ACHIEVEMENT REPORT
UNDER
NEDP PROJECT
2016-17
&
2017-2018
Government of Mizoram
Urban Development & Poverty Alleviation Department
Aizawl, Mizoram
2 | P a g e
FOREWARD
Urban Development and Poverty Alleviation Department is rendering its
effort towards sustainable development and growth of urban city and towns in
Mizoram through various National Schemes and missions and had achieved
remarkable outcome in the state for the welfare of urban societies especially the
weaker sections. Urban development is a big challenge for every city and state
as it invites many challenges and issues, although the state has undertaken
various kinds of actions to improve urban infrastructure and economy of urban
areas in Mizoram, no state owned specific plan, initiatives and action was
recognized in the state before the New Economic Development Policy that was
launched in 30th September 2016.
India has a total population of 1,210.2 million and out of this, 68.84% is
the population of rural areas and the urban areas comprises of 31.16%. As for
the state of Mizoram, rural population is 48.49% to the total population of the
state and the urban population is 51.51% to the total population. Mizoram’s
urban population percentage is very high as compared to the urban population
percentage of India, however; increase in urbanization is a healthy mark of the
State as the contribution of urban economy is highly crucial for the development
of the state economy as well. NEDP addresses the problem of transitional gap
that arise due to urbanization and its effect, such as transition from traditional
farming method into contemporary livelihood method, lack of infrastructure in
rural and urban areas, competition among entrepreneurs etc, all these affect the
state economy and live- ability in the state.
Keeping in mind the above mentioned issues in urban administration, The
department has taken its initiatives to have smart, clean and flourishing city and
urban towns, The Urban Development and Poverty Alleviation Department
plays an active role and is driving all urban development initiatives in Mizoram,
among which NEDP is one of the most important and effective programmes
being implemented by the department.
3 | P a g e
NEDP ALLOCATION 2016 -2017
Sl.No. Name of Scheme Amount
Rs(In lakhs)
1. Composite Infrastructure Development for
Urban Areas/ Localities schemes 1500.00
2
Urban Development:
(i) Operation and maintenance of existing
infrastructure/ equipments;
(ii) (ii) Provision of e-services/ e-offices
340.51
3 Aizawl Road junction improvement 650.00
(i) Improvement & Widening of Venghlui to
Republic Road – Pangi Junction; 95.74
(ii) Improvement of road junction atBawngkawn 283.63
(iii) Improvement of vaivakawn to Hunthar
Junction 142.20
4 Climate Change Mitigation – Sanitation and
Cleanliness Drive Component 25.00
TOTAL 2515.51
Physical and financial progress is 98%.
4 | P a g e
NEDP ALLOCATION 2017-2018
Sl.
No. Name of Schemes
Budget Estimate
Amount
Rs(In lakhs)
1 Improvement of Urban Infrastructure in the City/Towns
(UD&PA Components) 7500.00
2 Aizawl City Infrastructure Development 1500.00
3 Operation & Maintenance (Service Level) 500.00
4 Construction of Zodin Multilevel Car Parking 2500.00
5 Improvement of ATI Junction at New Secretariat 140.00
6 Climate Change Mitigation Initiatives 200.00
7 Construction of Mizoram State Convention Centre 5000.00
8 Aizawl City GIS Based Street Zoning and Signage 300.00
9. Additional fund for improvement of various connectivity in
Aizawl city 236.37
TOTAL 17876.37
5 | P a g e
Approved annual Action Plan for 2017-2018 NEDP
1) Improvement of Urban Infrastructure in the City/Towns -Rs. 7500lakh
(UD&PA Components)
Sl. No. Name of proposal Amount
(in lakh)
1
Composite urban infrastructure within Aizawl:
1) Internal roads
2) Pedestrian footpath
3) Drainage
4) Retaining wall
5) RCC Steps
6) Solid Waste Management
7) Culvert / Bridge
8) Parking
9) Other urban amenities
10) Etc.
2200.00
2
Composite urban infrastructure in city and census
towns:
1) Internal roads
2) Pedestrian footpath
3) Drainage
4) Retaining wall
5) RCC Steps
6) Solid Waste Management
7) Culvert / Bridge
8) Parking
9) Other urban amenities
10) Etc.
1510.00
3 Continuation of Pavilion & Gallery at Rajiv Gandhi
Stadium atMualpui, Aizawl 2350.00
4 Zero Waste Projects at Selected Institutions (PUC,
HATIM, ATC, and AICS) 60.00
5 Providing and laying of Artificial Turf (including
approach road atMeisatla) Siaha 650.00
6 Purchase of Garbage dumping trucks (4 nos.) 72.00
7 Completion of Directorate Office building UD&PA
Department 600.00
8 Completion of Linkages of Road from Ramhlun
South YMA Hall to main road atRamhlun South,
Aizawl
30.00
9 Construction of Road atKhatla South Vengthar
(approach road to Thlanmual via Khatla South
Vengthar Presbyterian Church)
28.00
TOTAL 7500.00
6 | P a g e
2) AizawlCity Infrastructure Development- Rs. 1500 lakh
Sl. No. Name of proposal Amount
(in lakh)
1
Junctions Improvement 50,000,000.00
i) Dinthar Junction atDawrpuiVengthar 127,87,350.00
ii) Improvement of industry pengatRamhlun North 63,38,000.00
iii) Improvement of Venghlui to Republic road on
upper Republic at Pi Pangi junction 94,05,000.00
iv) Improvement of 3rd
Bn MAP junction atATI veng
and Salem veng border 44,28,200.00
v) Improvement of Armed Veng to Chhingaveng
Junction 42,57,000.00
vi) Improvement of Kawipui junction at Republic
Veng 61,92,450.00
vii) Improvement of Magazine kawn to Armed
Veng South Hall at Armed Veng South, Aizawl 65,92,000.00
2
Construction of elevated road from
HangiLunglentlang connecting to DurtlangLeitan
(Consultancy Works)
138.14
Supply and Installation of Synthetic Athletic Track
atSerchhip Stadium 334.80
Rajiv Gandhi Stadium GST 177.06
3 Re-construction of car parking near Power House at
Electric Veng. 100.00
4 Multi level car parking at College Veng 150.00
5 Improvement & widening of roads and improvement
of traffic island at various locations of the city. 82.00
6. Construction of Pedestrian side walk with Hand
railing along the main road at Bara Bazar, Dawrpui 18
TOTAL 1500.00
7 | P a g e
3) Operation & Maintenance (Service Level) - Rs. 500lakh
Sl.No Name of proposal Amount
(in lakh)
1 Construction of Public Service Centre for EWS Housing
Complex atDurtlangLeitan 50.00
2 Repairing and maintenance of housing phase II complex at
New Secretariat Complex 30.00
3
Fencing of BSUP Housing Complex
1. Lawipu
2. Edenthar
3. Durtlang
4. Rangvamual
80.00
4 Operation and maintenance of Crematorium atSairang 20.00
5 Acoustic treatment & lighting of Community Hall atSaitual 5.00
6 Construction of Departmental Quarters with fencing
atRamthar, Lunglei 40.00
7 Construction of Departmental quarters with fencing
atKhuangpuilam, Kolasib 40.00
8 Development of Site for Proposed Re-creation Centre
atThenzawl 65.00
9 Fencing of RAY project Site at Falkland 10.00
10 Providing external water connection and external power
connection for Sports Stadium atSerchhip and Champhai 15.00
11 Construction of DUDO office atSerchhip (60 lakhs) and
Mamit (40 lakhs) 100.00
12 Repair and Renovation of Dumping grounds 45.00
TOTAL 500.00
8 | P a g e
4) Construction of Zodin Multi Level Car Parking - Rs. 2500 lakh
5) Improvement of ATI Junction at New Secretariat Complex -Rs. 140lakh
6) Climate Change Mitigation Initiatives – Sanitation and -Rs. 200lakh
Cleanliness Drive Component
7) Construction of Mizoram State Convention Centre -Rs. 5000lakh
8) Aizawl City GIS Based Street Zoning and Signage -Rs. 300lakh
9) Link Road Armed veng S to Bethlehem VT -Rs 107.43
10) LC Road at armed Veng S -Rs 9.68
11) Approach road to Chaltlang road Lily Vengcemetary -Rs 35.00
12) Reno. & black Topping of Roads between NH 54 and BSNL land at durtlang N –
Rs 39.25
13) Approach Road to SairangSaronveng road - Rs 50.00
14) Enhancement of Armed VengCom.Centre -Rs40.01
9 | P a g e
ACHIEVEMENT REPORT OF NEDP 2016 – 2017
1. Composite Infrastructure Development for Urban Areas/ Localities schemes
= Rs 1500 lakh.
The Scheme covered Aizawl city and five other District towns
LungleiChamphai, Serchhip,Kolasib and Mamit
Urban infrastructure Components mainly includes:
- Public Amenities and Utilities
- Drainage System improvement
- Improvement of Internal Roads
- RCC Culvert/Bridge
- Protection work(retaining wall)
- Vertical linkage(Masonry/RCC steps)
- Masonry/Cement Concrete Flooring.
The above said infrastructures were constructed based on the needs and
proposals from local authorities and fund was allocated among various localities in
urban areas. Mizoram, being a steep and hilly terrain, there needs to be construction
of various protection works to avoid landslide and possible disaster; moreover,
connectivity and drains in urban areas are also improved with fund received from
composite Infrastructure development fund under NEDP
Following are various works implemented under Composite Infrastructure
development for Urban area / Localities Schemes under NEDP 2016-2017 :
1. Name of Work : Construction of Link Drain near Saithanchhunga’s
house atChanmari West
2. Amount : Rs. 1,00,000.00
3. Location : Chanmari West, Aizawl
4. Status : Completed
10 | P a g e
1. Name of Work : Laying of chequered tile Near PuH.Lalmuana’s house
atChanmari West.
2. Amount : Rs. 1,00,000.00
3. Location : Chanmari West
4. Status : Completed
1. Name of Work : Laying of Chequered tile near Pu.RunaMualatChanmari
West, Aizawl
2. Amount : Rs. 1,0,000.00
3. Location : Chanmari West
4. Status : Completed
11 | P a g e
1. Name of Work : RCC Slab Culvert on DamdiaiLuihnaratEdenthar,
Aizawl.
2. Amount : Rs. 1,50,000.00
3. Location : Edenthar
4. Status : Completed
1. Name of Work : Construction of Crash barrier near Chakma House
atHunthar, Aizawl
2. Amount : Rs. 1,00,000.00
3. Location : Hunthar
4. Status : Completed
12 | P a g e
1. Name of Work : Construction of step with chequered tile near
PuR.Pakunga to Central road T-section atChanmari
West, Aizawl
2. Amount : Rs. 1,50,000.00
3. Location : Chanmari West, Aizawl
4. Status : Completed
1. Name of Work : Construction of drain near Rochungnunga’s house at,
Chanmari
2. Amount : Rs. 1,00,000.00
3. Location : Chanmari, Aizawl
4. Status : Completed
13 | P a g e
1. Name of Work : Construction of drain near Singhmuaka’s house
atChanmari, Aizawl.
2. Amount : Rs. 1,25,000.00
3. Location : Chanmari
4. Status : Completed
1. Name of Work : Construction of Drain between EdentharTuikhur to
PuHrangliana house atEdenthar
2. Amount : Rs. 1,50,000.00
3. Location : Hunthar
4. Status : Completed
14 | P a g e
1. Name Of Work : Construction of S/M Step Near PuHrangliantawna
(L) House AtZuangtui
2. Amount : Rs. 1,20,000 /-
3. Location : Zuangtui
4. Status : Completed
1. Name Of Work : Construction of Public Step atZuangtuiVengthar
2. Amount : Rs. 1,50,000 /-
3. Location : Zuangtui
4. Status : Completed
15 | P a g e
1. Name of Work : Construction of Public TuikhuratZuangtuiVengthar
2. Amount : Rs. 1,00,000 /-
3. Location : Zuangtui
4. Status : Completed
1. Name of Work : Construction of S/M step with railing near
PuLalchungnunga's house atZemabawk North
2. Amount : Rs. 1,50,000 /-
3. Location : Zemabawk North
4. Status : Completed
16 | P a g e
1. Name of Work : Construction of s/m step with railing near
PuRemliana's house atZemabawkNorth
2. Amount : Rs. 1,50,000 /-
3. Location : Zemabawk North
4. Status : Completed
1. Name of Work : Laying of chequered tile near PuLalrema'sColney
house atZemabawk North - diverted
2. Amount : Rs. 60,000 /-
3. Location : Zemabawk North
4. Status : Completed
17 | P a g e
1. Name of Work : Construction of S/M step with railing near
PuRodinga's houseatZemabawk North
2. Amount : Rs. 1,50,000 /-
3. Location : Zemabawk North
4. Status : Completed
1. Name of Work : Construction of R/Wall below Zemabawk Cemetery
2. Amount : Rs.2,00,000 /-
3. Location : Zemabawk
4. Status : Completed
18 | P a g e
1. Name of Work : Construction of S/M R/Wall on parallel road to
Bethel Veng, Zemabawk
2. Amount : Rs.1,00,000 /-
3. Location : Zemabawk
4. Status : Completed
1. Name of Work : Construction of Minor RCC slab Culvert between
Thlanmual& Middle School Mual(Approach to
Supply peng)
2. Amount : Rs.95,000 /-
3. Location : Zemabawk
4. Status : Completed
19 | P a g e
1. Name of Work : Construction of minor RCC slab culvert near
PuLalrinfela's house at Middle School Veng,
Zemabawk(Approach to Supply peng)
2. Amount : Rs.1,08,000 /-
3. Location : Zemabawk
4. Status : Completed
1. Name of Work : Construction of link drain near Primary School at
Bung Bangla
2. Amount : Rs.1,50,000 /-
3. Location : Zemabawk
4. Status : Completed
20 | P a g e
1. Name of Work : Construction of Culvert near Upper Primary School
atZemabawkBerawLui
2. Amount : Rs.1,50,000 /-
3. Location : Zemabawk
4. Status : Completed
1. Name of Work : Construction of link drain on approach to RC road
near A.Ralmana house atDurtlangLeitanDIVERTED
2. Amount : Rs.150,000 /-
3. Location : DurtlangLeitan
4. Status : Completed
21 | P a g e
1. Name of Work : Construction of step near PuThanchhunga house
atDurtlangRamthar
2. Amount : Rs.1,30,000 /-
3. Location : DurtlangLeitan
4. Status : Completed
1. Name of Work : Construction Of Slab Culvert Below Pu
Hmangaihzuala House AtDurtlangRamthar
2. Amount : Rs.2,00,000 /-
3. Location : DurtlangLeitan
4. Status : Completed
22 | P a g e
1. Name of Work : Construction of RCC Step Cover Drain at Shalom
Veng.
2. Amount : Rs.5,00,000/-
3. Location : Bawngkawn
4. Status : Completed
1. Name of Work : Construction of S/M Step atBawngkawn
Thlanmual
2. Amount : Rs.1,50,000 /-
3. Location : Bawngkawn
4. Status : Completed
23 | P a g e
1. Name of Work : Construction of PCC Flooring with Turning Point
at Salvation Army Church Road atThuampui
West, Aizawl
2. Amount : Rs.2,50,000/-
3. Location : Thuampui
4. Status : Completed
24 | P a g e
1. Name of Work : Construction Of Retaining Wall Near KT
Lalrikhuma'sHouse atThuampui
2. Amount : Rs.2,00,000 /-
3. Location : Thuampui
4. Status : Completed
25 | P a g e
1. Name of Work : Construction of Culvert Near Boupena House At
Thuampui
2. Amount : Rs.2,00,000 /-
3. Location : Thuampui
4. Status : Completed
26 | P a g e
1. Name of Work : Construction Of Steel Hand Railing at Golden
Jubilee Road,ElectricVeng
2. Amount : Rs.1,00,000 /-
3. Location : Electric Veng
4. Status : Completed-
27 | P a g e
1.Name of Work : Reparing Of Side Drain Near St. Mary Church At
Electric Veng
2. Amount : Rs.1,00,000 /-
3.Location : Electric Veng
4. Status : Completed
28 | P a g e
1. Name of Work : Repairing of Step at Electric Vengchung To
Presbyterian Churchat Electric Veng -Diverted
2. Amount : Rs.1,00,000 /-
3. Location : Electric Veng
4. Status : Completed
29 | P a g e
1. Name of Work : Construction of Step Between Pu J.Lungawia
House and PuDosavunga House At Electric Veng
Diverted
2. Amount : Rs.1,50,000 /-
3. Location : Electric Veng
4. Status : Completed
30 | P a g e
1. Name of Work : Construction Of Steel Hand Railing at
PuVanlalngena (L) House ToLalchungnunga House
At Electric Veng
2. Amount : Rs.1,00,000 /-
3. Location : Electric Veng
4. Status : Completed
31 | P a g e
1. Name of Work : Construction of Step over Drain between
J.Dengdailova House and K.Lalhmuaka House at
Electric Veng
2. Amount : Rs.3,50,000 /-
3. Location : Electric Veng
4. Status : Completed
32 | P a g e
1. Name of Work : Construction of Link Road Thlanmual To
Pi R.Zamawii Ram Mawng
2. Amount : Rs.4,00,000 /-
3. Location : Falkland
4. Status : Completed
1. Name Of Work : Construction Of Pavillion For Volleyball Court At
Falkland
2. Amount : Rs.1, 50,000 /-
3. Location : Falkland
4. Status : Completed
33 | P a g e
1. Name Of Work : Construction of RCC Slab covering of Side Drain
fromZarkawtKawn to PuLalrinawma House
atZarkawt
2. Amount : Rs.1,50,000 /-
3. Location : Zarkawt
4. Status : Completed
34 | P a g e
1. Name of Work : Construction Of Footpath With Side Drain In Front
ofPuRamhermawia House AtZarkawt
2. Amount : Rs.2,50,000 /-
3. Location : Zarkawt
4. Status : Completed
35 | P a g e
1. Name of Work : Construction Of Steel Hand Railing From Zarkawt
Kawn to PuZamliana House PwdTlang
2. Amount : Rs.1,30,000 /-
3. Location : Zarkawt
4. Status : Completed
36 | P a g e
1. Name Of Work : Construction of Drain Cover Near PuZalawma(L)
House atZarkawt
2. Amount : Rs.1,30,000 /-
3. Location : Zarkawt
4. Status : Completed
37 | P a g e
1. Name Of Work : Laying of Chequered Tile from Ahimsa Hotel to
PuThangchuanga House atZarkawt
2. Amount : Rs.1,00,000 /-
3. Location : Zarkawt
4. Status : Completed
1. Name of Work : Construction of side drain near PuRolawma's house.
2. Amount : Rs 1,50,000.00
3. Location : RamhlunVenglai
4. Status : Completed
38 | P a g e
1. Name of Work : Construction of step hand railing revelation near Pu LR
Dama's house
2. Amount : Rs 1,20,000.00
3. Location : RamhlunVenglai
4. Status : Completed
1. Name of Work : Construction of side drain near PuLalhmingliana's
house.
2. Amount : Rs 1,50,000.00
3. Location : RamhlunVenglai
4. Status : Completed
39 | P a g e
1. Name of Work : Construction of R/wall below PuVanlalsangaPachuau
house.
2. Amount : Rs 2,00,000.00
3. Location : Ramhlun Sport Complex.
4. Status : Completed
1. Name of Work : Construction of retaining wall for protection Laipuitlang
landslide at Upper lane
2. Amount : Rs 1,50,000.00
3. Location : Laipuitlang
4. Status : Completed
40 | P a g e
1. Name of Work : Construction of step between Rev.Zolawma's and Pu
Hrangchhuana's house.
2. Amount : Rs 1,50,000.00
3. Location : AizawlVenglai
4. Status : Completed
1. Name of Work :Construction of PCC florring approach road from
H.BuanaTuikhur to SL Zamveli's house.
2. Amount : Rs 2,00,000.00
3. Location : RamhlunVengthar
4. Status : Completed
BEFORE AFTER
AFTER
41 | P a g e
1. Name of Work : Repairing of Step and laying of Chequered tile near Pu
Bawichhunga house.
2. Amount : Rs 1,00,000.00
3. Location : RamtharVeng.
4. Status : Completed
1. Name of Work : Construction of hand railing and step on approach to
YMA Hall near PuHrangchhuana's house.
2. Amount : Rs 3,00,000.00
3. Location : AizawlVenglai
4. Status : Completed
42 | P a g e
1. Name of Work : Repairing of Step and Laying of Chequered tile near
Zirtiri College atAizawlVenglai.
2. Amount : Rs 1,00,000.00
3. Location : AizawlVenglai
4. Status : Completed
BEFORE
AFTER
43 | P a g e
1. Name of Work : Construction of step near PuChawngzidinga's house.
2. Amount : Rs 1,00,000.00
3. Location : RamhlunVengthar
4. Status : Completed
1. Name of Work : Construction of hand railing between PuSangthanga's
house and PuLaltanpuis's house
2. Amount : Rs 1,00,000.00
3. Location : Ramhlun South
4. Status : Completed
44 | P a g e
1. Name of Work : Construction of S/M step with laying of chequered tile
and hand railing near Salvation Church.
2. Amount : Rs 1,50,000.00
3. Location : RamtharVeng.
4. Status : Completed
1. Name of Work : Construction of S/M retaining wall & hand railing near
PuChhuanawmatuikhur.
2. Amount : Rs 1,50,000.00
3. Location : Ramhlun South.
4. Status : Completed
45 | P a g e
1. Name of Work : Construction of R/Wall near Pi Tawii(L) house.
2. Amount : Rs 1,50,000.00
3. Location : Laipuitlang
4. Status : Completed
1. Name of Work : Continuation for construction of drain near Ramhlun
South High School.
2. Amount : Rs 4,00,000.00
3. Location : Ramhlun South.
4. Status : Completed
46 | P a g e
1. Name of Work : Construction of steel handrailing near Taxi Stand.
2. Amount : Rs 1,00,000.00
3. Location : RamtharVeng
4. Status : Completed
1. Name of Work : Construction of step hand railing near Pu LR Dama's
house.
2. Amount : Rs 1,20,000.00
3. Location : RamhlunVenglai.
4. Status : Completed
47 | P a g e
1. Name of Work : Construction of footpath near Presbyterian Church.
2. Amount : Rs 3,00,000.00
3. Location : RamtharVeng.
4. Status : Completed
1. Name of Work : Construction of step over drain between PuJ.Zahaua
house to PuR.Thangzuala house.
2. Amount : Rs 3,00,000.00
3. Location : Ramhlun Sport Complex.
4. Status : Completed
48 | P a g e
1. Name of Work : Construction of side drain from PuT.Remmawia's house
to Rehabilitation Centre.
2. Amount : Rs 1,50,000.00
3. Location : Ramhlun Sport Complex.
4. Status : Completed
1. Name of Work : New construction of step between Dr.Palaia and Pu
V.Vanlawma's house.
2. Amount : Rs 1,00,000.00
3. Location : RamtharVeng.
4. Status : Completed
49 | P a g e
1. Name of Work : Retaining wall near RamtharTlangveng Taxi Stand.
2. Amount : Rs 1,00,000.00
3. Location : RamtharVeng.
4. Status : Completed
1. Name of Work : Continuation for construction of Tile Pavement on
internal road.
2. Amount : Rs 9,00,000.00
3. Location : Ramhlun South Vengchhak
4. Status : Completed
50 | P a g e
1. Name of Work : Construction of step with hand railing from PC
Zonunsanga's house to H.BuanaTuikhur.
2. Amount : Rs 2,00,000.00
3. Location : RamhlunVengthar.
4. Status : Completed
51 | P a g e
1. Name of Work : Re-Construction of drain near PuLalromana’s house.
2. Amount : Rs 1,00,000.00
3. Location : Ramthar North.
4. Status : Completed
BEFORE
52 | P a g e
1. Name of Work : Laying of chequered tile from PuBiaka's house to
Edenthar area atChaltlangTatkawngveng.
2. Amount : Rs. 2,00,000.00
3. Location : Chaltlang.
4. Status : Completed.
53 | P a g e
1. Name of Work : Repairing of Chequered tile between Pu
Laldingliana’s House and Ramhlun road at
ChaltlangTatkawngVeng.
2. Amount : Rs 2,50,000.00
3. Location : Chaltlang.
4. Status : Completed.
54 | P a g e
1. Name of Work : Laying of chequered tile from Adinga's house to
ZotuiatTatkawngVeng.
2. Amount : Rs 1,00,000.00
3. Location : Chaltlang
4. Status : Completed
1. Name of Work : Construction of R/Wall below LalremlianiRalte
house atChaltlang
2. Amount : Rs1,50,000.00
3. Location : Chaltlang
4. Status : Completed
55 | P a g e
1. Name of Work : RCC balcony for widening of road near
Lalchhanhimi's house atChaltlangVenglai
2. Amount : Rs3,00,000.00
3. Location : Chaltlang
4. Status : Completed
1. Name of Work : Continuation of pedestrian footpath near
Hrangbana Petrol pump atChaltlang Lily Veng
2. Amount : Rs7,00,000.00
3. Location : Chaltlang North
4. Status : Completed
5. S
t
a
t
u
s
:
1.
56 | P a g e
1. Name of Work : Construction of step and side drain near
PuKawlhlira house Lily vengJeepable road to
Thlanmual step(Diverted)
2. Amount : Rs1,00,000.00
3. Location : Chaltlang North
4. Status : Completed
1. Name of Work : Construction of step near PuT.Siama house
atDurtlangMualVeng
2. Amount : Rs1,50,000.00
3. Location : Durtlang
4. Status : Completed
57 | P a g e
1. Name of Work : Construction of R/Wall near PuV.Manliana house
atDurtlangMualVeng(Diverted)
2. Amount : Rs2,00,000.00
3. Location : Durtlang
4. Status : Completed
58 | P a g e
1. Name of Work : Construction of step between ChhuahlamTuikhur to
Zuangtui road atSelesih
2. Amount : Rs1,20,000.00
3. Location : Selesih
4. Status : Completed
59 | P a g e
1. Name of Work : Continuation of chequered tile atZoramthara Road
atSelesih
2. Amount : Rs 1,00,000.00
3. Location : Selesih
4. Status : Completed
1. Name of Work : Laying of chequered tile between Presbyterian
Church to PWD road atSihphirVenghlun
2. Amount : Rs1,50,000.00
3. Location : SihphirVenghlun
4. Status : Completed
60 | P a g e
1. Name of Work : Construction of S/M Step between M/S -I Arpu to
PuLalramlawma house atSihphir
2. Amount : Rs2,00,000.00
3. Location : Sihphir
4. Status : Completed
61 | P a g e
1. Name of Work : Repairing of Step & drain near PuC.Liankima (L)
house atBawngkawn 'S'
2. Amount : Rs 3,00,000.00
3. Location : Bawngkawn South.
4. Status : Completed
62 | P a g e
1. Name of Work : Construction of drain cover near Vety Side Office
atBawngkawn 'S'
2. Amount : Rs50,000.00
3. Location : Bawngkawn South.
4. Status : Completed.
1. Name of Work : Construction of hand railing near Pu
CB.Thanghluta’sHouseatBawngkawn 'S'
(Diverted)
2. Amount : Rs80,000.00
3. Location : Bawngkawn South.
4. Status : Completed.
63 | P a g e
1. Name of Work : Construction of side drain near PuLalbiakthuama’s
house atBawngkawn 'S'
2. Amount : Rs1,00,000.00
3. Location : Bawngkawn South.
4. Status : Completed
64 | P a g e
1. Name of Work : Construction of step for approach to Seven day
Church atDurtlang North
2. Amount : Rs1,50,000.00
3. Location : Durtlang North.
4. Status : Completed
1. Name of Work : Construction of R/Wall near Rotlinga's house at
Durtlang North
2. Amount : Rs2,00,000.00
3. Location : Durtlang North.
4. Status : Completed
:
65 | P a g e
1. Name of Work : Laying of C.Tile between Community Hall and
College Road atRamhlun North.
2. Amount : Rs1,98,000.00
3. Location : Ramhlun North.
4. Status : Completed
1. N
ame
of
Wor
k
:
Con
stru
ctio
n of
66 | P a g e
footpath with hand railing near Pu John Biakliana's house
at Industry Mual
2. Amount : Rs63,000.00
3. Location : Ramhlun North.
4. Status : Completed
67 | P a g e
1. Name of Work : Construction of RCC footpath near Damhlia's
house at Basic Mual
2. Amount : Rs1,20,000.00
3. Location : Ramhlun North.
4. Status : Completed
68 | P a g e
1. Nameof Work : Construction of step with chequered tile near PuSapluta(L)
house at Armed veng
2. Location : Armed veng
3. Amount : Rs 80,000.00
4. Status : Completed
1. Name of Work : Construction of step and R/WallbetweenK.Liankunga
house to Phirthanga house atArmedveng
2. Location : Armed veng
3. Amount : Rs 2,00,000.00
4. Status : Completed
69 | P a g e
1.Name of Work : Reparing of Footpath and hand railing near Dawrpui
Presbyterian church atDawrpui
2.Location : Dawrpui
3.Amount : Rs 50,000.00
4.Status : Completed
1. Name of Work : Construction of s/m R/Wall from Nazareth English
School to Vengthar main road atChhingaveng
2. Location : Chhingaveng
3. Amount : Rs 1,50,,000.00
4. Status : Completed
70 | P a g e
1. Name of Work: - Laying of Chequered tile on existing step from Thangveli
house and C.Lalbiakthanga house.
2. Location :SaronVeng, Aizawl.
3. Amount :Rs. 80,000.00
4. Status : Completed.
1. Name of Work: - Repairing of Steps and side drain at P&E transformer to Pi
Sangzuali’s house.
2. Location :ChiteVeng, Aizawl.
3. Amount :Rs. 1,00,000.00
4. Status : Completed.
1. Name of Work: Construction of
R/Wall for Chhuanliana BVT road.
2. Location : Bethlehem Vengthlang, Aizawl.
71 | P a g e
3. Amount :Rs. 2,50,000.00
4. Status : Completed.
5. Name of Work : Construction of Step near JH.Rokamlova’s house.
6. Location : Tuithiang, Aizawl.
7. Amount : Rs. 1,50,000.00
8. Status : Completed.
72 | P a g e
1. Name of Work : Construction of step from VenglaiTuikhur to Upa
Vanlalsiama’s house.
2. Location :Tuithiang, Aizawl.
3. Amount : Rs. 2,00,000.00
4. Status : Completed.
1. Name of Work : Repairing andrenovate of tennis court bus stand at
Tuikualsouth
2.Amount : Rs 1,50,000.00
3.Location : Khatla East, Aizawl
4.Status : Complete
73 | P a g e
1.Nameof Work : Renovation of Tuichhunchhuah waiting shed at Tu8ikual
South
2.Amount : Rs 50,000.00
3.Location : Tuikual South, Aizawl
4.Status : Complete
1.Nameof Work : Re-Construction of SakhisihTuikhurat model veng, aizawl
2.Amount : Rs 2,50,000.00
3.Location : model veng, Aizawl
4.Status : Complete
74 | P a g e
1.Nameof Work : Construction off motor turning point approach to
Thlanmualatmaubawk
2.Amount : Rs 2,50,000.00
3.Location : Maubawk, Aizawl
4.Status : Complete
1.Nameof Work : Construction off R/Wall and Hand railing below CP road
near Thlanmualattuikual ‘S’
2.Amount : Rs 1,00,000.00
3.Location : Tuikual ‘S’, Aizawl
4.Status : Complete
75 | P a g e
1.Nameof Work : Re-Construction of public step near Pu Joseph L.Ralte
house atchawnpui
2.Amount : Rs 9,00,000.00
3.Location : Chawnpui, Aizawl
4.Status : Complete
1.Nameof Work : Construction of hand railing between Gosenpeng to YMA
run at Tlangnuam VT
2.Amount : Rs 1,50,000.00
3.Location : TlangnuamVt, Aizawl
4.Status : Complete
76 | P a g e
1.Nameof Work : Construction ofPCCFlooringat Rangvamual
Sairangkawnghlui near Prresbyteerian church
2.Amount : Rs 1,00,000.00
3.Location : Rangvamual, Aizawl
4.Status : Complete
1.Nameof Work : Continuation of cement concrete flooring for approach to
hlimen H/S vengchungat
2.Amount : Rs 2,50,000.00
3.Location : HLIMEN, Aizawl
4.Status : Complete
77 | P a g e
1.Name of Work : Construction of RCC slab between primary school to
middle school road atlawipu
2.Amount : Rs 1,50,000.00
3.Location : Lawipu, Aizawl
4.Status : complete
1.Nameof Work : Construction of side Drain near Zonuam Police outpost at
Zonuam
2.Amount :Rs 1,00,000.00
3.Location : Zonuam, Aizawl
4.Status : Complete
78 | P a g e
1.Nameof Work : Construction of Step below Rotuaki house atkulikawn
2.Amount : Rs 2,00,000.00
3.Location : Kulikawn, Aizawl
4.Status : Complete
1.Nameof Work : Construction of culvert with hand railing below
PuVanlawma’s house atKhatla ‘E’
2.Amount : Rs 3,00,000.00
3.Location : Khatla ‘E’, Aizawl
4.Status : Complete
79 | P a g e
1.Nameof Work : Laying of Chequered tile near Presbyterian church at
vaivakawn
2.Amount : Rs 1,00,000.00
3.Location : Vaivakawn, Aizawl
4.Status : Complete
1.Nameof Work : Construction of step from anganwadicentre to health
centreatTuikhuahtlang
2.Amount : Rs 2,00,000.00
3.Location : Tuikhuahtlang, Aizawl
4.Status : Complete
80 | P a g e
1.Nameof Work : Construction of RCC flooring between kangthelhkawn to
H.Lalruata house atchawnpui
2.Amount : Rs 1,00,000.00
3.Location : Chawnpui, Aizawl
4.Status : Complete
1.Nameof Work : Laying of Chequered tile near chawnpuivengthlang
Presbyterian church atchawnpui
2.Amount : Rs 1,00,000.00
3.Location : Chawnpui, Aizawl
4.Status : Complete
81 | P a g e
2 . Infrastructure development (Operation and Maintenance) = Rs 340.51 lakh
(i) Improvement of service level in city and Towns-Rs 285.51 lakh
(ii) Provision of e-Office/e Service-Rs 40 lakh
(iii) Furnishing of AIST Accomodation- Rs 15.00 lakh
Under Infrastucture Development ( Operation and Maintenance) various urban
infrastructures were maintained and developed, Community assets were created,
maintained, renovated and requirements were met through fund from NEDP by the
Department, with developing urban economy, transformation and increase in
population , various challenges arise in urban towns and city in Mizoram, such as
issues on urban economy, issues on urban sanitation, issues on urban poverty and
transportation etc and the Department is giving its effort to meet the needs of
urbanites and its welfare through this State Flagship programme NEDP.
Photographs of various Works implemented under Infrastructure development
(Operation and Maintenance) NEDP are as follows:
(i) Improvement of service level in city and Towns-Rs 285.51 lakh
Repair and renovation of Dumping ground atKhawzawlRs 5 lakh
86 | P a g e
Improvement of internal link Road from rev Vanlalauva’s House to Mission for
Christ Junction atdurtlangLeitan South Rs 35 lakh
87 | P a g e
Improvement of RCC elevated Public Road near PlaygroudatTlangnuam,
Aizawl (Phase –I& 1I) diversion Rs 35 lakh(2016-2017)+ Rs 35 lakh
(2017-2018) = Total Rs 70 lakh
91 | P a g e
(iii) Provision of e-Office/e Service-Rs 40 lakh :
e-service facility and inaugurated by PuZodintluanga, Hon’ble Minister, UD&PA
on15th November, 2016. e- office was introduced in the office of Directorate of UD & PA department under operation and
maintenance, NEDP 2016-2017, The e- office is expected to benefit the department in better service
delivery, efficiency & cost reduction, besides, modern technology such as mobile apps which has
developed during the last five years has become very essential and benefits the government servants
in implementation of various National and state Missions/Schemes in a faster and effective manner.
3. Aizawl Road Junction improvement = Rs 650 lakh
92 | P a g e
Urbanization has led to an increase in business centers, various urban
constructions and moveable assets like public and private vehicles, without proper
planning and traffic management, a city become congested and cause difficultiesin
movement within the city, to resolve the issues encountered byAizawl city,
Aizawl city junction improvement project was initiated in the year 2016-2017
under NEDP.This is the pet project of hon’ble minister UD & PA department, and
the project was headed by UD & PA department, various departments such as
public Works department, Public Health Engineering Department and Service
Provider like BSNL etc are coordinating enthusiastically for the success of this
project. This project has benefitted public by resolving various traffic problems
that has emerged inaforementioned junctions.
1. Name of Work : Improvement & Widening of Venghlui to
Republic Road – Pangi Junction;
1. Amount : Rs. 95.74 lakh
2. Location : Republic veng
3. Status : Completed
93 | P a g e
1. Name of Work : Improvement of Bawngkawn Junction
2. Amount : Rs. 283.63 lakh
3. Location : Bawngkawnveng
4. Status : completed
94 | P a g e
1. Name of Work : Improvement of Vaivakawn to Hunthar junction
2. Amount : Rs. 142.20 lakh
3. Location : Huntharveng
4. Status : completed
95 | P a g e
4. Climate Change Mitigation – Sanitation and Cleanliness Drive Component -Rs
25lakh
Enormous increase in population,
urbanization and lack of awareness among
public results in an increase in urban waste,
these, without proper management and
treatment can hamper the urban health,
environment and can become very harmful for
environment and an obstacle for the growth of
the city and for future generations. This
requires an infrastructure, scientific treatment
of waste as well as an awareness among the
urbanites as cleanliness can only be achieved
through people’s participation and is a contribution everyone has to make, to tackle
this issues of major environmental concern, the department is initiating projects for
solid waste management through SBM Mission and funding from various sources and
as a means of convergence mission, Urban development and poverty alleviation
Department had instigated Sanitation and Cleanliness drive in all covered Urban
towns and Districts. Through this motive under NEDP 2016-2017, many urbanites
were educated and were made aware of environmental conservation.
Pic: Activities of Sanitation & Cleanliness drive in urban city and Towns
100 | P a g e
BEFORE
AFTER
ACHIEVEMENT OF NEDP 2017-2018
1. Improvement of urban Infrastructure in the city/towns (UD&PAComponents)
Rs 7500
Composite Urban Infrastructure within AizawlRs 2200 lakh
Composite urban Infrastructure in City and towns Rs 1510 lakh
Following are various developmental works and construction of basic
necessities such as Internal roads, Pediastrian footpath, Drainage, retaining wall, RCC
steps, Culverts and other Urban amenities undertaken in Urban areas in the year 2017-
2018,NEDP.
1. Name of work : Laying of chequered tile and construction of hand railing
near Primary School –I.
2. Location : Armed Veng South, Aizawl.
3. Amount : Rs 2,39,700.00
4. Status : Completed
1. Name of work : Construction of Culvert near PuBiakthanga’s
house .
2. Location : Armed Veng South, Aizawl.
3. Amount : Rs 56,000.00
4. Status : Completed
101 | P a g e
BEFORE AFTER
1. Name of work : Construction of Step with hand railing near Pu
Dangpuia’s house.
2. Location : Armed Veng South, Aizawl.
3. Amount : Rs 1,71,700.00
4. Status : Completed
AFTER
1. Name of work : Construction of rigid pavement near Pu
Laldailova’s house.
2. Location : Armed Veng South, Aizawl.
3. Amount : Rs 4,39,000.00
4. Status : Completed
BEFORE AFTER
102 | P a g e
1. Name of work : Laying Chequered tile flooring near Pi Saibulliani’s
house to PuDawltea’s house.
2. Location : Armed Veng South, Aizawl.
3. Amount : Rs 1,92,300.00
4. Status : Completed
BEFORE AFTER
BEFORE (Contd.) AFTER (Contd.)
103 | P a g e
1. Name of work : Construction of PCC pavement from Hnam Ro
Chawisang Pawl Building to PuK.Zothantluanga
(L) house - Block I.
2. Location : Dawrpui, Aizawl.
3. Amount : Rs1,27,300.00
4. Status : Completed
BEFORE AFTER
1. Name of work : Construction of PCC pavement from Hnam Ro
Chawisang Pawl Building to PuK.Zothantluanga
(L) house - Block II .
2. Location : Dawrpui, Aizawl.
3. Amount : Rs 54,300.00
4. Status : Completed.
104 | P a g e
BEFORE AFTER
1. Name of work : Construction of side drain cover for widening of
road from Pi Manliani (L) house to PuDingluaia’s
house.
2. Location : Dawrpui West, Aizawl.
3. Amount : Rs 2,24,600.00
4. Status : Completed.
BEFOREAFTER ( Drain)
AFTER (Drain cover)
105 | P a g e
1. Name of work : Laying of Chequered tile near UpaRokamlova’s
house (Church street).
2. Location : Dawrpui, Aizawl.
3. Amount : Rs 48,100.00
4. Status : Completed.
BEFORE AFTER
1. Name of work : Laying of Chequered tile & construction of steel hand
railing near PuV.Thanga (L) house.
2. Location : Dawrpui, Aizawl.
3. Amount : Rs 3,34,500.00
4. Status : Completed.
106 | P a g e
BEFORE AFTER
1. Name of work : Laying of Chequered tile on existing step from Pu
Johana’s house to TuikualSairang Road.
2. Location : Dawrpui West, Aizawl.
3. Amount : Rs 1,20,300.00
4. Status : Completed.
BEFORE AFTER
1. Name of work : Construction of R/Wall near PuHrangliana’s house
2. Location : Armed Veng, Aizawl.
3. Amount : Rs1,31,400.00
4. Status : Completed
107 | P a g e
Name of Work : Construction of R/Wall near UPS School.
Location : Chite, Aizawl.
Amount : Rs. 2,54,700.00
Status : Completed.
AFTER
BEFORE
108 | P a g e
1. Name of Work : Construction of Drain with cover from
PuBawihlawra (L) house to Lamhnaituikhur.
2. Location : Venghlui, Aizawl.
3. Amount : Rs. 2,00,000.00
4. Status : Completed.
AFTER
BEFORE
109 | P a g e
1. Name of Work : Construction of PCC Pavement near PuHanga
Colony road.
2. Location : Venghlui, Aizawl.
3. Amount : Rs. 2,00,000.00
4. Status : Completed.
BEFORE
AFTER
110 | P a g e
1. Name of Work : Construction of RCC Footpath with hand railing
near PuRobina house.
2. Location : Venghlui, Aizawl.
3. Amount : Rs. 2,00,000.00
4. Status : Completed.
BEFORE
111 | P a g e
1. Name of Work : Construction of Hand railing from Venghlui main
road to PuK.Lalhuma house to PuBawilawra(L)
house.
2. Location : Venghlui, Aizawl.
3. Amount : Rs. 50,000.00
4. Status : Completed.
BEFORE
BEFORE
112 | P a g e
1. Name of Work: Construction of RCC Drain near PuBiakzuala and
PuLalengkima house.
2. Location :Venghlui, Aizawl.
3. Amount :Rs. 1,50,000.00
4. Status : Completed.
AFTER
AFTER
BEFORE
113 | P a g e
1. Name of Work: Laying of Chequered tile between Vanlalhlana house to
Aizawl Central Hall.
2. Location :Venghlui, Aizawl.
3. Amount :Rs. 50,000.00
4. Status : completed
114 | P a g e
5. Name of Work: Construction of PCC Pavement BELOW PuLaldingliana
house.
6. Location :Venghlui, Aizawl.
7. Amount :Rs. 1,50,000.00
8. Status : Completed.
AFTER
BEFORE
115 | P a g e
1. Name of Work : Construction of Chequered tile near Pi Zoliani
house to Pi Vanlalsawmmi house atTuikual N’
2. Amount : ~ 60,000.00
3. Location : Tuikual N’
4. Status : Completed
116 | P a g e
1. Name of Work : Construction of side drain near PuArona
house to Pi Sangliani house atTuikual N’
(2017-2018)
2. Amount : ~ 40,000.00
3. Location : Tuikual N’
4. Status : Completed
117 | P a g e
1. Name of Work : Construction of Chequered tile near IKK (Var)
Church atTuikual N
2. Amount : ~ 40,000.00
3. Location : Tuikual N’
4. Status : Completed
118 | P a g e
1. Name of Work : Construction of Pcc Flooring from HV
Lalhmachhuana house at Salem Veng
2. Amount : ~2,00,000.00
3. Location : Salem Veng
4. Status : Completed
\
1. Name of Work : Construction of step below PuLallungmuana
house for approach to Zoremsiami house at
DawrpuiVengthar
2. Amount : ~2,00,000.00
3. Location : DawrpuiVengthar
4. Status : Completed
119 | P a g e
1. Name of Work : Construction of step and hand railing on
approach to MaipawlTuikhuratDawrpui
Vengthar
2. Amount : ~1,00,000.00
3. Location : DawrpuiVengthar
4. Status : Completed
1. Name of Work : Construction of hand railing near Zamliana house
at Mission Vengthlang (2017-2018)
2. Amount : ~1,00,000.00
3. Location : Mission Vengthlang
4. Status : Completed
120 | P a g e
1. Name of Work : Construction of PCC flooring from Lalkima
house to Huliana house at Salem Veng
2. Amount : ~2,00,000.00
3. Location : Salem Veng
4. Status : Completed
121 | P a g e
1. Name Of Work : Construction Of Hand Railing Approach To
Basketball Court Atzemabawk
2. Amount : Rs100,000/-
3. Location : Zemabawk North
4. Status : Completed
122 | P a g e
1. Name Of Work : Pcc Flooring And Construction Of Retaining Wall
Athmangaihnaveng Road Below High School Road
AtZemabawk
2. Amount : Rs500,000/-
3. Location : Zemabawk
4. Status : Completed
1. Name Of Work : Construction Of R/Wall Above Lily Veng
GraveyardAtChaltlang North
2. Amount : Rs500,000/-
3. Location : Chaltlang North
4. Status : Completed
123 | P a g e
1. Name Of Work : Construction And Repairing Of Existing
Step Between Biakdailova And
PuLalthanhawla’s House AtZarkawt
2. Amount : Rs300,000/-
3. Location : Zarkawt
4. Status : Completed
\
1. Name Of Work : Construction Of R/W Approach To
Hebraiveng, Falkland
2. Amount : Rs100,000/-
3. Location : Falkland
4. Status : Completed
124 | P a g e
5. Name Of Work : Pcc Flooring Of Internal Road Water Bank Road
6. To Thlanmual Road At Falkland
7. Amount : Rs500,000/-
8. Location : Falkland
9. Status : Completed
1. Name Of Work : Construction Of Side Drain From Pukawlsailova
House To Puchalmawii House, Galilee Veng,
Zemabawk
2. Amount : Rs150,000/-
3. Location : Zemabawk
4. Status : Completed
125 | P a g e
Continuation of Pavilion & Gallery at Rajiv Gandhi Stadium atMualpui,AizawlRs
2350.00 lakh:
In pursuance of commitment made by the Hon’ble Chief Minister to enhance
seating capacity of Rajiv Gandhi Stadium at Mualpui, The Department had pursued
the work by utilizing the service of Great Sport Infra Co. which is the leading sport
infrastructure company, the seating capacity has now wnhanced with 14570 seats
from NEDP 2016-2017.
127 | P a g e
Completion of Linkages of Road from Ramhlun south YMA Hall to
main road atRamhlun South, AizawlRs 30 lakh
128 | P a g e
Construction of Road atKhatla South Vengthar (approach road to
Thlanmual via Khatla South Vengthar Presbyterian Church) Rs 28 lakh
129 | P a g e
2. Aizawl city Infrastructure Development:
Junction improvement atDinthar Junction atdawrpuivengthar
130 | P a g e
Supply and Installation of Synthetic Athletic track atSerchhip stadium-
Rs 334.80 lakh:
131 | P a g e
3. Operation and Maintenance ( Service Level) Rs 500 Lakh
Operation and Maintenanceof Crematorium atSairangRs 20 l akh
Construction of Chowkidar Quarters aand Housing for DG set
135 | P a g e
5.Climate Change Mitigation Initiatives-sanitation and Cleanliness Drive
Component Rs 200 lakh
Urban Development & Poverty Alleviation Department has been working on
Cleanliness and sanitation since its existence, Under National flagship Mission
i.eSwachh Bharat Mission, which was launched in 2014, various cleanliness activities
and targets were achieved by the Department, all 23 urban towns in Mizoram were
declared ODF status and out of which 21 were certified ODF status by Quality control
of India after spot verification, the remaining two are soon to be declared too, besides,
all 23 towns were participated in SwachhSurvekshan 2018, awareness were created
through Information, education and communication activities in all the covered towns,
all missions and projects under the department were converged wherever possible for
the benefit of the people , and hence, as a means of convergence and one of
sustainable development initiatives for public welfare, the Department had purchased
public bins under NEDP 2017-2018 for district towns;this is expected to serve as
useful means for cleanliness of public places in towns.
Purchase and Installation of Public Community binsRs 100 lakh
136 | P a g e
6.Aizawl City GIS based Street zoning and signage Rs 300 lakh This project was undertaken to benefit urbanites and tourists visiting
Aizawl city as it is expected to help in identification and direction of
locality/streets and important landmarks in the city, also, it will help in
smooth functioning and movement of traffic in the city.
Name of Contractor - INNOVATIONS, N.Delhi
Project Cost (in lakh) - Rs. 300
Date of start - 5.9.2017
Scheduled date of completion - May 2018
Physical Progress - 30 %
Financial Progress - 64.30%