Accounting for Facilities 201
Sara Slater, Long Beach UnifiedLettie Boggs, Colbi Technologies, Inc.
How do I pull all of this into
a plan of
ACTION ?
2017 CASBO ANNUAL CONFERENCE & CALIFORNIA SCHOOL BUSINESS EXPO
Master PlanSite Level Planning
Needs Assessment SFPEqualization Maintenance Records LCFF Goal
Bond LanguageADA Superintendent List State
Funding Eligibility
Nexus Requirements DEV FeesCabinet Demands Equal Access
Facilities Inventory CEQA
Do some thinking!PROMISES MADE
Did your bond language make promises to your voters?
Did your District make promises to the sites?
To Parents?
CURRICULAR/PROGRAM CHANGES
Which sites make the maintenance “horror” list?
What roofs leak? Termites? Building failures?
Where are the DM age outs most prominent?
Where are we spending the most time for the least benefit?
2017 CASBO ANNUAL CONFERENCE & CALIFORNIA SCHOOL BUSINESS EXPO
MOST CRITICAL M&O NEEDS
Are there sites that need to change program delivery
◦ Grade level changes
◦ Program changes (ex: CTE)
◦ Site Reconfigurations
◦ Parking/Drop off redo
This may have been done in your Master Plan
Graph the overlaps
2017 CASBO ANNUAL CONFERENCE & CALIFORNIA SCHOOL BUSINESS EXPO
What are the Quick start/Quick visibility projects?
Which Schools show up the most?
Are any of them critical to the point of must do first?
What patterns emerge?
You can then move from this to some timeframes
A B CFranklinWashington Washington
JeffersonMadison Madison Madison
Adams
GlennMcAuliffe McAulifeShepard
South High South HighNorth High
Put the projects into timeframes
2017 CASBO ANNUAL CONFERENCE & CALIFORNIA SCHOOL BUSINESS EXPO
What order makes sense?
How much work can your team do at once? Pacing
Consider what makes a smart project
16/17 17/18 18/19 19/20 20/21HVAC Shepard Franklin Glenn South WashingtonParking Shepard South Jefferson Madison McAuliffeRoofing Adams McAuliffe North WashingtonMod Madison Madison Madison
16/17 17/18 18/19 19/20 20/21AdamsNorthMadison Madison Madison Madison
Franklin FranklinWashington Washington
Jefferson Jefferson
Multiple site disruptions
Not manageable workload
Max work for Purch/Accounting
Poor bid arrangement (See 101)
VS.
Do/or revise the budgetMake sure each project has a budget allocation
Verify that each project has a contingency
Build a program contingency as well
Determine how you will handle project inflation
Then review the schedule again in a cost loaded format, annually, not just by project
Adjust again to optimize the balance between pacing and dollars
2017 CASBO ANNUAL CONFERENCE & CALIFORNIA SCHOOL BUSINESS EXPO
Political Realities
2017 CASBO ANNUAL CONFERENCE & CALIFORNIA SCHOOL BUSINESS EXPO
Conversation scope depends on your politics, but should always include the Supt!
◦ Discuss your DRAFT with the following as appropriate:
Superintendent Cabinet
M&O Director Administrative/Principal Counsel
Curriculum Office Governing Board
Political Realities
2017 CASBO ANNUAL CONFERENCE & CALIFORNIA SCHOOL BUSINESS EXPO
Review and Revise until its agreed upon
Then take it to the board for approval
This board item can include Authorization to proceed with the project planningAdoption of the Project Budgets
Facilities Inventory
Needs Assessment
Master Plan
Educational Specifications (Ed Specs)
District Standards
Request for Qualification Pools
Contracts Developed for Architects and Contractors
Have you already got these things in place?
If not then they are priority work!
2017 CASBO ANNUAL CONFERENCE & CALIFORNIA SCHOOL BUSINESS EXPO
Building Blocks of the Plan
2017 CASBO ANNUAL CONFERENCE & CALIFORNIA SCHOOL BUSINESS EXPO
Facilities Inventory◦ Lists all of the building components that require ongoing maintenance,
their life cycle, and cost of replacement estimate
Needs Assessment◦ Prioritizes the components of the Inventory that are due or nearly due
with an analysis of replacement cost
Master Plan◦ Describes projects and timelines to implement solutions to the Needs
Assessment
Required!
2017 CASBO ANNUAL CONFERENCE & CALIFORNIA SCHOOL BUSINESS EXPO
Informs the design community about the district standards and requirements
Site requirementsBuilding design conceptsProximity requirements
Special district nuances
District Standards
2017 CASBO ANNUAL CONFERENCE & CALIFORNIA SCHOOL BUSINESS EXPO
Design criteria unique to the district
Sole source items (board approved)Roofing, Energy Mgmt, and HVAC
Maintenance requirements for standardizationPaint Color, Flooring types
RFQ and RFP
2017 CASBO ANNUAL CONFERENCE & CALIFORNIA SCHOOL BUSINESS EXPO
Request for Qualification◦ Where a bid is not required, RFQ can be used to solicit qualified vendors for a
specific type of work◦ A pool can be created of prescreened vendors for ease of selection and contracting
later◦ For Professional Services, typically architects, IOR’s, geo and environmental, survey
work, etc. ◦ Use whenever you will need more than one firm to supply your need or when
price is not the criteria.
Request for Proposals◦ Where a bid is not required, RFP can be used to solicit proposals for cost of work◦ Can be from a pool or stand alone◦ Best practice is three quotes minimum
Contracts
2017 CASBO ANNUAL CONFERENCE & CALIFORNIA SCHOOL BUSINESS EXPO
If you are gearing up for a bond program, this is a good time to review your contracts
◦ Incorporate lessons learned◦ Get your legal firm’s advice on any appropriate changes/updates◦ Standardize so that each of your projects is working from the same
contract (minor exceptions)
This promotes easier management of the projects when there is a lot going on!
Architects
2017 CASBO ANNUAL CONFERENCE & CALIFORNIA SCHOOL BUSINESS EXPO
Must be competitively selected (if using state funds) but not price based
Can be hired as the program architect, or by project
A significant team member
Look for a good match to complement the districtSmall District Staff with a Comprehensive FirmVery specific direction with willingness to listen and incorporate the district direction
Determine construction delivery method
2017 CASBO ANNUAL CONFERENCE & CALIFORNIA SCHOOL BUSINESS EXPO
Design – Bid – Build (DBB)
Lease- Lease Back (LLB)
Multi-Prime with Construction Management
oCM can be used with any method as augment of staff (and additional cost)oDifferent methods work better for different project types
Prequalification of bidders is now required by the Dept of Industrial Relations for all projects >$1m, and for districts with a student population over 2500 (PCC 201111.6)
Contractors must register with DIR if they hold a GC license (A or B) or any MEP license
Many districts require all licenses to prequalify
We are getting pressure to use bond funds
(which are insufficient anyway)
to fund deferred maintenance.
Is this legal? Is it smart?
What are the long-term consequences?
2017 CASBO ANNUAL CONFERENCE & CALIFORNIA SCHOOL BUSINESS EXPO
Bond Money and Def Maintenance Deferred Maintenance was designed as a sinking fund
It is no longer a state program, but has been rolled into the LCFF
The quality of buildings needs to be part of the site level conversations
This leaves many districts looking to bond funds to cover what used to be Deferred Maintenance costs.
It looks like you have a lot of money when you pass that new bond. But if you read the Needs Assessment in most districts – it exceeds the bond authorization by quite a bit.
2017 CASBO ANNUAL CONFERENCE & CALIFORNIA SCHOOL BUSINESS EXPO
So what is the challenge?
2017 CASBO ANNUAL CONFERENCE & CALIFORNIA SCHOOL BUSINESS EXPO
Let’s say the maintenance items the bond is asked to fund last as indicated in the chart.
The funding takes 30 years to pay off.And costs you twice as much by time you pay it off.X 2 – at least
An ever increasing cycle of poverty!
And some of the items need replacing before you pay off the first round of funding.
So is it never appropriate?We are not going to speak to the legality – that is for your counsel…but
Doing DM components as part of any Modernization takes it off the list and should reduce regular maintenance costs as well.
Picking up 30 year life items may cost twice as much, but it can boost a program out of routinely underfunded situation.
2017 CASBO ANNUAL CONFERENCE & CALIFORNIA SCHOOL BUSINESS EXPO
X 2 – at least
What are the real risks?
The funding requirement is now moved to your bond program and is not a component of LCFF
You risk creating a false level of funding available for ongoing costs like raises
The bond money will run out, or the voter willingness to give it to you will end
- and you now have a self inflicted fiscal cliff
2017 CASBO ANNUAL CONFERENCE & CALIFORNIA SCHOOL BUSINESS EXPO
X 2 – at least
We have just passed a second bond.
Do I manage them separately?
How do I do two Oversight Committees?
2017 CASBO ANNUAL CONFERENCE & CALIFORNIA SCHOOL BUSINESS EXPO
Two concurrent bonds No need to have two oversight committees
Though each bond will need to account for expenditures Make sure to revise your committee bylaws
Each separately elected bond must have its own fund or sub-fund Within one bond, issuances do not need separate fund numbers, assuming first in/fist out
2017 CASBO ANNUAL CONFERENCE & CALIFORNIA SCHOOL BUSINESS EXPO
Please feel free to contact us:SARA SLATER
Long Beach Unified School District
562-997-7550
LETTIE BOGGS
Colbi Technologies, Inc.
714-505-9544
2017 CASBO ANNUAL CONFERENCE & CALIFORNIA SCHOOL BUSINESS EXPO