresham, Oregon, WWTP Upper Bar ... · ADDENDUM NO. 1, City of Gresham, Oregon, to the Contract Documents for the construction of WWTP Upper Bar Screens Replacement
Page 38: ADDENDUM NO. 1 , City of Gresham, Oregon, WWTP Upper Bar ... · ADDENDUM NO. 1, City of Gresham, Oregon, to the Contract Documents for the construction of WWTP Upper Bar Screens Replacement
Page 39: ADDENDUM NO. 1 , City of Gresham, Oregon, WWTP Upper Bar ... · ADDENDUM NO. 1, City of Gresham, Oregon, to the Contract Documents for the construction of WWTP Upper Bar Screens Replacement
Page 40: ADDENDUM NO. 1 , City of Gresham, Oregon, WWTP Upper Bar ... · ADDENDUM NO. 1, City of Gresham, Oregon, to the Contract Documents for the construction of WWTP Upper Bar Screens Replacement
Page 41: ADDENDUM NO. 1 , City of Gresham, Oregon, WWTP Upper Bar ... · ADDENDUM NO. 1, City of Gresham, Oregon, to the Contract Documents for the construction of WWTP Upper Bar Screens Replacement
Page 42: ADDENDUM NO. 1 , City of Gresham, Oregon, WWTP Upper Bar ... · ADDENDUM NO. 1, City of Gresham, Oregon, to the Contract Documents for the construction of WWTP Upper Bar Screens Replacement