© Copyright 2015 OSIsoft, LLC EMEA USERS CONFERENCE 2015 Presented by Achieving Operational Efficiency by Leveraging PI System at PowerStream Vince Polsoni, PowerStream Inc.

Upload: others

Post on 31-Dec-2021

4 views

Category:

Documents


0 download

TRANSCRIPT

© Copyright 2015 OSIsoft, LLC EMEA USERS CONFERENCE 2015

Presented by

Achieving Operational Efficiency by Leveraging PI System at PowerStream

Vince Polsoni, PowerStream Inc.

© Copyright 2015 OSIsoft, LLC EMEA USERS CONFERENCE 2015

Where are we?

2

Ontario 1,068,587 km2

Texas 696,200 km2

Powerstream Service Territory • 806 km2 • 11 Municipalities • Located just North of Toronto

Powerstream Service Territory

© Copyright 2015 OSIsoft, LLC EMEA USERS CONFERENCE 2015

PowerStream Fast Facts

• 2nd Largest Municipally owned Local Distribution Co. (LDC) in Ontario, Canada

• Serving 11 Communities through Central Ontario (Serving over 1 million residents)

• 550 Employees

• 343,000 Customers : (Residential (89%) Commercial Ind. (11%) )

• Total Revenue: $788 Million

• Total Assets: $1,087.5 Million

• Overhead Circuit Wires: 2,500 km

• Underground Cable: 4,900 km

• Transformer Stations (TS’s): 11

• Municipal Substations (MS’s): 55

• Distribution Transformers: 43,000

• Switchgears: 1,800

• Poles: 40,000

• Peak Demand: 1,972 MW

• Geographical Size of Service Territory: 806 Sq. Km

• Distribution Voltages 4kV, 8kV, 13.8kV, 27.6kV and 44kV

3

© Copyright 2015 OSIsoft, LLC EMEA USERS CONFERENCE 2015

Agenda

• PI System in use at PowerStream (Operations)

• Technology and Innovation

– Equipment Monitoring

– Big Saves

– PI System Dashboards

4

© Copyright 2015 OSIsoft, LLC EMEA USERS CONFERENCE 2015

Life before PI System / Operations Reporting SCADA / CMMS / OMS / CIS / ERP / EAM / WFM

SCADA

• Data is overwritten based on frequency of data point collection in some databases (e.g. SCADA)

• Archived/Historical data is often extracted and stored in flat files (spreadsheets)

Reports Data Dumps

OMS CIS

CMMS

5

© Copyright 2015 OSIsoft, LLC EMEA USERS CONFERENCE 2015

Station Maintenance at PowerStream

– RCM2 methodology incorporated into CMMS

– Risk based Condition Based Maintenance (PI System and CMMS)

– Instant Information (true real-time)

• Instant Notifications from PI System (Real-time)

• Alerts from Computerized Maintenance Management System (CMMS) (CASCADE)

• Better Reporting and Asset Health assessments

– Automatic Maintenance Work Orders triggered by Events in SCADA via PI System and Maintenance/Inspection Reads

– Field staff aware of equipment condition/health/risk

– One data source

6

© Copyright 2015 OSIsoft, LLC EMEA USERS CONFERENCE 2015

Background - PI System at Powerstream

• July 2012

– Implementation – 5000 tags, PI ProcessBook, PI DataLink

– Justified as part of Computerized Maintenance Management System (CMMS) implementation strategy

• 2013 to 2014

– Operational reports (PI ProcessBook, PI Coresight, DataLink, PI WebParts)

– Asset Framework (AF), Templates

– Notifications

– 30,000 tags

• 2015

– Performance Equations, Data sets, Analysis, Tables

– Dashboards (PI Coresight and PI WebParts)

– PI Interfaces (CMMS, OMS, HTML, UFL)

7

© Copyright 2015 OSIsoft, LLC EMEA USERS CONFERENCE 2015

Leveraging PI System at Powerstream

• Operations Dashboards (Public Monitors, IPAD)

• Link to multiple databases/systems

– SCADA, OMS/CIS, CMMS, MicroGrid

– PI HTML Interface, PI UFL Interface

– Expand Notifications / Alerting to stakeholders (email) • Offload low level SCADA alarms through PI System

Notifications to field staff (awareness)

• AF, Performance Equations and Asset Analytics

• Next – ESRI Integrator, Forecasting, Enhanced Analytics

8

© Copyright 2015 OSIsoft, LLC EMEA USERS CONFERENCE 2015

Station Sustainment Innovation Equipment Monitoring – SEL Relays

– Online Transformer Gas in Oil Monitoring Units

• (7 Gas) DGA monitors on 55/83 MVA and 75/125 MVA transformers

• Hydrogen monitors on 5 to 20 MVA transformers

– Portable DGA testers

– Tap Changer Filtration Systems. Transformer Oil Dry-out Filtration System

– Online Bushing Monitoring Systems

– Maintenance Free Dehydrating Breathers

– Station Equipment Temperature Sensors (new 2015)

© Copyright 2015 OSIsoft, LLC EMEA USERS CONFERENCE 2015

PI System Products used at Powerstream

10

• PI ProcessBook • PI Coresight • PI WebParts • PI DataLink • PI AF • PI SMT, PI Explorer, PI ICU • PI HTML Interface • PI UFL Interface • PI RDBMS Interface • Templates

• Element • Notifications

30,000 tags

(and growing)

© Copyright 2015 OSIsoft, LLC EMEA USERS CONFERENCE 2015

PI System Explorer – AF - PowerStream

11

Elements Notification Templates Element Templates Notifications

© Copyright 2015 OSIsoft, LLC EMEA USERS CONFERENCE 2015

How PowerStream uses PI System Explorer

• Asset Framework

• Elements

– Attributes from PI Points, CMMS, OMS, web pages(HTML) and static data

– Create tags from attributes using “Analyses” tab

– Attributes used in many PI System Reports

• Library

– Notification Templates

– Tables (from OMS, CMMS)

• Notifications

– Over 1400 notifications enabled

12

© Copyright 2015 OSIsoft, LLC EMEA USERS CONFERENCE 2015

• Automatically Generate maintenance task in CMMS system based on triggers, gather data from OMS

• Basic functions (average, max, min) • Trends, calculated values, counters

• Various displays catering to different audiences • Various display tools • Drill–down user interface

• Notifications and alarms (Real-time) • Access to Reports via Notifications

Leveraging PI System for Risk Based Condition Based Maintenance

13

Real-time Alerting

Visual Reports

User Friendly

Simple Tools

Integration

© Copyright 2015 OSIsoft, LLC EMEA USERS CONFERENCE 2015

Condition Based Maintenance - Data Flow

14

SCADA PI

System CMMS

Station Equipment Analog & Status Data

CMMS Alerts (delayed)

PI Notifications (Real-time)

Firewall

PI System Reports / Dashboards (Real-time)

CMMS Work Order

Firewall

Patrols

HTML

Internet Scraping

Reads

OMS

(CMMS)

Algorithm Rules Engine

Outage Mgmt System

© Copyright 2015 OSIsoft, LLC EMEA USERS CONFERENCE 2015

SCADA – PI System – CMMS working as One

15

(from SCADA event) (from CMMS) (automatically generated)

PI Notifications CMMS Alert CMMS Work Order

PI System Report PI System Report

High

(High Water Alarm Cleared) (High Water Alarm)

© Copyright 2015 OSIsoft, LLC EMEA USERS CONFERENCE 2015

PI ProcessBook Reports - Powerstream

16

• System Demand • Geomagnetic Induced Current • Station Performance/Risk • DC System • Station Fire Alarm • Building Heating • Station Single Line Diagrams • Primary Switch Status • Under Frequency Load Shed

• Transformer • Condition (Health) • Dissolved Gas Analysis • Oil Temperature & Cooling • Tap Changer and Tap

Changer Position • Bushing Monitoring • Hydrogen Gas

• Circuit Breaker

• Status and Detailed • SF6 Status

© Copyright 2015 OSIsoft, LLC EMEA USERS CONFERENCE 2015

PI ProcessBook Reports Home Page

17

© Copyright 2015 OSIsoft, LLC EMEA USERS CONFERENCE 2015

PI ProcessBook – TS Transformer Report

Links: • Weather report • Radar Map Link

Pictures External Database/App

Trends

Animations

Gauges

Equipment Attributes

18

AF Elements

Template Report

Status

© Copyright 2015 OSIsoft, LLC EMEA USERS CONFERENCE 2015

Station Performance/Risk Reports

19

Transformer Station

Performance (Risk)

Distribution Station

Performance (Risk)

© Copyright 2015 OSIsoft, LLC EMEA USERS CONFERENCE 2015

Geomagnetically Induced Current Report

20

© Copyright 2015 OSIsoft, LLC EMEA USERS CONFERENCE 2015

Transformer Online Bushing Report

21

© Copyright 2015 OSIsoft, LLC EMEA USERS CONFERENCE 2015

Corporate / Operations Dashboards

22

© Copyright 2015 OSIsoft, LLC EMEA USERS CONFERENCE 2015 23

System Loading Dashboard

© Copyright 2015 OSIsoft, LLC EMEA USERS CONFERENCE 2015

230kV Transmission Supply Status Report

24

© Copyright 2015 OSIsoft, LLC EMEA USERS CONFERENCE 2015

Regional Demand: Current, 30 Day & Year to Date Maximums

25

© Copyright 2015 OSIsoft, LLC EMEA USERS CONFERENCE 2015

Current Outages By Region

26

© Copyright 2015 OSIsoft, LLC EMEA USERS CONFERENCE 2015

System Reliability Report using PI Coresight/PI ProcessBook

27

© Copyright 2015 OSIsoft, LLC EMEA USERS CONFERENCE 2015

Substation Interconnection – Load Transfer Report

28

© Copyright 2015 OSIsoft, LLC EMEA USERS CONFERENCE 2015

TS Transformer Criticality, Health and Risk Report

29

© Copyright 2015 OSIsoft, LLC EMEA USERS CONFERENCE 2015

Substation Distribution Transformer Hydrogen Gas Alarm Report

30

© Copyright 2015 OSIsoft, LLC EMEA USERS CONFERENCE 2015

PI ProcessBook Reports

Tap Changer

DC Systems

230 kV Primary Switch Status

Circuit Breaker Status

31

© Copyright 2015 OSIsoft, LLC EMEA USERS CONFERENCE 2015

Demand Report • Use PI System to view and notify when System Demand approaches

Powerstream’s “All-Time” peak.

32

© Copyright 2015 OSIsoft, LLC EMEA USERS CONFERENCE 2015

PI ProcessBook – Station Single Line

33

© Copyright 2015 OSIsoft, LLC EMEA USERS CONFERENCE 2015

Notifications

• Low SF6 Gas

• Current Total Outages by Region

• Station Building Temp

• DC System

• Battery Low Voltage

• Calisto 9 General Alarm

• Circuit Breaker Operation

• Transformer Online / Offline

• Transformer Oil Temp/Cooling

• Tap Changer Oil Filtration Alarm

• Feeder Protection Trip

• Secondary Breaker Operation

• Primary Switch Operation

• High Sump Water Level

34

© Copyright 2015 OSIsoft, LLC EMEA USERS CONFERENCE 2015

Outage Information Flow with PI System

35

Notifications Feeder Protection Trip

Link to view PI Coresight Report

Notifications Outage Counts by Region

Email from Outage Management System

© Copyright 2015 OSIsoft, LLC EMEA USERS CONFERENCE 2015

PI Coresight Report – System MW

36

© Copyright 2015 OSIsoft, LLC EMEA USERS CONFERENCE 2015

PI Coresight – Transformer Reports

37

Transformer Load (MW) Transformer Hydrogen and Moisture

Transformer Winding Temperature

© Copyright 2015 OSIsoft, LLC EMEA USERS CONFERENCE 2015

Big Saves - Thanks to PI System

39

© Copyright 2015 OSIsoft, LLC EMEA USERS CONFERENCE 2015

Save - 10MVA 44kV-13.8 kV Transformer

40

Notifications • Hi Winding Temperature • Hi Hydrogen Alarm

Installed a Hydrogen Gas Monitoring Unit and connected to SCADA (PI)

• $500,000 averted • No customer outages • Transformer taken out of

service before failure and replaced with spare

© Copyright 2015 OSIsoft, LLC EMEA USERS CONFERENCE 2015

Save - 75/125 MVA 230kV-27.6kV

41

© Copyright 2015 OSIsoft, LLC EMEA USERS CONFERENCE 2015

Transformer - Save

• In late 2011 noticed increased gassing from annual oil test results from laboratory.

• In early 2012 Purchased a portable DGA unit and began to test and monitor transformer oil.

• In summer 2012 implemented PI System. • In fall 2012 installed a 7 gas oil monitoring unit created tags in

PI Data Archive • Created PI Report and configured a Trigger in CMMS to monitor

gassing vs. load and oil temperature • Consulted with transformer SME’s (provided SME’s PI Server data)

42

© Copyright 2015 OSIsoft, LLC EMEA USERS CONFERENCE 2015

Comparison T3 and T4 DGA Trends

T3 (Good) T4 (Failing)

43

© Copyright 2015 OSIsoft, LLC EMEA USERS CONFERENCE 2015

Expert Systems Working in Unison

Oil Oil

Data Data

44

Data Analysis Analysis

© Copyright 2015 OSIsoft, LLC EMEA USERS CONFERENCE 2015

Increased Gassing - 2 Significant Events

Oct 20, 2012 April 19, 2013

PI Coresight PI Coresight

45

© Copyright 2015 OSIsoft, LLC EMEA USERS CONFERENCE 2015

Gassing in Transformer

PI ProcessBook, TOA4 and CASCADE CMMS

TOA4

CMMS

PI Processbook

Transformer Problem Identified

(Health and Risk)

46

Daily or

on demand

daily

© Copyright 2015 OSIsoft, LLC EMEA USERS CONFERENCE 2015

Findings

• It was found that one of the "T" connectors was not crimped during manufacturing to the copper lead.

Repair: $100,000 (Potential Failure)

Up to $2 million if unit failed catastrophically or with serious internal damage to windings or core.

47

© Copyright 2015 OSIsoft, LLC EMEA USERS CONFERENCE 2015

Expansion of PI System at PowerStream

• Corporate and Operations Dashboards

• Micro Grid Reporting

– Micro Grid Demonstration Project (PowerStream head office)

– Penetanguishene Micro Grid Project –PowerStream / KEPCO (Penetanguishene, ON, Canada)

• ESRI Integrator – GIS

• Analytics

• Potential Merger (more opportunities)

48

© Copyright 2015 OSIsoft, LLC EMEA USERS CONFERENCE 2015

Benefits of PI System

• Maintenance Optimization

• Able to accomplish a lot with minimal resources

– Fast learning curve

• YouTube, Manuals, Support, Training

• Innovation stimulant

• Instant Information to those who need it

49

© Copyright 2015 OSIsoft, LLC EMEA USERS CONFERENCE 2015

PowerStream’s Micro Grid Projects

50

• Micro Grids work in the same way as large-scale electricity delivery systems or the grid, but instead of delivering electricity to hundreds of thousands or millions of customers at a time, they can be scaled down and customized to meet the needs of communities or even just one customer.

• Micro Grids rely on a mix of clean and renewable sources of generation and can operate independently or feed electricity back to the grid.

© Copyright 2015 OSIsoft, LLC EMEA USERS CONFERENCE 2015

Micro Grid Demonstration Project

• Launched the Micro Grid demonstration project in November 2013 at its head office in Vaughan, Ontario.

• Using the project to evaluate a Micro Grid’s performance while it is connected to, and also disconnected from, the provincial grid.

51

© Copyright 2015 OSIsoft, LLC EMEA USERS CONFERENCE 2015 52

• 30 kW load

Display and analysis

• 25 kW Renewables • Solar • Wind

• 35 kW Natural Gas Generator

• 40 kWh storage • Batteries

• Lead Acid • Lithium • Na Ni CL

© Copyright 2015 OSIsoft, LLC EMEA USERS CONFERENCE 2015

Generation Assets

53

1.8 kW Wind Generator

17 kW Tracking Solar Generator 5 kW Solar

Generator (EV Car Port)

35 kW Natural Gas Generator

© Copyright 2015 OSIsoft, LLC EMEA USERS CONFERENCE 2015

Control and Storage Assets

54

© Copyright 2015 OSIsoft, LLC EMEA USERS CONFERENCE 2015

Communications and Control System

55

D400 Gateway Protocol Convertor

Smart Load Panel Transfer Switch

SCADA Server

PI ProcessBook, HMI Display Screens

PI Server

www.

Battery Systems EV Charger NG Generator

G

SMA Inverters

Modbus Ethernet

HDMI

Ethernet

© Copyright 2015 OSIsoft, LLC EMEA USERS CONFERENCE 2015

PI ProcessBook Micro Grid Display

56

© Copyright 2015 OSIsoft, LLC EMEA USERS CONFERENCE 2015

• Multiple report options • Historical data • Mobility (Smartphone, tablet)

• Notifications and alarms (Real-time)

• Intuitive Display • Various displays catering to different audiences • Drilldown user interface

PI System Benefits – Micro Grid Project

57

Real-Time Display

Notifications / Alarms

User Friendly

Simple Tools

© Copyright 2015 OSIsoft, LLC EMEA USERS CONFERENCE 2015

Penetanguishene Micro Grid – PowerStream / KEPCO Project (2016)

• Partnership between PowerStream and Korea Electric Power Corporation (KEPCO) • Installed adjacent to one of PowerStream’s Municipal Substations • Operated from PowerStream’s System Control Centre with remote monitoring using

PI System for PowerStream • Provides power to customers even when there is a loss of supply from the provincial

grid • Connected to PowerStream’s distribution feeder that provides up to 11 hours of

backup power for approximately 400 customers in Penetanguishene, ON, Canada. • Micro Grid will operate either connected to the grid (grid mode) or disconnected

from the grid (island mode) • Comprised of

– Two 500 kilowatt-hours (kWh) batteries – One 750 kilowatt power control system

• Construction underway - 2016 implementation

58

© Copyright 2015 OSIsoft, LLC EMEA USERS CONFERENCE 2015

RESULTS AND BENEFITS BUSINESS CHALLENGES SOLUTION

Summary

59

A. Optimize Maintenance practices and improve system reliability

B. Provide and utilize Operational data outside of SCADA (Operations)

C. Build Operations Dashboards and expand the use of PI System

A. SCADA to PI connectivity

B. Integrated PI System to CMMS and OMS

C. Utilize PI Notifications to alert on potential failures

D. Build Dashboards

• Real-time information to those who need it

• Increased equipment monitoring and alerting

• Information is current and consistent

• Improved Reliability and Availability

There is a constant pressure to do more with less. Improve reliability and availability. In order to achieve this, the same information needs to be made available in multiple systems.

Data turned into Information is the key to achieving Operational efficiency.

© Copyright 2015 OSIsoft, LLC EMEA USERS CONFERENCE 2015

Contact Information

60

Vince Polsoni

[email protected]

Manager Station Sustainment

PowerStream Inc.

60

© Copyright 2015 OSIsoft, LLC EMEA USERS CONFERENCE 2015 61

Questions

Please wait for the microphone before asking your questions

Please don’t forget to…

Complete the Online Survey for this session

http://eventmobi.com/emeauc15

State your name & company

© Copyright 2015 OSIsoft, LLC EMEA USERS CONFERENCE 2015

Thank You