ADDENDUM #1

_____________________________________________________

Alderson & Associates, Inc. | Consulting Engineers | TBPE Firm No. F1008 7700 Torino, Suite 101 | San Antonio, TX 78229 | (210) 614-1110 | www.alderson-inc.com

Date: October 29, 2015 Client: RVK Architects Project Name: Castroville Clinic Renovation Project Number: 15-080 This addendum is generally separated into sections for convenience; however, all contractors, subcontractors, material men and other parties shall be responsible for reading the entire addendum. The failure to list an item or items in all affected sections of this addendum does not relieve any part affected from performing as per instructions, providing that the information is set forth one time any place in this addendum. These documents shall be attached to and become part of the Contract Documents for this project. PLAN ITEMS MECHANICAL RE: Plan Sheet M-101:

Item 1: Revised keyed note #3. ELECTRICAL RE: Plan Sheet E-202:

Item 1: Revised circuitry for mini-split 1 and 2. RE: Plan Sheet E-401:

Item 1: Removed transformer feeder schedule. Item 2: Revised keyed note 1, 5 and 7. Item 3: Added keyed note 9. Item 4: Revised feeders. Item 5: Revised enclosed circuit breaker designations. Item 6: Revised utility service.

RE: Plan Sheet E-501: Item 1: Revised panel ‘A’, as indicated. Item 2: Added feeder schedule. Item 3: Revised mechanical/plumbing equipment schedule.

Page 3: ADDENDUM # 1 - netReturns · provide and install vibration isolators on any equipment with moving parts. 11. duct smoke detectors to be provided and installed by the ... condensate

ADDENDUM #1

_____________________________________________________

Alderson & Associates, Inc. | Consulting Engineers | TBPE Firm No. F1008 7700 Torino, Suite 101 | San Antonio, TX 78229 | (210) 614-1110 | www.alderson-inc.com

PLUMBING RE: Plan Sheet P-101:

Item 1: Revised keyed notes to reflect proper utility connection requirements.

RE: Plan Sheet P-201: Item 1: Revised keyed notes to reflect proper utility connection requirements. Item 2: Added isolation valves and shock arrestors to domestic water riser diagram. Item 3: Added keyed notes to aid in proper pipe routing requirements.

END OF ITEMS FOR ADDENDUM #1

Page 4: ADDENDUM # 1 - netReturns · provide and install vibration isolators on any equipment with moving parts. 11. duct smoke detectors to be provided and installed by the ... condensate
Page 5: ADDENDUM # 1 - netReturns · provide and install vibration isolators on any equipment with moving parts. 11. duct smoke detectors to be provided and installed by the ... condensate
Page 6: ADDENDUM # 1 - netReturns · provide and install vibration isolators on any equipment with moving parts. 11. duct smoke detectors to be provided and installed by the ... condensate
Page 7: ADDENDUM # 1 - netReturns · provide and install vibration isolators on any equipment with moving parts. 11. duct smoke detectors to be provided and installed by the ... condensate

3 2

F

1

4

5

6

SA3220

SA2100

SA3205

SA280

SA280

SA5380

SA240

SA240

SA140

SA140

SA270

SA4300

SA180

SA295

SA160

SA270

SA4295

SA4295

SA280

SA280

SA280

SA2100

SA280

SA4260

SA2100

SA255

SA3225

SA6125

SA6115

SA140

SA275

RA1220

EA170

22"x

14"

20"x14"

10"x14"

8"ø

8"ø

6"ø

10"x10"

10"x

14"

10"x10"

RA2225

FC-1

24"x

14"

EA1100

EA170

EA170

EA170EF-1

CU-1

CU-2

MS-1

MS-2

OU-1

OU-2

10"x14"

FC-2

8"x8

"

6"x6"

6"x6"

6"x6"

RA180

10"x10"

10"x10"

RA1100

RA1205

RA1280

RA180

RA1295

RA1420

SA6110

SA240

24"x14"

10"x10"

RA180

RA180

RA180

RA1100

RA3490

RA1225

RA175

6"ø

10"x10"

10"x10"

8"ø

10"x10"

RA155

6"ø

10"ø

6"ø

10"ø

10"x14"

8"ø

8"ø

8"ø

10"x

10"

10"x

10"

10"x

10"

10"x10"

8"x8

"

10"x

10"

6"ø

10"x10"

10"x10"

1

2

3 3

4

4

4

4

56

6

7

7

16"x

14"

6"ø

6"ø

6"ø

12"x14"

14"x14"

22"x14"

8

8

9

10

10

11

10"x10"

12"x10"

6"ø

6"ø

6"ø

10"x10" 10"x10"

ø6"

12

13

13

6"x6

"

6"x6

"

3/4"ø

3/4"ø

14

6"x14"

6"ø6"ø

6"ø

10"ø

6"ø6"ø

6"ø

20"x

10"

6"ø

14"x14"

10"x

10"

10"x

14"

10"x

10"

RA2125

RA1100

10"x10"

RA1160

TFC-2

T FC-1

L-2

VITALS124BLOOD

DRAW125

VISITORT/R A105

VISITORT/R B106

SPECIMENT/R132

NURSEWORK

115

EXAM 6119 EXAM 7

120

EXAM 5118

EXAM 4117

EXAM 3116

NURSEWORK

123

STAFF T/R109

EXAM 2113

CONTROL130A

CORRIDOR A122

CORRIDOR B126

EXAM 1112

EXAM 8127

EQUIPMENTSTORAGE

128

MED ROOM129

OFFICE121

CORRIDOR C104

RECEPTION102

OFFICE131

WAITING101

X-RAY130

BREAKROOM

108

CORRIDOR D107

IDF110

ELECT.111

OFFICE114

CHARTSTORAGE

102A

JANITOR103

MECHANICALROOM

133

L-1

9

12"x

14"

14"x

14"

10"ø

6"ø6"ø

12"ø

20"x

10"

22"x

14"

24"x

14"

(TYPICAL)

NIC

6"ø

14"x14"

10"x10"

T FC-1

14"x

14"

10"x10"

6"x6"

10"x14"

18"x

14"

PR

OJEC

T #15 080

7700 Torino St, Suite 101San Antonio, TX 78229

Telephone: 210.614.1110© 2015 Alderson & Associates, Inc.

F-1008

Copyright 1971-2015 RVK, INC. The record copy of this drawing is on file at the offices of RVK, Inc., 745 E. Mulberry, Suite 601, San Antonio, Texas

arch

itect

ure

in

terio

r des

ign

la

ndsc

a pe

arch

it ect

ure

project no.

date

construction documents

REN

OVA

TIO

NC

ASTR

OVI

LLE

CLI

NIC

8406

FM

471

CAS

TRO

VILL

E, T

EXAS

14094

10/23/15

MECHANICAL FLOORPLAN - NEW WORK

M-101

(THIS SHEET ONLY)KEYED NOTES

GENERAL MECHANICAL NOTES1. ALL WORK SHALL BE IN ACCORDANCE WITH THE 2012 INTERNATIONAL

BUILDING CODE, THE 2012 INTERNATIONAL MECHANICAL CODE, ANDTHE OTHER CODES AND ORDINANCES OF THE AUTHORITY HAVINGJURISDICTION.

2. DUCT DIMENSIONS INDICATED ARE INSIDE DIMENSIONS CLEAR.

3. ALL RECTANGULAR SUPPLY AND RETURN DUCTS SHALL HAVE TURNINGVANES AT EACH 90 DEGREE ELBOW OR TEE.

4. ALL DUCT SHALL BE SHEETMETAL AND SHALL BE INSTALLED WITHINSULATION AS SPECIFIED.

5. ALL DUCTWORK SHALL BE FABRICATED AND INSTALLED AS PER ASHRAEAND SMACNA STANDARDS.

6. MOUNT ALL THERMOSTATS AND SENSORS AT 3'-8" A.F.F.

7. PROVIDE AND INSTALL A SPIN-IN TYPE TAKE-OFF W/ VOLUMECONTROL DAMPER ON EACH ROUND SUPPLY BRANCH DUCT SERVING ASUPPLY DIFFUSER/REGISTER. PROVIDE A VOLUME CONTROL DAMPER

8. COORDINATE ALL DUCTWORK, GRILLES, AND EQUIPMENT WITH ALLTRADES BEFORE INSTALLING.

9. TRANSITION SUPPLY, RETURN AND EXHAUST DUCT FROM UNIT CONNECTIONSIZE TO DUCT SIZE SHOWN.

10. PROVIDE AND INSTALL VIBRATION ISOLATORS ON ANY EQUIPMENT WITHMOVING PARTS.

11. DUCT SMOKE DETECTORS TO BE PROVIDED AND INSTALLED BY THEFIRE ALARM SYSTEMS INSTALLER. COORDINATE WITH MECHANICALCONTRACTOR. INSTALL DETECTOR IN RETURN DUCT NEAR UNITCONNECTION. THE MECHANICAL CONTRACTOR SHALL BERESPONSIBLE FOR WIRING BETWEEN THE FIRE ALARM LOW VOLTAGERELAY AND THE HVAC CONTROL EQUIPMENT.

12. ALL UNITS MUST BE INSTALLED LEVEL.

13. PROVIDE CANVAS CONNECTION AT UN-ISOLATED FAN DUCTCONNECTIONS.

14. COORDINATE WITH ELECTRICAL TRADE FOR STARTERS ON EXHAUSTFANS; SEE NOTES IN FAN SCHEDULES AND ON PLANS. MECHANICALCONTRACTOR TO PROVIDE LAMINATED SIGN AT EACH SWITCH STATINGMARK NUMBER.

15. COORDINATE LOCATIONS OF NEW MECHANICAL EQUIPMENT WITHGENERAL CONTRACTOR AND STRUCTURE, TYPICAL. WHERE SIGNIFICANTCHANGES ARE REQUIRED, THE CONTRACTOR SHALL PRESENT POTENTIALMODIFICATIONS TO, AND OBTAIN APPROVAL FROM THE ENGINEER PRIORTO PROCEEDING WITH SAID WORK.

16. CAREFULLY PROTECT ALL EQUIPMENT AND MATERIAL PRIOR TOINSTALLATION. SEE SPECIFICATIONS.

17. ALL CONDENSATE DRAIN PIPING SHALL BE TYPE L COPPER, GRADEPIPING AT 1/8" PER FOOT. (MIN.).

18. PROVIDE MANUFACTURER'S RECOMMENDED CLEARANCES FOR ALLMECHANICAL EQUIPMENT.

19. SIZE AND ROUTE REFRIGERANT PIPING PER EQUIPMENTMANUFACTURER'S RECOMMENDATIONS.

ON EACH RECTANGULAR RETURN/EXHAUST DUCT SERVING A RETURNOR EXHAUST REGISTER. PROVIDE A ROTO-TWIST CABLE OPERATEDDAMPER FOR AIR DEVICES LOCATED IN INACCESSIBLE CEILINGS.

SCALE: 1/4" = 1'-0"1 FLOOR PLAN - HVAC - NEW WORK

1 MOUNT BOTTOM OF LOUVER AT 12'-6" ABOVE FINISHED FLOOR.2 OFFSET 6" SUPPLY DUCT DOWN BELOW DUCTS.3 PROVIDE A RETURN AIR PLENUM UNDER FAN COIL UNIT, PLENUM SHALL BE

18" TALL AND 34" DEEP. PLENUM SHALL BE CONSTRUCTED OUT OF STEELWITH AN INSULATED SHEET METAL FACE.

4 PROVIDE 3-1/2" THICK CONCRETE EQUIPMENT PAD THAT EXTENDS 6"BEYOND ALL SIDES OF EQUIPMENT.

5 MOUNT BOTTOM OF EXHAUST FAN 12" ABOVE CEILING.6 MOUNT MINI-SPLIT UNIT ABOVE DOOR, AS HIGH AS POSSIBLE7 ROUTE INSULATED CONDENSATE DRAIN LINE FROM MINI-SPLIT

CONDENSATE PUMP UP ABOVE CEILING AND OVER TO MOP SINK.8 REFRIGERANT PIPING UP IN WALL TO ABOVE CEILING. ROUTE REFRIGERANT

PIPING TO ASSOCIATED FAN COIL UNIT. (NOT SHOWN FOR CLARITY).9 ROUTE INSULATED CONDENSATE DRAIN LINE WITH P-TRAP DOWN TO

FLOOR DRAIN. REFER TO PLUMBING DRAWINGS FOR LOCATION OF FLOORDRAIN.

10 PROVIDE A 24 VOLT 2 POSITION LOW LEAKAGE MOTORIZED DAMPER EQUALTO A RUSKIN CD60, POWERED OPEN SPRING RETURN. INTERLOCK DAMPERWITH ASSOCIATED FAN COIL UNIT THERMOSTAT. BALANCE DAMPER TOSPECIFIED OUTSIDE AIR FLOW WHEN OPEN.

11 TAP 6"X6" EXHAUST DUCT OFF OF 10"X10" EXHAUST DUCT MAIN.12 ROUTE REFRIGERANT PIPING UP IN WALL AND TO ASSOCIATED INDOOR

MINI-SPLIT UNIT.13 PROVIDE SHEETMETAL PLENUM, FULL SIZE OF LOUVER, 36" DEEP.14 ROUTE 3/4" INSULATED CONDENSATE DRAIN LINE DOWNIN WALL.

TERMINATE END OF CONDENSATE DRAIN LINE JUST ABOVE MOP SINK.

1

no. revision date1 ADD #1 10/29/15

Page 8: ADDENDUM # 1 - netReturns · provide and install vibration isolators on any equipment with moving parts. 11. duct smoke detectors to be provided and installed by the ... condensate

SS

3 2

E

F

1

4

5

6

JANITOR103

IDF110

VITALS124

BLOODDRAW

125

VISITORT/R A105

VISITORT/R B106

SPECIMENT/R132

NURSEWORK-2

123-2

NURSEWORK

115

CONTROL130A

EXAM 6119

EXAM 7120

EXAM 5118

EXAM 4117

EXAM 3116

CORRIDOR D107

CORRIDOR B126

CORRIDOR C104

X-RAY130

OFFICE131

CORRIDOR A122

OFFICE121

WAITING101

RECEPTION102CHART

STORAGE102ASTAFF T/R

109

BREAKROOM

108

ELECT.111

EXAM 2113

OFFICE114

EXAM 1112

EXAM 8127

EQUIPMENTSTORAGE

128

MED ROOM129

CU-1

CU-2

OU-1

OU-2

MS-2

MS-1

EF-1

B-18,20

B-22,24,26

A-10,12,14A-16,18,20

B-10,12

B-14,16

B-28

FC-1

FC-2

M

B-3278"A.F.F

78"A.F.F

11

M

23

3

4

1

PR

OJEC

T #15 080

7700 Torino St, Suite 101San Antonio, TX 78229

Telephone: 210.614.1110© 2015 Alderson & Associates, Inc.

F-1008

Copyright 1971-2015 RVK, INC. The record copy of this drawing is on file at the offices of RVK, Inc., 745 E. Mulberry, Suite 601, San Antonio, Texas

arch

itect

ure

in

terio

r des

ign

la

ndsc

a pe

arch

it ect

ure

project no.

date

constructiondocuments

REN

OVA

TIO

NC

ASTR

OVI

LLE

CLI

NIC

8406

FM

471

CAS

TRO

VILL

E, T

EXAS

15-080

10/23/15

MECHANICAL EQUIP.POWER - NEW WORK

E-202

SCALE: 1/8" = 1'-0"1 MECHANICAL EQUIPMENT - NEW WORK

KEYED NOTES (APPLIES TO THIS SHEET ONLY)

1 PROVIDE WALL MOUNTED RECEPTACLE FOR CONDESATE PUMP ATDESIGNATED HEIGHT.

2 PROVIDE 120V CONNECTION TO MOTORIZED DAMPER.3 PROVIDE FEEDER AND ASSOCIATED EQUIPMENT CONNECTION TO INDOOR

UNIT, FED DROM OUTDOOR UNIT.4 PROVIDE RELAY FOR CONTROL OF EXHAUST FAN, EF-1. PROVIDE CIRCUITRY

BACK TO LIGHTING CONTROL PANEL FOR CONTROL OF RELAY OFF OFCONTROL PANEL TIMECLOCK.

GENERAL POWER NOTES (THIS SHEET ONLY)

1. ALL WORK TO BE COMPLETED IN ACCORDANCE WITH THE NATIONALELECTRIC CODE AND AUTHORITIES HAVING JURISDICTION.

2. ALL WALL MOUNTED RECEPTACLES TO BE LOCATED 18" A.F.F. TO BOTTOMOF BOX UNLESS OTHERWISE NOTED.

3. ALL OUTLETS SHOWN AS "AC" (ABOVE COUNTER) ARE TO BE INSTALLED 3"ABOVE COUNTER OR BACK SPLASH TO BOTTOM OF BOX.

4. SINGLE HOME RUNS ARE SHOWN FOR CIRCUIT IDENTIFICATION ONLY.CONTRACTOR MAY GROUP A MAXIMUM OF THREE (3) BRANCH CIRCUITSPER HOMERUN RACEWAY, UNLESS NOTED OTHERWISE. TYPICAL FOR ALLELECTRICAL FLOOR PLANS.

5. MULTI-WIRED (SHARED NEUTRAL) BRANCH CIRCUITS SHALL NOT BEINSTALLED. ALL 120- & 277- VOLT BRANCH CIRCUITS SHALL HAVE ADEDICATED INDIVIDUAL NEUTRAL CONDUCTOR.

6. ALL HOMERUNS AND RUNS BETWEEN JUNCTION BOXES TO BE A MINIMUMOF 3/4" CONDUIT WITH #10 WIRE. NO MORE THAN THREE (3) CIRCUITS PERHOMERUN. ALL WIRING SHALL HAVE A SEPARATE INSULATED GREENGROUNDING CONDUCTOR. #10 CONDUCTORS SHALL EXTEND FROM OCPDTO A JUNCTION BOX IN THE AREA OF THE OUTLETS OR UTILIZATIONEQUIPMENT. DROPS TO INDIVIDUAL 20A SWITCHES AND RECEPTACLES MAYBE #12 THHN COPPER.

7. COORDINATE LOCATIONS OF ALL POWER AND DATA OUTLETS WITHFURNITURE AND CASEWORK FOOTPRINTS PRIOR TO COMMENCING ANY DEVICE ROUGH-IN TO AVOID CONFLICTS OR LOCATING DEVICES BEHIND ORUNDER EQUIPMENT THAT WOULD RENDER THE DEVICE USELESS ORINACCESSIBLE.

8. PROVIDE U.L. LISTED FIRE STOP SYSTEMS AT ALL PENETRATIONSTHROUGH WALLS.

9. ELECTRICAL CONTRACTOR SHALL COORDINATE THE INSTALLATION OFELECTRICAL WORK ABOVE THE CEILING TO PROVIDE THE GREATESTPOSSIBLE CLEARANCE FOR PLUMBING AND MECHANICAL EQUIPMENTBOTH CURRENT AND FUTURE. CONDUITS SHALL BE KEPT TIGHT TOSTRUCTURE OR ROUTED THROUGH STRUCTURAL TRUSSES WHEREVERPOSSIBLE.

10. ALL SWITCHES AND RECEPTACLES SHALL BE U.L. LISTED AND SHALL BESPECIFICATION GRADE.

11. ALL FEEDER AND BRANCH CIRCUIT WIRING SHALL BE COPPER.

12. ALL JUNCTION BOX COVERS WILL BE MARKED USING "SHARPIE" OR"MARKSALOT" INDICATING THE PANEL AND CIRCUIT #'S CONTAINED WITHINTHE JUNCTION BOX.

13. ALL SWITCH AND RECEPTACLE COVER PLATES WILL BE MARKED TOINDICATE PANEL AND CIRCUIT #'S USING APPROVED LABEL MAKER.

14. IN ALL CASES VOLTAGE DROP TO LAST OUTLET MUST NOT EXCEED 3%.

15. FLEXIBLE METAL CONDUIT (FMC) CAN BE USED ONLY FOR FINALCONNECTIONS TO LIGHT FIXTURES. RUNS LONGER THAN 6' WILL NOT BEALLOWED.

16. LIQUIDTIGHT FLEXIBLE CONDUIT (LFMC) SHALL BE USED FORCONNECTIONS TO EQUIPMENT AND MOTORS.

17. ALL DATA CONDUITS, SLEEVES AND STUBS SHALL BE TERMINATED WITHPLASTIC BUSHINGS.

18. COORDINATE LOCATION OF ALL DISCONNECT SWITCHES TO ENSURE THATALL NEC MINIMUM WORKING CLEARANCES ARE MAINTAINED.

19. REFER TO BRANCH CIRCUIT SCHEDULES FOR CONDUCTOR SIZING.CIRCUITS FEEDING COMPUTERS SHALL CONSIST OF THE FOLLOWING: (1) CURRENT CARRYING CONDUCTOR (1) NEUTRAL CONDUCTOR (1) INSULATED GND. CONDUCTOR

(1) INSULATED ISOLATED GND. CONDUCTOR

20. PROVIDE CEILING ACCESS DOORS TO GAIN ACCESS TO EQUIPMENT ABOVEHARD CEILINGS.

no. revision date1 ADD #1 10/29/2015

Page 9: ADDENDUM # 1 - netReturns · provide and install vibration isolators on any equipment with moving parts. 11. duct smoke detectors to be provided and installed by the ... condensate

NEWPANEL

A600A

208/120V 3PH, 4W

4 #350 KCMIL1 #1 GND

2 #2-1/2" CONDUIT EACH WITH

#1 AWG CU

4 #350 KCMIL

2 #2-1/2" CONDUITEACH WITH

NEWPANEL

B200A

208/120V 3PH, 4W

4 #3/0 AWG CU1 #6 GND

2" CONDUIT

ENCLOSEDCB60A

X-RAY

3 #3 AWG CU1 #8 GND

1" CONDUIT4 #6 AWG CU

1 #10 GND

1" CONDUIT

T-H75KVA XMFR

208-277Y/480V

NEWENCLOSED

CB60A

4 #6 AWG CU1 #10 GND

1" CONDUIT

4 #6 AWG CU1 #10 GND

1" CONDUIT

KEYED NOTES:1. CONTRACTOR TO CONNECT CONDUIT WITH PULL STRING FROM UTILITY SERVICE TO NEW METER.

2. PROVIDE NEW RACK WITH NEW METER AND 600A DISCONNECT. PROVIDE SERVICE RATED 'SE' DISCONNECT IN NEMA3 R ENCLOSURE.

3. BOND NEUTRAL IN SERVICE DISCONNECT TO GROUND ELECTRODE CONDUCTOR, AND BOND TO EQUIPMENTENCLOSURE.

4. ROUTE CONDUIT OVERHEAD FROM PANEL 'A' TO EXISTING 75KVA TRANSFORMER.

5. ROUTE THIS SECTION OF FEEDER UTILIZING RELOCATED WIREWAY IN X-RAY ROOM. UTILIZE 'SO' CORD, ASNECESSARY, TO MATCH EXISTING CONDITIONS FOR X-RAY CONNECTION AT CURRENT CLINIC FACILITY.

6. OWNER TO RELOCATE EXISTING 75KVA TRANSFORMER TO NEW FACILITY.

7. OWNER TO RELOCATE EXISTING 60A CIRCUIT BREAKER TO NEW FACILITY.

8. OWNER TO RELOCATE EXISTING X-RAY AND X-RAY EQUIPMENT TO NEW FACILITY. REFER TO POWER SHEETS ANDSCHEDULE SHEETS FOR MORE INFORMATION.

9. DO NOT BOND NEUTRAL AND GROUND BUSSUS AT THIS PANELBOARD.

(APPLIES TO THIS SHEET)GENERAL NOTES:1. UNLESS OTHERWISE NOTED HEREIN, ALL ELECTRICAL DISTRIBUTION EQUIPMENT, CONDUIT & CONDUCTORS

SHOWN ARE TO BE FURNISHED & INSTALLED BY THE ELECTRICAL CONTRACTOR, FOR A COMPLETE FUNCTIONALELECTRICAL DISTRIBUTION SYSTEM.

2. ALL WORK TO BE COMPLETED IN ACCORDANCE WITH THE NATIONAL ELECTRIC CODE, COSA CHAPTER 10AMENDMENTS AND AUTHORITY HAVING JURISDICTION.

3. OUTAGES MUST BE SCHEDULED AND PHASED TO MINIMIZE INTERRUPTION OF POWER TO THE EXISTING FACILITYAND ADJACENT BUILDINGS. THE CONTRACTOR SHALL COORDINATE WITH OWNER AND CPS AS REQUIRED. THECONTRACTOR SHALL INCLUDE ALL COSTS AS A RESULT OF OVERTIME AND WEEKEND WORK IN HIS BID.

4. THE CONTRACTOR SHALL COORDINATE WITH CPS ENERGY FOR THE INSTALLATION AND COMMISSIONING OF THENEW ELECTRICAL SERVICE.

5. THE CONTRACTOR SHALL FURNISH AND INSTALL PHENOLIC LABELS FOR ALL DISTRIBUTION EQUIPMENT,PANELBOARDS AND DISCONNECT SWITCHES. LABELS SHALL BE BLACK ETCHED TO REVEAL WHITE LETTERS ONBLACK BACKGROUND.

(APPLIES TO THIS SHEET)

NEWDISC.

600AM

ELECTRICAL ROOM 111

NEW CASTROVILLE CLINIC

NEW CPS ENERGY UTILITY POLE WITHTRANSFORMERS

#1 AWG CU

#1 AWG CU

X-RAY ROOM 130

#1 AWG CU

2

3

7

8

4

6

9

1

5

NEWPANEL

A600A

208/120V 3PH, 4W

4 #350 KCMIL1 #1 GND

2 #2-1/2" CONDUIT EACH WITH

#1 AWG CU

4 #350 KCMIL

2 #2-1/2" CONDUITEACH WITH

NEWPANEL

B200A

208/120V 3PH, 4W

4 #3/0 AWG CU1 #6 GND

2" CONDUIT

ENCLOSEDCB60A

X-RAY

3 #3 AWG CU1 #8 GND

1" CONDUIT4 #6 AWG CU

1 #10 GND

1" CONDUIT

T-H75KVA XMFR

208-277Y/480V

NEWENCLOSED

CB60A

4 #6 AWG CU1 #10 GND

1" CONDUIT

4 #6 AWG CU1 #10 GND

1" CONDUIT

KEYED NOTES:1. CONTRACTOR TO CONNECT CONDUIT WITH PULL STRING FROM UTILITY SERVICE TO NEW METER.

2. PROVIDE NEW RACK WITH NEW METER AND 600A DISCONNECT. PROVIDE SERVICE RATED 'SE' DISCONNECT IN NEMA3 R ENCLOSURE.

3. BOND NEUTRAL IN SERVICE DISCONNECT TO GROUND ELECTRODE CONDUCTOR, AND BOND TO EQUIPMENTENCLOSURE.

4. ROUTE CONDUIT OVERHEAD FROM PANEL 'A' TO EXISTING 75KVA TRANSFORMER.

5. ROUTE THIS SECTION OF FEEDER UTILIZING RELOCATED WIREWAY IN X-RAY ROOM. UTILIZE 'SO' CORD, ASNECESSARY, TO MATCH EXISTING CONDITIONS FOR X-RAY CONNECTION AT CURRENT CLINIC FACILITY.

6. OWNER TO RELOCATE EXISTING 75KVA TRANSFORMER TO NEW FACILITY.

7. OWNER TO RELOCATE EXISTING 60A CIRCUIT BREAKER TO NEW FACILITY.

8. OWNER TO RELOCATE EXISTING X-RAY AND X-RAY EQUIPMENT TO NEW FACILITY. REFER TO POWER SHEETS ANDSCHEDULE SHEETS FOR MORE INFORMATION.

9. DO NOT BOND NEUTRAL AND GROUND BUSSUS AT THIS PANELBOARD.

(APPLIES TO THIS SHEET)GENERAL NOTES:1. UNLESS OTHERWISE NOTED HEREIN, ALL ELECTRICAL DISTRIBUTION EQUIPMENT, CONDUIT & CONDUCTORS

SHOWN ARE TO BE FURNISHED & INSTALLED BY THE ELECTRICAL CONTRACTOR, FOR A COMPLETE FUNCTIONALELECTRICAL DISTRIBUTION SYSTEM.

2. ALL WORK TO BE COMPLETED IN ACCORDANCE WITH THE NATIONAL ELECTRIC CODE, COSA CHAPTER 10AMENDMENTS AND AUTHORITY HAVING JURISDICTION.

3. OUTAGES MUST BE SCHEDULED AND PHASED TO MINIMIZE INTERRUPTION OF POWER TO THE EXISTING FACILITYAND ADJACENT BUILDINGS. THE CONTRACTOR SHALL COORDINATE WITH OWNER AND CPS AS REQUIRED. THECONTRACTOR SHALL INCLUDE ALL COSTS AS A RESULT OF OVERTIME AND WEEKEND WORK IN HIS BID.

4. THE CONTRACTOR SHALL COORDINATE WITH CPS ENERGY FOR THE INSTALLATION AND COMMISSIONING OF THENEW ELECTRICAL SERVICE.

5. THE CONTRACTOR SHALL FURNISH AND INSTALL PHENOLIC LABELS FOR ALL DISTRIBUTION EQUIPMENT,PANELBOARDS AND DISCONNECT SWITCHES. LABELS SHALL BE BLACK ETCHED TO REVEAL WHITE LETTERS ONBLACK BACKGROUND.

(APPLIES TO THIS SHEET)

NEWDISC.

600AM

ELECTRICAL ROOM 111

NEW CASTROVILLE CLINIC

NEW CPS ENERGY UTILITY POLE WITHTRANSFORMERS

#1 AWG CU

#1 AWG CU

X-RAY ROOM 130

#1 AWG CU

2

3

7

8

4

6

9

1

5

PR

OJEC

T #15 080

7700 Torino St, Suite 101San Antonio, TX 78229

Telephone: 210.614.1110© 2015 Alderson & Associates, Inc.

F-1008

Copyright 1971-2015 RVK, INC. The record copy of this drawing is on file at the offices of RVK, Inc., 745 E. Mulberry, Suite 601, San Antonio, Texas

arch

itect

ure

in

terio

r des

ign

la

ndsc

a pe

arch

it ect

ure

project no.

date

constructiondocuments

REN

OVA

TIO

NC

ASTR

OVI

LLE

CLI

NIC

8406

FM

471

CAS

TRO

VILL

E, T

EXAS

15-080

10/23/15

RISER DIAGRAM

E-401

SCALE: NTS1 RISER-DIAGRAM

CHANGES THROUGHOUTSHEET

1

no. revision date1 ADD #1 10/29/2015

Page 10: ADDENDUM # 1 - netReturns · provide and install vibration isolators on any equipment with moving parts. 11. duct smoke detectors to be provided and installed by the ... condensate

PR

OJEC

T #15 080

7700 Torino St, Suite 101San Antonio, TX 78229

Telephone: 210.614.1110© 2015 Alderson & Associates, Inc.

F-1008

Copyright 1971-2015 RVK, INC. The record copy of this drawing is on file at the offices of RVK, Inc., 745 E. Mulberry, Suite 601, San Antonio, Texas

arch

itect

ure

in

terio

r des

ign

la

ndsc

a pe

arch

it ect

ure

project no.

date

constructiondocuments

REN

OVA

TIO

NC

ASTR

OVI

LLE

CLI

NIC

8406

FM

471

CAS

TRO

VILL

E, T

EXAS

15-080

10/23/15

ELECTRICALSCHEDULES

E-501

Lighting Fixture Schedule

32 Manufacturer Catalog Number Description Lamp Qty Lamp Type Ballast Qty Ballast Type Mounting Voltage Wattage

A1 NULITE L2D 3 32T8 120 IS N (FLG FORHARD CEILING)

2x4 VOLUMETRIC FLUORESCENT TROFFER, FROSTED ACRYLIC DIFFUSER.CONTRACTOR TO VERIFY EXACT MOUNTING REQUIREMENTS PERARCHITECTURAL RCP PRIOR TO ORDERING.

3 32W T8 4100K 1 ELECTRONIC RECESSED 120 V 96 VA

A1E NULITE L2D 3 32T8 120 IS N EM (FLGFOR HARD CEILING)

SAME AS FIXTURE ABOVE EXCEPT WITH 90 MINUTE EMERGENCY BATTERYBACKUP.

3 32W T8 4100K 1 ELECTRONIC RECESSED 120 V 96 VA

A2 NULITE L2D 2 32T8 120 IS N 2x4 VOLUMETRIC FLUORESCENT TROFFER, FROSTED ACRYLIC DIFFUSER.CONTRACTOR TO VERIFY EXACT MOUNTING REQUIREMENTS PERARCHITECTURAL RCP PRIOR TO ORDERING.

2 32W T8 4100K 1 ELECTRONIC RECESSED 120 V 64 VA

A2E NULITE L2D 2 32T8 120 IS N EM SAME AS FIXTURE ABOVE EXCEPT WITH 90 MINUTE EMERGENCY BATTERYBACKUP.

2 32W T8 4100K 1 ELECTRONIC RECESSED 120 V 64 VA

A3 NULITE L2D 3 32T8 120 IS N DIM FLG 2x4 VOLUMETRIC FLUORESCENT TROFFER, FROSTED ACRYLIC DIFFUSER, WITHDIMMING. CONTRACTOR TO VERIFY MOUNTING REQUIREMENTS PRIOR TOORDERING.

3 32W T8 4100K 1 ELECTRONIC RECESSED 120 V 96 VA

A3E NULITE L2D 3 32T8 120 IS N DIM EM FLG SAME AS ABOVE, EXCEPT WITH EMERGENCY BATTERY PACK 3 32W T8 4100K 1 ELECTRONIC RECESSED 120 V 96 VAB1E NULITE G2 2 32T8 120 PS N EM 2x4 LENSED TROFFER, ACRYLIC PRISMATIC LENS, ELECTRONIC PROGRAMMED

START BALLAST, WITH EMERGENCY BATTERY BACKUP.2 32W T8 4100K 1 ELECTRONIC RECESSED 120 V 64 VA

C1 NULITE SA 2 32T8 120 IS N WG 4' FLUORESCENT STRIPLIGHT WITH WIRE GUARD 2 32W T8 4100K 1 ELECTRONIC CHAIN / SURFACE 120 V 64 VAC1E NULITE SA 2 32T8 120 IS N EM WG SAME AS ABOVE, EXCEPT WITH EMERGENCY BATTERY PACK 2 32W T8 4100K 1 ELECTRONIC CHAIN / SURFACE 120 V 64 VAD1 DECO LIGHTING DVA-6 32 EB 120 6" DIA. OPEN RECESSED CFL DOWNLIGHT. VERIFY TRIM FINISH WITH ARCHITECT

PRIOR TO ORDERING.1 32W TRT 4100K 1 ELECTRONIC RECESSED 120 V 32 VA

D1E DECO LIGHTING DVA-6 32 EB 120 EL6 SAME AS ABOVE, EXCEPT WITH EMERGENCY BATTERY PACK 1 32W TRT 4100K 1 ELECTRONIC RECESSED 120 V 32 VAEM1 EVENLITE WLEM BZ CT WET LOCATION ARCHITECTURAL EMERGENCY LIGHT. VERIFY EXACT HEIGHT AND

FINISH WITH ARCHITECT.1 LED 1 LED DRIVER WALL 120 V 11 VA

EM2 DECO LIGHTING DC-1-WH EMERGENCY LIGHTING UNIT, THERMOPLASTIC HOUSING, 2 HEADS 2 5.4W INCAN. 1 LED DRIVER WALL 120 V 11 VAK DECO LIGHTING D421-242-C-DT-C-XX-LP ROUND CANOPY CFL FIXTURE, VERIFY FINISH AND MOUNTING REQUIREMENTS

WITH ARCHITECT.2 42W TRT 1 ELECTRONIC SURFACE 120 V 100 VA

W1 DECO LIGHTING D402-LED3040UNVBZ LED WALLPACK, CLEAR PRISMATIC GLASS REFLECTOR, MOUNTED AT 10'-" A.F.F..VERIFY FINISHES AND MOUNTING REQUIREMENTS WITH ARCHITECT PRIOR TOORDERING.

1 LED 1 LED DRIVER WALL 120 V 30 VA

X1 DECO LIGHTING DCLXP-1-R-WH-EM SINGLE FACE BATTERY BACKUP SIDE LITE LED EXIT SIGN. REFER TO PLANS FORREQUIRED NUMBER OF FACES, ARROWS AND MOUNTINGREQUIREMENTS(CEILING/WALL). VERIFY FINISH AND LED COLOR(RED/GREEN)WITH ARCHITECT PRIOR TO ORDERING.

1 LED 1 LED DRIVER WALL/CEILING 120 V 3 VA

X2 DECO LIGHTING DCLXP-2-R-WH-EM DOUBLE FACE BATTERY BACKUP SIDE LITE LED EXIT SIGN. REFER TO PLANS FORREQUIRED NUMBER OF FACES, ARROWS AND MOUNTINGREQUIREMENTS(CEILING/WALL). VERIFY FINISH AND LED COLOR(RED/GREEN)WITH ARCHITECT PRIOR TO ORDERING.

1 LED 1 LED DRIVER WALL/CEILING 120 V 3 VA

X3 DECO LIGHTING DCLXLP-C-1-R-A-WH-EM SINGLE FACE BATTERY BACKUP COMBO LED EXIT/EMERGENCY LIGHT. REFER TOPLANS FOR REQUIRED NUMBER OF FACES, ARROWS AND MOUNTINGREQUIREMENTS(CEILING/WALL). VERIFY FINISH AND LED COLOR(RED/GREEN)WITH ARCHITECT PRIOR TO ORDERING.

1 LED 1 LED DRIVER WALL/CEILING 120 V 11 VA

X4 EVENLITE RCG AC R WH 1 WW W DIE CAST SINGLE FACE VANDAL AND TAMPER PROOF LED "X-RAY IN USE" SIGN.VERIFY FINISH AND MOUNTING REQUIREMENTS WITH ARCHITECT PRIOR TOORDERING.

1 LED 1 LED DRIVER WALL 120 V 2 VA

Electrical Mechanical/Plumbing Equipment Schedule

HVAC UnitDesignation HP LML FLA

SubloadkW MCA MOCP Total kW Voltage Ph

HVAC UnitLocation

HVAC UnitLocation

DisconnectFeeder

TagPanelName

Circuit# Remarks

SpaceName Space #

CU-1 35.0 A 60.0 A 5.8 kW 208 V 1 60AF/2P/NF/N1 65/1 B 18,20CU-2 31.1 A 40.0 A 9.0 kW 208 V 3 60AF/3P/NF/N1 50 B 22,24,26EF-1 1/6 4.4 A 4.4 A 5.5 A 15.0 A 0.5 kW 120 V 1 TOGGLE 25/1 N B 28FC-1 1 1/2 6.6 A 6.6 A 40.8 A 45.0 A 11.8 kW 208 V 3 60AF/3P/NF/N1 50 A 10,12,14FC-2 3 10.6 A 10.6 A 52.2 A 60.0 A 15.0 kW 208 V 3 60AF/3P/NF/N1 65 A 16,18,20MS-1 0.3 A 0.3 A 0.4 A 15.0 A 0.1 kW 208 V 1 30AF/2P/NF/N1 25/1MS-2 0.3 A 0.3 A 0.4 A 15.0 A 0.1 kW 208 V 1 30AF/2P/NF/N1 25/1OU-1 15.0 A 15.0 A 2.2 kW 208 V 1 30AF/2P/NF/N1 25/1 B 10,12OU-2 15.0 A 15.0 A 2.2 kW 208 V 1 30AF/2P/NF/N1 25/1 B 14,16

Notes:

Total Demand(Amps): 100 A

Receptacle 18360 VA 77.23% 14180 VA Total Demand(KVA): 36041 VA

Other 2220 VA 100.00% 2220 VA Total Conn. Load(KVA): 40221 VACooling 19641 VA 100.00% 19641 VALoad Classification Connected Load Demand Factor Estimated Demand Panel Totals

Total Amps: 118 A 110 A 108 ATotal Load: 14181 VA 13139 VA 12901 VA

83 Spare -- 20 A 1 0 0 1 20 A -- Spare 8481 Spare -- 20 A 1 0 0 1 20 A -- Spare 8279 Spare -- 20 A 1 0 0 1 20 A -- Spare 8077 Spare -- 20 A 1 0 0 1 20 A -- Spare 7875 Spare -- 20 A 1 0 0 1 20 A -- Spare 7673 Spare -- 20 A 1 0 0 1 20 A -- Spare 7471 Spare -- 20 A 1 0 0 1 20 A -- Spare 7269 Spare -- 20 A 1 0 0 1 20 A -- Spare 7067 Spare -- 20 A 1 0 0 1 20 A -- Spare 6865 Spare -- 20 A 1 0 0 1 20 A -- Spare 6663 Spare -- 20 A 1 0 0 1 20 A -- Spare 6461 Spare -- 20 A 1 0 0 1 20 A -- Spare 6259 Spare -- 20 A 1 0 0 1 20 A -- Spare 6057 Receptacle VITALS 124 Recep... 20 A 1 360 0 1 20 A -- Spare 5855 Receptacle - IDF 110 Recep... 20 A 1 180 0 1 20 A -- Spare 5653 Receptacle - NEMA 5-20R IDF 110 Recep... 20 A 1 180 0 1 0 A -- Spare 5451 Receptacle - NEMA 5-20R IDF 110 Recep... 20 A 1 180 0 1 0 A -- Spare 5249 Receptacle - QUAD NEMA 5-20R IDF 110 Recep... 20 A 1 360 0 1 0 A -- Spare 5047 Receptacle - NEMA 5-20R IDF 110 Recep... 20 A 1 180 0 1 0 A -- Spare 4845 Receptacles - MED ROOM 129 Recep... 20 A 1 720 0 1 0 A -- Spare 4643 Receptacles - CONTROL 130A Recep... 20 A 1 360 0 1 0 A -- Spare 4441 Receptacle GFI X-RAY 130 Recep... 20 A 1 180 0 1 0 A -- Spare 4239 Receptacles - X-RAY RM 130 Recep... 20 A 1 180 540 1 20 A Recep... Receptacles - NURSE WORK 123 4037 Receptacle - WALL BUCKY X-RAY RM 130 Recep... 20 A 1 180 540 1 20 A Recep... Receptacles - NURSE WORK 123 3835 Receptacles Recep... 20 A 1 720 720 1 20 A Recep... Receptacles - RECEPTION 102 3633 Receptacles - REFRIGERATOR MED ROOM 129 Other 20 A 1 800 180 1 20 A Recep... Receptacles - RECEPTION 102 3431 Receptacles - FREEZER MED ROOM 129 Recep... 20 A 1 180 360 1 20 A Recep... Receptacle CONDENSATE PUMP ELECT. 111 3229 Receptacles - CRASH CART EQUIP. STOR. RM... Recep... 20 A 1 180 120 1 20 A Other FACP ELECT. 111 3027 Receptacles - EKG. EQUIP. STOR. RM 128 Recep... 20 A 1 180 528 1 15 A Cooling 'EF-1' - CORRIDOR D 107 2825 Receptacles - EXAM 8 RM 127 Recep... 20 A 1 1080 2988 -- -- -- -- 2623 Receptacles - EXAM 7 RM 120 Recep... 20 A 1 1080 2988 -- -- -- -- 2421 Receptacles - EXAM 5 RM 118 Recep... 20 A 1 1080 2988 3 40 A Cooling CU-2 2219 Receptacles - EXAM 3 RM 116 Recep... 20 A 1 1080 2912 -- -- -- -- 2017 Receptacles RR 105, 106 Recep... 20 A 1 180 2912 2 60 A Cooling CU-1 1815 Receptacles CORRIDOR 107 Recep... 20 A 1 1080 1082 -- -- -- -- 1613 Receptacles - EXAM 2 RM 113 Recep... 20 A 1 1080 1082 2 15 A Cooling 'OU-2' 1411 Receptacles - EXAM 1 RM 112 Recep... 20 A 1 540 1082 -- -- -- -- 129 Receptacle - ELECT. RM 111 Recep... 20 A 1 360 1082 2 15 A Cooling 'OU-1' 107 Receptacles - BREAK RM 108 Recep... 20 A 1 180 360 1 20 A Recep... Receptacles - NURSE WORK RM 123 85 Receptacles - REF. BREAK RM 108 Other 20 A 1 800 1040 1 20 A Other;... Receptacles - TV, WAITING RM 101 63 Receptacles - BREAK RM 108 Recep... 20 A 1 720 1080 1 20 A Recep... Receptacles - NURSE WK RM 115, B. DRAW RM... 41 Receptacle GFI STAFF T/R RM109 Recep... 20 A 1 1080 180 1 20 A Recep... Receptacle COPIER RM 102 2

CKT Circuit Description Type Trip Poles A B C Poles Trip Type Circuit Description CKTEnclosure: NEMA 1 MCB Rating: 200 AMounting: SURFACE Wires: 4 Mains Rating: 200 A

Supply From: A Phases: 3 Mains Type: MCBLocation: ELECT. 111 Volts: 120/208 Wye A.I.C. Rating: 18000 A

Branch Panel: B

Notes:

Receptacle 18360 VA 77.23% 14180 VAOther 2220 VA 100.00% 2220 VA Total Demand(Amps): 344 A

Lighting 6181 VA 125.00% 7727 VA Total Demand(KVA): 123780 VA

Equipment 53209 VA 100.00% 53209 VA Total Conn. Load(KVA): 126414 VACooling 46444 VA 100.00% 46444 VALoad Classification Connected Load Demand Factor Estimated Demand Panel Totals

Total Amps: 355 A 348 A 350 ATotal Load: 42608 VA 41807 VA 41979 VA

41 -- -- -- -- 12901 17736 -- -- -- -- 4239 -- -- -- -- 13139 17736 -- -- -- -- 4037 NEW PANEL B Other;... 200 A 3 14181 17736 3 100 A Equip... T-H 75KVA XFMR 3835 Spare -- 20 A 1 0 0 1 20 A -- Spare 3633 Spare -- 20 A 1 0 0 1 20 A -- Spare 3431 Spare -- 20 A 1 0 0 1 20 A -- Spare 3229 Spare -- 20 A 1 0 0 1 20 A -- Spare 3027 Spare -- 20 A 1 0 0 1 20 A -- Spare 2825 Spare -- 20 A 1 0 0 1 20 A -- Spare 2623 LTG EXTERIOR BUILDING FACADE Lighting 20 A 1 240 0 1 20 A -- Spare 2421 LTG EXTERIOR CANOPY Lighting 20 A 1 611 0 1 20 A Equip... Equipment X-RAY 130 2219 LTS EMERGENCY Lighting 20 A 1 33 5015 -- -- -- -- 2017 LTS EMERGENCY Lighting 20 A 1 33 5015 -- -- -- -- 1815 LTS X-RAY RM 130, CONTROL RM 130A Lighting 20 A 1 290 5015 3 60 A Cooling FC-2 MECH RM 1613 LTS EXAM RM 127, STOR. 128, MED RM 129 Lighting 20 A 1 448 3920 -- -- -- -- 1411 LTS EXAM RM 116, 117, 118, 119, 120, OFF. 121 Lighting 20 A 1 1152 3920 -- -- -- -- 129 LTS WAITING RM 101 Lighting 20 A 1 521 3920 3 45 A Cooling FC-1 MECH RM 107 LTGS RM 123, 131, 132 Lighting 20 A 1 480 0 1 20 A -- Spare 85 LTS CORRIDOR 107, 122, 126 Lighting 20 A 1 982 0 1 20 A -- Spare 63 LTS ELEC RM 111, IDF RM 102 Lighting 20 A 1 576 0 1 20 A -- Spare 41 LTS RM 102,103,104,105,106,108,109,115,125 Lighting 20 A 1 795 0 1 20 A -- Spare 2

CKT Circuit Description Type Trip Poles A B C Poles Trip Type Circuit Description CKTEnclosure: NEMA 1 MCB Rating: 600 AMounting: SURFACE Wires: 4 Mains Rating: 600 A

Supply From: Phases: 3 Mains Type: MCBLocation: ELECT. 111 Volts: 120/208 Wye A.I.C. Rating: 18000 A

Branch Panel: A1

1

1

1

FEEDER SCHEDULESTRANDED COPPER CONDUCTORS, 75 DEG. C INSULATION

3 PHASE, 4 WIRE & 3 PHASE, 3 WIRE

TAG CONDUIT PHASE NEUTRAL GROUND

CONDUCTORS CONDUCTORS CONDUCTORS

25/1 N (1) 3/4" ea. w/ (1)-#12 (1)-#12 (1)-#12

35 N (1) 3/4" (1)-#10

50 N (1) 3/4" (2)-#8 (1)-#8

65/1 (1) 1" (2)-#6 N/A

85 N (1) 1-1/4" (3)-#4 (1)-#4

25 (1) 3/4"

35 (1) 3/4"

50 (1) 3/4" (3)-#8 (1)-#10

65 (1) 3/4" (3)-#6

85 (1) 1" (3)-#4

100 (1) 1" (3)-#3 N/A (1)-#8

(1)-#8

(1)-#8

(1)-#10

(1)-#10

(1)-#8

(1)-#8

(1)-#10

(1)-#10

N/A

N/A

N/A

N/A

N/A

(3)-#10

(3)-#10

(3)-#10

ea. w/

ea. w/

ea. w/

ea. w/

ea. w/

ea. w/

ea. w/

ea. w/

ea. w/

ea. w/

25 N (1) 3/4" ea. w/ (3)-#10 (1)-#10 (1)-#12

ea. w/65 N (1) 1" (3)-#6 (1)-#6 (1)-#8

25/1 (1) 3/4" ea. w/ (2)-#12 N/A (1)-#12

1

no. revision date1 ADD #1 10/29/2015

Page 11: ADDENDUM # 1 - netReturns · provide and install vibration isolators on any equipment with moving parts. 11. duct smoke detectors to be provided and installed by the ... condensate

3 2

E

F

1

4

5

6

SK-1SK-1SK-1

SK-1

SK-1

SK-2

WC-1

L-2

MS-1

EWH-1

L-2L-2

WC-1 WC-1

SK-1

SK-1 SK-1

SK-1

L-2

WC-1

SK-1

SK-1

FD-1

FD-1

FD-1 FD-1

FD-1

FD-1

EWC-1

STAFF T/R109

EXAM 2113

VITALS124

BLOODDRAW

125

VISITORT/R A105

VISITORT/R B106

SPECIMENT/R132

NURSEWORK

123

NURSEWORK

115

CONTROL130A

EXAM 6119

EXAM 7120

EXAM 5118

EXAM 4117

EXAM 3116

CORRIDOR B126

EXAM 1112

EXAM 8127

EQUIPMENTSTORAGE

128

MED ROOM129

OFFICE121

CORRIDOR C104

RECEPTION102

OFFICE131WAITING

101

X-RAY130

BREAKROOM

108

CORRIDOR D107

IDF110

ELECT.111

OFFICE114

CHARTSTORAGE

102A

JANITOR103

MECHANICALROOM

133

12

4

3 2

E

F

1

4

5

6

SK-1SK-1

SK-1

SK-1

SK-1

SK-2

WC-1

L-2

MS-1

EWH-1

L-2L-2

WC-1 WC-1

SK-1

SK-1 SK-1

SK-1

WC-1

SK-1

SK-1IMB

EWC-1

STAFF T/R109

EXAM 2113

VITALS124

BLOODDRAW

125

VISITORT/R A105

VISITORT/R B106

SPECIMENT/R132

NURSEWORK

123

NURSEWORK

115

CONTROL130A

EXAM 6119

EXAM 7120

EXAM 5118

EXAM 4117

EXAM 3116

CORRIDOR A122

CORRIDOR B126

EXAM 1112

EXAM 8127

EQUIPMENTSTORAGE

128

MED ROOM129

OFFICE121

CORRIDOR C104

RECEPTION102

OFFICE131

WAITING101

X-RAY130

BREAKROOM

108

CORRIDOR D107

IDF110

ELECT.111

OFFICE114

CHARTSTORAGE

102A

JANITOR103

MECHANICALROOM

133

3

L-2

(THIS SHEET ONLY)KEYED NOTES

PR

OJEC

T #15 080

7700 Torino St, Suite 101San Antonio, TX 78229

Telephone: 210.614.1110© 2015 Alderson & Associates, Inc.

F-1008

Copyright 1971-2015 RVK, INC. The record copy of this drawing is on file at the offices of RVK, Inc., 745 E. Mulberry, Suite 601, San Antonio, Texas

arch

itect

ure

in

terio

r des

ign

la

ndsc

a pe

arch

it ect

ure

project no.

date

Construction Documents

REN

OVA

TIO

NC

ASTR

OVI

LLE

CLI

NIC

8406

FM

471

CAS

TRO

VILL

E, T

EXAS

15-080

10/23/15

PLUMBING FLOOR PLAN -NEW WORK

P-101

SCALE: 1/8" = 1'-0"1 FIRST FLOOR NEW WORK - SANITARY AND VENT

SCALE: 1/8" = 1'-0"2 FIRST FLOOR NEW WORK - DOMESTIC WATER

1. NEW 4" SANITARY MAIN CONNECTED TO NEW COUNTY PROVIDED SANITARYSEWER SYSTEM IN THIS APPROXIMATE LOCATION. REFERENCE MEDINACOUNTY NEW ANNEX WASTE WATER IMPROVEMENT DRAWINGS PROVIDEDBY OTHERS.

2. NEW TWO WAY CLEAN OUT IN THIS APROXIMATE LOCATION.3. CONNECT TO EXISTING WATER SUPPLY PIPING IN THIS APPROXIMATE

LOCATION. VERIFY CONDITION OF EXISTING PIPE AND EXACT LOCATIONBEFORE ROUTING ANY NEW PIPING.

4. CONNECT NEW VENT PIPING TO EXISTING VENT PIPING IN THIS APPROXIMATELOCATION AND REUSE EXISTING VENT THRU ROOF. VERIFY LOCATION ANDCONDITION OF EXISTING VENT THROUGH ROOF BEFORE ROUTING ANY NEWPIPING.

1

no. revision date1 ADD #1 10/29/15

Page 12: ADDENDUM # 1 - netReturns · provide and install vibration isolators on any equipment with moving parts. 11. duct smoke detectors to be provided and installed by the ... condensate

SK-1

SK-1

SK-1

SK-1

L-2

WC-1

FD-1

SK-1

SK-1

SK-1

SK-1

SK-1

FD-1

WC-1WC-1

L-2

L-2

FD-1EWH-1

MS-1

FD-1

SK-2

WC-1L-2

FD-1

SK-1

SK-1

AAV

AAV

FD-1

EWC-1

1 1/2"ø Vent

1 1/2"ø Vent

1 1/2"ø Vent2"ø Vent

3"ø Vent

1 1/2"ø Vent2"ø Vent

2"ø Vent2"ø Vent

1 1/2"ø Vent

2"ø Vent

2"ø Vent

2"ø Vent

3"ø Vent

3"ø Vent

3"ø Vent2"ø Vent

1 1/2"ø Vent

3"ø Vent

3"ø Vent

2"ø Vent

2"ø Vent

2"ø Sanitary4"ø Sanitary

4"ø

Sani

tary

2"ø Sanitary

3"ø Sanitary3"ø Sanitary

3"ø Sanitary

4"ø Sanitary

4"ø Sanitary

4"ø Sanitary

4"ø Sanitary 3"ø Sanitary

4"ø Sanitary

4"ø Sanitary

3"ø Sanitary

2"ø Sanitary

3"ø Sanitary4"ø Sanitary

3"ø Sanitary

4"ø Sanitary

2"ø Sanitary

2"ø Sanitary

2"ø Sanitary

2"ø Sanitary2"ø Sanitary

3"ø Sanitary

2"ø Sanitary

3"ø Sanitary

4"ø Sanitary

3"ø Sanitary

FCO

TWCO-1 3"ø VTR

1

2

TYP

TYP

TYP

TYP

TYPTYP

TYP

TYPTYP

TYP

4

5

6

5

7

8

6

9

8

7 10

2 1/2"ø CW

SK-1

SK-1

SK-1

SK-1

SK-1

WC-1

L-2

SK-1

SK-1

SK-1

SK-1

WC-1

WC-1

L-2

L-2

EWC-1

MS-1

EWH-1HWRP

SK-1

SK-2

WC-1

L-2

SK-1

IMB

1/2"ø HWR

1/2"ø HW1/2"ø CW

1/2"ø HWR

1/2"ø HW

1/2"ø CW

1"ø HWR

1 1/4"ø HW

2 1/2"ø CW

2"ø CW

1 1/4"ø HW1"ø HWR

1 1/4"ø HWR

1 1/4"ø HW

2"ø CW

1 1/4"ø HWR

1 1/4"ø HW

2"ø CW

1 1/2"ø CW

1 1/4"ø HW

1 1/4"ø HWR

1/2"ø CW1/2"ø HW

1/2"ø HWR

1 1/4"ø CW

3/4"ø HW

1 1/2"ø CW

3/4"ø HW

3/4"ø HWR3/4"ø CW

3/4"ø HWR1"ø HW2 1/2"ø CW

2 1/2"ø CW

1"ø HW3/4"ø HWR

1/2"ø HWR

3/4"ø CW3/4"ø HW

1/2"ø HWR

3/4"ø HW

3/4"ø CW

1/2"ø HWR

1/2"ø HW1 1/4"ø CW

1"ø CW

3/4"ø CW

3/4"ø HW1/2"ø HWR

1/2"ø HWR

1/2"ø HW1/2"ø CW

1/2"ø CW

1"ø CW

3

TYP

TYP

TYP

1111

1111

TYP

TYP

1111TYP

12

1212

1212

1111 TYP

TYP

PR

OJEC

T #15 080

7700 Torino St, Suite 101San Antonio, TX 78229

Telephone: 210.614.1110© 2015 Alderson & Associates, Inc.

F-1008

Copyright 1971-2015 RVK, INC. The record copy of this drawing is on file at the offices of RVK, Inc., 745 E. Mulberry, Suite 601, San Antonio, Texas

arch

itect

ure

in

terio

r des

ign

la

ndsc

a pe

arch

it ect

ure

project no.

date

Construction Documents

REN

OVA

TIO

NC

ASTR

OVI

LLE

CLI

NIC

8406

FM

471

CAS

TRO

VILL

E, T

EXAS

15-080

10/23/15

PLUMBING RISERDIAGRAMS

P-201

SCALE:1 PLUMBING RISER DIAGRAM - SANITARY AND VENT

SCALE:2 PLUMBING RISER DIAGRAM - DOMESTIC WATER

NOT TO SCALE

NOT TO SCALE

(THIS SHEET ONLY)KEYED NOTES1 NEW 4" SANITARY MAIN CONNECTED TO NEW COUNTY PROVIDED SANITARY

SEWER SYSTEM IN THIS APPROXIMATE LOCATION. REFERENCE MEDINACOUNTY NEW ANNEX WASTE WATER IMPROVEMENT DRAWINGS PROVIDEDBY OTHERS.

2 NEW TWO WAY CLEAN OUT IN THIS APROXIMATE LOCATION.3 CONNECT TO EXISTING WATER SUPPLY PIPING IN THIS APPROXIMATE

LOCATION. VERIFY CONDITION OF EXISTING PIPE AND EXACT LOCATIONBEFORE ROUTING ANY NEW PIPING.

4 CONNECT NEW VENT PIPING TO EXISTING VENT PIPING IN THISAPPROXIMATE LOCATION AND REUSE EXISTING VENT THRU ROOF. VERIFYLOCATION AND CONDITION OF EXISTING VENT THROUGH ROOF BEFOREROUTING ANY NEW PIPING.

5 NEW 4" SANITARY MAIN ROUTED UNDERFLOOR.6 NEW 3" SANITARY MAIN ROUTED UNDER FLOOR7 2" VENT PIPING ROUTED IN WALL TO ABOVE CEILING.8 1-1/2" VENT PIPING ROUTED IN WALL TO ABOVE CEILING.9 3" VENT PIPING ROUTED ABOVE CEILING10 2" VENT PIPING ROUTED ABOVE CEILING11 PROVIDE ISOLATION VALVES AT ALL BRANCH PIPING PER SPECS.12 WATER HAMMER ARRESTOR SHOCK ABSORBER.

1

1

1

no. revision date1 ADD #1 10/29/15