abdelrahman ibrahim c v december 2015

13
CURRICULUM VITAE COVER SHEET First Name Abdelrahman Family Name Abdelhadi Marital/ Family Status Married Children 3 (12,9,5 years) Gender Male Date of Birth 01/08/1974 Education BSc. Metallurgical Engineering, Suez Canal University – Suez- Egypt Current Location Doha Desired Location Doha or GCC Reason for Leaving Role Better Opportunity – Has been with the current Organization for more than 8 years. Looking for a new challenge to prove myself dedicated, wrathful and energetic as a QA/QC Mgr. in a progressive organization that gives me scope to apply my knowledge and skills and be a member of team, the dynamically works towards success and growth of the organization with attitude of continuous learning Notice Period 1 – 2 Months Nationality/ Visa Requirements Egyptian Fluent Languages English, Arabic Total Monthly Package 32000 QAR + Company car Current Additional Benefits Bonus: Annual Medical: My Self & Family Flights: 3 tickets for self/ year Desired Total Monthly Salary Negotiable Desired Benefits Negotiable Relevant Experience 18 years of relevant experience

Upload: abdelrahman-ibrahim

Post on 25-Jul-2016

227 views

Category:

Documents


1 download

DESCRIPTION

QA/QC Manager CV

TRANSCRIPT

Page 1: Abdelrahman ibrahim c v december 2015

CURRICULUM VITAE COVER SHEET

First Name Abdelrahman

Family Name Abdelhadi

Marital/ Family Status Married

Children 3 (12,9,5 years)

Gender Male

Date of Birth 01/08/1974

Education

BSc. Metallurgical Engineering, Suez Canal University – Suez- Egypt Current Location Doha

Desired Location Doha or GCC

Reason for Leaving Role Better Opportunity – Has been with the current Organization for more than 8 years. Looking for a new challenge to prove myself dedicated, wrathful and energetic as a QA/QC Mgr. in a progressive organization that gives me scope to apply my knowledge and skills and be a member of team, the dynamically works towards success and growth of the organization with attitude of continuous learning

Notice Period 1 – 2 Months

Nationality/ Visa Requirements

Egyptian

Fluent Languages English, Arabic

Total Monthly Package 32000 QAR + Company car

Current Additional Benefits Bonus: Annual

Medical: My Self & Family

Flights: 3 tickets for self/ year

Desired Total Monthly Salary Negotiable

Desired Benefits Negotiable

Relevant Experience 18 years of relevant experience

Page 2: Abdelrahman ibrahim c v december 2015

[email protected] [email protected]

Mobile: +974-66716398(Qatar) Mobile: +20-10 23894894 & 10 06546775 (Egypt)

Abdel-Rahman Ibrahim Ibrahim

Profile Q.A/Q.C Mgr. for a current TWO projects with contract value of 650

million QRs (managing manpower of 20 QC engineers, inspectors and

technicians "mechanical, electrical, HVAC, MEP & civil").

Part of my duties as QA/QC Mgr. is to review the contracts, preparing the

project management review report, meetings with and auditing the

subcontractors, meeting with vendors and suppliers, conducting internal

audits as per schedule in the project quality plan and training & quality

inductions, FEED engineering for project specifications/data sheets,

assisting in procurement and material selection, witnessing of FAT.

Good technical and analytical skills and fluency in English.

Able to work effectively within a multinational, multidisciplinary team with

people of diverse cultures.

Effective communication and mentoring skills and high computer skills.

Mentoring the new young graduates.

Aware of most of aspects of office and field work.

Experience include coordination with various discipline engineers during

Concept optimization studies, FEED & EPIC Detailed engineering development,

procurement fabrication, construction, installation & hook-up.

Total job experience: around 18 Years (Middle East & North Africa

Experience)

Member of the Egyptian Society for NDT (ESNT)

I am looking forward to obtain a key/senior position in well

established company to develop my career and experience.

Main Key

Competencies

& motivations

CSWIP 3.2.2 Senior Welding Inspector (Certificate No. 32493/2)

CSWIP 3.1 Welding Inspector (Certificate No. 12196)

Certified as Auditor / Lead Auditor “ISO 9001:2008” by IRCA (Certificate No.

104597)

Certified as Internal Auditor Integrated Management System (I.M.S course)

Attended PMP course

Attend Six Sigma seminar with Blue Ocean and plan for the Green Belt this year

Member in American Society for Quality (ASQ) membership no. 65421571

Ongoing Certified Manager of Quality/Organization Excellence “CMQ/OE” course

Page 3: Abdelrahman ibrahim c v december 2015

by Chicago Training Center-Qatar

Plan this year for OHSAS 18001:2007 & NEBOSH IGC

Aware of QP SAP requirements

Career

Challenges

Supported one of the operated companies to reduce the repair percentage from

6.4% last October 2011 to 1.6% on January 2012 by making an analysis of the

defect types, the rout causes and the preventive actions and future plan.

Current Work

Duties

The responsibilities of the Quality Manager include but not limited to:

Put in place and operate QA Management systems addressing the total project

development.

Assure implementation of the existing Project Management System that assures

Company policies, objectives, targets and standards are met.

Support Company Project Management in ensuring the effectiveness of the

management system through the development of Health Checks / Self-

assessment and Audit, which will assist in identifying improvement to the

system.

Ensure that adequate development and monitoring / review of the Contractor’s

Technical Integrity Verification Process is in place.

Provide support in management reviews of the Management System.

Provide technical QA and Integrity advice and input to other disciplines in detail

design and installation engineering.

Provide assistance to the project teams to achieve full QA and Integrity

compliance with country's Regulatory requirements within the deadlines

governed by the project execution schedules.

Ensure that QA and integrity management evaluation in pre-qualification of

Contractors and Bid Evaluations, and QA and Integrity management system

requirements in Tenders and Contracts.

Raise QA and Integrity awareness and ensure QA and Integrity considerations

are addressed in detail design and all subsequent project execution activities.

Ensure that QA and Integrity document management system is in place to

efficiently document commissioning and start-up of systems for ‘Handover’ to

Operations.

Liaise with Third Party Inspection Parties during all the applicable phases of the

project.

Liaise with Contractor QA and Integrity Management and advice and assist when

necessary.

Review Contractors’ Execution Plans / Quality Plans and manage audit of

Contractor activities.

Manage the project Action Tracking system.

Manage and monitor QA and Integrity performance against targets set in the

Page 4: Abdelrahman ibrahim c v december 2015

project Audit Plan. This includes capture, tracking and closeout of QA and

Integrity related issues.

Provide active support & technical QA and Integrity advice to project site teams,

including site visits to monitor & audit Contractors QA and Integrity performance

Other Duties Preparing Quality Plan, Inspection/Test Plan and Procedures.

Verify that all quality control, inspection and test procedures have been

approved.

Plan, coordinate and supervise the inspection activities at site.

Review QA/QC documentation control/management systems till handover to

commissioning activities.

Conducting internal audits as per schedule of the project quality plan.

Checking newly received and stock materials to ensure compliance with the

Company’s specifications and relevant standards.

Prepare WPSs, BPSs & witnessing WPS qualification tests.

Familiar with welding of C.S, S.S, Duplex/Super Duplex, Special Alloys, CuNi

& Titanium Alloys

Witnessing and verification of welder qualification tests.

Monitoring of fit-up/welding works to ensure compliance with specifications.

Verify that the required NDT and tests have been carried out and that the results

are acceptable.

Ensure welding inspection, surface preparation and painting & coating inspection

are performed and the results are acceptable.

Conducting thorough visual inspection including dimension checks of critical or

major dimensions and

Verifies the Red-line Marked Up drawings.

Witnessing of hydrostatic tests, reinstatement tests and the like to ensure

compliance with the Company’s

Specifications and relevant standards.

Coordination of radiographic work requirement for any particular task and

verifying the interpretation of radiographic films.

All other necessary inspections, tests, checks, reviews and the like required to

meet the Company Quality

Control and Quality Assurance objectives.

Attend progress meetings as and when required.

Review of QAQC part of the final documentations.

Maintain inspection files and logs; prepare inspection reports, correspondence

and other written materials.

Monitor all safety aspects of the inspection and NDT works onsite and participate

in HSE program at job site.

Page 5: Abdelrahman ibrahim c v december 2015

Fully conversant & familiar with most of International Standards & Codes

including but not limited to the followings:

ANSI, API, ASME, NACE, BS, DIN, ASTM, AWS, EN, EEMUA, NFPA, PFI, IEC,

SHELL DEP`s and ISO.

Aware of the requirements of Qatar Construction Specifications “QCS 2007/2010”

Fully conversant with Company Standard Engineering Specifications & Design

Engineering Practice.

Sound knowledge with NDT methods and applications.

Be conversant in the supervision and inspection of hook-up and commissioning

works.

Capable of reviewing construction drawings i.e. Isometric, P&ID, structural.

Be able to solve problems and perform work under pressure and with a high

degree of efficiency.

Effective communication, interpersonal and leadership / influencing skills.

Reviews of FEED and Detail Engineering work that shall include In-service and

Pre-service conditions of Onshore / Offshore oil & gas project. Provide QA/QC

inputs to the to the Engineering deliverables including Material selection,

Project specifications, Data sheets, SPIRs,… etc.

Manage and coordinate the interfaces and to work closely alongside other

disciplines, operations teams throughout FEED, Detailed design, Procurement,

Construction and Commissioning

Ensure that Contractor, Sub-Contractors and Vendors have the required

competent resources, implant internationally acceptable practices and

delivery of a product in compliance to Client and Project Quality requirements.

Participate in the pre-qualification of Contractors, Sub-Contractors and

Vendors.

Manage the timely review, processing and approval of QA/QC deliverables of

FEED and EPIC Engineering, as well as Vendors Quality related documents,

i.e. Project Quality Plans, Quality Management and Control Plans, ITPs and

other QA/QC documentation

Review and ensure that all work undertaken by Contractor/Sub-

Contractors/Vendors/Manufacturers/Service providers is in accordance with

project /applicable specifications, International codes and standards, and

Contract QA/QC requirements. Witnesses Factory/Site Acceptance Tests

"FAT", as required, and ensure that tests and inspection of works are carried

out as stated in the specifications and endorse the relevant test certificates

As certified lead auditor, responsible of the activities of Internal and External

Project QA/QC Audits on the Sub-Contractor/Supplier/Vendor and ensure that

all Audit findings are properly closed and root causes has been identified and

corrective actions has been taken for non-re-occurrences. Conduct visits to

site to check work-in-progress is in compliance with Project quality

requirements. Raise necessary NCRs/CARs with different categories “major or

minor” and follow-up on the effective and timely closure of findings

Page 6: Abdelrahman ibrahim c v december 2015

Career Brief

History

Sep. 2012 up to Date: Q.A/Q.C Mgr. Lead a team of QA/QC Engineers, Inspectors and technicians. In different disciplines “Civil, E&I, MEP, HVAC, Piping, Structural Steel” for two projects with Qatar Petroleum

Name of Employer: Target Engineering Construction Co. Ltd.

Project-1 : Construction Of Integrated Chiller, Freezer, Laundry,

Dinning And Accommodation Facilities In Halul, Qatar

(Contract no.: GC11103000 & Project no.2684)

Project-2 : Construction of New Telecom / Security Building and

New Northern Western Extension Road at Halul, Qatar (Contract no.: GC12113200 & Project no.3199)

Client: Qatar Petroleum “QP”

Main Contractor: Target Engineering Construction Co. Ltd.

Jun. 2011 up to August 2012: Q.A/Q.C Mgr. Lead a strong team of QA/QC Engineers, Inspectors and technicians for successful completion and handover of the project.

Q.A/Q.C Mgr. for a current project with contract value of 150 million USDs (managing

manpower of 35 QC engineers, inspectors and technicians "mechanical & civil" and

increased to 55 in the peak time).

SPECIFIC RESPONSIBILITIES :

Supervise all Company activities relating to Quality Management System and Project Quality Management particularly for the following functions:

1. Overall responsibility for all aspects of Quality of Project. 1. Lead a strong team of 35 QA/QC Engineers and Inspectors for successful

completion and handover of the near 1 Billion Dollar Project. 2. Represent the company regarding all matters of quality 3. Co-ordinate the definition and distribution of Company Procedures. 4. Plan and supervise Quality System Audits and evaluate any necessary corrective

actions. 5. Provide necessary assistance and technical expertise to other departments

concerning matters of quality. 6. Evaluate the Quality Systems of suppliers and sub-contractors during the pre-

qualification phase. 7. Vendor audits and PIM 8. Supplier evaluation 9. QC Man Power Planning and TPI assignment. 10. Allocation of Quality personnel to various duties. 11. Prepare Management Review meetings of the Quality System. 12. Training all personnel about Quality System issues management and

methodologies and implementation of the necessary training Programs for Quality personnel.

13. Propose preventive measures, promotion and implementation of improvement programs.

Page 7: Abdelrahman ibrahim c v december 2015

14. Plan and assess project audit results and analysis of non-conformity. 15. Implementation of customer satisfaction tools and activities. 16. Assist the Project Director / Project Manager during project execution. 17. Ensure that analysis of data coming from projects is forwarded to Vice President. 18. Manage Company document system ensuring its maintenance and updating,

cooperating with different company functions

Name of Employer: Target Engineering Construction Co. Ltd.

Project : Ruwais Refinery Expansion (RRE) Project

Client: Abu Dhabi Oil Refinery Co. “TAKREER”

Main Contractor: Gs Engineering & Construction Corp.

PMC: JACOBS.

Nov. 2009 to Jun. 2011: Acting as Q.A/Q.C Mgr.

Name of Employer: Target Engineering Construction Co. Ltd.

Project : Green Diesel Project

Client: Abu Dhabi Oil Refinery Co. “TAKREER”

Main Contractor: GS Engineering & Construction Corp.

PMC: Worley Parsons.

Aug. 2009 to Nov. 2009: Lead Q.A/Q.C Engineer.

Name of Employer: Target Engineering Construction Co. Ltd.

Project : Emal Smelter Project, Abudhabi, UAE

“PACKAGES NO.CM-1010,CM6668,5480 & CE2171”

Client: Emirates Aluminium Limited “EMAL”

Main Contractor: SNC Lavalin & Worley Parsons “SLWP”.

July 2008 to July 2009: Lead Q.A/Q.C Engineer.

Name of Employer: Target Engineering Construction Co. Ltd.

Project : Offshore Associated Gas Project, Das Island, UAE

Client: Abu Dhabi Gas Liquifaction Company Ltd. (ADGAS)

Main Contractor: MEPI / TECHNIP.

Dec. 2007 to Jun. 2008: Senior Q.A/Q.C Engineer (Client Rep.).

Name of Employer: Bureau Veritas Egypt.

Project : Taurt Field Development

Client: British Petroleum Company (Egypt)

Main Contractor: Petrojet.

Sep. 2007 to Dec. 2007: Senior Q.A/Q.C Engineer (Main Contractor

Rep.).

Name of Employer: BUREAU VERITAS EGYPT.

Project : Salam Gas Trains 3 & 4 Project ( Fabrication Of

No. 17 Pressure Vessels )

Client: Khalda Petroleum Company (Egypt)

Main Contractor: Petrofac International Ltd.

Sub-Contractor: Petrojet

May 2007 to July 2007: Senior Q.A/Q.C Engineer (Contractor Rep.).

Name of Employer: Target Engineering Construction Co. Ltd.

Page 8: Abdelrahman ibrahim c v december 2015

Project : Replacement Of Cryogenic Heat Exchanger 3-E-

152-BUHASA (Shutdown Job) .

Client: Abu Dhabi Gas Industries Limited (GASCO).

Main Contractor: Target Engineering Construction Co. Ltd.

Apr. 2007 to May 2007: Senior Q.A/Q.C Engineer (Contractor Rep.).

Name of Employer: Target Engineering Construction Co. Ltd.

Project : PE-1 Black Project Intermediate Phase

(Shutdown Job).

Client: Abu Dhabi Polymers Company Limited(BOROUGE)

Main Contractor: Target Engineering Construction Co. Ltd.

Jan 2007 to Feb. 2007: Senior Q.A/Q.C Engineer (Contractor Rep.).

Name of Employer: Target Engineering Construction Co. Ltd.

Project : Repair & installation of piping and spool works plus

repair of 3”and4”RADIANT COILS (25 Cr 35 Ni &

35 Cr 45 Ni) Of two furnaces for Tie-In Shut Down

2007 in Borouge Petrochemical Plant.

Client: Abu Dhabi Polymers Company Limited(BOROUGE)

Main Contractor: Target Engineering Construction Co. Ltd.

Feb. 2006 to July 2007: Q.A/Q.C Engineer (Contractor Rep.)

Acting Senior of QA.QC Welding Engineers Started from Jan. 2007.

Name of Employer: Target Engineering Construction Co. Ltd.

Project : Construction Works for Jebbel Dhanna Tank Farm

Facilities Upgrade

Client: Abu Dhabi Company of Onshore Oil Operations

Main Contractor: Project Management Consulting Co. (PMC).

Aug. 2005 to Feb. 2006: Q.C Welding & NDT Engineer (Sub-

Contractor Rep.).

Name of Employer: Orascom Construction Company

Project: Ammonia / Urea Project Helwan

Client: Helwan Fertilizer Company (HFC)

Third Party: Germaincher Lioyed

Main Contractor: UHDE.

Jun. 2005 to Aug. 2005: Q.C Welding & NDT Engineer (Third Party Rep.).

Name of Employer: Germaincher Lioyed

Project: 30" Export Gas Line from Mubarak Field to

Hamriyah Port ( Offshore ) UAE

Page 9: Abdelrahman ibrahim c v december 2015

Client: Crescent Petroleum Company International Limited

(CPCIL)

Contractor: National Petroleum Construction Company (NPCC)

by Derrick Lay Barge DLP 1000. .

May 2005 to Jun. 2005: Q.C Welding & NDT Engineer (Client

Rep.).

Name of Employer: Egyptian Fertilizer Company (EFC)

Project: Ammonia / Urea Project Suez II

Contractor: Orascom.

Sept. 2004 to Apr. 2005: Senior Welding & NDT Engineer

(Contractor Rep.).

Name of Employer: Bonatti

Project: Western Libya Gas Project

Client: AGIP GAS BV

Main Contractor: Snamprogetti Lummus Gas.

From August 1999 to September 2004 with employer "OPCO"

July 2004 to Sep. 2004: Senior Welding & NDT Inspector

(Contractor Rep.).

Name of Employer: Egypt Gas (E.G)

Project: Maintenance of Amer 2&6 and Ghareb 1&12

Platforms Boat Landing

Client: General Egyptian Petroleum Co. (G.E.P.C).

Oct. 2003 up to Jul. 2004: Senior Welding & NDT Inspector

(Client Rep.)

Name of Employer: Badr El_Den Petroleum Company (BAPETCO).

Project: BED- 1 Tanks Repair

Contractor: Port Saeed Engineering Works (P.S.E.W)

Apr. 2003 to Oct. 2003: Senior Welding & NDT Inspector (Client

Rep.)

Name of Employer: Be SIX Orascom

Project: Damietta LNG Jetty Piles.

Contractor: National Steel Fabrication Company

Mar. 2003 to Apr. 2003: Welding & NDT Inspector (Client Rep.)

Name of Employer: GUPCO (Suez Gulf Petroleum Co.)

Project: NIPCO 1&2 Tanks Repair.

Contractor: PETROMAINT (Alexandria Petroleum Maintenance Co.)

Dec.2002 to Mar. 2003: Welding & NDT Inspector (Contractor

Page 10: Abdelrahman ibrahim c v december 2015

Rep.)

Name of Employer: Egyptian Maintenance Company (EMC).

Project: Tank Batteries Upgrading & Sub-Marine Pipelines.

Client: Pelaeem Petroleum Co. (PETROBEL)

Oct. 2002 to Dec. 2002: Welding & NDT Inspector (Client Rep.)

Name of Employer: EAST GAS COMPANY.

Project: El_Aresh - Tabba High Pressure Pipe Line

Contractor: Petrojet

Sep. 2002 to Oct. 2002: Welding & NDT Inspector (Client Rep.)

Name of Employer: Badr El_Den Petroleum Company (BAPETCO).

Project: Obayed Gas Plant Shutdown

Contractor: Petrojet / Enppi

Jul. 2002 to Aug. 2002: Welding & NDT Inspector (Client Rep.)

Name of Employer: Burulus Gas Company.

Project: SCARAAB/SAFRON 4" GLYCON Pipeline.& TIE IN of

30” Line ( Offshore )

Contractor: Petroleum Marine Service Company (PMS) Barge 12.

Jun. 2002 to Jul. 2002: Welding & NDT Inspector (Contractor

Rep.)

Name of Employer: Egyptian Maintenance Company (EMC).

Project: Bapetco Crossover Pipelines 12".

Client: Badr El-Den Petroleum Company (BAPETCO).

Aug. 2001 to Jun. 2002: Welding & NDT Inspector (Contractor

Rep.)

Name of Employer: Egyptian Maintenance Company (EMC).

Project: Fayum Gas Development.

Client: Fayum Gas Company.

Nov. 2000 to Aug. 2001: Welding & NDT Inspector (Client Rep.)

Name of Employer: South Dabaa Petroleum Company.

Project: 6 Crude Oil Storage Tanks & 2 Water Tanks and the

related piping facilities

Contractor: Petrojet.

Oct. 2000 to Nov. 2000:

Training Course in Nuclear Power Corporation about Dealing With Radiation

Sources Aug.2000 to Oct. 2000: Welding & NDT Inspector (Contractor

Rep.)

Page 11: Abdelrahman ibrahim c v december 2015

Name of Employer: Egypt Gas Company.

Project: Fire Fighting Water Tank (3000 M^3).

Client: Egyptian Fertilizer Company (EFC)/KRUPP AHUDA

May 2000 to Aug. 2000: Welding & NDT Inspector (Contractor

Rep.)

Name of Employer: Egypt Gas Company.

Project: 4 LPG Spherical Tanks (500 M^3) & Related Piping

Facilities

Client: H U Company.

Third Party: Beurru Veritas (B.V)

Jan. 2000 to may 2000: Welding & NDT Inspector (Contractor

Rep.)

Name of Employer: Egyptian Maintenance Company (EMC).

Project: 6th Of October City Gas Distribution Pipeline.

Client: National Gas Company.

Aug. 1999 to Jan. 2000: Welding & NDT Inspector (Contractor

Rep.)

Name of Employer: Egyptian Maintenance Company (EMC).

Project: Beni Suef Gas Distribution Pipeline.

Client: Nile Valley Gas Company.

1998 to 1999 as:

o Visual Welding Inspection.

o NDT Inspector Responsible & Carrying Out (RT, UT , MT , PT & VT )

o Witness on Welding Procedure Specification (WPS) & Welder

Qualification Tests (WQT).

In The Following Companies:

Quaron Company (Visual & PT on Crude Oil Tanks).

Arab Contractors, El-Massara (WPS & WQT, visual & UT on Giza Metro

Bridge).

Arab Contractors, (UT on Eion Mousa Power Station).

Arab Contractors, El-Massara (Thickness Measurement & Vacuum Test

on Isoris, Aurora & Palanimaly Ships).

Kolaly Engineering (WPS&WQT, Vacuum & RT for Mazot & Solar Tanks

and Boilers).

Kolaly Engineering (RT Interpretation for 2 Boilers in Suez Company for

Petroleum Refining).

Kolaly Engineering (UT for Steel Structure in Abu Rawash Work Shop).

Alex Technology (Visual & UT for Co2 Pressure Vessels in Dokky,

Assuit, Nasr City & Zagazig Coca-Cola Factories).

Cetro Masr Egypt (UT on Pipelines).

Petroleum Pipes Company (PT, Vacuum Tests on Floating Roof Oil

Tanks).

Page 12: Abdelrahman ibrahim c v december 2015

Mazen Steel (UT on Steel Structure).

1997 to 1998:

Production Engineer of Special Steel in Abu Zaabal Industrial Engineering

Company, Military Factory 100.

Training &

Courses

Auditor / Lead Auditor “ISO 9001:2008” by Intertek Moody International-

Egypt

Integrated Management System (I.M.S coarse) by “BSI” – Internal Auditor

Project Management Professional (P.M.P coarse) by “Cambridge

Institute/PMI”

Level II Ultrasonic Testing (UT). ASNT TC-1A

Level II Radiographic Testing (RT). ASNT TC-1A

Level II Magnetic Particle Inspection (MPI). ASNT TC-1A

Level II Dye Penetrant Inspection (DPI). ASNT TC-1A

Painting & Coating Training

CSWIP 3.2 SENIOR WELDING INSPECTOR (CERTIFICATE No. 32493/2)

CSWIP 3.1 WELDING INSPECTOR (CERTIFICATE No. 12196)

Ongoing Certified Manager of Quality/Organization Excellence “CMQ/OE”

course by Chicago Training Center-Qatar

Plan for API 510, 570, 653 this year

Plan for Six Sigma this year

Education 1992 - 1997: Suez Canal University – Suez – Egypt

B.Sc., Metallurgical Engineering (Faculty of petroleum & mining

engineering), with overall estimation “Good” and Project estimation of “Very

Good”.

Other Skills Computer:

Professionally using Windows, MS Office package.

Professionally using Excel and VBA for programming with Macros for various

work needs.

Presentation:

High Skills in designing and introducing technical presentations.

Languages:

Arabic (Mother tongue) & English (Very good command - written and

spoken).

Page 13: Abdelrahman ibrahim c v december 2015

Personal

Details

Date & place of Birth: 1st of Aug. 1974, Mansoora - Egypt.

Religion & nationality: Moslem, Egyptian.

Marital Status: Married with three Childs.

EGYPT Address: 5 Sayed Marey st., Flat no. 8, Nehayet Faisal, El-Haram, Giza, Egypt. (+20) 100 654 6775

Qatar Address: Flat no. 22, Building no. 9, Ezdan Al-Than Compound, Bin Mahmoud, Doha, Qatar. (+974) 6671 6398

Others Member of the Egyptian Society for NDT (ESNT)

Member in American Society for Quality (ASQ) membership no. 65421571

Holding Egyptian, Emirates, Qatar & International Driving Licenses.

References 1. Ahmed Elmorshedy, Senior QA/QC Manager, Qatar Petroleum “Q.P” – Qatar.

Tel: N.A Mob. +974 66895152

2. Razali Bin Mohd Rais, Senior Project Engineer, Qatar Petroleum “Q.P” –

Qatar. Tel: N.A Mob. +974 33174140

3. Moustafa Idrees, KSA Operation Manager, TARGET Eng. Const. Co – UAE.

Tel: +971505025060, +966509368707, +966545025060

[email protected] & [email protected]

4. Makram Samy, Project Manager, TARGET Eng. Const. Co – Qatar.

Tel: +97433552915

[email protected]

5. Waleed Rashad, TMOG Division Manager, TARGET Eng. Const. Co. – UAE.

Tel: +971506110920, Fax: +97126747017

[email protected]

6. Medhat Mounir, Bureauveritas-Egypt, Operation manager, Egypt.

Tel:+202 418 3020/ 418 2998, Fax:+202 418 3016

[email protected]

7. Ahmed El-Kousy, QA/QC Manager, OPCO Co. – Egypt.

Tel: +20127338288

[email protected]

December-2015