SAIC-A-2022 SAIC-L-2017 MATERIAL RECEIVING 1.3 Leak Testing Procedure SAIC-A-2005 3.0 APPLICATION Verification Inspection of Testing Equipment SAIC-A-2009 SAIC-A-2004 SAIC-A-2006 SAIC-A-2006 Post-Test Re-Instatement Procedure QUALITY PROCEDURE PROJECT PHASE & Activity Code SAUDI ARAMCO ID/PID FORM REV 1 - 010109 Rev 4 SAIC-A-2001 WBS/BI/JO/NO. COS 03/31/2010 PROJECT TITLE: QUALITY RECORD SPECIAL PROCESS (PRESSURE TESTING) REQUIRES BEST QUALITY PRACTICE, CPI & EFFICIENT METHODS IN PROCEDURES. PROPOSE BEST METHODS . Use SATR-A-2001 Safety Assessment on Equipment RH Use SATR-A-2008 In conjunction with SATIP-L-350-01 or the applicable Pipeline or Equipment SATIP. R H SAIC-A-2011 H W SAIC-A-2009 H W Verify Pneumatic Test Medium & Bubble Test Solution (Snoop, etc) 3.4 3.1 3.2 3.3 RH RH RH RH RH SAIC-A-2023 2.1 2.0 Internal Cleanliness or Flushing 1.2 Pre-Test Punch Listing DISCIPLINE: REMARKS MECHANICAL APPROVED DATE INSPECTION RESPONSIBILITY ASSIGNMENTS CONTRACTOR/SUBCONTRACTOR SAUDI ARAMCO Pneumatic Pressure Testing TASK / ACTIVITY SAUDI ARAMCO TYPICAL INSPECTION PLAN SATIP No. ITEM NO. 3.8 Filling & Pressurization a) Strength test b) Service test 3.6 Inspection of Pneumatic Pressure Test Bubble Leak Test @ 5-10 psig 3.7 3.5 Safe De-Pressurization Verification of Test Preparation Including safeguards & safety reqmts SAIC-A-2011 SAIC-A-2021 SAIC-A-2020 Include applicable Quality Records referenced SATR-A-2001, SATR-A-2002, SATR-A-2003 SATR-A-2006 Use SATR-A-2001 SAIC-A-2003 SAIC-L-2001 SAIC-L-2017 In Conjunction with SATIP-A-004-05 for Leak Testing Data Sheet req'd for solution. Soap Prohibited. In conjunction with SATIP-L-350-01 or the applicable Pipeline or Equipment SATIP. Submit Sample Test Package & Proposed Pressure Testing Procedure, *See also Notes 1 & 6 In Conjunction with SATIP-A-004-05 (Leak Testing) Note: A Leak Test at 5-10 psig is mandatory after all pneumatic strength tests & in systems where service tests are performed in lieu of pneumatic strength tests (Utility air and inert gases) RH R SAIC-A-2003 SAIC-A-2005 H SAIC-A-2023 In Conjunction with SATIP-A-004-05 (Leak Testing) Note: A Leak Test at 5-10 psig is mandatory after all pneumatic strength tests & in systems where service tests are performed in lieu of pneumatic strength tests (Utility air and inert gases) Use SATR-A-2010 In Conjunction with SATIP-A-004-05 (Leak Testing) H W W SAIC-A-2022 W H Use SATR-A-2001 In Conjunction with SATIP-A-004-05 (Leak Testing) S S 4.0 POST- TEST H Use SATR-A-2007, SATR-A-2011 Verify completion of Reinstatement & Certify Test Pkg. Incomplete items go to FEIL for MCC SAIC-A-2006 4.2 Post-Test Re-Instatement Inspection SAIC-A-2006 H Pressure Testing Procedure 1.5 Line Flushing or Internal Cleanliness Procedure 1.4 1.1 DOCUMENT REVIEW Pressure Test Package Preparation 1.0 SAIC-A-2001 RH 31-Aug-11 For all Pressure Testing (Pneumatic Test, Hydrotest) CNTRCTR SAIC-A-2020 SAIC-A-2021 SATIP-A-004-01 RH Required Per SAEP-1160, Section 8 SAIC-A-2004 SAIC-L-2001 RH H SAIC-A-2010 Use SATR-A-2007 In conjunction with SATIP-L-350-01 or the applicable Pipeline or Equipment SATIP. SAIC-A-2010 H H Page 1 of 3

Upload: sameer313

Post on 08-Jul-2016

215 views

Category:

Documents


4 download

DESCRIPTION

mvhjfjno;uv mj

TRANSCRIPT

Page 1: abcd

SAIC-A-2022

SAIC-L-2017

MATERIAL RECEIVING

1.3 Leak Testing Procedure SAIC-A-2005

3.0 APPLICATION

Verification Inspection of Testing

EquipmentSAIC-A-2009

SAIC-A-2004

SAIC-A-2006 SAIC-A-2006Post-Test Re-Instatement Procedure

QUALITY

PROCEDURE

PROJECT PHASE &

Activity Code

SAUDI ARAMCO ID/PID FORM REV 1 - 010109 Rev 4

SAIC-A-2001

WBS/BI/JO/NO.

COS 03/31/2010

PROJECT TITLE:

QUALITY

RECORD

SPECIAL PROCESS (PRESSURE TESTING) REQUIRES BEST QUALITY PRACTICE, CPI & EFFICIENT METHODS IN PROCEDURES. PROPOSE BEST METHODS.

Use SATR-A-2001 Safety Assessment on Equipment

RH

Use SATR-A-2008 In conjunction with SATIP-L-350-01

or the applicable Pipeline or Equipment SATIP.

R

H

SAIC-A-2011 H W

SAIC-A-2009 H W

Verify Pneumatic Test Medium & Bubble

Test Solution (Snoop, etc)

3.4

3.1

3.2

3.3

RHRH

RH

RHRH

SAIC-A-2023

2.1

2.0

Internal Cleanliness or Flushing

1.2

Pre-Test Punch Listing

DISCIPLINE:

REMARKS

MECHANICAL

APPROVED DATE

INSPECTION RESPONSIBILITY

ASSIGNMENTS

CONTRACTOR/SUBCONTRACTOR

SAUDI

ARAMCO

Pneumatic Pressure Testing

TASK / ACTIVITY

SAUDI ARAMCO TYPICAL INSPECTION PLANSATIP No.

ITEM

NO.

3.8

Filling & Pressurization

a) Strength test

b) Service test

3.6 Inspection of Pneumatic Pressure Test

Bubble Leak Test @ 5-10 psig

3.7

3.5

Safe De-Pressurization

Verification of Test Preparation Including

safeguards & safety reqmtsSAIC-A-2011

SAIC-A-2021

SAIC-A-2020

Include applicable Quality Records referenced

SATR-A-2001, SATR-A-2002, SATR-A-2003

SATR-A-2006

Use SATR-A-2001

SAIC-A-2003

SAIC-L-2001

SAIC-L-2017

In Conjunction with SATIP-A-004-05 for Leak Testing

Data Sheet req'd for solution. Soap Prohibited.

In conjunction with SATIP-L-350-01 or the applicable

Pipeline or Equipment SATIP.

Submit Sample Test Package & Proposed Pressure

Testing Procedure, *See also Notes 1 & 6

In Conjunction with SATIP-A-004-05 (Leak Testing) Note: A Leak Test at 5-10 psig is mandatory after all pneumatic

strength tests & in systems where service tests are performed in

lieu of pneumatic strength tests (Utility air and inert gases)

RH RSAIC-A-2003

SAIC-A-2005

H

SAIC-A-2023

In Conjunction with SATIP-A-004-05 (Leak Testing) Note: A Leak Test at 5-10 psig is mandatory after all pneumatic

strength tests & in systems where service tests are performed in

lieu of pneumatic strength tests (Utility air and inert gases)

Use SATR-A-2010 In Conjunction with SATIP-A-004-05

(Leak Testing)

H

W

W

SAIC-A-2022 W

H

Use SATR-A-2001 In Conjunction with SATIP-A-004-05

(Leak Testing)

S

S

4.0 POST- TEST

H

Use SATR-A-2007, SATR-A-2011 Verify completion of

Reinstatement & Certify Test Pkg. Incomplete items go to

FEIL for MCC

SAIC-A-20064.2 Post-Test Re-Instatement Inspection SAIC-A-2006 H

Pressure Testing Procedure

1.5Line Flushing or Internal Cleanliness

Procedure

1.4

1.1

DOCUMENT REVIEW

Pressure Test Package Preparation

1.0

SAIC-A-2001 RH

31-Aug-11

For all Pressure Testing (Pneumatic Test, Hydrotest)

CNTRCTR

SAIC-A-2020

SAIC-A-2021

SATIP-A-004-01

RH

Required Per SAEP-1160, Section 8

SAIC-A-2004

SAIC-L-2001 RH

H

SAIC-A-2010Use SATR-A-2007 In conjunction with SATIP-L-350-01 or

the applicable Pipeline or Equipment SATIP.SAIC-A-2010 H H

Page 1 of 3

Page 2: abcd

QUALITY

PROCEDURE

PROJECT PHASE &

Activity Code

SAUDI ARAMCO ID/PID FORM REV 1 - 010109 Rev 4

WBS/BI/JO/NO.

COS 03/31/2010

PROJECT TITLE:

QUALITY

RECORD

SPECIAL PROCESS (PRESSURE TESTING) REQUIRES BEST QUALITY PRACTICE, CPI & EFFICIENT METHODS IN PROCEDURES. PROPOSE BEST METHODS.

DISCIPLINE:

REMARKS

MECHANICAL

APPROVED DATE

INSPECTION RESPONSIBILITY

ASSIGNMENTS

CONTRACTOR/SUBCONTRACTOR

SAUDI

ARAMCO

Pneumatic Pressure Testing

TASK / ACTIVITY

SAUDI ARAMCO TYPICAL INSPECTION PLANSATIP No.

ITEM

NO.

DOCUMENT REVIEW1.0

31-Aug-11

CNTRCTR

SATIP-A-004-01

Page 2 of 3

Page 3: abcd

QUALITY

PROCEDURE

PROJECT PHASE &

Activity Code

SAUDI ARAMCO ID/PID FORM REV 1 - 010109 Rev 4

WBS/BI/JO/NO.

COS 03/31/2010

PROJECT TITLE:

QUALITY

RECORD

SPECIAL PROCESS (PRESSURE TESTING) REQUIRES BEST QUALITY PRACTICE, CPI & EFFICIENT METHODS IN PROCEDURES. PROPOSE BEST METHODS.

DISCIPLINE:

REMARKS

MECHANICAL

APPROVED DATE

INSPECTION RESPONSIBILITY

ASSIGNMENTS

CONTRACTOR/SUBCONTRACTOR

SAUDI

ARAMCO

Pneumatic Pressure Testing

TASK / ACTIVITY

SAUDI ARAMCO TYPICAL INSPECTION PLANSATIP No.

ITEM

NO.

DOCUMENT REVIEW1.0

31-Aug-11

CNTRCTR

SATIP-A-004-01

Surveillance: QA/QC organization to monitor work in progress without notice from Construction Organization.

Witness: QA/QC organization shall be notified of the timing of Inspection or test in advance. However, the inspection or test shall be performed as scheduled if the QA/QC organization representative is not

present.

GENERAL NOTES

The first three incidents of each Inspection or testing activity listed require 100 % participation by Saudi Aramco Site Inspection Personnel. After this period, Saudi Aramco Inspection may adjust the levels of

Saudi Aramco participation based upon the Contractor’s performance.

4

3

1

2

Hold: QA/QC organization shall be notified of the timing of inspection or test in advance. Inspection or test shall not be carried out without the QA/QC organization representative in attendance.

100% Hold Point for QC Inspection or Test. R Review of Documents

Witness Inspection/Test RH Review and Approval of DocumentsW

LEGEND

6For Test Package Preparation & review on large projects, each new system designed for testing is thoroughly reviewed & approved. All subsequent packages within a given system shall be built following the

"Copy & Paste" theme for Test Package efficiency and R2 (Sample Review of documents) may be performed.

H

If the Main Contractor delegates the assigned responsibility to the Subcontractor, then the Main Contractor will have the same degree of responsibility as assigned to Saudi Aramco.5

Page 3 of 3