accelerator and numi upgrades shutdown update

19
Accelerator and NuMI Upgrades Shutdown Update Cons Gattuso June 3, 2013 03/25/2022 Cons Gattuso 1

Upload: cole-mclaughlin

Post on 31-Dec-2015

28 views

Category:

Documents


1 download

DESCRIPTION

Accelerator and NuMI Upgrades Shutdown Update. Cons Gattuso June 3, 2013. NuMI Activities. Horn 1 and Horn 2 Installation is complete Pulse testing scheduled for next week Target Has been installed in the chase Preparing for power supply testing (next week) Interlock testing - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Accelerator and NuMI Upgrades Shutdown Update

Accelerator and NuMI UpgradesShutdown Update

Cons Gattuso

June 3, 2013

04/19/2023 Cons Gattuso 1

Page 2: Accelerator and NuMI Upgrades Shutdown Update

NuMI Activities• Horn 1 and Horn 2

– Installation is complete– Pulse testing scheduled for next week

• Target– Has been installed in the chase

• Preparing for power supply testing (next week)– Interlock testing – Pretarget down to target hall

• Prepare chase for Horn pulse testing & thermal scan of stripline– Next week, process will take ~3 days – General

• Raw water systems– Complete and running: Target, Horn 1, Horn 2, All RAW skids system, exchange systems tested and

operations

• Completed beamline vacuum work & all ion pumps on. Final survey completed.• Started demobilizing shutdown equipment from Target Hall

– Closed up By the 14 of June….

• Installed LBNE Muon Monitor prototype infrastructure in Absorber Passageway

Page 3: Accelerator and NuMI Upgrades Shutdown Update

NuMI Target Hall

Page 4: Accelerator and NuMI Upgrades Shutdown Update

NuMI Beamline

Page 5: Accelerator and NuMI Upgrades Shutdown Update

MI/RR Shutdown 2012Injection Line Remaining Work:

• Magnet installation• Complete

• Vacuum system• MI

• 100% Complete and under vacuum• Recycler

• Q848-100 installed• Leak checked fine

• Q100-Q104• Beam Box installation on new stand complete• Cable termination 100-105

• Powered elements• Cable terminations -95% complete

• Instrumentation• Cable terminations -95% complete

• Alignment• MI and RR from 848-102 complete• RR from 102 to 105 still left to be done

• Installation of components and vacuum system

Page 6: Accelerator and NuMI Upgrades Shutdown Update

MI/RR Shutdown 2013

Page 7: Accelerator and NuMI Upgrades Shutdown Update

MI/RR Shutdown 2012RR-30 straight:• MI primary collimator marble shielding re-installation is complete• Bake is completed downstream of 309. • Bake is completed upstream of 229.• Installing Recycler Ring beam pipe between girders: Approximately 90% complete.• 229 Recycler Kicker spool installed, kickers pumping down.• Replacing corroded MI beam pipe (301-304)• Starting on MI re-assembly at 306 – 308• Need MI drawings• Reworking multiwire installations to

clear obstructions

Page 8: Accelerator and NuMI Upgrades Shutdown Update

MI/RR Shutdown 2012Still addressing MI corrosion issues in 30 straight section

Page 9: Accelerator and NuMI Upgrades Shutdown Update

MI/RR Shutdown 2012

Page 10: Accelerator and NuMI Upgrades Shutdown Update

MI/RR Shutdown 2012MI 52 Lambertson:

Leak checks completeBake terminated todayBlankets off tomorrow followed by the leak check.

Page 11: Accelerator and NuMI Upgrades Shutdown Update

MI/RR Shutdown 2012RR 53 MHz Cavity Installation

Page 12: Accelerator and NuMI Upgrades Shutdown Update

MI/RR Shutdown 2012• RR Bakes:

• Bake status ~97% complete• 105-109 Completed601-607 Completed• 125-203 Completed608-610 Completed• 210-219 Completed620-627 Completed• 319-328 Completed227-229 Completed• 335-400 Completed 309-311 Completed• 618-620 CompletedMI306 Lambertson ( extraction line)

• Bake what were added during the shut down• 219-227 Completed, was added due to a component failure• 527 -601 Completed, was added due to MI buss repair• MI521-522 Completed, MI 52 lambertson Flange leak

Page 13: Accelerator and NuMI Upgrades Shutdown Update

Shutdown Dose Accumulation

04/19/2023 Cons Gattuso 130 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56

0

5000

10000

15000

20000

25000

Cumulative Dose

Week of Shutdown

Person-mrem

Page 14: Accelerator and NuMI Upgrades Shutdown Update

MI Radiation Shielding Status

• Sight Risers– One of three fabricated

• Service Building– LCW – 100 % complete– Power Supply Cabinets 100 % complete

• MI-60 – RF Penetrations– Empty RF Penetrations 100 % complete– Rooms 117 &118

04/19/2023 Cons Gattuso 14

Page 15: Accelerator and NuMI Upgrades Shutdown Update

Radiation Shielding• Service building power supply/LCW headers 100% complete *• MI-60

– Empty RF penetration 100% complete *– RF Penetrations – installation underway

• Sight Risers *– Welding and installing by the end of first week of June

• 1 of 3 is welded up and ready for installation • Problem areas

– MI60 LCW Penetrations• Waiting on material

– Steel to arrive mid June– Poly to arrive late June ( installation ~ 1-2 days)

– Power supply Rooms 117 and 118 ( completion aprox. first week of July) • Waiting on designs (poly block)

– Est First week of June• Waiting on ploy block

– Est first week of July

* (required to run low intensity beam)

04/19/2023 Cons Gattuso 15

Page 16: Accelerator and NuMI Upgrades Shutdown Update

Shielding Types

04/19/2023 Cons Gattuso 16

Sight Riser

LCW penetrations

Buss penetrations

RF penetrations

Room 118

Room 117

Page 17: Accelerator and NuMI Upgrades Shutdown Update

Recycler Shims

• Fabrication has started on the RGD shims– Completed sometime middle/late of June

• Fabrication of the RGF Shims– Start late June/early July – Completed by the middle July

• Tunnel installation could start mid June • Conservative est. Would have them complete

installed sometime Mid-End July (WAG)

04/19/2023 Cons Gattuso 17

Page 18: Accelerator and NuMI Upgrades Shutdown Update

MI/RR Shutdown 2012Startup activities for last week:

Removed all locks from the MI/RR MCR LOTO box by Friday.

Re-core tunnel to standard tunnel access keys for the weekend.• Safety system tests were successfully completed• Successfully high potted all the MI busses to 1 KV

• To many faults were removed to list…Re-core back to shutdown keys on Monday morning to continue with tunnel installation

Startup activities for this week:Removed all locks from the MI/RR MCR LOTO box by Friday.

Re-core tunnel to standard tunnel access keys for the weekend.• Main Buss Power supply testing through out the weekend

Re-core back to shutdown keys on Monday morning to continue with tunnel installation

Page 19: Accelerator and NuMI Upgrades Shutdown Update

04/19/2023 Cons Gattuso 19

W Th F S S M T W Th F S S M T W Th F S S M T W Th F S S M T W Th F S S M T W Th F S S

5/2

2/2

01

3

5/2

3/2

01

3

5/2

4/2

01

3

5/2

5/2

01

3

5/2

6/2

01

3

5/2

7/2

01

3

5/2

8/2

01

3

5/2

9/2

01

3

5/3

0/2

01

3

5/3

1/2

01

3

6/1

/20

13

6/2

/20

13

6/3

/20

13

6/4

/20

13

6/5

/20

13

6/6

/20

13

6/7

/20

13

6/8

/20

13

6/9

/20

13

6/1

0/2

01

3

6/1

1/2

01

3

6/1

2/2

01

3

6/1

3/2

01

3

6/1

4/2

01

3

6/1

5/2

01

3

6/1

6/2

01

3

6/1

7/2

01

3

6/1

8/2

01

3

6/1

9/2

01

3

6/2

0/2

01

3

6/2

1/2

01

3

6/2

2/2

01

3

6/2

3/2

01

3

6/2

4/2

01

3

6/2

5/2

01

3

6/2

6/2

01

3

6/2

7/2

01

3

6/2

8/2

01

3

6/2

9/2

01

3

6/3

0/2

01

3

Injenction line Vacuum install

Alingment Cable termination Sheilding removal

RR30 Ring Vacuum install

Alingment Cable termination Sheilding removal

RR30 Extraction Line Vacuum install

Alingment Cable termination Sheilding removal

RF Vacuum install

Alingment Cable termination Sheilding removal

RF testing RR Abort

Vacuum install Alingment

Cable termination kicker testing

Power Supply testingMI Interlock test

NuMI PT PT PT PT PT PT PT PT PT PT

MI beam Remove Equip.

Lase

r sc

ans

Lase

r sc

ans

Bu

s w

arm

up

S+S

Beam in MINuMI Target scans

Po

we

r Su

pp

ly te

st

S+S

S+ S Po

we

r Su

pp

ly te

st