  • 8/6/2019 ACO & PCO ion Procedure

    1/14

    OPTIMISATION PROCEDURE FOR ACO & PCO

  • 8/6/2019 ACO & PCO ion Procedure

    2/14

    ACCESS CHANNEL OCCUPANCY

  • 8/6/2019 ACO & PCO ion Procedure

    3/14

    Quick Reference Guide for ACO

    Reference Reports:

    Lucent:- ACO-PCO Summary-Flux / RFISS

    Did the sectors

    ACO exceed

    the threshold in

    last months

    TOP6 ACO

    report?

    ACO Thresholds:

    Lucent ACO Th = 20%

    Yes

    It could be due to

    special event

    or unplanned event,

    Keep an eye on occupancy

    No

    Ensure

    Correct Datafill for

    all ACH

    related Parameters

    Process B (Capacity Balancing)

    Are the Zone

    base

    Registrations

    High?

    Process C ( Zone Base Registration Issue)Yes

    Optimization

    Yes

    Escalate Issue to next level of Support

    Prior to R21, Introduce new carrier

    With R21, activate new access channel

  • 8/6/2019 ACO & PCO ion Procedure

    4/14

    ACH Recommended Parameter Settings and OMs

    Rel28_AccParameters

    Rel28_ACP_PCO

  • 8/6/2019 ACO & PCO ion Procedure

    5/14

    NoPhysical

    optimization

    to control

    energy

    Yes

    Is the

    RF energy

    overshooting

    across the

    Zone border?

    Process C Zone based

    Registration Issues

    Are the Zone

    settings correct andzones balanced?

    No C2 Fix data errors,

    Modify LAs usingZone boundary tool.

    Yes

    C1

    Monitor

    Stats

    ACO

    Resolved?

    Yes

    Done

    No

    Monitor

    StatsACO

    Resolved? Done

    C4

    Optimization

    Modify tot_zones and

    Zone timer (Cell2)

    C3Yes Is the

    RF Energy still

    overshooting?

    C5

    Monitor

    Stats

    Does the

    traffic distribution

    along the border4 allow

    for a zone change?

    C8

    C6

    Yes

    ACO

    Resolved?

    Yes

    No

    No

    Move site tonext zone,

    Modify LA.

    C7

    Monitor

    Stats

    ACO

    Resolved?

    Done

    Yes

    No

    Add access channel.

    Monitor ACO of all access

    Channels (cpcarr 247-250)

    C9

    Yes

    No

    No

    Process C

    Zone BasedRegistrationIssues

  • 8/6/2019 ACO & PCO ion Procedure

    6/14

    Process B

    Do all carriers have

    same footprint and

    sectors loadbalanced within

    15%?

    Process B - Capacity

    Balancing

    Are the carriers

    balanced within 15%of the average carrier

    load?

    No

    Modify TCA weights, NL,

    and IFHO settings

    Yes

    Conduct Antenna and

    Power audits & matchthe footprints and load.

    No

    Monitor

    Stats

    ACO Resolved?

    Yes

    Done

    No

    Monitor

    Stats

    ACO Resolved?

    Yes

    Done

    Optimization

    Check the next step i.e.Zone Based Registration

    No

    Yes

    CapacityBalancing

  • 8/6/2019 ACO & PCO ion Procedure

    7/14

    PAGING CHANNEL OCCUPANCY

  • 8/6/2019 ACO & PCO ion Procedure

    8/14

    Quick Reference Guide for PCO Lucent

    Reference Reports:

    Lucent- Monthly Top 6 PCO Report-Falcon /

    31 day trending report / RFSM

    Prospect

    Did the sectors

    PCO exceed

    the threshold in

    last months

    TOP6 PCO

    report?

    PCO Thresholds:

    Lucent PCO Threshold = 72%

    Yes

    (Carrier Balancing) essentially a

    common carrier sanity check to

    ensure that the PCO is equally

    distributed among all reasonable

    carriers on the sector

    PCO

    Resolved

    ?

    No

    It could be due to

    special event

    or unplanned event,

    Keep an eye on occupancy

    No

    Ensure Correct

    Data fill for all PCO

    impacting

    Parameters including

    Paging Channel

    Overload Controls

    Verify if SHAPCAR is enabled in the

    switch. Implement sub-MSC paging.

    Zone Based Paging & Multiple Paging Channel Analysis

    Process A

    Yes

    Activate 2nd

    paging

    Channels &

    Monitor PCO

    Pg. Succ.

    improved?

    Yes

    No

    DONE

    A

    DONE

    Add 2nd Pg.

    Ch to All sites

    In LA/switch/

    Adj. SW.?

    Add 2nd Carrier

    to LA. Optimize LA.

  • 8/6/2019 ACO & PCO ion Procedure

    9/14

    PCH Recommended Parameter Settings and OMs

    Attached is the list of all Paging Channel related parameters and the PSP

    recommended Standardized settings. The second spreadsheet lists OMs as

    of Release 29.

    Please verify that each of these parameters are set correctly and ensure

    all Fax flashes to optimize the PCH related parameters have been

    implemented.

    A ccCh_ PgCh_Par ms Rel28_A CP_P CO

  • 8/6/2019 ACO & PCO ion Procedure

    10/14

    Process A

    Process A

    Implement Sub-MSC paging.

    Implement ISPAGE2, as needed. Do

    Not Degrade Pg. Success Rate.

    Is the ACO on

    the zone border

    sites < 20% ?

    Yes

    No

    Implement the ACO Resolution Process

    Reference Reports:

    Page Success Reports:

    (i) RFISS Excel Stats Data retrieval

    Generic Report.

    (ii) Flux

    (III) RFSM

    Page Channel Occupancy Reports:

    (i)RFISS

    (ii) Flux

    (iii) RFSM

    PCO

    Resolved ?

    Optimize Borders. Optimize LA sizes.

    Optimize paging strategy. Do not

    degrade Pg. Success rate.

    PCO

    Resolved ?

    Implement CLAC paging. Add access

    channels as needed. Do not degrade

    Pg. Success Rate.

    PCO

    Resolved ?DONE

    DONE

    DONE

    Add 2nd Pg. channel. Optimize zones

    and paging strategy. Monitor stats

    (cpcarr 240-246).

    No

    No

    Enough

    Power for 2nd

    Pg. Ch.?

    Add Carrier/s.

    Pg. Success

    Degraded?DONE

    No

    No

    No

    No

    A

    Yes

    Yes

    Yes

  • 8/6/2019 ACO & PCO ion Procedure

    11/14

    Second Paging Channel This feature introduces the ability to support up to 2 Paging

    Channels per carrier-sector. Each Paging Channel can accommodate up to six

    additional access channels Changing the number of Paging Channels is recommended

    to be performed during the maintenancewindow only.

    MOP:

    note: Deployment of this feature must be closely analyzed

    and monitored due to potential loss of capacity due

    to limited forward power availability.

    2nd_PgCh_MOP

  • 8/6/2019 ACO & PCO ion Procedure

    12/14

    Second Paging Channel: BTSEQP Form View

  • 8/6/2019 ACO & PCO ion Procedure

    13/14

    ACCESS FAILURE REASONS

  • 8/6/2019 ACO & PCO ion Procedure

    14/14

    THANK YOU