about us products service contact us sitemap -liftnetionline.neti.com.ph/trainingfiles/nmc 11/nmc...

127
About us | Products | Service | Contact us | Sitemap www.h-lift.com Products >>Marine anchor | Anchor chain Anchor Chain Joining Shackle Type Kenter Common Link Anchor Joining Shackle "Pear" Shaped Enlarged Link Anchor Swivel Shackle End Link Swivel Studless Link Page 1 of 4 STUD LINK ANCHOR CHAIN 05/01/2011 http://www.h-lift.com/anchorchain.htm

Upload: nguyentuyen

Post on 03-Nov-2018

226 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: About us Products Service Contact us Sitemap -liftnetionline.neti.com.ph/trainingfiles/NMC 11/NMC 11,12,13.pdf · 1 N = 0.102 kg. 1 inch = 25.4 mm 1 foot = 304.8 mm 1 fathom = 1.828

About us | Products | Service | Contact us | Sitemap www.h-lift.com

Products>>Marine anchor | Anchor chain

Anchor Chain

▲Joining Shackle Type Kenter

▲Common Link

▲Anchor Joining Shackle "Pear" Shaped

▲Enlarged Link

▲Anchor Swivel Shackle

▲End Link

▲Swivel

▲Studless Link

Page 1 of 4STUD LINK ANCHOR CHAIN

05/01/2011http://www.h-lift.com/anchorchain.htm

Page 2: About us Products Service Contact us Sitemap -liftnetionline.neti.com.ph/trainingfiles/NMC 11/NMC 11,12,13.pdf · 1 N = 0.102 kg. 1 inch = 25.4 mm 1 foot = 304.8 mm 1 fathom = 1.828

Proof Load, Breaking Load & Weight of Anchor Chain Cable

▲Joining Shackle Type D

▲Type A Buoy Shackle

▲Mining Round Link Chain

▲Type B Buoy Shackle

▲Chafe Chain

A.1 - Connection of two chain-cables

A.2 - Standard length with joining shackle

A.3 - Standard length with joining shackle and anchor shackle

A.4 - End length with joining shackle, swivel and anchor shackle

A.5 - Forerunner with joining shackle, swivel and anchor shackle

B.1 - Connection of two chain-cables

B.2 - Standard length with lugless joining shackle

B.3 - Standard length with lugless joining shackles and ordinary anchor shackle

B.4 - End length with lugless joining shackle, swivel and ordinary anchor

shackle

B.5 - Forerunner with lugless joining shackle, swivel and lugless anchor

shackle

B.6 - Three links adaptor piece

Chain Diameter

Length of five links

Normal Strength Grade 1 High Strength

Grade 2

Extra-high Strength

Grade 3

Mass

Kilograms per 27.5 metersProof

LoadBreaking Load Proof

LoadBreaking Load Proof

LoadBreaking Load

mm mm kN kN kN kN kN kN kg

Page 2 of 4STUD LINK ANCHOR CHAIN

05/01/2011http://www.h-lift.com/anchorchain.htm

Page 3: About us Products Service Contact us Sitemap -liftnetionline.neti.com.ph/trainingfiles/NMC 11/NMC 11,12,13.pdf · 1 N = 0.102 kg. 1 inch = 25.4 mm 1 foot = 304.8 mm 1 fathom = 1.828

12.5

14

16

17.5

19

275

308

352

385

418

46.1

57.9

75.5

89.2

104.9

65.7

82.4

106.9

127.5

150.0

65.7

82.4

106.9

127.5

150.9

92.2

115.7

150.0

179.5

210.8

92.2

115.7

150.0

179.5

210.8

132.4

164.8

215.7

260.8

301.1

110

130

170

180

220

20.5

22

24

26

28

451

484

528

572

616

122.6

140.2

166.7

194.2

224.6

174.6

200.1

237.3

277.5

320.7

174.6

200.1

237.3

277.5

320.7

244.2

280.5

332.4

389.3

449.1

244.2

280.5

332.4

389.3

449.1

349.1

401.1

475.6

556.0

642.3

260

300

340

420

480

30

32

34

36

38

660

704

748

792

836

256.9

291.3

327.5

365.8

406.0

367.7

416.8

467.8

522.7

580.6

367.7

416.8

467.8

522.7

580.6

513.9

582.5

655.1

731.6

812.0

513.9

582.5

655.1

731.6

812.0

734.5

832.6

936.5

1049.3

1157.2

550

610

700

790

880

40

42

44

46

48

880

924

968

1012

1056

448.2

492.3

538.4

585.5

635.5

640.4

703.1

768.8

836.5

908.1

640.4

703.1

768.8

836.5

908.1

896.3

980.7

1078.7

1167.0

1274.9

896.3

980.7

1078.7

1167.0

1274.9

1284.7

1402.3

1539.6

1676.9

1814.2

970

1070

1170

1270

1380

50

52

54

56

58

60

62

64

66

68

1100

1144

1188

1232

1276

1320

1364

1408

1452

1496

686.5

739.4

794.3

851.2

909.1

968.9

1029.7

1098.3

1157.2

1225.8

980.7

1059.1

1137.6

1216.0

1294.5

1382.7

1471.0

1559.3

1657.3

1745.6

980.7

1059.1

1137.6

1216.0

1294.5

1382.7

1471.0

1559.3

1657.3

1745.6

1372.9

1480.8

1588.7

1706.4

1814.2

1914.7

2059.4

2186.9

2314.4

2451.7

1372.9

1480.8

1588.7

1706.4

1814.2

1914.7

2059.4

2186.9

2314.4

2451.7

1961.3

2108.4

2265.3

2432.0

2598.8

2765.5

2942.0

3128.3

3304.8

3501.0

1480

1600

1720

1850

1990

2120

2250

2440

2590

2750

70

73

76

78

81

1540

1606

1672

1716

1782

1294.5

1392.5

1500.4

1578.9

1686.7

1843.7

1990.7

2147.6

2255.5

2412.4

1843.7

1990.7

2147.6

2255.5

2412.4

2579.1

2794.9

3010.6

3157.7

3383.3

2579.1

2794.9

3010.6

3157.7

3383.3

3687.3

3991.3

4295.3

4501.3

4824.9

2910

3180

3470

3650

3930

84

87

90

92

95

1848

1914

1980

2024

2090

1804.4

1922.1

2049.6

2128.0

2255.5

2579.1

2745.9

2922.4

3040.1

3226.4

2579.1

2745.9

2922.4

3040.1

3226.4

3608.8

3854.0

4089.4

4256.1

4511.0

3608.8

3854.0

4089.4

4256.1

4511.0

5158.3

5501.5

5844.8

6080.1

6443.0

4250

4560

4860

5100

5400

97

98

100

102

105

2134

2156

2200

2244

2310

2343.8

2383.0

2471.3

2559.5

2696.8

3344.1

3402.9

3530.4

3657.9

3854.0

3344.1

3402.9

3530.4

3657.9

3854.0

4677.8

4766.0

4942.6

5119.1

5393.7

4677.8

4766.0

4942.6

5119.1

5393.7

6688.1

6851.6

7060.8

7315.8

7698.2

5670

5750

6010

6250

6600

107

108

2354

2376

2785.1

2834.1

3981.5

4040.3

3981.5

4040.3

5570.2

5658.4

5570.2

5658.4

7963.0

8090.4

6820

6950

Page 3 of 4STUD LINK ANCHOR CHAIN

05/01/2011http://www.h-lift.com/anchorchain.htm

Page 4: About us Products Service Contact us Sitemap -liftnetionline.neti.com.ph/trainingfiles/NMC 11/NMC 11,12,13.pdf · 1 N = 0.102 kg. 1 inch = 25.4 mm 1 foot = 304.8 mm 1 fathom = 1.828

GENERAL INFORMATION

CONVERSION

How to order anchor chain ?

111

114

117

2442

2508

2574

2971.4

3108.7

3255.8

4246.3

4442.4

4648.4

4246.3

4442.4

4648.4

5942.8

6227.2

6511.6

5942.8

6227.2

6511.6

8482.8

8894.6

9296.7

7290

7640

7980

120

122

124

127

130

2640

2684

2728

2794

2860

3402.9

3501.0

3599.0

3746.1

3903.0

4854.3

5001.4

5138.7

5354.4

5570.2

4854.3

5001.4

5138.7

5354.4

5570.2

6805.8

7001.9

7198.1

7492.3

7796.3

6805.8

7001.9

7198.1

7492.3

7796.3

9718.4

9993.0

10277.4

10708.9

11140.4

8310

8620

8920

9380

9840

132

137

142

147

152

2904

3014

3124

3234

3344

4001.1

4256.1

4520.9

4785.6

5050.4

5717.3

6080.1

6452.8

6835.2

7217.7

5717.3

6080.1

6452.8

6835.2

7217.7

802.2

8512.2

9031.9

9561.5

10100.8

802.2

8512.2

9031.9

9561.5

10100.8

11424.7

12160.2

12905.6

13660.7

14425.6

10140

10910

11670

12440

13200

157

162

3454

3564

5325.0

5599.6

7600.2

8002.2

7600.2

8002.2

10640.2

11199.2

10640.2

11199.2

15200.3

15994.6

14000

14700

● The inside length (grip or pitch) of one link is 4 wire diameters.

● The outside length of one link is 6 wire diameters.

● The outside width of one link is 3.56 wire diameters.

● The gauge-test length is the outside length over 6 links and equals 26 wire diameters.

● The weight of one links is about 3-1/3 times its wire diameter cubed.

● Doubling the wire diameter of one link multiplies its weight by 8.

● The weight of 1 linear foot of chain is 10 times its wire diameter squared.

● The length of a standard "shot" = 15 fathoms = 90ft.= 1080".

● The weight of a 90ft. shot = 900 times its wire diameter squared.

● Doubling the wire diameter of a 90ft. shot multiplies its weight by 4.

● Doubling the size of chain theoretically multiplies its strength by 4, in practice, by a trifle less than 4.

● The safe working load of chain is ordinarily assumed as one half the proof test.

1 lbs = 0.454 kg. 1 cwt = 50.8 kg.

1 ton (long) = 1016 kg. 1 KN = 102 kg.

1 N = 0.102 kg. 1 inch = 25.4 mm

1 foot = 304.8 mm 1 fathom = 1.828 m

● Chain Diameter & Grade

●Length: 27.5m or 25m

● Finish: H. D. Galvanized or Black-tarred.

● Quantity of Lengths

● Quantity of Fittings

● Class Certifications: ABS(USA), BV(France), CCS(China), DNV(Norway), GL(Germany), KR(Korea), LR(U. K. ), NK(Japan), RINA(Italy), RS(Russia) & Works Certificate.

Products>> Marine anchor | Anchor chain

About us | Products | Service | Contact us | Sitemap www.h-lift.com

Copyright @ 2009 H-Lift Industries Co.,Ltd. All rights reserved. 8/F., No. 560 Jincheng Road, Xiaoshan, Hangzhou, 311202, China Tel: +86-571-8263-6008, 8263-6018, 8263-6058, 8263-6068 Fax: +86-571-8263-6028 E-mail: [email protected]

Page 4 of 4STUD LINK ANCHOR CHAIN

05/01/2011http://www.h-lift.com/anchorchain.htm

Page 5: About us Products Service Contact us Sitemap -liftnetionline.neti.com.ph/trainingfiles/NMC 11/NMC 11,12,13.pdf · 1 N = 0.102 kg. 1 inch = 25.4 mm 1 foot = 304.8 mm 1 fathom = 1.828

Document No.: ZZ-S-P-07.20.02 Revision Date: 2011/02/28 Form No.: S-072002-02FIG

Issuer: HSEQ Manager

Approver: DPA

Anchoring

Method of Reducing Speed Gradually (Examples) Figure

- In case of huge vessels (when fully loaded) Dist to (miles) Speed (knots) Order

7 abt 12 S/B Eng 6 10 HALF 5 8 SLOW 4 6 D/SLOW 3 5 STOP If, after Stop Eng, it is necessary to drop the headway speed to less

than 5 knots, place engine on Dead Slow Astern at appropriate times.

(As the ship’s head will swing, do not run the engine for more than 1 minute).

When within 0.5 mile, stop taking off the ships headway by going from Slow Astern to Half Astern.

- In case of ordinary ships (standard) Dist to (miles) Speed (knots) Order

5 abt 12 S/B Eng 4 10 HALF DOWN 3 8 SLOW DOWN 2 6 D/SLOW 1 4 STOP When within 0.5 mile, stop the ship’s headway by going from Slow

Astern to Half Astern.

Note: Engine speed should be gradually reduced before coming to the S/B Eng point, and should be the speed of S/B Full when the S/B Eng point is reached.

Page 6: About us Products Service Contact us Sitemap -liftnetionline.neti.com.ph/trainingfiles/NMC 11/NMC 11,12,13.pdf · 1 N = 0.102 kg. 1 inch = 25.4 mm 1 foot = 304.8 mm 1 fathom = 1.828

Document No.: ZZ-S-P-07.20.02 Revision Date: 2011/02/28 Form No.: S-072002-04FIG

Issuer: HSEQ Manager

Approver: DPA

Anchoring

Determination of Holding Power of Anchor Figure

1 / 2

(Examples as Guidance)

Holding power P is derived from the weight of anchor, weight of anchor chain, and their holding power coefficients. P = Pa + Pc = λa x Wa + λc x Wc x L P: Holding Power ( Ton ) Pa: Holding Power of anchor ( Ton ) Pc: Holding Power of anchor chain ( Ton ) λa : Holding Power coefficient of anchor Wa: Weight of anchor ( Ton ) λc: Holding Power coefficient of anchor chain Wc: Weight of anchor chain L: Length of anchor chain laid on the bottom (m)

The length of anchor chain laid on the bottom is derived from following formula:

L = Lc – S = Lc - √y x (y+ 2T/Wc)

Lc: Length of anchor chain veered out ( m ) S: Length of catenary’s curve of anchor chain (m) y: Height of hose-pipe from sea bottom (m) T: External force by wind (ton) Wc: Weight of anchor chain. The maximum tension on the chain is approximated as three times wind pressure on the front of the ship ( For PCCs, five times ) T = 3 x R ( for PCCs, T = 5 x R ) T: Maximum tension on the chain (Ton) R: Wind pressure on front of the ship (Ton) Wind pressure on front of the ship is derived through the following formula: R = 0.5 x ρ x Ca x ( V x G)² x A / 1000 R: Wind pressure on front of ship (Ton) ρ: Air density = 0.125 kg/m3 Ca: Wind pressure coefficient = 0.75 V: Wind velocity ( m/sec ) G: Gust rate = 1.25 A: Frontal area of windage above sea surface (m2)

Page 7: About us Products Service Contact us Sitemap -liftnetionline.neti.com.ph/trainingfiles/NMC 11/NMC 11,12,13.pdf · 1 N = 0.102 kg. 1 inch = 25.4 mm 1 foot = 304.8 mm 1 fathom = 1.828

Document No.: ZZ-S-P-07.20.02 Revision Date: 2011/02/28 Form No.: S-072002-04FIG

Issuer: HSEQ Manager

Approver: DPA

Anchoring

Determination of Holding Power of Anchor Figure

2 / 2

2 / 2

It can be seen that when wind velocity is 23 m/sec, the holding power P and maximum tension T become almost the same, and the ship will start dragging its anchor.

For reference, below table shows the holding power coefficient of a typical anchor and anchor chain.

AC-14 JIS Type Anchor Chain

Sand

7.0 3.5 0.75

Mud

10.0 3.0 1.0

Page 8: About us Products Service Contact us Sitemap -liftnetionline.neti.com.ph/trainingfiles/NMC 11/NMC 11,12,13.pdf · 1 N = 0.102 kg. 1 inch = 25.4 mm 1 foot = 304.8 mm 1 fathom = 1.828
Page 9: About us Products Service Contact us Sitemap -liftnetionline.neti.com.ph/trainingfiles/NMC 11/NMC 11,12,13.pdf · 1 N = 0.102 kg. 1 inch = 25.4 mm 1 foot = 304.8 mm 1 fathom = 1.828
Page 10: About us Products Service Contact us Sitemap -liftnetionline.neti.com.ph/trainingfiles/NMC 11/NMC 11,12,13.pdf · 1 N = 0.102 kg. 1 inch = 25.4 mm 1 foot = 304.8 mm 1 fathom = 1.828

GENERAL INSTRUCTION

LETTER

Ref.No.: GI/FLT/001/14 Page: 1/2 Date: 09/01/2014 Appr.By.: DPA

NYKSM Manoeuvring Standard

This GI Letter cancels and supersedes GI/FLT/011/12, dated 11 April 2012

[Gist]: [Gist]: [Gist]: [Gist]:

The company has reviewed and amended the “NYKSM Manoeuvring Standard”. The amended

Standard is attached with this GI-FLT.

[Background]:[Background]:[Background]:[Background]:

“NYKSM Manoeuvring Standard” comprises of essential instructions and procedures which

should be observed by the Bridge Team Members (including Pilots) on board NYKSM managed

vessels.

Some serious navigational incidents had occurred during manoeuvring in port and/or under

pilotage. Few such incidents are listed here as a reference:-

a) during berthing, contact incident with crane and other vessel at berth at Kobe in 2006.

b) during un-berthing, contact incident with crane and other vessel at berth at Kobe in 2008

(GI/FLT/038/08)

c) during approaching berth, vessel touched bottom at Dampier Australia .

(HSEQ/ALL/032/12)

This placard was implemented as one of the countermeasures and a reminder to the Bridge

Team members in order to prevent reoccurrence of similar incidents.

Furthermore, this standard was reviewed and amended as a follow up of an incident

(HSEQ/BLT/016/13 Date: 01- Nov -2013, Incident Bulletin for weeks 37 ~43 of 2013) in which

Pilot refused to berth the vessel and disembarked. It was considered to highlight that

compliance with Standard Berthing and Un-berthing Plans (as per GI/FLT/038/08) is only a

recommendation for safe berthing / un-berthing in ports other than Kobe (berth at Rokko

Terminal). If Master and/or pilots have safer option considering existing availability of sea room,

proximity of navigation hazards, prevailing conditions of wind/current etc, the safer navigation

option should be exercised. .

[Supplementary Explanation]:[Supplementary Explanation]:[Supplementary Explanation]:[Supplementary Explanation]:

a) “NYKSM Manoeuvring Standard” helps the Master and other Bridge Team Members to

challenge the pilot in cases where he intends to conduct some unsafe manoeuvre or

non-necessary deviation from safe navigation practices.

b) Contents of “NYKSM Manoeuvring Standard” shall be confirmed and studied by the Bridge

Team Members

c) “NYKSM Manoeuvring Standard” forms part of the Master - Pilot information exchange.

Page 11: About us Products Service Contact us Sitemap -liftnetionline.neti.com.ph/trainingfiles/NMC 11/NMC 11,12,13.pdf · 1 N = 0.102 kg. 1 inch = 25.4 mm 1 foot = 304.8 mm 1 fathom = 1.828

GENERAL INSTRUCTION

LETTER

Ref.No.: GI/FLT/001/14 Page: 2/2 Date: 09/01/2014 Appr.By.: DPA

NYKSM Manoeuvring Standard

Pilot’s signature on the Pilot card serves as evidence of pilot having read and understood the

company’s requirements as included in this standard

d) When the Master judges that pilot’s manoeuvre is unsafe or poses a risk to the safety of

navigation, he should assert the alternative option which is safer. Masters are reminded

that, if required, they have the authority to immediately override the pilot's instructions

and manoeuvre the vessel as is deemed necessary.

[[[[Action Required]Action Required]Action Required]Action Required]

a) Print out the attached “NYKSM Manoeuvring Standard”, laminate it, and keep it readily

available on the bridge.

b) "NYKSM Manoeuvring Standard" should be shown and explained to the pilot when the

Master presents the Pilot Card and discusses other information including passage plan

during Master Pilot Information Exchange.

c) Seek cooperation from Pilot to comply with this Standard as far as practicable, except when

required to avoid any hazards or dangers to vessel’s safe navigation. If the pilot has any

concern or other suggested alternative manoeuvre or plan, please assess the risks and follow

the safest option.

d) It is recommended that Masters comply with Standard Berthing and Un-Berthing Plans as

closely as possible giving due regard to:-

i) Proximity of navigational hazards off the berth

ii) Prevailing conditions of wind and current

iii) Actual berth approaches may vary as per the plan / layout at the port.

iv) For the Port of Kobe, Berth at Rokko Terminal: These standard berthing and

un-berthing plans should be complied with strictly as far as practicable.

[Attachments]:[Attachments]:[Attachments]:[Attachments]:

NYKSM Manoeuvring Standard - Placard

********** END **********

Page 12: About us Products Service Contact us Sitemap -liftnetionline.neti.com.ph/trainingfiles/NMC 11/NMC 11,12,13.pdf · 1 N = 0.102 kg. 1 inch = 25.4 mm 1 foot = 304.8 mm 1 fathom = 1.828

<Ver. 2.0, Issued Jan 2014>

NNYYKKSSMM aanndd MMaasstteerr wwoouulldd ll iikkee ttoo wweellccoommee tthhee PPii lloott oonn bbooaarrdd oouurr ccoommppaannyy’’ ss mmaannaaggeedd vveesssseell .. WWee llooookk ffoorrwwaarrdd ttoo yyoouurr aaccttiivvee iinnvvoollvveemmeenntt iinn BBrriiddggee TTeeaamm.. WWee rreeqquueesstt yyoouurr ccooooppeerraattiioonn iinn iinnffoorrmmaattiioonn sshhaarriinngg wwii tthh tthhee MMaasstteerr,, aatt lleeaasstt wwii tthh rreessppeecctt ttoo tthhee ffooll lloowwiinngg,, aass ppaarrtt ooff tthhee MMaasstteerr--PPii lloott IInnffoorrmmaattiioonn EExxcchhaannggee::--

�� PPaassssaaggee PPllaannnniinngg ((iinntteennddeedd ccoouurrssee,, ssppeeeedd,, aapppprrooaacchh)) �� AAnnttiicciippaatteedd ddiissttuurrbbaanncceess ((wweeaatthheerr ccoonnddii ttiioonnss,, ccuurrrreennttss,, eettcc..)) �� TTrraaffff iicc CCoonnggeessttiioonn �� LLooccaall rreegguullaattiioonnss,, rruulleess aanndd nnaavviiggaattiioonnaall wwaarrnniinngg �� IInnffoorrmmaattiioonn ff rroomm aannyy sshhiippss aarroouunndd oorr ttrraaff ff iicc ccoonnttrrooll �� IInnssttrruuccttiioonnss ffoorr ttuuggss oorr eessccoorrtt bbooaattss �� AAnnyy aall tteerraattiioonn iinn yyoouurr ppllaann;; aannyy uunnaannttiicciippaatteedd ssii ttuuaattiioonnss �� AAsscceerrttaaiinn eeqquuiippmmeenntt ffoorr yyoouurr uussee aanndd sseettttiinnggss

EExxcceepptt iinn ccaasseess ooff eemmeerrggeennccyy ffoorr aavvooiiddaannccee ooff aannyy iimmmmiinneenntt ddaannggeerr oorr ii ff yyoouurr iinntteennddeedd mmaannooeeuuvvrree iiss tthhee ssaaffeerr ooppttiioonn,, pplleeaassee ccooooppeerraattee ttoo aaddhheerree ttoo tthhee ffooll lloowwiinngg aass ffaarr aass pprraaccttiiccaabbllee::-- •• DDOO NNOOTT DDEEVVIIAATTEE from CCHHAARRTTEEDD PPAASSSSAAGGEE iinn cchhaannnneell //tt rr aaff ff iicc rr oouuttee • CCOOMMPPLLYY with company’s UUKK CC PPooll iiccyy (Ref Pilot Card Section-D) • CCOOMMPPLLYY with company’s AAII RR DDRRAAFFTT PPooll iiccyy • BBEE GGUUIIDDEEDD with company’s SSTTAANNDDAARRDD BBEERRTTHHII NNGG //

UUNNBBEERRTTHHII NNGG PPRROOCCEEDDUURREESS NNoottee:: AAll ll BBrr iiddggee TTeeaamm MMeemmbbeerrss aarree eexxppeecctteedd ttoo oobbsseerrvvee pprruuddeenntt sseeaammaannsshhiipp aanndd ccoommppllyy wwii tthh aappppll iiccaabbllee llooccaall aanndd iinntteerrnnaattiioonnaall rruulleess && rreegguullaattiioonnss aanndd rreelleevvaanntt ccoommppaannyy’’ ss nnaavviiggaattiioonn pprroocceedduurreess..

Maximum Air Draft shall be limited such that a MINIMUM NET CLEARANCE OF 0.60M is maintained at all times during the voyage NET CLEAREANCE =

Charted Clearance – Air Draft – Wave Allowance – Accuracy of Chart ±Other Corrections / allowances for various

factors

NYKSM Manoeuvring Standard

Air Draft Policy

Page 13: About us Products Service Contact us Sitemap -liftnetionline.neti.com.ph/trainingfiles/NMC 11/NMC 11,12,13.pdf · 1 N = 0.102 kg. 1 inch = 25.4 mm 1 foot = 304.8 mm 1 fathom = 1.828

<Ver. 2.0, Issued Jan 2014>

NYKSM Manoeuvring Standard

STANDARD BERTHING PLAN

STANDARD UN-BERTHING PLAN

(A)

STANDARD UN-BERTHING PLAN

(B)

Page 14: About us Products Service Contact us Sitemap -liftnetionline.neti.com.ph/trainingfiles/NMC 11/NMC 11,12,13.pdf · 1 N = 0.102 kg. 1 inch = 25.4 mm 1 foot = 304.8 mm 1 fathom = 1.828

NYK SMS Manual APPENDIX 7 APPENDIX 7 APPENDIX 7 APPENDIX 7 (Rev: 2015/12/01) <S-072003-01FRM> Pilot CardPilot CardPilot CardPilot Card Page 1 of 3

PILOT CARD and MASTER-PILOT INFORMATION EXCHANGE

Port : Date : Pilot’s Name :

PART A : PART A : PART A : PART A : SHIP’S PARTICULARSSHIP’S PARTICULARSSHIP’S PARTICULARSSHIP’S PARTICULARS (fixed/permanent data) (fixed/permanent data) (fixed/permanent data) (fixed/permanent data)

Ship’s name IMO No.

Call sign LOA Breadth Year built

GRT M/T Deadweight M/T Summer Displ. M/T

Anchor chain: Port shackles, Stbd shackles, Stern shackles (1 Shackle=(1 Shackle=(1 Shackle=(1 Shackle= 2 2 2 27.57.57.57.5 m m m m //// 15 15 15 15 fathoms)fathoms)fathoms)fathoms)

Distance Bridge: to bow m, to stern m Bulbous bow: YES / NO

Thruster : Bow kw ( HP), Stern kw ( HP)

Rudder Type , Max. angle , Number of rudders , Hard-over to hard-over sec

Rudder angle for neutral effect , Type of Steering Gear :

Steering idiosyncrasies / peculiarities (if any): .

Number of Propellers , Propeller Turn : RIGHT / LEFT, Controllable Pitch : YES / NO

Type of engine Maximum power kw ( HP)

Maneuvering Engine order Rpm/pitch Speed Loaded Speed Ballast

Full ahead

Half ahead

Slow ahead

Dead slow ahead

Dead slow astern

Slow astern

Half astern

Full astern

h. Any Constraints imposed by Fuel type in use:

a. Time limit for ME to run continuously astern min

b. Time taken: Full ahead to full astern sec

c. Max. no. of consecutive starts

d. Minimum RPM , knots

e. Critical RPM : From to

f. Astern power % of ahead power

g. Type of Fuel in use for M/E propulsion ______________

(Eg. HFO/DO/MGO/ULSGO etc)

((((OOOObtainbtainbtainbtain items items items items ‘a’ t ‘a’ t ‘a’ t ‘a’ to ‘o ‘o ‘o ‘e’ from sea trial booklet, item ‘f ’ for diesel engines may be estimated by experience and ‘rule of thumb’)e’ from sea trial booklet, item ‘f ’ for diesel engines may be estimated by experience and ‘rule of thumb’)e’ from sea trial booklet, item ‘f ’ for diesel engines may be estimated by experience and ‘rule of thumb’)e’ from sea trial booklet, item ‘f ’ for diesel engines may be estimated by experience and ‘rule of thumb’)

PART PART PART PART B B B B ---- 1 1 1 1 : : : : SHIP’S SHIP’S SHIP’S SHIP’S CONDITION: (voyageCONDITION: (voyageCONDITION: (voyageCONDITION: (voyage----specific data, to be filledspecific data, to be filledspecific data, to be filledspecific data, to be filled----in for each maneuver)in for each maneuver)in for each maneuver)in for each maneuver)

List deg Port / Starb’d

Draught: Fwd m/ ft in, Aft: m/ ft in Mid-Ship: m / ft in,

Displacement : M/T

PART PART PART PART B B B B ---- 2 2 2 2 : : : : SHIP’S SHIP’S SHIP’S SHIP’S READINESS : (voyageREADINESS : (voyageREADINESS : (voyageREADINESS : (voyage----specific data, to be filledspecific data, to be filledspecific data, to be filledspecific data, to be filled----in for each maneuver)in for each maneuver)in for each maneuver)in for each maneuver)

Check and Confirm following tested and in readiness and in good working order as applicable:

Anchors, Windlass, Winch Steering gear Number of power units operating Whistle ECDIS # 1 ECDIS # 2

Radar / ARPA #1 cm IndicatorsIndicatorsIndicatorsIndicators : Rudder ME Rpm/Pitch Rate of Turn

Radar / ARPA #2 cm Bow Thruster (s) Flags, Day signal Lamp, Shapes

Radar / ARPA #3 cm Speed log Doppler

VHFs Water speed Ground speed

M/E run ahead / astern Dual-Axis Echo sounder

Engine Telegraphs Compass System *Constant Gyro Error

Elec. Pos. Fix. Sys. Type: *(Gyro Error)=(Gyro Bearing)-(True Bearing)<Ex: Gyro 240°True 242°: Gyro Error -2°> ** AIS **AIS power output: (Arrival in port limits = Reduce) / (Departure from port limits = Increase)

m

m

m

m

Parallel W/L Loaded m Ballast m

Air Draught m ft in

Center of manifold

(Required for oil & gas tankers only)

Page 15: About us Products Service Contact us Sitemap -liftnetionline.neti.com.ph/trainingfiles/NMC 11/NMC 11,12,13.pdf · 1 N = 0.102 kg. 1 inch = 25.4 mm 1 foot = 304.8 mm 1 fathom = 1.828

NYK SMS Manual APPENDIX 7 APPENDIX 7 APPENDIX 7 APPENDIX 7 (Rev: 2015/12/01) <S-072003-01FRM> Pilot CardPilot CardPilot CardPilot Card Page 2 of 3

The Company defines the navigational equipment that the pilot can use as follows: a).RADAR/ARPA No:. _______ . b) ECDIS No. c). VHF No. d). AIS e) Air Horn f). Others : .

PART C: Local conditions and special information (voyage-specific data, to be filled-in for each maneuver) Vessels must attempt to obtain as much of the following data as is possible; by discussion with the Pilot.

However, it is understood that traffic & maneuvering situations and time in hand may not always allow a complete review.

Therefore the extent of information recorded in this part is at the Master’s discretion, as best suitable to the prevailing circumstances.

Weather: Actual condition ( Berthing and Un-berthing criteria )

(1) Wind: m/s (≦ m/s ) (2) Current: kt (≦ kt )

(3) Sea & Swell: m (≦ m) (4) Visibility: n.m. (> n.m.)

(5) Changes in the effect of (1) & (2) on the vessel, when ever courses are altered, with special emphasis to cross-track drift

of the vessel.

� All conditions are within the criteria for berthing/un-berthing to/from the terminal

� Not all conditions are within the criteria, however, all parties concerned have acknowledged to proceed for approach to

berthing/un-berthing on condition that

Approach plan & Berthing/mooring/anchoring layout; Tugs, mooring boats to be used; cautionary positions where special

care may be required (sketch if possible or attach Pilot’s sketch if provided):

Berthing and Un-berthing criteria

(1) Berthing Speed: ≦ cm/sec.

(2) Tug arrangement: Berthing / Un-berthing ps x

(3) Location of Tug Push Point :

Others:

1. Contingency Plan by Vessel and Pilot, in case of FAILURE of M/E, Bow Thruster and Steering.

2. Special limitations or malfunctions of relevant equipment/machinery (if any other than below SWLs):

S.W.L. of mooring bitts = ___T, S.W.L. of sunken (recessed) bitts = ___T, S.W.L. of bitts for S.T.S. = ___T

Maximum permissible bollard pull of Tugs__________________

SWL of Fairleads: ___________________ SWL of Bitts: __________________

New local hazards, reporting regulations etc.:

Master _____ _D/O (Pilot – optional)_______________________

Check condition for safe berthing/un-berthing

Page 16: About us Products Service Contact us Sitemap -liftnetionline.neti.com.ph/trainingfiles/NMC 11/NMC 11,12,13.pdf · 1 N = 0.102 kg. 1 inch = 25.4 mm 1 foot = 304.8 mm 1 fathom = 1.828

NYK SMS Manual APPENDIX 7 APPENDIX 7 APPENDIX 7 APPENDIX 7 (Rev: 2015/12/01) <S-072003-01FRM> Pilot CardPilot CardPilot CardPilot Card Page 3 of 3

Part D (Applicable to all vessels)Part D (Applicable to all vessels)Part D (Applicable to all vessels)Part D (Applicable to all vessels)

The effect of Squat, available UKC and maximum allowable speed to maintain company UKC policy shall be

discussed and confirmed with pilot.

Squat and UKC informationSquat and UKC informationSquat and UKC informationSquat and UKC information

Speed (in knots) 03 04 05 06 07 08 09 10 11 12

Squat (Sinkage) in Metres

Draft Fwd in Metres

(After effect of Squat)1

Draft Aft in Metres

(After effect of Squat) 1

1:1:1:1: Squat shall always be added to fwd and aft draft

-------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

Company Policy on UKC

Required Static

UKC to meet

Company

Policy.

Vessel

Minimum

Static

UKC.

Maximum

allowable Speed

to maintain

Dynamic UKC

Remark

(1) Coastal Passages–

15% of the deepest draft + Sinkage due effect of

squat at prevailing speed

(2) Channels inside ports – a) 10% of the deepest draft (See Note 2)

Or

b) 0.60 m + Sinkage due to effect of Squat at speed

to be maintained + 0.5 m allowance for accuracy

of chart and depth (if applicable)

(3) Fairway or Channels outside ports (leading to

ports) and during river passages – a) 15% of the deepest draft (See Note 2)

Or

b) 0.60 M + Sinkage due to effect of Squat at

speed to be maintained + 0.5m allowance for

accuracy of chart (if applicable) + 0.5m

allowance for wave motion (if applicable).

(4) Canal transit –

As per local navigational rules. If none, then as per

“(2) Channels inside ports” above.

(5) Moored Alongside – 0.60 m + Sinkage due to effect of squat caused by

prevailing current + swell

Note 1: For all of the above Company Policy on UKC, following should be noted:-

Additional appropriate allowance shall be made by considering reduction in UKC due to heeling of vessel during alteration

of course(s), rolling / pitching, weather and other applicable factors as listed in ZZ-S-P-07.41.03 paragraph 6.5.

Note 2: The maximum speed shall be limited so as minimum 0.60 m of net UKC is maintained at all times after deducting the

sinkage due to squat, and accuracy of the chart (Zone of Confidence and other factors).

Note 3: Wherever the word “OrOrOrOr” is mentioned in the above table, the vessel should maintain the higher of the two calculated UKC

options.

Note 4: Risk assessment should be initiated and Company approval sought as per SMS ZZ-S-P-07.41.03, sec 4, Table 1 (Threshold

for submitting RA to the Company (related to UKC Policy).

Master _____ _D/O (Pilot – optional)_______________________

Page 17: About us Products Service Contact us Sitemap -liftnetionline.neti.com.ph/trainingfiles/NMC 11/NMC 11,12,13.pdf · 1 N = 0.102 kg. 1 inch = 25.4 mm 1 foot = 304.8 mm 1 fathom = 1.828
Page 18: About us Products Service Contact us Sitemap -liftnetionline.neti.com.ph/trainingfiles/NMC 11/NMC 11,12,13.pdf · 1 N = 0.102 kg. 1 inch = 25.4 mm 1 foot = 304.8 mm 1 fathom = 1.828
Page 19: About us Products Service Contact us Sitemap -liftnetionline.neti.com.ph/trainingfiles/NMC 11/NMC 11,12,13.pdf · 1 N = 0.102 kg. 1 inch = 25.4 mm 1 foot = 304.8 mm 1 fathom = 1.828
Page 20: About us Products Service Contact us Sitemap -liftnetionline.neti.com.ph/trainingfiles/NMC 11/NMC 11,12,13.pdf · 1 N = 0.102 kg. 1 inch = 25.4 mm 1 foot = 304.8 mm 1 fathom = 1.828
Page 21: About us Products Service Contact us Sitemap -liftnetionline.neti.com.ph/trainingfiles/NMC 11/NMC 11,12,13.pdf · 1 N = 0.102 kg. 1 inch = 25.4 mm 1 foot = 304.8 mm 1 fathom = 1.828
Page 22: About us Products Service Contact us Sitemap -liftnetionline.neti.com.ph/trainingfiles/NMC 11/NMC 11,12,13.pdf · 1 N = 0.102 kg. 1 inch = 25.4 mm 1 foot = 304.8 mm 1 fathom = 1.828
Page 23: About us Products Service Contact us Sitemap -liftnetionline.neti.com.ph/trainingfiles/NMC 11/NMC 11,12,13.pdf · 1 N = 0.102 kg. 1 inch = 25.4 mm 1 foot = 304.8 mm 1 fathom = 1.828
Page 24: About us Products Service Contact us Sitemap -liftnetionline.neti.com.ph/trainingfiles/NMC 11/NMC 11,12,13.pdf · 1 N = 0.102 kg. 1 inch = 25.4 mm 1 foot = 304.8 mm 1 fathom = 1.828
Page 25: About us Products Service Contact us Sitemap -liftnetionline.neti.com.ph/trainingfiles/NMC 11/NMC 11,12,13.pdf · 1 N = 0.102 kg. 1 inch = 25.4 mm 1 foot = 304.8 mm 1 fathom = 1.828
Page 26: About us Products Service Contact us Sitemap -liftnetionline.neti.com.ph/trainingfiles/NMC 11/NMC 11,12,13.pdf · 1 N = 0.102 kg. 1 inch = 25.4 mm 1 foot = 304.8 mm 1 fathom = 1.828
Page 27: About us Products Service Contact us Sitemap -liftnetionline.neti.com.ph/trainingfiles/NMC 11/NMC 11,12,13.pdf · 1 N = 0.102 kg. 1 inch = 25.4 mm 1 foot = 304.8 mm 1 fathom = 1.828

To: Master(s) - All Fleet Vessels Fm: NYK SHIPMANAGEMENT PTE LTD / HSEQ Dept. (Please reply to [email protected]) Ref : HSEQ/ALL/021/13 (info - valid till next update) Date: 06-Feb-13 Dear Captain(s) & Chief Engineer(s), Good Day, Gist: This is to remind all vessels to comply with the contents of GI/FLT/011/12 - "NYKSM Maneuvering Standard" Background: We regret to advise the occurrence of the following incidents, in the recent past.: a) Incident 1 Date: 03 Feb 2013 Time: 2043 LT Port: Bremerhaven Type of Vessel: PCC Position: Vessels port quarter made contact with the North lock entrance, east side due to parting of the Aft Tug rope. Weather conditions: Wind W’ly x 19knots, Sea state: Slight b) Incident 2 Date: 30 Jan 2013 Time: 1723 LT Port: Nagoya, Tokai Centre, berth C-5 Type of Vessel: PCC Position: While approaching Tokai Centre Berth C-5, vessel made slight contact with the edge of wharf causing slight damage to the wharf and scratches on the hull near the sunken bit / contact area. Weather conditions: Wind: NNW (Onshore) gusting to 23 kts c) Incident 3 Date: 29 Jan 2013 Time: 1435 LT Port: Mumbai, India Type of Vessel: General Cargo / Multipurpose Position: Vessel's port bow made contact with the Lock wall when entering Indira docks causing slight indentation to the hull in the contact area Weather conditions:

Page 28: About us Products Service Contact us Sitemap -liftnetionline.neti.com.ph/trainingfiles/NMC 11/NMC 11,12,13.pdf · 1 N = 0.102 kg. 1 inch = 25.4 mm 1 foot = 304.8 mm 1 fathom = 1.828

d) Incident 4

Date: 18 Jan 2013

Time: 1310 LT

Port: Nhava Sheva, India

Type of Vessel: Container

Position: Vessel's port quarter made contact with the wharf and bollard no.10, causing indentation on the ship side plating in way of the CO2 room and slight damage to the berth’s concrete.

Weather conditions: NNW x approx 10 kts

The Incidents are presently under investigation, however in some of the cases, inadequate compliance with NYKSM Standard berthing procedure is attributed as one of the contributory factors.

Following action required:

a) Please discuss this circular with all applicable staff.

b) Please be reminded & guided by the following instructions:

- GI/FLT/011/12 "NYKSM Maneuvering Standard"

c) Vessel's shall print a copy of the“NYKSM Maneuvering Standard”, laminate it, and keep it readily available on the bridge.

d) NYKSM Maneuvering Standard shall be shown and explained to the Pilot when the Master presents the Pilot Card and discusses other information including passage plan during Master Pilot Information Exchange.

e) Vessel's shall seek the cooperation of the Pilot to comply with this standard as far as practicable, except when required to avoid any hazards or dangers to vessel’s safe navigation.

f) Master shall not hesitate to override the Pilot's actions, if in doubt regarding the Pilot's actions or in case deemed necessary.

Thank you and best regards,

Health Safety Environment & Quality (HSEQ)

******************************************************* NYK SHIPMANAGEMENT PTE LTD (For and on behalf of Owners, As Agents Only) 15-01 HarbourFront Tower One, Singapore 098633 Tel :+ 65 6416 7500 Fax: +65 6416 9923 ******************************************************* NYK Group values - Integrity, Innovation, Intensity

Page 29: About us Products Service Contact us Sitemap -liftnetionline.neti.com.ph/trainingfiles/NMC 11/NMC 11,12,13.pdf · 1 N = 0.102 kg. 1 inch = 25.4 mm 1 foot = 304.8 mm 1 fathom = 1.828

Marketing & Shipping Group E-mail: [email protected] P.O. Box 24200 DOHA, QATAR 07 May 2013

CIRCULAR LETTER 03/2013

Ras Laffan port Berthing Criteria

To: All RasGas Long Term Owner/Operators Dear All, Please find bellow Ras Laffan port vessel berthing/un-berthing criteria. Please forward this to all concerned parties.

Thanks and regards

Yours sincerely,

Talal Al-Tamimi Marine Risk and Quality Assurance

Page 30: About us Products Service Contact us Sitemap -liftnetionline.neti.com.ph/trainingfiles/NMC 11/NMC 11,12,13.pdf · 1 N = 0.102 kg. 1 inch = 25.4 mm 1 foot = 304.8 mm 1 fathom = 1.828

Weather Parameter

Vessels of up to 20,000 SDWT (Excluding Small Craft)

Vessels between 20,000 and 150,000 SDWT, including LPG Carriers.

Vessels greater than 150,000 SDWT and LNG Carriers

Visibility 0.5 Nautical Mile 0.75 Nautical Mile 1.0 Nautical Mile

Wind – Berthing 40.0 Knots 35.0 Knots 33.0 Knots

Wind – Unberthing 45.0 Knots 40.0 Knots 38.0 Knots

Current at Port Entrance 3.0 knots 3.0 knots 3.0 knots

Wave Height (in the Channel) 2.5 Metres 2.0 Metres 2.0 Metres

Note: The actual decision to berth or un-berth a vessel depends on many factors which can only be assessed by the Pilot and the Master. The parameters in the table above may not therefore be strictly observed by the Pilot, if in his professional judgment and in consultation with the Master, more or less restrictive parameters should apply to ensure the safe maneuvering of the vessel

Page 31: About us Products Service Contact us Sitemap -liftnetionline.neti.com.ph/trainingfiles/NMC 11/NMC 11,12,13.pdf · 1 N = 0.102 kg. 1 inch = 25.4 mm 1 foot = 304.8 mm 1 fathom = 1.828

To: Master(s) - All Fleet Vessels Fm: NYK SHIPMANAGEMENT PTE LTD / HSEQ Dept. (Please reply to [email protected]) Ref : HSEQ/ALL/059/13 (info - valid till further update) Date: 23-May-13 Dear Captain(s) & Chief Engineer(s), Good Day, Gist: All vessels are hereby reminded to comply with the requirements of SMS Chapter <ZZ-S-M-07.00.00> section 4.4.2 "Pilot and Self Pilotage" Background: A container vessel under our management was involved in an allision/contact incident while departing from the port of Shimizu, without a Pilot on board and without the assistance of Tugs. The Incident is presently under investigation, however following contributory factors were identified 1. Non compliance with SMS Chapter <ZZ-S-M-07.00.00> section 4.4.2 "Pilot and Self Pilotage" 2. Non compliance with NYKSM Standard berthing procedure. 3. No Tug was used to assist vessel during departure. Brief description of the Incident Date / Time: 16 May 2013 / 1243 LT Port: Shimizu, Japan Type of Vessel: Container Incident: The vessel attempted to depart from the berth using the Bow Thruster & Main Engine only, without Tug assistance. The maneuver involved moving astern along the wharf, using the Main Engine & Bow Thruster, until clear of the berth. Damage: Vessel's shipside (port side) made contact with the corner of the wharf, resulting in the following damage: - a wave meter located at the corner of the wharf - a ladder fender on the side of the wharf. - There were scratch marks on the vessel's shipside (port side) between frames 35 and 40.

Page 32: About us Products Service Contact us Sitemap -liftnetionline.neti.com.ph/trainingfiles/NMC 11/NMC 11,12,13.pdf · 1 N = 0.102 kg. 1 inch = 25.4 mm 1 foot = 304.8 mm 1 fathom = 1.828

Following actions required:

a) Please discuss this circular with all applicable staff.

b) Please be reminded & guided by the following instructions:

- SMS Chapter <ZZ-S-M-07.00.00> section 4.4.2 "Pilot and Self Pilotage"

- GI/FLT/011/12 "NYKSM Maneuvering Standard"

c) Master shall promptly inform NYKSM / Vessel Manager in case he is asked to conduct self-pilotage in non-compulsory pilotage waters, and obtain approval for conducting self-pilotage. d) Even if the Master has previous experience or is confident of navigating through the areas of non-compulsory pilotage, he shall always exercise the option of taking a pilot and communicate with the charterers accordingly keeping Vessel Manager and NYKSM well informed.

e) Master shall conduct a Risk Assessment for conducting Self-Pilotage and send to NYKSM / Vessel Manager for approval.

The Risk Assessment shall include but not be limited to the following:

- Sailing Experience of Master

- Number of previous transits through the area (where self pilotage is requested), with a Pilot on board in the past 2 years

- Number of berthings / un-berthings at/from the port (where self pilotage is requested), with a Pilot on board.

- State of Visibility

- Number of Tugs being used, in case of berthing / un-berthing

- Traffic expected

f) Master shall always request for Tug assistance when berthing or un-berthing. If Tug assistance is not available NYKSM shall be informed.

Thank you and best regards,

Health Safety Environment & Quality (HSEQ) ******************************************************* NYK SHIPMANAGEMENT PTE LTD (For and on behalf of Owners, As Agents Only) 15-01 HarbourFront Tower One, Singapore 098633 Tel :+ 65 6416 7500 Fax: +65 6416 9923 ******************************************************* NYK Group values - Integrity, Innovation, Intensity

Page 33: About us Products Service Contact us Sitemap -liftnetionline.neti.com.ph/trainingfiles/NMC 11/NMC 11,12,13.pdf · 1 N = 0.102 kg. 1 inch = 25.4 mm 1 foot = 304.8 mm 1 fathom = 1.828

Original Date

01/07/07

Approved By

NK**

Edition:

2

NYK SHIPMANAGEMENT

PTE LTD

Training Center, No 25 Pandan

Crescent #04-10 Tic Tech Center,

Singapore - 128477

Revised Date

12/11/12

Prepared By

MC**

Page:

1 of 92

INDEX CONTENTS PAGE Introduction 3 Emergency Escape Plan 4 Chapter I – FACTORS AFFECTING THE SHIP HANDLING 1. Linear Motion 5 2. Rotational Motion 5 3. Underwater Hull Geometry 5 4. Pivot Point and Centre of Lateral Resistance 6 5. Hydraulic Lift – Lateral Resistance 8 6. Motion of Ship when Lateral Forces are Applied 9 6.1. The Rotation Effect 9 6.2. The ship generated sideways current 9 7. Practical observations and how they meet the theory 10 Chapter II – SPEED MANAGEMENT 1. Approach speed 14 2. Control while slowing 15 3. Kick Ahead 15 4. Recommended Approach Speed 4.1. For PCC, Container, LNG, LPG, Tanker, Bulk 16 4.2. For VLCC, VLOC, Cape-size Bulk 17 5. Slow Speed Control 17 6. Lateral Speed Control (for Berthing) 20 Chapter III: ANCHORAGE MANEUVER 1. Anchoring Plan 20 2. Critical Wind Velocity for Dragging Anchor 21 3. Preparing To Cast Anchor (Drop Anchor) 21 4. Determination of Amount of Anchor Chain To Be Laid Out 22 5. Anchoring in Deep Water 22 6. Points To Be Observed When Anchoring 23 7. Weighing Anchor (Heave up the Anchor) 24 8. Points To Be Observed When Weighing Anchor 24 9. Checking of Anchor cable, links and D-Shackle 24 10. Inspecting Anchor 25 Chapter IV: BERTHING MANEUVER 1. Golden Rules for Berthing 25 1.4. NYKSM Maneuvering Standard 26 2. Ship Handling Forces 26 2.1. Controllable Forces 26 2.1.1. Forces created by Propeller 26 2.1.2 Forces created by Rudder 28 2.1.3. Forces created by Bow/thruster 29

Page 34: About us Products Service Contact us Sitemap -liftnetionline.neti.com.ph/trainingfiles/NMC 11/NMC 11,12,13.pdf · 1 N = 0.102 kg. 1 inch = 25.4 mm 1 foot = 304.8 mm 1 fathom = 1.828

Original Date

01/07/07

Approved By

NK**

Edition:

2

NYK SHIPMANAGEMENT

PTE LTD

Training Center, No 25 Pandan

Crescent #04-10 Tic Tech Center,

Singapore - 128477

Revised Date

12/11/12

Prepared By

MC**

Page:

2 of 92

2.1.4. Forces created by Tugs 30 2.1.4.1 Working with Tugs: Points to remember 30 2.1.4.2 Steering a ship going astern with tug alongside 31 2.1.4.3. Handling the Tugs during Simulator Exercises 32 2.1.4.4. Experiments on Small-scale Models 52 2.2. Un-Controllable Forces 54 2.2.1. Wind Effect 54 2.2.1.1. CLR and Point of influence of the wind W 55 2.2.1.2. Force of the Wind 58 2.2.1.3. Wind Pressure Effect on PCC while underway 59 2.2.1.4. Berthing in Strong Winds: Points to Remember 61 2.2.2. Current Effect 62 2.2.2.1. Berthing in Current 63 2.2.2.2. Berthing in Current: Points to Remember 64 2.2.3. Cross Current Effect and Bollard Pull Calculation 65 2.3. Semi-Controllable Forces – Hydrodynamic Effects 69 2.3.1. Water Depth – Shallow Water Effects 70 2.3.2. Squat 71 2.3.3. Waterway Width 71 2.3.4. Bank Effect 72 2.3.5. Interaction with Other Ships 73 2.3.5.1. Passing Effect 74 2.3.5.2. Overtaking Effect 76 2.3.5.3. How to Reduce Interaction 79 2.3.6. Approach Channels 80 2.3.7. Effect on Hull Resistance and Ship’s Speed 80 2. Ship Handling in Rivers 80 2.1. Maneuvering in a Following Current / Tide 80 2.2. Maneuvering in Current / Tide from the Head 81 2.3. Maneuvering with Sudden Changes of Current / Tide 82 2.4. Particularities of Shiphandling in Rivers 83 2.5. Characteristics of Shiphandling in Rivers 83 2.6. Effect of the River Current 83 3. Tugs and Pilots – Legal Issues 84 3.1. Pilotage 84 3.2. Towage 85 3.3. Master – Pilot Relationship 86 4. Brief Explanation of Anchor Holding Power Calculation 88 4.1. Used Figures 88 4.2. Wind Pressure Force Calculation 89 4.3. Wind Pressure Coef / Direction of Wind Pressure Resultant 90 List of Appendices 91 Bibliography and Case Study 92

Page 35: About us Products Service Contact us Sitemap -liftnetionline.neti.com.ph/trainingfiles/NMC 11/NMC 11,12,13.pdf · 1 N = 0.102 kg. 1 inch = 25.4 mm 1 foot = 304.8 mm 1 fathom = 1.828

Original Date

01/07/07

Approved By

NK**

Edition:

2

NYK SHIPMANAGEMENT

PTE LTD

Training Center, No 25 Pandan

Crescent #04-10 Tic Tech Center,

Singapore - 128477

Revised Date

12/11/12

Prepared By

MC**

Page:

3 of 92

INTRODUCTION

“ Ship handling is an art rather than a science.

However, a ship handler who knows a little of the science will be better at his art.

Knowledge of the science will enable easy identification

of a ship’s maneuvering characteristics and quick evaluation of the skills needed

for control.

A ship handler needs to understand what is happening to his ship and, more importantly, what

will happen a short time into the future. “

Page 36: About us Products Service Contact us Sitemap -liftnetionline.neti.com.ph/trainingfiles/NMC 11/NMC 11,12,13.pdf · 1 N = 0.102 kg. 1 inch = 25.4 mm 1 foot = 304.8 mm 1 fathom = 1.828

Original Date

01/07/07

Approved By

NK**

Edition:

2

NYK SHIPMANAGEMENT

PTE LTD

Training Center, No 25 Pandan

Crescent #04-10 Tic Tech Center,

Singapore - 128477

Revised Date

12/11/12

Prepared By

MC**

Page:

4 of 92

NYKSM Training Centre Level 4 Emergency Escape Plan

Page 37: About us Products Service Contact us Sitemap -liftnetionline.neti.com.ph/trainingfiles/NMC 11/NMC 11,12,13.pdf · 1 N = 0.102 kg. 1 inch = 25.4 mm 1 foot = 304.8 mm 1 fathom = 1.828

Original Date

01/07/07

Approved By

NK**

Edition:

2

NYK SHIPMANAGEMENT

PTE LTD

Training Center, No 25 Pandan

Crescent #04-10 Tic Tech Center,

Singapore - 128477

Revised Date

12/11/12

Prepared By

MC**

Page:

5 of 92

Chapter I: FACTORS AFFECTING THE SHIP HANDLING

1. Linear Motions

Heave: The up and down motion along the vertical axis.

Sway: The lateral (side-to-side) motion along the horizontal axis.

Surge: The forward and backward motion along the longitudinal axis. The distance gained or lost while changing speed.

2. Rotational Motions

Pitch: Rotation about the horizontal axis. The bow and stern move up and down in opposite directions.

Roll: Rotation about the longitudinal axis. The sides move up and down in opposite directions.

Yaw: Rotation about the vertical axis. The bow and stern move

side to side in opposite directions.

3. Underwater Hull Geometry: Length to beam (L/B), beam to draught (B/T), block coefficient, prismatic coefficient (ratios of the ship’s volume of displacement against the volume of a rectangular block or a prism) and location of longitudinal centre of buoyancy, all give an indication of how a ship will handle. - High values of L/B are associated with good course directional stability. Container ships are likely to have a L/B ratio of approximately 8, while harbour tugs, which need to be able to turn quickly and where course stability is not required, have a value of 2.5 to 3. - High values of B/T increase leeway and the tendency for a ship in a beam wind to ‘skate across the sea surface’. A B/T ratio of over 4 is large. Most merchant ships have a B/T ratio in the range of 2.75 to 3.75. A 22-metre fast motor yacht will have a B/T ratio of about 5.75. - Ships with large block and prismatic coefficients have poor course stability and a readiness to turn. When turning, they will do so easily. Large tankers have these characteristics. Ships with a large protruding bulbous bow are likely to have their longitudinal centre of buoyancy far forward. As a result, the ship will show a tendency to turn.

Page 38: About us Products Service Contact us Sitemap -liftnetionline.neti.com.ph/trainingfiles/NMC 11/NMC 11,12,13.pdf · 1 N = 0.102 kg. 1 inch = 25.4 mm 1 foot = 304.8 mm 1 fathom = 1.828

Original Date

01/07/07

Approved By

NK**

Edition:

2

NYK SHIPMANAGEMENT

PTE LTD

Training Center, No 25 Pandan

Crescent #04-10 Tic Tech Center,

Singapore - 128477

Revised Date

12/11/12

Prepared By

MC**

Page:

6 of 92

4. Pivot Point (PP) and Centre of Lateral Resistance (CLR): - Pivot Point (PP) is the imaginary point about which the ship rotates, a point along the fore and aft axis of a turning ship that has no sideways movement, having for reference the surface of the water. - The pivot point is generally at 1/3 ship’s length from the bow when the ship is moving ahead, and between 1/4 ship’s length from the stern and the rudder post when going astern. But if a powerful and effective lateral force is applied at one end of the vessel, the position of the pivot point will shift at about 1/3 ship’s length from the other end of the ship (relative to the applied force). Therefore, the position of the pivot point is also function of the efficient lateral force(s) applied on the ship, and not only caused by the headway or sternway. - At port maneuvering speed, the centre of leverage (point of the ship where an effective lateral force causes no rotation) is close to midship; it will move forward less than 10% of ship’s length, if the vessel is trimmed by the head, and it will move aft if the vessel is trimmed by the stern. This point is called Centre of Lateral Resistance (CLR). - At any given moment, the CLR of a vessel is that point where, if you apply an effective lateral force, no rotation (if the vessel has a steady heading) will occur. Acting on this point, a lateral force has no arm lever, therefore no turning moment, it only pushes the vessel sideways. A force acting ahead of the CLR will rotate the ship in a different direction than the same force acting astern of the CLR would do. The lateral resistance is also called hydraulic lift. - The position of the CLR depends on: • the centre of gravity • the centre of the underwater surface area (hull shape and trim) • the pressure fields around the hull - The starting point of the CLR is a point between the centre of gravity of the ship and the centre of underwater surface area, when these two do not coincide. - The position of the centre of the underwater surface for one ship is mainly affected by the trim. A trim by the stern moves the CLR point more aft. A trim by the head moves it more forward. - The pressure field (bow wave, stern sub-pressure) under headway shifts the CLR forward. This is mainly due to the positive pressure built around the bow (in a forward motion) which creates a more resistant surface for the hull to lean on

Page 39: About us Products Service Contact us Sitemap -liftnetionline.neti.com.ph/trainingfiles/NMC 11/NMC 11,12,13.pdf · 1 N = 0.102 kg. 1 inch = 25.4 mm 1 foot = 304.8 mm 1 fathom = 1.828

Original Date

01/07/07

Approved By

NK**

Edition:

2

NYK SHIPMANAGEMENT

PTE LTD

Training Center, No 25 Pandan

Crescent #04-10 Tic Tech Center,

Singapore - 128477

Revised Date

12/11/12

Prepared By

MC**

Page:

7 of 92

when pushed sideways. The same principle applies when going astern. For practical shiphandling purposes, the shift of the CLR due to the speed is rarely more than 10% of the ship’s length in the direction of the ship’s movement. The CLR is the leaning point for arm levers, it is not the pivot point. Actually these two points almost never coincide. - The PP can even lie outside of the ship’s physical limits; the position of the pivot point at any given moment depends on: • the hull underwater resistance to lateral movement, • the efficient lateral force(s) applied on the vessel, • the inertia of rotation of the vessel; - In order to estimate the position of the apparent pivot point we must assess how a lateral force will affect the rotation of the vessel and the sideways movement of the vessel. The position of the pivot point will also vary with ship’s speed: an increase in speed will shift the PP in the direction of the ship’s movement.

- A lateral force acting away (fig. 9) from the CLR will, for the same angle of rotation, push the CLR relatively less sideways than a force acting closer to the CLR. This results in a pivot point further at the opposite end of the vessel (fig.10). The closer to the CLR the force is acting, the further away from the opposite end the pivot point will be, this can even result in a pivot point outside of the vessel physical limits (fig. 11). This principle is very helpful when using tugs.

Page 40: About us Products Service Contact us Sitemap -liftnetionline.neti.com.ph/trainingfiles/NMC 11/NMC 11,12,13.pdf · 1 N = 0.102 kg. 1 inch = 25.4 mm 1 foot = 304.8 mm 1 fathom = 1.828

Original Date

01/07/07

Approved By

NK**

Edition:

2

NYK SHIPMANAGEMENT

PTE LTD

Training Center, No 25 Pandan

Crescent #04-10 Tic Tech Center,

Singapore - 128477

Revised Date

12/11/12

Prepared By

MC**

Page:

8 of 92

5. Hydraulic Lift – Lateral resistance The “lift” is the resistance of the water to any lateral movement of the vessel. - The hydraulic lift varies with: • The shape of the hull: a more profiled (narrow) hull will induce relatively more lift. Let’s compare two ships with the same length, same draft, the first one having twice the beam of the second one. After the ships have developed sideways motion, it is harder to stop the drift of the wider ship (twice heavier) for approximately the same lateral resisting force (L x draught = surface area of the wall of water). • The under keel clearance: little under keel clearance means more lift (the narrow space under the keel makes it difficult for the water to flow from one side of the ship to the other, so it is harder to push the ship sideways).

A higher lift means a pivot point closer to the CLR

Page 41: About us Products Service Contact us Sitemap -liftnetionline.neti.com.ph/trainingfiles/NMC 11/NMC 11,12,13.pdf · 1 N = 0.102 kg. 1 inch = 25.4 mm 1 foot = 304.8 mm 1 fathom = 1.828

Original Date

01/07/07

Approved By

NK**

Edition:

2

NYK SHIPMANAGEMENT

PTE LTD

Training Center, No 25 Pandan

Crescent #04-10 Tic Tech Center,

Singapore - 128477

Revised Date

12/11/12

Prepared By

MC**

Page:

9 of 92

- For the same change of angle, the CLR of a vessel with high lift will drift less sideways than a vessel with low lateral resistance when submitted to a lateral force. This results in an apparent pivot point closer to the CLR for a vessel with high lift than the vessel with low lift. 6. Motion of the ship when lateral force(s) are applied: 6.1. The rotation effect - Let’s consider a solid bar free to move on an friction free surface. Let’s push it sideways with some anti-clockwise rotation. Now stop the force acting on it and watch the resulting movement: The center of gravity is moving to the right and the bar rotates around it. The point that has no speed (having for reference the ice surface) is “P”, the apparent pivot point.

- When a ship is being handled at low speed (when the pressure fields on the hull are actually very low), it is mainly due to the above effect that the “apparent pivot point” seems to move astern if the vessel is moving astern and turning, and ahead if the vessel is moving ahead and turning. 6.2. The ship generated sideways current - Let’s consider a ship turning, and moving ahead. The “sweeping” movement of the stern creates a vacuum which in turn drags a mass of water towards the quarter shipside. The outer shipside also pushes a mass of water away. We will call it the ship generated sideways current . Let’s now stop the force creating the turning movement.

Page 42: About us Products Service Contact us Sitemap -liftnetionline.neti.com.ph/trainingfiles/NMC 11/NMC 11,12,13.pdf · 1 N = 0.102 kg. 1 inch = 25.4 mm 1 foot = 304.8 mm 1 fathom = 1.828

Original Date

01/07/07

Approved By

NK**

Edition:

2

NYK SHIPMANAGEMENT

PTE LTD

Training Center, No 25 Pandan

Crescent #04-10 Tic Tech Center,

Singapore - 128477

Revised Date

12/11/12

Prepared By

MC**

Page:

10 of 92

- The ship, with its rotational inertia, keeps on turning, but the rate of turn will reduce due to water friction. The ship generated sideways current with its own inertia, will catch the stern and continue to push it sideways, while the forward part of the ship is in undisturbed water. This force, acting more or less sideways on the stern contributes in moving the apparent pivot point more forward. - The ship generated sideways current effect is relatively more important on a deeply laden vessel than on a wide light barge. On the latter, the rotation effect will be more noticeable. The result, however, is the same: an apparent pivot point located forward. Note: The ship generated sideways current can have surprising effects when an efficient side force (strong tug, for example) is applied, at the shoulder on a ship with headway or at the quarter on a ship with sternway, for long periods. The ship can develop a swing in the opposite direction! 7. Practical observations and how they meet the theory Ship generated sideways current and stern seeking to go up-wind with astern movement 1) A ship adrift is pushed sideways in a beam wind. Its motion creates a ship generated sideways current.

Page 43: About us Products Service Contact us Sitemap -liftnetionline.neti.com.ph/trainingfiles/NMC 11/NMC 11,12,13.pdf · 1 N = 0.102 kg. 1 inch = 25.4 mm 1 foot = 304.8 mm 1 fathom = 1.828

Original Date

01/07/07

Approved By

NK**

Edition:

2

NYK SHIPMANAGEMENT

PTE LTD

Training Center, No 25 Pandan

Crescent #04-10 Tic Tech Center,

Singapore - 128477

Revised Date

12/11/12

Prepared By

MC**

Page:

11 of 92

2) The vessel is going astern (we neglect here the effect of the transverse thrust), pulling the aft part of the vessel out of the ship generated sideways current. The stern being now in an area of relatively undisturbed water, the rest of the vessel still in the local ship generated current, a turning couple is created, bringing the stern up-wind.

As the stern is progressively directed into the wind, it gets out of and produces less ship generated sideways current. Another force couple is developing: the component of the propeller pull which is directed in the opposite direction of the wind is increasing, causing an arm lever of a length “d” between the propelling force and the centre of windage (fig. 19).

“Donkey” - like behavior of a ship pushed sideways by a forward escort tug (this phenomenon was described in 2001 in the text: Unpredictable behavior; example of a reason to reconsider the theory of maneuvering for navigators by Capt. Max J. van Hilten of the Maritime Pilots’ Institute, Netherlands)

Page 44: About us Products Service Contact us Sitemap -liftnetionline.neti.com.ph/trainingfiles/NMC 11/NMC 11,12,13.pdf · 1 N = 0.102 kg. 1 inch = 25.4 mm 1 foot = 304.8 mm 1 fathom = 1.828

Original Date

01/07/07

Approved By

NK**

Edition:

2

NYK SHIPMANAGEMENT

PTE LTD

Training Center, No 25 Pandan

Crescent #04-10 Tic Tech Center,

Singapore - 128477

Revised Date

12/11/12

Prepared By

MC**

Page:

12 of 92

1) The ship is moving ahead. The forward escort tug will start pushing in order to direct the bow to port.

2) The tug pushing has the following effect on the ship: • sideways motion of the ship to port, • rotation of the ship to port, since the force is acting forward of the CLR. • due to the sideways motion, the ship is displacing a mass of water sideways with her, pushing it on port side and pulling it on starboard side. 3) As the ship moves ahead, the bow will float in an area of relatively undisturbed water. The stern instead will be affected by the ship generated sideways current that has started to develop in 2), causing a turning moment that will reduce the port swing and can even initiate a starboard swing. When the ship starts a starboard swing, the stern, due to the rotation, keeps on generating more sideways current than the forward part of the vessel, thus amplifying the turning moment.

Page 45: About us Products Service Contact us Sitemap -liftnetionline.neti.com.ph/trainingfiles/NMC 11/NMC 11,12,13.pdf · 1 N = 0.102 kg. 1 inch = 25.4 mm 1 foot = 304.8 mm 1 fathom = 1.828

Original Date

01/07/07

Approved By

NK**

Edition:

2

NYK SHIPMANAGEMENT

PTE LTD

Training Center, No 25 Pandan

Crescent #04-10 Tic Tech Center,

Singapore - 128477

Revised Date

12/11/12

Prepared By

MC**

Page:

13 of 92

- The similar effect is sometimes observed when leaving a berth stern to tide, having a tug made fast on the quarter and pulling. If the tug is used for a prolonged period to open the stern towards the centre of the river, (with the engines of the ship astern) the forward part of the vessel will be more affected by the ship generated sideways current than the stern. This will cause the bow to go after a while in the same direction as the tug pull.

VESSEL “DEAD” IN THE WATER

AHEAD MOVEMENT... LONG STEERING

LEVER FROM PROPS/RUDDERS

ASTERN MOVEMENT... NO EFFECTIVE STEERING LEVER UNTIL SOME STERNWAY

Page 46: About us Products Service Contact us Sitemap -liftnetionline.neti.com.ph/trainingfiles/NMC 11/NMC 11,12,13.pdf · 1 N = 0.102 kg. 1 inch = 25.4 mm 1 foot = 304.8 mm 1 fathom = 1.828

Original Date

01/07/07

Approved By

NK**

Edition:

2

NYK SHIPMANAGEMENT

PTE LTD

Training Center, No 25 Pandan

Crescent #04-10 Tic Tech Center,

Singapore - 128477

Revised Date

12/11/12

Prepared By

MC**

Page:

14 of 92

DIW – BOTH TUGS HAVE SLOW EQUAL STERN LEVERAGE WAY FWD TUG HAS MORE LEVERAGE

SLOW HEAD WAY- AFT TUG HAS MORE LEVERAGE

Chapter II: SPEED MANAGEMENT

1. Approach speed: Many berthing accidents occur because the speed of approach is too high. The master should advise the pilot of the ship’s stopping distance and general maneuvering characteristics, giving particular emphasis to speed, corresponding engine revolutions and to the critical range. When close to a dock, speed should be the minimum necessary to maintain control.

PIER

PIER

PIER

Page 47: About us Products Service Contact us Sitemap -liftnetionline.neti.com.ph/trainingfiles/NMC 11/NMC 11,12,13.pdf · 1 N = 0.102 kg. 1 inch = 25.4 mm 1 foot = 304.8 mm 1 fathom = 1.828

Original Date

01/07/07

Approved By

NK**

Edition:

2

NYK SHIPMANAGEMENT

PTE LTD

Training Center, No 25 Pandan

Crescent #04-10 Tic Tech Center,

Singapore - 128477

Revised Date

12/11/12

Prepared By

MC**

Page:

15 of 92

2. Control while slowing: - It can be difficult to reduce speed and maintain control. This is because reduction in propeller speed reduces water flow over the rudder and the rudder becomes less effective. - The normal procedure for stopping is to put engines astern. However, when a propeller rotates astern, water flow over the rudder is broken and the ship will be less responsive to helm. - In addition, there is the disruptive effect of transverse thrust. For this reason, it is essential to plan a stop by reducing speed in good time. Also, it should be appreciated that putting engines to full astern during an emergency could result in a loss of steerage. 3. Kick ahead: - The ‘kick ahead’ is used when a ship is moving forward at very slow speed due to minimal water flow over the rudder and the ship is not responding to helm. It is also used to initiate a turn. Engines are put ahead for a short burst with the objective of increasing water flow over the rudder, but without increasing the ship’s speed. Engine power is reduced before the ship’s longitudinal inertia is overcome and she begins to accelerate. - When using the ‘kick ahead’, it should be borne in mind that prolonged and frequent kicks ahead will increase the ship’s speed. Apply full rudder to provide maximum steering force. Anything less than hard over during turning will allow a greater proportion of the power to drive the ship ahead. It is important to reduce engine power before reducing helm. - In case of “Kick ahead”, hard over, while having sternway (after an engine turning astern, causing stern motion, is followed by bold ahead engine movement with rudder hard over), the turbulence around the rudder, caused by the opposite flows of the surrounding water (coming from aft) and the propeller thrust, reduces its efficiency. - The ability of a conventional rudder to initiate rotation is then very poor. However, with a powerful twin screw, and / or a high efficiency rudder, can be produced enough efficient lateral force to move the pivot point ahead, even with the vessel still having stern way.

Page 48: About us Products Service Contact us Sitemap -liftnetionline.neti.com.ph/trainingfiles/NMC 11/NMC 11,12,13.pdf · 1 N = 0.102 kg. 1 inch = 25.4 mm 1 foot = 304.8 mm 1 fathom = 1.828

Original Date

01/07/07

Approved By

NK**

Edition:

2

NYK SHIPMANAGEMENT

PTE LTD

Training Center, No 25 Pandan

Crescent #04-10 Tic Tech Center,

Singapore - 128477

Revised Date

12/11/12

Prepared By

MC**

Page:

16 of 92

4.1. Recommended Approach Speeds (CTNR, PCC, LNG, LPG, BULK ships)

Speed 

( knot )

Distance (m)

Y 軸

X 軸

Y 軸

X 軸

Y 軸

X 軸

Y 軸

X 軸

Y 軸

X 軸0      500      1000     1500       2000      2500     3000

10

8

6

4

2

0

Distance (m)

Speed Rangeto

AvoidSpeed Range

toNotice

Available SpeedRange

Available SpeedRange

RecommendableSpeed Range

Page 49: About us Products Service Contact us Sitemap -liftnetionline.neti.com.ph/trainingfiles/NMC 11/NMC 11,12,13.pdf · 1 N = 0.102 kg. 1 inch = 25.4 mm 1 foot = 304.8 mm 1 fathom = 1.828

Original Date

01/07/07

Approved By

NK**

Edition:

2

NYK SHIPMANAGEMENT

PTE LTD

Training Center, No 25 Pandan

Crescent #04-10 Tic Tech Center,

Singapore - 128477

Revised Date

12/11/12

Prepared By

MC**

Page:

17 of 92

4.2. Recommended Approach Speeds (VLCC, VLOC, CAPE BULK)

Fig. 2.2:

Fig-2.2

5. Slow Speed Control:

- To estimate a speed and knowing when to reduce speed when approaching berth is not always easy, confidence can only come with experience. - On large ships such as VLCC some guidance may be available from reliable Doppler logs, but on many ships a Doppler log is not available. In any case full reliance on instruments is not wise and is no substitute for experience. Pilots often jumping from one ship to another sometimes several ships may

Speed 

( knot )

Distance (m)

Y 軸

X 軸

Y 軸

X 軸

Y 軸

X 軸

Y 軸

X 軸

Y 軸

X 軸0      1500      3000     4500      6000      7500     9000

10

8

6

4

2

0

Speed Rangeto

Avoid

Speed Rangeto

Notice

Available SpeedRange

Available SpeedRange

RecommendableSpeed Range

Page 50: About us Products Service Contact us Sitemap -liftnetionline.neti.com.ph/trainingfiles/NMC 11/NMC 11,12,13.pdf · 1 N = 0.102 kg. 1 inch = 25.4 mm 1 foot = 304.8 mm 1 fathom = 1.828

Original Date

01/07/07

Approved By

NK**

Edition:

2

NYK SHIPMANAGEMENT

PTE LTD

Training Center, No 25 Pandan

Crescent #04-10 Tic Tech Center,

Singapore - 128477

Revised Date

12/11/12

Prepared By

MC**

Page:

18 of 92

have to adjust and develop the feel for the type of ships; therefore Master has to pay special consideration towards effective & safe speed management. - It is desirable to balance safe and effective speed of approach against a realistic time scale. It would be unwise for example, to conduct a 3mile run-in at a speed of one knot, it is therefore impossible to give exact figures, the requirements is dictated to a large degree by variable factors such as type of ships and tonnage, draft, shaft horsepower and environmental conditions. – - Generally speaking ships of less than 40,000dwt for example are inclined to run their way off relatively quickly when engine speed is reduced, whereas larger ships carry their way for much larger distances and their speed must be brought firmly under control at greater distances from berth: fig (5.1)

Fig-5.1

- We can illustrate some important points, in this example we have a medium sized ship with a single right handed and fixed pitch propeller and a single conventional rudder, at one mile from berth approaching at 6 knots speed, it is well in excess of the ships dead slow speed of 3 knots, as the ship approaches

Page 51: About us Products Service Contact us Sitemap -liftnetionline.neti.com.ph/trainingfiles/NMC 11/NMC 11,12,13.pdf · 1 N = 0.102 kg. 1 inch = 25.4 mm 1 foot = 304.8 mm 1 fathom = 1.828

Original Date

01/07/07

Approved By

NK**

Edition:

2

NYK SHIPMANAGEMENT

PTE LTD

Training Center, No 25 Pandan

Crescent #04-10 Tic Tech Center,

Singapore - 128477

Revised Date

12/11/12

Prepared By

MC**

Page:

19 of 92

the half mile mark, speed is still over 3 knots despite a rapid reduction in rpm. It is now necessary to stop the engine and sustain prolonged period of stern power to stop the ship in time. - During this substantial time frame the ship is affected by transverse thrust, wind, tide and bank or shallow water effects, the ships gets effectively out of control an area of uncertainty for Master, if we can reduce this prolonged period of increasing stern power and thus retain control, so much the better. - In the fig (5.2) below we see the same ship, again 1 mile from berth but this time at its dead slow speed of 3 knots or less, before it approaches the ½ mile mark it may also be necessary to stop the engine to further reduce the headway and allow plenty of time for adjusting approach and positioning for the berth.

Fig-5.2

Page 52: About us Products Service Contact us Sitemap -liftnetionline.neti.com.ph/trainingfiles/NMC 11/NMC 11,12,13.pdf · 1 N = 0.102 kg. 1 inch = 25.4 mm 1 foot = 304.8 mm 1 fathom = 1.828

Original Date

01/07/07

Approved By

NK**

Edition:

2

NYK SHIPMANAGEMENT

PTE LTD

Training Center, No 25 Pandan

Crescent #04-10 Tic Tech Center,

Singapore - 128477

Revised Date

12/11/12

Prepared By

MC**

Page:

20 of 92

- One of the biggest worries is the loss of rudder effectiveness and the fear that we can not keep control of the ships head at very slow speeds, particularly without any tug assistance, for variety of reasons such as poor steering, wind, tide, shallow water or directional control the bow may well begin to develop an unwanted sheer, it may be desirable to adjust the attitude of approach. Control is best achieved by applying full rudder and utilizing a short but substantial burst of engine power. This is called slow speed control.

(Refer to Appendix 1 - Method of Reducing Speed Gradually – ZZ-S-P-07.20.02 / Form No.: S-072002-02FIG) 6. Lateral Speed Control (for Berthing): Lateral vessel’s speed can be controlled using tugs, rudder & propeller effects, as well as wind and current effects. Below Table is the recommended lateral berthing speed as per Company requirements (GI/FLT/016/12 - Lateral Approach Speed while Berthing).

Lateral Berthing Speed Distance VLCC / TKR / Bulk

Carrier PCC/CNTR/Gen

200m 20 cm/sec -

100m 15 cm/sec 20 ~30 cm/sec

50m 10 cm/sec 15 cm/sec

25m 5 cm/sec 10 cm/sec final

(<10m) max 5 cm/sec max 8 cm/sec

Chapter III: ANCHORAGE MANEUVER 1. Anchoring Plan: The master shall prepare a plan for anchoring in accordance with the following: - Selection of Anchorage - Determining of Anchoring Method (single anchor, double anchoring, two-anchor mooring or any other appropriate anchoring)

Page 53: About us Products Service Contact us Sitemap -liftnetionline.neti.com.ph/trainingfiles/NMC 11/NMC 11,12,13.pdf · 1 N = 0.102 kg. 1 inch = 25.4 mm 1 foot = 304.8 mm 1 fathom = 1.828

Original Date

01/07/07

Approved By

NK**

Edition:

2

NYK SHIPMANAGEMENT

PTE LTD

Training Center, No 25 Pandan

Crescent #04-10 Tic Tech Center,

Singapore - 128477

Revised Date

12/11/12

Prepared By

MC**

Page:

21 of 92

- Deciding Which Anchor To Be Used (which anchor to be used considering the anchoring method, direction of approach, tidal current set, frequency of use of both anchors until now, etc.) - Deciding on Extension of Anchor Chains (give consideration to the duration of anchoring, room of the anchoring area for use, weather conditions while the ship is at anchor and holding power of the anchor, etc.) - Arrival at Anchorage (prepare a plan for the gradual decreasing of the speed suitable for the maneuverability of the ship). 2. Critical Wind Velocity for dragging anchor: (Refer to Appendix 2 - Determination of Critical Wind Velocity for Dragging Anchor - ZZ-S-P-07.20.02 / Form No.: S-072002-05FIG, and Appendix 3 – Safety Bulletin GEN 2007 001: Determining Critical Wind Velocity for Dragging Anchor). To avoid any disasters resulting from dragging anchor, Master shall calculate the critical wind velocity for dragging anchor. This should be utilized in developing the anchoring plan and the anchor watch instructions / checks. It should also be noted that this calculation provides only a guidance to grasp the wind velocity for dragging anchor and that the ship may even start to drag its anchor if the wind velocity is lesser than the critical wind velocity. It should be carefully examined to determine whether safe anchoring can be maintained especially when heavy weather is forecasted. a) Note that the critical wind velocity is subject to preconditions such as size or shape of the ship, depth of water, bottom sediment, etc. b) The followings to be considered when examining risk of dragging anchor: i) Even if the wind velocity is not more than the critical wind velocity, the ship may drag or damage her anchor due to other additional factors such as swells, waves, currents, age & condition of anchor itself, its chain, shackles etc. ii) It is very difficult to heave up anchor if the weather, especially the sea condition, becomes heavy or unfavorable. 3. Preparing To Cast Anchor (Drop Anchor): - The Master, at an appropriate time before arriving at the anchoring area for use, shall station the forecastle chain-party at forward and advise the chief officer of

Page 54: About us Products Service Contact us Sitemap -liftnetionline.neti.com.ph/trainingfiles/NMC 11/NMC 11,12,13.pdf · 1 N = 0.102 kg. 1 inch = 25.4 mm 1 foot = 304.8 mm 1 fathom = 1.828

Original Date

01/07/07

Approved By

NK**

Edition:

2

NYK SHIPMANAGEMENT

PTE LTD

Training Center, No 25 Pandan

Crescent #04-10 Tic Tech Center,

Singapore - 128477

Revised Date

12/11/12

Prepared By

MC**

Page:

22 of 92

the anchors to be used, expected number of chains to be laid out, expected depth of anchoring area for use, and any other necessary information. - The Chief Officer (or Officer as assigned by Master), after taking up the station at forecastle, checks the number of crew members there and reports to the bridge. He shall confirm from Master regarding the anchors to be used, expected depth of anchoring area and expected length of anchor chains to be laid out. In addition, in consultation of master, he directs the deck crew members to be ready to cast anchor in accordance with the SMS procedures, and report about the ship's way to the bridge at appropriate times judging from the state of the cutwater. 4. Determination of Amount of Anchor Chain To Be Laid Out: (Examples as Guidance) For Normal Anchoring: S = 3D + 90 m For Rough Weather Anchoring: S = 4D + 145 m S: Length of Anchor Chain Laid Out (m) D: Depth of Water (m) (Refer to Appendix 4 - Determination of Holding Power of Anchor - ZZ-S-P-07.20.02 / Form No.: S-072002-04FIG, and Appendix 5 – Anchor Chain Weight and Type Table). (Also refer to Appendix 6 - SMS Tools: Calculation of Holding Power and Wind Pressure Force – excel format calculation sheets). 5. Anchoring in Deep Water: Lowering of the anchor in deep water shall be done in accordance with the following procedure: 5.1. When the depth of the water exceeds 25 meters, walk back the anchor under water close to the sea bottom (10 to 5 meters) and then let it go; 5.2. When the depth of the water exceeds 50 meters, walk back the anchor until it reaches the sea bottom and pay out the anchor chain under power to the scheduled amount of chain to be laid out while laying the anchor chain along the sea bottom; and, when paying out the anchor chain, speed over the ground shall be 0.5 knots or less.

Page 55: About us Products Service Contact us Sitemap -liftnetionline.neti.com.ph/trainingfiles/NMC 11/NMC 11,12,13.pdf · 1 N = 0.102 kg. 1 inch = 25.4 mm 1 foot = 304.8 mm 1 fathom = 1.828

Original Date

01/07/07

Approved By

NK**

Edition:

2

NYK SHIPMANAGEMENT

PTE LTD

Training Center, No 25 Pandan

Crescent #04-10 Tic Tech Center,

Singapore - 128477

Revised Date

12/11/12

Prepared By

MC**

Page:

23 of 92

(Refer to Appendix 7 – Calculation of Maximum Anchoring Depth basis Windlass Power, and Calculation of Load on the Windlass).

Maximum Anchoring Depth Guidelines & Calculation (GI/FLT/039/11) =============================================== As far as practicable, vessels shall avoid anchoring in depths greater than the Maximum Anchoring depth, calculated basis 80% of the Lifting Load of the Windlass. Maximum Anchoring depth, based upon 80 % of the Liftable Load of the Windlass = 111.6 metres Maximum anchoring depth, based upon 90 % of the Liftable Load of the Windlass = 134.4 metres Contact Vessel Manager immediately if vessel is unable to obtain suitable anchoring position with depth less than 134.4 metres (basis 90 % of the Liftable Load of the Windlass) 6. Points To Be Observed When Anchoring: - Avoid anchoring for short periods unless as per Charterer's and/or Owner's requirements. Master shall avail berthing information and vessel's schedule well in advance so as to adjust speed and arrive at the pilot station on time. - Pay due consideration to the condition of hydraulic gear, windlass motors, anchors, cable, and brake lining; - The anchor chain is liable to be subjected to an unexpected load causing the anchor to drag in the initial stage of laying out the chain after the anchor is let go, or causing the chain to lie curved or snaked on the sea bottom so that a good hold of the anchor cannot be obtained; - When the current is from the side of the ship, since the lee way becomes bigger as the ship loses her way becomes smaller, approach the anchorage keeping course with a sufficient inertia, face the current immediately before, and when the ship stops, pay out the anchor of the side of the current for about 1.5 times the depth of the sea, then stop the anchor and face the bow into the current. After that pay out the chain while slowly going astern;

Page 56: About us Products Service Contact us Sitemap -liftnetionline.neti.com.ph/trainingfiles/NMC 11/NMC 11,12,13.pdf · 1 N = 0.102 kg. 1 inch = 25.4 mm 1 foot = 304.8 mm 1 fathom = 1.828

Original Date

01/07/07

Approved By

NK**

Edition:

2

NYK SHIPMANAGEMENT

PTE LTD

Training Center, No 25 Pandan

Crescent #04-10 Tic Tech Center,

Singapore - 128477

Revised Date

12/11/12

Prepared By

MC**

Page:

24 of 92

- Try as much as possible not to have the current from behind, but if this is unavoidable, lessen the way of the ship and let go the anchor on the turning side of the ship at a short distance from the scheduled anchorage; and - PCC vessels are more susceptible to winds due to large superstructure and are likely to encounter difficulty in holding anchor when the wind velocity exceeds 12m/sec. 7. Weighing Anchor (Heave up the Anchor): - Start the windlasses and test operate them to check that there is nothing wrong with them; - For security and emergency purposes while anchoring, put the opposite side anchor on S/B. (Check the space between the stopper and the anchor chains on S/B. The putting on or taking off of the stopper shall be done according to the directions of the master.); - After engaging the gears, release the brakes and remove the stopper; and – where applicable – request the bridge for a supply of sea water to wash the anchor chain. - Check the tension on the anchor chain and, if necessary, request the bridge for the use of the engine, and report to the bridge the direction in which the anchor chain is extended and the state of the heaving in process (at every shackle). - Officer stationed on the forecastle, after weighing anchor shall confirm by visually sighting that the anchor is not damaged and is clear of all obstructions. 8. Points To Be Observed When Weighing Anchor: - When the wind or current is strong, the anchor will drag as the chain is being hove up and the ship will start to go astern. In such a case, use the engine at appropriate times to reduce the load on the windlass; - When the ship heads, while heaving anchor, in a direction excessively different from the one she intends to proceed after the anchor is up, carry out anchor weighing operation to help her turn to the favorable direction by using the engine and rudder in combination in its process; - When weighing anchor in swells, the windlass motors are subjected to excessive forces, so be careful about the damage they are liable to incur; and - When rough weather is expected, do not lose the right opportunity to weigh anchor. 9. Checking of Anchor cable, links and D-Shackle: The condition of all moving parts, confirming the proper condition of cables and fittings, detection of twists in the cables, cracks in stud link welds, spile and other 'locking' pins that hold Kenter-type joining shackles together and the pin of the 'D'

Page 57: About us Products Service Contact us Sitemap -liftnetionline.neti.com.ph/trainingfiles/NMC 11/NMC 11,12,13.pdf · 1 N = 0.102 kg. 1 inch = 25.4 mm 1 foot = 304.8 mm 1 fathom = 1.828

Original Date

01/07/07

Approved By

NK**

Edition:

2

NYK SHIPMANAGEMENT

PTE LTD

Training Center, No 25 Pandan

Crescent #04-10 Tic Tech Center,

Singapore - 128477

Revised Date

12/11/12

Prepared By

MC**

Page:

25 of 92

shackles shall be checked at every opportunity and reported to Bridge. The diligence of the Chief Officer in proper inspection and reporting may prevent the loss of the anchor, or worse. A spare Kenter-type shackle shall always be kept on board. 10. Inspecting Anchor: When the ship remains at anchor for a long period, if prevailing circumstances permit, the master should temporarily heave up her anchor and let go again at the interval mentioned below as a standard in order to maintain good anchoring condition: - In a river or estuary where tidal current is significant: every 3 days; - At area where there is a lot of moving muddy sand in sea bed: every 5 days; - Other area: once every 1 week. - If 10 completed 360° turns are made earlier than above listed intervals. (Refer also to GI/FLT/039/11 - Guidelines on calculation of Maximum Anchoring Depth, basis vessel's Windlass power)

Chapter IV: BERTHING MANEUVER 1. Golden Rules for Berthing: - Plan your passage from berth to berth, discuss the passage & berthing plan with the pilot, clarify your doubts if any, and pay attention to the dangers that may be encountered. - Consider the usage of tugs, where wind & current or the ship’s handling characteristics create difficult berthing conditions, estimate the windage & use this estimation to determine the number of tugs required. - Avoid un-necessary high speeds - when working with tugs, when using bow thruster, when under keel clearance is small, when navigating in narrow channel & when close to other ships. - Test your Main Engines astern before required to be used. - Remember that a ship will want to settle with the pivot point to the windward side and in alignment with, the point of influence of wind, which changes with wind direction and the ship’s heading. - Remember that at low speed, current and wind has a greater effect on maneuverability of the vessel. - Always anticipate well ahead and expect the unexpected to occur, do not ring “Finished with engines” until every mooring line has been made fast.

Page 58: About us Products Service Contact us Sitemap -liftnetionline.neti.com.ph/trainingfiles/NMC 11/NMC 11,12,13.pdf · 1 N = 0.102 kg. 1 inch = 25.4 mm 1 foot = 304.8 mm 1 fathom = 1.828

Original Date

01/07/07

Approved By

NK**

Edition:

2

NYK SHIPMANAGEMENT

PTE LTD

Training Center, No 25 Pandan

Crescent #04-10 Tic Tech Center,

Singapore - 128477

Revised Date

12/11/12

Prepared By

MC**

Page:

26 of 92

1.1. NYKSM Maneuvering Standard (GI/FLT/011/12):

- “NYKSM Maneuvering Standard” comprises of essential instructions and procedures which should be observed by the Bridge Team Members (including Pilots) on board NYKSM managed vessels, as over the past few years, many serious navigational incidents have occurred during maneuvering in port and/or under pilotage. - “NYKSM Maneuvering Standard” helps the Master and other Bridge Team Members to challenge the pilot in cases where he intends to conduct some unsafe maneuver or non-necessary deviation from safe navigation practices. - Master is requested to assert with Pilots to follow the passage plan and the berthing / un-berthing procedure. - Contents of “NYKSM Maneuvering Standard” shall be confirmed and studied by the Bridge Team Members. - Pilot’s signature on the Pilot card serves as evidence of pilot having read and understood the company’s requirements as included in this standard. (Refer to Appendix 8 – NYKSM Maneuvering Standard). 2. Ship Handling Forces: 2.1 Controllable Forces

2.1.1 Forces created by PROPELLER: - Propeller longitudinal thrust is the force caused by the displacement of water along the propeller shaft to thrust the ship ahead as the ship moves in the direction of the low pressure area. The after face of the propeller blade creates a high pressure area. - Propeller transversal thrust is the force that moves the stern of the ship in the direction of screw rotation. Side thrust produced by the screw's rotation through the water. The twin-screw ships cancel side force created by the rotating the screws in opposite directions. - Propeller Wash is the turbulence produced by the screws turning against the water. While twisting or operating astern, it negatively effects a short radius turn by decreasing the efficiency of the rudder. - Propeller Pitch is the distance a propeller would travel in one revolution if water were a solid medium.

Page 59: About us Products Service Contact us Sitemap -liftnetionline.neti.com.ph/trainingfiles/NMC 11/NMC 11,12,13.pdf · 1 N = 0.102 kg. 1 inch = 25.4 mm 1 foot = 304.8 mm 1 fathom = 1.828

Original Date

01/07/07

Approved By

NK**

Edition:

2

NYK SHIPMANAGEMENT

PTE LTD

Training Center, No 25 Pandan

Crescent #04-10 Tic Tech Center,

Singapore - 128477

Revised Date

12/11/12

Prepared By

MC**

Page:

27 of 92

- Cavitation: Cavities or bubbles around a propeller which are a result of the pressure on the lower and upper blade surfaces being unequal. It is caused by blade tip speed being excessive or by the vessel riding high in the water. - The propeller will generate both longitudinal and transverse forces, initially transversal forces are more noticeable.

- Twin screw ships can oppose the longitudinal forces to create a twisting moment – one propeller “ahead” and the other “astern”. - Crenshaw compares side force (transverse force) to a paddle wheel affect with the propeller walking across the bottom. - When going ahead, a right hand screw will force the stern to starboard and the bow to port. A left hand screw does the opposite.

COUPLE

(TWIST)

LONGITUDINAL TRANSVERSE THRUST THRUST (SIDE FORCE OR PADDLE WHEEL FORCE)

Fig. Propeller Forces

Page 60: About us Products Service Contact us Sitemap -liftnetionline.neti.com.ph/trainingfiles/NMC 11/NMC 11,12,13.pdf · 1 N = 0.102 kg. 1 inch = 25.4 mm 1 foot = 304.8 mm 1 fathom = 1.828

Original Date

01/07/07

Approved By

NK**

Edition:

2

NYK SHIPMANAGEMENT

PTE LTD

Training Center, No 25 Pandan

Crescent #04-10 Tic Tech Center,

Singapore - 128477

Revised Date

12/11/12

Prepared By

MC**

Page:

28 of 92

2.1.2 Forces created by Rudder – RUDDER Effectiveness: - The rudder acts as a hydrofoil. By itself, it is a passive instrument and relies on water passing over it to give it ‘lift’. Rudders – to be most effective – are placed at the stern of a ship for this reason and to take advantage of the forward pivot point, which enhances the effect. - Water flow is provided by the ship passing through the water and by the propeller forcing water over the rudder in the process of driving the ship. The optimum steerage force is provided by water flow generated by a turning propeller. Water flow is vital in maintaining control of the ship. While water flow provided by the ship’s motion alone can be effective, the effect will diminish as speed is reduced. Obstacles that deflect flow, such as a stopped propeller in front of the rudder, particularly when the propeller is large, can reduce rudder effectiveness. Reduced or disturbed flow will result in a poor response to rudder. - Conventional rudders are described as ‘balanced’; part of the rudder area is forward of the pintles to help the rudder turn and to ease the load on the steering motor. This arrangement provides for better hydrodynamic loading. A flap (Becker rudder) can be fitted to the rudder’s trailing edge. The flap works to increase the effective camber of the rudder and to increase lift. - With propeller stopped, the only flow across the rudder is created by the ship’s motion through the water (there is no side force). - Rudders can be defined by what is known as the ‘rudder area ratio’, which is a ratio of the surface area of the rudder divided by the ship’s length and draught. The rudder area ratio gives an indication of the likely effectiveness of a rudder. Merchant ship ratios range from 0.016 to 0.035. The larger the ratio, the greater the effect the rudder will have.

- When vessel is going astern, the discharge current is not directed against the rudder and effectiveness is dependent entirely on the ship’s sternward velocity to create flow across the rudder. In addition, when engines are initially backed, the pivot point moves aft, reducing the lever arm of forces applied to the stern. - Screw current can be used to “pump to the rudder” to swing the head over. A “kick ahead” on the engine with the rudder over will swing the head in the direction of the rudder without creating significant ahead motion. - Once sternway is achieved, the low pressure side of the rudder is reversed. Left rudder will force the stern to port; right rudder will try to turn the stern to stbd.

Page 61: About us Products Service Contact us Sitemap -liftnetionline.neti.com.ph/trainingfiles/NMC 11/NMC 11,12,13.pdf · 1 N = 0.102 kg. 1 inch = 25.4 mm 1 foot = 304.8 mm 1 fathom = 1.828

Original Date

01/07/07

Approved By

NK**

Edition:

2

NYK SHIPMANAGEMENT

PTE LTD

Training Center, No 25 Pandan

Crescent #04-10 Tic Tech Center,

Singapore - 128477

Revised Date

12/11/12

Prepared By

MC**

Page:

29 of 92

2.1.3 Forces created by BOW / STERN THRUSTERS: - Lateral thrusters can be fitted in the bow or the stern and are most effective when a ship has neither headway nor sternway. They create a turning effect by providing a side force at their location. Their effectiveness will depend upon the distance between the thruster and ship’s pivot point. When berthing a ship that has a single bow thruster, and no stern thruster, it is important not to become too focused on the bow, because this can be controlled with the thruster. Plan to get the stern alongside as a priority, and a tug may be needed to control the stern. - Pure rotation can only be induced by two lateral thrusters, one forward and one aft, opposing each other; - Bow thruster will lose its effectiveness as a ship’s speed increases. Depending on the hull and thrust tunnel design, thrust effectiveness can be lost at between 2 and 5 knots. The reason for this is the merging of the slipstream from the thruster with the general flow around a forward moving hull, plus the position from the pivot point when vessel is moving ahead. - When the ship starts moving ahead, will be a high speed stream of water expelled from the thruster bends along the hull (fig. 23). Its high velocity flow creates a low pressure area that “pulls” the bow in a direction opposite to the side we want to thrust it. The result is that the two forces tend to annihilate each other and the net thrust force is very weak. - When the vessel is moving astern (fig. 24), the vacuum effect created by the thruster is much less significant since the hull area over which it acts is quite smaller (area between the bow thruster opening and the stem).

Page 62: About us Products Service Contact us Sitemap -liftnetionline.neti.com.ph/trainingfiles/NMC 11/NMC 11,12,13.pdf · 1 N = 0.102 kg. 1 inch = 25.4 mm 1 foot = 304.8 mm 1 fathom = 1.828

Original Date

01/07/07

Approved By

NK**

Edition:

2

NYK SHIPMANAGEMENT

PTE LTD

Training Center, No 25 Pandan

Crescent #04-10 Tic Tech Center,

Singapore - 128477

Revised Date

12/11/12

Prepared By

MC**

Page:

30 of 92

Thrusting when stopped – When stopped and thrusting, a ship’s pivot point is likely to be amidships. If a bow thruster is put to starboard on a stopped ship, the ship’s bow will move to starboard. Thrusting with headway – The pivot point will be forward of the midship, so thrusting will not be very effective, especially at high speeds. Thrusting with sternway – The pivot point is aft and the thruster will be effective, acting as a form of ‘rudder’, but its effectiveness will be also reduced with sternway increasing. 2.1.4 Forces created by TUGBOATS: - Tugs are usually employed according to the practice of the port after taking into account the capabilities of the available tug types. - Towage has a number of potential hazards, and tug masters will give priority to the safety of their own tugs in dangerous situations. - Factors to take into account when determining the number of tugs: • practice in the port for the particular size of ship and the designated berth • under-keel clearance • anticipated strength and direction of wind / current and their effect • windage area, stopping power and handling characteristics of the ship, etc. - In general, tugs have difficulty operating at high speed. Interactive forces between the ship and the tug can become very large, particularly at the ends of the ship. High speed increases the possibility of capsizing a conventional tug. - The effectiveness of a tug is proportional to the distance between its point of contact and the ship’s pivot point. (For instance, when the ship has headway with two tugs attached, one forward and one aft, the aft tug will have more effect than the forward one because the distance from the after tug connection to the ship’s pivot point is greater. If both tugs are applying the same power, the result will be a swing of the ship in favour of the aft tug). - When a tug attached by a line leading forward applies a turning force there will also be an increase in the ship’s speed (transversal and longitudinal vectors). 2.1.4.1 Working with Tugs: Points to remember: • Anticipate any changes in tug positioning on the ship and allow sufficient time for the tugs to reposition and be ready to assist.

Page 63: About us Products Service Contact us Sitemap -liftnetionline.neti.com.ph/trainingfiles/NMC 11/NMC 11,12,13.pdf · 1 N = 0.102 kg. 1 inch = 25.4 mm 1 foot = 304.8 mm 1 fathom = 1.828

Original Date

01/07/07

Approved By

NK**

Edition:

2

NYK SHIPMANAGEMENT

PTE LTD

Training Center, No 25 Pandan

Crescent #04-10 Tic Tech Center,

Singapore - 128477

Revised Date

12/11/12

Prepared By

MC**

Page:

31 of 92

• Be aware of any space or other limitations that may give the tug master difficulty in carrying out the ship’s requirements. • Tugs are most effective when a ship is navigating at slow speed, and more effective when pushing, compared to pulling. • It is important for masters to discuss with a pilot the position where a tug will attach before the tugs arrive. A tug acting with a long lever from the ship’s pivot point will be more effective than a tug with a short lever. The effectiveness of a tug will depend upon the position where it is attached (may be placed to control the bow, or aft to decelerate the vessel, etc.). • Propeller wash from tugs operating close to a ship, and pulling, could initially cause a ship’s bow or stern to move away from the tug. • Conventional tugs connected by a line can exert an unwanted force on a small ship, which may require corrective action. • Masters should understand the different performance characteristics of tugs and that conventional tugs are likely to be less maneuverable than water tractor tugs. Ships’ masters can decide on the number of tugs employed but have not much influence on the tug type.

2.1.4.2 Steering a ship going astern with tug alongside: It is possible to steer a ship with a tug, even if positioned at approximately 1/4 L from the stern where the pivot point supposedly lies when a ship is moving astern. When the tug is pushing, you do not get a bodily movement as traditional theory suggests but a movement of the stern in the direction of the action of the tug. The arm lever is short. The CLR is lying a little aft of midship since the ship is going astern slowly. The rotation produced is small and the side movement important, the pivot point is consequently somewhere between the bow and 1/3 L from the bow (if this pushing force is applied long enough for an important ship generated sideways current to appear, the rotation of the vessel may stop).

Page 64: About us Products Service Contact us Sitemap -liftnetionline.neti.com.ph/trainingfiles/NMC 11/NMC 11,12,13.pdf · 1 N = 0.102 kg. 1 inch = 25.4 mm 1 foot = 304.8 mm 1 fathom = 1.828

Original Date

01/07/07

Approved By

NK**

Edition:

2

NYK SHIPMANAGEMENT

PTE LTD

Training Center, No 25 Pandan

Crescent #04-10 Tic Tech Center,

Singapore - 128477

Revised Date

12/11/12

Prepared By

MC**

Page:

32 of 92

2.1.4.3. Handling the Tugs during Simulator Exercises

USE OF TUG BOATS

Radio check Take tug line (location) S/b push or pull (direction) Push or pull (direction/power)

TUGS NAME

No.1 ~ No.6

(Direction/location)

Clockwise 1~12 o’clock

POWER TABLE

4,600HP 3,500HP

PUSH PULL PUSH PULL

FULL 60 54 50 45 HALF 45 41 38 34 SLOW 30 27 25 23 D.SLOW 15 13 13 11 OMEGA3 12 11 6 6 OMEGA2 7 6 3 3 OMEGA1 1 1 2 1 HANGING 0 0 0 0

Page 65: About us Products Service Contact us Sitemap -liftnetionline.neti.com.ph/trainingfiles/NMC 11/NMC 11,12,13.pdf · 1 N = 0.102 kg. 1 inch = 25.4 mm 1 foot = 304.8 mm 1 fathom = 1.828

Original Date

01/07/07

Approved By

NK**

Edition:

2

NYK SHIPMANAGEMENT

PTE LTD

Training Center, No 25 Pandan

Crescent #04-10 Tic Tech Center,

Singapore - 128477

Revised Date

12/11/12

Prepared By

MC**

Page:

33 of 92

SIMULATOR PROCEDURE STANDARD BERTHING PLAN

No. 1 STOP & PARALLEL

No. 2 LATERAL MOVING

Parallel & Lateral movement

2 1

Page 66: About us Products Service Contact us Sitemap -liftnetionline.neti.com.ph/trainingfiles/NMC 11/NMC 11,12,13.pdf · 1 N = 0.102 kg. 1 inch = 25.4 mm 1 foot = 304.8 mm 1 fathom = 1.828

Original Date

01/07/07

Approved By

NK**

Edition:

2

NYK SHIPMANAGEMENT

PTE LTD

Training Center, No 25 Pandan

Crescent #04-10 Tic Tech Center,

Singapore - 128477

Revised Date

12/11/12

Prepared By

MC**

Page:

34 of 92

SIMULATOR RESULTS FOR USE OF TUGS

Results from Simulator Trials, For Use of Tugs

Tug pushing at the bow

Tug pushing at the bow Ship’s speed : 0 knots Main engine : stopped Rudder : amidships External forces : nil Tug power : full Turning by 180°

Page 67: About us Products Service Contact us Sitemap -liftnetionline.neti.com.ph/trainingfiles/NMC 11/NMC 11,12,13.pdf · 1 N = 0.102 kg. 1 inch = 25.4 mm 1 foot = 304.8 mm 1 fathom = 1.828

Original Date

01/07/07

Approved By

NK**

Edition:

2

NYK SHIPMANAGEMENT

PTE LTD

Training Center, No 25 Pandan

Crescent #04-10 Tic Tech Center,

Singapore - 128477

Revised Date

12/11/12

Prepared By

MC**

Page:

35 of 92

Ship Handling – Use of Tugs

Tug pushing at the bow Tug pushing at the bow Ship’s speed : 2 knots Main engine : stopped Rudder : amidships External forces : nil Tug power : full Turning by 90°

Page 68: About us Products Service Contact us Sitemap -liftnetionline.neti.com.ph/trainingfiles/NMC 11/NMC 11,12,13.pdf · 1 N = 0.102 kg. 1 inch = 25.4 mm 1 foot = 304.8 mm 1 fathom = 1.828

Original Date

01/07/07

Approved By

NK**

Edition:

2

NYK SHIPMANAGEMENT

PTE LTD

Training Center, No 25 Pandan

Crescent #04-10 Tic Tech Center,

Singapore - 128477

Revised Date

12/11/12

Prepared By

MC**

Page:

36 of 92

Ship Handling – Use of Tugs

Tug pushing at the stern

Tug pushing at the stern Ship’s speed : 0 knots Main engine : stopped Rudder : amidships External forces : nil Tug power : full Turning by 180°

Page 69: About us Products Service Contact us Sitemap -liftnetionline.neti.com.ph/trainingfiles/NMC 11/NMC 11,12,13.pdf · 1 N = 0.102 kg. 1 inch = 25.4 mm 1 foot = 304.8 mm 1 fathom = 1.828

Original Date

01/07/07

Approved By

NK**

Edition:

2

NYK SHIPMANAGEMENT

PTE LTD

Training Center, No 25 Pandan

Crescent #04-10 Tic Tech Center,

Singapore - 128477

Revised Date

12/11/12

Prepared By

MC**

Page:

37 of 92

Ship Handling – Use of Tugs

Tug pushing at the stern

Tug pushing at the stern Ship’s speed : 2 knots Main engine : stopped Rudder : amidships External forces : nil Tug power : full Turning by 90°

Page 70: About us Products Service Contact us Sitemap -liftnetionline.neti.com.ph/trainingfiles/NMC 11/NMC 11,12,13.pdf · 1 N = 0.102 kg. 1 inch = 25.4 mm 1 foot = 304.8 mm 1 fathom = 1.828

Original Date

01/07/07

Approved By

NK**

Edition:

2

NYK SHIPMANAGEMENT

PTE LTD

Training Center, No 25 Pandan

Crescent #04-10 Tic Tech Center,

Singapore - 128477

Revised Date

12/11/12

Prepared By

MC**

Page:

38 of 92

Ship Handling – Use of Tugs

Tugs pushing at the bow & stern

Tugs pushing at the bow & stern Ship’s speed : 0 knots Main engine : stopped Rudder : amidships External forces : nil Tug power : full (both) Parallel pushing – 3b shift of cg

Page 71: About us Products Service Contact us Sitemap -liftnetionline.neti.com.ph/trainingfiles/NMC 11/NMC 11,12,13.pdf · 1 N = 0.102 kg. 1 inch = 25.4 mm 1 foot = 304.8 mm 1 fathom = 1.828

Original Date

01/07/07

Approved By

NK**

Edition:

2

NYK SHIPMANAGEMENT

PTE LTD

Training Center, No 25 Pandan

Crescent #04-10 Tic Tech Center,

Singapore - 128477

Revised Date

12/11/12

Prepared By

MC**

Page:

39 of 92

Ship Handling – Use of Tugs

Tugs pushing at the bow & stern

Tugs pushing at the bow & stern Ship’s speed : 2 knots Main engine : stopped Rudder : amidships External forces : nil Tug power : full (both) Parallel pushing – 3b shift of cg

Page 72: About us Products Service Contact us Sitemap -liftnetionline.neti.com.ph/trainingfiles/NMC 11/NMC 11,12,13.pdf · 1 N = 0.102 kg. 1 inch = 25.4 mm 1 foot = 304.8 mm 1 fathom = 1.828

Original Date

01/07/07

Approved By

NK**

Edition:

2

NYK SHIPMANAGEMENT

PTE LTD

Training Center, No 25 Pandan

Crescent #04-10 Tic Tech Center,

Singapore - 128477

Revised Date

12/11/12

Prepared By

MC**

Page:

40 of 92

Ship Handling – Use of Tugs

Tugs pushing at the bow & stern

Tugs pulling at the bow & stern Ship’s speed : 0 knots Main engine : stopped Rudder : amidships External forces : nil Tug power : full (both) Parallel pulling – 3b shift of cg

Page 73: About us Products Service Contact us Sitemap -liftnetionline.neti.com.ph/trainingfiles/NMC 11/NMC 11,12,13.pdf · 1 N = 0.102 kg. 1 inch = 25.4 mm 1 foot = 304.8 mm 1 fathom = 1.828

Original Date

01/07/07

Approved By

NK**

Edition:

2

NYK SHIPMANAGEMENT

PTE LTD

Training Center, No 25 Pandan

Crescent #04-10 Tic Tech Center,

Singapore - 128477

Revised Date

12/11/12

Prepared By

MC**

Page:

41 of 92

Ship Handling – Use of Tugs

One pushing at bow & other pulling at stern

One tug pushing at the bow & Second tug pulling at the stern Ship’s speed : 0 knots Main engine : stopped Rudder : amidships External forces : nil Tug power : full (both tugs) Turning by 180°

Page 74: About us Products Service Contact us Sitemap -liftnetionline.neti.com.ph/trainingfiles/NMC 11/NMC 11,12,13.pdf · 1 N = 0.102 kg. 1 inch = 25.4 mm 1 foot = 304.8 mm 1 fathom = 1.828

Original Date

01/07/07

Approved By

NK**

Edition:

2

NYK SHIPMANAGEMENT

PTE LTD

Training Center, No 25 Pandan

Crescent #04-10 Tic Tech Center,

Singapore - 128477

Revised Date

12/11/12

Prepared By

MC**

Page:

42 of 92

Ship Handling – Use of Tugs

Tugs puling at bow & stern at 60°

Tugs pulling at the bow & stern - 60° forward of abeam Ship’s speed : 0 knots Main engine : stopped Rudder : amidships External forces : nil Tug power : full (both)

Page 75: About us Products Service Contact us Sitemap -liftnetionline.neti.com.ph/trainingfiles/NMC 11/NMC 11,12,13.pdf · 1 N = 0.102 kg. 1 inch = 25.4 mm 1 foot = 304.8 mm 1 fathom = 1.828

Original Date

01/07/07

Approved By

NK**

Edition:

2

NYK SHIPMANAGEMENT

PTE LTD

Training Center, No 25 Pandan

Crescent #04-10 Tic Tech Center,

Singapore - 128477

Revised Date

12/11/12

Prepared By

MC**

Page:

43 of 92

Ship Handling – Use of Tugs

Tugs pulling at the bow & stern at 30°

Tugs pulling at the bow & stern - 30° abaft of beam Ship’s speed : 0 knots Main engine : stopped Rudder : amidships External forces : nil Tug power : full (both)

Page 76: About us Products Service Contact us Sitemap -liftnetionline.neti.com.ph/trainingfiles/NMC 11/NMC 11,12,13.pdf · 1 N = 0.102 kg. 1 inch = 25.4 mm 1 foot = 304.8 mm 1 fathom = 1.828

Original Date

01/07/07

Approved By

NK**

Edition:

2

NYK SHIPMANAGEMENT

PTE LTD

Training Center, No 25 Pandan

Crescent #04-10 Tic Tech Center,

Singapore - 128477

Revised Date

12/11/12

Prepared By

MC**

Page:

44 of 92

Ship Handling – Use of Tugs

Tugs pulling at the bow & stern at 60°

Tugs pulling at the bow & stern - 60° abaft of beam Ship’s speed : 0 knots Main engine : stopped Rudder : amidships External forces : nil Tug power : full (both)

Page 77: About us Products Service Contact us Sitemap -liftnetionline.neti.com.ph/trainingfiles/NMC 11/NMC 11,12,13.pdf · 1 N = 0.102 kg. 1 inch = 25.4 mm 1 foot = 304.8 mm 1 fathom = 1.828

Original Date

01/07/07

Approved By

NK**

Edition:

2

NYK SHIPMANAGEMENT

PTE LTD

Training Center, No 25 Pandan

Crescent #04-10 Tic Tech Center,

Singapore - 128477

Revised Date

12/11/12

Prepared By

MC**

Page:

45 of 92

Ship Handling – Use of Tugs

Tugs pulling at bow & stern at 6 o’clock Tugs pulling at bow & stern – 6 o’clock Ship’s speed : 2 knots Main engine : stopped Rudder : amidships External forces : nil Tug power : full (both) Ship stopped in about 3 ship’s length

Page 78: About us Products Service Contact us Sitemap -liftnetionline.neti.com.ph/trainingfiles/NMC 11/NMC 11,12,13.pdf · 1 N = 0.102 kg. 1 inch = 25.4 mm 1 foot = 304.8 mm 1 fathom = 1.828

Original Date

01/07/07

Approved By

NK**

Edition:

2

NYK SHIPMANAGEMENT

PTE LTD

Training Center, No 25 Pandan

Crescent #04-10 Tic Tech Center,

Singapore - 128477

Revised Date

12/11/12

Prepared By

MC**

Page:

46 of 92

Ship Handling – Use of Tugs

Tugs pulling at stern at 6 o’clock

Tugs pulling at stern – 6 o’clock Ship’s speed : 2 knots Main engine : stopped Rudder : amidships External forces : nil Tug power : full (both) Ship stopped in less than 3 ship’s length

Page 79: About us Products Service Contact us Sitemap -liftnetionline.neti.com.ph/trainingfiles/NMC 11/NMC 11,12,13.pdf · 1 N = 0.102 kg. 1 inch = 25.4 mm 1 foot = 304.8 mm 1 fathom = 1.828

Original Date

01/07/07

Approved By

NK**

Edition:

2

NYK SHIPMANAGEMENT

PTE LTD

Training Center, No 25 Pandan

Crescent #04-10 Tic Tech Center,

Singapore - 128477

Revised Date

12/11/12

Prepared By

MC**

Page:

47 of 92

Standard Commands for Tractor Tug Operations

Powered Indirect 4-7 kts Powered Indirect 4-7 kts

Direct Pull @90º under 4kts Direct Pull @90º under 4kts

Indirect Pull Indirect Pull 5 kts

Direct Pull @45º Under 5 Direct Pull @45º under 5 kts

Transverse Arrest 7 kts, Indirect Braking 4 kts Direct pull inline under 6 knots

Standard Operation for Tractor tug operations

Page 80: About us Products Service Contact us Sitemap -liftnetionline.neti.com.ph/trainingfiles/NMC 11/NMC 11,12,13.pdf · 1 N = 0.102 kg. 1 inch = 25.4 mm 1 foot = 304.8 mm 1 fathom = 1.828

Original Date

01/07/07

Approved By

NK**

Edition:

2

NYK SHIPMANAGEMENT

PTE LTD

Training Center, No 25 Pandan

Crescent #04-10 Tic Tech Center,

Singapore - 128477

Revised Date

12/11/12

Prepared By

MC**

Page:

48 of 92

Full Powered Indirect Towing

Powered indirect 4-7 kts

Ships Transverse Arrest 7 kts, Indirect Braking 4 kts Direction

Direct pull inline speed below 6 knots

Page 81: About us Products Service Contact us Sitemap -liftnetionline.neti.com.ph/trainingfiles/NMC 11/NMC 11,12,13.pdf · 1 N = 0.102 kg. 1 inch = 25.4 mm 1 foot = 304.8 mm 1 fathom = 1.828

Original Date

01/07/07

Approved By

NK**

Edition:

2

NYK SHIPMANAGEMENT

PTE LTD

Training Center, No 25 Pandan

Crescent #04-10 Tic Tech Center,

Singapore - 128477

Revised Date

12/11/12

Prepared By

MC**

Page:

49 of 92

Indirect Towing

45º

30º

Significant Heeling can occur during indirect

towing. Exercise caution tug should not trip over

Page 82: About us Products Service Contact us Sitemap -liftnetionline.neti.com.ph/trainingfiles/NMC 11/NMC 11,12,13.pdf · 1 N = 0.102 kg. 1 inch = 25.4 mm 1 foot = 304.8 mm 1 fathom = 1.828

Original Date

01/07/07

Approved By

NK**

Edition:

2

NYK SHIPMANAGEMENT

PTE LTD

Training Center, No 25 Pandan

Crescent #04-10 Tic Tech Center,

Singapore - 128477

Revised Date

12/11/12

Prepared By

MC**

Page:

50 of 92

Direct Towing

Tug Bollard Pull Vs Towing speed for CPP & Nozzles

In Direct towing, tug simply pulls on its line to create slowing & steering forces for the vsl. In narrow channel it

allows the vsl to increase its maneuverability while limiting its speed. As the vsl speed increases tug limitation

increases too.

Page 83: About us Products Service Contact us Sitemap -liftnetionline.neti.com.ph/trainingfiles/NMC 11/NMC 11,12,13.pdf · 1 N = 0.102 kg. 1 inch = 25.4 mm 1 foot = 304.8 mm 1 fathom = 1.828

Original Date

01/07/07

Approved By

NK**

Edition:

2

NYK SHIPMANAGEMENT

PTE LTD

Training Center, No 25 Pandan

Crescent #04-10 Tic Tech Center,

Singapore - 128477

Revised Date

12/11/12

Prepared By

MC**

Page:

51 of 92

Page 84: About us Products Service Contact us Sitemap -liftnetionline.neti.com.ph/trainingfiles/NMC 11/NMC 11,12,13.pdf · 1 N = 0.102 kg. 1 inch = 25.4 mm 1 foot = 304.8 mm 1 fathom = 1.828

Original Date

01/07/07

Approved By

NK**

Edition:

2

NYK SHIPMANAGEMENT

PTE LTD

Training Center, No 25 Pandan

Crescent #04-10 Tic Tech Center,

Singapore - 128477

Revised Date

12/11/12

Prepared By

MC**

Page:

52 of 92

2.1.4.4. Experiments on small-scale models: The following experiments were undertaken at the Ilawa shiphandling center in Poland in July 2005, using a small-scale bulk carrier loaded to an even keel. The aim of the experiment was to apply really effective side force on different points of the ship when she was making way through the water. For this we used a hand pulled towing line oriented at 90 degrees from the ship axis. By using a line, the results are not altered by hull/working force hydraulic interactions (as produced by tugs or bow thrusters). Four tests were made: 1) Headway (5 knts) and steady, engine stopped, pulling at the bow:

2) Headway (5 knts) and steady, engine stopped, pulling at 1/3 L from the bow:

Page 85: About us Products Service Contact us Sitemap -liftnetionline.neti.com.ph/trainingfiles/NMC 11/NMC 11,12,13.pdf · 1 N = 0.102 kg. 1 inch = 25.4 mm 1 foot = 304.8 mm 1 fathom = 1.828

Original Date

01/07/07

Approved By

NK**

Edition:

2

NYK SHIPMANAGEMENT

PTE LTD

Training Center, No 25 Pandan

Crescent #04-10 Tic Tech Center,

Singapore - 128477

Revised Date

12/11/12

Prepared By

MC**

Page:

53 of 92

3) Sternway (5 knts) and steady, engine stopped, pulling at the stern:

4) Sternway (5 knts) and steady, engine stopped, pulling at 1/4 L from the stern:

Results / conclusion: - When the force is applied at the extreme end of the ship (tests 1 and 3), the pivot point is at the opposite end of where the traditional theory expects it to be. - When the force is applied on the pivot point (tests 2 and 4), the expected result (traditional theory) of a ship only moving bodily sideways (since there is no arm lever), does not occur. There is a moment of rotation, therefore an arm lever. The pivot point is also at the opposite end of the one where the force is applied.

Page 86: About us Products Service Contact us Sitemap -liftnetionline.neti.com.ph/trainingfiles/NMC 11/NMC 11,12,13.pdf · 1 N = 0.102 kg. 1 inch = 25.4 mm 1 foot = 304.8 mm 1 fathom = 1.828

Original Date

01/07/07

Approved By

NK**

Edition:

2

NYK SHIPMANAGEMENT

PTE LTD

Training Center, No 25 Pandan

Crescent #04-10 Tic Tech Center,

Singapore - 128477

Revised Date

12/11/12

Prepared By

MC**

Page:

54 of 92

2.2. UN-CONTROLLABLE FORCES

- These forces are not always a disadvantage, sometimes they can be used for berthing & un-berthing. Alternatively these forces can be compensated by steering drift angle or a minimum vessel’s speed to maintain her steering.

2.2.1 WIND Effect - Wind has a significant effect on a ship. It causes heading changes and leeway. Failure to compensate correctly for wind during berthing is a significant cause of berthing accidents. The difficulty in allowing for wind arises from the variable effect that wind can have on a ship because of changes in heading and speed. - Wind has special significance in handling of high free-board vessels such as PCC. The effects vary with the relative wind direction and the speed of the ship. - Although wind force and direction can be estimated from various information sources, the actual / local conditions can change rapidly and with little warning. Control of a ship can be easily lost during the passage of a squall. - There is an obvious need to understand how wind will affect your ship, and how this effect can be difficult to predict.

Page 87: About us Products Service Contact us Sitemap -liftnetionline.neti.com.ph/trainingfiles/NMC 11/NMC 11,12,13.pdf · 1 N = 0.102 kg. 1 inch = 25.4 mm 1 foot = 304.8 mm 1 fathom = 1.828

Original Date

01/07/07

Approved By

NK**

Edition:

2

NYK SHIPMANAGEMENT

PTE LTD

Training Center, No 25 Pandan

Crescent #04-10 Tic Tech Center,

Singapore - 128477

Revised Date

12/11/12

Prepared By

MC**

Page:

55 of 92

- For example, it might appear logical that the effect of wind on a vessel stopped in the water would cause the bow to swing towards the wind. However, experience shows that different ships stopped in the water may lie with the wind forward of the beam (various angles) rather than fine on the bow. - Vessels with relatively high free-board (PCC, Containers, Passengers, LNG, and other vessels in ballast) may have significantly large windage area, which will affects the safety of maneuvers. It is especially difficult to predict the effect of wind on a partially loaded container ship - For example, a container vessel with a wind area of 6000m² and a wind abeam of 25 knots has to reckon with additional lateral force of at least 60 tones. It is useful to know these forces and moments to decide the number of tugs required during berthing. 2.2.1.1. CLR and Point of influence of the wind W - The force of the wind causes the ship to drift and, by doing so, hydrodynamic forces act on the underwater hull to resist the effect of the wind. The point of influence of these underwater forces is known as the centre of lateral resistance (CLR) and is the point on the underwater hull at which the whole hydrodynamic force can be considered to act. - Similarly, there is a point of influence of wind (W) which has an important relationship with the CLR. W is likely to alter frequently as it will change in relation to the wind direction and the ship’s heading. - To anticipate the effect wind will have on a ship’s heading, W must be viewed in relation to CLR. Ship handlers prefer to refer to pivot point (PP) rather than CLR when discussing the effects of wind on a ship with headway or sternway. However, a stopped ship does not have a pivot point and for this reason CLR should always be used. Therefore CLR is used for a stopped ship and PP for a ship with motion. - The point of influence of wind (W) is that point on the ship’s above-water structure upon which the whole force of the wind can be considered an act; W moves depending on the profile of the ship presented to the wind. - When a ship’s beam is facing to the wind, W will be fairly close to the mid-length point, slightly aft in the case of ships with aft accommodation and slightly forward if the accommodation is forward.

Page 88: About us Products Service Contact us Sitemap -liftnetionline.neti.com.ph/trainingfiles/NMC 11/NMC 11,12,13.pdf · 1 N = 0.102 kg. 1 inch = 25.4 mm 1 foot = 304.8 mm 1 fathom = 1.828

Original Date

01/07/07

Approved By

NK**

Edition:

2

NYK SHIPMANAGEMENT

PTE LTD

Training Center, No 25 Pandan

Crescent #04-10 Tic Tech Center,

Singapore - 128477

Revised Date

12/11/12

Prepared By

MC**

Page:

56 of 92

Important: a ship will always want to settle into a position where the pivot point and point of influence of wind in are in alignment. Case 1: Ship stopped – ship with accommodation aft: - On a stopped ship with the wind on her beam, W will be close to the ship’s mid-length. When stopped in the water, the CLR is also at its mid-length. The difference in location between the two points produces a small couple, and the ship will turn with its head towards the wind. As the ship turns, W moves until it is close to the CLR, when the couple reduces to zero. The ship will settle on this heading, usually with the wind slightly forward of the beam.

Case 2: Ship with headway – ship with accommodation aft: - If a ship has headway, PP is forward and the lever between W and PP is large. The resultant force will cause the ship’s head to turn to the wind.

wind direction

W CLR

Small turning

lever, W aft

of CLR

W CLR

No turning

lever, W and

CLR coincide

Page 89: About us Products Service Contact us Sitemap -liftnetionline.neti.com.ph/trainingfiles/NMC 11/NMC 11,12,13.pdf · 1 N = 0.102 kg. 1 inch = 25.4 mm 1 foot = 304.8 mm 1 fathom = 1.828

Original Date

01/07/07

Approved By

NK**

Edition:

2

NYK SHIPMANAGEMENT

PTE LTD

Training Center, No 25 Pandan

Crescent #04-10 Tic Tech Center,

Singapore - 128477

Revised Date

12/11/12

Prepared By

MC**

Page:

57 of 92

Case 3: Ship with sternway – ship with accommodation aft: - If a ship has sternway, PP is aft of W and the ship’s stern will seek the wind. However, and for the majority of ships, the complexity of the aft-end accommodation structure can cause W to move further aft as the ship turns. Eventually, the ship may settle with the wind broad on the quarter rather than the stern.

PP W

wind direction

Medium

turning lever,

PP aft of W

W PP

wind direction

Large turning

lever, PP in

front of W

Page 90: About us Products Service Contact us Sitemap -liftnetionline.neti.com.ph/trainingfiles/NMC 11/NMC 11,12,13.pdf · 1 N = 0.102 kg. 1 inch = 25.4 mm 1 foot = 304.8 mm 1 fathom = 1.828

Original Date

01/07/07

Approved By

NK**

Edition:

2

NYK SHIPMANAGEMENT

PTE LTD

Training Center, No 25 Pandan

Crescent #04-10 Tic Tech Center,

Singapore - 128477

Revised Date

12/11/12

Prepared By

MC**

Page:

58 of 92

2.2.1.2. Force of the Wind - Wind force can be estimated by the formula: F = (V2/18,000) x windage area, where F is the wind force in tones / square metre, V is the wind speed in m/s (metres/second) and windage area is the area of ship exposed to the wind in square metres. Note: we may estimate windage area for a beam wind by multiplying length by freeboard and adding the profile area of the accommodation. For a head wind, multiply beam by freeboard and add the area of the bridge front. - And, as per practical experience and seamanship, double the figure obtained for F and order one or more tugs with the nearest bollard pull. - This calculation gives an estimate of the total force of wind on a ship’s side, and will give an indication of the total power that tugs will need in order to overcome this force. - As shown above, a ship will always want to settle on a heading where the ship’s pivot point is in alignment with the position of the wind’s point of influence. When navigating on such a course, a ship will show good course-keeping properties. - As a result, it is preferable to berth with head to wind with headway and to berth with stern to wind with sternway. In addition, knowledge of the location of W, compared with PP, makes it possible to predict whether the ship’s head or stern will ‘go to wind’ as a ship is stopped. The ship will want to settle with P in alignment with and to windward of W. Note: High free-board ships may suffer more from leeway than from heading change. - A ship is most vulnerable when presenting its broadside, the area of greatest windage, to the wind. In strong winds, it will be difficult to counteract the effect without proper tug assistance or the use of thruster(s). - If close to a berth, it is essential that mooring lines are set as quickly as possible. Ideally, plan the maneuver so as to present the minimum profile to the wind, i.e. head to wind, or at least reduce to a minimum the time the wind is at a broad angle to the ship.

Page 91: About us Products Service Contact us Sitemap -liftnetionline.neti.com.ph/trainingfiles/NMC 11/NMC 11,12,13.pdf · 1 N = 0.102 kg. 1 inch = 25.4 mm 1 foot = 304.8 mm 1 fathom = 1.828

Original Date

01/07/07

Approved By

NK**

Edition:

2

NYK SHIPMANAGEMENT

PTE LTD

Training Center, No 25 Pandan

Crescent #04-10 Tic Tech Center,

Singapore - 128477

Revised Date

12/11/12

Prepared By

MC**

Page:

59 of 92

2.2.1.3. Wind Pressure Effect on PCC while underway

The working point of unified forces (resultant wind force) is located at a distance of “a” from & moves with wind direction. The resultant wind force acting on the working point varies with wind speed and direction, reaching a maximum when the beam wind is acting on the largest wind affected area.

The graph shows the relation between controllability limit and leeway when the maximum rudder deflection of check helm is limited to 15 degrees.

Page 92: About us Products Service Contact us Sitemap -liftnetionline.neti.com.ph/trainingfiles/NMC 11/NMC 11,12,13.pdf · 1 N = 0.102 kg. 1 inch = 25.4 mm 1 foot = 304.8 mm 1 fathom = 1.828

Original Date

01/07/07

Approved By

NK**

Edition:

2

NYK SHIPMANAGEMENT

PTE LTD

Training Center, No 25 Pandan

Crescent #04-10 Tic Tech Center,

Singapore - 128477

Revised Date

12/11/12

Prepared By

MC**

Page:

60 of 92

The rudder deflection of check helm is indicated on the longitudinal axis and wind direction on the horizontal axis, curves on controllability limits are shown on the graph using the parameter of each Va (wind speed in knot) and Vs (ship speed in knot) ratio 1 to 5.

Fig. 4.5: Wind effect for indicated areas

3.2.11 BERTHING IN WIND

Wind Effect For Indicated Areas

0

50

100

150

200

250

0 3 6 9 12 15 18 21 24 27 30 33 36 39

Wind Speed In Knots

Com

pensato

ry B

ollard

Pull, Tonnes

9000

8000

7000

6000

5000

4000

3000

2000

1000

Page 93: About us Products Service Contact us Sitemap -liftnetionline.neti.com.ph/trainingfiles/NMC 11/NMC 11,12,13.pdf · 1 N = 0.102 kg. 1 inch = 25.4 mm 1 foot = 304.8 mm 1 fathom = 1.828

Original Date

01/07/07

Approved By

NK**

Edition:

2

NYK SHIPMANAGEMENT

PTE LTD

Training Center, No 25 Pandan

Crescent #04-10 Tic Tech Center,

Singapore - 128477

Revised Date

12/11/12

Prepared By

MC**

Page:

61 of 92

2.2.1.4. Berthing in Strong Winds: Points to Remember • Ensure that conditions are safe and suitable for the envisaged maneuver. It will be cheaper to delay the ship until the wind moderates than to deal with the aftermath of an accident. • Wind force acting on a ship increases with the square of the wind speed. Doubling the wind speed gives four times the force. Gusts of wind are dangerous. • Take evasive/corrective action early. Attach tugs early and before are needed. • Tugs should be of sufficient strength not only to counteract the effects of wind but to get the ship to the required destination. • The berthing plan should be devised to minimize the adverse effect of wind and to maximize its assistance. • A ship is more vulnerable to wind at slow speed. As speed reduces hydrodynamic forces reduce, and the effect of wind on heading and leeway increases. • Take corrective action as soon as it becomes obvious that it is needed. The earlier that action is taken, the less that needs to be done. The longer things are left, the more drastic will be the action needed to correct the situation. • Kicks ahead are effective in controlling a ship in windy conditions. • Consider any special circumstances where wind may affect ship handling. Trim, freeboard and deck cargo can vary the position of W and the force of the wind on the ship, and change the ship’s natural tendency in wind. For example, significant trim by the stern can cause W to move ahead of PP. In these circumstances the bow will have increased windage. Consequently, if the ship is heading into wind, the bow may show a tendency to blow downwind, even if the ship has headway. • The windage area, and hence the force of the wind on the ship, will vary with the heading relative to the wind. The maximum force on the ship is when the ship is broadside to the wind. • Good control is easy to achieve when the ship’s head is to wind and the ship has headway. Control is difficult when wind is following and strong turning forces are created. • Apply large passing distances when it is windy. Always pass any obstructions well upwind. Gusts and squalls can arrive very rapidly and with little warning. When wind has caused a ship to move rapidly to leeward, it can be difficult to overcome the motion and return to a position of safety. • Allow plenty of distance from the berth when wind is onshore. If berthing in an onshore wind, it is best practice to stop half a ship’s length from the berth and then come alongside in a controlled manner.

Page 94: About us Products Service Contact us Sitemap -liftnetionline.neti.com.ph/trainingfiles/NMC 11/NMC 11,12,13.pdf · 1 N = 0.102 kg. 1 inch = 25.4 mm 1 foot = 304.8 mm 1 fathom = 1.828

Original Date

01/07/07

Approved By

NK**

Edition:

2

NYK SHIPMANAGEMENT

PTE LTD

Training Center, No 25 Pandan

Crescent #04-10 Tic Tech Center,

Singapore - 128477

Revised Date

12/11/12

Prepared By

MC**

Page:

62 of 92

2.2.2 CURRENT Effect - A feature of any river berth is the current. It is common for a river berth to lie in the same direction as the prevailing current so that the current can assist with berthing. In this case, a berth can be approached bow into the current in order to give the advantage of relatively high speed through the water with a reduced speed over the ground. Consequently, steerage at low ground speed is improved by the good water flow over the rudder, and the ship will be easier to stop. - Advantage of berthing heading in current is that it can be used to push a ship alongside. Position the ship off the intended berth but at a slight angle towards it. Then allow the current to produce a sideways movement towards the berth. - Masters should note that currents are usually complex, with varying rates and directions that can change hourly. Local knowledge is essential. Important: a ship making headway into a current, but stopped over the ground, will have a forward pivot point.

Page 95: About us Products Service Contact us Sitemap -liftnetionline.neti.com.ph/trainingfiles/NMC 11/NMC 11,12,13.pdf · 1 N = 0.102 kg. 1 inch = 25.4 mm 1 foot = 304.8 mm 1 fathom = 1.828

Original Date

01/07/07

Approved By

NK**

Edition:

2

NYK SHIPMANAGEMENT

PTE LTD

Training Center, No 25 Pandan

Crescent #04-10 Tic Tech Center,

Singapore - 128477

Revised Date

12/11/12

Prepared By

MC**

Page:

63 of 92

2.2.2.1. Berthing in Current: - Berthing with a following current is difficult, since the ship must develop sternway through the water in order to be stopped over the ground. In these circumstances, a tug should be used to hold the stern against the current. - Berthing with head in the current directions is easier, however, should be avoided too large angle between the berth and the direction of the current, or else it may cause the ship to move rapidly sideways.

- On the other hand, if during berthing the bow’s angle to the berth is over corrected then the ship could move away from the berth as the wedge of water between ship and berth becomes established. This may cause the ship’s stern to strike the berth.

PP

direction of

the current

PP

direction of

the current

Page 96: About us Products Service Contact us Sitemap -liftnetionline.neti.com.ph/trainingfiles/NMC 11/NMC 11,12,13.pdf · 1 N = 0.102 kg. 1 inch = 25.4 mm 1 foot = 304.8 mm 1 fathom = 1.828

Original Date

01/07/07

Approved By

NK**

Edition:

2

NYK SHIPMANAGEMENT

PTE LTD

Training Center, No 25 Pandan

Crescent #04-10 Tic Tech Center,

Singapore - 128477

Revised Date

12/11/12

Prepared By

MC**

Page:

64 of 92

2.2.2.2. Berthing in Current: Points to Remember • In many places a counter current flows in opposition to the main current close to the bank. Most of the time only local knowledge will provide this information. • Current can vary with depth of water and large deep draught ships can experience different current effects at differing parts of the hull. • When close to the berth in a head current, there is a danger that flow inshore of the ship becomes restricted and the ship is subject to interactive forces that can cause the ship to either be sucked towards or pushed away from the berth.

• As speed is reduced, take care that the increased proportion of the ship’s vector which is attributable to current does not set the ship close to obstructions.

• Always make a generous allowance for current. Its effect on the ship increases as the ship’s speed reduces. A mistake made during berthing is often impossible to correct. Remember that current predictions are just predictions and actual meteorological conditions may result in a greater or lesser rate than forecast.

Page 97: About us Products Service Contact us Sitemap -liftnetionline.neti.com.ph/trainingfiles/NMC 11/NMC 11,12,13.pdf · 1 N = 0.102 kg. 1 inch = 25.4 mm 1 foot = 304.8 mm 1 fathom = 1.828

Original Date

01/07/07

Approved By

NK**

Edition:

2

NYK SHIPMANAGEMENT

PTE LTD

Training Center, No 25 Pandan

Crescent #04-10 Tic Tech Center,

Singapore - 128477

Revised Date

12/11/12

Prepared By

MC**

Page:

65 of 92

2.2.3. Cross Current Effect and Bollard Pull Calculation

Cross Current Effect On Underwater Area ( Perpendicular to surface)

0

50

100

150

200

250

300

0 0.2 0.4 0.6 0.8 1 1.2 1.4 1.6 1.8 2Current Rate, Knots

Req

uir

ed

Co

mp

en

sato

ry B

ollard

Pu

ll,to

nn

es

7000

6000

5000

4000

3000

2000

1000

Page 98: About us Products Service Contact us Sitemap -liftnetionline.neti.com.ph/trainingfiles/NMC 11/NMC 11,12,13.pdf · 1 N = 0.102 kg. 1 inch = 25.4 mm 1 foot = 304.8 mm 1 fathom = 1.828

Original Date

01/07/07

Approved By

NK**

Edition:

2

NYK SHIPMANAGEMENT

PTE LTD

Training Center, No 25 Pandan

Crescent #04-10 Tic Tech Center,

Singapore - 128477

Revised Date

12/11/12

Prepared By

MC**

Page:

66 of 92

REQUIRED BOLLARD PULL TO COMPENSATE FOR CURRENT

Refer to Appendix 9: Calculation of Tugs Required (for Bollard Pull)

The above curves assume a depth to draught ratio > 6.0 For other depth to draught ratios, the required bollard pulls for perpendicular cross currents should be increased by the following factors:

FOR D/d RATIO OF 1. 5 FACTOR IS APPROX – 2.75

FOR D/d RATIO OF 1. 2 FACTOR IS APPROX – 3.75

FOR D/d RATIO OF 1. 1 FACTOR IS APPROX – 4.625

D / d F D / d F

First let us discuss about various stages where tug assistance is required, depending on local conditions……………… The phase whereby a ship has reasonable speed……….. Ships can use their engines & rudder to compensate for, drift forces caused due to …. Wind, Current, Waves By steering drift angle, depending on the condition, tugs can or may assist.

1.0 6.0

1.01 5.87

1.02 5.73

1.03 5.59

1.04 5.45

1.05 5.32

1.06 5.18

1.07 5.04

1.08 4.91

1.09 4.77

1.1 4.625

1.11 4.54

1.12 4.45

1.15 4.19

1.2 3.75

1.25 3.59

1.3 3.42

1.35 3.25

1.4 3.09

1.45 2.92

1.5 2.75

Page 99: About us Products Service Contact us Sitemap -liftnetionline.neti.com.ph/trainingfiles/NMC 11/NMC 11,12,13.pdf · 1 N = 0.102 kg. 1 inch = 25.4 mm 1 foot = 304.8 mm 1 fathom = 1.828

Original Date

01/07/07

Approved By

NK**

Edition:

2

NYK SHIPMANAGEMENT

PTE LTD

Training Center, No 25 Pandan

Crescent #04-10 Tic Tech Center,

Singapore - 128477

Revised Date

12/11/12

Prepared By

MC**

Page:

67 of 92

The intermediate stage……….. When ships have to reduce speed while entering dock, harbour basin, turning circle or approaching berth. When ships have to be stopped within certain distance. When reducing speed, ships steering performances also decreases, thereby allowing the influence from wind & current to increase. To compensate for the uncontrollable forces, tug assistance is needed more frequently & to larger extent. The final stage, when berthing or un-berthing……….. When Ships are practically dead in water, such as in the turning basin, or while berthing & un-berthing. - Ships are very restricted in maneuvering performance. - Ships are unable to compensate for wind & current forces.

Therefore tugs have to assist fully. “Bollard pull” requirement based on environmental conditions & displacements Let us do some calculations……..

Ships affected by wind, current Container ship: length overall 294m, length between perpendiculars 281m,beam 32m, draught 12.5m, water depth 13.8m. Top of container to waterline approximately 22m, onshore wind right angles to berth , wind speed 30 knots, with cross current of 0.5 knots Calculate the required bollard pull???

Refer to the graphs in your handouts Ratio draft/water depth 13.8/12.5 = 1.1 � (4.625) Area above water approx 294 x 22 = +/- 6500 m² Underwater area approx 281 x 12.5 = +/- 3500 m² Displacement = 75,000 t When towing on a tug line or pulling at ships side on medium length towline, the following compensatory total bollard pull is required. The on shore wind (figure in handbook) = 100 tons

Page 100: About us Products Service Contact us Sitemap -liftnetionline.neti.com.ph/trainingfiles/NMC 11/NMC 11,12,13.pdf · 1 N = 0.102 kg. 1 inch = 25.4 mm 1 foot = 304.8 mm 1 fathom = 1.828

Original Date

01/07/07

Approved By

NK**

Edition:

2

NYK SHIPMANAGEMENT

PTE LTD

Training Center, No 25 Pandan

Crescent #04-10 Tic Tech Center,

Singapore - 128477

Revised Date

12/11/12

Prepared By

MC**

Page:

68 of 92

The crosswise current (figure in handbook) = 10 x 4.625 = 47 tons Total bollard pull required = 147 tons* * To compensate for wind & current, four tugs with at least 40 tons bollard pull are needed. Allowance of 20% should be made for the reserve power for the tugs. “Bollard pull” of the Bow thruster 100 HP of a bow thruster is about 1.1 tons of force 100 KW of a bow thruster is about 1.5 tons of force In the earlier example of a container ship, if it was equipped with a bow thruster of 2500 HP (1840KW) then 28 tons less pull is required forward. “Bollard pull” required in a cross current

VLCC: length overall 350m, length between perpendiculars 315m,beam 52m, draught 22m, water depth 24m. Onshore wind right angles to berth, wind speed 12 knots, with cross current of 0.5 knots Calculate the required bollard pull ??? Ratio draft/water depth 24/22 = 1.09 � (4.77) Area under water approx 315 x 22 = +/- 6900 m² Displacement = 245,000 t When towing on a tug line or pulling at ships side on medium length towline, the following compensatory total bollard pull is required. The crosswise current (figure in handbook) = 15 x 4.77 = 72 tons The onshore wind = 28 tons Total bollard pull required = 120 tons* * Allowance of 20% should be made for the reserve power for the tugs. What happens if under keel clearance is reduced to 1.0 meter & cross current is increased to 1.5 knots??? Let us Calculate the required bollard pull ??? Ratio draft/water depth 23/22 = 1.04 � (5.45) Area under water approx 315 x 22 = +/- 6900 m² Displacement = 245,000 t

Page 101: About us Products Service Contact us Sitemap -liftnetionline.neti.com.ph/trainingfiles/NMC 11/NMC 11,12,13.pdf · 1 N = 0.102 kg. 1 inch = 25.4 mm 1 foot = 304.8 mm 1 fathom = 1.828

Original Date

01/07/07

Approved By

NK**

Edition:

2

NYK SHIPMANAGEMENT

PTE LTD

Training Center, No 25 Pandan

Crescent #04-10 Tic Tech Center,

Singapore - 128477

Revised Date

12/11/12

Prepared By

MC**

Page:

69 of 92

When towing on a tug line or pulling at ships side on medium length towline, the following compensatory total bollard pull is required. The crosswise current (figure in handbook) = 130 x 5.45 = 709 tons Total bollard pull required = 851 tons* * Allowance of 20% should be made for the reserve power for the tugs * Assuming Tug power is 40 tons, therefore required number of Tugs for berthing is 21 !! 2.3. SEMI – CONTROLLABLE FORCES – Hydrodynamic Effects

When a ship is making way, surrounding water is displaced ahead, towards the sides and under the ship’s keel, exerting the flow of water relative to the moving ship. The pressure distribution that develops around the ship moving through water distorts the water line by raising the level of the high pressure regions and lowering it along the length of the hull, particularly amidships.

Pmax

+

+

+

+

+

+

+

+

+

+

+

+

+

+

Pmin

Pmin

- -

-

- -

-

- -

-

-

+

+

+

+

-

- -

-

-

-

-

-

While vessel making headway, are formed the bow waves: moving abt 45deg with longitudinal axe, and stern waves: moving perpendicular to the vessel’s heading. In shallow / confined waters, this waves will affect more the vessel’s steering, comparing to deep / large waters. SPEED CONTROL will have a great influence: less speed, less effect !

Page 102: About us Products Service Contact us Sitemap -liftnetionline.neti.com.ph/trainingfiles/NMC 11/NMC 11,12,13.pdf · 1 N = 0.102 kg. 1 inch = 25.4 mm 1 foot = 304.8 mm 1 fathom = 1.828

Original Date

01/07/07

Approved By

NK**

Edition:

2

NYK SHIPMANAGEMENT

PTE LTD

Training Center, No 25 Pandan

Crescent #04-10 Tic Tech Center,

Singapore - 128477

Revised Date

12/11/12

Prepared By

MC**

Page:

70 of 92

2.3.1. Water Depth – Shallow Water Effects: - Water depth has a profound effect on maneuvering. In a harbour, water depth may vary from deep to conditions in which there is danger of touching bottom. - The behavior of the ship changes with changes in water depth: a ship’s resistance increases as water depth reduces. The increase becomes significant when the water depth is less than twice the mean draught. The effect of this increased resistance is a reduction in speed, and as depth and under keel clearance reduce, turning ability deteriorates, virtual mass increases (increase in a ship’s mass resulting from water being dragged along with the ship) and the effect of the propeller transverse thrust on yaw alters. - As a result, a ship can become very difficult to control during a stopping maneuver as the rudder loses the beneficial effects of the propeller slipstream, and the bias off-course may become more pronounced. - The increase in virtual mass is most noticeable when a ship is breasting on to a quay or jetty. Virtual mass in sway motion is invariably large, increasing as under keel clearance reduces. Consequently, any impact with a quay wall, jetty or fender will be much more severe if under-keel clearance is small. - Similarly, when a large ship moored in shallow water is allowed to move, the momentum can be considerable. - Water depth limits a ship’s speed. There is a maximum speed that a conventional displacement ship can achieve in shallow water which can be less than the normal service speed. This is called the “limiting speed”. Limiting speed needs to be considered during passage planning. Knowledge of areas where ship’s speed is limited by water depth is important because any increase in engine power to overcome the limiting speed will greatly increase wash. In simple terms, the limiting speed can be calculated from the formula: Vlim = 4.5 h where h is the water depth (in metres) and Vlim is speed (in knots). - In shallow water, and because of insufficient engine power, a conventional ship may be unable to overcome the limiting speed. However, some powerful ships such as fast ferries can overcome limiting speed, but in doing so may produce dangerous wash.

Page 103: About us Products Service Contact us Sitemap -liftnetionline.neti.com.ph/trainingfiles/NMC 11/NMC 11,12,13.pdf · 1 N = 0.102 kg. 1 inch = 25.4 mm 1 foot = 304.8 mm 1 fathom = 1.828

Original Date

01/07/07

Approved By

NK**

Edition:

2

NYK SHIPMANAGEMENT

PTE LTD

Training Center, No 25 Pandan

Crescent #04-10 Tic Tech Center,

Singapore - 128477

Revised Date

12/11/12

Prepared By

MC**

Page:

71 of 92

2.3.2. Squat (Please refer to Appendix 10: Pilot Card with Squat Calculation) - Squat is the increase in draught and trim that occurs when a ship moves on the surface of the sea. At low speed, a ship sinks bodily and trims by the head. At high speed, a ship bodily lifts and trims by the stern. At especially high speed, the ship can plane. However, squat is greatest in shallow water where the resulting increase in draught and trim can cause grounding. - The overall effect of the pressure distribution is to create a local depression of the mean level that coincides with the ship and travels along with it. Furthermore, the drop in the water level is concentrated amidships, where immersed hull volume is greatest, and the ship will also move bodily downwards to maintain its full buoyancy, including a change of trim. This effect is irrelevant in deep water, but it becomes significant when the ship moves into shallow water, which results in reduction of under keel clearance.

- The squat is conspicuous in shallow water. Trim by the head is prominent in the low speed range, trim by stern by high speed range. As the Froude number approaches 0.25 (a ship of 300m length with its speed about 26 knots), the bow of the ship tends to float, and the stern tends to sink abruptly. - However large sized ships usually navigate shallow water at stand by speed, and most ships are considered to be proceeding with the trim by the head, because the squat is mainly related to large sized ships and with full load conditions, it is important to obtain the amount of the bow sinkage, as most of the ships tend to be trimmed by the head. - Squat provides a further limit on speed in shallow water, consideration of grounding due to squat being especially important if the under-keel clearance is 10% or less of the draught and the speed is 70% or more of the limiting speed. In shallow water, squat can be estimated by adding 10% to the draught or 0.3 metres for every 5 knots of speed. 2.3.3. Waterway Width: - If the waterway is restricted in width as well as depth, this can also have an effect on performance. If the underwater midship area of the ship is significant compared to that of the waterway (over 20%, say) then this ‘blockage’ will further increase resistance, increase squat and create a ‘backflow’ of water between the ship and the waterway. - This will cause silt to go into suspension or deposit on the bed of the channel, and may erode the waterway. It may also cause bank material to be transferred to the bed of the waterway.

Page 104: About us Products Service Contact us Sitemap -liftnetionline.neti.com.ph/trainingfiles/NMC 11/NMC 11,12,13.pdf · 1 N = 0.102 kg. 1 inch = 25.4 mm 1 foot = 304.8 mm 1 fathom = 1.828

Original Date

01/07/07

Approved By

NK**

Edition:

2

NYK SHIPMANAGEMENT

PTE LTD

Training Center, No 25 Pandan

Crescent #04-10 Tic Tech Center,

Singapore - 128477

Revised Date

12/11/12

Prepared By

MC**

Page:

72 of 92

2.3.4. Bank Effect: - A further effect: the ship may steer away from the bank. This ‘bank effect’ is due to backflow between the bank and the ship creating a low pressure region amidships. This causes the ship to be ‘sucked’ towards the bank, and a pressure wave between the bow and the bank (the ‘bow cushion’) pushes the bow away from the bank and the stern is drawn in. - Bank effect increases with increases in speed, blockage (i.e. when the cross-sectioned area of the ship is large relative to the cross-sectioned area of the bank) and low under-keel clearance. If speed is too high, bank effect can be severe and sudden, catching the ship handler unaware. - It is advisable to slow down and to steer towards the bank. By so doing, it may be possible to strike a balance, with the ship running parallel to the bank. Bank effect is also felt on bends in a waterway when proximity to the outer bank may ‘help the bow round’ a tight bend.

Page 105: About us Products Service Contact us Sitemap -liftnetionline.neti.com.ph/trainingfiles/NMC 11/NMC 11,12,13.pdf · 1 N = 0.102 kg. 1 inch = 25.4 mm 1 foot = 304.8 mm 1 fathom = 1.828

Original Date

01/07/07

Approved By

NK**

Edition:

2

NYK SHIPMANAGEMENT

PTE LTD

Training Center, No 25 Pandan

Crescent #04-10 Tic Tech Center,

Singapore - 128477

Revised Date

12/11/12

Prepared By

MC**

Page:

73 of 92

- The general bank effect is a build-up in the water level ahead of the vessel and a lowering astern. - A surging effect and a streamlining (Venturi effect) arises due to the restricted flow of the water on one side of the vessel � an increase in velocity of the water in that side. - The stern moves towards the bank (Suction Effect) and the bow away from the bank (Cushion Effect) due to the differences in pressure around the ship.

- The interaction between vessel and bank due to the difference in pressure created by the water flow along the vessel’s hull. The effect is stronger when distance between vessel and bank is smaller, and when the water depth is less. 2.3.5. Interaction with Other Ships: - Just as ships can interact with banks, they can also interact with other ships. The same basic physical factors are involved: shallow water, speed and distance. - When one ship comes too close to another at high speed, then one or more things can happen: the ship may turn towards, or be drawn towards the other ship, or both ships may sheer away from each other, or the ship may turn towards (across) the other’s bows, depending on ship’s sizes, relative positions, distance between ships and relative speed. - These hydrodynamic effects are collectively known as ‘interaction’. They can and do lead to collisions or contact. Interaction is accentuated by shallow water when a large hydrodynamic effect can render a ship almost impossible to control. - To minimize their effect, it is essential that masters anticipate the situation, that speed is reduced before the encounter, if practicable, and that the maximum passing distance is maintained. This is especially true when overtaking.

(+)

(+)

Page 106: About us Products Service Contact us Sitemap -liftnetionline.neti.com.ph/trainingfiles/NMC 11/NMC 11,12,13.pdf · 1 N = 0.102 kg. 1 inch = 25.4 mm 1 foot = 304.8 mm 1 fathom = 1.828

Original Date

01/07/07

Approved By

NK**

Edition:

2

NYK SHIPMANAGEMENT

PTE LTD

Training Center, No 25 Pandan

Crescent #04-10 Tic Tech Center,

Singapore - 128477

Revised Date

12/11/12

Prepared By

MC**

Page:

74 of 92

- Interaction is more of a problem when overtaking than when crossing on a reciprocal course, because the forces have more time to ‘take hold’ of the other ship. But it should be remembered that both ships are affected by the interaction and both should take care to minimize its effect. 2.3.5.1. Passing Effect Stage 1 It is important, when meeting another ship, not to work over to the side of the channel too early or too far. If the ship gets to close to a shallow water or bank, it can experience bank effect and unexpectedly sheer across the path of the approaching ship with serious consequences. As the bows of both ships approach each other, the combined bow pressure zones between them will build up and encourage the respective bows to swing away from each other, use of helm will be required to check the swing.

Fig - Stage 1 Passing

Page 107: About us Products Service Contact us Sitemap -liftnetionline.neti.com.ph/trainingfiles/NMC 11/NMC 11,12,13.pdf · 1 N = 0.102 kg. 1 inch = 25.4 mm 1 foot = 304.8 mm 1 fathom = 1.828

Original Date

01/07/07

Approved By

NK**

Edition:

2

NYK SHIPMANAGEMENT

PTE LTD

Training Center, No 25 Pandan

Crescent #04-10 Tic Tech Center,

Singapore - 128477

Revised Date

12/11/12

Prepared By

MC**

Page:

75 of 92

Stage 2 With the two ships nearly abeam of each other, a combined low pressure, or suction area exists between them and if the ships are too close, there is all the likelihood of them being sucked together in collision literally. At this stage the bow of each ship will also begin to seek the low pressure area astern of the other. It is usual to feel this “turning in” towards the other ship as you pass and it is also helpful, because the ship is also back towards the center of the channel.

Fig - Stage 2 Passing

Page 108: About us Products Service Contact us Sitemap -liftnetionline.neti.com.ph/trainingfiles/NMC 11/NMC 11,12,13.pdf · 1 N = 0.102 kg. 1 inch = 25.4 mm 1 foot = 304.8 mm 1 fathom = 1.828

Original Date

01/07/07

Approved By

NK**

Edition:

2

NYK SHIPMANAGEMENT

PTE LTD

Training Center, No 25 Pandan

Crescent #04-10 Tic Tech Center,

Singapore - 128477

Revised Date

12/11/12

Prepared By

MC**

Page:

76 of 92

Stage 3 Having previously turned in towards the center of the channel, the opposite now occurs. As the two sterns pass each other, they are drawn together by the low pressure area between them and this has a tendency to realign the ships with the channel. These effects are not always very noticeable, because the ships often pass through the pressure zones fairly quickly, even at relatively slow speeds, the effect however should always be anticipated and used correctly to advantage, corrective helm being applied when necessary.

Fig -Stage 3 Passing

2.3.5.2. Overtaking Effect Stage 1 The ship to be overtaken should not move over to the side of the channel without first considering the consequences of the bank effect and their danger of shearing across the path of the overtaking vessel. This particularly applies to smaller ships, which will easily be influenced by a large ship.

Page 109: About us Products Service Contact us Sitemap -liftnetionline.neti.com.ph/trainingfiles/NMC 11/NMC 11,12,13.pdf · 1 N = 0.102 kg. 1 inch = 25.4 mm 1 foot = 304.8 mm 1 fathom = 1.828

Original Date

01/07/07

Approved By

NK**

Edition:

2

NYK SHIPMANAGEMENT

PTE LTD

Training Center, No 25 Pandan

Crescent #04-10 Tic Tech Center,

Singapore - 128477

Revised Date

12/11/12

Prepared By

MC**

Page:

77 of 92

- As ship A approaches the stern of ship B its bow pressure zone will put pressure on the rudder of ship B causing it to shear across the path of the overtaking ship. The overtaking ship will also feel the low pressure area astern of ship B and exhibit a tendency to turn in.

Fig-Stage 1 Overtaking

- Ship B may experience an increase in speed, as it is virtually pushed along by the pressure zone of the overtaking ship. These may be very powerful forces and it may require full rudder and power to counteract them. Stage 2 when both ships are abeam of each other, a powerful pressure zone exists between their bows and a low pressure area between their sterns, these combined forces create a strong turning lever which is trying to swing the bows

Page 110: About us Products Service Contact us Sitemap -liftnetionline.neti.com.ph/trainingfiles/NMC 11/NMC 11,12,13.pdf · 1 N = 0.102 kg. 1 inch = 25.4 mm 1 foot = 304.8 mm 1 fathom = 1.828

Original Date

01/07/07

Approved By

NK**

Edition:

2

NYK SHIPMANAGEMENT

PTE LTD

Training Center, No 25 Pandan

Crescent #04-10 Tic Tech Center,

Singapore - 128477

Revised Date

12/11/12

Prepared By

MC**

Page:

78 of 92

away from each other, this is a powerful force and vigorous corrective measured may again be needed. - In addition to the turning forces, there is also an underlying suction area between the two ships which will, if they are allowed to get too close, draw then inexorably alongside of each other, if this doe happen, ship B normally dragged along with ship A and unless they both slow down together to reduce the suction area between them, it is difficult to get the two ships apart again.

Fig-Stage 2 Overtaking Stage 3 As the overtaking ship passes the other vessel, ship B may be influenced by the effects of two powerful forces. Firstly on one side, bank effect and secondly on the other side, the low pressure area of the passing vessel. This can combine as a very strong turning force and require bold corrective action. The rudder of the ship A may be adversely affected with positive pressure, as it passes through the pressure zone around the bow of the overtaken ship B particularly if that ship is large. This can cause the ship to turn unexpectedly across the path of the overtaken ship, as the ship B is drawn towards the suction area of the passing ship, it may experience a noticeable increase in speed.

Page 111: About us Products Service Contact us Sitemap -liftnetionline.neti.com.ph/trainingfiles/NMC 11/NMC 11,12,13.pdf · 1 N = 0.102 kg. 1 inch = 25.4 mm 1 foot = 304.8 mm 1 fathom = 1.828

Original Date

01/07/07

Approved By

NK**

Edition:

2

NYK SHIPMANAGEMENT

PTE LTD

Training Center, No 25 Pandan

Crescent #04-10 Tic Tech Center,

Singapore - 128477

Revised Date

12/11/12

Prepared By

MC**

Page:

79 of 92

Fig- Stage 3 Overtaking

2.3.5.3. How to Reduce the Interaction? - The overtaking / passing to be in straight river (no bents) as much as possible; - The distance between ships to be as large as possible (more than 3 beams of overtaking vessel); - The difference in speed between overtaking and overtaken vessel to be minimized; - Rudder effect to be used in order to minimize the suction effect (anticipative action); - Speed and heading control of both vessels; - The ship should be navigated so that maximum amount of correcting rudder is always available, together with as much maneuvering room as possible; - A sheer could be instantly corrected by increasing engine revolutions.

Page 112: About us Products Service Contact us Sitemap -liftnetionline.neti.com.ph/trainingfiles/NMC 11/NMC 11,12,13.pdf · 1 N = 0.102 kg. 1 inch = 25.4 mm 1 foot = 304.8 mm 1 fathom = 1.828

Original Date

01/07/07

Approved By

NK**

Edition:

2

NYK SHIPMANAGEMENT

PTE LTD

Training Center, No 25 Pandan

Crescent #04-10 Tic Tech Center,

Singapore - 128477

Revised Date

12/11/12

Prepared By

MC**

Page:

80 of 92

2.3.6. Approach Channels: Approach channels allow a deep-draught ship to enter an otherwise shallow port and may provide many of the external factors that affect maneuvering. - The width, depth and alignment of many approach channels are subject to rigorous analysis at the design stage so that they provide the minimum hazard to ships that move along them. - They are designed for single or two-way traffic and their width, depth and alignment are an optimized compromise between acceptable marine risk on the one hand and economic acceptability (with regard to dredging costs) on the other. 2.3.7. Effect on Hull Resistance and Ship’s Speed:

When a ship moves into shallow water, ship speed is reduced due to increased wave making resistance and the deterioration of propulsive efficiency.

From the results of speed trials, the following formula is proposed for the critical water depth affecting hull resistance:

H<3√Bd H: Water depth (m) B: Ship Breadth (m) d: Ship Draft (m) 2. Ship Handling in Rivers / Channels 2.1. Maneuvering in a Following Current / Tide:

• A Ship can react both violently & rapidly to this force & it should never be underestimated.

• When a large ship is rounding the bend in a channel with strong following tide, the ship may be positioned in such a way that the larger under-water area is located aft, tide’s effect is more on the stern.

• With the pivot point forward, the tide is thus creating a stronger turning lever, and a turning force of considerable magnitude is created.

• This swing can be corrected with a kick ahead of full power.

Page 113: About us Products Service Contact us Sitemap -liftnetionline.neti.com.ph/trainingfiles/NMC 11/NMC 11,12,13.pdf · 1 N = 0.102 kg. 1 inch = 25.4 mm 1 foot = 304.8 mm 1 fathom = 1.828

Original Date

01/07/07

Approved By

NK**

Edition:

2

NYK SHIPMANAGEMENT

PTE LTD

Training Center, No 25 Pandan

Crescent #04-10 Tic Tech Center,

Singapore - 128477

Revised Date

12/11/12

Prepared By

MC**

Page:

81 of 92

• Therefore, if sufficient space is available, it may be prudent to steer the vessel at the outside of the bend.

2.2. Maneuvering in Current / Tide from the Head:

• When a ship is negotiating a bend in channel with a tide from ahead, it is possible to get into the position where the ship is influenced by tides of differing strength.

• A turning moment which is opposing the intended turn and if it is not anticipated with appropriate helm and power, resulting in ship not responding & clear the bend which may lead to grounding.

• It may be better to steer the vessel inside of the bend so that the bow does not enter the area of stronger tide at any time during the turn.

Page 114: About us Products Service Contact us Sitemap -liftnetionline.neti.com.ph/trainingfiles/NMC 11/NMC 11,12,13.pdf · 1 N = 0.102 kg. 1 inch = 25.4 mm 1 foot = 304.8 mm 1 fathom = 1.828

Original Date

01/07/07

Approved By

NK**

Edition:

2

NYK SHIPMANAGEMENT

PTE LTD

Training Center, No 25 Pandan

Crescent #04-10 Tic Tech Center,

Singapore - 128477

Revised Date

12/11/12

Prepared By

MC**

Page:

82 of 92

Fig: Maneuvering with a tide from ahead

2.3. Maneuvering with Sudden Changes of tide directions and strength: Attention when vessel is approaching breakwaters, jetty-ends, or any other marine object that might stop or alter the speed / direction of the tide, and consequently with a sudden and unpredictable effect towards the vessels.

Page 115: About us Products Service Contact us Sitemap -liftnetionline.neti.com.ph/trainingfiles/NMC 11/NMC 11,12,13.pdf · 1 N = 0.102 kg. 1 inch = 25.4 mm 1 foot = 304.8 mm 1 fathom = 1.828

Original Date

01/07/07

Approved By

NK**

Edition:

2

NYK SHIPMANAGEMENT

PTE LTD

Training Center, No 25 Pandan

Crescent #04-10 Tic Tech Center,

Singapore - 128477

Revised Date

12/11/12

Prepared By

MC**

Page:

83 of 92

2.4. Particularities of ship’s handling on rivers - Different sectors may have different water flow and variable current velocity; - Currents can be circular, especially in the river bents; - Due to weather factors (rain) the water level can vary a lot in different periods; - Due to high banks and reefs, the visibility can be affected, mostly on bents; - The river bottom and banks are always exposed to depositions or erosions � consequently the velocity and direction of the river current may vary; - In some areas, near the banks the water-flow may be opposite from the main flow (counter-current). 2.5. Characteristics of ship’s handling on rivers

- Current velocity is NOT constant at the transversal section and it can change with the depth; - Consequently, may cause a difficulties in a vessel’s maneuver: sudden and un-expected reactions and effects. - Shallow water and squat will affect the speed and the steering of the ship. - River navigation will decrease the ship’s speed with 20-30%, because the volume of water “pushed” by the vessel will form waves that will be reflected back from the banks to the vessel. - When navigating close to the bank or close to another ships, the maneuvering capacity will be reduced due to suction effect. - When making way through the water, a ship will push ahead and laterally a volume of water equivalent to the speed and hull’s size � a (+) pressure in the bow and a (-) pressure (suction or vacuum) along sides and in the stern. - Subsequently it will be created a water-flow opposed to the vessel’s headway, its velocity depending on vessel’s breadth, draft and speed (the water will tend to fill-up the volume left in the stern).

2.6. Effects of the River Current

- A berth can be approached bow into the current in order to give the advantage of relatively high speed through the water with a reduced speed over the ground. - Consequently, steerage at low ground speed is improved by the good water flow over the rudder; also the ship will be easier to stop. - Current can be used to push a ship alongside. Position the ship off the intended berth but at a slight angle towards it. Then allow the current to produce a sideways movement of the ship towards the berth. - A ship making headway into a current, but stopped over the ground, will have a forward pivot point.

Page 116: About us Products Service Contact us Sitemap -liftnetionline.neti.com.ph/trainingfiles/NMC 11/NMC 11,12,13.pdf · 1 N = 0.102 kg. 1 inch = 25.4 mm 1 foot = 304.8 mm 1 fathom = 1.828

Original Date

01/07/07

Approved By

NK**

Edition:

2

NYK SHIPMANAGEMENT

PTE LTD

Training Center, No 25 Pandan

Crescent #04-10 Tic Tech Center,

Singapore - 128477

Revised Date

12/11/12

Prepared By

MC**

Page:

84 of 92

- Heading in the current, a vessel can use minimum engine ahead – and still have steering, due to water flow on the rudder - Even if ship’s speed = current speed (SOG = 0) the vessel can still steer; - Turning diameter is smaller. - A vessel with current from the stern is more difficult to control and maneuver, as rudder effect is weak, vessel more difficult to stop, and turning diameter is larger. 3. Tugs and Pilots: Legal Issues 3.1. Pilotage: - The relationship between the master and the pilot is fraught with potential difficulties and conflict. The pilot directs the navigation of the ship, but the master still retains overall command and control. - The freedom that the master gives to the pilot varies from master to master but also depends upon the circumstances in which the pilotage takes place. The master of a large foreign-going ship entering a difficult channel will tend to adopt a more passive attitude to the pilot than a coastal master who knows the area. The way in which the law interprets this relationship, and the rights and responsibilities of each to the other and to third parties, differs from country to country and the following is therefore offered as a general overview. In many legal systems, the customary rules and statutory enactments provide a confused and sometimes contradictory picture, which tends to the conclusion that a master, when considering how to operate with a pilot, should be guided more by common sense and self-preservation than by precise legal principles. - The pilot owes a professional duty of care to those whom he serves, which assumes a knowledge and awareness of local conditions. The pilot is therefore generally liable to the shipowner, and to third parties, for a failure to exercise such care. In practice, however, such a responsibility is largely illusory since the pilot, as an individual, has few assets with which to satisfy any award of damages. - Also the extent of his liability is often restricted at law or limited in amount, although he may also be subject to criminal sanctions under any relevant legislation as a result of his actions. - Where there is injury or damage to the property of a third party caused by the pilot’s negligence, the third party will naturally look to the shipowner for compensation. There may be a possibility of a recourse action against the harbour authority, port commission or canal company that employs the negligent

Page 117: About us Products Service Contact us Sitemap -liftnetionline.neti.com.ph/trainingfiles/NMC 11/NMC 11,12,13.pdf · 1 N = 0.102 kg. 1 inch = 25.4 mm 1 foot = 304.8 mm 1 fathom = 1.828

Original Date

01/07/07

Approved By

NK**

Edition:

2

NYK SHIPMANAGEMENT

PTE LTD

Training Center, No 25 Pandan

Crescent #04-10 Tic Tech Center,

Singapore - 128477

Revised Date

12/11/12

Prepared By

MC**

Page:

85 of 92

pilot. If, however, the relevant body merely acts as a licensing authority, it will not be liable for pilot error. Pilot associations are also generally immune from liability for the actions of their members. - In terms of engagement, the master is only legally bound to employ a pilot in an area of compulsory pilotage. However, the master may be found liable for not employing a pilot where it can be shown that such failure caused or contributed to an accident. - Whilst the pilot may assume control of the navigation of the ship, this does not relieve the master of his command of the ship. The master therefore retains both the right and the responsibility to intervene in the actions of the pilot, although it has been stressed on many occasions that the master is only justified in intervening, when the pilot is in charge, in very rare instances; for example, where he perceives the threat of an imminent danger to the ship or when the pilot is obviously incapacitated in some way. - The pilot is responsible for, and should be left in charge of, navigation in terms of speed, course, stopping and reversing, but the ship’s master is responsible for all other matters such as maintaining a proper lookout. And the pilot is entitled to expect a well-regulated and seaworthy ship, that provides him with proper assistance and information. 3.2. Towage: Towage has been defined as “a service rendered by one vessel to aid the propulsion or to expedite the movement of another vessel”. Towage can take place in many different circumstances and can be part of a salvage or wreck removal operation following a casualty. It can also occur when a ship is in distress in order to avoid a casualty occurring. In the vast majority of cases, however, towage is a routine operation, particularly within the confines of a port. This is referred to as customary towage. - An agent of the ship, or the charterer, usually requests the services of a tug for port towage. Once engaged, however, the tug may take its orders from any pilot on board the towed ship and therefore the presence of tugs adds to the complexities of the relationship between the master and pilot referred to above. The pilot should be fully aware of each tug’s power and handling characteristics but the responsibility for engaging tug assistance, where required, rests with the ship’s master, and the ship’s master may be found negligent in not engaging a tug to assist where the circumstances warrant it and an accident occurs.

Page 118: About us Products Service Contact us Sitemap -liftnetionline.neti.com.ph/trainingfiles/NMC 11/NMC 11,12,13.pdf · 1 N = 0.102 kg. 1 inch = 25.4 mm 1 foot = 304.8 mm 1 fathom = 1.828

Original Date

01/07/07

Approved By

NK**

Edition:

2

NYK SHIPMANAGEMENT

PTE LTD

Training Center, No 25 Pandan

Crescent #04-10 Tic Tech Center,

Singapore - 128477

Revised Date

12/11/12

Prepared By

MC**

Page:

86 of 92

- Every shipowner should leave the question of tug assistance to the discretion of the master who must make a judgment based on the prevailing circumstances. - The rights and responsibilities of the tug and the towed ship, with regards to each other and in relation to third parties, are generally dealt with in the applicable towage contract. In most cases, the contract will be based on industry standard terms that lay down clearly the division of responsibility between the two entities. Specific port user agreements exist, but standard form contracts, such as the UK Standard Towage Conditions, the Netherlands Towage Conditions or the Scandinavian Conditions, are used in most cases. These all favour the tug, although in the USA, the Supreme Court has held that any clauses in a towage contract purporting to relieve the tugowner of liability for negligence are invalid as being against public policy. - In Japan, the tugowner must exercise due diligence to make the tug seaworthy at the time she leaves the port and is liable for any damage to the tow caused by any failure to do so. Generally, in the absence of clear wording to the contrary, a court will apply as an implied term of the towage contract that the tug owner warrants to exercise due diligence to make the tug seaworthy at the commencement of the towage. 3.3. Master – Pilot Relationship: It is a given fact that invariably pilotage is compulsory and the majority of accidents during berthing occur with a pilot on the bridge. No berthing guide would be complete without reference to the master/pilot relationship. - Efficient pilotage is chiefly dependent upon the effectiveness of the communications and information exchanges between the pilot, the master and other bridge personnel and upon the mutual understanding each has for the functions and duties of the others. - Ship’s personnel, shore based ship management and the relevant port and pilotage authorities should utilize the proven concept of “Bridge Team Management”. - The presence of a pilot on the ship does not relieve the master or officer in charge of the navigational watch from their duties and obligations for the safe conduct of the ship. - Ships should provide the relevant port or pilotage authority with basic information regarding their arrival intentions and ship characteristics, such as draught and dimensions, maneuvering characteristics, etc. - In acknowledging receipt of this information, the appropriate port or pilotage authority should pass relevant information back to the ship (pilot boarding point;

Page 119: About us Products Service Contact us Sitemap -liftnetionline.neti.com.ph/trainingfiles/NMC 11/NMC 11,12,13.pdf · 1 N = 0.102 kg. 1 inch = 25.4 mm 1 foot = 304.8 mm 1 fathom = 1.828

Original Date

01/07/07

Approved By

NK**

Edition:

2

NYK SHIPMANAGEMENT

PTE LTD

Training Center, No 25 Pandan

Crescent #04-10 Tic Tech Center,

Singapore - 128477

Revised Date

12/11/12

Prepared By

MC**

Page:

87 of 92

reporting and communications procedures; and sufficient details of the prospective berth, anchorage and routing information, etc) to enable the Master to prepare the passage plan to the berth. - The Pilot and the Master should exchange information regarding the pilot’s intentions, the ship’s characteristics and operational parameters as soon as possible after the pilot has boarded the ship. (Refer to SMS procedures – Pilot Card and Master-Pilot Information Exchange <S-072003-01FRM> ) - The exchange of information regarding pilotage and the passage plan should include all relevant information and clarification of any doubts; after taking this information into account and comparing the pilot’s suggested plan with that initially developed on board, the Pilot and Master should agree an overall final plan early in the passage before the ship is committed. - Contingency plans should also be made which should be followed in the event of a malfunction or a shipboard emergency, identifying possible abort points and safe grounding areas. These should be discussed and agreed as well between Pilot and Master. - The pilot’s primary duty is to provide accurate information to ensure the safe navigation of the ship. In practice, the pilot will often con the ship on the master’s behalf. The master retains the ultimate responsibility for the safety of his ship. He and his bridge personnel have a duty to support the pilot and to monitor his actions. - In supporting the pilot, the master and ship’s personnel should ensure that the means of pilot embarkation and disembarkation are properly positioned, rigged, maintained and manned in accordance with IMO recommendations and, where applicable, other port requirements; - The master should liaise with the pilot station/transfer craft so that the ship is positioned and maneuvered to ensure safe boarding. - It is essential that a face-to-face master/pilot exchange results in clear and effective communication and the willingness of the pilot, master and bridge personnel to work together as part of a bridge management team. - English language, or a mutually agreed common language, or the IMO Standard Marine Communication Phrases should be used, and all members of the team share a responsibility to highlight any perceived errors or omissions by other team members, for clarification. - The necessity of co-operation and a close working relationship between the master and pilot during berthing and un-berthing operations is extremely

Page 120: About us Products Service Contact us Sitemap -liftnetionline.neti.com.ph/trainingfiles/NMC 11/NMC 11,12,13.pdf · 1 N = 0.102 kg. 1 inch = 25.4 mm 1 foot = 304.8 mm 1 fathom = 1.828

Original Date

01/07/07

Approved By

NK**

Edition:

2

NYK SHIPMANAGEMENT

PTE LTD

Training Center, No 25 Pandan

Crescent #04-10 Tic Tech Center,

Singapore - 128477

Revised Date

12/11/12

Prepared By

MC**

Page:

88 of 92

important to the safety of the ship. In particular, both the pilot and the master should discuss and agree which one of them will be responsible for operating key equipment and controls (such as main engine, helm and thrusters). - The pilot should co-ordinate the efforts of all parties engaged in the berthing or un-berthing operation (e.g. tug crews, linesmen, ship’s crew). His intentions and actions should be explained immediately to the bridge management team, in the previously agreed appropriate language. - The Master, having the ultimate responsibility for the safe navigation of the ship has a responsibility to request replacement of the Pilot, should he deem it necessary. 4. Brief Explanation of Anchor Holding Power Calculation - Rough calculations (3D+90m, 4D+145m, etc.) are used to estimate the length of anchor chain needed. Some considerations for ‘equipment numeral’ is given for the above figures; however, necessary length will differ by vessel conditions (ballast/laden and anchor holding factor / chain’s friction factor, etc.) 4.1. Used Figures - A necessary holding power is the sum of anchor holding power ad frictional resistance on the contracted length of the chain. We can get an estimate of holding power by performing the following calculations.

Page 121: About us Products Service Contact us Sitemap -liftnetionline.neti.com.ph/trainingfiles/NMC 11/NMC 11,12,13.pdf · 1 N = 0.102 kg. 1 inch = 25.4 mm 1 foot = 304.8 mm 1 fathom = 1.828

Original Date

01/07/07

Approved By

NK**

Edition:

2

NYK SHIPMANAGEMENT

PTE LTD

Training Center, No 25 Pandan

Crescent #04-10 Tic Tech Center,

Singapore - 128477

Revised Date

12/11/12

Prepared By

MC**

Page:

89 of 92

4.2. Wind Pressure Force Calculation It is very important to understand how much wind pressure is placed on a ship during anchorage and berth in strong wind conditions. When wind hits a ship, pivot forces are given off by wind pressure and more steerage is needed to keep the intended course during harbor approach at low speed. In addition, more attention should be provided to potentially dragging anchor at anchorage. The results calculated using the below figures may differ from actual conditions. Calculations Ra = 1/2pa · Ca · Va2 (A cos2

θ + B sin2θ)

Pa: Air density (kg.sec2/m4 : Adopt 0.124 as a normal value) C Ca: A wind pressure coefficient Va: Relative wind force (m/sec) A: The front projection area on the water (m2) B: The side projection area on the water (m2)

θ : Relative direction of the wind (deg) Ra: Wind pressure resultant (kg) α: The direction where wind pressure resultant acts on (deg) a: Distance from the bow to the wind pressure point (m) Lpp: Length of perpendicular (m)

Page 122: About us Products Service Contact us Sitemap -liftnetionline.neti.com.ph/trainingfiles/NMC 11/NMC 11,12,13.pdf · 1 N = 0.102 kg. 1 inch = 25.4 mm 1 foot = 304.8 mm 1 fathom = 1.828

Original Date

01/07/07

Approved By

NK**

Edition:

2

NYK SHIPMANAGEMENT

PTE LTD

Training Center, No 25 Pandan

Crescent #04-10 Tic Tech Center,

Singapore - 128477

Revised Date

12/11/12

Prepared By

MC**

Page:

90 of 92

4.3. Wind Pressure Coefficient and the Direction Where Wind Pressure Resultant Acts The following approximations are used: Wind pressure coefficient General cargo vessel: Ca = 1.325 – 0.05cos2θ – 0.35cos4θ – 0.175cos6θ Passenger ship: Ca = 1.142 – 0.142cos2θ – 0.367cos4θ -0.133cos6θ Bulker & Oil Tanker: Ca = 1.20 – 0.083cos2θ – 0.25cos4θ – 0.117cos Distance from the bow to the wind pressure point a/Lpp = 0.291 + 0.0023θ Distance from the bow to the wind pressure point

============================================================

Page 123: About us Products Service Contact us Sitemap -liftnetionline.neti.com.ph/trainingfiles/NMC 11/NMC 11,12,13.pdf · 1 N = 0.102 kg. 1 inch = 25.4 mm 1 foot = 304.8 mm 1 fathom = 1.828

Original Date

01/07/07

Approved By

NK**

Edition:

2

NYK SHIPMANAGEMENT

PTE LTD

Training Center, No 25 Pandan

Crescent #04-10 Tic Tech Center,

Singapore - 128477

Revised Date

12/11/12

Prepared By

MC**

Page:

91 of 92

List of Appendices APPENDIX 1: Guidelines for Safe Anchoring Doc Ref No.: SB GEN 2012 016 and GI/FLT/037/12 APPENDIX 2: Method of Reducing Speed Gradually (Examples) Doc ZZ-S-P-07.20.02, Form S-072002-02FIG APPENDIX 3: Determination of Holding Power of Anchor Doc ZZ-S-P-07.20.02, Form S-072002-04FIG APPENDIX 4: Anchor Chain Holding Power and Wind Pressure Force SMS Tools – Excel calculation sheets. APPENDIX 5: NYKSM Maneuvering Standard Standard Berthing and Un-Berthing Plans APENDIX 6: Calculation of Tugs Required (for required Bollard Pull) SMS Tools – Excel calculation sheet. APPENDIX 7: Pilot Card with Squat Calculation (UKC Calculation tool) SMS Tools – Excel calculation sheet. APPENDIX 8: Owner’s Instructions for all VLOCs / VLCCs: NYK Standard for VLOCs Passing the Malacca/Singapore/Sunda/Lombok Strait APPENDIX 9: SAFETY REPORT: Reporting Bollard Strength on Nomination Sheets (Ref. No. 2012-08 / 01-Nov-2012). APPENDIX 10: Contact incidents - HSEQ/ALL/021/13 dated 06-Feb-2013. APPENDIX 11 (For LNG): Ras Laffan Port berthing criteria – SMUK/MOPS/OTHER/003/13 dated 09-May-2013. APPENDIX 12: Reminder regarding compliance with SMS requirements pertaining to "Self-Pilotage" - HSEQ/ALL/059/13 dated 23-May-2013

Page 124: About us Products Service Contact us Sitemap -liftnetionline.neti.com.ph/trainingfiles/NMC 11/NMC 11,12,13.pdf · 1 N = 0.102 kg. 1 inch = 25.4 mm 1 foot = 304.8 mm 1 fathom = 1.828

Original Date

01/07/07

Approved By

NK**

Edition:

2

NYK SHIPMANAGEMENT

PTE LTD

Training Center, No 25 Pandan

Crescent #04-10 Tic Tech Center,

Singapore - 128477

Revised Date

12/11/12

Prepared By

MC**

Page:

92 of 92

BIBLIOGRAPHY: - IMO Publication: “A Master’s Guide to Berthing” - American Bureau of Shipping: “Vessel Maneuverability” - Capt Hugues Cauvier: “The Pivot Point” – Article published in “The Pilot” (The Official Organ of the UK Maritime Pilots’ Association, October 2008) - NYKSM Safety Management System – Various Forms and Instructions - NYK Line – Various Instructions and Circulars

Various Case-Study are discussed, depending on Vessel’s type

VLCC - “TOSHI” nearmiss grounding, K Sea-Berth / Japan, overshoot position. - “TOSA” alleged capsizing of fishing boat, Uotsuri / Japan. - “TAKASUZU” contact with new terminal berth, Ningbo / China. - “NIPPON” collision with fishing boat, off Kiire / Japan. - “NIPPON” collision with Bulk-carrier “VTC Ace”, Malacca Strait. PCC - “HEIJIN” grounding near breakwater, Zeebruge / Belgium. - “HEIJIN” port anchor and 10 shackles chain lost, Cristobal / Panama. - “JINGU” collision with fishing boat, South China Sea. - “NADA V” collision with PCC “Grande Nigeria”, Antwerp / Belgium. - “GARNET LEADER” grounding, Oita / Japan. - “KAIJIN” contact with berth and gantry crane, Chiba / Japan. - “PLEIADES LEADER” contact with M/V “Sun Happiness”, Nagoya / Japan LNG - “ECHIGO MARU” collision with fishing boat, Indian Ocean. LNG Twin Screw - “AL UTOURIYA” contact with canal edge port side, Suez Canal / Egypt. CONTAINER - “NYK SPRINGTIDE” contact with 2 ships, berth and gantry crane, Kobe / Japan. - “IMARI” contact with Scow and Dredger, Shooters Island, New York / USA. - Container vessel contact with shore fender, T05 Tanjong Pagar terminal, Singapore. WOODCHIP CARRIER - “CRIMSON MERCURY” contact with berth (no tugs used), Macapa / Brazil BULK CARRIER - 2 Bulk-Carriers involved in collision during anchorage maneuvers (arrival and departure).

Page 125: About us Products Service Contact us Sitemap -liftnetionline.neti.com.ph/trainingfiles/NMC 11/NMC 11,12,13.pdf · 1 N = 0.102 kg. 1 inch = 25.4 mm 1 foot = 304.8 mm 1 fathom = 1.828

NYK SMS Manual APPENDIX 7 APPENDIX 7 APPENDIX 7 APPENDIX 7 (Rev: 2015/12/01) <S-072003-01FRM> Pilot CardPilot CardPilot CardPilot Card Page 1 of 3

PILOT CARD and MASTER-PILOT INFORMATION EXCHANGE

Port : Date : Pilot’s Name :

PART A : PART A : PART A : PART A : SHIP’S PARTICULARSSHIP’S PARTICULARSSHIP’S PARTICULARSSHIP’S PARTICULARS (fixed/permanent data) (fixed/permanent data) (fixed/permanent data) (fixed/permanent data)

Ship’s name IMO No.

Call sign LOA Breadth Year built

GRT M/T Deadweight M/T Summer Displ. M/T

Anchor chain: Port shackles, Stbd shackles, Stern shackles (1 Shackle=(1 Shackle=(1 Shackle=(1 Shackle= 2 2 2 27.57.57.57.5 m m m m //// 15 15 15 15 fathoms)fathoms)fathoms)fathoms)

Distance Bridge: to bow m, to stern m Bulbous bow: YES / NO

Thruster : Bow kw ( HP), Stern kw ( HP)

Rudder Type , Max. angle , Number of rudders , Hard-over to hard-over sec

Rudder angle for neutral effect , Type of Steering Gear :

Steering idiosyncrasies / peculiarities (if any): .

Number of Propellers , Propeller Turn : RIGHT / LEFT, Controllable Pitch : YES / NO

Type of engine Maximum power kw ( HP)

Maneuvering Engine order Rpm/pitch Speed Loaded Speed Ballast

Full ahead

Half ahead

Slow ahead

Dead slow ahead

Dead slow astern

Slow astern

Half astern

Full astern

h. Any Constraints imposed by Fuel type in use:

a. Time limit for ME to run continuously astern min

b. Time taken: Full ahead to full astern sec

c. Max. no. of consecutive starts

d. Minimum RPM , knots

e. Critical RPM : From to

f. Astern power % of ahead power

g. Type of Fuel in use for M/E propulsion ______________

(Eg. HFO/DO/MGO/ULSGO etc)

((((OOOObtainbtainbtainbtain items items items items ‘a’ t ‘a’ t ‘a’ t ‘a’ to ‘o ‘o ‘o ‘e’ from sea trial booklet, item ‘f ’ for diesel engines may be estimated by experience and ‘rule of thumb’)e’ from sea trial booklet, item ‘f ’ for diesel engines may be estimated by experience and ‘rule of thumb’)e’ from sea trial booklet, item ‘f ’ for diesel engines may be estimated by experience and ‘rule of thumb’)e’ from sea trial booklet, item ‘f ’ for diesel engines may be estimated by experience and ‘rule of thumb’)

PART PART PART PART B B B B ---- 1 1 1 1 : : : : SHIP’S SHIP’S SHIP’S SHIP’S CONDITION: (voyageCONDITION: (voyageCONDITION: (voyageCONDITION: (voyage----specific data, to be filledspecific data, to be filledspecific data, to be filledspecific data, to be filled----in for each maneuver)in for each maneuver)in for each maneuver)in for each maneuver)

List deg Port / Starb’d

Draught: Fwd m/ ft in, Aft: m/ ft in Mid-Ship: m / ft in,

Displacement : M/T

PART PART PART PART B B B B ---- 2 2 2 2 : : : : SHIP’S SHIP’S SHIP’S SHIP’S READINESS : (voyageREADINESS : (voyageREADINESS : (voyageREADINESS : (voyage----specific data, to be filledspecific data, to be filledspecific data, to be filledspecific data, to be filled----in for each maneuver)in for each maneuver)in for each maneuver)in for each maneuver)

Check and Confirm following tested and in readiness and in good working order as applicable:

Anchors, Windlass, Winch Steering gear Number of power units operating Whistle ECDIS # 1 ECDIS # 2

Radar / ARPA #1 cm IndicatorsIndicatorsIndicatorsIndicators : Rudder ME Rpm/Pitch Rate of Turn

Radar / ARPA #2 cm Bow Thruster (s) Flags, Day signal Lamp, Shapes

Radar / ARPA #3 cm Speed log Doppler

VHFs Water speed Ground speed

M/E run ahead / astern Dual-Axis Echo sounder

Engine Telegraphs Compass System *Constant Gyro Error

Elec. Pos. Fix. Sys. Type: *(Gyro Error)=(Gyro Bearing)-(True Bearing)<Ex: Gyro 240°True 242°: Gyro Error -2°> ** AIS **AIS power output: (Arrival in port limits = Reduce) / (Departure from port limits = Increase)

m

m

m

m

Parallel W/L Loaded m Ballast m

Air Draught m ft in

Center of manifold

(Required for oil & gas tankers only)

Page 126: About us Products Service Contact us Sitemap -liftnetionline.neti.com.ph/trainingfiles/NMC 11/NMC 11,12,13.pdf · 1 N = 0.102 kg. 1 inch = 25.4 mm 1 foot = 304.8 mm 1 fathom = 1.828

NYK SMS Manual APPENDIX 7 APPENDIX 7 APPENDIX 7 APPENDIX 7 (Rev: 2015/12/01) <S-072003-01FRM> Pilot CardPilot CardPilot CardPilot Card Page 2 of 3

The Company defines the navigational equipment that the pilot can use as follows: a).RADAR/ARPA No:. _______ . b) ECDIS No. c). VHF No. d). AIS e) Air Horn f). Others : .

PART C: Local conditions and special information (voyage-specific data, to be filled-in for each maneuver) Vessels must attempt to obtain as much of the following data as is possible; by discussion with the Pilot.

However, it is understood that traffic & maneuvering situations and time in hand may not always allow a complete review.

Therefore the extent of information recorded in this part is at the Master’s discretion, as best suitable to the prevailing circumstances.

Weather: Actual condition ( Berthing and Un-berthing criteria )

(1) Wind: m/s (≦ m/s ) (2) Current: kt (≦ kt )

(3) Sea & Swell: m (≦ m) (4) Visibility: n.m. (> n.m.)

(5) Changes in the effect of (1) & (2) on the vessel, when ever courses are altered, with special emphasis to cross-track drift

of the vessel.

� All conditions are within the criteria for berthing/un-berthing to/from the terminal

� Not all conditions are within the criteria, however, all parties concerned have acknowledged to proceed for approach to

berthing/un-berthing on condition that

Approach plan & Berthing/mooring/anchoring layout; Tugs, mooring boats to be used; cautionary positions where special

care may be required (sketch if possible or attach Pilot’s sketch if provided):

Berthing and Un-berthing criteria

(1) Berthing Speed: ≦ cm/sec.

(2) Tug arrangement: Berthing / Un-berthing ps x

(3) Location of Tug Push Point :

Others:

1. Contingency Plan by Vessel and Pilot, in case of FAILURE of M/E, Bow Thruster and Steering.

2. Special limitations or malfunctions of relevant equipment/machinery (if any other than below SWLs):

S.W.L. of mooring bitts = ___T, S.W.L. of sunken (recessed) bitts = ___T, S.W.L. of bitts for S.T.S. = ___T

Maximum permissible bollard pull of Tugs__________________

SWL of Fairleads: ___________________ SWL of Bitts: __________________

New local hazards, reporting regulations etc.:

Master _____ _D/O (Pilot – optional)_______________________

Check condition for safe berthing/un-berthing

Page 127: About us Products Service Contact us Sitemap -liftnetionline.neti.com.ph/trainingfiles/NMC 11/NMC 11,12,13.pdf · 1 N = 0.102 kg. 1 inch = 25.4 mm 1 foot = 304.8 mm 1 fathom = 1.828

NYK SMS Manual APPENDIX 7 APPENDIX 7 APPENDIX 7 APPENDIX 7 (Rev: 2015/12/01) <S-072003-01FRM> Pilot CardPilot CardPilot CardPilot Card Page 3 of 3

Part D (Applicable to all vessels)Part D (Applicable to all vessels)Part D (Applicable to all vessels)Part D (Applicable to all vessels)

The effect of Squat, available UKC and maximum allowable speed to maintain company UKC policy shall be

discussed and confirmed with pilot.

Squat and UKC informationSquat and UKC informationSquat and UKC informationSquat and UKC information

Speed (in knots) 03 04 05 06 07 08 09 10 11 12

Squat (Sinkage) in Metres

Draft Fwd in Metres

(After effect of Squat)1

Draft Aft in Metres

(After effect of Squat) 1

1:1:1:1: Squat shall always be added to fwd and aft draft

-------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

Company Policy on UKC

Required Static

UKC to meet

Company

Policy.

Vessel

Minimum

Static

UKC.

Maximum

allowable Speed

to maintain

Dynamic UKC

Remark

(1) Coastal Passages–

15% of the deepest draft + Sinkage due effect of

squat at prevailing speed

(2) Channels inside ports – a) 10% of the deepest draft (See Note 2)

Or

b) 0.60 m + Sinkage due to effect of Squat at speed

to be maintained + 0.5 m allowance for accuracy

of chart and depth (if applicable)

(3) Fairway or Channels outside ports (leading to

ports) and during river passages – a) 15% of the deepest draft (See Note 2)

Or

b) 0.60 M + Sinkage due to effect of Squat at

speed to be maintained + 0.5m allowance for

accuracy of chart (if applicable) + 0.5m

allowance for wave motion (if applicable).

(4) Canal transit –

As per local navigational rules. If none, then as per

“(2) Channels inside ports” above.

(5) Moored Alongside – 0.60 m + Sinkage due to effect of squat caused by

prevailing current + swell

Note 1: For all of the above Company Policy on UKC, following should be noted:-

Additional appropriate allowance shall be made by considering reduction in UKC due to heeling of vessel during alteration

of course(s), rolling / pitching, weather and other applicable factors as listed in ZZ-S-P-07.41.03 paragraph 6.5.

Note 2: The maximum speed shall be limited so as minimum 0.60 m of net UKC is maintained at all times after deducting the

sinkage due to squat, and accuracy of the chart (Zone of Confidence and other factors).

Note 3: Wherever the word “OrOrOrOr” is mentioned in the above table, the vessel should maintain the higher of the two calculated UKC

options.

Note 4: Risk assessment should be initiated and Company approval sought as per SMS ZZ-S-P-07.41.03, sec 4, Table 1 (Threshold

for submitting RA to the Company (related to UKC Policy).

Master _____ _D/O (Pilot – optional)_______________________