•click to edit master text styles •second level company … · 2011. 2. 28. · •click to...
TRANSCRIPT
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth levelWill Barrett
February 17, 2011
Company Presentation
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
• Founders• Jason France
• Mike Rogers
• Dave Packard
• In EV industry since 1993
• Developed 14 generations of EVSEs
• Shipped over 9,000 EVSEs in the US and Europe, including 4,500 shipped since 2009
• Numerous UL listed products, • One of the first companies through
UL1998, UL 2202 and UL 2231
ClipperCreekHistory
ClipperCreek / TS-90
Davis, CA
2009
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
• EVSE Design and Manufacturing:Electric Vehicle Supply Equipment (EVSE) for BEVs and PHEVs
• UL Listed: Three UL listed products on the market: (CS, TS and PCS)
• Utilities: Currently working with US utilities: (SCE, PG&E, Southern Company, SMUD, Pepco, Northeast Utilities, Progress Energy…)
• Automakers: Currently working with automakers and distributors in NA, Europe and Japan: (BMW, Tesla, Mercedes, Nissan, Ford, Chrysler, GM, Magna E-car, Honda, Toyota …)
Company Position
ClipperCreek / TS-90
CPUC Meeting, San Francisco, CA
2009
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Current Infrastructure Product
• CS Line Public infrastructure
product• UL Listed
• 208 V / 240 V
• 20 to 80 Amps
• Upgrades
• LibertyPlugIn synchronous
code
• Access Control
• Revenue Collection
• Cale digital pay station
code generation
• Smart Grid/WiFi/Cellular data
collection
• Local web portal
• Cloud based data
collection
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
• 20 mA CCID
• CCID self test
• Reclosure
• Load management
• Earth ground monitor
• Cold load pickup
• External control input
• External fault notification
• NEMA 4 enclosure
• 110 V to 240 V
• Models rated from 16 Amp to
100 Amp branch circuits
Current Product Specifications
ClipperCreek / TS-90
Dixon, CA
2009
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
• Delphi partnership to
provide EVSEs to
Automakers
• Silver Spring Networks partnership to provide
smart grid integrated EVSE
to Silver Spring customers
• CE Certified EVSE
• On GSA Schedule GS07F0127V
News
NorthEast Utilities
Hartford, CT
2010
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
• California Energy Commission
ClipperCreek, Inc. was chosen to replace existing infrastructure throughout the state.
Funded through
CEC AB 118
PON-09-006 Alternative and Renewable Fuel Infrastructure
• EVSE Deployment Program
ClipperCreek is partnering with the Bay Area AQMD
Big News
evchargermaps.com
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Thank YouWill Barrett
11805 Kemper RoadAuburn, CA 95603
[email protected] P530-887-8527 F
GSA Contract Number #
GS07F0127V