MATERIAL RECEIVING
1.3 Leak Testing Procedure SAIC-A-2005
3.0 APPLICATION
Verification Inspection of Testing
EquipmentSAIC-A-2009
SAIC-A-2004
SAIC-A-2006 SAIC-A-2006Post-Test Re-Instatement Procedure
QUALITY
PROCEDURE
PROJECT PHASE &
Activity Code
SAUDI ARAMCO ID/PID FORM REV 1 - 010109 Rev 4
SAIC-A-2001
WBS/BI/JO/NO.
COS 03/31/2010
PROJECT TITLE:
QUALITY
RECORD
SPECIAL PROCESS (PRESSURE TESTING) REQUIRES BEST QUALITY PRACTICE, CPI & EFFICIENT METHODS IN PROCEDURES. PROPOSE BEST METHODS.
Use SATR-A-2001 Safety Assessment on Equipment
RH
Use SATR-A-2008 In conjunction with SATIP-L-350-01
or the applicable Pipeline or Equipment SATIP.
R
H
SAIC-A-2011 H W
SAIC-A-2009 H W
Verify Pneumatic Test Medium & Bubble
Test Solution (Snoop, etc)
3.4
3.1
3.2
3.3
RHRH
RH
RHRH
SAIC-A-2023
2.1
2.0
Internal Cleanliness or Flushing
1.2
Pre-Test Punch Listing
DISCIPLINE:
REMARKS
MECHANICAL
APPROVED DATE
INSPECTION RESPONSIBILITY
ASSIGNMENTS
CONTRACTOR/SUBCONTRACTOR
SAUDI
ARAMCO
Pneumatic Pressure Testing
TASK / ACTIVITY
SAUDI ARAMCO TYPICAL INSPECTION PLANSATIP No.
ITEM
NO.
3.8
Filling & Pressurization
a) Strength test
b) Service test
3.6 Inspection of Pneumatic Pressure Test
Bubble Leak Test @ 5-10 psig
3.7
3.5
Safe De-Pressurization
Verification of Test Preparation Including
safeguards & safety reqmtsSAIC-A-2011
SAIC-A-2021
SAIC-A-2020
Include applicable Quality Records referenced
SATR-A-2001, SATR-A-2002, SATR-A-2003
SATR-A-2006
Use SATR-A-2001
SAIC-A-2003
SAIC-L-2001
SAIC-L-2017
In Conjunction with SATIP-A-004-05 for Leak Testing
Data Sheet req'd for solution. Soap Prohibited.
In conjunction with SATIP-L-350-01 or the applicable
Pipeline or Equipment SATIP.
Submit Sample Test Package & Proposed Pressure
Testing Procedure, *See also Notes 1 & 6
In Conjunction with SATIP-A-004-05 (Leak Testing) Note: A Leak Test at 5-10 psig is mandatory after all pneumatic
strength tests & in systems where service tests are performed in
lieu of pneumatic strength tests (Utility air and inert gases)
RH RSAIC-A-2003
SAIC-A-2005
H
SAIC-A-2023
In Conjunction with SATIP-A-004-05 (Leak Testing) Note: A Leak Test at 5-10 psig is mandatory after all pneumatic
strength tests & in systems where service tests are performed in
lieu of pneumatic strength tests (Utility air and inert gases)
Use SATR-A-2010 In Conjunction with SATIP-A-004-05
(Leak Testing)
H
W
W
SAIC-A-2022 W
H
Use SATR-A-2001 In Conjunction with SATIP-A-004-05
(Leak Testing)
S
S
4.0 POST- TEST
H
Use SATR-A-2007, SATR-A-2011 Verify completion of
Reinstatement & Certify Test Pkg. Incomplete items go to
FEIL for MCC
SAIC-A-20064.2 Post-Test Re-Instatement Inspection SAIC-A-2006 H
Pressure Testing Procedure
1.5Line Flushing or Internal Cleanliness
Procedure
1.4
1.1
DOCUMENT REVIEW
Pressure Test Package Preparation
1.0
SAIC-A-2001 RH
31-Aug-11
For all Pressure Testing (Pneumatic Test, Hydrotest)
CNTRCTR
SAIC-A-2020
SAIC-A-2021
SATIP-A-004-01
RH
Required Per SAEP-1160, Section 8
SAIC-A-2004
SAIC-L-2001 RH
H
SAIC-A-2010Use SATR-A-2007 In conjunction with SATIP-L-350-01 or
the applicable Pipeline or Equipment SATIP.SAIC-A-2010 H H
Page 1 of 3
QUALITY
PROCEDURE
PROJECT PHASE &
Activity Code
SAUDI ARAMCO ID/PID FORM REV 1 - 010109 Rev 4
WBS/BI/JO/NO.
COS 03/31/2010
PROJECT TITLE:
QUALITY
RECORD
SPECIAL PROCESS (PRESSURE TESTING) REQUIRES BEST QUALITY PRACTICE, CPI & EFFICIENT METHODS IN PROCEDURES. PROPOSE BEST METHODS.
DISCIPLINE:
REMARKS
MECHANICAL
APPROVED DATE
INSPECTION RESPONSIBILITY
ASSIGNMENTS
CONTRACTOR/SUBCONTRACTOR
SAUDI
ARAMCO
Pneumatic Pressure Testing
TASK / ACTIVITY
SAUDI ARAMCO TYPICAL INSPECTION PLANSATIP No.
ITEM
NO.
DOCUMENT REVIEW1.0
31-Aug-11
CNTRCTR
SATIP-A-004-01
Page 2 of 3
QUALITY
PROCEDURE
PROJECT PHASE &
Activity Code
SAUDI ARAMCO ID/PID FORM REV 1 - 010109 Rev 4
WBS/BI/JO/NO.
COS 03/31/2010
PROJECT TITLE:
QUALITY
RECORD
SPECIAL PROCESS (PRESSURE TESTING) REQUIRES BEST QUALITY PRACTICE, CPI & EFFICIENT METHODS IN PROCEDURES. PROPOSE BEST METHODS.
DISCIPLINE:
REMARKS
MECHANICAL
APPROVED DATE
INSPECTION RESPONSIBILITY
ASSIGNMENTS
CONTRACTOR/SUBCONTRACTOR
SAUDI
ARAMCO
Pneumatic Pressure Testing
TASK / ACTIVITY
SAUDI ARAMCO TYPICAL INSPECTION PLANSATIP No.
ITEM
NO.
DOCUMENT REVIEW1.0
31-Aug-11
CNTRCTR
SATIP-A-004-01
Surveillance: QA/QC organization to monitor work in progress without notice from Construction Organization.
Witness: QA/QC organization shall be notified of the timing of Inspection or test in advance. However, the inspection or test shall be performed as scheduled if the QA/QC organization representative is not
present.
GENERAL NOTES
The first three incidents of each Inspection or testing activity listed require 100 % participation by Saudi Aramco Site Inspection Personnel. After this period, Saudi Aramco Inspection may adjust the levels of
Saudi Aramco participation based upon the Contractor’s performance.
4
3
1
2
Hold: QA/QC organization shall be notified of the timing of inspection or test in advance. Inspection or test shall not be carried out without the QA/QC organization representative in attendance.
100% Hold Point for QC Inspection or Test. R Review of Documents
Witness Inspection/Test RH Review and Approval of DocumentsW
LEGEND
6For Test Package Preparation & review on large projects, each new system designed for testing is thoroughly reviewed & approved. All subsequent packages within a given system shall be built following the
"Copy & Paste" theme for Test Package efficiency and R2 (Sample Review of documents) may be performed.
H
If the Main Contractor delegates the assigned responsibility to the Subcontractor, then the Main Contractor will have the same degree of responsibility as assigned to Saudi Aramco.5
Page 3 of 3