Most of the work is slated to be completed by 2014, while a few by 2013. The rows marked in red are the lakes whose BBMP zones have not been identified Action plan for lakes to be restored Lakes under BBMP Name of lake Abbigere kere Agrahara lake Bellahalli Chikka Banawara Chokkanahalli lake Handrahalli Kammagondanahalli Kattiganahalli kere Kattiganahalli kere Kogilu lake Lakshmipura lake Lingadiranahalli Mallasandra Gudde lake Medi Agrahara Nagarabhavi Shivanahalli Singapura kere Srigandadakaval Srinivasapura kere Action plan for the lakes under BBMP, BDA, Lake Development Authority and Karanataka Forest Department

Upload: citizen-matters

Post on 25-Nov-2014

234 views

Category:

Documents


4 download

DESCRIPTION

Action plan for Bengaluru's lakes

TRANSCRIPT

Page 1: Action Plan Lakes

Most of the work is slated to be completed by 2014, while a few by 2013.The rows marked in red are the lakes whose BBMP zones have not been identified

Action plan for lakes to be restored

Lakes under BBMP

Name of lake

Abbigere kere

Agrahara lake

Bellahalli

Chikka Banawara

Chokkanahalli lakeHandrahalliKammagondanahalli

Kattiganahalli kereKattiganahalli kere

Kogilu lake

Lakshmipura lakeLingadiranahalli Mallasandra Gudde lakeMedi Agrahara

Nagarabhavi

Shivanahalli

Singapura kere

Srigandadakaval

Srinivasapura kere

Action plan for the lakes under BBMP, BDA, Lake Development Authority and Karanataka Forest Department

Page 2: Action Plan Lakes

Thirumenahalli

Vaderahalli

Veerasagara lake

Vishwa nidam lake

Ramagondanahalli

Gunjur mouji kere

Panathur kere

Parappara Agrahara

Gangasetty kere

Kudlu doddakere

Nalluralli tank

Kudlu chikere

Siddapura kere

Panathur kere

Bhoganalli kere

Devara bisenalli kere

Gunjur palya kere

Gunjur kere (Carmelarm)

KR Puram (BEML)

Vibhuthipura kere

Horamavu kere

Page 3: Action Plan Lakes

Vijanapura kere

Junnsandra kere

Konnappana agrahara

Chikka Bellandur kere

Doddakanenahalli kere

Haraluru kere

Munnekolalu kere

Horamavu Agara

Sadaramangala kere

Garudachar palya kere (Gosala)

Hoodi kere

Hoodi kere (Giddana kere)

Garudachar palya (Achanakere)

Devsandra kere

Chikkabasavanapura kere

Sowl kere

Bhattralli kere

Sigehalli

Jimkenalli kere

Sitaram palya

Pattandur AgraharaKasavanalli

Page 4: Action Plan Lakes

Shilavantana kereNagareshwara-Nagenahalli lake

Kalkere Rampura kere

Chennasandra

Pattandur AgraharaMahadevpura

Dubasipalya lake

H Gollahalli lake

Gattigere palya lake

Byappana palya kunte

Chikkegowdana palya lake

Halagevaderahalli lake

Byrasandra kere

Gowdana Palya lake

Haralakunte lake (Somasandrakere)

Mangammana Palya lake

Anjanapura lake/Alahalli

Basapura lake -1

Basapura lake -2

Basavanapura lake

Begur lake

Chikkammanahalli lake

Chik Begur lake

Page 5: Action Plan Lakes

Devarakere lake

Nyanappanahalli lake

Gottigere lake

Kalena Agrahara lake

Subbarayanakere

Subedeharanakere

Subramanyapura lake

Swarnakunte gudda kere

Yellenhalli lake

Chowdeshwari layout lake

Kammanahalli lake (Meenakshi lake)Annappahalli/Yelachenahalli lake

Singasandra lake

Kalyani/kunte next to Sai Baba temple

Total funds required

Lakes under BDA

Name

Nalagadaranahalli

Amruthalli

Chikkabasthi

Page 6: Action Plan Lakes

Manganahalli

Kenchanapura

Garvebhavi Palya

Chunchanaghatta

Kaggadasanapura

Singasandra

B Narayanapura

Doddanakundi

Narasappanahalli

Bheemanakuppe

Hosakere

Chikkabettahalli

Sulekere

Kannenahalli

B Channasara lake

Bellandur

Varthur

Lingadheeranahalli

Gubbalala

Konankunte

Hosakerehalli

Doddakallasandra

Avalahalli

Byrasandra

Arekere

Page 7: Action Plan Lakes

Hulimavu

Kembathalli

Vasanthapura

Lakes under LDA

Name

Jaraganahalli

Agaram lake

Lakes under KFD

Name of lake

Puttenahalli

JB Kaval tank

Mylsandra

Page 8: Action Plan Lakes

BBMP zone Extent Status

Dasarahalli 47-13

Byatarayanapura 15-33

Byatarayanapura 18-32 Survey completed

104.4 To be surveyed

Byatarayanapura 8-2Dasarahalli 16-6 Fencing in progressDasarahalli 22.29 Certified, fencing yet to start

Byatarayanapura 25 Sketch certified by Tahsildar, fencing to be startedByatarayanapura 20-10 Sketch certified by Tahsildar, fencing is nearing completion

Byatarayanapura 73-28

East 10-20Dasarahalli 11-32 Fencing in progressDasarahalli 17-11 Fencing in progress

13-15 Survey in progress

17-39 Survey in progress

Byatarayanapura 18-12

66-18

6-33 Fencing in progress

Byatarayanapura 3-4 To be surveyed

Sketch certified by Tahsildar; fencing is almost complete except in encroached areas and letter has been sent to DC (Urban) to take action to evict encroachmentsSketch certified by Tahsildar; fencing is almost complete except in encroached areas and letter has been sent to DC (Urban) to take action to evict encroachments

Sketch certified by Tahsildar; fencing is almost complete except in encroached areas and letter has been sent to DC (Urban) to take action to evict encroachments

Sketch submitted to Tahsildar for certification, fencing in progressSketch certified by Tahsildar; fencing is almost complete except in encroached areas and letter has been sent to DC (Urban) to take action to evict encroachments

Rajarajeshwari Nagar

Lake land is acquired for NH-7, other roads and railway embankment. To be handed over to BDASketch certified by Tahsildar; fencing is almost complete except in encroached areas and letter has been sent to DC (Urban) to take action to evict encroachments

Page 9: Action Plan Lakes

Byatarayanapura 23-8

Byatarayanapura 9-34 Sketch certified by Tahsildar, fencing in progress

Byatarayanapura 21-14

Dasarahalli 4-30 Certified. In progress

Mahadevpura 36-26 To be surveyed

Mahadevpura 63-39

Mahadevpura 27-17

16-11 Fenced by KFD, afforestation works are in progress

Mahadevpura 21-27

43-39

Mahadevpura 47-39

13-15

South 27-35

Mahadevpura 6-31

Bommanahalli 12-24

Bommanahalli 13-31

Mahadevpura 36-27

Mahadevpura 9-17

East 45-39

Mahadevpura 45-18

Byatarayanapura 37-14

Fencing not started as acquisition data on the lake area is not available

Sketch certified by Tahsildar. Fencing is almost complete except for an encroachment, letter has been sent to DC (Urban) to evict encroachment

Sketch made by BBMP surveyors. Fencing is complete except for a temple area, about which case is pending in SC. DC had given 2.20 acres to an individual through an order in 1953. Afforestation works are in progressSketch certified by tahsildar. Fencing is complete, encroachments have been evicted and afforestation is in progress

Sketch signed by BBMP surveyors. Encroachments by slum dwellers wil be shifted from the tank. Afforestation work is in progressSketch certified by Tahsildar. Some encroachments are evicted and tank is partly fenced. Afforestation works are progressingSketch submitted to Tahsildar, yet to be certified. Some land was granted to individuals, DC has to verify that. Partly fenced and afforestation works are in progressSketch certified by Tahsildar. Tank is completed, all encroachments evicted and afforestation works are in progress

Sketch submitted to tahsildar. Encroachment of 2.18 acres already evicted; rest encroachment by BEML Housing Society, case pending in HC. Tank is partly fenced and afforestation works are in progress

Sketch certified by Tahsildar. Encroachments evicted, fencing complete and afforestation works in progressSketch certified by Tahsildar. Some encroachments are to be removed. Tank is fully fenced and afforestation work is in progressSketch certified by Tahsildar. All encroachments except that of road are evicted. Fencing is complete and afforestation is progressingSketch certified by Tahsildar. Encroachments evicted, fencing complete and afforestation works in progressSketch certified by Tahsildar. Encroachments evicted except Christian missionary area, fencing complete and afforestation works in progress

Sketch certified by Tahsildar. Partly fenced, Encroachment of 30 guntas should be evicted; afforestation progressingSketch certified by Tahsildar. Fencing work progressing. DC has been asked to remove the permanent structures that have encroached the lakeSketch submitted to Tahsildar. Fencing work progressing. Encroached by permanent constructions/houses, some cases pending in HC

Page 10: Action Plan Lakes

Mahadevpura 11-28

Bommanahalli 24-33

Bommanahalli 5-17

Mahadevpura 67-14

Bommanahalli 18-14

Bommanahalli 34-7

Mahadevpura 15-38

Byatarayanapura 51-34

Mahadevpura 62-11

Mahadevpura 5-36

Mahadevpura 15-10 Fencing done by KFD and BBMP. Afforestation progressing

Mahadevpura 28-31

Mahadevpura 5-14

Mahadevpura 16-8

Mahadevpura 14-7 Sketch submitted to East Tahsildar; fencing under progress

Bommanahalli 61-37

18-10

Mahadevpura 31-13

Mahadevpura 8-24

23-37

16-35Bommanahalli 55-8 Fenced by KFD

Sketch submitted to Tahsildar. A govt school building and other constructions have encroached the lake and sewage is entering the lake

Sketch certified by Tahsildar. Entire lake is encroached, used for eucalyptus plantation. Case is pending in court

Sketch certified by Tahsildar, fencing and afforestation in progressSketch submitted to Tahsildar; fencing and afforestation in progress. Encroachment by way of agriculture/gardenSketch certified by Tahsildar. Afforestation progressing and fencing work will be completed after removing encroachments on north east sideSketch submitted to Tahsildar. Fencing and afforestation progressing; encroachment near waist weir by way of compound wall to be evicted.

Sketch certified and afforestation in progress. Fencing is complete except on south side where apartments have extended compound wall into the lake area; this will be evicted

Sketch submitted to tahsildar; fencing and afforestation progressing

Afforestation in progress. Part of the lake in Sadaramangala village has been certified by Tahsildar, there are protests about ownership. Sketch of the other part of the lake, which comes in Kodagehalli village, is yet to be certified.Sketch submitted for counter signature to Tahsildar, Bangalore East. Afforestation progressing

Survey map submitted to East Tahsildar. Fencing partly completed, afforestation progressing

Sketch submitted to East Tahsildar; fencing and afforestation progressing

Sketch certified by East Tahasildar. Encroaching building to be evicted; fencing and afforestation progressing

Sketch certified by East Tahsildar except the lake area in Doddakanahalli sy no.68; fencing and afforestation progressing

Sketch submitted to East Tahsildar. Encroachment is by way of slum. Fencing and afforestation progressingSketch certified by East Tahsildar; fencing and afforestation in progress. Letter addressed to DC to evict buildings that encroachSketch certified by East Tahsildar; fencing and afforestation in progress. Letter addressed to DC to evict buildings that encroach

Rajarajeshwari Nagar

Sketch submitted to East Tahsildar; encroachment exists; fencing and afforestation progressing

Sketch submitted to East Tahsildar; Encroachment is partly removed and fencing and afforestation work is going on

Page 11: Action Plan Lakes

Mahadevpura 19-32 Sketch countersigned by East Tahsildar; Fencing done by ZPByatarayanapura 11-8 Yet to be surveyed and fenced

Byatarayanapura 187-31

East 47-38

12-37 Major part of lake is encroachedMahadevpura 13-11 Major part of lake is encroached

23-35 Survey sketch certified; encroachment being evicted

21-18 Fencing and afforestation completed

1 ac 30 g Checked

2 ac 31 g Certified, encroachment to be removed

1 ac 10 g Checked

17-10 Fencing existing

15-11 Survey in progress

South 9-30 Checked, encroachment to be removed

16-29 Certified

Bommanahalli 7-29 Sketch submitted for certification

Bommanahalli 21-25 Certified

9-34 Fencing and afforestation progressing

10-29 Fencing and afforestation progressing

Mahadevpura 7-34 Fencing and afforestation progressing

Bommanahalli 137-24 Fencing and afforestation progressing

East 5-19 Fencing and afforestation progressing

Bommanahalli 41-16 Certified. Yet to start

Sketch submitted for certification. Part of the area was granted to private people, now sketch has to be corrected accordingly. Fencing and afforestation progressing

Fenced by KFD, part of lake is encroached by Fire station and buildings

Rajarajeshwari Nagar

Rajarajeshwari Nagar

Rajarajeshwari Nagar

Rajarajeshwari Nagar

Rajarajeshwari Nagar

Page 12: Action Plan Lakes

South 7-15 Certified

Bommanahalli 6-07 Fencing and afforestation progressing

Bommanahalli 37-13 Fencing and afforestation progressing

7-30 Work in progress

Bommanahalli 5-10 Fencing and afforestation progressing

Bommanahalli 6-05 Fencing and afforestation progressing

18-6 Sketch submitted for certification

9-05 Fencing and afforestation progressing

4-39 Fencing and afforestation progressing

Byatarayanapura 11-18 Fencing and afforestation progressing

East 18-37 Fencing and afforestation progressingSouth 6-32 Fencing progressing

Bommanahalli 11-09 Fencing progressing

Bommanahalli 1-08 Development and afforestation progressing

BBMP zone Extent Status

20 lake is weed infested and sewage ridden

Byatarayanapura 25

6 Highly weed-infested. Is a source for fishing

Rajarajeshwari Nagar

lake is sewage-ridden and covered with weeds to the extent that water surface is not visible

Page 13: Action Plan Lakes

6 Weed infested and sewage ridden

20

Bommanahalli

Bommanahalli 14-14

East 35-19 Needs to be de-weeded and free of sewage

Bommanahalli 7-20 Water is opaque. Boundary to be demarcated.

Mahadevpura 3-8 Needs to be de-weeded and free of sewage

Mahadevpura 111-37 Very little water impounded

11-24

Water is clean. Dredging needed to increase capacity

38-16

Byatarayanapura

15-7 Very small quantity of water impounded. Boundary to be fixed

117-16 Very small quantity of water impounded. Boundary to be fixed

3-8

Bommanahalli 797-21

Mahadevpura 411-21

Dasarahalli 5-22 Dry

8-10 Polluted

Bommanahalli 19-18 Polluted, weed growth, solid waste dumped and encroached

59-26 Dry, silted, weed growth, weir breached, encroached

Bommanahalli 21-16 polluted, encroached

South 21-25 polluted, weed growth

South 14-30 Dry, silted, weed growth, weir breached, encroached

Bommanahalli 37-21 Polluted, weed growth, solid waste dumped and encroached

Located close to NICE road, surrounded by villages and agricultural farms

Impounding capacity to be increased and water quality to be improved

Water is dark and opaque, and foaming is observed. Needs to be de-weeded

Should be de-weeded, and made free of industrial waste and sewage

Water quality should be improved. De-weeding required and sewage entry to be controlled

Boundary not defined. Impounding capacity should be increased and de-weeding should be done

Covered with weeds. Sewage entry should be stopped and storage capacity should be increased

Covered with weeds, there is heavy foaming. Sewage entry should be controlled

High levels of organic pollution. Desilting and controlling sewage entry is needed

Rajarajeshwari nagar

Rajarajeshwari nagar

Page 14: Action Plan Lakes

Bommanahalli 130-17 Polluted, weed growth, solid waste dumped and encroached

5-16 Encroached

Bommanahalli 7-10 Polluted, weed growth, solid waste dumped and encroached

BBMP zone Extent Status

South

Bommanahalli 97-76

BBMP Zone Status

Byatarayanapura 100

Byatarayanapura 20 Lake situated in forest area

85 Plating indigenous species, fencing

Was developed under National Lake Conservation Programme (NCLP). There is sewage entry. De-weeding needed and STP has to be set up if inflow of rainwater is inadequate. Developer under NCLP on 15 years lease basis by M/s Biota Natural Systems (India) Pvt Ltd, Hyderabad from 10-4-2007 to 9-4-2022 at the cost of Rs 1363.16 lakh

Cost estimate in lakhs

Lake full of sewage, but rich in avian bio-diversity. Recently sewage diverted to Yelahanka tertiary treatment plant (STP), but treated water is not discharged back to the lake. Restoration should be in phased manner to protect existing

Rajarajeshwari nagar

Page 15: Action Plan Lakes

Restoration plan Time in years Estimated Cost Remarks

Comprehensive Development 3 340

Comprehensive Development 3 110

Comprehensive Development 3 135

Comprehensive Development 3 820

Comprehensive Development 3 65Comprehensive Development 2 120Comprehensive Development 3 305

Comprehensive Development 3 180Comprehensive Development 3 145

Comprehensive Development 3 540

Comprehensive Development 3 75Comprehensive Development 2 70Improvements 2 240Comprehensive Development 3 300

215

Comprehensive Development 3 400

Comprehensive Development 3 470

Comprehensive Development 3 55

Comprehensive Development 3 25

After encroachment is removed, development work can be startedAfter encroachment is removed, development work can be startedAfter encroachment is removed, development work can be startedAfter encroachment is removed, development work can be started

After encroachment is removed, development work can be started

After encroachment is removed, development work can be started

After encroachment is removed, development work can be startedAfter encroachment is removed, development work can be startedAfter encroachment is removed, development work can be startedAfter encroachment is removed, development work can be started

Page 16: Action Plan Lakes

Comprehensive Development 3 170

Comprehensive Development 3 70

Comprehensive Development 3 145

Improvements 2 60

Comprehensive Development 3 270

Comprehensive Development 3 435

Comprehensive Development 3 199

Comprehensive Development 3 232

Comprehensive Development 3 290

Comprehensive Development 3 612

Comprehensive Development 3 668

Comprehensive Development 2 187

Comprehensive Development 3 385

Comprehensive Development 3 54

Comprehensive Development 3 89

Comprehensive Development 3 189

Comprehensive Development 3 514

Comprehensive Development 2 68

Comprehensive Development 2 87

Comprehensive Development 3 395

Comprehensive Development 3 528

After encroachment is removed, development work can be started

After encroachment is removed, development work can be started

After encroachment is removed, development work can be started

After encroachment is removed, development work can be started

After encroachment is removed, development work can be started

After encroachment is removed, development work can be started

After encroachment is removed, development work can be startedAfter encroachment is removed, development work can be startedAfter encroachment is removed, development work can be startedAfter encroachment is removed, development work can be started

Page 17: Action Plan Lakes

Comprehensive Development 2 91

Comprehensive Development 3 118

Comprehensive Development 2 73

Comprehensive Development 3 479

Comprehensive Development 3 257

Comprehensive Development 3 483

Comprehensive Development 3 234

Comprehensive Development 3 367

Comprehensive Development 3 374

Comprehensive Development 2 89

Comprehensive Development 2 110

Comprehensive Development 2 399

Comprehensive Development 3 75

Comprehensive Development 3 230

Comprehensive Development 3 103

Comprehensive Development 3 850

Comprehensive Development 3 258

Comprehensive Development 3 441

Comprehensive Development 3 61

Comprehensive Development 3 174

Comprehensive Development 3 117Comprehensive Development 3 766

After encroachment is removed, development work can be startedAfter encroachment is removed, development work can be started

After encroachment is removed, development work can be startedAfter encroachment is removed, development work can be started

After encroachment is removed, development work can be startedAfter encroachment is removed, development work can be started

After encroachment is removed, development work can be started

After encroachment is removed, development work can be startedAfter encroachment is removed, development work can be startedAfter encroachment is removed, development work can be started

After encroachment is removed, development work can be startedAfter encroachment is removed, development work can be startedAfter encroachment is removed, development work can be startedAfter encroachment is removed, development work can be startedAfter encroachment is removed, development work can be started

Page 18: Action Plan Lakes

Comprehensive Development 2 290Fencing 1 87

Comprehensive Development 3 2624

Comprehensive Development 3 344

Comprehensive Development 2 104111

Comprehensive Development 2 500

Comprehensive Development 3 400

17

102

14

Comprehensive Development 2 200

200

Comprehensive Development 2 200

200

Comprehensive Development 3 200

350

Comprehensive Development 3 150

Comprehensive Development 3 170

Comprehensive Development 3 145

Comprehensive Development 3 600

Comprehensive Development 3 150

Comprehensive Development 3 350

After encroachment is removed, development work can be startedAfter encroachment is removed, development work can be startedAfter encroachment is removed, development work can be started

After encroachment is removed, development work can be started

After encroachment is removed, development work can be startedAfter encroachment is removed, development work can be startedAfter encroachment is removed, development work can be started

After encroachment is removed, development work can be startedAfter encroachment is removed, development work can be startedAfter encroachment is removed, development work can be startedAfter encroachment is removed, development work can be startedAfter encroachment is removed, development work can be startedAfter encroachment is removed, development work can be started

Page 19: Action Plan Lakes

Comprehensive Development 3 80

Comprehensive Development 3 80

Comprehensive Development 3 520

Comprehensive Development 3 180

Comprehensive Development 3 130

Comprehensive Development 3 160

260

Comprehensive Development 3 160

Comprehensive Development 3 130

Comprehensive Development 3 185

Comprehensive Development 3 260150

Comprehensive Development 3 150

Comprehensive Development 3 60

262 cr

Restoration plan

3

3

3

After encroachment is removed, development work can be startedAfter encroachment is removed, development work can be startedAfter encroachment is removed, development work can be startedAfter encroachment is removed, development work can be startedAfter encroachment is removed, development work can be startedAfter encroachment is removed, development work can be started

After encroachment is removed, development work can be startedAfter encroachment is removed, development work can be startedAfter encroachment is removed, development work can be startedAfter encroachment is removed, development work can be started

After encroachment is removed, development work can be startedAfter encroachment is removed, development work can be started

Time required in years

Chain link fencing, de-weeding, desilting/dredging, network improvement, electrical works, landscaping, STP, Jogging track, Chain link fencing, de-weeding, desilting/dredging, network improvement, electrical works, landscaping, STP, Jogging track, Chain link fencing, de-weeding, desilting/dredging, network improvement, electrical works, landscaping, STP, Jogging track,

Page 20: Action Plan Lakes

3

3

DPR under preparation 3

DPR under preparation 3

DPR under preparation 3

DPR under preparation 3

DPR under preparation 3

DPR under preparation 3

DPR under preparation 3

DPR under preparation 3

DPR under preparation 3

DPR under preparation 3

DPR under preparation 3

DPR under preparation 3

DPR under preparation 3

DPR under preparation 3

DPR under preparation 3

DPR under preparation 3

DPR under preparation 3

DPR under preparation 3

DPR under preparation 3

DPR under preparation 3

DPR under preparation 3

DPR under preparation 3

DPR under preparation 3

Chain link fencing, de-weeding, desilting/dredging, network improvement, electrical works, landscaping, STP, Jogging track, Chain link fencing, de-weeding, desilting/dredging, network improvement, electrical works, landscaping, STP, Jogging track

Page 21: Action Plan Lakes

DPR under preparation 3

DPR under preparation 3

DPR under preparation 3

Action plan

Action plan is not yet decided

Proposed Restoration

Lease is terminated and lessee got stay from High Court. After case is decided, LDA will maintain the lake. As inflow is reduced STP needs to

Bund strengthening, clearing inlet and outlet, diversion channel, desilting etcBund strengthning, pitching round the wasteweir, creation of island, desilting, catchment area treatment

bund strengthning, desilting, planting, fencing