abutment a2 -cable anchorage structural details
DESCRIPTION
ABUTMENT A2 -Cable Anchorage STRUCTURAL DETAILS for Abutment a2 -Approach SlabTRANSCRIPT
![Page 1: Abutment a2 -Cable Anchorage Structural Details](https://reader036.vdocuments.us/reader036/viewer/2022081817/5695d4cd1a28ab9b02a2d060/html5/thumbnails/1.jpg)
ABUTMENT A2
CABLE ANCHORAGE
STRUCTURAL DETAILS
PROJECT DOCUMENT NUMBER:
company phase
SCALE :
FILE NAME:
zone
document number
DRAWING TITLE:ENGINEERING CONSULTANT:
REVESTABLISHED CHECKED
APPROVEDDATE DESCRIPTION
STAT.
GOVERNMENT OF UGANDA
NEW BRIDGE ACROSS RIVERNILE AT JINJA
EMPLOYER:
UGANDA NATIONAL ROADS AUTHORITYPLOT 11, YUSUF LULE ROADP O BOX 28487KAMPALA - UGANDAEmail: [email protected]
ENGINEERING CONTRACTOR:
SCALE :
FILE NAME:
DRAWING TITLE:ENGINEERING CONSULTANT:
DATE
EMPLOYER:
ENGINEERING CONTRACTOR:
RONALD0 NISHIO AKIYAMA
SCALE :
WORKING DRAWING
SCALE :
20/07/15