3 Kitakami site - Detector Access Yard Several location options for of the Access Yard, how to select them : 1.Ideally a Short tunnel length and a low slope, but most likely a compromise of the two features. 2.How much does the Detector Access Yard share with the installation and maintenance of the CFS around the IP ? A seprate Access Yard for the machine ? 3.Proximity to Freeways and Rail rated for heavy loads transport 4.Assuming that the same developed area for all the options is available 5.Costs.TRANSCRIPT
![Page 1: Access Yard Assembly Marco Oriunno (SLAC), November 13, 2013 LCWS13, TOKYO](https://reader035.vdocuments.us/reader035/viewer/2022062905/5a4d1aef7f8b9ab05997d330/html5/thumbnails/1.jpg)
Access Yard AssemblyMarco Oriunno (SLAC), November 13, 2013LCWS13, TOKYO
![Page 2: Access Yard Assembly Marco Oriunno (SLAC), November 13, 2013 LCWS13, TOKYO](https://reader035.vdocuments.us/reader035/viewer/2022062905/5a4d1aef7f8b9ab05997d330/html5/thumbnails/2.jpg)
2
Japanese ILC Site – Horizontal Tunnel Access
![Page 3: Access Yard Assembly Marco Oriunno (SLAC), November 13, 2013 LCWS13, TOKYO](https://reader035.vdocuments.us/reader035/viewer/2022062905/5a4d1aef7f8b9ab05997d330/html5/thumbnails/3.jpg)
3
Kitakami site - Detector Access Yard
Several location options for of the Access Yard, how to select them :
1. Ideally a Short tunnel length and a low slope, but most likely a compromise of the two features.
2. How much does the Detector Access Yard share with the installation and maintenance of the CFS around the IP ? A seprate Access Yard for the machine ?
3. Proximity to Freeways and Rail rated for heavy loads transport
4. Assuming that the same developed area for all the options is available
5. Costs.
![Page 4: Access Yard Assembly Marco Oriunno (SLAC), November 13, 2013 LCWS13, TOKYO](https://reader035.vdocuments.us/reader035/viewer/2022062905/5a4d1aef7f8b9ab05997d330/html5/thumbnails/4.jpg)
4
ILC needs to have “Lean” Detectors
Toyota Factories pioneered Lean Assembly :
“preserving value with less work”
Fight The Seven Muda (futilities)
Transportation, Inventory, Motion, Waiting, Over-processing, Over-production, Defects.
Big Detectors for Big Science must be Lean :Time vs labor (Costs)Time vs Technology drive (Increasing Performances)Low Maintenance (Costs)High Upgradability (Costs and Scientific reach)Shorter commissioning to get nominal performancesInternational Competition
![Page 5: Access Yard Assembly Marco Oriunno (SLAC), November 13, 2013 LCWS13, TOKYO](https://reader035.vdocuments.us/reader035/viewer/2022062905/5a4d1aef7f8b9ab05997d330/html5/thumbnails/5.jpg)
5
Lean assembly – Some Examples
CMS Detector Shipbuilding
Airbus
![Page 6: Access Yard Assembly Marco Oriunno (SLAC), November 13, 2013 LCWS13, TOKYO](https://reader035.vdocuments.us/reader035/viewer/2022062905/5a4d1aef7f8b9ab05997d330/html5/thumbnails/6.jpg)
6
Detector Hall Requirements – The War of Resources
Two detectors in one experimental hall must share a lot of infrastructures even more than beam time.
1. Single Horizontal tunnel : Minimize by design the risk of logjam
2. Single 200t+ bridge crane : strict planning of the heavy lifts
3. Unfriendly environment
4. Safety of the personnel
…Planning tasks on surface As Many As Reasonable Achievable : A.M.A.R.A.
…Decoupling detector assembly from Experimental Hall construction
![Page 7: Access Yard Assembly Marco Oriunno (SLAC), November 13, 2013 LCWS13, TOKYO](https://reader035.vdocuments.us/reader035/viewer/2022062905/5a4d1aef7f8b9ab05997d330/html5/thumbnails/7.jpg)
7
Assembly Yard - CMS
140 m
223 m
150 m
34,000 m2
25 m
Con
trol R
oom
Offi
ces
Gas 1
Gas 2
He
![Page 8: Access Yard Assembly Marco Oriunno (SLAC), November 13, 2013 LCWS13, TOKYO](https://reader035.vdocuments.us/reader035/viewer/2022062905/5a4d1aef7f8b9ab05997d330/html5/thumbnails/8.jpg)
8
Assembly Yard - CMS
![Page 9: Access Yard Assembly Marco Oriunno (SLAC), November 13, 2013 LCWS13, TOKYO](https://reader035.vdocuments.us/reader035/viewer/2022062905/5a4d1aef7f8b9ab05997d330/html5/thumbnails/9.jpg)
9
SPS beam extraction - North area (CERN)
46 m
230 m
![Page 10: Access Yard Assembly Marco Oriunno (SLAC), November 13, 2013 LCWS13, TOKYO](https://reader035.vdocuments.us/reader035/viewer/2022062905/5a4d1aef7f8b9ab05997d330/html5/thumbnails/10.jpg)
10
SPS beam extraction - North area (CERN)
![Page 11: Access Yard Assembly Marco Oriunno (SLAC), November 13, 2013 LCWS13, TOKYO](https://reader035.vdocuments.us/reader035/viewer/2022062905/5a4d1aef7f8b9ab05997d330/html5/thumbnails/11.jpg)
11
Detector Assembly Hall
Iron Barrel Doors
Solenoid
One bridge crane ~ 30t
Ground motion with pushback trucks
Detector units loaded with sensors, tested and pre-commissioned
Loading Area
![Page 12: Access Yard Assembly Marco Oriunno (SLAC), November 13, 2013 LCWS13, TOKYO](https://reader035.vdocuments.us/reader035/viewer/2022062905/5a4d1aef7f8b9ab05997d330/html5/thumbnails/12.jpg)
12
Kitakami Access Yard
60,000 m2
Tunnel
![Page 13: Access Yard Assembly Marco Oriunno (SLAC), November 13, 2013 LCWS13, TOKYO](https://reader035.vdocuments.us/reader035/viewer/2022062905/5a4d1aef7f8b9ab05997d330/html5/thumbnails/13.jpg)
13
Access Yard Buildings
Assembly Hall #2
Assembly Hall #1
OfficesAccess Tunnel
Site Entrance
400t Loading Station
![Page 14: Access Yard Assembly Marco Oriunno (SLAC), November 13, 2013 LCWS13, TOKYO](https://reader035.vdocuments.us/reader035/viewer/2022062905/5a4d1aef7f8b9ab05997d330/html5/thumbnails/14.jpg)
14
Kitakami Access Yard
5% 190 m
320 m
Undergound Detector Hall
![Page 15: Access Yard Assembly Marco Oriunno (SLAC), November 13, 2013 LCWS13, TOKYO](https://reader035.vdocuments.us/reader035/viewer/2022062905/5a4d1aef7f8b9ab05997d330/html5/thumbnails/15.jpg)
Solenoid Assembly and Commissioning
![Page 16: Access Yard Assembly Marco Oriunno (SLAC), November 13, 2013 LCWS13, TOKYO](https://reader035.vdocuments.us/reader035/viewer/2022062905/5a4d1aef7f8b9ab05997d330/html5/thumbnails/16.jpg)
16
Detector Units on cart + Pushback track
![Page 17: Access Yard Assembly Marco Oriunno (SLAC), November 13, 2013 LCWS13, TOKYO](https://reader035.vdocuments.us/reader035/viewer/2022062905/5a4d1aef7f8b9ab05997d330/html5/thumbnails/17.jpg)
17
DCL-TLG100 Moving Crane – 400 T
![Page 18: Access Yard Assembly Marco Oriunno (SLAC), November 13, 2013 LCWS13, TOKYO](https://reader035.vdocuments.us/reader035/viewer/2022062905/5a4d1aef7f8b9ab05997d330/html5/thumbnails/18.jpg)
18
Transferring parts underground
![Page 19: Access Yard Assembly Marco Oriunno (SLAC), November 13, 2013 LCWS13, TOKYO](https://reader035.vdocuments.us/reader035/viewer/2022062905/5a4d1aef7f8b9ab05997d330/html5/thumbnails/19.jpg)
19
Loading station 400 tons
![Page 20: Access Yard Assembly Marco Oriunno (SLAC), November 13, 2013 LCWS13, TOKYO](https://reader035.vdocuments.us/reader035/viewer/2022062905/5a4d1aef7f8b9ab05997d330/html5/thumbnails/20.jpg)
20
Loading station 400 tons
![Page 21: Access Yard Assembly Marco Oriunno (SLAC), November 13, 2013 LCWS13, TOKYO](https://reader035.vdocuments.us/reader035/viewer/2022062905/5a4d1aef7f8b9ab05997d330/html5/thumbnails/21.jpg)
21
Detector Hall
![Page 22: Access Yard Assembly Marco Oriunno (SLAC), November 13, 2013 LCWS13, TOKYO](https://reader035.vdocuments.us/reader035/viewer/2022062905/5a4d1aef7f8b9ab05997d330/html5/thumbnails/22.jpg)
Magnet Installation – Japanese Site
215 tons Crane