about us- emi steel industries - company profile · 2018. 4. 11. · emi specialize in design,...
TRANSCRIPT
Al Mafraq Industrial Area
P.O. Box: 8952
Abu Dhabi, UAE
Tel No.: + 971 2 585 5981
Fax No.:+ 971 2 585 4940
Email add: [email protected]
Website: www.emi-steel.com
COMPANY PROFILE
Steel Industries L.L.C.
Company Profile Rev.02
Steel Industries L.L.C
EMI-CPF-001 Rev. No.: 04|17-Mar-2018 Issue No.: 01|15-Jan-2018 Page 2 of 34
COMPANY PROFILE
Table of Contents 1. COMPANY INTRODUCTION ............................................................................................................................ 3
2. COMPANY SERVICES........................................................................................................................................ 4
a. Design and Build ............................................................................................................................................... 4
b. General Contractor ......................................................................................................................................... 4
c. Construction Management .......................................................................................................................... 4
d. Design and Supply of LGS Steel and Hot Rolled Steel Material .......................................................... 5
3. COMPANY INSURANCES ................................................................................................................................. 5
4. COMPANY FACILITIES ...................................................................................................................................... 5
4.1. Machine and Equipment Facilities .............................................................................................................. 6
4.2. Machine and Equipment List ...................................................................................................................... 10
4.3. EMI Factory Lay-Out ...................................................................................................................................... 16
5. MATERIAL SOURCES ........................................................................................................................................ 17
5.1. Material and Supplier List ............................................................................................................................. 18
6. COMPANY POLICIES & DOCUMENTS ......................................................................................................... 20
7. EMI PROJECTS .................................................................................................................................................. 26
7.1. List of Projects .................................................................................................................................................. 26
7.2. Project Photos ................................................................................................................................................. 31
Steel Industries L.L.C
EMI-CPF-001 Rev. No.: 04|17-Mar-2018 Issue No.: 01|15-Jan-2018 Page 3 of 34
COMPANY PROFILE
1. COMPANY INTRODUCTION
Emi Steel Industries LLC specializes in the design, supply, manufacture and
installation of both light weight galvanized structural steel systems (LGS) and
Hot Rolled structural steelwork.
Emi Steel Industries has traded successfully and developed steadily to
be one of the leading LGS Contractors in the UAE and undertakes work
throughout the whole the Middle East and Africa providing quality products due to
its sustainability, cost effective,
environment friendly and time saving
production system With Emi’s well experienced
professionals, we are able to cater and
deliver different client requirements not
only in the Middle East but also in other
parts of the Asian, European and African
region.
At EMI, we look upon every project as a
challenge to our commitment to
continually improve and provide
effective building solutions.
Emi Steel Industries is an affiliated company of EMI Group. With its highly specialized
and well experienced team, Emi Steel Industries is aiming to serve the Middle East
construction market by delivering sustainable and time effective building solutions. Emi Steel Industries factory has a covered area of 7,800 m2 which is located at Mafraq,
Abu Dhabi, UAE. It has a production capacity of more than 20, 000 tons per year or
equivalent to 4,000 houses.
Steel Industries L.L.C
EMI-CPF-001 Rev. No.: 04|17-Mar-2018 Issue No.: 01|15-Jan-2018 Page 4 of 34
COMPANY PROFILE
2. COMPANY SERVICES
EMI specialize in design, fabrication, and building structure using Light Gauge Steel (LGS) system
and Hot Rolled Steel System.
Our clients are mainly from market sectors that involves in Hotels and Leisure, Schools and
Universities, Hospital, Accommodations and Commercial sectors.
a. Design and Build
EMI Design/Build projects of any type
and size. We stay abreast of the latest
design and construction methods to
ensure that our customers get the best
possible value for their money. Under
this Design/Build method of
construction, EMI can bear the single
point of responsibility for the design and
construction of the project.
b. General Contractor
As a General Contractor, EMI can undertake
the execution, supervision and overall
coordination of the project. Our highly skilled
team perform many individual construction
tasks from site improvements, to foundations,
steel erection, insulation and sheet metal work.
For other trades such as drywall, painting,
flooring, plumbing, HVAC and electrical; the
company has a team of experienced trades
that will serve the needs of clients.
c. Construction Management
As a Construction Manager, EMI can
coordinate the construction trades and
liaise between the owner and design
team. Utilizing our technical expertise
under this construction method, we assists
our customers with large projects in
scheduling, budgeting and establishment
of the controls necessary to accurately
monitor the project.
Steel Industries L.L.C
EMI-CPF-001 Rev. No.: 04|17-Mar-2018 Issue No.: 01|15-Jan-2018 Page 5 of 34
COMPANY PROFILE
d. Design and Supply of LGS Steel and Hot Rolled Steel Material
Having a factory that has a production capacity of 20,000 tons per year, EMI also caters
supply only of LGS Steel and Hot Rolled Steel.
In this case where in the client requires only supply of materials, we assure that they will only
receive quality products that will meet their satisfaction.
3. COMPANY INSURANCES
Through the Group, Company Insurances are held which includes Workers Compensation, Plant
and Equipment, Third Party Liability Professional Indemnity:
Property All Risk
Contractor All Risk
Medical Insurance
Office Multi-cover
Workmen Compensation
Professional Indemnity
4. COMPANY FACILITIES
EMI factory is located in Abu Dhabi at Plot No.242-243 Al Mafraq Industrial Area, constructed on a
7800m² areas. The factory area includes the following facilities:
Advanced roll forming machines
Stock area for galvanized steel coils
Panel assembly area
Office area
Steel Industries L.L.C
EMI-CPF-001 Rev. No.: 04|17-Mar-2018 Issue No.: 01|15-Jan-2018 Page 6 of 34
COMPANY PROFILE
4.1. Machine and Equipment Facilities
Machine/ Equipment Name Tag Machine / Equipment Photo
EMI-ME-0001
Framemaster TF 350 A
LGS (89x0.75mm), (890x0.95mm), (89x1.15mm)
S.N.: A0039
EMI-ME-0002
Framemaster TF 350 B
LGS (89x0.75mm), (890x0.95mm), (89x1.15mm)
S.N.: A0034
EMI-ME-0003
Framemaster TF 350 A
LGS (150x0.95mm), (150x1.15mm)
S.N.: A10038
Steel Industries L.L.C
EMI-CPF-001 Rev. No.: 04|17-Mar-2018 Issue No.: 01|15-Jan-2018 Page 7 of 34
COMPANY PROFILE
EMI-ME-0004
Framemaster TF 550 H
LGS (150x0.95mm), (150x1.15mm), (150x1.55mm),
(150x1.95)
S.N.: A10033
EMI-ME-0005
Framemaster FL 650
LGS (254x1.55mm), (254x1.95mm), (260x1.55mm),
(240x1.95)
S.N.: F50002
EMI-ME-0006
FG.I. Corrugated Sheet Machne
LGS (1220x0.4mm), (1220x0.5mm), (1220x0.6mm),
(1220x0.7)
Steel Industries L.L.C
EMI-CPF-001 Rev. No.: 04|17-Mar-2018 Issue No.: 01|15-Jan-2018 Page 8 of 34
COMPANY PROFILE
EMI-ME-0007
Furring Chanel Machine
LGS (108x0.5mm), (108x0.6mm)
EMI-ME-0008
Angle and Chanel MAchine
LGS (50x0.5mm), (50x0.6mm), (58x0.5mm), (58x0.6mm)
EMI-ME-0010
Bending Machine APHS 6106x240
Capacity of bending all kind of steel plate with 6000mm
wide X6mm thick
S.N.: 18869
Steel Industries L.L.C
EMI-CPF-001 Rev. No.: 04|17-Mar-2018 Issue No.: 01|15-Jan-2018 Page 9 of 34
COMPANY PROFILE
EMI-ME-0011
Cutting Machine HNC 6100x6
Capacity of cutting all kind of steel plate with 6000mm
wide X6mm thick
S.N.: 19017
EMI-ME-0013
Peddinghaus PCD1100 & 1100 DG
combines saw/drill
Cutting and drilling of hot rolled steel sections
S.N.: 65999
EMI-ME-0014
Peddinghaus Hole Punching
Hole Punching of hot rolled steel sections maximum
30mm
Steel Industries L.L.
EMI-CPF-001 Rev. No.: 00|15-Jan-2018 Issue No.: 01|15-Jan-2018 Page 10 of 34
COMPANY PROFILE
4.2. Machine and Equipment List
S/N ID No. Description Quantity Unit Manufacturer Production Details Capacity
1 EMI-ME-0001 Framemaster TF 350 A 1 pc Framecad
LGS
(89x0.75mm),(89x0.95mm),
(89x1.15mm)
3T / 8 hrs
2 EMI-ME-0002 Framemaster TF 350 B 1 pc Framecad LGS(89x0.75mm),
(89x0.95mm),(89x1.15mm) 3T / 8 hrs
3 EMI-ME-0003 Framemaster TF 550 A 1 pc Framecad LGS(150x0.95mm),
(150x1.15mm) 5T / 8 hrs
4 EMI-ME-0004 Framemaster TF 550 H 1 pc Framecad
LGS(150x0.95mm),
(150x1.15mm),(150x1.55mm),
150x1.95)
5T / 8 hrs
5 EMI-ME-0005 Framemaster FL 650 1 pc Framecad
LGS(254x1.55mm),
(254x1.95mm),
(260x1.55mm), (260x1.95)
10T / 8 hrs
6 EMI-ME-0006 G.I. Corrugated Sheet
Machine 1 pc Pioneer
LGS(1220x0.4mm),
(1220x0.5mm),
(1220x0.6mm), (1220x0.7)
10T / 8 hrs
Steel Industries L.L.C.
EMII-CPF-001 Rev. No.: 00|15-Jan-2018 Issue No.: 01|15-Jan-2018 Page 11 of 34
COMPANY PROFILE
7 EMI-ME-0007 Furring Chanel
Machine 1 pc Pioneer
LGS(108x0.5mm),
(108x0.6mm) 1T / 8 hrs
8 EMI-ME-0008 Angle and Chanel
Machine 1 pc Pioneer
LGS(50x0.5mm), (50x0.6mm),
(58x0.5mm), (58x0.6mm) 1T / 8 hrs
9 EMI-ME-0009 Rubber Slitting
Machine 1 pc Pioneer
Rubber(89x5x10m),
(150x5x10mm)
1000M / 8
hrs
10 EMI-ME-0010 Bending Machine
APHS 6106x240 1 pc Baykal
Capacity of bending all kind
of steel plate with 6000mm
wide X6mm thick
2T / 8 hrs
11 EMI-ME-0011 Cutting Machine
HNC 6100x6 1 pc Baykal
Capacity of cutting all kind
of steel plate with 6000mm
wide x 6mm thick
2T / 8 hrs
12 EMI-ME-0012 Multipurpose
Machine 1 pc
Geka
Hydracrop
80/A
Steel (Hole Punching), (Plate
Cutting), (Angle Cutting),
(Rod Cutting)
1T / 8 hrs
13 EMI-ME-0013
Peddinghaus
PCD1100 & 1100 DG
combined saw/drill
1 pc Peddinghaus Cutting and drilling of hot
rolled steel sections 20T / 8 hrs
Steel Industries L.L.C.
EMII-CPF-001 Rev. No.: 00|15-Jan-2018 Issue No.: 01|15-Jan-2018 Page 12 of 34
COMPANY PROFILE
14 EMI-ME-0014 Peddinghaus Hole
Punching 1 pc Peddinghaus
Hole Punching of hot rolled
steel sections maximum
30mm
1T / 8 hrs
15 EMI-ME-0015
CXE-P 4500
Gas/Plasma(Hyperth
erm Max 200) cutter
1 pc Esab
Cutting profiles from steel
plate with (4000 x16000 x
75)mm capacity
20T / 8 hrs
16 EMI-ME-0016 Forklift CAT 1 pc Cat All kind of loading and
unloading 5T / lift
17 EMI-ME-0017 Forklift Hyster 1 pc Hyster All kind of loading and
unloading 5T
18 EMI-ME-0018 JCB Boomloader 1 pc JCB All kind of loading and
unloading, erection 5T / lift
19 EMI-ME-0019 Bolt threader 1 pc Rigid 300
Compact
Making thread for Pipe 1/4
to2",Rod 1/4 to 2" 1T / 8 hrs
20
EMI-ME-0020
to
EMI-ME-0025
MIG Welding
Machine-1 to 6 6 pc
Kemppi HiArc
M 400 R All kind of Hot Rolled welding 20T / 8 hrs
21
EMI-ME-0026
to
EMI-ME-0027
SMAW Welding
Machine-1 to 2 2 pc
Kemppi Minarc
150 All kind of Hot Rolled welding 5T / 8 hrs
Steel Industries L.L.C.
EMII-CPF-001 Rev. No.: 00|15-Jan-2018 Issue No.: 01|15-Jan-2018 Page 13 of 34
COMPANY PROFILE
22 EMI-ME-0028 Radial Gas Cutting 1 pc Rockwood Intr. Cutting for all kinds of Plates
less than 40mm 5T / 8 hrs
23 EMI-ME-0029 Magnetic Drill
Machine 1 pc Magbroach
Making of holes to the Hot
Rolled 5T / 8 hrs
24 EMI-ME-0030 Magnetic Drill
Machine small 1 pc Magbroach
Making of holes to the Hot
Rolled 5T / 8 hrs
25 EMI-ME-0031 Compressor and TD
51 dryer 1 pc Kaeser
Produces dry compressed air
to Peddinghaus machine
PCD 1100
N/A
26 EMI-ME-0032 Bandsaw machine 1 pc Cuteral csm
550
Cutting Sectional steel up to
550mm wide and 600mm
height
2T / 8 hrs
27 EMI-ME-0033 Compressor '12' bar
500 litre 1 pc Abac
Produces compressed air to
Furring Chanel Machine
12' bar 500
litre
28 EMI-ME-0034 Shot blasting
machine 1 pc Gietart Blasting of hot roll 5T / 8 hrs
Steel Industries L.L.C.
EMII-CPF-001 Rev. No.: 00|15-Jan-2018 Issue No.: 01|15-Jan-2018 Page 14 of 34
COMPANY PROFILE
29 EMI-ME-0035 Pot blaster 1 pc Contracor Manual blasting machine 2T / 8 hrs
30 EMI-ME-0036 Compressor '12' bar
1000 litre 1 pc Abac
Produces compressed air to
Shot blasting machine
12' bar
1000 litre
31
EMI-ME-0037
to
EMI-ME-0038
Paint pump-1 & 2 1 pc Graco To apply coating onto a
blasted steel N/A
32 EMI-ME-0039 Extractor 1 pc Nederman
Extractor of toxic fumes from
the scab profile cutting
machine
N/A
33 EMI-ME-0040
Erlo-TCA-40- vertical
mounted drill
machine
1 pc Erlo Drilling and countersinking of
metals 3T
34 EMI-ME-0041 Generator-220KVA 1 pc FG Wilson
Generates electric power for
Peddinghaus saw/drill
machine
220KVA
35 EMI-ME-0042 Generator-30KVA 1 pc Marapco Generates electric power for
Kaeser compressor 30KVA
Steel Industries L.L.C.
EMII-CPF-001 Rev. No.: 00|15-Jan-2018 Issue No.: 01|15-Jan-2018 Page 15 of 34
COMPANY PROFILE
36 EMI-ME-0043 Generator-225KVA 1 pc Cukurova
Generates electric power for
Gietart shot blasting
machine and Abac
compressor
225KVA
37
EMI-ME-0044
to
EMI-ME-0047
Voltage regulator-1
to 4-SVC 30000VA 4 pc Andeli
Regulates voltage to
Framecad machine TF 350 30000VA
38 EMI-ME-0048 Voltage regulator-5-
SVC 40000VA 1 pc Andeli
Regulates voltage to
Framecad machine FL 650 40000VA
39 EMI-ME-0049 Voltage regulator-6-
SBW-120KVA 1 pc Andeli
Regulates voltage to
Peddinghaus saw/drill
machine
120KVA
40 EMI-ME-0050 Voltage regulator-7-
SVC-20000VA 1 pc NBS Spare 20000VA
41 EMI-ME-0051 Gantry Crane
(Manual) 1 pc Toyo
All kind of loading and
unloading 3T / lift
42 EMI-ME-0052 Cleaning machine 1 pc
ALTO
SCRUBTEC 553
B
For floor cleaning N/A
43 EMI-ME-0053 Cat Boom loader 1 pc Caterpillar All kind of loading and
unloading, erection 5T / lift
EMI-CPF-001 Rev. No.: 00|15-Jan-2018 Issue No.: 01|15-Jan-2018 Page 16 of 34
COMPANY PROFILE
4.3. EMI Factory Lay-Out
Steel Industries L.L.C
EMI-CPF-001 Rev. No.: 00|15-Jan-2018 Issue No.: 01|15-Jan-2018 Page 17 of 34
COMPANY PROFILE
5. MATERIAL SOURCES
All raw materials and accessories required by us are purchased from reputable local and
international suppliers.
Light Gauge Steel (LGS) / Steel Coil
Hot Rolled Steel
Steel Industries L.L.C
EMI-CPF-001 Rev. No.: 00|15-Jan-2018 Issue No.: 01|15-Jan-2018 Page 18 of 34
COMPANY PROFILE
5.1. Material and Supplier List
S/N Material Supplied Supplier Name
1
Steel Coils
Maroo Steel (JINDAL)
2 Framecad
3 Sabic
4 MS Steel International
5 Ale international
6 BK Global
7 Arcelor Mittal
8 Essar
9
Hot Rolled Steel
Age Steel
10 DBMSC Steel
11 Core Metal
12 Al Khaleej Steel Suppliers
13 Zirkoon
14
Cement Boards
Everest Industries
15 Sahyadri Industries
16 Cembrit
17
Gypsum Board
Gyproc
18 Knauf
19 ASK
20
Glass wool / Rock wool
(Insulation Material)
Gypsemna
21 Knauf
22 Isover
Steel Industries L.L.C
EMI-CPF-001 Rev. No.: 00|15-Jan-2018 Issue No.: 01|15-Jan-2018 Page 19 of 34
COMPANY PROFILE
S/N Material Supplied Supplier Name
23
Vapor barrier Sisalation
24 Tyvek
25
Fasteners
a. screws,
b. anchors,
c. bolts,
d. nuts
e. washers
Fischer
26 Ejot
27 Wurth
28 ITW
29 Ramset
30 Hilti
31
Sandwich panel/ Gutter
Dana
32 Al Jazira
33 Ajecbond
34 Tiger Profiles
35 EIP (Emirates Industrial Panels)
36
Rubbers
ISMAT Technical Trading
37 Al Nauras
38 Edilteco Group
39
Paints and Thinners
Sigma Paints
40 Jotun
41 Remmers
42 Shot and Garnet
Euroblast
43 Emirates Blastmaster
Steel Industries L.L.C
EMI-CPF-001 Rev. No.: 00|15-Jan-2018 Issue No.: 01|15-Jan-2018 Page 20 of 34
COMPANY PROFILE
6. COMPANY POLICIES & DOCUMENTS
QUALITY POLICY
EMI-CPF-001 Rev. No.: 03|02-Jan-2018 Issue No.: 03|31-May-2017 Page 21 of 34
COMPANY PROFILE
HSE POLICY
EMI-CPF-001 Rev. No.: 03|02-Jan-2018 Issue No.: 03|31-May-2017 Page 22 of 34
COMPANY PROFILE
INDUSTRIAL LICENSE
EMI-CPF-001 Rev. No.: 03|02-Jan-2018 Issue No.: 03|31-May-2017 Page 23 of 34
COMPANY PROFILE
ISO 9001-2015
EMI-CPF-001 Rev. No.: 03|02-Jan-2018 Issue No.: 03|31-May-2017 Page 24 of 34
COMPANY PROFILE
ISO 14001-2015
EMI-CPF-001 Rev. No.: 03|02-Jan-2018 Issue No.: 03|31-May-2017 Page 25 of 34
COMPANY PROFILE
ISO OHSAS 18001-2007
Steel Industries L.L.C
EMI-CPF-001 Rev. No.: 00|15-Jan-2018 Issue No.: 01|15-Jan-2018 Page 26 of 34
COMPANY PROFILE
7. EMI PROJECTS
7.1. List of Projects
SN CLIENT/
Consultant PROJECT NAME
BUILDING
AREA (m2) SCOPE OF WORK START DATE
COMPLETION
DATE STATUS
1
Commodore
Contracting
Co LLC
CCC Labour
Accommodation Bldg. 26,388
Design, Supply & Erection
of LGS FRAME &
Cladding
Sep-2009 Jun-2010 Completed
2 CCC Labour Camp
Administration Building 535
Design, Supply & Erection
of LGS FRAME &
Cladding
Jan-2010 Aug-2010 Completed
3 CCC Labour Camp
Restaurant Building 2690
Design, Supply & Erection
of LGS FRAME &
Cladding
Jan-2010 Aug-2010 Completed
4 CCC Labour Camp
Supermarket 670
Design, Supply & Erection
of LGS FRAME &
Cladding
Jan-2010 Aug-2010 Completed
5 CCC Labour Camp
Laundry Building 488
Design, Supply & Erection
of LGS FRAME &
Cladding
Jan-2010 Aug-2010 Completed
6 CCC MEP Offices 1,357
Design, Supply & Erection
of LGS FRAME &
Cladding
Mar-2011 Aug-2011 Completed
7 CCC Offices ( CSI & CCI ) 273.18
Design, Supply & Erection
of LGS FRAME &
Cladding
Jan-2011 Jun-2011 Completed
8 CCC Mosque 480
Design, Supply & Erection
of LGS FRAME &
Cladding
Mar-2011 Dec-2011 Completed
Steel Industries L.L.C
SN CLIENT/
Consultant PROJECT NAME
BUILDING
AREA (m2) SCOPE OF WORK START DATE
COMPLETION
DATE STATUS
EMI-CPF-001 Rev. No.: 00|15-Jan-2018 Issue No.: 01|15-Jan-2018 Page 27 of 34
COMPANY PROFILE
9 Commodore
Contracting
Co LLC
CCC Clinic 228 Design, Supply & Erection of
LGS FRAME & Cladding Aug-2011 Dec-2011 Completed
10 Private Majilis (Hall) Inside
Villa in Abu Dhabi 133
Design, Supply & Installation
of LGS Framing only. Jun-2013 Aug-2013 Completed
11 CCC / Sheikha
Wadeema
292 Villa -Al Ain
Residential Complex 71,142
Design, Supply & Erection of
LGS FRAME & Cladding Mar-2012 Mar-2014 Completed
12
H.H Sheikh
Tahnoon Bin
Saeed
Khalifa City A Villas 17,524 Design, Supply & Erection of
LGS FRAME & Cladding Dec-2010 Mar-2012 Completed
13 Royal Catering
Services
Labor & Staff
Accommodations 76,000
Design, Supply & Erection of
LGS FRAME & Cladding May-2011 Feb-2012 Completed
14 Tawazun
Holdings
Labor Accommodation -
G+2 1,752
Design, Supply & Build
including Foundation and
MEP Works
Dec-2011 Jul-2012 Completed
15
Petroleum
Development
Oman/ Blizzard
Bros.
Qarn Alam Bldg 612 Design & Supply of LGS &
HR members + Supervision Jul-2012 Aug-2012 Completed
16 Al Mouj Marina Office 230 Design & Supply of LGS &
HR members + Supervision Sep-2012 Oct-2012 Completed
17 PDO Feed Office in
Oman 945
Design & Supply of LGS
FRAME + Supervision Nov-2012 Dec-2012 Completed
18 Petroleum
Development
CWE Facilities Marmul
Camp Office 509
Design & Supply of LGS
members Feb-2013 Mar-2013 Completed
Steel Industries L.L.C
SN CLIENT/
Consultant PROJECT NAME
BUILDING
AREA (m2) SCOPE OF WORK START DATE
COMPLETION
DATE STATUS
EMI-CPF-001 Rev. No.: 00|15-Jan-2018 Issue No.: 01|15-Jan-2018 Page 28 of 34
COMPANY PROFILE
19 Oman/ Blizzard
Bros. CWE Facilities Harweel
Camp Office 474
Design & Supply of LGS
members Feb-2013 Mar-2013 Completed
20 MC2 ACC Room -
Muscat Int'l Aiport 711
Design & Supply of LGS
members Mar-2013 Apr-2013 Completed
21
Musananda
VIP Rest Hall & Dining 450 Design, Supply & Erection of
LGS FRAME & Cladding May-2012 Sep-2012 Completed
22 Mosque of Capacity 100
Prayers 159
Design, Supply & Installation
of LGS FRAME & Cladding Feb-2013 Mar-2013 Completed
23 Add Roof Floor Structure
Al Khazna Bldg 838
Design, Supply & Installation
of LGS FRAME & Cladding
Excluding Ceiling Jun-2013 Aug-2013 Completed
24 3 Additional Classrooms
in Al Mushrif School 218
Design, Supply & Installation
of LGS Framing. May-2013 Jun-2013 Completed
25
Two Additional Office
Extension in Immigration
HQ, Abu Dhbai
161 Design, Supply & Installation
of LGS Framing. May-2013 Jun-2013 Completed
26 HH Sheikh
Mansoor Bin
Zayed Al
Nahyan
Engineering
Office
Horse Paddocks Stable
and Services in Al Ain 609
Design, Supply & Build
including Foundation and
MEP Works
May-2013 Sep-2014 Completed
27 3 Chalets in Al Wathba 540 Design, Supply & Build
including Foundation and
MEP Works
Jun-2013 Dec-2013 Completed
28
HH Sheikh
Mansoor Bin
Zayed Al
Female Riders'
Accommodation in Al
Wathba
647 Design, Supply & Build
including Foundation and
MEP Works Jun-2013 Sep-2013 Completed
Steel Industries L.L.C
SN CLIENT/
Consultant PROJECT NAME
BUILDING
AREA (m2) SCOPE OF WORK START DATE
COMPLETION
DATE STATUS
EMI-CPF-001 Rev. No.: 00|15-Jan-2018 Issue No.: 01|15-Jan-2018 Page 29 of 34
COMPANY PROFILE
29
Nahyan
Engineering
Office
Endurance Village
Kitchen Extension in Al
Wathba
316 Design, Supply & Build
including Foundation and
MEP Works Jun-2013 Sep-2013 Completed
30 Crown Prince
Court RAK Fishermens Port 24,357
Design & Supply of LGS
Frame Nov-2013 Dec-2014 Completed
31 Quick Mix
Beton
Additional Floor to
Existing Villa 209 Design, Supply & Build Apr-2013 Jul-2013 Completed
32 Additional Floor for
Existing Villa 2 224
Design, Supply & Build w/o
MEP works Dec-2013 Apr-2014 Completed
33
Ministry of
Presidential
Affairs
Grand Mosque Souvenir
and Cafe Shop 807
Design, Supply & Build
including Foundation and
MEP Works Dec-2013 Sep. 2014 Completed
34 Eriango Angola Warehouse and
Supermarket 5,552
Design, Supply & Build the
Warehouse & Supermarket
building with both Structural
Steel and LGS
May-2014 Jan-2015 Completed
35 Ventura YAS Beach Club 3,000
Design, Supply and Build 23
Nos. Light-Gauge Steel
structures including Soft &
Hard Landscaping &
Swimming Pools
Apr-2015 Nov-2015 Completed
36
Commodore
Contracting -
Qatar
Qatar University - Male &
Female Classrooms 21,703
Design, Supply and Install of
Hot Rolled Steel, LGS Frame
and Walls, Ceiling & Roof
Cladding
Aug-2014 Aug-2016 Completed
Steel Industries L.L.C
SN CLIENT/
Consultant PROJECT NAME
BUILDING
AREA (m2) SCOPE OF WORK START DATE
COMPLETION
DATE STATUS
EMI-CPF-001 Rev. No.: 00|15-Jan-2018 Issue No.: 01|15-Jan-2018 Page 30 of 34
COMPANY PROFILE
37 Al Amer Group ( 4-Unit ) G+2 Labour
Camp in Qatar 2,650
Design, Supply and Install
LGS Frame including
Sandwich Panel Cladding
Feb-2015 Aug-2015 Completed
38
Rep. of Niger -
Ministry of
Urbanization &
Housing
Zinder Multi-Functional
Market 39,681
Design, Supply and Install of
LGS and Hot Rolled Steel
structure plus Construction
of the following;
- Foundation works
- Architectural works
- Internal and External Wall
Cladding
- MEP works
- External infrastructure
- Road works.
Apr-2016 Apr-2017 Completed
39
Republic of
Niger - Ministry
of Public
Health
Maradi Reference
Hospital 22,000
Design, Supply and Install of
LGS and Hot Rolled Steel
structure plus Construction
of the following;
- Foundation works
- Architectural Works
- MEP works
- External Infrastructure
- Road works
- Landscaping,
- Supply of Medical
Equipment
- Supply of Furniture
Dec-2016 Dec-2017 On Going
Steel Industries L.L.C.
EMI-CPF-001 Rev. No.: 00|15-Jan-2018 Issue No.: 01|15-Jan-2018 Page 31 of 34
COMPANY PROFILE
7.2. Project Photos
Project Name Photo
Al Amer Group -
G+2 Labour Camp
in Doha
Commodore
Contracting Labor
Camp – Abu
Dhabi
RAK Fisherman
Port
Steel Industries L.L.C
EMI-CPF-001 Rev. No.: 00|15-Jan-2018 Issue No.: 01|15-Jan-2018 Page 32 of 34
COMPANY PROFILE
Royal Catering
Services Labor &
Staff
Accommodations
Tawazun Holdings
Labor
Accommodation
Angola
Warehouse and
Supermarket
Steel Industries L.L.C
EMI-CPF-001 Rev. No.: 00|15-Jan-2018 Issue No.: 01|15-Jan-2018 Page 33 of 34
COMPANY PROFILE
Qatar University
(Male and Female
Building)
- Doha Qatar
Yas Beach Club –
Abu Dhabi
292 Villa -Al Ain
Residential
Complex
Steel Industries L.L.C
EMI-CPF-001 Rev. No.: 00|15-Jan-2018 Issue No.: 01|15-Jan-2018 Page 34 of 34
COMPANY PROFILE
Khalifa City A
Villas – Abu Dhabi
Zinder Central
Market in Niger
Maradi Hospital -
Niger