a/c air conditioning unit in the approved da of lot …...hw dp rwt a/c ppos 6 star hot water system...

6
G E N E R A L L E G E N D T.O.W TOP OF WALL BR1, BR2, etc. BRICK FACE TYPE BAL1, BAL2, etc. BALUSTRADE TYPE FEN1, FEN2, etc. FENCE TYPE CR1, CR2, etc. CEMENT RENDER TYPE/ COLOUR FAS FASCIA FD FLOOR DRAIN GD GARAGE DOOR GUT GUTTER TD TIMBER DOOR DP / DP1 etc. DOWN PIPE / TYPES OF DP BG BOX GUTTER INS1, INS2, etc. INSULATION TYPES NGL NATURAL GROUND LEVEL RWT RAIN WATER TANK A/C AIR CONDITIONING UNIT P.P.O.S PRINCIPAL PRIVATE OPEN SPACE TIMBER LAMINATE FLOOR CARPET WATER CLOSET STORAGE WASHING MACHINE CERAMIC TILES FRIDGE PANTRY ROBE RM METAL ROOF RC CONCRETE ROOF RWH RAIN WATER HEAD TL CPT WC S WM CT F P R CONCRETE FINISH CF1, CF2, etc. HW HOT WATER UNIT WALL CLADDING CD1, CD2, etc. HWD HARDWOOD TIMBER RCT CONCRETE TILED ROOF OBS OBSCURE GLASS CERAMIC TILES - WET AREAS CT1 WINDOW W SLIDING DOOR SD CONCRETE FLOOR CONC. DOOR D F.F.L FINISHED FLOOR LEVEL ENS. ENSUITE M. BED MASTER BEDROOM R.L REDUCED LEVEL FW FLOOR WASTE RE ROOF EAVES PPOS PRINCIPAL PRIVATE OPEN SPACE HOT WATER UNIT HWU FLOOR TILES FT, FT1, FT2, etc DRAWING TITLE: PROJECT: DRAWING No: DATE: SCALE: TYPE: DRAWN BY: REV: A3 NORTH: ISSUED BY: CHECKED BY: LOT-01 1 : 100 14/04/20 A \\172.31.7.12\projects\Projects- Current\Perfection Avenue Stanhope Gardens\Lot 01\01 -Revit File\04 -SECTION 96\LOT 01 - S4.55.rvt JP LOT-01- COVER PAGE S.01 JP LOT 01 PERFECTION AVE & LOT 1A BATLOW STREET STANHOPE GARDENS PERFECTION AVENUE IP S4.55 ISSUE TORRENS TITLE SUBDIVISION INTO TWO LOTS AND PROPOSED CONSTRUCTION OF A DOUBLE STOREY DWELLING ON EACH LOT. PROPOSED LOT 01 PERFECTION AVENUE , STANHOPE GARDENS IN THE APPROVED DA OF LOT 11 IN DP NO .1239008. UNIT 01 SHEET SCHEDULE-UNIT-01 Sheet Number Sheet Name Drawn By Checked By Issue Date Current Revision S.01 LOT-01- COVER PAGE JP IP 14/04/20 A S.02 LOT-01- SITE PLAN JP IP 14/04/20 A S.03 LOT-01- GROUND FLOOR PLAN JP IP 14/04/20 A S.04 LOT-01- FIRST FLOOR PLAN JP IP 14/04/20 A S.05 LOT-01- ROOF PLAN JP IP 14/04/20 A S.06 LOT-01- ELEVATIONS 01 JP IP 14/04/20 A S.07 LOT-01- ELEVATIONS 02 JP IP 14/04/20 A S.08 LOT-01- SECTIONS 01 JP IP 14/04/20 A REV DATE DESCRIPTION BY A 14/04/20 ISSUED FOR S4.55 APPLICATION JP

Upload: others

Post on 14-Jul-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: A/C AIR CONDITIONING UNIT IN THE APPROVED DA OF LOT …...HW DP RWT A/C PPOS 6 STAR HOT WATER SYSTEM SITE BOUNDARY WIND DIRECTION VEHICULAR MOVEMENT VEHICULAR ACCESS SETBACK LINE TREES

G E N E R A L L E G E N D

T.O.W TOP OF WALL

BR1, BR2, etc. BRICK FACE TYPE

BAL1, BAL2, etc. BALUSTRADE TYPE

FEN1, FEN2, etc. FENCE TYPE

CR1, CR2, etc. CEMENT RENDER TYPE/ COLOUR

FAS FASCIA

FD FLOOR DRAIN

GD GARAGE DOOR

GUT GUTTER

TD TIMBER DOOR

DP / DP1 etc. DOWN PIPE / TYPES OF DP

BG BOX GUTTER

INS1, INS2, etc. INSULATION TYPES

NGL NATURAL GROUND LEVEL

RWT RAIN WATER TANK

A/C AIR CONDITIONING UNIT

P.P.O.S PRINCIPAL PRIVATE OPEN SPACE

TIMBER LAMINATE FLOOR

CARPET

WATER CLOSET

STORAGE

WASHING MACHINE

CERAMIC TILES

FRIDGE

PANTRY

ROBE

RM METAL ROOF

RC CONCRETE ROOF

RWH RAIN WATER HEAD

TL

CPT

WC

S

WM

CT

F

P

R

CONCRETE FINISHCF1, CF2, etc.

HW HOT WATER UNIT

WALL CLADDINGCD1, CD2, etc.

HWD HARDWOOD TIMBER

RCT CONCRETE TILED ROOF

OBS OBSCURE GLASS

CERAMIC TILES - WET AREASCT1

WINDOWW

SLIDING DOORSD

CONCRETE FLOORCONC.

DOORD

F.F.L FINISHED FLOOR LEVEL

ENS. ENSUITE

M. BED MASTER BEDROOM

R.L REDUCED LEVEL

FW FLOOR WASTE

RE ROOF EAVES

PPOS PRINCIPAL PRIVATE OPEN SPACE

HOT WATER UNITHWU

FLOOR TILESFT, FT1, FT2, etc

DRAWING TITLE:PROJECT:DRAWING No:DATE: SCALE:TYPE:

DRAWN BY:

REV:

A3

NORTH:

ISSUED BY:CHECKED BY:

LOT-01

1 : 100

14/04/20 A

\\172.31.7.12\projects\Projects- Current\Perfection Avenue StanhopeGardens\Lot 01\01 -Revit File\04 -SECTION 96\LOT 01 - S4.55.rvt

JP

LOT-01- COVER PAGES.01

JPLOT 01 PERFECTION AVE & LOT1A BATLOW STREETSTANHOPE GARDENS

PERFECTION AVENUE

IP

S4.55 ISSUE

TORRENS TITLE SUBDIVISION INTO TWO LOTS AND PROPOSED

CONSTRUCTION OF A DOUBLE STOREY DWELLING ON EACH LOT.

PROPOSED LOT 01 PERFECTION AVENUE , STANHOPE GARDENSIN THE APPROVED DA OF LOT 11 IN DP NO .1239008.

UNIT 01

SHEET SCHEDULE-UNIT-01

Sheet Number Sheet Name Drawn ByChecked

By Issue DateCurrentRevision

S.01 LOT-01- COVER PAGE JP IP 14/04/20 A

S.02 LOT-01- SITE PLAN JP IP 14/04/20 A

S.03 LOT-01- GROUND FLOOR PLAN JP IP 14/04/20 A

S.04 LOT-01- FIRST FLOOR PLAN JP IP 14/04/20 A

S.05 LOT-01- ROOF PLAN JP IP 14/04/20 A

S.06 LOT-01- ELEVATIONS 01 JP IP 14/04/20 A

S.07 LOT-01- ELEVATIONS 02 JP IP 14/04/20 A

S.08 LOT-01- SECTIONS 01 JP IP 14/04/20 A

REV DATE DESCRIPTION BY

A 14/04/20 ISSUED FOR S4.55 APPLICATION JP

Page 2: A/C AIR CONDITIONING UNIT IN THE APPROVED DA OF LOT …...HW DP RWT A/C PPOS 6 STAR HOT WATER SYSTEM SITE BOUNDARY WIND DIRECTION VEHICULAR MOVEMENT VEHICULAR ACCESS SETBACK LINE TREES

BATLOW STREET

185°

02' 0

3"69

50

1 39 ° 28 ' 1 0"

12 37 5

50° 33' 52"

17863

230° 33' 52"

13230

52.830

RL.

52.5

0

RL.53.00

140°

33'

52"

1733

3

52.830

PROPOSED CONCRETEDRIVEWAY

1200

SID

E S

ET

BA

CK

1200

SE

CO

ND

AR

Y R

OA

D S

ET

BA

CK

5290

RL.53.25

EASEMENT F

OR

DRAINAGE

EA

SE

ME

NT

FO

RD

RA

INA

GE

1850

1850

53.000

52.830

SITE BOUNDARY

17865

1200 3125 2050 6010 690 1200 3588

1202

3390

3050

3400

1000

5291

SIT

E B

OU

ND

AR

Y

1733

5

1200 7775 4100 1200 3824

SITE BOUNDARY

18100

1202

3390

1198

6252

5291

SIT

E B

OU

ND

AR

Y

1733

5

RWT

13230 4869

12373

4960

GMEB

HWU

UNIT 01

A/C

DOWN PIPE

1500L RAIN WATER TANK

3.5 STAR AIR-CONDITIONER AIR OUTLET

PRINCIPAL PRIVATE OPEN SPACE

TREES TO BE RETAINED

TREES TO BE REMOVED

HW

DP

RWT

A/C

PPOS

6 STAR HOT WATER SYSTEM

SITE BOUNDARY

WIND DIRECTION

VEHICULAR MOVEMENT

VEHICULAR ACCESS

SETBACK LINE

TREES TO BE PROPOSED

DRAWING TITLE:PROJECT:DRAWING No:DATE: SCALE:TYPE:

DRAWN BY:

REV:

A3

NORTH:

ISSUED BY:CHECKED BY:

LOT-01

As indicated

14/04/20 A

\\172.31.7.12\projects\Projects- Current\Perfection Avenue StanhopeGardens\Lot 01\01 -Revit File\04 -SECTION 96\LOT 01 - S4.55.rvt

JP

LOT-01- SITE PLANS.02

JPLOT 01 PERFECTION AVE & LOT1A BATLOW STREETSTANHOPE GARDENS

PERFECTION AVENUE

IP

1 : 100S.02

SITE PLAN1

S4.55 ISSUE

REV DATE DESCRIPTION BY

A 14/04/20 ISSUED FOR S4.55 APPLICATION JP

Page 3: A/C AIR CONDITIONING UNIT IN THE APPROVED DA OF LOT …...HW DP RWT A/C PPOS 6 STAR HOT WATER SYSTEM SITE BOUNDARY WIND DIRECTION VEHICULAR MOVEMENT VEHICULAR ACCESS SETBACK LINE TREES

UNIT 01FALL 22.5°

FA

LL 2

2.5

°F

ALL 2

2.5

°

FALL 22.5°

FA

LL 2

2.5

°

FALL 22.5°

CC GUTFASCRT

RM

FIRST FLOOR WALLS BELOW

FIR

ST

FLO

OR

WA

LLS

BE

LO

W

FIR

ST

FLO

OR

WA

LLS

BE

LO

W

GUT

FA

LL 2

2.5

°

FALL 22.5°

FA

LL 2

2.5

°

FALL 22.5°

OH

400 2725

OH

400 1650

OH

400 4915

OH

1495 290

OH

400

12675

OH

400

600

OH

400

6450

OH

400

2990

OH

400

OH

400 7775

OH

400 3700

OH

400

12675

OH

400

2990

OH

400

1800

OH

400

5250

OH

400

11640

11640

FA

LL 3

°

FA

LL 3

°

L E G E N D

CP NA

DP DOWN PIPE

OVERHANGOH

CRT CONCRETE ROOF TILES

CONC CONC SOFFIT

BOX GUTTERBG

METAL ROOFMR

DRAWING TITLE:PROJECT:DRAWING No:DATE: SCALE:TYPE:

DRAWN BY:

REV:

A3

NORTH:

ISSUED BY:CHECKED BY:

LOT-01

1 : 100

14/04/20 A

\\172.31.7.12\projects\Projects- Current\Perfection Avenue StanhopeGardens\Lot 01\01 -Revit File\04 -SECTION 96\LOT 01 - S4.55.rvt

JP

LOT-01- ROOF PLANS.05

JPLOT 01 PERFECTION AVE & LOT1A BATLOW STREETSTANHOPE GARDENS

PERFECTION AVENUE

IP

1 : 100S.05

ROOF PLAN1

S4.55 ISSUE

REV DATE DESCRIPTION BY

A 14/04/20 ISSUED FOR S4.55 APPLICATION JP

Page 4: A/C AIR CONDITIONING UNIT IN THE APPROVED DA OF LOT …...HW DP RWT A/C PPOS 6 STAR HOT WATER SYSTEM SITE BOUNDARY WIND DIRECTION VEHICULAR MOVEMENT VEHICULAR ACCESS SETBACK LINE TREES

01 FIRST FLOOR

55.95

01 CEILING LEVEL

58.40

01 GROUND FLOOR

53.00

01 ROOF RIDGE

60.09 ROOF PITCH

22.50°

CRT CR1BR2 CR3CR2

52.830

SIT

E B

OU

ND

AR

Y

SIT

E B

OU

ND

AR

Y

PROPOSED GROUND LINE

N.G.L

1800

UNIT 01

GW-01

GD

BALCC BR2

720

2400

52.830

DROP EDGE BEAM TOENGINEER'S DETAIL

CR2

2400

FW-02 FW-08FW-01

D-01

1800

340

1800

340

340

1800

2050

300

7089

1689

2450

2950

2400

2140

1050

DPDPDP

01 FIRST FLOOR

55.95

01 CEILING LEVEL

58.40

01 GROUND FLOOR

53.00

01 ROOF RIDGE

60.09

UNIT 01

RWT

ROOF PITCH

22.50°

CRTBR1 CC

GW-05

1030

1370

7089

1689

2450

2950

2400

2140

DPDPDPDPDP

A/C

DRAWING TITLE:PROJECT:DRAWING No:DATE: SCALE:TYPE:

DRAWN BY:

REV:

A3

NORTH:

ISSUED BY:CHECKED BY:

LOT-01

1 : 100

14/04/20 A

\\172.31.7.12\projects\Projects- Current\Perfection Avenue StanhopeGardens\Lot 01\01 -Revit File\04 -SECTION 96\LOT 01 - S4.55.rvt

JP

LOT-01- ELEVATIONS 01S.06

JPLOT 01 PERFECTION AVE & LOT1A BATLOW STREETSTANHOPE GARDENS

PERFECTION AVENUE

IP

1 : 100S.06

UNIT-01 FRONT ELEVATION1

1 : 100S.06

UNIT-01 REAR ELEVATION2

UNIT-01 DOOR SCHEDULE

NO. LEVEL WIDTH HEIGHT Count COMMENT

01 GROUND FLOOR

D-01 01 GROUND FLOOR 1280 2400 1

D-02 01 GROUND FLOOR 800 2100 1

D-04 01 GROUND FLOOR 800 2100 1

D-05 01 GROUND FLOOR 900 2100 1

D-06 01 GROUND FLOOR 3216 2400 1 SLIDING DOOR OPENING

D-06A 01 GROUND FLOOR 2316 2400 1

GD 01 GROUND FLOOR 2780 2400 1 GARAGE DOOR OPENING

GD.31 01 GROUND FLOOR 800 2100 1

8

01 FIRST FLOOR

D-02 01 FIRST FLOOR 900 2100 3

D-03 01 FIRST FLOOR 800 2100 3

D-09 01 FIRST FLOOR 2410 2100 1

7

UNIT-01 WINDOW SCHEDULE

NO LEVEL WIDTH HEIGHT SILL HEIGHT HEAD HEIGHT DESCRIPTION

01 GROUND FLOOR

GW-01 01 GROUND FLOOR 1810 2050 300 2350 AWNING

GW-02 01 GROUND FLOOR 850 2050 350 2400

GW-03 01 GROUND FLOOR 850 2050 350 2400

GW-04 01 GROUND FLOOR 850 2050 350 2400 AWNING

GW-05 01 GROUND FLOOR 1210 1370 1030 2400 SLIDING

5

01 FIRST FLOOR

FW-01 01 FIRST FLOOR 1210 1800 340 2140 AWNING

FW-02 01 FIRST FLOOR 1210 1800 340 2140 AWNING

FW-03 01 FIRST FLOOR 1810 600 1540 2140 SLIDING

FW-04(OBS) 01 FIRST FLOOR 850 860 1280 2140 SLIDING-OBS

FW-05(OBS) 01 FIRST FLOOR 1570 860 1280 2140 SLIDING-OBS

FW-06 01 FIRST FLOOR 1810 1200 940 2140 SLIDING

FW-07(OBS) 01 FIRST FLOOR 850 1200 1000 2200 SLIDING-OBS

FW-08 01 FIRST FLOOR 850 1800 340 2140 AWNING

8

S4.55 ISSUE

REV DATE DESCRIPTION BY

A 14/04/20 ISSUED FOR S4.55 APPLICATION JP

Page 5: A/C AIR CONDITIONING UNIT IN THE APPROVED DA OF LOT …...HW DP RWT A/C PPOS 6 STAR HOT WATER SYSTEM SITE BOUNDARY WIND DIRECTION VEHICULAR MOVEMENT VEHICULAR ACCESS SETBACK LINE TREES

01 FIRST FLOOR

55.95

01 CEILING LEVEL

58.40

01 GROUND FLOOR

53.00

01 ROOF RIDGE

60.09

CR1

SIT

E B

OU

ND

AR

Y

UNIT 01

52.830 52.830

BR1 CRT CC CR2 BR1

2400 2950

1689

2450

2950

7089

SIT

E B

OU

ND

AR

Y

FW-06FW-05(OBS) FW-04(OBS)

2050

350

2050

350

860

1280

FW-03

GW-03 GW-02GW-04

D-06

2400

609

2140

RWT

CR2

DPDPDP

01 FIRST FLOOR

55.95

01 CEILING LEVEL

58.40

01 GROUND FLOOR

53.00

01 ROOF RIDGE

60.09

CRTBR1BAL BR1

UNIT 01

2400

CCCR1

HWUEBGM D-06A

GD.312175

7089

2950

2450

1689

SIT

E B

OU

ND

AR

Y

2400

2140

DP DP DP DP

A/C

RWT

DRAWING TITLE:PROJECT:DRAWING No:DATE: SCALE:TYPE:

DRAWN BY:

REV:

A3

NORTH:

ISSUED BY:CHECKED BY:

LOT-01

1 : 100

14/04/20 A

\\172.31.7.12\projects\Projects- Current\Perfection Avenue StanhopeGardens\Lot 01\01 -Revit File\04 -SECTION 96\LOT 01 - S4.55.rvt

JP

LOT-01- ELEVATIONS 02S.07

JPLOT 01 PERFECTION AVE & LOT1A BATLOW STREETSTANHOPE GARDENS

PERFECTION AVENUE

IP

1 : 100S.07

UNIT-01 LEFT ELEVATION1

1 : 100S.07

UNIT-01 RIGHT ELEVATION2

S4.55 ISSUE

REV DATE DESCRIPTION BY

A 14/04/20 ISSUED FOR S4.55 APPLICATION JP

Page 6: A/C AIR CONDITIONING UNIT IN THE APPROVED DA OF LOT …...HW DP RWT A/C PPOS 6 STAR HOT WATER SYSTEM SITE BOUNDARY WIND DIRECTION VEHICULAR MOVEMENT VEHICULAR ACCESS SETBACK LINE TREES

SECTIONS L E G E N D

AL ALUMINIUM FRAME WINDOW

CR1, CR2 CEMENT RENDER TYPE/ COLOUR

DP DOWN PIPE

BAL1, BAL2 BALUSTRADE TYPE

AC AIR CONDITIONING UNIT

CC CONCRETE CAPPING

GD GARAGE DOOR

GUT GUTTER

TD TIMBER DOOR

NGL NATURAL GROUND LEVEL

RWT RAIN WATER TANK

MR METAL ROOF

HWS HOT WATER SYSTEM

CRT CONCRETE ROOT TILE

FAS FASCIA

N.G.L

2400

52.226

PLASTERBOARD CEILING

PLASTERBOARD CEILING

CRT ROOF STRUCTURETO ENGINEERS

DETAIL

ROOF INSULATIONAS PER BASIX

REPORT

GUT CCCEILINGPLASTER BOARD

R2.5

LIVINGHALLWAYDINING

BED 3 HALLWAY M.BED

53.000

55.950

01 FIRST FLOOR

55.95

01 CEILING LEVEL

58.40

01 GROUND FLOOR

53.00

01 ROOF RIDGE

60.09

HALLWAY ENSBED 2

GARAGE HALLWAY KITCHEN

PLASTERBOARD CEILING

PLASTERBOARD CEILING

2450

2450

2820

CRT ROOF STRUCTURETO ENGINEERS

DETAIL

ROOF INSULATIONAS PER BASIX

REPORT

GUT CCCEILINGPLASTER BOARD

R2.5

7089

1689

2450

2950

DPDP

52.830

53.000

DRAWING TITLE:PROJECT:DRAWING No:DATE: SCALE:TYPE:

DRAWN BY:

REV:

A3

NORTH:

ISSUED BY:CHECKED BY:

LOT-01

1 : 100

14/04/20 A

\\172.31.7.12\projects\Projects- Current\Perfection Avenue StanhopeGardens\Lot 01\01 -Revit File\04 -SECTION 96\LOT 01 - S4.55.rvt

JP

LOT-01- SECTIONS 01S.08

JPLOT 01 PERFECTION AVE & LOT1A BATLOW STREETSTANHOPE GARDENS

PERFECTION AVENUE

IP

1 : 100S.08

UNIT-01 SECTION AA1

1 : 100S.08

UNIT-01 SECTION BB2

S4.55 ISSUE

REV DATE DESCRIPTION BY

A 14/04/20 ISSUED FOR S4.55 APPLICATION JP