Page 1: Acciona Energia Madrid Information Day

EUROGIA2020 – SPAIN Info Day

ACCIONA ENERGIA’s involvement in EUROGIA

&

Some examples of development through collaborative projects

Eugenio Guelbenzu

[email protected]

Madrid 18-February-2015

1

© ACCIONA – Proprietary and confidential information

Page 2: Acciona Energia Madrid Information Day

1

Why EUROGIA2020 and Reasons

2

© ACCIONA – Proprietary and confidential information

Page 3: Acciona Energia Madrid Information Day

3

ACCIONA’s Hystory in EUROGIA2020

ACCIONA ENERGIA is a BOARD member of the EUROGIA Cluster since 2008, appointed as the National

Representative in the Cluster, and being the chairman of the cluster from May 2011 to March 2013.

The EUROGIA Cluster is considered as the most appropriate way to promote and develop core

technology projects (R&D) with need to crystallize in short term and with high impact in the business

areas, as we are well covered by the White Book (Low Carbon Conventional Fossil Fuels technologies and

Renewable Energy).

Participation ACCIONA ENERGIA is as follows:

9 Projects presented to PO (WIFI, ADVOCAT (Cantabria presence), ILIS, CSPIMP, FLOATMET,

W2POWER, WINDMELT, EasyToConnect, V4WT) with 4 projects lead by ACCIONA

5 Projects Labelled and 4 approved for FPP

50% of Projects with other Board Members.

Total ACCIONA budget of labelled projects 4M€

Various Themes: Wind On/Offshore, PV, Materials and Composites, …

© ACCIONA – Proprietary and confidential information

Page 4: Acciona Energia Madrid Information Day

4

Why EUROGIA2020 and Reasons :

• Easy preparation of documentation and access for questions and help to the Secretariat.

• Easy and understandable process for evaluation that gives the choice to explain FtF

• Industry Driven and so we feel comfortable.

• Short Time from IDEA (PO) to Start of Funded Project (Label FPP and funding).

• Easy Contract, Consortium Agreement, and IPR Discussions (Short number of partners).

• Easy to Manage, due to low number of partners.

• You work only with the one you want with and not with a group due to balancing and photo.

• Follow up and access to partnerships and knowledge.

Strong support from CDTI and other authorities (EC,..) to EUROGIA 2020

© ACCIONA – Proprietary and confidential information

Page 5: Acciona Energia Madrid Information Day

5

Submission process

Always a 2 stage process: 1. PO – Project Outline

Complete and submit a Project Outline. The project coordinator is invited to present it through an oral presentation in front of the Technical Committee.

2. FPP – Full Project Proposal Applicants will be invited to fill in and submit a Full Project Proposal. Following the evaluation, the Technical Committee will give its recommendations to the eurogia+ Board, who in turn will decide to label the project. With this label, project participants can apply for funding in their respective countries.

NATIONAL FUNDING

PROJECT RUNNING & FUNDED

© ACCIONA – Proprietary and confidential information

Page 6: Acciona Energia Madrid Information Day

6

Submission process

Good Idea / Project / Eureka Criteria*

Project Outline, ¿?

Evaluation and Assessment

TECHNICAL COMMITTEE MEETING: • Comprise of Research and Academia Members & Industry + PAs (Observers) • Face to Face* Meeting divided in 3 sections:

1. Project Details presentation (Project description, Budget,…)

2. Questions and Answers (Questions from TC Members + PAs)

3. TC members Consensus and Assessment (Filling the Evaluation and Propose Action: Go for FPP With/Without Recommendations; New PO; Rejected).

Also Recommendations are made during the FtF Presentation and Mentors could be assign to help the development and structuring of the project FPP and Project overview.

Always a 2 stage process: 1. PO – Project Outline

2. FPP – Full Project Proposal

© ACCIONA – Proprietary and confidential information

Page 7: Acciona Energia Madrid Information Day

7

Submission process

Always a 2 stage process: 1. PO – Project Outline

2. FPP – Full Project Proposal

TECHNICAL COMMITTEE MEETING: • Comprise of Research and Academia Members & Industry + PAs (Observers) • Revision of FPP and Recommendations (if made) and fulfillment of all criteria

• TC members Consensus and Assessment (Filling the Evaluation)

• Propose Recommendation to Board: Label Project, Conditional Label, Reject / New FPP.

Project Outline - Approved

FPP

Good Idea / Project / Eureka Criteria*

© ACCIONA – Proprietary and confidential information

Page 8: Acciona Energia Madrid Information Day

8

Submission process

Always a 2 stage process: 1. PO – Project Outline

2. FPP – Full Project Proposal

BOARD MEETING: • Looks to the TC evaluation and recommendations • Take final decision on: Label Project, Conditional Label, Reject / New FPP.

• Assign Project Mentor / Reviewer: Link between Cluster and Project during its life to follow the project

and assist if needed.

• Send Letter with final decision to Coordinator and request Project Consortium Agreement (PCA) to be sign between partners.

• Inform Public authorities (MS and ESE) and Liaise to facilitate funding.

Project Outline - Approved

FPP

Good Idea / Project / Eureka Criteria*

© ACCIONA – Proprietary and confidential information

Page 9: Acciona Energia Madrid Information Day

2

Case Examples

9

© ACCIONA – Proprietary and confidential information

Page 10: Acciona Energia Madrid Information Day

WIFI-Wind Farm Installation Vessel

+ © ACCIONA – Proprietary and confidential information

10

Case Examples: WIFI

Page 11: Acciona Energia Madrid Information Day

Case Examples: WIFI

New concept of barge for the installation of offshore in-one-piece wind turbine

catamaran barge / float over method

E+ Label on the 16th of March 2009

PARTNERSHIP

Leader

French Partner

(Subcontractor for Technip)

Norwegian Partner

Spanish Partner

Technip France

Oceanide

DNV

Acciona

Project Management and Engineering

Basin tests

Rules, regulation and validation

Wind Turbine

BUDGET € Total Cost Self funded National Funding

Technip France

ACCIONA 350.000 260.000 90.000

DNV

TOTAL 1 344.512

Duration June 2009 to March 2011

11 +

© ACCIONA – Proprietary and confidential information

Page 12: Acciona Energia Madrid Information Day

12

New vessels and installation procedures:

o Wet Tow avoiding some HLV usage and do commissioning onshore

o Marine operations based on floating vessels (DP2) and be independent of water depths.

Initial Concept Final Concept • Use of DSIV

• Elevating capacity = 20,000 t (96 pinions)

• Hulls = 142.5m x 25m x 12m

• Displacement = 28,000 t

• Rear door to operate

• Not really fit for purpose !

• Barge = 87 m x 18 m x 9 m, Draft = 4.60 m

• One central linking beam : 66 m x 30/16 m x 20 m

• Dynamic Positioning during installation

• Vertical handling of WTGs (heave compensation)

• Square Leg 16 m x 16 m x 84 m

• Really fit for purpose !

Wind Farm Installation Vessel*

+

© ACCIONA – Proprietary and confidential information

Case Examples: WIFI

Page 13: Acciona Energia Madrid Information Day

NUEVOS CONCEPTOS: WIFI PROJECT-OBJETIVOS Y ALCANCE

© ACCIONA – Proprietary and confidential information

13 +

Case Examples: WIFI

Page 14: Acciona Energia Madrid Information Day

Case Examples: ADVOCAT

Photos 3 & 4 : monolitic Laminate Repair - Workshop

ADVanced Composite Repair Tooling

for Wind Turbine Blade Maintenance

- ADVOCAT-

© ACCIONA – Proprietary and confidential information

14 +

Page 15: Acciona Energia Madrid Information Day

Case Examples: ADVOCAT

Participants Competences & Role in the Project

Name(s) Type SPAIN FRANCE GERMANY

ACCIONA BLADES (Coordinator) LE

Coordinator Blade repairs technology definition and implementation

ACCIONA ENERGIA LE

Renewable Company Blade repair engineering design and technology implementation

GMI SME Aerospace composite repair technology development

LZH I Laser technology developer

TECMECA SME Steel and aluminium structures design and fabrication

Type: LE (Large Enterprise), SME (Small & Medium Sized Enterprise), I (Research Institute), U (University)

Total Costs: 2,692 M€ 1,377 M€

Expected Public Funding: 0,894 M€ 0,282 M€

© ACCIONA – Proprietary and confidential information

15 +

Page 16: Acciona Energia Madrid Information Day

Case Examples: ADVOCAT

© ACCIONA – Proprietary and confidential information

16 +

Page 17: Acciona Energia Madrid Information Day

Case Examples: ADVOCAT

© ACCIONA – Proprietary and confidential information

17 +

Page 18: Acciona Energia Madrid Information Day

Case Examples: FLOADMET

© ACCIONA – Proprietary and confidential information

18 +

Page 19: Acciona Energia Madrid Information Day

Case Examples: FLOADMET

Total Costs 6,05 M€ 2,02 M€

Duration 2012 (feb.) to 2014 (march )

© ACCIONA – Proprietary and confidential information

19 +

Page 20: Acciona Energia Madrid Information Day

Case Examples: FLOADMET

© ACCIONA – Proprietary and confidential information

20 +

Page 21: Acciona Energia Madrid Information Day

Case Examples: ILIS

Total Costs 5,82 M€ 2,36 M€

Duration 2010 to 2012

Innovative Lithium-Ion System Management design for MW Solar Plants

© ACCIONA – Proprietary and confidential information

21 +

Page 22: Acciona Energia Madrid Information Day

Case Examples: ILIS

It’s very useful to optimize the PV and Battery system in each project in relation with the specific grid code requirements for the countries.

© ACCIONA – Proprietary and confidential information

22 +

Page 23: Acciona Energia Madrid Information Day

4.68 4.7 4.72 4.74 4.76 4.78 4.8 4.82 4.84

x 104

2

2.5

3

3.5

4

4.5

5

5.5

6

6.5

7

x 105

Case Examples: ILIS

Electrical grid requirements

+

Energy Storage Management (SOC)

+

Weather - Power Forecast

Ebat Grid

Epv Ebat

Power Generation Smoothing

Power Generation to operator set-points

Frequency & Voltage Regulation

+

© ACCIONA – Proprietary and confidential information

23

Page 24: Acciona Energia Madrid Information Day

Case Examples: ILIS

+

© ACCIONA – Proprietary and confidential information

24

Page 25: Acciona Energia Madrid Information Day

Case Examples: ILIS

+

© ACCIONA – Proprietary and confidential information

25

Page 26: Acciona Energia Madrid Information Day

Case Examples: ILIS

+

© ACCIONA – Proprietary and confidential information

26

PV plant controller: Power Dispatcher

SCADA to control power output of PV inverters to fulfil different Grid specifications by performing grid support services. Allows also the efficient hybridization with other technologies like diesel generators

PV + Storage plant controller: SunDispatcher

SCADA to control power output of PV plant in combination with an electric energy storage system (ESS) in order to create a dispatchable solar plant .

Products as Results of the Project

Page 27: Acciona Energia Madrid Information Day

¡¡ Thank you very much !!

Muchas Gracias [email protected]

27