ALAN BRIDGMAN PHOTOGRAPHIC RECORD OF CONTRACT HISTORY AUTHOR: ALAN BRIDGMAN Page 1 of 6 27/07/2015 FORMER ROYAL HOSPITAL, WOLVERHAMPTON CONTRACT VALUE £2MILLION, COMPLETED JUNE 2015. ST HELEN'S HOUSE, DERBY PHASE TWO CONTRACT VALUE 105K, COMPLETED 2011. PHASE ONE CONTRACT VALUE 32K, COMPLETED JULY 2009. Principle Contractor for Masonry works to the Grade One listed Georgian building for Richard Blunt Ltd. Architect: Brownhill Haywood and Brown of Lichfield. PRIVATE HALL, STAFFORDSHIRE CONTRACT VALUE 6K, COMPLETED JULY 2010. Cleaning using the Stonehealth Jos and Doff System. WEST PARK, WOLVERHAMPTON CONTRACT VALUE 20K, COMPLETED 2010. Cleaning using the Stonehealth Jos and Doff System, Restoration, Repointing and Masonry Works to the existing masonry structure'

Upload: alan-bridgman

Post on 07-Apr-2017

82 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: ABPROFILE APRIL 2011 WITH PHOTOS

ALAN BRIDGMAN PHOTOGRAPHIC RECORD OF CONTRACT HISTORY

AUTHOR: ALAN BRIDGMAN Page 1 of 6 27/07/2015

FORMER ROYAL HOSPITAL, WOLVERHAMPTON CONTRACT VALUE £2MILLION, COMPLETED JUNE 2015.

ST HELEN'S HOUSE, DERBY PHASE TWO CONTRACT VALUE 105K, COMPLETED 2011. PHASE ONE CONTRACT VALUE 32K, COMPLETED JULY 2009. Principle Contractor for Masonry works to the Grade One listed Georgian building for Richard Blunt Ltd. Architect: Brownhill Haywood and Brown of Lichfield.

PRIVATE HALL, STAFFORDSHIRE CONTRACT VALUE 6K, COMPLETED JULY 2010. Cleaning using the Stonehealth Jos and Doff System.

WEST PARK, WOLVERHAMPTON CONTRACT VALUE 20K, COMPLETED 2010. Cleaning using the Stonehealth Jos and Doff System, Restoration, Repointing and Masonry Works to the existing masonry structure'

Page 2: ABPROFILE APRIL 2011 WITH PHOTOS

ALAN BRIDGMAN PHOTOGRAPHIC RECORD OF CONTRACT HISTORY

AUTHOR: ALAN BRIDGMAN Page 2 of 6 27/07/2015

27 GUILDHALL ROAD, NORTHAMPTON. CONTRACT VALUE 400K, COMPLETED FEB 2008. Doff and Jos cleaning to retained elevations of existing building (faience, terracotta, brick and sandstone) remedial masonry, restoration and repointing works.

TRENTHAM GARDENS PHASE 6, PREMIER INN HOTEL, STOKE ON TRENT CONTRACT VALUE 180K, COMPLETED NOV 2007. Supply and install natural sandstone entablature to new build hotel. Project Manager: Prosurv Consult Ltd, Newcastle under Lyme.

PAVILION SQUARE, SCARBOROUGH, NORTH RIDING OF YORKSHIRE CONTRACT VALUE 210K, COMPLETED NOV 2007. Cleaning, restoration of listed Victorian terrace and reinstatement of original boundary walls. Project Manager: Hayes Lazonby Architects, Scarborough.

HIGH STREET, STAMFORD, LINCOLNSHIRE CONTRACT VALUE 75K, COMPLETED 2006. Cleaning using the Stonehealth Jos and Doff System, Restoration, Repointing and Masonry Works to the existing masonry structure.

SIR CHARLES BORROMEO R.C. CHURCH, HAMPTON ON THE HILL, WARWICK CONTRACT VALUE 110K, COMPLETED AUG 2006. Restoration of existing stucco works in traditional lime, supply and install new natural stone finials. Architect: Brownhill Haywood and Brown of Lichfield.

Page 3: ABPROFILE APRIL 2011 WITH PHOTOS

ALAN BRIDGMAN PHOTOGRAPHIC RECORD OF CONTRACT HISTORY

AUTHOR: ALAN BRIDGMAN Page 3 of 6 27/07/2015

TRENTHAM GARDENS PHASE 3, EAST & WEST LODGES, STOKE ON TRENT CONTRACT VALUE 34K, COMPLETED JULY 2005. Jos cleaning to remove previous paint coating from brick and sandstone, repointing and restoration of existing masonry and application of traditional lime wash to brickwork. Project Manager: Prosurv Consult Ltd, Newcastle under Lyme and Architect: Brownhill Haywood and Brown of Lichfield.

TRENTHAM GARDENS PHASE 2, ITALIAN GARDEN FOUNTAINS, STOKE ON TRENT CONTRACT VALUE 73K, COMPLETED MARCH 2005. Supply and install new Hollington sandstone fountains, remove and rebuild existing sandstone fountains in their original positions. Project Manager: Prosurv Consult Ltd, Newcastle under Lyme and Architect: Brownhill Haywood and Brown of Lichfield

WHITBOURNE HALL, WORCESTER CONTRACT VALUE 88K, COMPLETED JANUARY 2005. Principle Contractor for Masonry and Conservation works, dismantle and rebuild existing Limestone Orangery in original and new Bathstone. Project Manager: Conservation Projects ltd, Kings Heath, Birmingham.

CRIMEA WAR MEMORIAL, BOTANICAL GARDENS, SHEFFIELD CONTRACT VALUE 64K, COMPLETED MAY 2005. Dismantle existing sandstone statue of Queen Victoria, salvage and record all masonry and return to Client for rebuilding at a later date. Client: Sheffield City Council.

TRENTHAM GARDENS PHASE 1, STONE ROAD, TRENTHAM, STOKE ON TRENT CONTRACT VALUE 380K, COMPLETED JULY 2004. Principle Contractor for Masonry works to the existing Italianate Garden’s, Parterre Balustrade and Triple Arch Pavilion, Lakeside Balustrade and the Statue of Perseus for Trentham Leisure Ltd. Project Manager: Faithful and Gould, Stoke on Trent and Architect: Brownhill Haywood and Brown of Lichfield.

Page 4: ABPROFILE APRIL 2011 WITH PHOTOS

ALAN BRIDGMAN PHOTOGRAPHIC RECORD OF CONTRACT HISTORY

AUTHOR: ALAN BRIDGMAN Page 4 of 6 27/07/2015

MOOR STREET STATION, BIRMINGHAM CONTRACT VALUE 282K, COMPLETED JUNE 2003. Cleaning and Paint Removal using the Stonehealth Jos and Doff System, Restoration, Glazed Brickworks, Repointing and Masonry Works to the original Edwardian Station Building for Sir Robert McAlpine and the Architects Simons Design. Including the supply, replacement of defective sections of the original Guiting Limestone in new Guiting carved and profiled by ourselves to match the original architectural detail. The contract was completed under the direct supervision of the Conservation Architect Mr Richard Hudson of Birmingham City Council.

BOTANICAL GARDENS, SHEFFIELD, SOUTH YORKSHIRE CONTRACT VALUE 187K, COMPLETED OCTOBER 2002. Cleaning using the Stonehealth Jos and Doff System, Restoration, Repointing and Masonry Works to the existing masonry structure forming the Glasshouses of the Botanical Gardens for Strata Construction Ltd. Including the supply, replacement and rebuilding defective and missing sections of the original Stanton Moor Sandstone carved and profiled by ourselves to match the original architectural detail.

ROYAL BATHS, HARROGATE, NORTH RIDING OF YORKSHIRE PHASE TWO CONTRACT VALUE 330K, COMPLETED APRIL 2002. Surveying and Contracts Management of the Cleaning, Repointing and Masonry Works for Realstone Ltd on the redevelopment of the Historic Royal Baths and Winter Gardens for David Lyons & Associates. PHASE ONE CONTRACT VALUE 55K, COMPLETED DECEMBER 2001. Supply, carve and fix new natural sandstone to the balustrade forming the entrance to the Winter Gardens for J D Wetherspoons. Paint Removal and Stone Cleaning using the Stonehealth Jos System. SAINT ANDREW’S CHURCH, SHIFNAL, SHROPSHIRE. CONTRACT VALUE 28K, COMPLETED JANUARY 2002. Rebuilding existing buttress, Conservation and Repointing of existing masonry. Including the supply, replacement and rebuilding defective and missing sections of the Plinth Course in natural Red Hollington Sandstone carved and profiled to match the original architectural detail.

WOOTTON HALL, STAFFORDSHIRE. CONTRACT VALUE 109K, COMPLETED OCTOBER 2001. Supply of Specialist Labour for the construction of a Substantial New Country House in Natural Sandstone for Realstone Ltd. FULBOURN HOSPITAL, CAMBRIDGE. CONTRACT VALUE 360K, COMPLETED OCTOBER 2000. Cleaning using the Stonehealth Jos and Doff system, restoration and repointing of existing brick and masonry external elevations for Simons of Lincoln. Including the supply, replacement and rebuilding defective and missing sections of the original Ancaster limestone and Stanton moor sandstone carved and profiled to match the original architectural detail.

Page 5: ABPROFILE APRIL 2011 WITH PHOTOS

ALAN BRIDGMAN PHOTOGRAPHIC RECORD OF CONTRACT HISTORY

AUTHOR: ALAN BRIDGMAN Page 5 of 6 27/07/2015

LOW LEVEL STATION, LONDON ROAD, NOTTINGHAM. CONTRACT VALUE 103K, COMPLETED 1999. Cleaning, restoration and repointing of existing retained external elevations of this Grade Two Listed building for Simons of Lincoln. The contract included the supply and replacement of defective and missing sections of the original Ancaster Limestone and Stanton Moor Sandstone carved and profiled to match the original architectural detail.

ST MICHAEL AND ALL ANGELS CHURCH, HAMSTALL RIDWARE, STAFFORDSHIRE CONTRACT VALUE 73K, COMPLETION 1999. Masonry repairs in Hollington Sandstone, rebuilding the upper part of the spire, replacement carved masonry to windows on North Clerestory, repointing stonework and remedial internal masonry works to West wall. Completed under the direct supervision of English Heritage and the Architects, Horsley Huber of Stafford.

ST MICHAEL AND ALL ANGELS CHURCH, ADBASTON, STAFFORDSHIRE CONTRACT VALUE 55K, COMPLETION 1998. Masonry repairs in Lazonby Red Sandstone, repointing stonework and remedial leadworks to tower roof. Completed under the direct supervision of English Heritage and the Architects, Horsley Huber of Stafford.

ST MARKS STATION AND RETAIL DEVELOPMENT, LINCOLN ANTI GRAFFITI CONTRACT VALUE 25K, COMPLETED 1997. Application of Tensid Grafficote One water based wax anti graffiti coating to existing and new masonry buildings, new brickwork and artificial stone to allow the safe removal of any subsequent graffiti. MASONRY CONTRACT VALUE 280K COMPLETED 1996. Cleaning, restoration and repointing of existing retained external elevations of this Grade Two listed building for Simons of Lincoln. The contract includes the supply and replacement of defective and missing sections of the original Ancaster stone carved and profiled by Realstone Ltd to match the original architectural detail. In addition to the works to the existing building, Realstone Ltd supplied the masonry for the reconstruction of the original High Bridge Obelisk; we were responsible for the research and its construction on site.

GUYS CLIFFE HOUSE, WARWICK. CONTRACT VALUE 150K, COMPLETED 1995. Stabilisation and Preservation of a substantial Grade Two Listed building following fire damage, works briefly consisted of the careful demolition of unstable areas and subsequent rebuilding works in new and reclaimed brick and masonry. The contract was completed under the direct supervision of Philip Johnson Associates, English Heritage and Warwick District Council.

Page 6: ABPROFILE APRIL 2011 WITH PHOTOS

ALAN BRIDGMAN PHOTOGRAPHIC RECORD OF CONTRACT HISTORY

AUTHOR: ALAN BRIDGMAN Page 6 of 6 27/07/2015

ALL SAINTS CHURCH, MODDERSHALL, STOKE ON TRENT CONTRACT VALUE 81K, COMPLETED 1994. Masonry works involving the careful demolition of the existing Church due to subsidence, recording and finally rebuilding in reclaimed and new stone to the original design.

ST LUKE’S CHURCH, SILVERDALE, NEWCASTLE UNDER LYME CONTRACT VALUE 46K, COMPLETED 1994. First phase remedial masonry works to church tower including descaling loose and friable stone by hand, indenting replacement coursed and ashlar Grinshill sandstone, repointing and the application of non-silicone masonry water repellent system