about 7000 mw of capacity is below 100 ps

15
1

Upload: ryu

Post on 19-Jan-2016

23 views

Category:

Documents


0 download

DESCRIPTION

ABOUT 16000 MW OF CAPACITY IS BELOW 300 Ps. ABOUT14200 MW OF CAPACITY IS BELOW 200 Ps. CUM. INS. CAP. ABOUT 7000 MW OF CAPACITY IS BELOW 100 Ps. 49.72 HZ. MERIT ORDER : UNITS BOXED UP. ESC TO EXIT. KADAMPARAI PUMP OPERATION. SAVINGS OF RS 40 LAKHS EVERY DAY INVESTMENT OF 1600 CRORES SAVED. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: ABOUT 7000 MW OF CAPACITY IS BELOW 100 Ps

1

VARIABLE COST(Ps) OF POWER STATION IN SR AS ON JUNE 2004

0

2000

4000

6000

8000

10000

12000

14000

16000

18000P

ON

DY

PC

L (3

2.5

MW

)(19

.61

PS

)

NE

YV

ELI

-II S

TG

1 *

*(63

0 M

W)(

67.9

9 P

S)

KO

VIL

KA

LAP

PA

L *(

105

MW

)(68

PS

)

JEG

UR

UP

AD

U (

GA

S)(

216

MW

)(82

PS

)

SP

EC

TR

UM

(G

AS

)(20

8 M

W)(

83 P

S)

VIJ

JES

WA

RA

M -

I(10

0 M

W)(

84 P

S)

VIJ

JES

WA

RA

M -

II(17

2.5

MW

)(86

PS

)

B S

E S

(A

P)(

GA

S)(

140

MW

)(87

PS

)

RE

INS

CA

LCIN

ING

LT

D.(

41 M

W)(

90 P

S)

RA

MA

GU

ND

AM

(210

0 M

W)(

90 P

S)

LAN

CO

(350

MW

)(91

.48

PS

)

NE

YV

ELI

-II S

TG

-II *

*(84

0 M

W)(

94.6

1 P

S)

SIM

HA

DR

I(10

00 M

W)(

96 P

S)

RA

MA

GU

ND

AM

-B(6

2.5

MW

)(96

PS

)

VIJ

AY

AW

AD

A T

.P.S

.-1&

2(10

50 M

W)(

101

PS

)

VIJ

AY

AW

AD

A T

.P.S

.-3(

210

MW

)(10

1 P

S)

KO

TH

AG

UD

EM

(B)(

210

MW

)(10

8 P

S)

RA

ICH

UR

.T.P

S. *

*(12

60 M

W)(

110

PS

)

KO

TH

AG

UD

EM

(A)(

240

MW

)(11

0 P

S)

KO

TH

AG

UD

EM

(C)(

220

MW

)(12

3.1

PS

)

KO

TH

AG

UD

EM

(D)(

500

MW

)(12

4 P

S)

RA

YA

LAS

EE

MA

TP

P(4

20 M

W)(

126

PS

)

NO

RT

H M

AD

RA

S.T

.P.S

(630

MW

)(13

0.98

PS

)

TU

TU

CO

RIN

.T.P

.S(1

050

MW

)(13

3.5

PS

)

ME

TT

UR

.T.P

.S(8

40 M

W)(

150

PS

)

V S

P *

(120

MW

)(16

9.11

PS

)

ST

-CM

S(2

50 M

W)(

171

PS

)

NE

YV

ELI

-I(6

00 M

W)(

185.

86 P

S)

EN

NO

RE

.T.P

.S(4

50 M

W)(

190.

2 P

S)

L V

S(3

7.8

MW

)(20

0 P

S)

YE

LEH

AN

KA

DE

ISE

L(12

7.92

MW

)(20

3.36

PS

)

NA

VB

HA

RA

T(3

5 M

W)(

205

PS

)

BR

AH

MA

PU

AM

D P

P(1

06.5

MW

)(21

4 P

S)

NE

LLO

RE

(30

MW

)(22

5 P

S)

B S

E S

(K

ER

ALA

)(16

5.5

MW

)(22

5 P

S)

TH

AN

NE

ER

BA

VI(

235

MW

)(22

8 P

S)

JIN

DA

L(26

0 M

W)(

247

PS

)

BA

LAJI

(SA

MA

YA

NA

LLU

R)(

105

MW

)(24

7 P

S)

KO

ZH

IKO

DE

DP

P(1

28.8

MW

)(25

0 P

S)

GM

R V

AS

AV

I(19

6 M

W)(

254

PS

)

SA

MA

LPA

TT

Y IP

P(1

05 M

W)(

263

PS

)

TA

TA

DE

ISE

L(81

.3 M

W)(

280

PS

)

KA

YA

MK

ULA

M N

TP

C(3

50 M

W)(

290

PS

)

KA

SA

RG

OD

P C

L(2

1 M

W)(

300

PS

)

RA

YA

LAS

EE

MA

(37.

8 M

W)(

330

PS

)

PP

NA

LLU

R(3

30.5

MW

)(41

5 P

S)

BA

SIN

BR

IDG

E(1

20 M

W)(

468

PS

)

CU

MU

LA

TIV

E IN

ST

AL

LE

D C

AP

AC

ITY

IN M

W

0

50

100

150

200

250

300

350

400

450

VA

RIA

BL

E C

OS

T IN

Ps/

UN

IT

VARIABLE COST

CUMULATIVEINSTALLE

ABOUT 7000 MW OF CAPACITY IS BELOW 100 Ps

ABOUT14200 MW OF CAPACITY IS BELOW 200 Ps

ABOUT 16000 MW OF CAPACITY IS BELOW 300 Ps

CUM. INS. CAP.

Page 2: ABOUT 7000 MW OF CAPACITY IS BELOW 100 Ps

2

49.72 HZ

Page 3: ABOUT 7000 MW OF CAPACITY IS BELOW 100 Ps

3

MERIT ORDER : UNITS BOXED UP

POWER STATION STATE CAPACITY(MW) FUELVARIABLE

COST

TATA DIESELKARNATAK

A 79 DIESEL 308

RAYALSEEMA DGPP

KARNATAKA 27 DIESEL 360

YELEHANKA DIESEL

KARNATAKA 128 DIESEL 314

THANRBHAVIKARNATAK

A 220 NAPTHA 325

SUB-TOTAL 454    

BRAHAMPURAM DPP KERALA 107 DIESEL 275

BSES KERALA 157 NAPTHA 308

KASARGODE PCL KERALA 22 NAPTHA 298

KAYAMKULAM KERALA 360 NAPTHA 322

SUB-TOTAL 646    

BASIN BRIDGETAMIL NADU 120 NAPTHA 584

P.P.NALLURTAMIL NADU 330 NAPTHA 415

SUB-TOTAL 450    

TOTAL 1550    

ESC TO EXIT

Page 4: ABOUT 7000 MW OF CAPACITY IS BELOW 100 Ps

4

KADAMPARAI PUMP OPERATION

-300

-200

-100

0

100

200

300

400

5000:

001:

002:

003:

004:

005:

006:

007:

008:

009:

0010

:00

11:0

012

:00

13:0

014

:00

15:0

016

:00

17:0

018

:00

19:0

020

:00

21:0

022

:00

23:0

00:

00

TIME ---->

IN M

W --

-->

48.50

49.00

49.50

50.00

50.50

51.00

FREQ

UENC

Y IN

HZ

---->

GENERATOR MODE

PUMP PUMP

SAVINGS OF RS 40 LAKHS EVERY DAY

INVESTMENT OF 1600 CRORES SAVED

Page 5: ABOUT 7000 MW OF CAPACITY IS BELOW 100 Ps

5

OPPORTUNISTIC UI TRADEEXPORT TO WR ON 13/05/03-14/05/03

-300

-200

-100

0

100

200

300

400

500

600

00 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 00 01 02 03 04 05 06 07 08

49

49.2

49.4

49.6

49.8

50

50.2

50.4

50.6

50.8

51POWER EXPORT TO WR ON

UI BASIS DURING LOAD CRASH

FREQ

Page 6: ABOUT 7000 MW OF CAPACITY IS BELOW 100 Ps

6

SCHEDULE VS ACTUAL INJECTION GRAPH OF ER (AT ER PERIPHERY) FOR DATE : 31.08.03

0

100

200

300

400

500

600

700

800

900

0 4 8 12 16 20 24 28 32 36 40 44 48 52 56 60 64 68 72 76 80 84 88 92

TIME AS BLOCK OF 15 MINUTE --->

MW

-->

49.0

49.5

50.0

50.5

51.0

51.5

52.0

52.5

53.0

53.5

54.0

54.5

55.0

FREQ

UEN

CY

(Hz)

-->

SCHEDULE ACTUAL INJECTION ENTITLEMENT

SR FREQ ER FREQ

Entitlement

Schedule

Actual Injection

OPERATION ON 31/08/03 (Ganesh Chathurthi)

AMOUNT SAVED FOR SR CONSTITUENTS = 107 LAKHS

50 NOS HVDC SETPOINT CHANGES DONE TO ACHIEVE THIS!!!!!

Page 7: ABOUT 7000 MW OF CAPACITY IS BELOW 100 Ps

7

UI IMPORT BY SR FROM ER ON 23-03-2005

0

100

200

300

400

500

600

00 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 00

TIME --.

UI

IN M

W -

->

48

48.5

49

49.5

50

50.5

51

FR

RQ

UE

NC

Y I

N H

Z->

ER UI

SR FREQ

ER/WR FREQ

SR FREQUENCY

ER/WR FREQUENCY

Page 8: ABOUT 7000 MW OF CAPACITY IS BELOW 100 Ps

8

UI IMPORT BY SR FROM WR ON 23-03-2005

-100

0

100

200

300

400

500

00 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 00

TIME --.

UI

IN M

W -

->

48

48.5

49

49.5

50

50.5

51

FR

RQ

UE

NC

Y I

N H

Z->

WR UI

SR FREQ

ER/WR FREQ

UI IMPORT FROM WR

SR FREQUENCY

ER/WR FREQUENCY

Page 9: ABOUT 7000 MW OF CAPACITY IS BELOW 100 Ps

9

GENERATION vs FREQUENCY FOR

10

30

50

70

90

08

:21

09

:21

10

:21

11

:21

TIME IN HH:MM ----->

MW

---

-->

49.00

49.20

49.40

49.60

49.80

50.00

50.20

50.40

FR

EQ

IN

HZ

---

-->

FREE GOVERNOR MODE OF OPERATION ON 12-DEC-04

SHARAVATHI -1

FREQ DROP FROM 49.72 HZ TO 49.27 HZ

i.e. ~ 0.45HZ

Page 10: ABOUT 7000 MW OF CAPACITY IS BELOW 100 Ps

10

OPTIMAL RESERVOIR UTILISATIONSHARAVATHY IN KARNATAKA

THE COST OF GENERATION AT SHARAVATHY IS LESS THAN 20 Ps /UNIT

AVERAGE SELLING UI RATE OF KARNATAKA IS 372 Ps/UNIT

PLANT OPERATORS AT SHARAVATHY THINK OF THE RESERVOIR LEVEL IN RUPEES

RATHER THAN IN FEET!!!

Rs. Rs.

Rs.

Rs.

Rs.

Rs.Rs.

Rs.

Rs.

Rs.

Rs.

Rs.

Rs.

Rs.

Rs.Rs.

Page 11: ABOUT 7000 MW OF CAPACITY IS BELOW 100 Ps

11

DEEP VALLEY

DEEP VALLEY

SHARP

PEAK

ESC TO EXIT

Page 12: ABOUT 7000 MW OF CAPACITY IS BELOW 100 Ps

12RTU RTU RTU

SUB LDC SUB LDC SUB LDC

SLDC SLDC SLDC

ERLDC

WRLDC NRLDC SRLDC

NERLDC

NLDC

32 Nos.

51 Nos.

1160Nos.

Unified Grid OperationUnified Grid Operation

5 Nos.

NationalLevel

RegionalLevel

State HQLevel

Group / Distt Level

Plant / Sub-Station Level

Page 13: ABOUT 7000 MW OF CAPACITY IS BELOW 100 Ps

13

RLDC,Bangalore

KalamasseryHyderabad BangaloreChennai

Cuddapah

Warangal

Vijayawada

Kalam’erry

Kannur

Trivandrum

Chennai

Erode

Madurai

Bangalore

Lingusugur

Hubli

CPCC SCC, Pondy

Hyderabad

Hierarchy of The ULDC Scheme in Southern Region

Andhra Kerala Tamilnadu Karnataka

Page 14: ABOUT 7000 MW OF CAPACITY IS BELOW 100 Ps

14

Annual Inter-Regional Energy Transfer

≈10,000MU

Transformation Capacity ≈

45000 MVA

Transformers (220kV and above)

480 nos.

Installed Capacity≈31870 MW

Integrated Opn of Ten Power

Utilities

Dynamic Grid Conditions

Southern Region Grid Complexities in Monitoring & Control

Generators –Hydro, Thermal,Gas/IPP

422 nos.

Transmission Network 400/220kV

≈ 37500 Ckm

40,000 POINTS Active Power, Reactive Power,

Voltage, Frequency, Transformer Tap Position, Circuit Breaker Position,

Isolator Position etc.

ESC TO EXIT

Page 15: ABOUT 7000 MW OF CAPACITY IS BELOW 100 Ps

15

Kolar

Chintamani

Cudappah

HoodyHosur

Salem

Udumalpet

Madras B’lore

+/- 500 KV DC line 1370 KM

ElectrodeStation

ElectrodeStation

TALCHER

400kv System

220kv system

KOLAR

TALCHER KOLAR TALCHER KOLAR SCHEMATICSCHEMATIC

ESC TO EXIT